Loading...
DRC Packet 10-21-2021CITY OF CUPERTINO DESIGN REVIEW COMMITTEE AGENDA This will be a teleconference meeting without a physical location Thursday, October 21, 2021 5:00 PM TELECONFERENCE / PUBLIC PARTICIPATION INFORMATION TO HELP STOP THE SPREAD OF COVID-19 In accordance with Government Code 54953(e), this will be a teleconference meeting without a physical location to help stop the spread of COVID-19. Members of the public wishing comment on an item on the agenda may do so in the following ways: 1) E-mail comments by 4:00 p.m. on Thursday, October 21 to the Committee at planning@cupertino.org. These e-mail comments will be received by the Committee members before the meeting and posted to the City’s website after the meeting. 2) E-mail comments during the times for public comment during the meeting to the Committee at planning@cupertino.org. The staff liaison will read the emails into the record, and display any attachments on the screen, for up to 3 minutes (subject to the Chair’s discretion to shorten time for public comments). Members of the public that wish to share a document must email planning@cupertino.org prior to speaking. 3) Teleconferencing Instructions Members of the public may observe the teleconference meeting or provide oral public comments as follows: Oral public comments will be accepted during the teleconference meeting. Comments may be made during “oral communications” for matters not on the agenda, and during the public comment period for each agenda item. To address the Committee, click on the link below to register in advance and access the meeting: Online Please click the link below to join the webinar: Page 1 DRC 10/21/2021 1 of 56 Design Review Committee Agenda October 21, 2021 https://cityofcupertino.zoom.us/webinar/register/WN_nDaQWw2rT3aALuTBQAN0pw Phone Dial: (669) 900 6833 and enter Webinar ID: 963 8192 7722 (Type *9 to raise hand to speak) Unregistered participants will be called on by the last four digits of their phone number. Or an H.323/SIP room system: H.323: 162.255.37.11 (US West) 162.255.36.11 (US East) Meeting ID: 963 8192 7722 SIP: 96381927722@zoomcrc.com After registering, you will receive a confirmation email containing information about joining the webinar. Please read the following instructions carefully: 1. You can directly download the teleconference software or connect to the meeting in your internet browser. If you are using your browser, make sure you are using a current and up-to-date browser: Chrome 30+, Firefox 27+, Microsoft Edge 12+, Safari 7+. Certain functionality may be disabled in older browsers, including Internet Explorer. 2. You will be asked to enter an email address and a name, followed by an email with instructions on how to connect to the meeting. Your email address will not be disclosed to the public. If you wish to make an oral public comment but do not wish to provide your name, you may enter “Cupertino Resident” or similar designation. 3. When the Chair calls for the item on which you wish to speak, click on “raise hand.” Speakers will be notified shortly before they are called to speak. 4. When called, please limit your remarks to the time allotted and the specific agenda topic. ROLL CALL APPROVAL OF MINUTES 1.Subject: Approve the January 21 Design Review Committee Minutes Recommended Action: Approve the January 21 Design Review Committee Minutes 1 - Draft Minutes 2.Subject: Approve the May 20 Design Review Committee Minutes Recommended Action: Approve the May 20 Design Review Committee Minutes Page 2 DRC 10/21/2021 2 of 56 Design Review Committee Agenda October 21, 2021 1 - Draft Minutes POSTPONEMENTS ORAL COMMUNICATIONS This portion of the meeting is reserved for persons wishing to address the Committee on any matter within the jurisdiction of the Committee and not on the agenda. Speakers are limited to three (3) minutes. In most cases, State law will prohibit the Commission from making any decisions with respect to a matter not on the agenda. PUBLIC HEARINGS 3.Subject: Consider an R1 Exception Permit to allow a reduced side-yard setback of 5-feet to accommodate a new garage addition to an existing single-family residence where a combined side-yard setback of 15-feet is required in the R1-7.5 Zoning District (Application No.: EXC-2021-001; Applicant: Raghu Kumar Devarakonda; Location: 10300 Imperial Avenue; APN: 357-19-052) Recommended Action: That the Design Review Committee adopt the draft resolution (Attachment 1) to: 1. Find the project exempt from CEQA; and 2. Approve the R-1 Exception (EXC-2021-001). Staff Report 1 - Draft Resolution 2 - Plan Set 3 - Monta Vista Residences with Reduced First-Floor Side-Yard Setbacks 4.Subject: Sign Exception to allow for a second wall sign on a commercial building where only wall sign is permitted (Mattress Firm). (Application No. EXC-2021-001; Applicant: Tracey Diehl (Expedite the Diehl); Location: 20510 Stevens Creek Boulevard; APN: 359-08-018) Recommended Action: That the Design Review Committee adopt the draft resolution (Attachment 1) to: 1. Find the project exempt from CEQA; and 2. Approve the Sign Exception (EXC-2021-002). Staff Report 1 - Draft Resolution 2 - Plan Set OLD BUSINESS NEW BUSINESS STAFF AND COMMITTEE REPORTS Page 3 DRC 10/21/2021 3 of 56 Design Review Committee Agenda October 21, 2021 FUTURE AGENDA SETTING ADJOURNMENT In compliance with the Americans with Disabilities Act (ADA), anyone who is planning to attend this teleconference meeting who is visually or hearing impaired or has any disability that needs special assistance should call the City Clerk's Office at 408-777-3223, at least 48 hours in advance of the meeting to arrange for assistance. In addition, upon request, in advance, by a person with a disability, meeting agendas and writings distributed for the meeting that are public records will be made available in the appropriate alternative format. Any writings or documents provided to a majority of the members after publication of the agenda will be made available for public inspection. Please contact the City Clerk’s Office in City Hall located at 10300 Torre Avenue, Cupertino, California 95014, during normal business hours. IMPORTANT NOTICE: Please be advised that pursuant to Cupertino Municipal Code section 2.08.100 written communications sent to the Cupertino City Council, Commissioners or City staff concerning a matter on the agenda are included as supplemental material to the agendized item. These written communications are accessible to the public through the City’s website and kept in packet archives. Do not include any personal or private information in written communications to the City that you do not wish to make public, as written communications are considered public records and will be made publicly available on the City website. Members of the public are entitled to address the members concerning any item that is described in the notice or agenda for this meeting, before or during consideration of that item. If you wish to address the members on any other item not on the agenda, you may do so during the public comment. Page 4 DRC 10/21/2021 4 of 56 CITY OF CUPERTINO Agenda Item 21-9987 Agenda Date: 10/21/2021 Agenda #: 1. Subject: Approve the January 21 Design Review Committee Minutes Approve the January 21 Design Review Committee Minutes CITY OF CUPERTINO Printed on 10/14/2021Page 1 of 1 powered by Legistar™ DRC 10/21/2021 5 of 56 Design Review Committee January 21, 2021 Cupertino, CA 95014 (408) 777-3308 ACTION MINUTES OF THE REGULAR MEETING OF THE DESIGN REVIEW COMMITTEE HELD ON January 21, 2021 ROLL CALL Committee Members present: R Wang, Chair David Fung, Commissioner Committee Members absent: none Staff present: Lauren Ninkovich, Assistant Planner Erick Serrano, Senior Planner APPROVAL OF MINUTES: 1. April 16, 2020 The minutes of April 16, 2020 were approved as written ORAL COMMUNICATION: None WRITTEN COMMUNICATIONS: None CONSENT CALENDAR: None PUBLIC MEETING: 2. Application No.