Loading...
CC 01-13-2022 Item No. 2 Amended Attachment C – Draft Resolution for DP-2020-001  RESOLUTION NO. _________    A RESOLUTION OF THE CUPERTINO CITY COUNCIL   APPROVING A DEVELOPMENT PERMIT TO A NINE (9) UNIT RESIDENTIAL  DEVELOPMENT AND ONE (1) ADU LOCATED AT 22690 STEVENS CREEK  BOULEVARD (APN: 341‐14‐066, 342‐14‐104 & 105)      SECTION I:  PROJECT DESCRIPTION  Application No.: DP‐2020‐001  Applicant:  Alan Enterprises LLC   Location:  22690 Stevens Creek Boulevard;   APN#s 341‐14‐066, 342‐14‐104 & 105    SECTION II:  FINDINGS FOR DEVELOPMENT PERMIT:  WHEREAS, the City of Cupertino received an application for a Development Permit  (Application No. DP‐2020‐001) as described in Section I of this resolution; and   WHEREAS, pursuant to the provisions of the California Environmental Quality Act of  1970 (Public Resources Code Section 21000 et seq.) (“CEQA”) and the State CEQA  Guidelines (California Code of Regulations, Title 14, Section 15000 et seq.) (ʺCEQA  Guidelinesʺ), the City prepared an Initial Study and proposed Mitigated Negative  Declaration (“Project”); and  WHEREAS, on October 28, 2021, the City of Cupertino’s Environmental Review  Committee held a duly noticed public hearing to receive public testimony and reviewed  and considered the information contained in the Draft IS/MND, and voted 5‐0‐0 to  recommend that the City Council adopt the Draft IS/MND (EA‐2020‐001) and mitigation  measures; and   WHEREAS, on November 23, 2021, the Planning Commission held a duly noticed public  hearing to receive staff’s presentation and public testimony, and to consider the  information contained in the IS/MND along with all staff reports, other pertinent  documents, and all written and oral statements received prior to and at the public  hearing, and recommended on a 4‐1‐0 (Wang no) vote, based on substantial evidence in  the record, that the City Council adopt the MND, adopt and incorporate into the Project  and implement as conditions of approval all of the mitigation measures for the project  that are identified in the IS/MND, and adopt the Mitigation Monitoring and Reporting  Program for the Project (EA‐2020‐001); and  WHEREAS, on November 23, 2021 the Planning Commission recommended on a 4‐1‐0  (Wang no) vote that the City Council approve Zone Map Amendment (Z‐2020‐001) in  Page 2 of 20 substantially similar form to the Resolution presented (Resolution No. 6932), approve the  Development Permit (DP‐2020‐001) in substantially similar form to the Resolution  presented (Resolution No. 6933), approve the Architectural and Site Approval Permit  (ASA‐2020‐001) in substantially similar form to the Resolution presented(Resolution No.  6935), approve the Vesting Tentative Map (TM‐2020‐001) in substantially similar form the  Resolution presented (Resolution No.6934) AND approve the Use Permit (U‐2020‐001) in  substantially similar form to the Resolution presented (Resolution No. 6936)   WHEREAS, all necessary public notices having been given as required by the Procedural  Ordinance of the City of Cupertino and the Government Code, and the Planning  Commission held at least one public hearing in regard to this application, and on January  1813, 2022, the City Council held a public hearing to consider the Development Permit;  and   WHEREAS, the City Council of the City of Cupertino is the decision‐making body for  this Resolution; and  WHEREAS, on January 1813, 2022, after consideration of substantial evidence contained  in the entire administrative record, and prior to consideration of the Development Permit,  the City Council adopted Resolution No. [####] adopting and requiring as conditions of  approval all of the mitigation measures for the Project which are within the responsibility  and jurisdiction of the City that are identified in the IS/MND, and adopting the Mitigation  Monitoring and Reporting Program for the Project; and  WHEREAS, the applicant has met the burden of proof required to support the application  for a Development Permit.  WHEREAS, the City Council finds as follows with regard to this application:  1. The proposed development, at the proposed location, will not be detrimental or  injurious to property or improvements in the vicinity, and will not be detrimental to  the public health, safety, general welfare, or convenience;  The project has been determined to be consistent with the General Plan, and the Zoning  Ordinance with the adoption of the Zone Map Amendments (Z‐2020‐001). The project has  been designed to be compatible with and respectful of adjoining land uses. Additionally, all  mitigation measures that are within the responsibility and jurisdiction of the City have been  adopted and will be made conditions of approval in order to mitigate potential impacts to a less  than significant level. Therefore, the project will not be detrimental or injurious to properties  or improvements in the vicinity, and will not be detrimental to the public health, safety, general  welfare, or convenience.   2. The proposed development will be located and conducted in a manner in accord with  the Cupertino Comprehensive General Plan and the purpose of the City’s zoning  ordinances.  Page 3 of 20 The General Plan land use designation for the property is Commercial/Residential. The  proposed use has been determined to be consistent with the General Plan in that the General  Plan allows for commercial, residential, or a mixed‐use commercial residential development.   The subject property will be zoned Planned Development with General Commercial and  Residential intent with the approval of the Zone Map Amendment (Z‐2020‐001). Projects that  are not on the City’s list of approved Housing Element sits are required to obtain a Use Permit  (U‐2020‐001), which the project is seeking and subject to approval, see Condition of Approval  (COA) #3 in Section III. The proposed development has been determined to meet the applicable  development standards in the General Plan and the City of Cupertino’s Municipal Code.  