Loading...
HomeMy WebLinkAbout06090201-DCOVER SHEET 06090201-D 7440 ROLLINGDELL DR � k,z �. �� �+' �ti °����� � i I� CONTROL # PERMIT # (��( �f � Z c� ( DATE �-�. Z �_� PROJECT(~-l) �cR, �=c-�,•,L� JC,k-c1�� c dam) �5��-,,, c...��w��<...n t^e—rc�a� ADDRESS % y � G ��f I'� � ��� �"�� APPLICANT :�-�.�,�- � ��� OWNER x�, �,��.�,�, 2� r� 9 �� ���. ��� ®- ®:, I� �� • �� .r �� ��� _-- �--- � __-- __-- _ ' ''. --_��: sip st, fr,. '� ��yy� r'" �- r✓ APN# �� �j `f — � i - CI � � RES. (LUNG) C� � � (GARAGE) COMM.SQ.FT.(NEW) T.I. SQ.FT. RES. REMODEL �� � � � CONTACT f%der �--��-v� r PHONE # �/� `1 �SC�% FAX �r -7 -~ 3 � �-� VALUATION � �/ �-��' `� � RECEIPT #� �j � �`� PLN. CHECK ��� ENERGY CONSTRUCTION TAX--------------(Y) (N) GRADING SCHOOL FEES ------------------------ (Y) (N) SOILS HOUSING MITIGATION FEES----(Y) � BLDG PMT HEART OFT E ITY ------------- Y /,�N) SEISMIC NOTES: �C� (� �, ' ����;i '- ELECT J 9' 6 6�' L�G�ixr'mc-ram � PLBG MECH ISSUED BY� �� DATE /2=-/z � � TOTAL FEES ��2, � � � �� i CITY OF CUPFt2'I"INO MTV - BUILDING DIVISION PEIVrIqT CONTRACTOR TR3GTOR INFO BUILDING ADDRESS: - PERMIT NO. 06090201 7440 ROLLIN OWNER'S NAME: PERMIT ISSUE DATE BIN ZHAI L JIA WO _12/12/2006 PHONE: SANITARY NO. CONTROL NO. ARCHITECT/ENGINEER: BUILDING PERMITINFO BLDG ELECT PLUMB MECH O p LICENSED CONTRACTOR'S DECLARATION V I hereby affirm that 1 am licensed under provisions of Chapter 9 (commencing Z with Section 7000) of -Division 3 of the Business and Professions Code, and my license is h y in full force and effect. y 2: License Class Lie & wDate Contractor ,3 ARCHITECTS DECLARATION i a I understand my plans shall be used as public records )yU +w0 H Licensed Professional n y OWNER -BUILDER DECLARATION j e I hereby affirm that I am exempt from the Contractor's License Law for the p O following runsan. (Section 7(131.5, Business and Professions Code: Any city or county <$ which requires a permit to construct, alter, improve, demolish, or repair any structure a — m prior to its issuance, also requires the applicant for such permit to file a signed statement ze that he is licensed pursuam ro the provisions of Ube Contractor's License Law (Chapter 9 (commencing with Section 7000) of Division 3 of the Business and Professions Code) or 5 that he is exempt therefrom and the basis for the alleged exemption. Any violation of Section 7031.5 by any applicant for a permit subjects the applicant to a civil penalty of not more than five hundred dollars ($500). ❑ 1, as owner of the property, or my employees with wages as their sale compensation, will do the work, and the structure is not intended or offered for sale (Sec.7044, Business and Professions Code: The Contractor's License Law does not apply to an owner of property who builds or improves thereon, and who does such work himself or through his own employees, provided that such improve mcnis are not intended or offered for sale. If, however, the building or improvement is sold within one year of completion, the owner - builder will have the burden of proving that he did not build or improve for purpose of Sale.). b1, as owner of the property, am exclusively contracting with licensed contractors to construct the project (Sec. 7044, Business and Professions Code:) The Contractor's Li. cense Law does not apply to an owner of property who builds or improves thereon, and who contracts for such projects with a contractor(s) licensed pursuant to the Contractor's License Law. ❑ 1 am exempt under Sec . B & P C for this mason Owner .....-...7%�7- -Z- 7L•f^C:'t--Date (Z/�1 �i WORKER'S COMPENSATION DECLARATION I hereby affirm under penalty of perjury one of the following declarations: ❑ I have and will maintain a Certificate of Consent to self -insure for Worker's Compen- sation, as provided for by Section 3700 of the Labor Code, for the performance of the work for which this permit is issued. ❑ 1 have and will maintain Worker's Compensation Insurance, as required by Section 3700 of the Labor Code, for the performance of the work for which this permit is issued. My Worker's Compensation Insurance carrier and Policy number are: Carrier: Policy No.: CERTIFICATE OF EXEMPTION FROM WORKERS' COMPENSATION INSURANCE (This section need not be completed if the permit is for one hundred dollars ($1 W) or less,) I certify that in the performance of the work for which this permit is issued. I shall not craplOyanypersonmanymanne o to bccq c subject to the Workers' Compensation Laws of California. Date- Applicant - NOTICE TO APPLICANT: If, alter making this Certificate of Exemption, you should become subject to the Worker's Compensation provisions of the Labor Code, you must 2 forthwith comply with such provisions or this permit shall be deemed revoked. 'z O CONSTRUCTION LENDING AGENCY .� I hereby affirm that there is a construction lending agency for the performance of 7 the work for which this permit is ;ssued (Sec. 3097, Civ, C.) W Q Lender's Name z Lender's Address V C) I certify that 1 have read this application and state that the above information is V. h"h correct. 1 agree to comply with all city and county ordinances and state laws relating to 0 U building construction, and hereby authorise representatives of this city to enter upon the W above-menuoned property for inspecuon purposes. CL (We) agree to save, indemnify and keep harmless the City of Cupertino against cA liabilities, judgments, costs and expenses which may in any way accrue against said City U Z in consequence of the granting of this permit. h� APPLICANT UNDERSTANDS AND WILL COMPLY WITH ALL NON -POINT SOURCE REGULATIONS. >/I�VV6 Signature of Applicam/Cuntractor Date HAZARDOUS MATERIALS DISCLOSURE Will die applicant or future building occupant store or handle hayardous material as defined by the Cupertino Municipal Code. Chapter 912, and the Health and Safety Code, Section 25532(a)? ❑ Yes ) j No Will the applicant or future building occupant use equipment or devices which emit hazardous air contaminants as defined by the Bay Area Air Quality Management District? C] Yes ) No 1 have read the hazardous materials requirements under Chapter 6.95 of the Califor- nia Health & Safety Code, Sections 25505, 25533 and 25534.1 understand that if the building does not currently have a tenant, that it is my responsibility to notify the occupant of the requirements which must be met prior to issuance of a Certificate of Ottcu�ancy. Owncr or authorized agent Datc Job Description ADDITION 6801-FAMILY ROOM, KITCHEN,BAY WINDOW ALSO REROOF ENTIRE HOUSE. Sq. Ft. Floor Area Vat$Z4r5 7 71 APN Number Occupancy Type 35931042.00 Required Inspections inIssued by: Re -roofs Type of Roof Date All roofs shall be inspected prior to any roofing material being installed. If a roof is installed without first obtaining an inspection, I agree to remove all new materials for inspection. Signature of Applicant Date All roof coverings to be Class "B" or better CITY OF CUPEkTINO Community Development 10300 Torre Avenue Cupertino CA 95014 Telephone (408) 777-3228 Fax (408) 777-3333 Building Department JOB ADDRE G ` I ! i i! ` D �4�Y PERMIT #_ �i% 0610 0 Z `(�! OWNER'S NAME: "Z. PHONE # _ GENERAL CONTRACTOR:;,/ l ram' �� FAX # XI am not using any subcontractors: Signature Please check applicable subcontractors and complete the following information: �)1,w -7 (,r y ,5- 4 Date SUBCONTRACTOR BUSINESS NAME BUSINESS LICENSE #_ Cabinets & Millwork Cement Finishing Electrical Excavation Fencing Flooring: Carpeting Linoleum / Wood Glass / Glazing Heating Insulation _ Landscaping Lathing Masonry _ Ornamental Sheet Metal Painting / Wallpaper Paving Plastering Plumbing _ Roofing Septic Tank � --------------- ___.____ Sheet Metal Sheet Rock Tile I Owner/Cofo.txa r Signature Date r 4i 77 Jr _.._.,_.._. �„_„_„_, 98.5........................................7.._.._.._.,_.,_,._.._.'_"98.. ...._.._.. ; rain p FAK ! = Fiberglass Pool, Hawaiian Aloha IGone"� ` 1 - ::SPA ,aaa o p 1 o i rai Existing Lamp p l: o_ ------ 33.000 20,000 = i step ++ I 7-7 C' � z C - E �i ment azd _ 51, O - New Concrete I� 5.000 a Exixting Concrete a o New am rain O _ - — i isti _ --- 23.500 Existing Stet Exis L Water Level 3" below lower top ' 12.000 26.000 — amp New oa,«ete ! jsolar1--, 2or 2'1.1 IW Neighbor's Flag Drive Way ! = s.s _s 53 4t ���. ��� �.4 4.50 e 7 Residence. 