(s): EXC-2020-006 Applicant: Manju Radhakrishnan (Radhakrishnan residence) Location: 10330 Menhart Lane APN: 375-16-017 Fence Exception to allow a six (6) foot front yard fence in the required 20’ front yard setback area Design Review Committee decision final unless appealed. Staff Member Ninkovich reviewed the project with the Committee. The Applicant is proposing to construct a fence along a portion of the front yard of their home. The property is roughly triangular in shape making the rear yard the smaller of the two. The applicant would like to install the fence to provide privacy and more usable yard space. They are not proposing to remove the trees in the yard. A Fence Exception is required as the applicant wants to install a six (6) foot high fence where a three (3) foot is allowed. The Public Works department has reviewed the plans. They found that due to the curve of the road, the proposed placement of the fence will not cause an issue with traffic sightlines. The applicant and homeowner, Mr. Radhakrishnan, addressed the Committee. He thanked Staff for their help. He expressed the need for his family to have some more useable outdoor space and privacy. The front window of the home faces Menhart Lane so they do not open the drapes. DRC 10/21/2021 6 of 56 2 Design Review Committee January 21, 2021 The Committee members reviewed the fence setback requirements from the sidewalk and the property line and the site plans. Staff confirmed that the proposed fence will be at the proper setback allowed per the Code. The Committee members concurred that the lot has a very small rear yard so providing space in the front would increase the “livability” of the home. Chair Wang opened the Public Comment period. There were no speakers Chair Wang closed the Public Comment period. Chair Wang agreed with Committee Member Fung’s thoughts that the addition of the fence would not adversely affect the neighbors or cause a sightline hazard to motorists rounding the curve on Menhart Lane. MOTION: Commissioner Fung moved to approve EXC-2020-006 per the draft resolution APPROVE: Chair Wang ABSENT: none ABSTAIN: none VOTE: 2-0-0 OLD BUSINESS: None NEW BUSINESS: None Respectfully submitted: /s/Beth Ebben Beth Ebben Deputy Board Clerk DRC 10/21/2021 7 of 56 CITY OF CUPERTINO Agenda Item 21-9993 Agenda Date: 10/21/2021 Agenda #: 2. Subject: Approve the May 20 Design Review Committee Minutes Approve the May 20 Design Review Committee Minutes CITY OF CUPERTINO Printed on 10/14/2021Page 1 of 1 powered by Legistar™ DRC 10/21/2021 8 of 56 Design Review Committee May 20, 2021 Cupertino, CA 95014 (408) 777-3308 ACTION MINUTES OF THE REGULAR MEETING OF THE DESIGN REVIEW COMMITTEE HELD ON May 20, 2021 ROLL CALL Committee Members present: Steven Scharf, Chair Vikram Saxena, Commissioner Committee Members absent: none Staff present: Erika Poveda, Associate Planner Piu Ghosh, Planning Manager APPROVAL OF MINUTES: 1. January 21, 2021 The minutes of January 21, 2021 were postponed due to a lack of a quorum for approval by proxy ORAL COMMUNICATION: None WRITTEN COMMUNICATIONS: None CONSENT CALENDAR: None PUBLIC MEETING: 2. Application No.(s): EXC-2020-005 Applicant: T.N. Design (Kumar residence) Location: 10290 Imperial Avenue APN: 357-19-053 R-1 Exception Permit to allow the construction of a new 3,026 SF single-story residence with reduced side-yard setbacks of 5' on each side, where a combined side-yard setback of 15' is typically required in the R1-7.5 zoning district. Design Review Committee decision final unless appealed. Staff Member Poveda reviewed the project with the Committee. The project site was annexed into the City in 2004 from the County. The lot is of substandard width (10’ narrower) and substandard size (774 square feet smaller) as are many of the homes in this area that have been annexed. Granting this exception will allow the property owner greater flexibility to construct their home with a balanced floor plan. The proposed residence complies with the R-1 Ordinance and is consistent in design with the other homes in the Monta Vista neighborhood. The Committee Members asked clarifying questions regarding the overall neighborhood design, allowed slot size and proposed landscaping. Chair Scharf opened the Public Comment period. DRC 10/21/2021 9 of 56 2 Design Review Committee May 20, 2021 Muni Madhdhipatla Chair Scharf closed the Public Comment period. Chair Scharf agreed with Committee Member Saxena’s thoughts that allowing the reduced setbacks would not adversely affect the neighborhood. The City has granted these types of exceptions where appropriate in the past. MOTION: Commissioner Saxena moved to approve EXC-2020-005 per the draft resolution APPROVE: Chair Scharf ABSENT: none ABSTAIN: none VOTE: 2-0-0 OLD BUSINESS: None NEW BUSINESS: None Respectfully submitted: /s/Beth Ebben Beth Ebben Deputy Board Clerk DRC 10/21/2021 10 of 56 CITY OF CUPERTINO Agenda Item 21-9971 Agenda Date: 10/21/2021 Agenda #: 3. Subject: Consider an R1 Exception Permit to allow a reduced side-yard setback of 5-feet to accommodate a new garage addition to an existing single-family residence where a combined side- yard setback of 15-feet is required in the R1-7.5 Zoning District (Application No.: EXC-2021-001; Applicant: Raghu Kumar Devarakonda; Location: 10300 Imperial Avenue; APN: 357-19-052) That the Design Review Committee adopt the draft resolution (Attachment 1) to: 1. Find the project exempt from CEQA; and 2. Approve the R-1 Exception (EXC-2021-001). CITY OF CUPERTINO Printed on 10/14/2021Page 1 of 1 powered by Legistar™ DRC 10/21/2021 11 of 56 DESIGN REVIEW COMMITTEE STAFF REPORT Meeting: October 21, 2021 Subject: Consider an R1 Exception Permit to allow a reduced side-yard setback of 5-feet to accommodate a new garage addition to an existing single-family residence where a combined side-yard setback of 15-feet is required in the R1-7.5 Zoning District (Application No.: EXC-2021-001; Applicant: Raghu Kumar Devarakonda; Location: 10300 Imperial Avenue; APN: 357-19-052) Recommended Action: That the Design Review Committee adopt the draft resolution (Attachment 1) to: 1. Find the project exempt from CEQA; and 2. Approve the R-1 Exception (EXC-2021-001). Project Data: General Plan Designation: Residential (0-4.4 DU/Ac.) Zoning Designation: R1-7.5 General Plan Neighborhood: Monta Vista Site Development Regulations: Required/ Allowed Existing Proposed Lot Area 7,500 sq. ft. 6,750 sq. ft. No change Lot Width 60’ 50’ No change Floor Area Ratio 45% 1,632 sq. ft. (24.2%) 2,350 sq. ft. (34.8%) Lot Coverage 50% N/A 2,999 sq. ft. (44.4%) 1st Floor Setbacks: Required Existing Proposed Front 20’ 24’-10” No change Side Combined 15’ (min. 5’) 12’ Left 5’-7” Right 17’-7” Combined 5’ Left 5’-7” Right 10’-7” Combined Rear 20’ 71’-10” 39’-6 ½” DRC 10/21/2021 12 of 56 