Therefore, the proposed development is consistent with the purpose of the City’s zoning  ordinance.  NOW, THEREFORE, BE IT RESOLVED:  That after careful consideration of maps, facts, exhibits, testimony and other evidence  submitted in this matter and the IS/MND and the Mitigation Monitoring and Reporting  Program for the Project (EA‐2020‐001), subject to the conditions which are enumerated in  this Resolution beginning on PAGE 3 thereof, and those contained in all other Resolutions  approved for this Project,   The application for a Development Permit, Application No. DP‐2020‐001, is hereby  approved, and that the subconclusions upon which the findings and conditions specified  in this Resolution are based are contained in the Public Hearing record concerning  Application no. DP‐2020‐001 as set forth in the Minutes of the City Council Meeting of  January 1813, 2022, and are incorporated by reference as though fully set forth herein.    SECTION III:  CONDITIONS ADMINISTERED BY THE COMMUNITY  DEVELOPMENT DEPARTMENT.  1. APPROVED EXHIBITS  Approval is based on the plan set dated January 29, 2021 consisting of 47 sheets  labeled as 22690 Stevens Creek Blvd, Cover Sheet, A1.01‐A1.20, L1‐L4, C0.0‐C7.2,  JT1‐JT5, SL1‐SL3, Photometric Plan, prepared by Dahlin Group, BKF, Tarrar  Utility Consultants, Thomas Baak & Associates, LLP, and CREE Lighting, except  as may be amended by conditions in this resolution.  2. ACCURACY OF PROJECT PLANS  The applicant/property owner is responsible to verify all pertinent property data  including but not limited to property boundary locations, building setbacks,  property size, building square footage, any relevant easements and/or  construction records. Any misrepresentation of any property data may invalidate  this approval and may require additional review.  Page 4 of 20 3. CONCURRENT APPROVAL CONDITIONS  The conditions of approval contained in file nos. ASA‐2020‐003, Z‐2020‐001, U‐ 2020‐001, TM‐2020‐001, EA‐2020‐001  4. ANNOTATION OF THE CONDITIONS OF APPROVAL   The conditions of approval set forth shall be incorporated into and annotated on  the first page of the building plans.   5. CONSULTATION WITH OTHER DEPARTMENTS  The applicant is responsible to consult with other departments and/or agencies  with regard to the proposed project for additional conditions and requirements.   Any misrepresentation of any submitted data may invalidate an approval by the  Community Development Department.  6. DEVELOPMENT ALLOCATION  The applicant shall receive an allocation of nine (9) of the residential unit  allocations for the Citywide housing allocation.  7. BELOW MARKET RATE HOUSING PROGRAM  The applicant shall participate in the City’s Below Market Rate (BMR) Housing  Program by dedicating 15% of the units.  The applicant shall record a covenant,  which shall be subject to review and approval by the City Attorney, to be recorded  prior to the issuance of building permits. One 4BR unit shall be provide as a BMR  unit. The unit shall be made available to moderate income levels in compliance with  the City’s BMR Manual.   8. BMR UNIT DESIGN REQUIREMENTS  The Applicant shall detail how the following requirements shall be met prior to  building permit issuance:   a) BMR units shall be comparable to market‐rate units in terms of unit type, number  of bedrooms per unit, quality of exterior appearance and overall quality of  construction.   b) Interior features and finishes in the affordable units shall be durable, of good  quality and consistent with the contemporary standards of new housing.   9. BMR AGREEMENT   Prior to the recordation of a final map or issuance of any building permit, an  affordable housing agreement shall be recorded against the property. The  affordable housing agreement shall include, but not be limited to the following:   a) Total number of BMR units, type, location (site map), square footage, number of  bedrooms, and construction scheduling of market‐rate and BMR units;   Page 5 of 20 b) Provisions to ensure concurrent construction and completion of BMR units and  market‐rate units;  c) Affordability levels for each BMR unit;  d) Provisions for income certification and screening of potential occupants of BMR  units;   e) Restriction control mechanisms;   f) Financing of ongoing administrative and monitoring costs;   g) Other reasonably required provisions to implement the Affordable Housing Plan.   10. BMR UNIT TERMS OF AFFORDABILITY:   Prior to occupancy, the proposed project shall record covenants that require the  units to be occupied at rents that are affordable to moderate income level  households for a period not less than 99 years from the date of first occupancy of  the unit.   11. PUBLIC ART REQUIREMENT  Public art shall be provided for the project in accordance with General Plan Policy  2‐66 and the City’s Public Art Ordinance (Chapter 19.148 of the Cupertino  Municipal Code). The minimum expenditure for the artwork, including, but not  limited to design, fabrication, and installation is one (1) percent of the construction  valuation for the first $100 million on construction valuation, or 0.9% of  construction valuation for valuation in excess of $100 million. The project pro  forma shall be provided to the City to confirm the project budget. The public art  plans (including location and design) shall be reviewed by the Fine Arts  Commission during the building permit stage, in advance of final occupancy.  