22435 Santa Paula Ave ! 10.00 0 �' New Shed o 1sI ? :a of j o ' 0 78.000 T10 G?� t` � � � t . !' `� - r {. t�,t; G %i-, it � ...,.. � . { b r�ax•». II,... . �$. �f.� ., ...,.,,.,.. ', i Exlstin Shed Id' ., a--e [ •. j j -,r_�_� f. _a ! �� 20.50 d et -- 32.000I� Gf x� t� 7- Existing Concrete 22.000 -- 1 ' ? Drive Way 1 04 li 1 i — I113.000 i 0C7�'/Z Scale: Grid Size = 1ft Address: 22435 Santa Paula Ave, Cupertino . Permit #: 02030139, 03/25/2002 < SANTA PAULA AVE > Rev: 1, 03/3112002 Owner: Mahmoud E Azar Shahram, 408-996-2584 I I __ FRONT ELEVATION REAR ELEVATION REAR ELEVATION W/ WINDOW 51DE ELEVATION m lL'Hl.t�:lolS�1:LL.11�lr Gi�T;♦yL1��f:Ll`IIiL SIDE WALL FRAMING �6 F I �'- ------- ------ � � TYPICAL END RAFTER axe JA TYPICAL INTERIOR RAFTER e,U C1GB�LE DETAIL n HIN�G\�_E DETAIL rr- NAILING SCHEDULE �o�vr M Ru nLL wN W' �.M VJ M0 Rn'.mo Y i�iwRR�R�txv �R�sro. nnnR FI FVATI N G3 RAW MAIM PLANS AND ELEVATIONS �I_I►_ j Vasil Bin Zhai & Jia Wo 7440 Rollingdell Drive Cupertino, CA 95014 (408) 383-9870 June 7, 2007 City of Cupertion Building Division RE: Permit# 06090201 To Whom It May Concern: Due to the loan processing takes more than what we expect, and also our request for quotation processing haven't fully completed yet, please help to extend our above listed permit from June 12, 2007 to July 6, 2007. Thanks for your help and consideration. Sincerely, Bin Zhai FREIONT UNION HIGH SCHOOL'nISTRICT 589 WEST FREMONT AVENUE SUNNYVALE, CALIFORNIA 94087 408-522-2200 Developer Impact Fee Compliance Building permits will not be issued without a completed Certificate of Compliance Building Permit Application The City of has received a request for a Building Permit described as follows: ___ New Residential Development ___ Residential Addition (501 sq. ft. or more) -___ Commercial Development Name of Owner/ Developer: Project Address: Lot/Parcel # Square Footage: Descript ion: Permit /Plan Check # Dat e City Building Inspector Square footage verified by the city prior to issuance of a building permit; fees may be adjusted accordingly. Feeder Elementary District: _ SCHOOL DISTRICT DEVELOPER IMPACT FEE CERTIFICATE OF CO ;1VF1D The authorized representative of the Fremont Union hl h Sch lDsJict1Jtcqwed lie City of BuildlnS Permit Request described above and hereby cerlifies that the developer or authorized representative has met the requirements of the District's Developer Impact Fee requirements. Dated: Certificate not valid without District Seal, Initial, and Date Fremont Union High School District Authorized Representative Fee $ Rev. 11/02 Farilities Planning -- White City -- Yellow Requestor -- Pink Accounting -- Gold i9/03 - 1,0001 w Cupertino Union School District 10301 Vista Drive, Cupertino, CA 95014 Tel (408) 252-3000 • Fax (408) 865-0326 Check Number: Developer Impact Fee Compliance The Cupertino Union School District has adopted Resolution Nos. 1403 and 1404, imposing developer impact fee pursuant to Government Code 53080. Building Permit Request The City of has received a request for a Building Permit described as follows: Residential Development Project Commercial/Industrial Development Project Name of Developer: Project Address: Description: Square Footage: Date: Lot/Parcel #: By: Permit #: City Authorized Representative Square footage will be verified by the city prior to issuance of a building permit; fees may be adjusted accordingly. Important Notice: Cupertino Union School District gives no credit for total demolition of existing s otage area, which makes way for new construction as mandated in the Government Code Section 5 0% 80.6 and 65995. SCHOOL DISTRICT DEVELOPER IMRLkT-FE1! J CERTIFICATE OF COMPLIANCE'-:� The authorized representative of the Cupertino Union School District has reviewed the City of Building Permit Request described above and hereby certifies that the developer or authorized representative has met the requirements of the District's Developer Impact Fee requirements. Dated: Authorized Representative Cupertino Union School District Certificate not valid without District Seal, Initial, and Date Fee: $ Facilities Planning - White City - Yellow Requestor - Pink Accounting - Gold [3) N IT TA L #2 0 11 ! P R 11 1 TT; U, U 1 V 111 0`2 7STFRUCTURAL CALCULATIONS F E pJ an 65 No, M Lu r" cc Em x Calculations By: I S E Job #: 0637 W CAO�_ Job Title: 7440 Rollingdell Drive Cupertino, CA S.F.R. Addition/New Roof Date: 8/29/2006 This engineering design is for the area of additions shown only. No warranty w ty as to the quality or the structural integrity of the existing sbxx:ture is inferred or implied beyond what is written in the calcuk-dxorrs and on the plans. By aocepting this work, the owner acknowiedges the erxjkwm limited liability. a Ingram Structural Engineering Jeff Ingram, P.E. 996 Minnesota Ave-, Suite 103 San Jose, CA 95125 Ofte: 408-836-6604 Cal: 4084n6-6602 Fax: 408-292-9370 emal: jaff0kxjramSE.com www,kVramSE.corn Page / of q6 GENERAL NOTES -THE FOLLOWING SPECIFICATIONS SHALL CONFORM TO THE 2001 CALIFORNIA BUILDING CODE AND ANY OTHER CITY ORDINANCES WHICH ARE IN FORCE AT THE TIME OF THIS PROJECT. —CONTRACTOR SHALL VERIFY ALL DIMENSIONS, ELEVATIONS, AND CONDITIONS PRIOR TO STARTING ANY FIELD WORK. —ANY DEVIATION CALLED BY THE FIELD CONDITIONS, OR ANY CONDITIONS DIFFERENT FROM THOSE INDICATED ON PLANS SHALL BE BROUGHT TO THE ENGINEER'S ATTENTION. ANY DISCREPANCY NOT REPORTED TO THE ENGINEER, WILL ABSOLVE THE ENGINEER FROM ANY LIABILITY. —TYPICAL DETAILS SHALL APPLY WHERE NO SPECIFIC DETAILS OR SECTIONS ARE PROVIDED- -DIMENSIONS SHOWN ON PLANS OR DETAILS TAKE PRECEDENCE OVER SCALES SHOWN. —THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE SATISFACTORY COMPLETION OF ALL WORK IN ACCORDANCE WITH THE PROJECT PLANS AND SPECIFICATIONS. —THE CONTRACTOR SHALL PROVIDE ADEQUATE FLASHING AND WATERPROOFING TO PREVENT ANY ROOF AND/OR BALCONY RAIN WATER SEEPAGE. —IF TRUSSES ARE TO BE USED IN LIEU OF CONVENTIONAL FRAMING, SHOP DRAWINGS AND CALCULATIONS SHALL BE PROVIDED TO THE CITY FOR APPROVAL BEFORE FABRICATION. —IF AN ALTERNATE SHEAR WALL TIEDOWN SYSTEM IS TO BE USED IN LIEU OF SIMPSON HOEDOWNS, SHOP DRAWINGS AND CALCULATIONS SHALL BE PROVIDED TO THE CFIY FOR APPROVAL BEFORE FABRICATION. STRUCTURAL STEEL -STRUCTURAL STEEL SHALL CONFORM TO A.S.T.M. (A-36) SPECIFICATIONS AND TO THE A.I.S_C. SPECIFICATIONS FOR FABRICATION AND ERECTION. -ALL BOLTS SHALL CONFORM TO A.S.T.M. (A-307) FOR UNFINISHED BOLTS. -ALL BOLT HOLES IN STEEL MEMBERS SHAH BE TRUE, BURNING OF HOLES FOR CONNECTIONS WILL NOT BE PERMITTED. -PROVIDE FULL BEARING ON UNTHREADED PORTION OF BOLT SHANK FOR ALL STEEL CONNECTIONS. -PROVIDE LEVELING NUTS FOR ALL BOLTS AT BEAM SEATS AND COLUMN BASE PLATES. -ALL NUTS FOR STRUCTURAL STEEL CONNECTIONS SHALL BE HEAVY HEXAGONAL NUTS. —ALL WELDING SHALL BE AS INDICATED ON THE DETAILS AND PERFORMED IN A QUALIFIED SHOP, UNDER CONTINUOUS INSPECTION PER CBC 1701. FIELD WELDING, OTHER THAN MISCELLANEOUS TACK WELDING, IS NOT PERMITTED, UNLESS NOTED OTHERWISE IN THE DETAILS. THE FABRICATION SHOP SHALL BE REGISTERED & APPROVED BY THE CITY BUILDING DEPARTMENT. CBC 1701.7 r Jeff Ingram, P E JobM> 996 Minnesota Ave.. Suits 103 San Jose, CA 95125 CXke: /08.836-OW4 Co: soe-as 6W Fa)c 4MM-9370 Of Ingram S&ucb fal � ema11 w °°m LUMBER -WOOD MEMBERS LESS THAN 5" IN WIDTH SHALL BE DOUGLAS FIR NO. 2 AND 5" OR WIDER SHALL BE DOUGLAS FIR NO.1, UNLESS NOTED OTHERWISE ON PLANS. -UNLESS NOTED OTHERWISE ON PLANS, ALL NAILING SHALL BE PER 2001 CALIFORNIA BUILDING CODE, TABLE 23-II-8-1. -ALL CONNECTING HARDWARE SHALL BE SIMPSON COMPANY TYPE OR EQUAL AND INSTALLATION SHALL BE IN ACCORDANCE WITH MANUFACTURER'S RECOMMENDATIONS UNLESS NOTED OTHERWISE ON PLANS. -GLUED LAMINATED TIMBER BEAMS SHALL HAVE A MINIMUM BENDING STRESS OF 2400 psi. PROVIDE STANDARD CAMBER UNLESS NOTED OTHERWISE ON PLANS. -ROOF PLYWOOD SHEATHING SHALL BE MINIMUM 1 /2" APA RATED CDX WITH EXTERIOR GLUE, GROUP 2. EXPOSED SHEATHING AT ROOF OVERHANG SHALL BE AS INDICATED ON THE ARCHITECTURAL PLANS. -WALL PLYWOOD SHEATHING, IF REQUIRED, SHALL BE MINIMUM 3/8" APA