Project Consistency with: General Plan: Yes Zoning: No, R-1 Exception requested for reduced side-yard setbacks of 10’-7” combined where 15-feet is required. Environmental Assessment: Categorically Exempt per Sections 15301 (Class 1) of the California Environmental Quality Act (CEQA) Background: Site Description The subject single-family residential property is located on Imperial Avenue in the Monta Vista neighborhood (Figure 1). The site is surrounded by planned development light industrial, P(ML), to the north and east, with other single-family residential uses to the south and west. The existing single-story residence with detached garage was originally built under the County of Santa Clara’s jurisdiction in 1951 and was annexed into the City in 2004. The existing lot is substandard in area at 6,750 square feet where 7,500 square feet is the minimum lot area for R1-7.5 zoned properties. Furthermore, the lot is substandard in lot width at 50 feet, which is 10 feet less than the minimum lot width of 60 feet required for R1-7.5 properties. Applicant Request The applicant/property owner, Raghu Kumar Devarakonda, is proposing to demolish the existing detached garage at the rear of the property, remodel the existing primary residence, and construct a 678 square-foot addition at the rear and a 442 square-foot garage addition at the front, resulting in a 2,350 square foot one-story single-family residence. A combined side-yard setback of 15 feet is required in the R1-7.5 zoning district. However, since the applicant is proposing a reduced side-yard setback of five feet, and a combined side-yard setback of 10’-7”, to accommodate a proposed attached garage, an R- 1 Exception Permit is required. The City’s Municipal Code (Chapter 19.12) requires Design Review Committee review for all proposed R-1 Exception applications. Figure 1: Project Vicinity DRC 10/21/2021 13 of 56 Discussion: Side-Yard Setback Exception While the R-1 Ordinance (Chapter 19.28 of the Cupertino Municipal Code) requires a combined 15-foot first floor side-yard setback, with no side-yard setback less than five feet from the property line in most zoning districts, it allows properties located in the R1- 5 zoning district (Rancho Rinconada neighborhood), where there are several hundred lots that have a lot width between 47 feet and 51 feet and lot areas ranging between 4,800 and 5,500 sq. ft., to have minimum five-foot side-yard setbacks on both sides. These reduced side-yard setbacks allow greater flexibility for these smaller and narrower lots to construct a reasonable and balanced floor plan and front elevation. Additionally, the Parking Regulations Ordinance (Chapter 19.124 of the Cupertino Municipal Code) requires a two-car garage measuring 20’ by 20’ for single-family residences. Given the project’s lot area and width constraints, the applicant is requesting an exception to the minimum 15-foot combined side-yard setback requirement to accommodate the two-car garage. The project site is located in the Monta Vista neighborhood where there are numerous lots that are substandard in width. The original subdivision in this neighborhood subdivided lots into 25 feet in width. Over time, many lots were conveyed together and eventually merged into 50-foot-wide lots as allowed by the Subdivision Map Act. Furthermore, much of Monta Vista was developed while under the development regulations of Santa Clara County. Consequently, several neighboring homes have side- yard setbacks that do not conform to the City of Cupertino’s development regulations. There have been other properties in the Monta Vista neighborhood for which a reduced side-yard setback has been approved due to a substandard lot width and/or substandard lot size. While research indicates that some of these residences were built under the County of Santa Clara’s jurisdiction with varying building setback and development parameters that are considered non-conforming under the City's requirements, there are nine recent first floor side-yard setback exception approvals1 in the neighborhood to allow five-foot first floor side-yard setbacks on either side. See Attachment 3 for a map of R1-zoned Monta Vista residences with existing first floor side-yard setbacks less than 15 feet combined. Since the exception is only proposed for the section of the home that serves to accommodate the required two-car garage, staff believes that the applicant has attempted 1 Note: Prior to 2005, 5-foot first floor side-yard setbacks were allowed for all lots 60’ or less in width and less than 6,000 sq. ft. in size, without the need for an exception throughout the City. This was amended by the City Council in 2005 to be limited to only the R1-5 zoning district. An exception would be required in all other zoning districts. DRC 10/21/2021 14 of 56 to minimize the exception to the least possible extent required. Therefore, in the interests of a more balanced front elevation and functional floor plan, staff recommends that this exception be granted to accommodate the garage. Project Design The proposed single-story residence (Figure 2) is designed to meet all aspects of the R-1 Ordinance, with the exception of the first-floor combined side-yard setback for the proposed garage only. The proposed design is generally consistent with the Single- Family Residential Design Guidelines and is compatible with other homes in the neighborhood in terms of massing and design with the architect proposing a design that features neutral-colored stucco and stone veneer. The site is not subject to the Monta Vista Design Guidelines, which regulate architectural style and materials within a portion of the Monta Vista Specific Plan area. Furthermore, the reduced five-foot side yard setbacks are appropriate to allow for a functional floor plan, to accommodate a 20’ by 20’ garage that is currently required for all single-family residences, and to create a balanced, aesthetically pleasing front elevation, that is not dominated by a two-car garage door, on the substandard lot. Site Improvements The scope of work includes modifications to the front yard including the installation of new landscaping comprised of mulch and a variety of drought-tolerant plantings and the installation of pervious pavers for the driveway and entry walkway. The total new landscape area is approximately 340 square feet and as a condition of approval, the applicant shall submit a Prescriptive Compliance Application or a full Landscape Documentation Package prior to Building Permit issuance to be consistent with the Water Efficient Landscape Ordinance (Chapter 14.15) of the Cupertino Municipal Code. There are no proposed tree removals as part of this project. The project shall comply with the requirements indicated on the Public Work Confirmation Form dated December 1, 2020, including but not limited to providing street improvement designs to be reviewed and approved by the Director of the Public Works Department prior to Building Permit issuance. Figure 2: Project Design DRC 10/21/2021 15 of 56 Environmental Assessment This project is categorically exempt from the requirements of the California Environmental Quality Act (CEQA) per Section 15301: Existing facilities. Public Outreach and Noticing The following table is a brief summary of the noticing done for this project: Notice of Public Hearing and Intent, Site Notice & Legal Ad Agenda  Site Signage (10 days prior to the hearing)  6 public meeting notices mailed to adjacent property owners (10 days prior to the hearing)  Posted on the City’s official notice bulletin board (one week prior to the hearing)  Posted on the City of Cupertino’s website (one week prior to the hearing) No public comments have been received as of the date of production of this staff report. Permit Streamlining Act This project is subject to the Permit Streamlining Act (Government Code Section 65920 – 65964). The City has complied with the deadlines found in the Permit Streamlining Act. Project Received: February 16, 2021; Deemed Incomplete: March 9, 2021 2nd Submittal Received: April 19, 2021; Deemed Incomplete: May 18, 2021 3rd Submittal Received: June 10, 2021; Deemed Complete: July 8, 2021 Deemed Incomplete: August 4, 2021 due to project revisions proposed by applicant. 