Once approved by the Fine Arts Commission, the public artwork shall be installed  to the satisfaction of the City prior to final occupancy. In the event the developer  or property owner determines that the placement of artwork on a particular  property may not be feasible, the developer or property owner may apply to the  Fine Arts Commission for an in‐lieu payment alternative as indicated in Chapter  19.148 of the Cupertino Municipal Code. The in lieu payment shall be 1.25% of the  construction valuation.   12. DEMOLITION REQUIREMENTS   All demolished building and site materials shall be recycled to the maximum  extent feasible subject to the Building Official.  The applicant shall provide  evidence that materials were recycled prior to occupancy.  13. FORMATION OF A PROPERTY OWNER’S ASSOCIATION  A Property Owner’s Association shall be formed to maintain the common areas of the  property. The Conditions, Covenants and Restrictions (CC&Rs) shall be reviewed and  Page 6 of 20 approved by the City Attorney and the Director of Community Development prior to  recordation.  The following terms shall be incorporated into the Association’s  Conditions, Covenants and Restrictions:   The members/board shall meet at a minimum of once/year   The Association dues shall cover:  o Maintenance of common area on the property in compliance with the  approved project and conditions of approval, including hardscaping,  parking, landscaping and accessory facilities and amenities, such as trash  bins/areas, common amenity areas, tree grates, outside trash bins, fences, etc,  o Building and site repair on a regular schedule, or as otherwise necessary, and  building renovation and replacement as necessary to ensure that the property  is maintained.  o Permits, including tree removal permits, required for maintenance and repair  of facilities in the common areas   Any changes to the exterior of the development must be reviewed by the  Property Owner’s Association.    Any changes to the CC&R’s must be reviewed and approved by the City   Disbanding of the Association shall require an amendment to the permit.  14. PRE‐CONSTRUCTION MEETING AND CONSTRUCTION MANAGEMENT  PLAN  A demolition and construction management plan shall be submitted and reviewed  prior to building permit issuance.  Prior to commencement of construction  activities, the applicant shall arrange for a pre‐construction meeting with the  pertinent departments (Building, Planning, and Public Works) to review the  prepared construction management plan, to ensure that construction complies  with the conditions of approval, staging of construction equipment is appropriate,  tree protection measures are in place, public access routes are identified, and noise  and dust control measures are established. The plan shall include but not be  limited to the following:  a. Compliance with CEQA Mitigation Measures  b. Appropriate construction staging area  c. Hours of construction  d. Compliance with the City noise ordinance  e. Best management practices  f. Staging of construction equipment shall not occur within ___ feet of any  residential property.  g. Any other measures as determined to be appropriate by the Director of  Community Development  Page 7 of 20 15. GRADING AND CONSTRUCTION HOURS AND NOISE LIMITS  The applicant shall indicate compliance with the following grading and  construction hours and noise limit requirements on all demolition, construction  and grading permits, and in the construction management plan(s), unless  otherwise indicated.   a. All grading activities shall be limited to the dry season (April 15 to October 1),  unless permitted otherwise by the Director of Public works.    b. Construction hours and noise limits shall be compliant with all requirements  of Chapter 10.48 of the Cupertino Municipal Code.  c. Grading, street construction, underground utility and demolition hours for  work done more than 750 feet away from residential areas shall be limited to  Monday through Friday, 7 a.m. to 8 p.m. and Saturday and Sunday, 9 a.m. to  6 p.m. Grading, street construction, demolition or underground utility work  within 750 feet of residential areas shall not occur on Saturdays, Sundays,  holidays, and during nighttime period as defined in Section 10.48.053(b) of the  Municipal Code.    d. Construction activities shall be limited to Monday through Friday, 7 a.m. to 8  p.m. and Saturday and Sunday, 9 a.m. to 6 p.m.  Construction activities are not  allowed on holidays as defined in Chapter 10.48 of the Municipal Code.  Nighttime construction is allowed if compliant with nighttime standards of  Section 10.48 of the Cupertino Municipal Code.   e. Rules and regulations pertaining to all construction activities and limitations  identified in this permit, along with the name and telephone number of an  applicant appointed disturbance coordinator, shall be posted in a prominent  location at the entrance to the job site.    f. The applicant shall be responsible for educating all contractors and  subcontractors of said construction restrictions.      The applicant shall comply with the above grading and construction hours and noise  limit requirements unless otherwise indicated.   