RATED CDX WITH EXTERIOR GLUE, GROUP 2. -FLOOR PLYWOOD SHEATHING SHALL BE T&G INT-APA WITH EXTERIOR GLUE, GROUP 2. SEE PLANS FOR SIZE. -BEARING AND NONBEARING WALLS SHALL HAVE DOUBLE TOP PLATES, LAPPED AT INTERSECTIONS. PLATE JOINTS SHALL BE STAGGERED 4'-0' MINIMUM AS INDICATED ON THE STRUCTURAL DETAILS. -UNLESS NOTED OTHERWISE ON PLANS, WALLS SHALL BE OF 2x4 STUDS (STUD GRADE OR GREATER) SPACED AT 16" ON CENTER. -ALL HEADERS ARE AS NOTED ON PLANS. -ALL WOOD BEARING ON CONCRETE OR MASONRY SHALL BE PRESSURE TREATED DOUGLAS FIR OR REDWOOD. EXCEPTION: POST BEARING ON PIERS MAY BE DOUGLAS FIR NO. 1 PROVIDED THAT A PROPER BASE CAP AND MIN. 6" ABOVE SOIL ARE PROVIDED. -HOLES FOR BOLTS SHALL BE DRILLED WITH A BIT 1 /16" LARGER THAN THE NOMINAL BOLT HOLE DIAMETER. FLAT WASHERS SHALL BE PROVIDED AT ALL HEADS AND NUTS WHICH WOULD OTHERWISE BARE DIRECTLY ON WOOD. ALL BOLTS SHALL BE TIGHTENED TO A SNUG CONDITION, AND RETIGHTENED UPON JOB COMPLETION. -STRUCTURAL MEMBERS (BEAMS, SHEAR WALL PLATES, OR POSTS USED AT HOLDOWNS) SHALL NOT BE CUT FOR PIPES, ECT., UNLESS SPECIFICALLY NOTED OR DETAILED. -2x SOLID BLOCKING SHALL BE PLACED BETWEEN JOISTS OR RAFTERS AT ALL SUPPORTS. CONCRETE -CONCRETE FOR SLABS ON GROUND, BEAM FOOTINGS, OR PIERS SHALL HAVE A MINIMUM COMPRESSIVE STRENGTH OF 2500 psi AT 28 DAYS, UNLESS NOTED OTHERWISE ON PLANS. -MAXIMUM AGGREGATE SIZE SHALL BE 3/4" AND A MAXIMUM SLUMP OF 4-1/2". p" Jeff Ingram, P.E. W6 Minnesota Ave., Suite 103 San Jose, CA 95125 Oahe: 40&93&4 eoa Celt 40e4S+seso¢ Fax: 408-292-9370 d ertteif: jafl@YpramSE.mm Ingram Strudwal Engineering wMw4voramsEo= —ANCHOR BOLTS, HOLDOWN BOLTS, DOWELS, AND OTHER REQUIRED INSERTS, SHALL BE POSITIONED AND FIRMLY SECURED IN PLACE BEFORE CONCRETE IS POURED. —CONTRACTOR SHALL TAKE ALL THE NECESSARY MEASURES TO PROVIDE A PROPER COMPACTION OF THE CONCRETE. —THE EXCAVATED BOTTOM OF ALL FOOTINGS SHALL EXTEND TO ELEVATIONS SHOWN ON THE DETAILS, AND THE FOOTINGS SHALL BE POURED IN NEAT EXCAVATIONS, WITHOUT SIDE FORMS AS POSSIBLE. REINFORCING STEEL —REINFORCING STEEL SHALL BE DEFORMED BARS, CONFORMING TO ASTM A615-40 REQUIREMENTS AND WELDED WIRE MESH PER ASTM SPECIFICATION A-185. —BARS NO. 4 AND SMALLER SHALL BE OF GRADE 40, AND BARS NO. 5 AND GREATER SHALL BE OF GRADE 60. LAP BARS 40 DIAMETERS AT SPLICES. —ALL REINFORCING BARS SHALL BE CLEAN OF ANY RUST OR FOREIGN MATERIALS. —CONCRETE COVER FOR REINFORCEMENT SHALL BE: a) 3" WHERE POURED AGAINST EARTH b} 2" WHERE POURED AGAINST FORMS c 1" FOR SLABS POURED AGAINST FORMS —SEE PLAN FOR QUANTITY AND LOCATION OF ANCHOR BOLTS, LOCATE BOLTS WITHIN 12" FROM CORNERS AND BUTT JOINTS. CONCRETE MASONRY — ALL MASONRY WORK SHALL BE REINFORCED GROUTED MASONRY AND CONFORM TO THE 2001 CALIFORNIA BUILDING CODE AND SHALL BE 8x8xl6 LIGHTWEIGHT UNITS WITH MAXIMUM LINEAR SHRINKAGE OF 0.06%, PER A.S.T.M. (C-90-52), GRADE A. NO CONTINUOUS INSPECTION REQUIRED. —MOTAR MIX SHALL BE COMPOSED OF ONE PART PORTLAND CEMENT TO NOT MORE THAN THREE PARTS SAND. GROUT MIX SHALL BE COMPOSED OF ONE PART PORTLAND CEMENT TO NOT MORE THAN THREE PARTS SAND AND NOT LESS THAN TWO PARTS PEA GRAVEL. —WALLS TO BE GROUTED IN 4' MAXIMUM LIFTS, UNLESS HIGH LIFT GROUT PROCEDURES (WITH BLOCKOUTS) ARE USED. ALL REINFORCING SHALL HAVE A MINIMUM COVERAGE OF 1 �2" OF GROUT. ALL BOLTS SHALL HAVE A MINIMUM COVERAGE OF 1 OF GROUT. —NO PIPES OR DUCTS SHALL BE PLACED IN MASONRY WALLS UNLESS SPECIFICALLY NOTED OR DETAILED. —DOWELS IN CONCRETE FOR MASONRY WALLS SHALL BE 2—#4 OR AS INDICATED ON THE DETAILS. —ALL RETAINING BLOCK WALLS SHALL BE PROVIDED WITH AN APPROVED MOISTURE BARRIER ON THE SOIL SIDE. SEE ARCHITECT'S DRAWINGS. SOIL —CONTRACTOR SHALL MAKE HIMSELF FAMILIAR WITH ALL OF THE SOIL INVESTIGATION REPORT REQUIREMENTS AND RECOMMENDATIONS, AND TAKE ALL THE NECESSARY MEASURES FOR A CORRECT AND COMPLETE IMPLEMENTATION OF SUCH REQUIREMENTS IN THE FIELD. Jeff Ingram, P.E. "' 9w Minnesota Ave., Suite 103 °j San Jose, CA 95125 oMee: 40B$.3"W4 Cat 40840"B02 Fax: 408-292-9370 s ingrem S`truckmal Engineering ww com Basis for Design: 2001 CBC, 2001 NDS Design Loads: ROOF LL Note LL for 12.12 pitch=12 psf, LL for <12 12=16 psf, LL<4 12=20 psf Roof Pitch (rise/run) 4 12 Roof Pitch(rise/run) 4 12 Vertical Loads (psf) (pst) Vertical Loads (psf) (psf) (psf) (psf) Roof. RDL RLL Roof: RDL RLL RLL RDL Roof w/fiat cln'g Roof (vault) Exterior Wall: w/stucco Roof Material 60 Roof Material 60 Studs 09 Plywd Sheathing 1.5 Plywd Sheathing 1.5 Plywd 1 2 2x Rafters @24" o c 20 2x Rafters @24" o c 2.0 Ext finish 100 Miscellaneous 00 Gyp & Instil.& Misc 60 Gypsum Board 2 5 95 16.0 155 160 Insulation 05 (see LL note) 151 Slope Adjustment., 10.0 Slope Adjustment: 16.3 (use for stucco or siding) RDL+RLL• 26.0 RDL+RLL: 32.3 Ceiling: Balcony or Terrace: Interior Wall: Joists 1 5 Finish Floor (file) 180 Studs 1 0 Insullation 1.0 Plywd 375 Gypsum Board 5.0 Ducts/Elec./Misc 05 Joists 25 LL Aiscellaneous: 1 0 5/8" Gypsum Bd. 30 LL 243 600 70 60 100 Note Deck LL=40 psf (10 psf min } For Seismic Hoor w/Carpet or Hardwood: Floor w/Tile or Stone: Finish Floor 300 Finish Floor 1250 (1" thk. @150 pcf) Plywd 225 314" C-D Plywd 225 314" C-D 3 0 psf per inch 2x6 @16" o c 1 40 2x_ @16" o c 200 Gypsum Board 250 Neglect @Foundation Gypsum Board 2 50 Ducts/Electrical 1.00 LL Miscellaneous 100 LL 102 400 203 400 Notes (1) For beam design, minimum deflection criteria per 2001 CBC is U240 & U360 for total load & live load respectively (2) Roof Rafters, Floor Joists, Studs designed for full lateral support @compression side of member, ie, CL=1 0 (3) For rafter desion the'hor¢ontal plane method' shall be used (see DL slope adiustment abovel Lumber Design Values for Joist or Beams, ASD BEAM DESIGN Specie Fb F F. ,tea, E-10 (psi)(psi)(psi) (Psi) DF-L #2 4x & less 900 160 1350 1 6 DF-L #1 4x & less 1000 180 1500 1 7 DF-L Select Structural 4x & less 1500 180 1700 1 9 DF-L #1 6x & greater 1350 170 925 1 6 DF-L Dense Select Structural 6x & greater 1900 170 1300 1 7 Glu-Lam's 24F-V4 DF/DF 2400 240 650 1 8 Parallam PSL 2 OE 2900 290 2900 20 Timberstrand 3x LSL 1 3E 1700 400 1400 1 3 Timberstrand 1.75"A & 3.97t LSL 1 7E 2600 400 2380 1 7 Microllam LVL 1.9E 2600 285 2510 19 Versa -Lam LVL 3080 Fb 3080 285 3000 20 Gang -Lam LVL 2950Fb-2.OE 2950 290 3200 20 Horizontal Loads: Earthquake (ZONE 4): Wind (exposure B): See Earthquake Analysis; 2001 CBC EQUATION (30-5) P=(Ce)(Cq)(qs)(I)=0.76'1.3'12.6'1.0=12.5 psf (U to 30'), CONSERVATIVE P=(Ce)(Cq)(qs)(I)=0.62`1.3'12.6`1.0=10.2 psf (0' to 15') 2001 NDS Tbl 4A 2001 NDS Tbl 4A 2001 NDS Tbl 4A 2001 NDS Tbl 4D 2001 NDS Tbl 4D 2001 NDS Tbl 5A Der Trus Joist (2003) Per Trus Joist (2003) Per Trus Joist (2003) Per Trus Joist (2003) ICBO ER-5663 ICBO ER-4321 Jeff Ingram, P.E. Jb "' 9% Minnesota Ave., Suite 103 San Jose, CA 95125 P.M Office:408-836-66oa Ceti:4084L%-6s02 ChwWd W. Fax: 408-292-9370 s errrad:'kV rgrarrr'- Ingram &nmitural Engineering www.krgramSE por= nn LATERAL ANALYSIS 'r` Jeff Ingram, P.E. J.6 0. 1 9% Wwxmota Ave., Slime 103 San Jose, CA 95125 POP Office- 408406.OW4 Cell_ 408-836.6W2 Fax: 408-292-9370 d ewok pr4VWVr9m%.aom Ingram Stucknai Engir~M www.kVramSE.com D.b. Jeff Ingram, P.E. 996 Mkw)esota Ave., Suite 103 Mp San Jose, CA 95125 Office Gatti 4084336-6W2 Chodw w Fax: 408-292-9370 of Ingram Structural Engineering *ww.kVnwvsSE-cam ro L V dc V'r 'v" 22-b /o' 0 LN LAJ 2- 0 A ouw Jeff Ingram, P.E. J.6 N. 9% Minnesota Ave., Suite 103 %r 199 pw San Jose, CA 95125 1 CXfios 40043&�� CeN: 408-836436M O—Ewd Fax: 408-292-9370 IrKjrarn Structural Engineering www. kVramSEcorn WIND: LATERAL ANALYSIS Method #2, Tbl. 16-H & 16-F, 70 mph, 2001 CBC P = CeCgggl = Ce(1.3)(12.6 psfl(1.0) = 16.38Ce Ce - per Tbl. 16-G Exposure B Exposure C Height Ce P (psfl Ce P (psfl 0-15' 0.62 10.2 1.06 17.4 15'-20' 0.67 11.0 1.13 18.5 20'-25' 0.72 11.8 1.19 19.5 25'-30' 0.76 12.5 1.23 20.1 30'-40' 0.84 13.8 1.31 21.5 IsE 1-rl J Jeff Ingram, P.E. 9% Mexwsofa Ave., Suf1e 103 San Jose, CA 95125 Offim: 40883&4=4 Cat 40840&4 W Fax 408-292-9370 a : jdlAtrgMrnSE.com wrw.kgramSE.00m . n1 ft . I� w a!e Z ZT Z Go << met p v z Z CO li w e i 0S to ? 