4th Submittal Received: August 17, 2021; Deemed Complete: September 16, 2021 The City has up to 60 days from the date of deeming the project complete (until November 16, 2021) to make a decision on the project. Conclusion: Staff recommends approval of the project since the project and conditions of approval address all concerns related to the proposed project and all of the findings for approval of the proposed project, consistent with Chapter 19.28 of the Cupertino Municipal Code, may be made. With respect to the R-1 Exception, the following findings may be made: 1. The literal enforcement of this chapter will result in restrictions inconsistent with the spirit and intent of this chapter. DRC 10/21/2021 16 of 56 The project is consistent with the intent of the R-1 Ordinance in that it minimizes visual impacts to adjacent residential properties and that it is compatible with other homes in the neighborhood. The reduced five-foot side yard setbacks are appropriate to allow for a functional floor plan, to accommodate a 20-foot by 20-foot garage that is required for all single-family residences, and a balanced, aesthetically pleasing front elevation, that is not dominated by a two-car garage door, on a substandard lot. 2. The proposed development will not be injurious to property or improvements in the area, nor be detrimental to the public and safety, health and welfare. The project will not be detrimental or injurious to property or improvements in the vicinity, and will not be detrimental to the public health, safety, or welfare. The project is a single-story single-family residence that is compatible with other homes in the neighborhood in terms of massing and overall design. 3. The exception to be granted is one that will require the least modification of the prescribed design regulation and the minimum variance that will accomplish the purpose. Due to the substandard lot width of the subject property and the two-car garage requirement for single-family homes, the strict application of the prescribed side-yard setback requirement per the R-1 Ordinance would create a situation that would result in an unbalanced floor plan, unbalance front elevation, and reduced interior garage size. All other aspects of the project comply with the R-1 Ordinance in terms of height, building envelope, front and rear setbacks, and design. The intent of the R-1 Ordinance is met since the R-1 Exception would result in a house that is comparable in siting, scale, and design as others in the neighborhood. 4. The proposed exception will not result in significant visual impact as viewed from abutting properties. The project is a single-story single-family residence that is consistent with other existing homes in the Monta Vista neighborhood. The granting of a side-yard setback exception is not anticipated to create adverse visual impacts as viewed from abutting properties as it will allow for a balanced front elevation on the substandard lot. All other aspects of the project comply with the R-1 Ordinance in terms of height, building envelope, front and rear setbacks, and design. Next Steps Should the project be approved, the Design Review Committee’s decision on this proposal is final unless an appeal is filed within 14 calendar days of the date of the decision, on November 4, 2021. The applicant may apply for building and other permits at the end of the appeal period. This approval expires on October 21, 2022, at which time the applicant may apply for a one-year extension. DRC 10/21/2021 17 of 56 Prepared by: Erika Poveda, Associate Planner Brianne Reyes, Associate Planner Reviewed and Approved by: Piu Ghosh, Planning Manager ATTACHMENTS: 1 – Draft Resolution 2 – Plan Set 3 – Monta Vista Residences with Reduced First-Floor Side-Yard Setbacks DRC 10/21/2021 18 of 56 EXC-2021-001 CITY OF CUPERTINO 10300 Torre Avenue Cupertino, California 95014 RESOLUTION NO. OF THE DESIGN REVIEW COMMITTEE OF THE CITY OF CUPERTINO APPROVING AN R-1 EXCEPTION PERMIT TO ALLOW A REDUCED SIDE- YARD SETBACK OF 5-FEET TO ACCOMMODATE A NEW GARAGE ADDITION TO AN EXISTING SINGLE-FAMILY RESIDENCE WHERE A COMBINED SIDE-YARD SETBACK OF 15-FEET IS REQUIRED IN THE R1-7.5 ZONING DISTRICT SECTION I: PROJECT DESCRIPTION Application No.: EXC-2021-0051 Applicant: Raghu Kumar Devarakonda Location: 10300 Imperial Avenue; APN: 357-19-052 SECTION II: FINDINGS WHEREAS, the Design Review Committee of the City of Cupertino received an application for an Exception from the Single-Family Residential Zoning regulations as described in Section I. of this Resolution; and WHEREAS, the Project is Categorically Exempt from the requirements of the California Environmental Quality Act pursuant to Section 15301 Class 1 (Existing facilities); and WHEREAS, the necessary notices have been given in accordance with the Procedural Ordinance of the City of Cupertino, and the Design Review Committee has held at least one Public Meeting on this matter; and WHEREAS, the applicant has met the burden of proof required to support said application; and WHEREAS, the Design Review Committee finds the following with regard to the exception for this application: 1. The literal enforcement of this chapter will result in restrictions inconsistent with the spirit and intent of this chapter. The project is consistent with the intent of the R-1 Ordinance in that it minimizes visual impacts to adjacent residential properties and that it is compatible with other homes in the neighborhood. The reduced five-foot side yard setbacks are appropriate to allow for a functional DRC 10/21/2021 19 of 56 Resolution No. EXC-2021-001 October 21, 2021 Page - 2 - floor plan, to accommodate a 20-foot by 20-foot garage that is required for all single-family residences, and a balanced, aesthetically pleasing front elevation, that is not dominated by a two-car garage door, on a substandard lot. 2. The proposed development will not be injurious to property or improvements in the area, nor be detrimental to the public and safety, health and welfare. The project will not be detrimental or injurious to property or improvements in the vicinity, and will not be detrimental to the public health, safety, or welfare. The project is a single-story single-family residence that is compatible with other homes in the neighborhood in terms of massing and overall design. 