Loading...
DIR-2022-005 Action Letter CITY OF CUPERTINO 10300 Torre Avenue, Cupertino, California 95014 (408) 777-3308 To: Mayor and City Council Members Chairperson and Planning Commissioners From: Benjamin Fu, Director of Community Development BH for BF Prepared by: Brianne Harkousha, Associate Planner Date: September 28, 2022 Subject: Director's Minor Modification, DIR-2022-005, to consider (1) a 124 sq. ft. one-story addition and 675 sq. ft. internal conversion to construct an attached ADU, (2) a 404 sq. ft. one-story addition to construct a sunroom at an existing single-family residence located at 22229 Hammond Way and in the Oak Valley Planned Development (U-1997-06) and modifications to the design approved for ASA-1998-25. Chapter 19.164 of the Cupertino Municipal Code allows for administrative approval of minor changes in a project. The Director reports the decision to the City Council and Planning Commission in time to allow an appeal of the decision within 14 calendar days. BACKGROUND The applicant, Louie Leu Architect, and property owner, Francois and Kelly Delepine are proposing to construct the following at an existing single-family home at 22229 Hammond Way, in addition to modifications to the design approved for ASA-1998-25: ■ An ADU by adding 124 sq. ft. and converting 675 sq. ft. of existing area, ■ A 404 sq. ft. sunroom The subject property is located in the Oak Valley neighborhood in the northwest part of the City. The Oak Valley Planned Development is a planned single-family residential development located adjacent to Rancho San Antonio and was approved as part of a Use Permit (U-1997-06). The property is zoned P(Res) - Planned Residential Development zoning with single-family homes permitted to be developed subject to the Use Permit and Oak Valley Planned Development Design Guidelines. The subject property is located on Lot 7 in Neighborhood Two of the Oak Valley Planned Development, P(Res). The existing single-family home was approved as part of an Architectural and Site Approval application (ASA-1998-25). Modifications to previously DIR-2022-005 22229 Hammond Way Page 2 approved use permits, and architectural site approvals are subject to review by the Director of Community Development. The property contains no further permit history or modifications since the above-mentioned approvals. DISCUSSION The applicant/property owner proposes to convert 675 sq. ft. of existing living area and add 124 sq. ft. to construct a 799 sq. ft. attached Accessory Dwelling Unit. Additionally, the scope includes demolishing an existing attached deck to construct a 404 sq. ft. sunroom at the rear of an existing residence. The proposed additions would partially modify the floor plan and building layout as part of the approved Architectural and Site Approval application (ASA-1998-25). As shown in Figure 1 below, _ the proposed sunroom is _ outlined in red and the 1 i proposed ADU is outlined in "� m blue. The proposed lot =_ coverage is 6,130 sq. ft. -�- °°- (20%), which is less than the _ 40% maximum allowable lot "� ram., "� ❑ coverage per the development standards of ithe Oak Valley Planned development. tl�rp tllnni r r 1 —_—` tlYYtn Figure 1:Proposed Floor DIR-2022-005 22229 Hammond Way Page 3 The proposed ADU is considered a streamlined ADU consistent with the development standards of Section 19.112.030 of the Cupertino Municipal Code and Government Code Section 6585.2(e). Therefore, any regulations that would prevent the construction of up to an 800 sq. ft. ADU such as a square foot limitation must be disregarded. In this case, as indicated in Table 1 below, the project exceeds the maximum allowed square footage by 124 sq. ft. While the City may not impose the maximum floor area since the ADU is considered a streamlined ADU, the project may not add any additional square footage in the future to the primary unit and may not incorporate the excess 124 sq. ft. to be a portion of the primary unit. Therefore, the proposed project would comply with the floor area ratio and lot coverage requirements for a single-family residence in neighborhood two of the Oak Valley Planned Development. Floor Area (sq. ft.) Comments Existing 4,825 Addition 528 Total Proposed 5,353 includes 799 sq.ft. ADU Maximum 5,229 Excess 124 City cannot prohibit an ADU 800 sq. ft. or less, therefore must allow additional floor area Table 1: Floor Area Details As shown in Figure 2 below, the exterior modifications include new windows for the sunroom at the north (rear) elevation, outlined in red and new windows on the north (rear) and west (left) elevation for the ADU, outlined in blue. The project design would not alter the architectural design style, overall height, or accessibility of the residence. The design including materials and colors, is consistent with the existing residence, therefore, is consistent with the Oak Valley Design Guidelines. -----------17 LEI]M R E E HORTH[l8AR18LHVATf6H .................._._....J N14S'lLSP17 8L8YA1H1N O � Figure 2:Proposed Rear&Left Elevations DIR-2022-005 22229 Hammond Way Page 4 The proposed one-story additions and window modifications of the existing single- family residence are not expected to have adverse privacy impacts to adjacent properties