16. ACOUSTIC STUDY AND REDUCTION OF INTERIOR NOISE LEVELS I  Prior to the issuance of building permits, the project applicant shall submit an  acoustic study to the satisfaction of the Cityʹs Community Development Director  to demonstrate that unit interiors meet an interior noise level due to exterior noise  of 45 dBA CNEL, consistent with State and local noise standards. The study shall  be based on precise grading and architectural plans including specific construction  method details and materials to calculate the necessary exterior to interior noise  reduction of approximately 30 dBA to achieve 45 dBA CNEL. The precise exterior  to interior reduction would be determined in the acoustical study when precise  Page 8 of 20 grading plans with building elevations, footprints and architectural plans are  ∙available. The applicant will be required to incorporate into the project design all  required noise insulation features and techniques necessary to reduce interior  noise levels to achieve the interior noise standard. To achieve the required interior  noise levels, features such as upgraded exterior wall and roof assemblies,  upgraded windows, and exterior doors may be required. In addition, a ʺwindows  closed” condition will be required with minimum supply of fresh air per UBC  requirements.  17. GREEN BUILDING  The project shall be constructed in accordance with the City’s Green Building  Ordinance (Chapter 16.58 of the Cupertino Municipal Code). The applicant shall  obtain LEED Silver certification or an alternative reference standard in accordance  with the ordinance since the building size is over 50,000 square feet. Third party  LEED certification or alternative reference standard is required per the ordinance  criteria.  18. BUILDING AND FIRE CODE  The applicant shall apply for and obtain building permits to allow the construction  of the approved project. The applicant shall provide information and plans to  allow the Building Official and the Fire Marshall or their designee that the  proposed plans comply with Building and Fire Codes in effect at the time of  application for a building permit.  19. TRASH AND DELIVERY ACTIVITIES  A detailed refuse and truck delivery plan shall be prepared by the applicant.  The  plan shall specify locations of trash facilities, refuse pick up schedules and truck  delivery schedules and routes.  All trash facilities must be screened and enclosed  to the satisfaction of the Public Works Department.  The final plan shall be  submitted to the City for review and approval prior to issuance of building  permits.  20. EXTERIOR BUILDING MATERIALS/TREATMENTS  The final building exterior plan shall closely resemble the details shown on the  original approved plans. Final building exterior treatment plan (including but not  limited to details on exterior color, materials, architectural treatments, doors,  windows, lighting fixtures, and/or embellishments) shall be reviewed and  approved by the Director of Community Development prior to issuance of  building permits to ensure quality and consistency.  Any exterior changes  determined to be substantial by the Director of Community Development shall  Page 9 of 20 either require a modification to this permit or a new permit based on the extent of  the change.   Future changes to the exterior building materials/treatments must be reviewed  and approved by the Property Owner’s Association. However, any changes to the  building materials that do not match the approved materials shall require an  amendment to this permit or a new permit.  21. DARK SKY COMPLIANCE AND/OR BIRD SAFE COMPLIANCE   Prior to issuance of Building Permits, the applicant/property owner shall submit  final plans in compliance with the approved lighting plans to comply with  development standards of Cupertino Municipal Code Section 19.102.030 Bird‐Safe  Development Requirements and/or Section 19.102.040 Outdoor Lighting  Requirements. In the event changes are proposed from the approved plans, said  changes must be reviewed and approved by the Director of Community  Development or their designee. The applicant shall provide all documentation  required to determine compliance with the Municipal Code. The final lighting  plan (including a detailed photometric plan) shall be reviewed and approved by  the Director of Community Development prior to building permit issuance. A  report from a licensed lighting engineer may be required to confirm all exterior  lighting throughout the site complies with the City’s Ordinance.  22. ROOFTOP EQUIPMENT SCREENING   All mechanical and other equipment on the building or on the site shall be  screened so they are not visible from public street areas or adjoining  developments.  The height of the screening shall be taller than the height of the  mechanical equipment that it is designed to screen.  A line of sight plan may be  required to demonstrate that the equipment will not be visible from any public  right‐of‐way.  The location of the equipment and necessary screening shall be  reviewed and approved by the Director of Community Development prior to  issuance of building permits.  23. SITE IMPROVEMENTS  All proposed site improvements shall be completed prior to final occupancy of any  structures approved in conjunction with the project.  24. COMMON OPEN SPACE  The residential common open space shall provide amenities for passive and/or  active recreation including but not limited to play structures, barbeque areas,  picnic tables etc. and shall not be retained as only a hardscaped or landscaped area  Page 10 of 20 25. NOISE LEVELS AND ABATEMENT   Project uses and all equipment installed on the site shall comply with the City’s  Community Noise Control Ordinance at all times. Installation of any mechanical  or other equipment shall be evaluated to determine that the installation meets the  City’s Community Noise Control Ordinance. Any documentation or studies  required to determine this shall be provided by the applicant as his/her sole  expense. Should the project exceed any of the stipulated maximum noise levels  outlined in the City’s Community Noise Control Ordinance, an acoustical  engineer may be required to submit noise attenuation measures to the satisfaction  of the Director of Community Development at the applicant’s expense.   