0 m to no Zn 1 N rn i Go CD 9. Z 30 O �9 �g�,A O rn aY Nmm^ r��� o o ^ J 2 Z$ o 0 o A o@ a m s v xQ a o:co u! i s D N n M ^ u4 s M F a D m N v^ n W Y 0 D O N r N o �. °o �__ c ZO 'SS 0 s R E ° c c o 68 z R D 3 Y o 0 3 S F 0 0 0 d dti W N N V V U _ S Z S 2 S 0 u0 U N O O Q O f Jeff Ingram, P.E. �. 9% Minnesota Ave., Suite 103 POP B' San Jose, CA 95125 OMM:40e-83&MGa Ca 408�36-6602 Fax:408-292-9370 a emai: je11�6fprartSE.com Ingram Structural Engineering ..w.k�gamSE_can OAmDD uNai c m m v 0 91 o o'mo oo 0 0 _ _ 0 o c o 0 0 0 o T v o ogg0000Ss88888goso oxs s � 0 0 0 0 0No 0 0 0 m' 0 w om 0 0 o c o 0 o 0 0 0 0 0 �, O O 0 0 0 0 0 0 0 0 o X y < W 0 b O -mi 0 0 o o o v o 0 3 0 � � e � 0 0 0 0 0 o n 0 0 0 0 0 0 0 0 0 0 O G O O G O 0 0 0 0 o G G o O O G G O O O o O O O Q O O O C O O 0 0 0 5 Q � I"n U U W J,, i f N N o m l7 � V v y M (7 � D M 0 0 0 0 0 0 0 0 0 0 0 0 0 O o 8S8S$0000SB$88$ 0 0 0 0 0 0 0 0 0 0 V O (T O O S S O O O S O p O S S O O S O p O O S o O O O O NU1 W NN+ - - n 0 CalE _ �n m m u• u, _ _ .7 z s O 3O3 O O O G O G O G G O 0 0 N 0 N N 0 o t� O o O m O r r M Vt W N O O O O O O O O O O O O l7 O O O P T 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 if ioo 00 00 00000 0 o ippO���A l`1 71 O o 0 0 m �^ m 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 G ��LL A it 7t R it it it i[ i[ O p 000 p 000000pA,m� � T aaaaaaaaaaaa�AW O' N 4 (/� ' y ss�3 2 C7 n N ro ag San Jose, CA 95125 c s O iog T 0 z n w �s 3 zW_ R z x � T m x S= S x 2 x= O �` Jeff Ingram, P.E. �. 9% MW Ave., Suite 103 owip &f. P.r OMw: 400-86-ssoa Cad: 2 2 Fax:408-292-9370 d anal: �xw InwM Shwtural Engineering �.ingraFnsE.cam c000 o ............... 0 ...... 00000 ' y ss�3 2 C7 n N ro ag San Jose, CA 95125 c s O iog T 0 z n w �s 3 zW_ R z x � T m x S= S x 2 x= O �` Jeff Ingram, P.E. �. 9% MW Ave., Suite 103 owip &f. P.r OMw: 400-86-ssoa Cad: 2 2 Fax:408-292-9370 d anal: �xw InwM Shwtural Engineering �.ingraFnsE.cam c000 o ............... 0 ...... 00000 S Reliability/Redundancy Factor o NS ROOF UBC 1630.1.1 (30-3) p= 2 - (20/(rmaxAb1/2)) rmax= maximum element -story shear ratio Iw length of wall in feef AB= the ground floor area in square feet (foot -print) r,= Vmax(10/IW)/F V,x= Total wall force (strength design) in lb F= Story shear (strength design) in lb Per 1999 SEAOC Blue Book, "The value of 10/IW need not be taken as greater than 1.0." E=/>Eh+Ev= 1.0Eh For ASD, E,= 0 UBC 1612.3.1 (12-9) D+E/1.4=0+E/1.4= E/1.4 Element in consideration is multiplied by p 1.00<=p <=1.50 Vstory= 18580.0 (lb) USE L=UNITY SINCE ri IS INDEPENDENT Abase= 2420.0 (ft^2) OF L Line IW (ft) VASD (plfl Vstrength (lb) ri A 1.00 379.2 530.86 0.286 B 1.00 283.3 396.55 0.213 C 1.00 245.8 344.07 0.185 1.00 1.0 1.40 0.001 1.00 1.0 1.40 0.001 1.00 1.0 1.40 0.001 1.00 1.0 1.40 0.001 1.00 1.0 1.40 0.001 1.00 1.0 1.40 0.001 1.00 1.0 1.40 0.001 1.00 1.0 1.40 0.001 1.00 1.0 1.40 0.001 1.00 1.0 1.40 0.001 1.00 1.0 1.40 0.001 1.00 1.0 1.40 0.001 1.00 1.0 1.40 0.001 1.00 1.0 1.40 0.001 1.00 1.0 1.40 0.001 1.00 1.0 1.40 0.001 r,max= 0.286 rho= 0.58 <=1.0, OK, USE 'RHO'=1.0 Max. Jeff Ingram, P.E. 9% Minrmsota Ave., SLA9 103 PON mp San Jose, CA 95125 1 3 �: CeU:406.83S.6z Fax: 408-292-9370 d era& jeff@bV=nSEc= Irx ram Strucka- l Engineering www.kgrarnSE.com Reliability/Redundancy Factor o E-W ROOF UBC 1630.1.1 (30-3) p= 2 - (20/(rmaxAb1/2)) rmax= maximum element -story shear ratio Iw length of wall in feef AB= the ground floor area in square feet (foot -print) r,= Vmax(10/IW)/F Vmax= Total wall force (strength design) in lb F= Story shear (strength design) in lb Per 1999 SEAOC Blue Book, "The value of 10/IW need not be taken as greater than 1.0." E=pEh+E,= 1.OEh For ASD, E,= 0 LIBC 1612.3.1 (12-9) D+E/1.4=0+E/1.4= E/1.4 Element in consideration is multiplied by p 1.00<=p <=1.50 Vstory= 18580.0 (lb) Abase= 2420.0 (ft^2) Line IW (ft) VASD Of) Vstrength (lb) ri 1,2 1.00 964.3 1350.00 6 3 1.00 384.4 538.13 0.290 5 1.00 466.7 653.33 0:352 1.00 1.0 1.40 0.001 1.00 1.0 1.40 0.001 1.00 1.0 1.40 0.001 1.00 1.0 1.40 0.001 1.00 1.0 1.40 0.001 1.00 1.0 1.40 0.001 1.00 1.0 1.40 0.001 1.00 1.0 1.40 0.001 1.00 1.0 1.40 0.001 1.00 1.0 1.40 0.001 1.00 1.0 1.40 0.001 1.00 1.0 1.40 0.001 1.00 1.0 1.40 0.001 1.00 1.0 1.40 0.001 1.00 1.0 1.40 0.001 1.00 1.0 1.40 0.001 r,max= 0.290 rho= 0.60 <=1.0, OK, USE 'RHO'=1.0 HARDY FRAME ri BELOW ri=964*1.4*1 11 8580=.073 Max. ri=467* 1.4* 1.5/ 18580=.053 Jeff Ingram, P.E. 9% Mkwmota Ave., SAe 103 mu San Jose, CA 95125 Pw• r oBoe: aas43s-sane cea: 40e-a�o2 Fax 4MM-9370 d ea. : or1@4 gran SE.mn Irxjlam Structural Engineering www.kVrsmSE.=n Roof Rafterf 2000 International Building Code (97 NDS)1 Ver: 6.00.81 By: Jeff Ingram, ISE Ingram Structural Engineering on: 09-16-2006 : 4:53:03 PM Project: - Location Summary: 1.5 IN x 7.25 IN x 14.0 FT (� 24 O.C. / #2 - Douglas Fir -Larch - Dry Use Section Adequate By: 10.3% Controlling Factor: Moment of Inertia / Depth Required 7.02 In Rafter Span Deflections: Dead Load: DLD-Interior- Live Load: LLD -Interior - Total Load: TLD-Interior- Rafter End Loads and Reactions: LOADS: Upper Live Load: 112 PLF Upper Dead Load: 74 PLF Upper Total Load: 186 PLF Lower Live Load: 112 PLF Lower Dead Load: 74 PLF Lower Total Load: 186 PLF Upper Equiv. Tributary Width: UTWeq= Lower Equiv. Tributary Width: LTWeq= Rafter Data: Interior Span: Eave Span: Rafter Spacing: Rafter Pitch: Roof sheathing applied to top of joists -Top of rafters fully braced. Live Load Deflect. Criteria: Total Load Deflect. Criteria: Rafter Loads: Roof Live Load: Roof Dead Load: Roof Duration Factor: Slope Adjusted Spans And Loads: Interior Span: Rafter Live Load: Rafter Dead Load: Rafter Total Load: Properties For: #2- Douglas Fir -Larch Bending Stress: Shear Stress: Modulus of Elasticity: Stress Perpendicular to Grain: Adjusted Properties Fb' (Tension): Adjustment Factors: Cd=1.25 Cf=1.20 Cr-1.15 Fv': Adjustment Factors: Cd=1.25 Design Requirements: Controlling Moment: 7.379 Ft from left support of span 2 (Center Span) Critical moment created by combining all dead loads and live loads on span(s) 2 Controlling Shear: At a distance d from left support of span 2 (Center Span) Critical shear created by combining all dead loads and live loads on span(s) 2 Comparisons With Required Sections: Section Modulus (Moment): Area (Shear): Moment of Inertia (Deflection): L= L-Eave= Spacing= RP= U U LL= DL= Cd= L-adi= wL-adi= wD-adi= wT-adj= Fb= Fv= Fc-pe p= Fb'= Fv'= M= V= 0.27 IN 0.40 IN = U439 0.67 IN = U265 RXNS: 224 LB 148 LB 372 LB 224 LB 148 LB 372 LB 7.38 FT 7.38 FT 14.0 FT 0.0 FT 24.0 IN O.C. 4.0 : 12 360 240 16.0 PSF 10.0 PSF 1.25 14.76 FT 29 PLF 19 PLF 48 PLF 900 PSI 95 PSI 1600000 PSI 625 PSI 1553 PSI 119 PSI 1301 FT -LB 324 LB Sreq= 10.05 IN3 S= 13.14 IN3 Areq= 4.10 IN2 A= 10.88 IN2 Ireq= 43.17 IN4 1= 47.63 IN4 Job M. Jeff Ingram, P.E. 9% k4nnesols Ave.. Suite 103 San Jose, CA 95125 P.o. Olffim 4064064i6 M CAN: 406-836.66W I Fax: 4W292-93700a a emA: i 01@*VranSEx= Ingram Structural Engineering www.kVwt6E.com I 1 Z Roof Rafterf 2000 International Buildinq Code (97 NDS) 1 Ver: 6.00.81 By: Jeff Ingram , ISE Ingram Structural Engineering on: 09-16-2006 : 4:57:47 PM Project: - Location Summary: 1.5 IN x 9.25 IN x 8.5 FT (m 24 O.G. / #2 - Douglas Fir -Larch - Dry Use Section Adequate By: 327.3% Controlling Factor: Section Modulus / Depth Required 4.57 In Rafter Span Deflections: Dead Load: DLD-Interior- Live Load: LLD -Interior - Total Load: TLD-Intedor- Rafter End Loads and Reactions: LOADS: Upper Live Load: 68 PLF Upper Dead Load: 72 PLF Upper Total Load: 140 PLF Lower Live Load: 68 PLF Lower Dead Load: 72 PLF Lower Total Load: 140 PLF Upper Equiv. Tributary Width: UTWeq= Lower Equiv. Tributary Width: LTWeq= Rafter Data: Interior Span: Eave Span: Rafter Spacing: Rafter Pitch: Roof sheathinq applied to top of joists -Top of rafters fully braced. Live Load Deflect, Criteria: Total Load Deflect. Criteria: Rafter Loads: Roof Live Load: Roof Dead Load: Roof Duration Factor: Slope Adjusted Spans And Loads: Interior Span: Rafter Live Load: Rafter Dead Load: Rafter Total Load: Properties For: #2- Douglas Fir -Larch Bendinq Stress: Shear Stress: Modulus of Elasticity: Stress Perpendicular to Grain: Adjusted Properties Fb' (Tension): Adjustment Factors: Cd=1.25 Cf=1.10 Cr-1.15 Fv': Adjustment Factors: Cd=1.25 