as the residence is one story and the scope of work does not propose second story additions. Windows and lighting are subject to the Bird Safe and Outdoor Lighting Requirements of Chapter 19.102 of the Cupertino Municipal Code and as conditioned (Conditions No. 9 and 10), final plans will be reviewed and approved prior to issuance of Building Permits. This neighborhood does not have a homeowner's association (HOA); therefore, an HOA approval letter was not required. ACTION The Director of Community Development deems the modification minor and approves the project with the following conditions of approval: 1. APPROVED EXHIBITS The approval is based on a plan set entitled, "Delepine Residence" prepared by Louie Leu Architect, consisting of 17 sheets labeled "A-0.0, A-1.0, A-1.1, A-2.0, A-2.1, A-3.1, A-4.1, A-4.2, A-5.1, A-6.1, A-7.1, A-8.1, four pages of 4bird frit treatment method, and survey" plans stamped as approved on September 21, 2022; and except as may be amended by the conditions contained in this resolution. 2. ACCURACY OF THE PROJECT PLANS The applicant/property owner is responsible to verify all pertinent property data including but not limited to property boundary locations, building setbacks, property size, building square footage, any relevant easements and/or construction records. Any misrepresentation of any property data may invalidate this approval and may require additional review. 3. BUILDING PERMITS The applicant shall consult with the City Building Division to obtain the necessary building permits, or building permit revisions, prior to commencement of work. 4. ANNOTATION OF THE CONDITIONS OF APPROVAL The conditions of approval set forth shall be incorporated into and annotated on the first page of the building plans. 5. PREVIOUS CONDITIONS OF APPROVAL DIR-2022-005 22229 Hammond Way Page 5 All prior conditions of approval through past approvals shall remain in effect unless superseded by or in conflict with subsequent conditions of approval and as specifically amended by this Director's Minor Modification approval. 6. CONSULTATION WITH OTHER DEPARTMENTS The applicant is responsible for consulting with other departments and/or agencies with regard to the proposed project for additional conditions and requirements. Any misrepresentation of any submitted data may invalidate an approval by the Community Development Department. 7. CORRECTION ON PLAN SET The applicant shall submit a revised plan set at Building Permit submittal that corrects the square footage of the proposed sunroom from 474 sq. ft. to 404 sq. ft. as shown on sheet A-2.1 Floor Plan to be reviewed and approved by the Planning Division prior to Building Permit issuance. 8. EXTERIOR BUILDING MATERIALS/TREATMENTS The final building exterior plan shall closely resemble the details shown on the original approved plans. Final building exterior treatment plan (including but not limited to details on exterior color, materials, architectural treatments, doors, windows, lighting fixtures, and/or embellishments) shall be reviewed and approved by the Director of Community Development prior to issuance of building permits to ensure quality and consistency. Any exterior changes determined to be substantial by the Director of Community Development shall either require a modification to this permit or a new permit based on the extent of the change. 9. BIRD SAFE COMPLIANCE Prior to issuance of Building Permits, the applicant/property owner shall submit final plans in compliance with the approved plans to comply with development standards of Cupertino Municipal Code Section 19.102.030 Bird-Safe Development Requirements. In the event changes are proposed from the approved plans, said changes must be reviewed and approved by the Director of Community Development or their designee. The applicant shall provide all necessary documentation required to determine compliance with the Municipal Code. 10. DARK SKY COMPLIANCE Prior to issuance of Building Permits, the applicant/property owner shall submit final plans in compliance with the approved lighting plans to comply with development standards of Cupertino Municipal Code Section 19.102.040 Outdoor Lighting Requirements. In the event changes are proposed from the approved plans, DIR-2022-005 22229 Hammond Way Page 6 said changes must be reviewed and approved by the Director of Community Development or their designee. The applicant shall provide all documentation required to determine compliance with the Municipal Code. 11. DUST CONTROL The following construction practices shall be implemented during all phases of construction for the proposed project to prevent visible dust emissions from leaving the site: a) Water all exposed surfaces areas (e.g., parking areas, staging areas, soil piles, graded areas, and unpaved access roads) at least twice daily and more often during windy periods to prevent visible dust from leaving the site; active areas adjacent to windy periods; active areas adjacent to existing land uses shall be kept damp at all times, or shall be treated with non-toxic stabilizers or dust palliatives. b) All haul trucks transporting soil, sand, or other loose material off-site shall be covered. c) All visible mud or dirt track-out