26. INGRESS/EGRESS EASEMENT  The applicant shall record an appropriate deed restriction and covenant running  with the land, subject to approval of the City Attorney, for all parcels that share a  common private drive or private roadway with one or more other parcels.  The  deed restriction shall provide for necessary reciprocal ingress and egress easement  to and from the affected parcels.  The easements shall be recorded at such time as  interest in one or more of the affected parcels is initially sold or transferred to  another party.  27. INDEMNIFICATION  As part of the application, to the fullest extent permitted by law, the applicant shall  agree to indemnify, defend with the attorneys of the City’s choice, and hold  harmless the City, its City Council, and its officers, employees, and agents  (collectively, the “indemnified parties”) from and against any liability, claim,  action, cause of action, suit, damages, judgment, lien, levy, or proceeding  (collectively referred to as “proceeding”) brought by a third party against one or  more of the indemnified parties or one or more of the indemnified parties and the  applicant related to any Ordinance, Resolution, or action approving the project,  the related entitlements, environmental review documents, finding or  determinations, or any other permit or approval authorized for the project. The  indemnification shall include but not be limited to damages, fees, and costs  awarded against the City, if any, and cost of suit, attorneys’ fees, and other costs,  liabilities, and expenses incurred in connection with such proceeding whether  incurred by the Applicant, the City, or the parties initiating or bringing such  proceeding.  The applicant shall agree to (without limitation) reimburse the City its actual  attorneys’ fees and costs incurred in defense of the litigation. Such attorneys’ fees  and costs shall include amounts paid to the City’s outside counsel and shall  include City Attorney time and overhead costs and other City staff overhead costs  Page 11 of 20 and any costs directly related to the litigation reasonably incurred by City. The  applicant shall likewise agree to indemnify, defend, and hold harmless the  indemnified parties from and against any damages, attorneys’ fees, or costs  awards, including attorneys’ fees awarded under Code of Civil Procedure section  1021.5, assessed or awarded against the indemnified parties. The Applicant shall  cooperate with the City to enter a Reimbursement Agreement to govern any such  reimbursement.  The Applicant shall agree to (without limitation) reimburse the City for all costs  incurred in additional investigation or study of, or for supplementing, redrafting,  revising, or amending, any document (such as an Environmental Impact Report,  negative declaration, specific plan, or general plan amendment) if made necessary  by proceedings challenging the project approvals and related environmental  review, if the applicant desires to continue to pursue the project.  The Applicant shall agree that the City shall have no liability to the Applicant for  business interruption, punitive, speculative, or consequential damages.  28. NOTICE OF FEES, DEDICATIONS, RESERVATIONS OR OTHER  EXACTIONS  The Conditions of Project Approval set forth herein may include certain fees,  dedication requirements, reservation requirements, and other exactions.  Pursuant  to Government Code Section 66020(d) (1), these Conditions constitute written  notice of a statement of the amount of such fees, and a description of the  dedications, reservations, and other exactions.  You are hereby further notified that  the 90‐day approval period in which you may protest these fees, dedications,  reservations, and other exactions, pursuant to Government Code Section 66020(a),  has begun.  If you fail to file a protest within this 90‐day period complying with  all of the requirements of Section 66020, you will be legally barred from later  challenging such exactions.  SECTION IV:  CONDITIONS ADMINISTERED BY THE PUBLIC WORKS  DEPARTMENT  1. EMERGENCY VEHICLE ACCESS EASEMENT  Developer shall provide an emergency vehicle access easement as necessary and if  required by the Santa Clara County Fire Department to facilitate emergency vehicle  access onsite.   2. TRAFFIC SIGNAL INSTALLATION  New traffic signals shall be installed at the southwest corner of Stevens Creek  Boulevard and South Foothill Boulevard and shall be approved by the Director of  Page 12 of 20 Public Works. Traffic signal plans must be completed and approved prior to Final  map approval.   3. STREE IMPROVEMENTS & DEDICATION  Roadway dedication in fee title and frontage improvements along the project will be  required to the satisfaction of the Director of Public Works. Street improvements and  grading and drainage plans must be completed and approved prior to Final map  approval.   Street improvements may include, but not be limited to, new curb, gutter, detached  sidewalk, ADA ramps, driveways, storm drain main upgrades and laterals, street tree  installations, green stormwater infrastructure, traffic signals, streetlight and/or  pedestrian push button relocation. All improvements must be completed and  accepted by the City prior to Building Final Occupancy or Street Improvement  Encroachment Permit acceptance whichever comes first.   Maintenance of Green Stormwater Infrastructure shall be the responsibility of the  Developer and included in the Stormwater Management Facilities, Operation,  Maintenance and Easement Agreement to be executed during the building permit  stage. Additional comments will be provided and shall be incorporated prior to Final  Map approval.   