HomeMy WebLinkAboutCC 06-07-2022 Item No. 37. City Hall Annex 10455 Torre Avenue_Staff PresentationCity Hall Annex (10455 Torre Avenue) Study Session June 07, 2022 CC 06-07-2022 Item No. 37 City Hall Annex Project Agenda ●Project Goals ●Project Background ●Financial Status ●Next Steps & Recommended Action Project Goals 10455 Torre Avenue Improvements Proposed Budget: $3,000,000 Proposed Scope: Program, plan and build facility improvements required for interim facility to accommodate staff while City Hall is remodeled, as well as the long-term use of this facility. The scope of work will include programming, planning, design, and construction. •Provide an Open Plan layout that allows for the greatest flexibility for future uses: an energy efficient, well-lit, seismically strong, easily accessible, flexible white box. •Program, Design and Construct improvements required for an interim facility to accommodate City Hall staff, including housing a temporary EOC and Video division. •Bring the building into Code Compliance with current building codes, including structural, energy and ADA/accessiblity code requirements. Address lead paint, thermal envelope, and outdated HVAC/ infrastructure issues. •Where economically feasible, improve the Energy Efficiency of the building, both short and long term. City Hall Annex – Project Objectives Project Background Ground floor plan - Existing FRONT DOOR TO R R E A V E N U E PACIFICA AVENUE 12’-10” x 15’-6” City Hall Annex: Current status City Hall Annex: Current status City Hall Annex: Current status Reception lobbyReception deskHallOffice Break Room Attic Bathroom Office City Hall Annex: Current status City Hall Annex: Programming Ground floor plan – Concept diagram TO R R E A V E N U E PACIFICA AVENUE FRONT DOOR BOH: spaces required: •Stairs •IT Supplies (attic) •Printer/Copy Room •Restrooms -(approximately 1200 SF) •Break Room •Lactation Room •Storage •Janitor's closet •Electrical/IT rooms FOH: 2 public-facing conference rooms and 1 public restroom 3-5 counters needed BOH: 26 workstations required (38 shown) BOH: 2 offices/meeting rooms (3 shown) Planning/Development Services - Large Projects Room City Hall Annex: Program Financial Status •Project funding: $3,025,000 ($3,000,000 FY21-22 CIP program + $25,000 transfer at Q3) •Services encumbered to date: Project Management (limited), HazMat survey, As-Built drawings, Topographic Survey •Funding remaining: $2,942,440 •Design Team services contract encumbrance is $508,502 ($443,480 contract + 15% contingency) City Hall Annex – Financial Status Next Steps & Recommended Action •Award Contract for Design Services •Initiate Programming and Code Compliance due diligence •Develop Schematic Design – review with CMO/City Council •Continue with Design (8-12 months) & Construction (6-9 months) phases. City Hall Annex – Next Steps 1.Authorize the City Manager to execute a Design Professional Services Agreement between the City and DIALOG Design LP to provide design services for the City Hall Annex in the amount of $443,480; and 2.Authorize the Director of Public Works to execute any necessary services or change orders, up to a contingency amount of $65,022 (15% of base services,) for a total appropriation of $508,502. City Hall Annex – Recommended Action Thank You!