Design Requirements: Controllinq Moment: 4.48 Ft from left support of span 2 (Center Span) Critical moment created by combining all dead loads and live loads on span(s) 2 Controllinq Shear: At a distance d from riqht support of span 2 (Center Span) Critical shear created by combining all dead loads and live loads on span(s) 2 Comparisons With Required Sections: Section Modulus (Moment): Area (Shear): Moment of Inertia (Deflection): L= L-Eave= Spacinq= RP= 0.03 IN 0.03 IN = U4076 0.05 IN = U1984 RXNS: 136 LB 143 LB 279 LB 136 LB 143 LB 279 LB 4.48 FT 4.48 FT 8.5 FT 0.0 FT 24.0 IN O.C. 4.0 : 12 U 360 U 240 LL= 16.0 PSF DL= 16.0 PSF Cd= 1.25 L-adj= 8.96 FT wL-adj= 29 PLF wD-adj= 30 PLF wT-adj= 59 PLF Fb= 900 PSI Fv= 95 PSI E= 1600000 PSI Fc-perp= 625 PSI Fb'= 1423 PSI Fv'= 119 PSI M= 594 FT -LB V= 223 LB Sreq= 5.01 IN3 S= 21.39 IN3 Areq= 2.81 IN2 A= 13.88 IN2 Ireq= 11.97 IN4 1= 98.93 IN4 Jeff Ingram, P.E. 9% Wrtnesota Ave., Suite 103 er San Jose, CA 95125 Offim: 408-83&6 oa ceW400.E 6Wz 1`7 Fax 408-292-9370 ar as, :ldr1Il*— In cram Struc wal Ervitmefing www.kVwnSF_=n MEMBER:1.75 x 11.875 MICROLLAM 1.9E LVL =R-3 ------------------------------------- STRESS/DEFLECTION L = 18.0 ft ----------------- R1 = 705.0 lb fv=VQ/(Ib) = 100.93 psi R2 = 1410.0 lb fb=My/I = 1425.07 psi V max. @x=18.0 ft = 1398.3 lb Deflection = 0.599 in M max. @x=10.4 ft = 4884.4 ft*lb ALLOW. DEFLECTION L/240 = 0.900 in MAX. DEFLECTION @ x = 9.35 ft TRIANGULAR LOAD (CASE 1) = 235.0 plf Fv'= Fv(Cd) = 356.3 psi Fb'= Fb(Cd*Cf*Cr*C1,Cv) = 3254.6 psi MOD. of ELASTICITY = 1900000 psi Cd=1.25, Cf=1.00, C1=1.000, Cv=1.000 SECTION IS ADEQUATE BY 50.20 'K CONTROLLING FACTOR: Moment ---------------------------------------------------------------- of Inertia ----- MEMBER:2-2xl2 DF-L No. 2 =R-3 OPTION -------------------------------------- STRESS/DEFLECTION L = 18.0 ft ----------------- Rl = 705.0 lb fv=VQ/(Ib) = 62.15 psi R2 = 1410.0 lb fb=My/I = 926.22 psi V max. @x=18.0 ft = 1398.3 lb Deflection = 0.488 in M max. @x=10.4 ft = 4884.4 ft*lb ALLOW. DEFLECTION L/240 = 0.900 in MAX. DEFLECTION @ x = 9.35 ft TRIANGULAR LOAD (CASE 1) = 235.0 plf Fv'= Fv(Cd) = 225.0 psi Fb'= Fb(Cd*Cf*Cr*Cl,Cv) = 1125.0 psi MOD. of ELASTICITY = 1600000 psi Cd=1.25, Cf=1.00, C1=1.000, Cv=1.000 SECTION IS ADEQUATE BY 21.46 b CONTROLLING FACTOR: Section ---------------------------------------------------------------------- Modulus MEMBER : 2x 8 DF NO. 2 PURLIN =R-4 UNIFORM DEAD LOAD = 100.0 plf SHEAR L= 12.6 ft UNIFORM LIVE LOAD = 160.0 plf MOMENT L= 6.7 ft UNIFORM TOTAL LOAD= 260.0 plf DEFLECTION L= 8.7 ft AREA = 10.88 in^2 SECTION MODULUS = 13.14 in^3 MAX. LENGTH: L= 6.7 ft INERTIA = 47.63 in^4 ---------------------------- MOD. of ELASTICITY= 1600000 psi Fv _ 180.0 psi Fb = 900.0 psi Cd=1.25, Cr=1.00, Cf=1.20 Jeff Ingram, P.E. 9% Minnesota Ave., Suite 103 San Jose, CA 95125 P'0� Office: 40840&f604 can_ 408$36-6602 Fax: 408 292-9370 d amp: Wl@kWamSE.com Imam Strudurai Engineering www.ingaffsSE=n Multi -Loaded Beam( 2000 International Buikjinq Code (97 NDS)1 Ver: 6.00.81 - -' By: Jeff Ingram , ISE Ingram Structural Engineering on: 09-16-2006 : 5:38:38 PM Proiect: - Location: Summary: 1.75 IN x 9.5 IN x 19.0 FT (9 + 10) / 1.9E Microllam - Trus Joist -MacMillan Section Adequate By: 83.7% Controlling Factor: Section Modulus / Depth Required 7.01 In Center Span Deflections: Dead Load: DLD-Center= 0.01 IN Live Load: LLD -Center= 0.04 IN = U2421 Total Load: TLD-Center= 0.06 IN = U1837 Right Span Deflections: Dead Load: DLD-Riqht= 0.03 IN Live Load: LLD-Riqht= 0.07 IN = U1844 Total Load: TLD-Right= 0.09 IN = U1269 Center Span Left End Reactions (Support A): Live Load: LL-Rxn-A= 397 LB Dead Load: DL-Rxn-A= 217 LB Total Load: TL-Rxn-A= 614 LB Bearinq Lenqth Required (Beam only, support capacity not checked): BL-A= 0.47 IN Center Span Riqht End Reactions (Support B): Live Load: LL-Rxn-B= 1190 LB Dead Load: DL-Rxn-B= 800 LB Total Load: TL-Rxn-B= 1990 LB Bearinq Length Required (Beam only, support capacity not checked): BL-B= 1.52 IN Right End Reactions (Support C): Live Load: LL-Rxn-C= 434 LB Dead Load: DL-Rxn-C= 260 LB Total Load: TL-Rxn-C= 694 LB Bearinq Lenqth Required (Beam only, support capacity not checked): BL-C= 0.53 IN Dead Load Uplift F.S.: FS= 1.5 Beam Data: Center Span Lenqth: L2= 9.0 FT Center Span Unbraced Lenqth-Top of Beam: Lu2-Top= 0.0 FT Center Span Unbraced Length -Bottom of Beam: Lu2-Bottom= 9.0 FT Riqht Span Lenqth: L3= 10.0 FT Riqht Span Unbraced Lenqth-Top of Beam: Lu3-Top= 0.0 FT Riqht Span Unbraced Lenqth-Bottom of Beam: Lu3-Bottom= 10.0 FT Live Load Duration Factor: Cd= 1.25 Live Load Deflect. Criteria: U 360 Total Load Deflect. Criteria: U 240 Center Span Loading: Uniform Load: Live Load: wL-2= 100 PLF Dead Load: wD-2= 62 PLF Beam Self Weight: BSW= 5 PLF Total Load: wT-2= 167 PLF Riqht Span Loading: Uniform Load: Live Load: wL-3= 100 PLF Dead Load: wD-3= 62 PLF Beam Self Weight: BSW= 5 PLF Total Load: wT-3= 167 PLF Properties For: 1.9E Microllam- Trus Joist -MacMillan Bendinq Stress: Fb= 2600 PSI Shear Stress: Fv= 285 PSI Modulus of Elasticity: E= 1900000 PSI Stress Perpendicular to Grain: Fc_perp= 750 PSI Adjusted Properties Fb' (Compression Face in Tension): Fb'= 1593 PSI Adjustment Factors: Cd=1.25 CI=0.47 Cf=1.03 Fv': Fv'= 356 PSI Adiustment Factors: Cd=1.25 Design Requirements: Controllinq Moment: M= -1902 FT -LB Over left support of span 3 (Right Span) Critical moment created by combining all dead loads and live loads on span(s) 2, 3 Controllinq Shear: V= 909 LB At a distance d from left support of span 3 (Right Span) Critical shear created by combining all dead loads and live loads on span(s) 2, 3 Comparisons With Required Sections: Section Modulus (Moment): Sreq= 14.33 IN3 S= 26.32 IN3 Area (Shear): Areq= 3.83 IN2 A= 16.63 IN2 Moment of Inertia (Deflection): Ireq= 24.41 IN4 1= 125.03 IN4 I Jeff Ingram, P.E. �. 9% Miraresota Ave., Sure 103 San Jose, CA 95125 O im:4084W4W4 Ceu:408.89640M r Fax: 408-292-9370Ing a ea>eY: jdl@ngrand;E.wm Ingram Structural Engine ing wwwAgarnSE.cam MEMBER: 2x10 DF NO. 2 HIP or VALLEY RAFTER =R-6 DEAD LOAD = 10.0 psf SHEAR L= 21.9 ft LIVE LOAD = 16.0 psf MOMENT L= 13.8 ft TOTAL LOAD = 26.0 psf DEFLECTION L= 15.2 ft AREA = 13.9 in^2 SECTION MODULUS = 21.4 in^3 MAX. LENGTH: L= 13.8 ft INERTIA = 98.9 in^4 ----------- ----- MOD. of ELASTICITY= 1600000 psi Fv = 180.0 psi Fb = 900.0 psi N (No. of Lumber) = 1 Cd=1.25, Cf=1.10 MEMBER:5-1/4 x 9-1/2 PARALLAM PSL 2.0E =H-1 -------------------------------------- STRESS/DEFLECTION L = 8.5 ft ----------------- R1 = 2462.5 lb fv=VQ/(Ib) = 74.06 psi R2 = 2462.5 lb fb=My/I = 1521.72 psi V max. @x= 0.0 ft - 2462.5 lb Deflection = 0.140 in M max. @x= 4.2 ft = 10014.1 ft*lb ALLOW. DEFLECTION L/600 = 0.170 in MAX. DEFLECTION @ x = 4.25 ft UNIFORM LOAD = 50.0 plf P at x= 4.3 ft = 4500.0 lb Fv'= Fv(Cd) = 362.5 psi Fb'= Fb(Cd*Cf*Cr*C1,Cv) = 3675.0 psi MOD. of ELASTICITY = 2000000 psi Cd=1.25, Cf=1.03, C1=0.988, Cv=1.000 SECTION IS ADEQUATE BY 21.05 =• CONTROLLING FACTOR: Moment ---------------------------------------------------------------------- of Inertia MEMBER:4x12 DF-L No. 1 =H-2 -------------------------- ----- STRESS/DEFLECTION L = 19.5 ft ------------ R1 = 1121.3 lb fv=VQ/(Ib) = 42.71 psi R2 = 1121.3 lb fb=My/I = 1055.85 psi V max. @x= 0.0 ft = 1121.3 lb Deflection = 0.614 in M max. @x= 9.8 ft - 6495.9 ft*lb ALLOW. DEFLECTION L/240 - 0.975 in MAX. DEFLECTION @ x = 9.75 ft UNIFORM LOAD = 50.0 plf TRIANGULAR LOAD (CASE 2) = 130.0 plf Fv'= Fv(Cd) = 225.0 psi Fb'= Fb(Cd*Cf*Cr*Cl,Cv) = 1273.4 psi MOD. of ELASTICITY = 1700000 psi Cd=1.25, Cf=1.10, C1=0.926, Cv=1.000 SECTION IS ADEQUATE BY 20.60 :Y CONTROLLING FACTOR: Section ------------------------------------------------------- Modulus -------------- o� Jeff Ingram, P.E. »a 996 Mirumota Ave., Suite 103 San Jose, CA 95125 offim: 4084136-66ne cede 40e4a)sss 2 �L Fax: 408-292-9370 a ell pr4R q-rk3F- Ingram Shictural Engineering w".kvramSE.