3. The exception to be granted is one that will require the least modification of the prescribed design regulation and the minimum variance that will accomplish the purpose. Due to the substandard lot width of the subject property and the two-car garage requirement for single-family homes, the strict application of the prescribed side-yard setback requirement per the R-1 Ordinance would create a situation that would result in an unbalanced floor plan, unbalance front elevation, and reduced interior garage size. All other aspects of the project comply with the R-1 Ordinance in terms of height, building envelope, front and rear setbacks, and design. The intent of the R-1 Ordinance is met since the R-1 Exception would result in a house that is comparable in siting, scale, and design as others in the neighborhood. 4. The proposed exception will not result in significant visual impact as viewed from abutting properties. The project is a single-story single-family residence that is consistent with other existing homes in the Monta Vista neighborhood. The granting of a side-yard setback exception is not anticipated to create adverse visual impacts as viewed from abutting properties as it will allow for a balanced front elevation on the substandard lot. All other aspects of the project comply with the R-1 Ordinance in terms of height, building envelope, front and rear setbacks, and design. NOW, THEREFORE, BE IT RESOLVED: That after careful consideration of the maps, facts, exhibits, testimony and other evidence submitted in this matter, subject to the conditions which are enumerated in this Resolution beginning on PAGE 3 thereof, the application for an Exception to the Single-Family Residential Ordinance regulations, Application no. EXC-2021-001 is: 1. Exempt from CEQA and 2. Hereby APPROVED, and That the sub-conclusions upon which the findings and conditions specified in this Resolution are based and contained in the Public Meeting record concerning Application DRC 10/21/2021 20 of 56 Resolution No. EXC-2021-001 October 21, 2021 Page - 3 - no. EXC-2021-001 as set forth in the Minutes of Design Review Committee Meeting of October 21, 2021 and are incorporated by reference as though fully set forth herein. SECTION III: CONDITIONS ADMINISTERED BY THE COMMUNITY DEVELOPMENT DEPT. 1. APPROVED EXHIBITS The approval is based on the plan set titled “Devaradonda Residence, 10300 Imperial Ave., Cupertino, CA 95014,” consisting of 13 sheets, labeled “A1, A2, A2.1, A3, A3.1, A3.2, A3.3, A4, A5, A6, A8, L1, and SS1,” except as may be amended by the Conditions contained in this Resolution. 2. R-1 EXCEPTION The R-1 Exception to allow a reduced side-yard setback of 5-feet shall only apply to the left (northerly) side-yard setback of the attached garage addition. Any future additions along the north side shall be set back at least 9’-5” from the north side property line in order to provide a combined side yard setback of 15 feet. Any proposed extension of the northerly 5-foot setback shall be subject to discretionary approval of the Design Review Committee in accordance with the Single-Family Residential (R-1) Ordinance. 3. ACCURACY OF THE PROJECT PLANS The applicant/property owner is responsible to verify all pertinent property data including but not limited to property boundary locations, building setbacks, property size, building square footage, any relevant easements and/or construction records. Any misrepresentation of any property data may invalidate this approval and may require additional review. 4. ANNOTATION OF THE CONDITIONS OF APPROVAL The conditions of approval set forth shall be incorporated into and annotated on the building plans. 5. CONSULTATION WITH OTHER DEPARTMENTS The applicant is responsible to consult with other departments and/or agencies with regard to the proposed project for additional conditions and requirements. Any misrepresentation of any submitted data may invalidate an approval by the Community Development Department. 6. COMPLIANCE WITH PUBLIC WORKS CONFIRMATION FORM The project shall comply with the requirements indicated on the Public Works Confirmation form dated December 1, 2020, including, but not limited to, dedications, DRC 10/21/2021 21 of 56 Resolution No. EXC-2021-001 October 21, 2021 Page - 4 - easements, off-site improvements, undergrounding of utilities, all necessary agreements, and utility installations/relocations as deemed necessary by the Director of Public Works and required for public health and safety. The Public Works Confirmation is a preliminary review and is not an exhaustive review of the subject development. Additional requirements may be established and implemented during the construction permitting process. The project construction plans shall address these requirements with the construction permit submittal, and all required improvements shall be completed to the satisfaction of the Director of Public Works prior to final occupancy. 7. LANDSCAPE PROJECT SUBMITTAL Prior to issuance of building permits, the applicant shall submit a full L andscape Documentation Package, per sections 14.15.050 A, B, C, and D of the Landscape Ordinance, for projects with landscape area 500 square feet or more or elect to submit a Prescriptive Compliance Application per sections 14.15.040 A, B, and C for proje cts with landscape area between 500 square feet and 2,500 square feet. The Landscape Documentation Package or Prescriptive Compliance Application shall be reviewed and approved to the satisfaction of the Director of Community Development prior to issuance of building permits, and additional requirements per sections 14.15.040 D, E, F, and G or 14.15.050 E, F, G, H, and I will be required to be reviewed and approved prior to final inspections. 8. DARK SKY COMPLIANCE Prior to issuance of Building Permits, the applicant/property owner shall submit final plans in compliance with the approved lighting plans to comply with development standards of Cupertino Municipal Code Section 19.102.040 Outdoor Lighting Requirements. In the event changes are proposed from the a pproved plans, said changes must be reviewed and approved by the Director of Community Development or their designee. The applicant shall provide all documentation required to determine compliance with the Municipal Code. 9. EXTERIOR BUILDING MATERIALS/TREATMENTS The final building exterior plan shall closely resemble the details shown on the original approved plans. Final building exterior treatment plan (including but not limited to details on exterior color, materials, architectural treatments, doors, windows, lighting fixtures, and/or embellishments) shall be reviewed and approved by the Director of Community Development prior to issuance of building permits to ensure quality and consistency. Any exterior changes determined to be substantial by the Director of Community Development shall either require a modification to this permit or a new permit based on the extent of the change. DRC 10/21/2021 22 of 56 Resolution No. EXC-2021-001 October 21, 2021 Page - 5 - 10. DEMOLITION REQUIREMENTS All demolished building and site materials shall be recycled to the maximum extent feasible subject to the Building Official. The applicant shall provide evidence that materials were recycled prior to issuance of final demolition permits. 