Loading...
21-256 Service Order #13 dated 10-3-23 Elcor Replace 200A Breaker at Service Center - 2024-229 CITY OF CUPERTINO MASTER AGREEMENT CONSULTANT SERVICES SERVICE ORDER NO. MASTER AGREEMENT #:MA Date: Maximum Compensation: Consultant:Firm Name: Address: Contact: Ph: Email Address: Project Name: Description: (simple project description if appropriate) Attachment A: Includes Description of Project, Scope of Service, Schedule of Performance and Compensation City Project Management Managing Department: Public Works Project Manager: Fiscal/Budget : SO Acc't #:PO #: Project #:Date: Approvals: Date: Date: Appropriation Certification: I hereby certify that an unexpended appropriation is available in the above fund for the above contract as estimated and that fund are available as of this date of signature City Finance:Date: Consultant: Manager: Management Analyst Master Agreement Maximum Compensation: Master Agreement Unencumbered Balance: Total Previously Encumbered to Date: MA End Date: Encumbrance this Service Order: City of Cupertino Master Agreement Service Order 2022-005 8/5/2021 $150,000 6/30/2025 Elcor Electric, Inc 3310 Bassett St, Santa Clara, CA 95054 Troy Martinez 408.986.1320 Nathan Vasquez $150,000 $76,794 $7,882 $65,324 100-87-829 700-702 N/A TBD 10-2-2023 14 tmartinez@elcorelectric.com 4 4 200A Breaker Estimate 9-27-2023 Repair and replace the 200A Breaker (RL-1) at Service Center Troy Martinez Oct 3, 2023 Oct 3, 2023 Oct 3, 2023 September 27, 2023 Mr. Nathan Vasquez City of Cupertino 21251 Stevens Creek Boulevard Cupertino, CA 95014 RE: Public Works – 200A Breaker 10555 Mary Ave., Cupertino, CA Electrical Proposal Dear Mr. Vasquez, We are pleased to submit our proposal for the above referenced project. This proposal was developed from direction provided by the City of Cupertino and a review of the site conducted by Elcor Electric. Our proposal, with qualifications, is as follows: Scope of Work •Remove existing 200A breaker labeled RL-1. •Replace with refurbished 200A Westinghouse breaker. •Provide 7-day power monitoring of new 200A breaker for future work. •Submit a final report. •This proposal assumes work needs to be completed by Saturday 10/7/23. •This proposal assumes all work, except for the power monitoring, shall be performed over a weekend at double time rates. •We are excluding design, drawings, permit, any other special systems, fire alarm system, liquidated damages, existing code violations, any paint and/or patch. Our total bid price for this project is $ 7,882. Bid Breakdown Labor Straight Time: $ 1,944 Double Time: $ 4,680 Material: $ 1,258 The above price is good for twenty (20) days. If you have any questions regarding this proposal, please contact the undersigned at your convenience. Sincerely, Troy Martinez Troy Martinez ELCOR ELECTRIC Proposal/City of Cupertino– Public Works – 200A Breaker 9.27.23 Elcor SO 13 Replace 200A Breaker at Service Center Final Audit Report 2023-10-03 Created:2023-10-02 By:Jindy Gonzalez (jindyg@cupertino.org) Status:Signed Transaction ID:CBJCHBCAABAAGvm6E-h_91tCBWWnjDzZvHwvTxBbXn6u "Elcor SO 13 Replace 200A Breaker at Service Center" History Document created by Jindy Gonzalez (jindyg@cupertino.org) 2023-10-02 - 10:36:08 PM GMT Document emailed to tmartinez@elcorelectric.com for signature 2023-10-02 - 10:37:14 PM GMT Email viewed by tmartinez@elcorelectric.com 2023-10-02 - 10:41:16 PM GMT Signer tmartinez@elcorelectric.com entered name at signing as Troy Martinez 2023-10-03 - 2:01:51 PM GMT Document e-signed by Troy Martinez (tmartinez@elcorelectric.com) Signature Date: 2023-10-03 - 2:01:53 PM GMT - Time Source: server Document emailed to Nathan Vasquez (nathanv@cupertino.org) for signature 2023-10-03 - 2:01:54 PM GMT Email viewed by Nathan Vasquez (nathanv@cupertino.org) 2023-10-03 - 2:13:14 PM GMT Document e-signed by Nathan Vasquez (nathanv@cupertino.org) Signature Date: 2023-10-03 - 2:13:32 PM GMT - Time Source: server Document emailed to Julia Kinst (juliak@cupertino.org) for signature 2023-10-03 - 2:13:33 PM GMT Document e-signed by Julia Kinst (juliak@cupertino.org) Signature Date: 2023-10-03 - 2:38:26 PM GMT - Time Source: server Agreement completed. 2023-10-03 - 2:38:26 PM GMT