onto adjacent public roads shall be removed using wet power vacuum street sweepers at least once per day. The use of dry power sweeping is prohibited. d) All vehicle speeds on unpaved roads shall be limited to 15 mph. e) All roadways, driveways, and sidewalks to be paved shall be completed as soon as possible. Building pads shall be laid as soon as possible after grading unless seeding or soil binders are used. f) Idling times shall be minimized either by shutting equipment off when not in use or reducing the maximum idling time to 5 minutes (as required by the California airborne toxics control measure Title 13, Section 2485 of California Code of Regulations [CCR]). Clear signage shall be provided for construction workers at all access points. g) All construction equipment shall be maintained and properly tuned in accordance with manufacturer's specifications. All equipment shall be checked by a certified mechanic and determined to be running in proper condition prior to operation. h) Post a publicly visible sign with the telephone number and person to contact at the Lead Agency regarding dust complaints. This person shall respond and take corrective action within 48 hours. The Air District's phone number shall also be visible to ensure compliance with applicable regulations. The applicant shall incorporate the City's construction best management practices into the building permit plan set prior to any grading, excavation, foundation or building permit issuance. DIR-2022-005 22229 Hammond Way Page 7 12. GRADING AND CONSTRUCTION HOURS AND NOISE LIMITS i) All grading activities shall be limited to the dry season (April 15 to October 1), unless permitted otherwise by the Director of Public works. j) Construction hours and noise limits shall be compliant with all requirements of Chapter 10.48 of the Cupertino Municipal Code. k) Grading, street construction, underground utility and demolition hours for work done more than 750 feet away from residential areas shall be limited to Monday through Friday, 7 a.m. to 8 p.m. and Saturday and Sunday, 9 a.m. to 6 p.m. Grading, street construction, demolition or underground utility work within 750 feet of residential areas shall not occur on Saturdays, Sundays, holidays, and during the nighttime period as defined in Section 10.48.053(b) of the Municipal Code. 1) Construction activities shall be limited to Monday through Friday, 7 a.m. to 8 p.m. and Saturday and Sunday, 9 a.m. to 6 p.m. Construction activities are not allowed on holidays as defined in Chapter 10.48 of the Municipal Code. Night time construction is allowed if compliant with nighttime standards of Section 10.48 of the Cupertino Municipal Code. m) Rules and regulations pertaining to all construction activities and limitations identified in this permit, along with the name and telephone number of an applicant appointed disturbance coordinator, shall be posted in a prominent location at the entrance to the job site. n) The applicant shall be responsible for educating all contractors and subcontractors of said construction restrictions. The applicant shall comply with the above grading and construction hours and noise limit requirements unless otherwise indicated. 13. NOISE AND VIBRATION NOTICE AND SIGNAGE REQUIREMENTS a. At least 10 days prior to the start of any demolition, ground disturbing, or construction activities, the project applicant shall send notices of the planned activity by first class mail as follows: i. For projects on sites that are more than 0.5 acres or four or more residential units the notices shall be sent to off-site businesses and residents within 500 feet of the project site; ii. For projects on sites between 0.25 to 0.5 acres, or two or three residential units (not including Accessory Dwelling Units) notices shall be sent to off- site businesses and residents within 250 feet of the project site; or DIR-2022-005 22229 Hammond Way Page 8 iii. For projects on sites less than 0.25 acres or one residential unit, the notices shall be sent to off-site businesses and residents within 100 feet of the project site. The notification shall include a brief description of the project, the activities that would occur, the hours when activity would occur, and the construction period's overall duration. The notification should include the telephone numbers of the contractor's authorized representatives that are assigned to respond in the event of a noise or vibration complaint. The project applicant shall provide the City with evidence of mailing of the notice, upon request. b. At least 10 days prior to the start of construction activities, a sign shall be posted at the entrance(s) to the job site, clearly visible to the public, which includes permitted construction days and hours, as well as the telephone numbers of the City's and contractor's authorized representatives that are assigned to respond in the event of a noise or vibration complaint. If the authorized contractor's representative receives a complaint, they shall investigate, take appropriate corrective action, and report the action to the City within three business days of receiving the complaint. 