11. DUST CONTROL The following construction practices shall be implemented during all phases of construction for the proposed project to prevent visible dust emissions from leaving the site: a) Water all exposed surfaces areas (e.g., parking areas, staging areas, soil piles, graded areas, and unpaved access roads) at least twice daily and more often during windy periods to prevent visible dust from leaving the site; active areas adjacent to windy periods; active areas adjacent to existing land uses shall be kept damp at all times, or shall be treated with non-toxic stabilizers or dust palliatives. b) All haul trucks transporting soil, sand, or other loose material off-site shall be covered. c) All visible mud or dirt track-out onto adjacent public roads shall be removed using wet power vacuum street sweepers at least once per day. The use of dry power sweeping is prohibited. d) All vehicle speeds on unpaved roads shall be limited to 15 mph. e) All roadways, driveways, and sidewalks to be paved shall be completed as soon as possible. Building pads shall be laid as soon as possible after grading unless seeding or soil binders are used. f) Idling times shall be minimized either by shutting equipment off when not in use or reducing the maximum idling time to 5 minutes (as required by the California airborne toxics control measure Title 13, Section 2485 of California Code of Regulations [CCR]). Clear signage shall be provided for construction workers at all access points. g) All construction equipment shall be maintained and properly tuned in accordance with manufacturer’s specifications. All equipment shall be checked by a certified mechanic and determined to be running in proper condition prior to operation. h) Post a publicly visible sign with the telephone number and person to contact at the Lead Agency regarding dust complaints. This person shall respond and take corrective action within 48 hours. The Air District’s phone number shall also be visible to ensure compliance with applicable regulations. i) The applicant shall incorporate the City’s construction best management practices into the building permit plan set. DRC 10/21/2021 23 of 56 Resolution No. EXC-2021-001 October 21, 2021 Page - 6 - 12. GRADING AND CONSTRUCTION HOURS AND NOISE LIMITS a) All grading activities shall be limited to the dry season (April 15 to October 1), unless permitted otherwise by the Director of Public works. b) Construction hours and noise limits shall be compliant with all requirements of Chapter 10.48 of the Cupertino Municipal Code. c) Grading, street construction, underground utility and demolition hours for work done more than 750 feet away from residential areas shall be limited to Monday through Friday, 7 a.m. to 8 p.m. and Saturday and Sunday, 9 a.m. to 6 p.m. Grading, street construction, demolition or underground utility work within 750 feet of residential areas shall not occur on Saturdays, Sundays, holidays, and during the nighttime period as defined in Section 10.48.053(b) of the Municipal Code. d) Construction activities shall be limited to Monday through Friday, 7 a.m. to 8 p.m. and Saturday and Sunday, 9 a.m. to 6 p.m. Construction activities are not allowed on holidays as defined in Chapter 10.48 of the Municipal Code. Night time construction is allowed if compliant with nighttime standards of Section 10.48 of the Cupertino Municipal Code. e) Rules and regulations pertaining to all construction activities and limitations identified in this permit, along with the name and telephone number of an applicant appointed disturbance coordinator, shall be posted in a prominent location at the entrance to the job site. f) The applicant shall be responsible for educating all contractors and subcontractors of said construction restrictions. The applicant shall comply with the above grading and construction hours and noise limit requirements unless otherwise indicated. 13. NESTING BIRDS Nests of raptors and other birds shall be protected when in active use, as required by the federal Migratory Bird Treaty Act and the California Department of Fish and Game Code. a) Construction and tree removal/pruning activities shall be scheduled to avoid the nesting season to the extent feasible. If feasible, tree removal and/or pruning shall be completed before the start of the nesting season to help preclude nesting. The nesting season for most birds and raptors in the San Francisco Bay area extends from February 1 through August 31. Preconstruction surveys (described below) are not required for tree removal or construction activities o utside the nesting period. b) If construction activities and any required tree removal occur during the nesting season (February 1 and August 31), a qualified ornithologist shall be required to DRC 10/21/2021 24 of 56 Resolution No. EXC-2021-001 October 21, 2021 Page - 7 - conduct surveys prior to tree removal or construction activities. Preconstruction surveys shall be conducted no more than 14 days prior to the start of tree removal, pruning or construction. Preconstruction surveys shall be repeated at 14-day intervals until construction has been initiated in the area after which survey s can be stopped. During this survey, the ornithologist shall inspect all trees and other possible nesting habitats in and immediately adjacent to the construction areas for nests. c) If the survey does not identify any nesting birds that would be affected b y construction activities, no further mitigation is required. If an active nest containing viable eggs or young birds is found sufficiently close to work areas to be disturbed by these activities, their locations shall be documented and protective measures implemented under the direction of the qualified ornithologist until the nests no longer contain eggs or young birds. d) Protective measures shall include establishment of clearly delineated exclusion zones (i.e. demarcated by identifiable fencing, such as orange construction fencing or equivalent) around each nest location as determined by the qualified ornithologist, taking into account the species of birds nesting, their tolerance for disturbance and proximity to existing development. In general, exclusion zones shall be a minimum of 300 feet for raptors and 75 feet for passerines and other birds. The active nest within an exclusion zone shall be monitored on a weekly basis throughout the nesting season to identify signs of disturbance and confirm nesting status. The radius of an exclusion zone may be increased by the qualified biologist, if project activities are determined to be adversely affecting the nesting birds. Exclusion zones may be reduced by the qualified biologist only in consultation with California Department of Fish and Wildlife. The protection measures and buffers shall remain in effect until the young have left the nest and are foraging independently or the nest is no longer active. e) A final report on nesting birds and raptors, including survey methodology, survey date(s), map of identified active nests (if any), and protection measures (if required), shall be submitted to the Planning Manager, through the building permit review process, and be completed to the satisfaction of the Community Development Director prior to the start of grading. 