=n �- Multi -Loaded Beam[ 2000 International Building Code (97 NDS) 1 Ver: 6.00.81 By: Jeff Ingram , ISE Ingram Structural Engineering on: 09-17-2006 : 09:51:50 AM Project: - Location: Summary: 5.125 IN x 19.5 IN x 30.0 FT / 24F-V4 - Visually Graded Western Species - Dry Use Section Adequate By: 58.4% Controlling Factor: Moment of Inertia / Depth Required 16.73 In Center Span Deflections: Dead Load: DLD-Center- 0.51 IN Live Load: LLD -Center- 0.43 IN = L/828 Total Load: TLD-Center- 0.95 IN = L/380 Camber Required: C= 077 IN Center Span Left End Reactions (Support A): Live Load: LL-Rxn-A= 2040 LB Dead Load: DL-Rxn-A= 2404 LB Total Load: TL-Rxn-A= 4444 LB Bearing Length Required (Beam only, support capacity not checked): BL-A= 1.33 IN Center Span Right End Reactions (Support B): Live Load: LL-Rxn-B= 2040 LB Dead Load: DL-Rxn-B= 2404 LB Total Load: TL-Rxn-B= 4444 LB Bearing Length Required (Beam only, support capacity not checked): BL-B= 1.33 IN Beam Data: Center Span Length: L2= 30.0 FT Center Span Unbraced Lenqth-Top of Beam: Lu2-Top= 0.0 FT Center Span Unbraced Length -Bottom of Beam Lu2-Bottom= 30.0 FT Live Load Duration Factor: Cd= 1.25 Live Load Deflect. Criteria: L/ 360 Total Load Deflect. Criteria: L/ 240 Center Span Loading: Uniform Load: Live Load: wL-2= 136 PLF Dead Load: wD-2= 136 PLF Beam Self Weight: BSW= 24 PLF Total Load: wT-2= 296 PLF Properties For: 24F-V4- Visually Graded Western Species Bending Stress: Fb= 2400 PSI Shear Stress: Fv= 190 PSI Modulus of Elasticity: Ex= 1800000 PSI Ev= 1600000 PSI Stress Perpendicular to Grain: Fc peril= 650 PSI Bendinq Stress of Comp. Face in Tension: Fb_cpr- 1200 PSI Adjusted Properties Fb' (Tension): Fb'= 2758 PSI Adjustment Factors: Cd=1.25 Cv=0.92 Fv': Fv'= 238 PSI Adjustment Factors: Cd=1.25 Design Requirements: Controllinq Moment: M= 33333 FT -LB 15.0 Ft from left support of span 2 (Center Span) Critical moment created by combining all dead loads and live loads on span(s) 2 Controlling Shear: V= 4000 LB At a distance d from left support of span 2 (Center Span) Critical shear created by combining all dead loads and live loads on span(s) 2 Comparisons With Required Sections: Section Modulus (Moment): Sreq= 145.05 IN3 S= 324.80 IN3 Area (Shear): Areq= 25.26 IN2 A= 99.94 IN2 Moment of Inertia (Deflection)- Ireq= 1999.64 IN4 1= 3166.77 IN4 Jeff Ingram, P.E. »a 9% Mint*sota Ave., Suite 103 B" San Jose, CA 95125 pow Office: 4os-836.66a4 Cetl: 408 83s-Gso2 Fa)c 408-292-9370M9 d emai WK0VMMSE_com Ingram Stnrdurai ErgineedN rww.k% anSE.00m -IEMBER:2-2x8 DF-L No. 2 =C-1 ------------------------------------- TRESS/DEFLECTION L = 19.0 ft ----------------- R1 = 747.9 lb fv=VQ/(Ib) = 51.58 psi R2 = 272.1 lb fb=My/I = 845.18 psi V max. @x= 0.0 ft = 747.9 lb Deflection = 0.776 in M max. @x= 5.4 ft = 1851.0 ft*lb ALLOW. DEFLECTION L/240 = 0.950 in MAX. DEFLECTION @ x = 8.85 ft UNIFORM LOAD = 20.0 plf P at x= 3.0 ft = 400.0 lb w (Partially dist. left) = 80.0 plf a = 3.0 ft Fv'= Fv(Cd) = 180.0 psi Fb'= Fb(Cd*Cf*Cr*Cl,Cv) = 1042.4 psi MOD. of ELASTICITY = 1600000 psi Cd=1.00, Cf=1.20, C1=0.965, Cv--1.000 SECTION IS ADEQUATE BY 22.39 'f CONTROLLING FACTOR: Moment of Inertia MEMBER:3-1/2 x 11-7/8 PARALLAM PSL 2.0E =C-2 --- --------------------------------- STRESS/DEFLECTION L = 19.0 ft ----------------- R1 = 1724.5 lb fv=VQ/(Ib) = 62.24 psi R2 = 1645.5 lb fb=My/I = 2082.99 psi V max. @x= 0.0 ft = 1724.5 lb Deflection = 0.793 in M max. @x= 9.5 ft = 14278.7 ft*lb ALLOW. DEFLECTION L/240 = 0.950 in MAX. DEFLECTION @ x = 9.45 ft UNIFORM LOAD = 30.0 plf P at x= 8.0 ft = 500.0 lb P at x= 9.5 ft - 2300.0 lb Fv'= Fv(Cd) = 362.5 psi Fb'= Fb(Cd*Cf*Cr*Cl,Cv) = 2643.8 psi MOD. of ELASTICITY = 2000000 psi Cd=1.25, Cf=1.00, C1=0.728, Cv=1.000 SECTION IS ADEQUATE BY 19.74 CONTROLLING FACTOR: Moment of Inertia M. Jeff Ingram, P.E. [KA I 9% Minnesota Ave., Suite 103 San Jose, CA 95125 Office: 41084U64iflN Ceu: 40e-836.6W2 22 Fax: 4WM-9370 & emaL "1@kvw1sE=M Ingram Stnxxural Ergineeing irww.k+grarnsE.cam tiIEMBER:3-1/2 x 11-7/8 PARALLAM PSL 2.0E =C-3 -------------------------------------- STRESS/DEFLECTION L = 19.0 ft ----------------- R1 = 1218.5 lb fv=VQ/(Ib) = 45.60 psi R2 = 1263.5 lb fb=My/I = 890.62 psi V max. @x=19.0 ft = 1263.5 lb Deflection = 0.411 in M max. @x=13.0 ft = 6105.1 ft*lb ALLOW. DEFLECTION L/240 = 0.950 in MAX. DEFLECTION @ x = 9.65 ft UNIFORM LOAD = 30.0 plf P at x= 4.0 ft = 800.0 lb P at x=13.0 ft = 800.0 lb w (Partially dist. right) = 52.0 plf a = 6.0 ft Fv'= Fv(Cd) = 290.0 psi Fb'= Fb(Cd*Cf*Cr*C1,Cv) = 2410.0 psi MOD, of ELASTICITY = 2000000 psi Cd=1.00, Cf=1.00, C1=0.830, Cv=1.000 SECTION IS ADEQUATE BY 130.97 4 CONTROLLING FACTOR: Moment ---------------------------------------------------------------------- of Inertia MEMBER:4x12 DF-L No. 1 =C-4 ------------------------------------- STRESS/DEFLECTION L = 12.0 ft ----------------- R1 = 1180.0 lb fv=VQ/(Ib) = 44.95 psi R2 = 1180.0 lb fb=My/I = 1063.01 psi V max. @x= 0.0 ft = 1180.0 lb Deflection = 0.196 in M max. @x= 6.0 ft = 6540.0 ft*lb ALLOW. DEFLECTION L/240 = 0.600 in MAX. DEFLECTION @ x = 6.00 ft UNIFORM LOAD = 30.0 plf P at x= 6.0 ft = 2000.0 lb Fv'= Fv(Cd) = 225.0 psi Fb'= Fb(Cd*Cf*Cr*C1,Cv) = 1330.6 psi MOD. of ELASTICITY = 1700000 psi Cd=1.25, Cf=1.10, C1=0.968, Cv=1.000 SECTION IS ADEQUATE BY 25.17 R CONTROLLING FACTOR: Section ---------------------------------------------------------------------- Modulus Jeff Ingram, P.E. Jb M. 9% Minns Ave., Sure 103 ej San .lose, CA 95125 pow Offim:408-83&fM4 Cab:40e4136-66M Fax:408-292-9370 d emai: p1l�kgamSE.00m Wxyam Structural EnglneedM www.kigmmnSE.com MEMBER:3-1/2 x 11-7/8 PARALLAM PSL 2.0E =C-5 -------------------------------------- STRESS/DEFLECTION L = 14.0 ft ----------------- R1 = 942.9 lb fv=VQ/(Ib) = 63.36 psi R2 = 1757.1 lb fb=My/I = 1109.18 psi V max. @x=14.0 ft = 1755.6 lb Deflection - 0.220 in M max. @x= 9.5 ft = 7603.4 ft*lb ALLOW. DEFLECTION L/240 = 0.700 in MAX. DEFLECTION @ x = 7.60 ft UNIFORM LOAD = 30.0 plf P at x= 9.5 ft = 2280.0 lb Fv'= Fv(Cd) = 362.5 psi Fb'= Fb(Cd*Cf*Cr*C1,Cv) = 3116.8 psi MOD. of ELASTICITY = 2000000 psi Cd=1.25, Cf=1.00, C1=0.859, Cv=1.000 SECTION IS ADEQUATE BY 181.00 6 CONTROLLING FACTOR: Section -------------------------------------- Modulus ------------------------------ MEMBER:3-1/2 x 11-7/8 PARALLAM PSL 2.0E =C-6 -------------------------------------- STRESS/DEFLECTION L = 10.5 ft ---------------- R1 = 1838.8 lb fv=VQ/(Ib) = 100.63 psi R2 = 2791.2 lb fb=My/I = 1558.70 psi V max. @x=10.5 ft = 2788.2 lb Deflection = 0.175 in M max. @x= 6.5 ft = 10684.7 ft*lb ALLOW. DEFLECTION L/240 = 0.525 in MAX. DEFLECTION @ x = 5.55 ft UNIFORM LOAD = 60.0 plf P at x= 6.5 ft = 4000.0 lb Fv'= Fv(Cd) = 362.5 psi Fb'= Fb(Cd*Cf*Cr*C1,Cv) = 3334.3 psi MOD. of ELASTICITY = 2000000 psi Cd=1.25, Cf=1.00, C1=0.919, Cv=1.000 SECTION IS ADEQUATE BY 113.92 % CONTROLLING FACTOR: Section ---------------------------------------------------------------------- Modulus °°� I Jeff Ingram, P.E. »d 9% k6nnesota Ave., Suite 103 w- Sari Jose, CA 95125 sbo. a f Office: aoe-e3s-ss 4 cen: Fax 408-292-9370 a, emd: prA@b gremSE.cw Ingram Shx*jral Engineering www-1vVwnSE-cam MEMBER:3-1/2 x 11-7/8 PARALLAM PSL 2.0E =C-7 -------------------------------------- STRESS/DEFLECTION L = 13.5 ft R1 - 1936.5 lb fv=VQ/(Ib) = 212.52 psi R2 = 5893.5 lb fb=My/I = 1278.61 psi V max. @x=13.5 ft - 5888.5 lb Deflection = 0.287 in M max. @x=10.0 ft = 8764.8 ft*lb ALLOW. DEFLECTION L/240 = 0.675 in MAX. DEFLECTION @ x = 7.15 ft UNIFORM LOAD = 100.0 plf P at x= 4.0 ft = 400.0 lb P at x=10.0 ft = 1180.0 lb P at x=12.5 ft = 4500.0 lb w (Partially dist. left) = 100.0 plf a = 4.0 ft Fv'= Fv(Cd) = 362.5 psi Fb'= Fb(Cd*Cf*Cr*Cl,Cv) = 3153.2 psi MOD. of ELASTICITY = 2000000 psi Cd=1.25, Cf=1.00, C1=0.869, Cv=1.000 SECTION IS ADEQUATE BY 70.57 CONTROLLING FACTOR: Shear ---------------------------------------------------------------------- MEMBER:3-1/2 x 14 PARALLAM PSL 2.0E =C-8 -------------------------------------- STRESS/DEFLECTION L = 17.0 ft ----------------- R1 = 3191.5 lb fv=VQ/(Ib) = 97.70 psi R2 = 3191.5 lb fb=My/I = 1633.93 psi V max. @x= 0.0 ft = 3191.5 lb Deflection = 0.480 in M max. @x= 8.5 ft = 15567.7 ft*lb ALLOW. DEFLECTION L/240 = 0.850 in MAX. DEFLECTION @ x = 8.50 ft UNIFORM LOAD = 320.0 plf P at x= 8.5 ft = 943.0 lb Fv'= Fv(Cd) = 362.5 psi Fb'= Fb(Cd*Cf*Cr*Cl,Cv) = 2498.2 psi MOD. of ELASTICITY = 2000000 psi Cd=1.25, Cf=0.98, C1=0.701, Cv=1.000 SECTION IS ADEQUATE BY 52.89 t CONTROLLING FACTOR: Section ---------------------------------------------------------------------- Modulus Jeff Ingram, P.E. J. N. 996 IMF Ave., Suite 103 Sw Jose, CA 95125 °aO� ., < Off=:406.836.6604 Catt 4084336.66MChOW.d W. .