Loading...
DIR-2021-003 - Action Letter CITY OF CUPERTINO 10300 Torre Avenue, Cupertino, California 95014 (408) 777-3308 To: Mayor and City Council Members Chairperson and Planning Commissioners From: Benjamin Fu, Director of Community Development Prepared by: Jeffrey Tsumura, Associate Planner Date: August 18, 2021 Subject: Director's Minor Modification, DIR-2021-003, to allow for minor exterior modifications as part of a retrofitting project to an existing water station located at 10450 Mann Drive, APN 326-45-015. Chapter 19.164 of the Cupertino Municipal Code allows for administrative approval of minor changes in a project. The Director reports his decision to the City Council and Planning Commission in time to allow an appeal of the decision within 14-calendar days. BACKGROUND The property is located at 10450 Mann Drive within an existing R1-10 residential neighborhood(Single Family Residential District-Minimum 10,000-square-foot lot area). The site contains a 188,000-gallon potable water storage tank and an approximately 1,070 -square-foot facility that houses water pumping equipment. The property is owned by the City of Cupertino and leased by San Jose Water Company(SJWC).As part of the lease agreement, SJWC maintains and operates the water tank and pump equipment on site to service Cupertino. DISCUSSION The applicant, Bill Tuttle of SJWC, is requesting equipment and retrofit upgrades to the existing site.The pump station is fully enclosed and contains the pumping equipment for the water tank. Equipment upgrades within the pump station include: • The removal and replacement of a new backup generator. • A new electrical meter and switchboard equipment and concrete pad. • A new motor control center (MCC) and concrete pad. The scope also includes exterior modifications to the water tank in the rear of the lot and behind the building. The exterior modifications will not be visible from the public right of way. The exterior modifications include: 1 • Exterior retrofits and replacement of new valves, piping, and safety equipment upgrades to the water tank. • New stairway and platform for a future cathodic protection system. • The removal and installation of a new six-foot tall rear and side wood perimeter fencing. • Re-roofing to the pump station. All new fittings and appurtenances attached to the tank will be primed and painted per SJWC standard painting and coating specifications and shall be California grouse tan. ACTION The Director of Community Development deems the project categorically exempt from environmental review under CEQA Guidelines, Article 19, Section 15301: Existing Facilities and further deems the modification minor and approves the project with the following conditions of approval: 1. APPROVED EXHIBITS Approval is based on exhibits titled "San Jose Water Company Mann Station Improvements", prepared by Ryan Yelinek, consisting of 25 sheets labeled SH01 through SH25, dated April 30, 2021, and revised July 1, 2021, except as may be amended by the conditions contained in this report. 2. ACCURACY OF THE PROTECT PLANS The applicant/property owner is responsible to verify all pertinent property data including but not limited to property boundary locations,building setbacks, property size, building square footage, any relevant easements and/or construction records. Any misrepresentation of any property data may invalidate this approval and may require additional review. 3. PREVIOUS CONDITIONS OF APPROVAL All prior conditions of approval through past approvals shall remain in effect unless superseded by or in conflict with subsequent conditions of approval and as specifically amended by this Director's Minor Modification approval. 4. DUST CONTROL The following construction practices shall be implemented during all phases of construction for the proposed project to prevent visible dust emissions from leaving the site: a. Water all exposed surfaces areas (e.g., parking areas, staging areas, soil piles, graded areas, and unpaved access roads) at least twice daily and more often 2 during windy periods to prevent visible dust from leaving the site; active areas adjacent to windy periods; active areas adjacent to existing land uses shall be kept damp at all times, or shall be treated with non-toxic stabilizers or dust palliatives. b. All haul trucks transporting soil, sand, or other loose material off-site shall be covered. c. All visible mud or dirt track-out onto adjacent public roads shall be removed using wet power vacuum street sweepers at least once per day. The use of dry power sweeping is prohibited. d. All vehicle speeds on unpaved roads shall be limited to 15 mph. e. All roadways, driveways, and sidewalks to be paved shall be completed as soon as possible. Building pads shall be laid as soon as possible after grading unless seeding or soil binders are used. f. Idling times shall be minimized either by shutting equipment off when not in use or reducing the maximum idling time to 5 minutes (as required by the California airborne toxics control measure Title 13, Section 2485 of California Code of Regulations [CCR]). Clear signage shall be provided for construction workers at all access points. g. All construction equipment shall be maintained and properly tuned in accordance with manufacturer's specifications. All equipment shall be checked by a certified mechanic and determined to be running in proper condition prior to operation. h. Post a publicly visible sign with the telephone number and person to contact at the Lead Agency regarding dust complaints. This person shall respond and take corrective action within 48 hours. The Air District's phone number shall also be visible to ensure compliance