14. INDEMNIFICATION As part of the application, to the fullest extent permitted by law, the applicant shall agree to indemnify, defend with the attorneys of the City’s choice, and hold harmless the City, its City Council, and its officers, employees, and agents (collectively, the “indemnified parties”) from and against any liability, claim, action, cause of action, suit, damages, judgment, lien, levy, or proceeding (collectively referred to as DRC 10/21/2021 25 of 56 Resolution No. EXC-2021-001 October 21, 2021 Page - 8 - “proceeding”) brought by a third party against one or more of the indemnified parties or one or more of the indemnified parties and the applicant related to any Ordinance, Resolution, or action approving the project, the related entitlements, environmental review documents, finding or determinations, or any other permit or approval authorized for the project. The indemnification shall include but not be limited to damages, fees, and costs awarded against the City, if any, and cost of suit, attorneys’ fees, and other costs, liabilities, and expenses incurred in connection with such proceeding whether incurred by the Applicant, the City, or the parties initiating or bringing such proceeding. The applicant shall agree to (without limitation) reimburse the City its actual attorneys’ fees and costs incurred in defense of the litigation. Such attorneys’ fees and costs shall include amounts paid to the City’s outside counsel and shall include City Attorney time and overhead costs and other City staff overhead costs and any costs directly related to the litigation reasonably incurred by City. The applicant shall likewise agree to indemnify, defend, and hold harmless the indemnified parties from and against any damages, attorneys’ fees, or costs awards, including attorneys’ fees awarded under Code of Civil Procedure section 1021.5, assessed or awarded against the indemnified parties. The Applicant shall cooperate with the City to enter a Reimbursement Agreement to govern any such reimbursement. The Applicant shall agree to (without limitation) reimburse the City for all costs incurred in additional investigation or study of, or for supplementing, redrafting, revising, or amending, any document (such as an Environmental Impact Report, negative declaration, specific plan, or general plan amendment) if made necessary by proceedings challenging the project approvals and related environmental review, if the applicant desires to continue to pursue the project. The Applicant shall agree that the City shall have no liability to the Applicant for business interruption, punitive, speculative, or consequential damages. 15. NOTICE OF FEES, DEDICATIONS, RESERVATIONS OR OTHER EXACTIONS The Conditions of Project Approval set forth herein may include certain fees, dedication requirements, reservation requirements, and other exactions. PASSED AND ADOPTED this 21st day of October 2021, at a regular meeting of the Design Review Committee of the City of Cupertino by the following roll call vote: DRC 10/21/2021 26 of 56 Resolution No. EXC-2021-001 October 21, 2021 Page - 9 - AYES: MEMBERS: NOES: MEMBERS: ABSTAIN: MEMBERS: ABSENT: MEMBERS: ATTEST: APPROVED: _ Erika Poveda Steven Scharf, Chair Associate Planner Design Review Committee DRC 10/21/2021 27 of 56 DRC 10/21/2021 28 of 56 DRC 10/21/2021 29 of 56 DRC 10/21/2021 30 of 56 DRC 10/21/2021 31 of 56 DRC 10/21/2021 32 of 56 DRC 10/21/2021 33 of 56 DRC 10/21/2021 34 of 56 DRC 10/21/2021 35 of 56 DRC 10/21/2021 36 of 56 DRC 10/21/2021 37 of 56 DRC 10/21/2021 38 of 56 RESIDENCEN 89°57'30" W 135.00'N 89°57'30" W 135.00'SOUTH 50.00'NORTH 50.00'322.68216.45 250.38 473.0067.14112.8667.14474.39147.86385.0067.14(N) Pervious Paver Driveway 564sfsuch asPacific Interlock Hydroflow100% permeable pavers(E) 7'8"ht Fence(E) 7'8" ht Wood Fence(E) 7'8"ht Wood Fence (E) 7'8"ht Wood Fence (E) 7'8" ht Wood Fence(E) 7'8"ht Gate3'-7"5'-714"Existing LandscapeNo modificationsExisting Landscape3" MulchCover88sfadd dripirrigationLandscape140sfadd drip irrigation(E) Neighboring HouseLantana montevidensis CWhiteC(4)3'-0"2.5sf(N) PerviousPaver Entry18.5sf3'-0"(N) PerviousPaver 202sf30sf 3" mulch30sf 3"mulchOsteospermum x CZion Copper AmethystC(8)11'-4916"32sf 3" mulchLantana montevidensis CPurpleC(6)4'-0"2'-0"2'-0"86sf2.5sf2.5sf2.5sf2.5sf2.5sf2.5sf2.5sfExisting LandscapeExisting Landscape N/AN/AYESN/AYESYESYESYES4/5/21YESLOT SIZE 6750FRONT SET BACK IMPERVIOUS SURFACESFront Setback 1236sfPorch: Impervious Concrete 108.3sfDriveway and Entry: Pervious pavers 860sf @ 50%= 430Total area: 430+ 108.3 = 538.3 = 44.6%Total Landscape area 2814.56sfNew Landscaped area: 248sf on drip irrigation in front onlyAdditional Mulch area front 92sfTotal new landscape area 340sfPLANT SCHEDULERevisions Date ByJob No 1596Drawn By: KALDate: 040521L- 01 Landscape Plan Devarakonda Residence10300 Imperial AveCupertino CA 95014THESE PLANS ARE A SCHEMATIC ONLY AND ARE NOT CONSTRUCTION DOCUMENTSKL Designs LLCSan Jose, CA 95118 kim@KLDesigns.bizPlant Material shall comply with the following:For residential areas, install climate adapted plants that require occasional, little or no summer water (average WUCOLSplant factor 0.3) for 75% of the plant area excluding edibles and areas using recycled water.Mulch & Soil Preparation1 Incorporate compost at a rate of at least four cubic yards per 1,000 square feet to a depth of 6" into landscape area(unless contra-indicated by a soil test.).2 A minimum of 3" layer of mulch shall be applied on all exposed soil surfaces of planting areas except turf areas, creepingor rooting ground covers, direct seeding applications where mulch is contra-indicated.3 no turf present on this installation.4 Prior to planting, compacted materials shall be transformed to a friable condition.5 For soils less than 6% organic matter in the top 6" of soil, add organic compost to planting areas equal to a rate ofminimum 4 cubic yards per 1,000sf of permeable area to a minimum depth of 6" into the soil.6. A soils report is required.Tree ProtectionThe following general tree preservation measures apply to all trees to be retained: No storage of material, top soil,vehicles, or equipment shall be permitted within the tree enclosure area, The ground under and around the tree canopyarea shall not be altered. Trees to retained shall be irrigated, aerated and maintained as necessary to ensure survival.Landscape & Irrigation Maintenance1. Maintenance may include but not limited to the following: routine inspection, auditing, pressure testing, adjustment, andrepair of the irrigation system; top dressing with compost, replenishing mulch, fertilizing, pruning, replanting of failed plants,weeding, pest control.2. Failed plants shall be replaced with the same functionally equivalent plants that may be size-adjusted as appropriate forthe stage of growth of the overall installation. Failing plants shall either be replaced or be revived through appropriateadjustments to water, nutrients, pest control or other factors recommended by landscape professional.Revisied 052521 KALStatic Water Pressure = 70psiProvider: San Jose WaterMeter size 3/4"IRRIGATION1 Irrigation Controller with rain sensing shut off device either integral or auxiliary required. Controller to be outsideof building. Exact location of the controller and weather sensor to be determined by the contractor.2. Valve Boxes: Exact location of valves to be determined by the contractor based on site conditions andunderground utilities. Valves shall have Pressure Reducer and Filter appropriate for Drip. A manual Shut OffValve shall be installed with Valve Nest.3. Irrigation for each hydro-zone shall have a separate valve..4. Manual Shut Off valves (such as a gate valve, ball valve, or butterfly valve) shall be installed as close aspossible to the point of