14. NOISE MANAGEMENT DURING CONSTRUCTION Projects shall implement the following measures to reduce noise during construction and demolition activity: a. The project applicant and contractors shall prepare and submit a Construction Noise Control Plan to the City's Planning Department for review and approval prior to issuance of the first permit during the Building Permit stage. The Construction Noise Plan shall demonstrate compliance with daytime and nighttime decibel limits pursuant to Chapter 10.48 (Community Noise Control) of Cupertino Municipal Code. The details of the Construction Noise Control Plan shall be included in the applicable construction documents and implemented by the on-site Construction Manager. Noise reduction measures selected and implemented shall be based on the type of construction equipment used on the site, distance of construction activities from sensitive receptor(s), site terrain, and other features on and surrounding the site (e.g., trees, built environment) and may include, but not be limited to, temporary construction noise attenuation walls, high quality mufflers. During the entire active construction period, the Construction Noise Control Plan shall demonstrate that compliance with the specified noise control requirements for construction DIR-2022-005 22229 Hammond Way Page 9 equipment and tools will reduce construction noise in compliance with the City's daytime and nighttime decibel limits. b. Select haul routes that avoid the greatest amount of sensitive use areas and submit to the City of Cupertino Public Works Department for approval prior to the start of the construction phase. c. Signs will be posted at the job site entrance(s), within the on-site construction zones, and along queueing lanes (if any) to reinforce the prohibition of unnecessary engine idling. All other equipment will be turned off if not in use for more than 5 minutes. During the entire active construction period and to the extent feasible, the use of noise producing signals, including horns, whistles, alarms, and bells will be for safety warning purposes only. The construction manager will use smart back-up alarms, which automatically adjust the alarm level based on the background noise level or switch off back-up alarms and replace with human spotters in compliance with all safety requirements and law. 15. INDEMNIFICATION As part of the application, to the fullest extent permitted by law, the applicant shall agree to indemnify, defend with the attorneys of the City's choice, and hold harmless the City, its City Council, and its officers, employees, and agents (collectively, the "indemnified parties") from and against any liability, claim, action, cause of action, suit, damages, judgment, lien, levy, or proceeding (collectively referred to as "proceeding") brought by a third party against one or more of the indemnified parties or one or more of the indemnified parties and the applicant related to any Ordinance, Resolution, or action approving the project, the related entitlements, environmental review documents, finding or determinations, or any other permit or approval authorized for the project. The indemnification shall include but not be limited to damages, fees, and costs awarded against the City, if any, and cost of suit, attorneys' fees, and other costs, liabilities, and expenses incurred in connection with such proceeding whether incurred by the Applicant, the City, or the parties initiating or bringing such proceeding. The applicant shall agree to (without limitation) reimburse the City its actual attorneys' fees and costs incurred in defense of the litigation. Such attorneys' fees and costs shall include amounts paid to the City's outside counsel and shall include City Attorney time and overhead costs and other City staff overhead costs and any costs directly related to the litigation reasonably incurred by City. The applicant shall likewise agree to indemnify, defend, and hold harmless the indemnified parties from and against any damages, attorneys' fees, or costs awards, including DIR-2022-005 22229 Hammond Way Page 10 attorneys' fees awarded under Code of Civil Procedure section 1021.5, assessed or awarded against the indemnified parties. The Applicant shall cooperate with the City to enter a Reimbursement Agreement to govern any such reimbursement. The Applicant shall agree to (without limitation) reimburse the City for all costs incurred in additional investigation or study of, or for supplementing, redrafting, revising, or amending, any document (such as an Environmental Impact Report, negative declaration, specific plan, or general plan amendment) if made necessary by proceedings challenging the project approvals and related environmental review, if the applicant desires to continue to pursue the project. The Applicant shall agree that the City shall have no liability to the Applicant for business interruption, punitive, speculative, or consequential damages. 16. NOTICE OF FEES, DEDICATIONS, RESERVATIONS OR OTHER EXACTIONS The Conditions of Project Approval set forth herein may include certain fees, dedication requirements, reservation requirements, and other exactions. This Director's approval is effective September 28, 2022. The 14-calendar-day appeal period will expire on October 12, 2022 at 5:00 p.m. Enclosure: Plan set