with applicable regulations. i. The applicant shall incorporate the City's construction best management practices into the building permit plan set. 5. GRADING AND CONSTRUCTION HOURS AND NOISE LIMITS a. All grading activities shall be limited to the dry season (April 15 to October 1), unless permitted otherwise by the Director of Public works. b. Construction hours and noise limits shall be compliant with all requirements of Chapter 10.48 of the Cupertino Municipal Code. c. Grading, street construction, underground utility and demolition hours for work done more than 750 feet away from residential areas shall be limited to Monday through Friday, 7 a.m. to 8 p.m. and Saturday and Sunday, 9 a.m. to 6 p.m. Grading, street construction, demolition or underground utility work within 750 feet of residential areas shall not occur on Saturdays, Sundays, holidays, and 3 during the nighttime period as defined in Section 10.48.053(b) of the Municipal Code. d. Construction activities shall be limited to Monday through Friday, 7 a.m. to 8 p.m. and Saturday and Sunday, 9 a.m. to 6 p.m. Construction activities are not allowed on holidays as defined in Chapter 10.48 of the Municipal Code. Nighttime construction is allowed if compliant with nighttime standards of Section 10.48 of the Cupertino Municipal Code. e. Rules and regulations pertaining to all construction activities and limitations identified in this permit, along with the name and telephone number of an applicant appointed disturbance coordinator, shall be posted in a prominent location at the entrance to the job site. f. The applicant shall be responsible for educating all contractors and subcontractors of said construction restrictions. g. The applicant shall comply with the above grading and construction hours and noise limit requirements unless otherwise indicated. 6. CONSULTATION WITH OTHER DEPARTMENTS The applicant is responsible for consulting other departments and/or agencies with regard to the proposed project for additional conditions and requirements. Any misrepresentation of any submitted data may invalidate an approval by the Community Development Department. 7. INDEMNIFICATION As part of the application, to the fullest extent permitted by law, the applicant shall agree to indemnify, defend with the attorneys of the City's choice, and hold harmless the City, its City Council, and its officers, employees, and agents (collectively, the "indemnified parties") from and against any liability, claim, action, cause of action, suit, damages, judgment, lien, levy, or proceeding (collectively referred to as "proceeding")brought by a third party against one or more of the indemnified parties or one or more of the indemnified parties and the applicant related to any Ordinance, Resolution, or action approving the project, the related entitlements, environmental review documents, finding or determinations, or any other permit or approval authorized for the project. The indemnification shall include but not be limited to damages, fees, and costs awarded against the City, if any, and cost of suit, attorneys' fees, and other costs, liabilities, and expenses incurred in connection with such proceeding whether incurred by the Applicant, the City, or the parties initiating or bringing such proceeding. The applicant shall agree to (without limitation) reimburse the City its actual attorneys' fees and costs incurred in defense of the litigation. Such attorneys' fees and 4 costs shall include amounts paid to the City's outside counsel and shall include City Attorney time and overhead costs and other City staff overhead costs and any costs directly related to the litigation reasonably incurred by City. The applicant shall likewise agree to indemnify, defend, and hold harmless the indemnified parties from and against any damages, attorneys' fees, or costs awards, including attorneys' fees awarded under Code of Civil Procedure section 1021.5, assessed or awarded against the indemnified parties. The Applicant shall cooperate with the City to enter a Reimbursement Agreement to govern any such reimbursement. The Applicant shall agree to (without limitation) reimburse the City for all costs incurred in additional investigation or study of, or for supplementing, redrafting, revising, or amending, any document (such as an Environmental Impact Report, negative declaration, specific plan, or general plan amendment) if made necessary by proceedings challenging the project approvals and related environmental review, if the applicant desires to continue to pursue the project. The Applicant shall agree that the City shall have no liability to the Applicant for business interruption, punitive, speculative, or consequential damages. 8. NOTICE OF FEES, DEDICATIONS, RESERVATIONS OR OTHER EXACTIONS The Conditions of Project Approval set forth herein may include certain fees, dedication requirements, reservation requirements, and other exactions. Pursuant to Government Code Section 66020(d) (1), these Conditions constitute written notice of a statement of the amount of such fees, and a description of the dedications, reservations, and other exactions. You are hereby further notified that the 90-day approval period in which you may protest these fees, dedications, reservations, and other exactions, pursuant to Government Code Section 66020(a), has begun. If you fail to file a protest within this 90-day period complying with all of the requirements of Section 66020, you will be legally barred from later challenging such exactions. This Director's approval is effective until August 18, 2023. The 14-calendar-day appeal period will expire on September 1, 2021. Enclosures: Attachment A: Plan set 5