Press Alt + R to read the document text or Alt + P to download or print.
This document contains no pages.
CC 05-17-2022 Item No. 40. FY 22-27 CIP Projects Report_Staff PresentationMay 17, 2022
City Council –Study Session
FY 22-27 CIP Projects Report
CC 05-17-2022 Item No. 40
Proposed CIP Projects
Multi-Year/Annual CIP Projects
1.ADA Improvements (Annually funded): $95,000
2.Annual Playground Replacement (Year 3 of 5): $300,000
3.Park Amenity Improvements (Year 3 of 5): $200,000
4.Street Light Installation -Annual Infill (Annually funded): $75,000
Unfunded/Future CIP Projects
1.Bollinger Road Bike Improvements
2.Carmen Road Bridge -Design
3.Carmen Road Bridge -Construction
4.Stevens Creek Blvd Separated
Bikeway, Phase 3 -Design
5.Don Burnett Bridge LED Lighting
Upgrade
6.Memorial Park Softball Field LED
Lighting Upgrade
7.Regnart Road Improvements: Ph. 3 -6
8.ADA 2015 report Update/Dashboard
9.Citywide Building Condition
Assessment Implementation
10.Community Hall Improvements
11.QCC skylight renovation
*Green = Parks & Rec *Blue = Bike Ped *Red = Streets & Grounds *Orange = Facilities
12.Blackberry Farm Bocce Ball Shade
Structure
13.Blackberry Farms Golf Course
Improvements
14.Jollyman Park Dog Off-Leash Area
(DOLA) Pathway
15.Lawrence Mitty Park -Design &
Construction
16.Linda Vista Park Picnic Area Shade
Structure
17.Major Facilities [Results] -Programming
and Design
18.Memorial Park -Design & Construction
19.Portal Park Picnic Area Shade Structure
FY 22-23 CIP Projects
*Green = Parks & Rec *Blue = Bike Ped *Red = Streets & Grounds *Orange = Facilities
PROPOSED PROJECTS:
1.Blackberry Farms Pools Splash Pad
2.Jollyman All-Inclusive Play Area: Adult-Assistive Bathroom Facilities
3.Major Recreation Facilities: Use and Market Analysis
4.De Anza Boulevard Buffered Bike Lanes
5.City Lighting LED improvements
6.City Hall Renovation/Replacement and Library Parking Garage: Design and
Construction
7.Stocklmeir, Byrne and Blesch: Inspection Reports and Analysis
Thank You!