4. ACCEPTANCE OF PROPERTY RIGHTS  The Public Works Director, or his/her designee, shall have the authority to accept all  offers of dedications, easements, quitclaims and other property rights and interests on  behalf of the City.   5. CURB AND GUTTER IMPROVEMENTS  Curbs and gutters, sidewalks and related structures shall be installed in accordance  with grades and standards as specified by the Director of Public Works. All  improvements must be completed and accepted by the City prior to Building Final  Occupancy or Street Improvement Encroachment Permit acceptance whichever  comes first.   6. PEDESTRIAN AND BICYCLE IMPROVEMENTS  Developer shall provide pedestrian and bicycle related improvements (e.g. walkway  and bicycle racks, etc.) consistent with the Cupertino Bicycle Transportation Plan and  the Pedestrian Transportation Plan, and as approved by the Director of Public Works.  All improvements must be completed and accepted by the City prior to Building Final  Occupancy or Street Improvement Encroachment Permit acceptance whichever  comes first.   Page 13 of 20 7. STREET LIGHTING INSTALLATION  Developer shall provide pedestrian and bicycle related improvements (e.g. walkway  and bicycle racks, etc.) consistent with the Cupertino Bicycle Transportation Plan and  the Pedestrian Transportation Plan, and as approved by the Director of Public Works.  All improvements must be completed and accepted by the City prior to Building Final  Occupancy or Street Improvement Encroachment Permit acceptance whichever  comes first.   8. GRADING  Grading shall be as approved and required by the Director of Public Works in  accordance with Chapter 16.08 of the Cupertino Municipal Code. 401 Certifications  and 404 permits maybe required. Please contact Army Corp of Engineers and/or  Regional Water Quality Control Board as appropriate.   9. DRAINAGE  Drainage shall be provided to the satisfaction of the Director of Public Works.   Hydrology and pre‐ and post‐development hydraulic calculations must be provided  to indicate whether additional storm water control measures are to be constructed or  renovated.  The storm drain system may include, but is not limited to, subsurface  storage of peak stormwater flows (as needed), bioretention basins, vegetated swales,  and hydrodynamic separators to reduce the amount of runoff from the site and  improve water quality.  Any storm water overflows or surface sheeting should be  directed away from neighboring private properties and to the public right of way as  much as reasonably possible.    All storm drain inlets shall be clearly marked with the words “No Dumping – Flows  to Creek” using permanently affixed metal medallions or equivalent, as approved by  the Environmental Programs Division.    Additional comments will be provided and shall be incorporated prior to Final Map  approval.   10. C.3 REQUIREMENTS  C.3 regulated improvements are required for all projects creating and/or replacing  10,000 S.F. or more of impervious surface (collectively over the entire project site).  The  developer shall reserve a minimum of 4% of developable surface area for the  placement of low impact development measures, for storm water treatment, unless  an alternative storm water treatment plan, that satisfies C.3 requirements, is approved  by the Director of Public Works.    Page 14 of 20 The Applicant must include the use and maintenance of site design, source control  and storm water treatment Best Management Practices (BMPs), which must be  designed per approved numeric sizing criteria.  A Storm Water Management Plan,  Storm Water Facilities Easement Agreement, Storm Water Facilities Operation and  Maintenance Agreement, and certification of ongoing operation and maintenance of  treatment BMPs are each required.     All storm water management plans are required to obtain certification from a City  approved third party reviewer.  11. SUBDIVISION AGREEMENT  The project developer shall enter into a subdivision agreement with the City of  Cupertino providing for payment of fees, including but not limited to checking and  inspection fees, storm drain fees, park dedication fees and fees for under grounding  of utilities. Said agreement shall be executed prior to recordation of Final Map.    Estimated Fees:  a. Checking & Inspection Fees:  Per current fee schedule ($4,482 or 5% of  improvement costs)  b. Grading Permit:  Per current fee schedule ($3,450 or 6% of  improvement costs)  c. Storm Drainage Fee:  Per current fee schedule ($3,777 per AC + $286  per unit)  d. Transportation Impact Fee:  Per current fee schedule $38,199 (single family   $6797 per unit) ($6,695 per new PM trip)  e. Encroachment Permit Fee:  Per current fee schedule ($3,095 or 5% of  improvement costs)  f. Park Fees (excluding BMR units):  Per current fee schedule: $480,000 ($60,000 per  unit)  g. Storm Management Plan Fee  Per current fee schedule ($1,484)  h. Map Checking Fee  Per current fee schedule ($11,527)  i. Street Tree Fee:  By Developer or Per current fee schedule: $427  per tree  Bonds:  a. Faithful Performance Bond: 100% of Off‐site and On‐site Improvements  b. Labor & Material Bond: 100% of Off‐site and On‐site Improvement  c. On‐site Grading Bond: 100% of site improvements.    ‐ The fees described above are imposed based upon the current fee schedule adopted  by the City Council. However, the fees imposed herein may be modified at the  Page 15 of 20 time of recordation of a final map or issuance of a building permit in the event of  said change or changes, the fees changed at that time will reflect the then current  fee schedule.  12. FINAL MAP  A final map will be subject to City Council approval and shall be recorded prior to  issuance of building permits. Existing buildings must be demolished prior to  recordation of the final map as building(s) cannot straddle between parcel lines.  