� j Fax: 408-292-9370 & mu emal: pd1@ n ran9W- = Ingram Structural Engineering �.kgranSF-oom MEMBER:4xl2 DF-L No. 1 =C-9 -------------------------------------- STRESS/DEFLECTION L = 14 0 ft----------------- R1 - 2030.0 lb fv=VQ/(Ib) = 77.33 psi R2 - 2030.0 lb fb=My/I = 1154.84 psi V max. @x= 0.0 ft - 2030.0 lb Deflection = 0.355 in M max. @x= 7.0 ft = 7105.0 ft*lb ALLOW. DEFLECTION L/240 - 0.700 in MAX. DEFLECTION @ x = 7.00 ft UNIFORM LOAD = 290.0 plf Fv'= Fv(Cd) = 225.0 psi Fb'= Fb(Cd*Cf*Cr*CI,Cv) - 1319.4 psi MOD. of ELASTICITY = 1700000 psi Cd=1.25, Cf=1.10, C1=0.960, Cv=1.000 SECTION IS ADEQUATE BY 14.25 CONTROLLING FACTOR: Section Modulus ---------------------------------------------------------------------- MEMBER:3-1/2 x 11-7/8 PARALLAM PSL 2.0E =C-10 -------------------------------------- STRESS/DEFLECTION L = 15.0 ft ------------ ---- R1 = 6274.0 lb fv=VQ/(Ib) = 226.43 psi R2 = 1756.0 lb fb=My/I = 2023.65 psi V max. @x= 0.0 ft = 6274.0 lb Deflection = 0.485 in M max. @x= 3.0 ft = 13872.0 ft*lb ALLOW. DEFLECTION L/240 - 0.750 in MAX. DEFLECTION @ x = 6.70 ft UNIFORM LOAD = 100.0 plf P at x= 2.0 ft = 4500.0 lb P at x= 3.0 ft = 2030.0 lb Fv'= Fv(Cd) = 362.5 psi Fb'= Fb(Cd*Cf*Cr*Cl,Cv) = 3030.7 psi MOD. of ELASTICITY = 2000000 psi Cd=1.25, Cf=1.00, C1=0.835, Cv=1.000 SECTION IS ADEQUATE BY 49.76 S CONTROLLING FACTOR: Section Modulus MEMBER:3-1/2 x 11-7/8 PARALLAM PSL 2.0E =H-3 -------------------------------------- STRESS/DEFLECTION L = 3.6 ft ----------------- R1 = 4730.0 lb fv=VQ/(Ib) = 170.71 psi R2 = 4730.0 lb fb=My/I = 1242.03 psi V max. @x= 0.0 ft = 4730.0 lb Deflection = 0.016 in M max. @x= 1.8 ft = 8514.0 ft*lb ALLOW. DEFLECTION L/240 = 0.180 in MAX. DEFLECTION @ x = 1.80 ft P at x= 1.8 ft = 9460.0 lb Fv'= Fv(Cd) = 362.5 psi Fb'= Fb(Cd*Cf*Cr*C1,Cv) = 3629.2 psi MOD. of ELASTICITY = 2000000 psi Cd=1.25, Cf=1.00, C1=1.000, Cv=1.000 SECTION IS ADEQUATE BY 112.35 ` CONTROLLING FACTOR: Shear ---------------------------------------------------------------------- Jeff Ingram, P.E. »d 9% K&wwmota Ave-, Suke 103 San Jose, CA 95125 Ofte 40e.336-6s cau: 4084336-66oz 2 Fax: 408-292-9370 d email: jer4PrqrwnSE.=n Ingram Structural Engineering www-WsgramSE.com I I j Foundation: 2r P.TD.F. i Pa• M' b• uwd bit of h PraWd w" am sba doaa rot ON*" OW pl sad W"w haft me dw*" a gwcW at sm[ w Mw w am" cWwft. Wac TbL 'art, roabrob 7I ALL SILL ANCHOR BOLTS (AND Alt CONNECTION HNiOMIATiE THAT WILL BE IN CONTACT TO PRESSURE TREATED UMBER) SttALL BE HOT —DIPPED GALVAN�D OR AN APPROVED EQUAL CORROSION RESISTANT MATERIAL FOUNDATION SILL BOLTS 2001 CBC Chapter 18. 1806.6 Seismic Zone 4 • 548� dorrraRar six Walla min. • 6. O.C. max. spacing • 7' min. ambsdmwA • 2-x2•r3/16` min. piste washers • 12' mcDL/7de min. from end Of plates r� I . �I \ + [yfl1f } �I +s L .K u" Lr 5 OF P.T. SILL PUTE.059 OW e 9®.) 1;4ka. A307 {IDG} BOLTS 3 rlQ'WW S0. PLATE WASHMS A MAX. (HDG' SH FOR _x6 SILLFJW WALL SCHEDULE Tor SPACW 21; mla '• i $�tl� �'FRI+ CONCRETE FOOTING '. ,:; :• INN. 2500 psi ire STRENGTH AWL— . r ! 3' CIR. C✓1 - C �- �ji'�NCI :3G ° �- OIL' \b 4EU% C�l� c i Jeff Ingram, P.E. Job Nk 9% Minnesota Ave.. Suite 103 °j San Jose, CA 95125 Olfice: 408436.6604 COM 408.836.6602 Fax. 408-292-9370 ar emst peekwartSE.aom Ingram Sbuctural Engiileewing www.pgramSE.mn /, yyII C U l.t Ail C I� C�l� T�1;•16 rK�4LC.Jt�ii10.�.� I�f x7 �'itCF � `=� �° Jeff Ingram, P.E. »D 9% Mhrwsota Ave., Suite 103 San Jose, CA 95125 offte:406406-66oa Ced:4o84M-6602 4 Fax_ 408-292-9370 ar ell pfApb mmSE oom Ingram Shiclural Engineefing www-kgrrnSE.c= Title Job # Dsgnr: Date: 11 521-111J 18 S E P 06 Description Scope Combined Footing Design Page I F JER i., Description FOOTING @LINE 5 i-General Information Code Ref: ACI 318-02.1997 UBC.2W3 IBC. 2003 NFPA Allow Soil Bearing 1,000.0 PSI rc 2,5000 psi Seismic Zone 4 Fy 60,000.0 psi Concrete Wt 150.0 Pcf Min As Pct 0.0014 Short Term Increase 1.33 Distance to C L of Rebar 3.50 in Overburden 0.00 psf Live & Short Term Load Combined Dimensions Footing Size... Column Support Pedestal Sizes Distance Left 1.00 ft #1 Square Dimension 0.00 in Dist. Betwn Cols. 14.00 ft ...Height 0.00 in Distance Right 1.00 ft #2 Square Dimension 0.00 in Footing Length 16,00 ft ...Height 0.00 in Width 1 00 It Thickness 12.00 in j Loads Note: Load factoring supports 2003 IBC and 2003 NFPA 5000 by virtue of their references to ACI 318-02 for concrete design. Factoring of entered loads to ultimate loads within this program is according to ACI 318-02 C-2 Vertical Loads... 0 Left Column Right Column Dead Load 1.500 k 1.500 k Live Load 1.500 k 1.500 k Short Term Load k k Applied Moments... Dead Load k-ft k-ft Live Load k-ft k-ft Short Term Load 6.300 k-ft 6.300 k-ft Summary . ...... Footinci Design OK Length = 16 00ft Widtl� = I 00ft. Thir-kness - DCin D;,-,t Left = I C,0ft Et, -in = 14--Julft Dist Right 00ft Maximum Soil Pressure 820.31 psf Allowable 1.330.00 psf Steel Req'd @ Left 0.259 in2/ft Max Shear Stress 35.90 psi Steel Req'd @ Center 0.416 in2/ft Allowable 85.00 psi Steel Req'd @ Right 0.259 in2/ft Min. Overturning Stability 5.333:1 F—Soil Pressures Soil Pressure @ Left Actual Allowable ACI Factored Eccentricity Dead + Live 525.0 1,000.0 PSI Eq. C-1 791.2 PSI 0.000 ft Dead+Live+Short Term 229.7 1,330.0 psf Eq. C-2 321.6 psf 1.500 ft Soil Pressure @ Right End Eq C-3 132.9 PSI Dead + Live 525.0 1,000.0 psf Eq. C-1 791.2 PSI 0.000 It Dead+Live+Short Term 820.3 1,330.0 PSI Eq. C-2 1,148.4 PSI 1.500 It Stability Ratio 53 1 Eq. C-3 474.6 psf Jeff Ingram, P.E. 996 Mirwxnoo Ave.. Suite 103 San Jose, CA 95125 P-w Offim: 408-83646804 C40:408406-BBU O Fax: 408-292-9370 eniW: jerj@k%Faff;SEx= Ingram Struchxal Engineering www.kVramSF-=n Title : Job # Dsgnr: Date: t ! 5-1APJ I8 SEP 06 Description Scope: d;ollibineC) Footing Design Page 2 Description FOOTING @UNE 5 Moment & Shear Summary ( values for moment are given per unit width of footing) Moments... ACI C-1 ACI C-2 ACI C-3 Mu @ Col #1 0.29 k-ft/ft 0.06 k-f /ft 0.00 k-ft/ft Mu Btwn Cols -13.95 k-ft/ft -14.98 k-ft/ft 8.82 k-ft/ft Mu @ Col #2 0.29 k-ft/ft 0.46 k-ft/ft 0.17 k-ft/ft One Way Shears... Vn : Allow' 0.85 85.000 psi 85.000 psi 85.000 psi Vu @ Col #1 1,662 psi 0.341 psi 0,003 psi Vu Btwn Cols 35.901 psi 26.268 psi 0.630 psi Vu @ Col #2 1.662 psi 2-662 psi 0,962 psi Two Way Shears... Vn : Allow ' 0.85 170.000 psi 170.000 psi 170.000 psi Vu @ Col #1 15.081 psi 14.249 psi 5.160 psi Vu @ Col #2 15.081 psi 12.980 psi 4.113 psi Reinforcing ( values given per unit width of footing) d Left Edge of Col #1 Between Columns 0 Right Edge of Col #2 Ru/Phi As Req'd Ru/Phi As Req'd Ru/Phi As Req'd ACI C-1 4.47 psi 0.259 in2/ft @ Bottom 214.53 psi -0.385 in2/ft @ Top 4.47 psi 0.259 in2/ft Bottom ACI C-2 0.99 psi 0.259 in2/ft @ Bottom 230.41 psi -0.416 in2/ft @ Top 7.08 psi 0.259 in2/ft Bottom ACI C-3 0.04 psi 0.259 in2/ft @ Bottom 135.68 psi 0.317 in2/ft @ Bottom 2.56 psi 0.259 in2/ft @ Bottom ACI Factors (per ACI. applied internally to entered loads) 4 ACI C-1 & C-2 DL 1.400 ACI C-2 Group Factor 0,750 Additional Seismic 1.4" Factor 1,400 ACI C-1 & C-2 LL 1.700 ACI C-3 Dead Load Factor 0.900 Additional Seismic "0-9' Factor 0.900 ACI C-1 & C-2 ST 1.700 ACI C-3 Short Term Factor 1.300 ....seismic = ST • : 1.100 Jeff Ingram, P.E. Jb «a 9% R&vwsota Ave., Suite 103 San Jose, CA 95125 e' pop Mimi 408s36-6M4 can: 4084636-6&12Chwi.d =' d Fax: 408-292-9370[Eg Or. d rnctrarn Structural ErKjW*edN emai: leR@ vrsn SE,=n www.WgwnSE.aom Title : Job # Dsgnr: Date: 4 i P M 1? E P 06 Description Scope: C�Ornbined Footing Design Page 1 ri:. - .E scriptiOr FOOTING @LINE 2 General information Code Ref: ACI 318-02. 