TUP-2021-003 - Project description letter - TUP 10-15-21 mbm�unity Deve� �rh�+�t �eip�Aap�kson
terms. Planning Divis'kyKttr4 Cupertino
Mernard J, 1-9011)
CVPERTI(A C.Jackson, FAIA o APPROVED
Frank W.Grauman,'tbP-20F21-003
Case kliam D.Loose,AIA
Gregory R.Mottola,AftiMcationNumbers)
R Viller,FAIA,LEED AP
Approva I BocW'DiMetor/SDtaf
u.Approva I Gate,,_ 01/06/22 c
S.Lee,AIA, I
Signatjo,ECse MartiJeffrey Tsumura
Kent Suhrbier,A,,,. LPL. Case Manager
15 October 2021
City of Cupertino Department of Community Development- Planning Division
Purpose: Temporary Use Permit TUP-2021-003
Project: Temporary Skylight Mockup Structure
12 Results Way, Cupertino, CA 95014
To Whom It May Concern,
We are pleased to present the attached drawings as required to receive a temporary use permit. As described
in the attached drawings and application forms, the project consists of construction of a temporary structure to
support eight skylight glazing panels as a mockup for review of aesthetic appearance. The glazing panels will
be attached to a scaffold structure designed by a licensed professional engineer. The structure is not intended
for use or occupancy and access will be restricted to authorized personnel only.
The structure will be located in the parking lot north of the office building at 12 Results Way, temporarily
displacing 14 of the 1,247 parking spaces within the office complex. The mockup structure is expected to
remain in place for approximately two weeks after completion. Following the two-week period, the structure will
be dismantled and removed from the site by the contractor.
Disturbance to the site will be limited to the minimum necessary to install the scaffolding and fencing. Trees
and pavement will not be disturbed. The site will be returned to its previous condition following removal of the
temporary structure.
Following approval of this temporary use permit, a building permit application will be submitted for approval.
Architecture Planning Interior Design 49 Geary Street, Suite 300
Wilkes-Barre/Pittsburgh/Philadelphia/Seattle/San Francisco/New York San Francisco, California 94108
415 989 2100 www.bcj.com
9—dliti UIV) [ Ve�$Yt PRrbepartment
amity of gDjIM- 6g tr1�J)6Development- Planning Division
CUPERTlAS October 2021 APPROVED
Casef'age 2 of 2 TUP-2021-003
Application Number(s)
Approval Body: Director/Staff
Appr(�yetLpp eterf 01/06/22 - J, -'1'4 y-u have u ,y questions.
Signature Jeffrey Tsumura
Case Manager
Sincerely,
Michael A. Henderson, AIA
Project Manager
206-204-5630
mhenderson@bcj.com
Enclosures:
Results Way Planning Application Executed 10.5.21.pdf
INDEMNIFICATION FORM signed 10-5-2021.pdf
A001 GENERAL INFORMATION.pdf
A100 PLANS ELEVS DETAILS.pdf