13. TRANSPORTATION IMPACT FEES  The Project is subject to the payment of Transportation Impact Fees under City’s  Transportation Impact Fee Program under (Chapter 14.02 of the Cupertino Municipal  Code).     14. PARKS  The residential project is subject to the payment of park fees in‐lieu of park land  dedication under City’s Park Land Dedication Fee (Chapter 13.08 of the Cupertino  Municipal Code). Below Market Rate units do not incur Park Land Dedication Fees.  15. SURVEYS  A Boundary Survey and a horizontal control plan will be required for all new  construction to ensure the proposed building will be set based on the boundary  survey and setback requirements.      16. TRASH, RECYCLING AND COMPOST ENCLOSURES   Trash enclosure plans must be designed in accordance with the City’s “Public Works  Guidelines” posted at www.cupertino.org/nowaste, and to the satisfaction of the  Environmental Programs Manager. Clearance by the Public Works Department is  required prior to obtaining a building permit. (CMC 9.18.210 H & K)  Applicant shall enter into an agreement with the City that indemnifies and holds  harmless both the City and the refuse and recycling collection company (Recology)  from and against any harm, damage or maintenance that may occur or become  necessary to onsite paving stone driveway surfaces.  17. OPERATIONS & MAINTENANCE AGREEMENT  Developer shall enter into an Operations & Maintenance Agreement with the City  prior to final occupancy.  The Agreement shall include the operation and maintenance  for non‐standard appurtenances in the public road right‐of‐way that may include, but  is not limited to, sidewalk, pavers, and street lights.  Page 16 of 20 18. UNDERGROUND UTILITIES  Developer shall comply with the requirements of the Underground Utilities  Ordinance No. 331 and other related Ordinances and regulations of the City of  Cupertino, and shall coordinate with affected utility providers for installation of  underground utility devices.  Developer shall submit detailed plans showing utility  underground provisions.  Said plans shall be subject to prior approval of the affected  Utility provider and the Director of Public Works.  19. TRANSFORMERS & CABINETS  Electrical transformers, telephone cabinets and similar equipment shall be placed in  underground vaults.  The developer must receive written approval from both the  Public Works Department and the Community Development Department prior to  installation of any above ground equipment.  Should above ground equipment be  permitted by the City, equipment and enclosures shall be screened with fencing and  landscaping such that said equipment is not visible from public street areas, as  determined by the Community Development Department.  Transformers shall not be  located in the front or side building setback area.  20. WATER BACKFLOW PREVENTERS  Domestic and Fire Water Backflow preventers and similar above ground equipment  shall be placed away from the public right of way and site driveways to a location  approved by the Cupertino Planning Department, Santa Clara County Fire  Department and the water company.  21. BEST MANAGEMENT PRACTICES  Utilize Best Management Practices (BMPs), as required by the State Water Resources  Control Board, for construction activity, which disturbs soil. BMP plans shall be  included in grading and street improvement plans.  22. NPDES CONSTRUCTION GENERAL PERMIT  When and where it is required by the State Water Resources Control Board (SWRCB),  the developer must obtain a Notice of Intent (NOI) from the SWRCB, which  encompasses preparation of a Storm Water Pollution Prevention Plan (SWPPP), use  of construction Best Management Practices (BMPs) to control storm water runoff  quality, and BMP inspection and maintenance.    23. EROSION CONTROL PLAN  Developer must provide an approved erosion control plan by a Registered Civil  Engineer.  This plan should include all erosion control measures used to retain  materials on site.  Erosion control notes shall be stated on the plans.  Page 17 of 20 24. WORK SCHEDULE  Every 6 months, the developer shall submit a work schedule to the City to show the  timetable for all grading/erosion control work in conjunction with this project.  25. TRAFFIC CONTROL PLAN  The developer must submit a traffic control plan by a Registered Traffic Engineer to  be approved by the City. The plan shall include a temporary traffic control plan for  work in the right of way as well as a routing plan for all vehicles used during  construction. All traffic control signs must be reviewed and approved by the City  prior to commencement of work.  The City has adopted Manual on Uniform Traffic  Control Devices (MUTCD) standards for all signage and striping work throughout  the City.    26. STREET TREES  Street trees shall be planted within the Public Right of Way to the satisfaction of the  Director of Public Works and shall be of a type approved by the City in accordance  with Ordinance No. 125.  27. FIRE PROTECTION  Fire sprinklers shall be installed in any new construction to the approval of the City.    28. SANTA CLARA COUNTY FIRE DEPARTMENT  A letter of clearance for the project shall be obtained from the Santa Clara County Fire  Department prior to issuance of building permits.  Clearance should include written  approval of the location of any proposed Fire Backflow Preventers, Fire Department  Connections and Fire Hydrants (typically Backflow Preventers should be located on  private property adjacent to the public right of way, and fire department connections  must be located within 100’ of a Fire Hydrant).  29. FIRE HYDRANT  Fire hydrants shall be located as required by the City and Santa Clara County Fire  Department as needed.  