1997 UBC. 2003 IBC. 2003 NFPA 5000 Allow Soil Bearing 1,000.0 psf Pc 2,500.0 psi Seismic Zone 4 Fy 60,000.0 psi Concrete Wt 150.0 pcf Min As Pct 0.0014 Short Term Increase 1.33 Distance to CL of Rebar 3.50 in Overburden 0.00 psf Live 8 Short Term Load Combined -- - - -- - --------- �Dimensions Footing Size... Column Support Pedestal Sizes Distance Left 1.00 ft #1 : Square Dimension 0.00 in Dist. Betwn Cols 10.00 ft ...Height 0.00 in Distance Right 1.00 ft #2 : Square Dimension 0.00 in Footing Length 12.00 ft ...Height 0.00 in Width 1.50 ft Thickness 18.00 in Loads Note: Load factoring supports 2003 IBC and 2003 NFPA 5000 by virtue of their references to ACI 318-02 for concrete design. Factoring of entered loads to ultimate loads within this program is according to ACI 318-02 C.2 Vertical Loads... 0 Left Column 0- Right Column Dead Load 0.250 k 0.250 k Live Load 0.250 k 0.250 k Short Term Load k k Applied Moments... Dead Load k-ft k-ft Live Load k-ft k-ft Short Term Load 7.710 k-ft 7.710 k-ft Summary Footincl Design OK + Length = I"� OOft 'JVidtt� - ? ft Thicknes = !8 -win. �?isi Lift = 1 �:�Oft 6t.vi� = IG �Gfi Dist Right = i Maximum Soil Pressure 761.72 psf Allowable 1.330.00 psf Steel Req'd @ Left 0.389 in2/ft Max Shear Stress 1.88 psi Steel Req'd @ Center 0.389 in2/ft Allowable 85.00 psi Steel Req'd @ Right 0.389 in2/ft Min. Overturning Stability 1.965:1 SoiPressures Soil Pressure @ Left Actual Allowable ACI Factored Eccentricity Dead + Live 280.6 1,000.0 psf Eq. C-1 401.1 psf 0.000 ft Dead+Live+Short Term 0.0 1,330.0 psf Eq. C-2 0.0 psf 3.053 ft Soil Pressure @ Right End Eq. C-3 0.0 psf Dead + Live 280.6 1,000-0 psf Eq. C-1 401.1 psf 0.000 ft Dead+Live+Short Term 761.7 1,330.0 psf Eq. C-2 1,066.4 psf 3.053 ft Stability Ratio 2.0 _1 Eq. C-3 617.7 psf Jeff Ingram, P.E. 9% Wrinescita Ave., Suite 103 San Jose, CA 95125 olfice:aae-e3s-seoa cen:eoe-s0s-sso2 Fax: 408-292-9370lag ,r Ingram Shichnal Ergineer"i el, :0f1lW wwnSE-m rwwTigramSEcom Title: Job # Dsgnr: Date: 2 41 PN4. 18 SEP 06 Description Scope: ------------ ------ - Combined Footing Design Page 2 Description FOOTING @LINE 2 Moment & Shear Summary 1 values for moment are given per unit width of footing) Moments... ACI C-1 ACI C-2 ACI C-3 Mu @ Col #1 0.04 k-ft/ft -0.16 k-ftlft -0.10 k-ft/ft Mu Btwn Cols -1.03 k-ft/ft 7.04 k-ft/ft 7.09 k-ft/ft Mu @ Col #2 0.04 k-ft/ft 0.36 k-ft/ft 0.20 k-ft/ft One Way Shears... Vn: Allow * 0.85 85.000 psi 85-000 psi 85.000 psi Vu @ Col #1 0.000 psi 0,000 psi 0.000 psi Vu Btwn Cols 1.881 psi 0.000 psi 0.000 psi Vu @ Col #2 0.000 psi 0.000 psi 0.000 psi Two Way Shears... Vn: Allow * 0.85 170.000 psi 170.000 psi 170.000 psi Vu @ Col #1 0.772 psi 1.379 psi 0.650 psi Vu @ Col #2 0772 psi 0-241 psi 0.319 psi Reinforcing values given per unit width of fooling) 9b Left Edge of Col #1 Between Columns A Right Edge of Col # Ru/Phi As Req'd Ru/Phi As Req'd Ru/Phi As Req'd ACI C-1 0.23 psi 0.389in2/ft @ Bottom 5.46 psi -0.389in2tft @ Top 0-23 psi 0.389 in2/ft @ Bottom ACI C-2 0.83 psi -0. 369 inZft @ Top 37.20 psi 0,389in2lft @ Bottom 1.88 psi 0.389 in2lft C Bottom ACI C-3 0.54 psi -0.389in2/ft @ Top 37.49 psi 0.389in2tft @ Bottom 1.04psi 0.389in2/ft @ Bottom ACI Factors (per ACI. applied internally to entered loads) ACI C-1 & C-2 DL 1.400 AC1 C-2 Group Factor 0.750 Additional Seismic '1.4!' Factor 1.400 ACI C-1 & C-2 LL 1.700 ACI C-3 Dead Load Factor 0.900 Additional Seismic "0-9' Factor 0.900 ACI C-1 & C-2 ST 1.700 ACI C-3 Short Term Factor 1.300 ....seismic = ST 1,100 Jeff Ingram, P.E. 9% Mininesota Ave., She 103 San Jose, CA 95125 Dedw %r Pe" 2 Offlos: 408436-OW4 Cen: 406-836-66M Fax: 408-292-937o Ingram Shx*n-M Engineeringwww.1nWan%W-=n � : jd14j&VrmnSE.cofn Title Job # Dsgnr: Date: 243PM. 18 SEP 06 Description Scope �.t � Combined Footing Design Page I I - 2.:-. i&r,. En,vv—run.-i Description FOOTING @LINE I General Information Code Ref: ACI 318-02.1997 UBC. 2003 IBC. 2003 NFPA Allow Soil Bearing 1,000.0 psf rc 2,500.0 psi Seismic Zone 4 Fy 60,000-0 psi Concrete Wt 1%0 pcf Min As Pct 0.0014 Short Term Increase 1.33 Distance to CL of Rebar 3,50 in Overburden 0.00 psf Live & Short Term Load Combined Footing Size... Column Support Pedestal Sizes Distance Left 1.00 ft #1 : Square Dimension O.C)o in Dist. Betwn Cols 17.50 ft —Height 0.00 In Distance Right - 100 ft #2: Square Dimension 0.00 in Footing Length 19.50 ft ...Height 0.00 in Width 1.00 ft Thickness 12.00 in Loads Note: Load factoring supports 2003 IBC and 2003 NFPA 5000 by virtue of their references to ACI 318-02 for concrete design. Factoring of entered loads to ultimate loads within this program is according to ACI 318-02 C.2 Vertical Loads... Q Left Column ill Right Column Dead Load 0,250 k 0.250 k Live Load 0.250 k 0.250 k Short Term Load k k Applied Moments... Dead Load k-ft k-ft Live Load k-ft k-ft Short Term Load 7.710 k-ft 7.710 k-ft Summary Footing Design OK Length = 19 50' It- 'vVidth = I 00ft Thickness = I '-.,D()in Dist Left = 1.00ft. Bt,.,.,n = 17 50ft Dist Right = I 100ft Maximum Soil Pressure 449.50 psf Allowable 1.330.00 psf Steel Req'd @ Left 0.259 in2/ft Max Shear Stress 6.27 psi Steel Req'd @ Center 0.340 in2/ft Allowable 85.00 psi Steel Req'd @ Right 0.259 in2/ft Min. Overturning Stability 2.482:1 ,FSoil Pressures ---------- 7 Soil Pressure @ Left Actual Allowable ACI Factored Eccentricity Dead + Live 2013 1,000.0 psf Eq. C-1 289.5 psf 0.000 ft Dead+Live+Short Term 0-0 1,330.0 psf Eq. C-2 0.0 psf 3.929 ft Soil Pressure @ Right End Eq. C-3 0.0 psf Dead + Live 201.3 1,000.0 psf Eq. C-1 289-5 psf 0.000 ft Dead+Live+Short Term 449.5 1,330.0 psf Eq. C-2 629.3 psf 3.929 ft Stability Ratio 2-5 :1 Eq. C-3 3510 psf Jeff Ingram, P.E. 9% Minr*sota Ave,, Suite 103 San Jose, CA 95125 P-" Offma: 406-8364=4 Cell: 4084KWP6602 Fax: 408-292-9370 Ch.Md ft emaillw: pf1@kvraff%SEcom IngrainIngrainStructural Engineering wwAngramSE-corn Title: Job # M Dsgnr: Date: 4 3 F N1, 18 S E F 06 Description Scope Cornbined Footing Design Page 2 Description FOOTING @LINE 1 �—Moment & Shear Summary values for moment are given per unit width of footing) Momnts... ACI C-1 ACI C-2 ACI C-3 MU @ Col #1 0.04 k-ft/ft -& 10 k-ft/ft -0-07 k-ft/ft Mu Btwn Cols -3-00 k-ft/ft -10.71 k-ft/ft 10.73 k-ft/ft Mu @ Col #2 0.04 k-ft/ft 0.20 k-ft/ft 0-111 k-ftlft One Way Shears... Vn: Allow * 0.85 85.000 psi 85.000 psi 85.000 psi Vu @ Col #1 0,227 psi 0.600 psi 0.386 psi Vu Btwn Cols 6.273 psi 0.385 psi 0.000 psi Vu @ Col #2 0.227 psi 1.184 psi 0.615 psi Two Way Shears... Vn: Allow * 0.85 170.000 psi 170.000 psi 170.000 psi Vu Col #1 2.544 psi 2.787 psi 1.103 psi Vu Col #2 2.544 psi 1.748 psi 0.430 psi Reinforcing values given per unit width of footing A Left Edge of Col #1 Between Columns 9b Right Edge of Col #2 Ru/Phi As Req'd Ru/Phi As Req'd Ru/Phi As Req'd ACI C-1 0.61 psi 0.259in2lft Bottom 46.18 psi -0.259 in2lft @ Top 0.61 psi 0.259in2lft @ Bottom ACI C-2 1.61 psi -0.259in2/ft Top 164.67 psi -0.340021ft @ Top 3-13 psi 0.259in2/ft @ Bottom ACI C-3 1.04 psi -0.259in2/ft Top 164.96 psi 0.340in2/ft @ Bottom 1.62psi 0.259in2/ft @ Bottom ACI Factors (per ACL applied internally to entered loads) ACI C-1 & C-2 DL 1.400 ACI C-2 Group Factor 0.750 Additional Seismic "14' Factor 1.400 ACI C-1 & C-2 LL 1.700 ACI C-3 Dead Load Factor 0.900 Additional Seismic "0.9" Factor 0.900 ACI C-1 & C-2 ST 1.700 ACI C-3 Short Term Factor 1,300 ....seismic = ST 1.100 Jeff Ingram, P.E. wl 9% Mininesola Ave., Suite 103 San Jose, CA 95125 P". Offioa: 408-83&4W4 Ce&: 400433640M Fax: 408-292-9370 ChodWd W Ci em 9: yA4jkVrwnSEx= Ingram StripMral Engineering www.kW&vW-=n FIAT 6FILIA) Y. L2 c) tMiLl f Jeff Ingram, P.E. 0 66, f 9% Minnesota Ave., Suite 103 POW San Jose, CA 95125 Ji Offkm: 40840&6W4 CAN: 408-83&6602 w Fax: 406-292-9370 Ingram amad: parl@ftramSE-com Structural Engineering www.WaqramSEo= 2?d yoiwo) t '00 J6 4 2-1(1-6 (49 S. L2 014 (JD4. x �cl N Jeff Ingram, P.E. 996 Minnesota Ave., Suite San Jose, CA 95125 103 Ndp or- Pd" 00bw: 408-&l,&6W4 C-ek: 4064i36-66W Fax: 408-292-9370 Ingram Shmlural Er*mwkig Smaw: peaftranISE com www.kWwnSF-corn L2 2,- ? Ir L) M lbb LL Jeff Ingram, P.E. 996 Minnesota Ave., Suite 103 pow San Jose, CA 95125 Offm: 408-83&6W4 CeK: 408-83&66W Fax 408-292-9370 Ingram SWjckn-M Engineering www.kpqrwnSEoom ?I � I?'; 7 O;A L2 OP, b ILI [go DAK Jeff Ingram, P.E. Mb N& 9% Minnesota Ave., SuAe 103 San Jose, CA 95125 Pao Olhw: 408-&*,SW4 Cel: 400413&o66M Fax: 408-292-9370 emW:jeff@kVran%SE.cofn I Ingram SMx*LjrA Engineering www.kWwnSE-com