Loading...
21-197 Sevice Order #13 Elcor for Check Receptacles for Proper Generator Voltage at City Hall (Vasquez) PO 2023-469 CITY OF CUPERTINO MASTER AGREEMENT CONSULTANT SERVICES SERVICE ORDER NO. MASTER AGREEMENT #:MA Date: Maximum Compensation: Consultant:Firm Name: Address: Contact: Ph: Email Address: Project Name: Description: (simple project description if appropriate) Attachment A: Includes Description of Project, Scope of Service, Schedule of Performance and Compensation City Project Management Managing Department: Public Works Project Manager: Fiscal/Budget : SO Acc't #:PO #: Project #:Date: Approvals: Date: Date: Appropriation Certification: I hereby certify that an unexpended appropriation is available in the above fund for the above contract as estimated and that fund are available as of this date of signature City Finance:Date: Consultant: Manager: Management Analyst Master Agreement Maximum Compensation: Master Agreement Unencumbered Balance: Total Previously Encumbered to Date: MA End Date: Encumbrance this Service Order: City of Cupertino Master Agreement Service Order 2022-005 8/5/2021 $150,000 6/30/2025 Elcor Electric, Inc 3310 Bassett St, Santa Clara, CA 95054 Troy Martinez 408.986.1320 Check receptacles for proper generator voltage at City Hall Proposal for Elcor Job # 231057 Nathan Vasquez $150,000 $76,310 $484 $73,206 100-87-827 700-702 N/A TBD 4-17-2023 13 tmartinez@elcorelectric.com 4 4 Troy Martinez Apr 18, 2023 Apr 19, 2023 Apr 19, 2023 MISC.332 -SERVICE 2023 Elcor Job #231057 Requestor Nathan V. Building 10300 Torre Ave Date:3/30/2023 Change Order #: Client Address: Scope of Work This change order only covers the material, labor, and equipment specifically identified below, and does not include compensation for any impact resulting from the changed scope of work or any delays resulting from the approval process. Elcor reserves the right to correct this quote for errors and omissions and reserves the right to claim for any impact and consequential costs incurred from this change. This price is good for acceptance within 20 days from receipt. Per City of Cupertino's direction, this breakdown represents the labor to urgently check receptacles for proper voltage in the City Hall Building. We checked the voltage in the telephone room and showed the facilities which panels are being fed from the generator. Itemized Breakdown Summary Foreman (2.00 Hrs @ $187.00) 374.00 Total Labor 374.00 Service Vehicle (Per Day)(0.50 @ 0.00 @ $50.00 + 0.000 % + 0.000 % + 0.000 %) 25.00 Administrative Fee (1.00 @ 0.00 @ $85.00 + 0.000 % + 0.000 % + 0.000 %) 85.00 Subtotal 484.00 Final Amount $484.00 CUSTOMER:________________________________________________________________________JOB #: ______________________________ SITE NAME: ____________________________________________________________________________________________DATE: _______________________________ ADDRESS: __________________________________________________________CONTACT: ___________________________________________________________ ________________________________________________________________________PHONE: _______________________________________________________________ DESC. OF WORK: _____________________________________________________________________________________________________________________________ ____________________________________________________________________________________________________________________________________________________ ____________________________________________________________________________________________________________________________________________________ 3310 Bassett Street, Santa Clara, CA 95054 t 408.986.1320 f 408.986.1324 Lic 500228 QTY. EMPLOYEE TOTAL DATE AND HOURS DESCRIPTION OF MATERIAL UNIT COST U EXT. PRICE MATERIALS TAX EQUIPMENT RENTAL MARK-UP % SUBTOTAL LABOR TOTAL AUTHORIZED SIGNATURE: X _______________________________________________ DATE: ________________________ PRINT NAME: X ___________________________________________________________ WORK ORDER _________ - ___________ VEHICLE AND EQUIPMENT RENTAL SUBCONTRACTORS MT WT F S S City of Cupertino 231057 City of Cupertino - City Hall 3/15/23 10300 Torre Ave Cupertino Ca Nathan V 408-614-4001 Check receptacles for proper voltage in City Hall building Notes: Received an emergency service request from Nathan to ensure Voltage is correct in telephone room and to show facilities which panels are being fed from the generator. 3/15 Casem,Ross 2 SO #13 Elcor for Repair ADA Controller Power at Community Hall Final Audit Report 2023-04-19 Created:2023-04-17 By:Jindy Garfias (jindyg@cupertino.org) Status:Signed Transaction ID:CBJCHBCAABAAaF59u2gxDmTSvd1D_3YzXthHOYWEbuZQ "SO #13 Elcor for Repair ADA Controller Power at Community H all" History Document created by Jindy Garfias (jindyg@cupertino.org) 2023-04-17 - 11:30:27 PM GMT Document emailed to tmartinez@elcorelectric.com for signature 2023-04-17 - 11:31:48 PM GMT Email viewed by tmartinez@elcorelectric.com 2023-04-18 - 1:37:06 PM GMT Signer tmartinez@elcorelectric.com entered name at signing as Troy Martinez 2023-04-18 - 2:46:09 PM GMT Document e-signed by Troy Martinez (tmartinez@elcorelectric.com) Signature Date: 2023-04-18 - 2:46:11 PM GMT - Time Source: server Document emailed to Nathan Vasquez (nathanv@cupertino.org) for signature 2023-04-18 - 2:46:12 PM GMT Document e-signed by Nathan Vasquez (nathanv@cupertino.org) E-signature obtained using URL retrieved through the Adobe Acrobat Sign API Signature Date: 2023-04-19 - 1:06:05 PM GMT - Time Source: server Document emailed to Julia Kinst (juliak@cupertino.org) for signature 2023-04-19 - 1:06:07 PM GMT Document e-signed by Julia Kinst (juliak@cupertino.org) Signature Date: 2023-04-19 - 2:00:58 PM GMT - Time Source: server Agreement completed. 2023-04-19 - 2:00:58 PM GMT Names and email addresses are entered into the Acrobat Sign service by Acrobat Sign users and are unverified unless otherwise noted.