30. SAN JOSE WATER COMPANY CLEARANCE  Provide San Jose Water Company approval for water connection, service capability  and location and layout of water lines and backflow preventers before Final Map  approval.  31. DEDICATION OF UNDERGROUND WATER RIGHTS  Developer shall “quit claim” to the City all rights to pump, take or otherwise  extract water from the underground basin or any underground strata in the Santa  Clara Valley.  Page 18 of 20 32. SANITARY DISTRICT  A letter of clearance for the project shall be obtained from the Cupertino Sanitary  District prior to Final Map approval.  33. UTILITY EASEMENTS  Clearance approvals from the agencies with easements on the property (including  PG&E, AT&T, and California Water Company, and/or equivalent agencies) will be  required prior to recordation of Final Map. or issuance of building permits, whichever  comes first.  Provide letters from PG&E and AT&T to state their concurrence with the  proposed easement relocation.    SECTION V:  CONDITIONS ADMINISTERED BY THE SANTA CLARA COUNTY  FIRE DEPARTMENT  1. FIRE SPRINKLERS REQUIRED:   (As noted on Sheet A0) Approved automatic sprinkler systems in new and existing  buildings and structures shall be provided in the locations described in this Section or  in Sections 903.2.1 through 903.2.18 whichever is the more restrictive. For the  purposes of this section, firewalls used to separate building areas shall be constructed  in accordance with the California Building Code and shall be without openings or  penetrations. NOTE: The owner(s), occupant(s) and any contractor(s) or  subcontractor(s) are responsible for consulting with the water purveyor of record in  order to determine if any modification or upgrade of the existing water service is  required. A State of California licensed (C‐16) Fire Protection Contractor shall submit  plans, calculations, a completed permit application and appropriate fees to this  department for review and approval prior to beginning their work. CFC Sec. 903.2 as  adopted and amended by CMC.  2. WATER SUPPLY REQUIREMENTS   Potable water supplies shall be protected from contamination caused by fire  protection water supplies. It is the responsibility of the applicant and any contractors  and subcontractors to contact the water purveyor supplying the site of such project,  and to comply with the requirements of that purveyor. Such requirements shall be  incorporated into the design of any water‐based fire protection systems, and/or fire  suppression water supply systems or storage containers that may be physically  connected in any manner to an appliance capable of causing contamination of the  potable water supply of the purveyor of record. Final approval of the system(s) under  consideration will not be granted by this office until compliance with the  requirements of the water purveyor of record are documented by that purveyor as  having been met by the applicant(s). 2016 CFC Sec. 903.3.5 and Health and Safety  Code 13114.7.  Page 19 of 20 3. ADDRESS IDENTIFICATION   New and existing buildings shall have approved address numbers, building numbers  or approved building identification placed in a position that is plainly legible and  visible from the street or road fronting the property. These numbers shall contrast  with their background. Where required by the fire code official, address numbers  shall be provided in additional approved locations to facilitate emergency response.  Address numbers shall be Arabic numbers or alphabetical letters. Numbers shall be a  minimum of 4 inches (101.6 mm) high with a minimum stroke width of 0.5 inch (12.7  mm). Where access is by means of a private road and the building cannot be viewed  from the public way, a monument, pole or other sign or means shall be used to  identify the structure. Address numbers shall be maintained. CFC Sec. 505.1  4. CONSTRUCTION SITE FIRE SAFETY   All construction sites must comply with applicable provisions of the CFC Chapter 33  and our Standard Detail and Specification SI‐7. Provide appropriate notations on  subsequent plan submittals, as appropriate to the project. CFC Chp. 33.  SECTION VI:  CONDITIONS ADMINISTERED BY THE OFFICE OF COMMUNITY  DEVELOPMENT – BUILDING DIVISION  1. CALIFORNIA BUILDING CODE:  The proposed scope of work shall comply with the 2019 California Building Code  Chapter 11A.     SECTION VIII:  CONDITIONS ADMINISTERED BY THE CUPERTINO SANITARY  DISTRICT   District will require developer/owner to enter into an Installer’s Agreement. If the  project is approved and moves into final design, please have the developer/engineer  contact us to initiate the Installer’s Agreement.    Connection permit fees, Sewer Development Fees, & Treatment Plant Capacity Fees will  be required for the proposed work during the Building Permit Phase and will be  required as part of the Installer’s Agreement.    Cupertino Sanitary District shall approve sanitary sewer civil plans during Building  Permit Phase.    Provide Cupertino Sanitary District with a sanitary sewer easement (SSE) that is  separate from the Public Utility Easement (PUE). Location of SSE can be the same as  proposed PUE.    Addition of 9 residential units to the system might cause an issue with the District’s  downstream sewer capacity through the City of Santa Clara.    Provide the Cupertino Sanitary District with new parcel numbers for lots after  subdivision.   Page 20 of 20     PASSED AND ADOPTED at a regular meeting of the City Council of the City of  Cupertino this 18th 13th day of January, 2022 by the following vote:    Members of the City Council    AYES:      NOES:   ABSENT:   ABSTAIN:     SIGNED:       ________  Darcy Paul, Mayor  City of Cupertino         ________________________   Date  ATTEST:        ________  Kirsten Squarcia, City Clerk       ________________________   Date