CC 11-15-2022 Item No. 24. City Hall Renovation Project Update_Staff PresentationCity Hall Project – Update November 15, 2022 City Council CC 11-15-2022 Item No. 24 Recommended Action 1. Receive report of the City Hall Project Subcommittee; and 2. Direct staff to include the City Hall Renovation Project as part of the fiscal year 2023-24 proposed Capital Improvement Program (CIP) project and budget. CIP Program – City Hall project Recommendation Action City Hall Project Update AGENDA 1.Background 2.Subcommittee Discussions a.Site Tour b.Seismic & Infrastructure c.EOC d.Space Programming e.Parking f.Funding 3.Recommendations November 15, 2022 Background Information City Hall Renovation / Replacement and Library Parking Garage: Design & Construction SEISMIC ADA/ACCESSIBILITY MECH, ELECT, PLUMBING & IT PROGRAMMING (INTERIOR) FUTURE-PROOFING / + STORY PARKING $79.6M SEISMIC + ACCESSIBILITY + MEP + INTERIOR/PROGRAMMING + STORY + PARKING Cost & Scope Scenarios from May 3, 2022 CIP presentation CM Moore and Willey were nominated for the subcommittee (July 19) The task of the Subcommittee was to review the City Hall facility, evaluate viable solutions and bring forward recommendations for Council’s consideration. The review would include options for seismic upgrades to the existing building, renovations to the existing building, replacement of the existing building, and other elements to support ongoing city operations. City Hall Project subcommittee Subcommittee Discussions a. [Introduction and Site Tour] b. Seismic Deficiencies and Options c. Emergency Operations Center (EOC) needs and options d. Space Programming e. Parking f. Funding Options and Recommendations Project Discussion Topics Site Tour Project Introduction While the focus of the reports* may vary, the findings are consistent: •The concrete structural elements do not have sufficient ductility to resist seismic lateral loads without sustaining significant damage. Damage to these critical structural gravity load-resisting elements could result in collapse of the roof structure. The life safety and economic risk could be substantial. •The building does not comply with either the Risk Category IV (Essential Services Facility) or Risk Category II (regular Office Building) evaluation criteria unless a seismic strengthening is undertaken. * The 2021 structural report findings are similar to the findings in the 2005, 2006, 2011, 2012 and 2014 reports. Seismic & Infrastructure Considerations Summary 1. Seismic Upgrade of the building: will trigger some additional work, like ADA/Accessibility improvements. 2. HVAC and other Infrastructure systems: how can you not replace these systems that are 50+ years old? 3. Seismic + HVAC/Infrastructure + Accessibility/ADA work will affect over 75% of the building, which leads us to consider a full interior renovation project. 4. Essential Facility (Risk Category IV) or not (Risk Category II)? Seismic & Infrastructure Considerations Scope of Work Scenarios Summary: It is well-documented that many structural engineers recommend that the 1965 City Hall building be seismically retrofit. The HVAC and other infrastructure systems are also significantly past their useful life and require replacement. We recommend a full seismic/ structural upgrade, as well as a complete reconstruction of all infrastructure systems such as HVAC and life safety systems.Council can consider proceeding with the City Hall project in Risk Category II or Risk Category IV. Seismic & Infrastructure Considerations Recommendations EOC Current Location (+/-1400 sq. ft.) Summary: On October 18, Council gave approval to proceed with programming, design, and construction of the City Hall Annex building as the City’s Permit Center and Emergency Operations Center (EOC). Council can consider proceeding with the City Hall project in Risk Category II or Risk Category IV. EOC Recommendations 61 seats, 9,950 sq ft 65 seats, 11,500 sq ft 21,450 sq ft with 126 seats = 170 sq ft per person Space Programming (Interior) Current Floor Plans Current Staff headcount at City Hall: 130 people Move 25 occupants to City Hall Annex = 105 occupants (does the Annex become a permanent Permit Center?) Accounting for Population Growth: •10% increase: 116 people •20% increase: 126 people Accounting for Telework: •Current headcount + 10% Growth – 30% WFH = 84 people •Current headcount + 20% Growth – 20% WFH = 105 people *** 21,450 sq. ft. / 105 people = +/- 204 sq. ft./person *** Space Programming (Interior) Growth Projections Summary: We believe the current footprint of City Hall can accommodate the Staff, Council offices and support functions such as community meeting rooms, planning for 20% growth and leveraging an efficient Telework policy that allows for 20% to be working remotely. We do not recommend the expansion of City Hall in order to address workplace overcrowding at this time. We recommend a full interior renovation to make better use of the interior space. Space Programming (Interior) Recommendations PROPOSED PROJECTS Parking Proposed Parking Improvements EXISTING CONDITIONS PROPOSED PROJECTS Summary: Since the pandemic has disrupted the parking patterns at Civic Center, it is difficult to ascertain the present and future parking needs at Civic Center. Assuming the City Hall building will not be expanding its footprint, we recommend the immediate implementation of new surface parking along the rear of Community Hall (+16 spaces) , and plan for future surface parking along the north edge of Library field (+21 spaces, approximately). Parking Recommendations Project Size Funding Options Considerations Small ($7M) Use of General Fund (GF) Fund Unassigned Fund Balance (FB) or General Fund Capital Reserve Would leave Capital Reserve in GF and the Capital Fund intact for additional future projects Medium ($26M-44M) Use of both GF Unassigned FB and GF Capital Reserve Would limit future CIPs Large (Over $45M) Debt Financing Could wipe out several reserves leaving only economic uncertainty remaining should the City require additional funding. Limit future CIPs. Funding Cost Estimates Element Area SF Cost / SF 2023 Project Total (+25% soft costs) 2024 Project Total (5% escalation) City Hall Renovation - Seismic Only, Non-Essential Facility 24,140 $216 $6,506,635 $6,831,967 City Hall Renovation - Seismic Only, Essential Facility 24,140 $232 $7,007,540 $7,357,917 City Hall Renovation - Seismic, MEP/IT, Interior gut, Non-Essential Facility 24,140 $807 $24,364,200 $25,582,410 City Hall Renovation - Seismic, MEP/IT, Interior gut, Essential Facility 24,140 $868 $26,194,616 $27,504,347 City Hall Replacement, Non-Essential Facility 24,140 $804 $24,250,139 $25,462,646 City Hall Replacement, Essential Facility 24,140 $908 $27,401,918 $28,772,013 City Hall Replacement w/ Added Floor, Non-Essential Facility 36,140 $809 $36,547,027 $38,374,378 City Hall Replacement w/ Added Floor, Essential Facility 36,140 $914 $41,271,880 $43,335,474 City Hall Replacement w/ Added Floor + 100 spaces Underground parking, Non-Essential Facility 70,140 $529 $46,339,451 $48,656,424 City Hall Replacement w/ Added Floor + 100 spaces Underground parking, Essential Facility 70,140 $582 $51,064,305 $53,617,520 Funding Cost Estimates We recommend proceeding with the Full Renovation of City Hall building (Seismic, HVAC, IT, Interiors, etc.), budgeting $26M, as part of FY23-28 CIP. Council can also consider upgrading to “Essential Facility” standards ($4M). •We also recommend adding parking behind Community Hall, budgeting $350,000 (scope and budget to be confirmed) as part of the existing $1M Civic Center Parking project •FY23-28 CIP proposal will include a Library Parking project, and an additional project to plan for City Hall demobilization/mobilization requirements and communications. CIP Program – City Hall project Recommendations Thank You!