connection of the water supply.5. All irrigation emission devices must meet the requirements set in the ANSI standard, ASBABE/ICC 802-2014."Landscape Irrigation Sprinkler and Emitter Standard."6. No sprinklers will be installed at this site.7. For areas less than ten (10) feet in width in any direction shall be irrigated with subsurface irrigation or othermeans that produces no runoff. Only drip irrigation will be installed on this site.8. Irrigation shall be designed, maintained and managed to meet or exceed an average landscape efficiency of70%.9. Irrigation run times shall be scheduled between 8pm and 10am. Operation outside time window is allowed forauditing and system maintenance.10 A diagram or list of the hydro-zones shall be kept with the irrigation controller for subsequent managementpurposes.11. At the time of final inspection, the permit applicant must provide the owner of the property with a certificate ofcompletion, irrigation schedule and a schedule of landscape and irrigation maintenance.12. An irrigation audit report shall be completed at the time of final inspection.HYDRO-ZONESFRONT DRIP1) Shrubs & Tree -LW 0.3Revisied 061021 KALRevisied 063021 KALDRC 10/21/2021 39 of 56 +/2'4+#.#8'07'NOTES:ABBREVIATIONLEGENDBASIS OF BEARINGS:SITE BENCHMARK:REFERENCES:SITE DATA:DRC 10/21/2021 40 of 56 Attachment 3: Monta Vista Homes with Reduced First-Floor Side-Yard Setbacks Reduced first-floor side-yard setback: Past City R-1 Exception approval: (with file number & lot width) N Project Site R-2005-17 Lot width: 50’ EXC-2014-05 Lot width: 50’ R-2007-23 Lot width: 44’ EXC-2010-08 Lot width: 40’ R-2006-13 Lot width: 50’ EXC-2013-01 Lot width: 50’ EXC-2010-11 Lot width: 50’ R-2005-18 Lot width: 50’ EXC-2020-005 Lot width: 50’ DRC 10/21/2021 41 of 56 CITY OF CUPERTINO Agenda Item 21-9970 Agenda Date: 10/21/2021 Agenda #: 4. Subject:Sign Exception to allow for a second wall sign on a commercial building where only wall sign is permitted (Mattress Firm). (Application No. EXC-2021-001; Applicant: Tracey Diehl (Expedite the Diehl); Location: 20510 Stevens Creek Boulevard; APN: 359-08-018) That the Design Review Committee adopt the draft resolution (Attachment 1) to: 1. Find the project exempt from CEQA; and 2. Approve the Sign Exception (EXC-2021-002). CITY OF CUPERTINO Printed on 10/14/2021Page 1 of 1 powered by Legistar™ DRC 10/21/2021 42 of 56 DESIGN REVIEW COMMITTEE STAFF REPORT Meeting: October 21, 2021 Subject Sign Exception to allow for a second wall sign on a commercial building where only wall sign is permitted (Mattress Firm). (Application No. EXC-2021-001; Applicant: Tracey Diehl (Expedite the Diehl); Location: 20510 Stevens Creek Boulevard; APN: 359-08-018). Recommended Action That the Design Review Committee adopt the draft resolution (Attachment 1) to: 1. Find the project exempt from CEQA; and 2. Approve the Sign Exception (EXC-2021-002). Discussion Project Data: General Plan Designation: Commercial/Office/Residential Special Area: Heart of the City Specific Plan Zoning Designation: P (CG, Res) / Planned Development with General Commercial and Residential uses Lot Area: 139,940 sq. ft. Floor Area: 4,200 sq. ft. Allowed Existing Total Proposed Change Wall Signs 1 1 2 2 Ground Sign 1 1 1 No change to number of signs Project Consistency with General Plan: Yes Zoning: No – needs sign exception Environmental Assessment: Categorically Exempt DRC 10/21/2021 43 of 56 Project Location: The project site is located at the corner of Stevens Creek Boulevard and De Anza Boulevard, west of the Chevron gas station. To the north are commercial banks, east of the building is the Chevron gas station, and to the west and south are various commercial uses. Background: The property is allowed two signs at 20510 Stevens Creek Blvd per the Municipal Code. These signs have already been approved by staff as follows: one wall sign facing Stevens Creek Boulevard, and one ground sign adjacent to South De Anza Boulevard. The applicant, Tracey Diehl, representing Mattress Firm, is requesting approval to install a second wall sign, exceeding the number of signs the Sign Ordinance allows. Sign Exception: Cupertino Municipal Code Section 19.104.140: Permanent Walls Signs allows for one sign per business with exterior frontage, and (1) an additional wall sign for when there is no ground sign, (2) sign is directed to the interior of the project and not visible from any public right-of-way, and (3) the building is occupied by a single tenant pad with more than 5,000 sq. ft. In this case, since the project contains a ground sign adjacent to South De Anza Boulevard, the proposed second wall sign would be visible from South De Anza Boulevard, and the building measures approximately 4,200 sq. ft. (less than 5,000 sq. ft.) a sign exception is required for the proposed sign. S. De Anza Blvd. City of Saratoga DRC 10/21/2021 44 of 56 The two wall signs proposed are identical in size, illumination and appearance. Each sign is consistent with the provisions of the City’s Sign Ordinance as follows: Sign A Sign B Allowed Proposed Allowed Proposed Allowable Sign Area (1 sq. ft. per linear store frontage) 64.9 sq. ft. 41.2 sq. ft. 75.2 sq. ft. 41.2 sq. ft. Maximum Store Frontage (70% of store frontage) 45.4 ft. 20.6 ft. 52.6 ft. 20.6 ft. Illumination Intensity (foot-lamberts) 250 < 250 250 <250 Staff supports the sign exception requested for the additional wall sign. The intent of the sign ordinance is to identify and enhance business while maintaining the aesthetic appearance of the City. The additional sign on the east side of the building will allow for effective and visible signage for the business. While the Chevron gas station would Figure 1: Sign A Facing Stevens Creek Blvd. Figure 2: Sign B Facing Interior of Property DRC 10/21/2021 45 of 56 partially obscure the view of the sign from De Anza Boulevard, the sign will nevertheless remain partially visible. Additionally, the facing the interior provides additional wayfinding for visitors of the shopping center will may be entering from the eastern and southern portions of the property. Environmental Assessment This project is categorically exempt from the requirements of the California Environmental Quality Act (CEQA) per Section 15301 Existing Facilities (Class 1) consisting of new copy on existing on and off-premise signs. Public Outreach and Noticing The following table is a brief summary of the noticing done for this project: Notice of Public Hearing and Intent, Site Notice & Legal Ad Agenda  Site Signage (10 days prior to the hearing)  8 public hearing notices mailed to adjacent property owners (10 days prior to the hearing)  Posted on the City’s official notice bulletin board (one week prior to the hearing)  Posted on the City of Cupertino’s website (one week prior to the hearing) No public comments have been received as of the date of production of this staff report. Permit Streamlining Act This project is subject to the Permit Streamlining Act (Government Code Section 65920 – 65964). The City has complied with the deadlines found in the Permit Streamlining Act. Project Received: May 7, 2021; Deemed Incomplete: June 3, 2021 2nd Submittal Received: July 12, 2021; Deemed Incomplete: August 9, 2021 3rd Submittal Received: August 11, 2021; Deemed Complete: September 3, 2021 The City has up to 60 days from the date of deeming the project complete (until November 3, 2021) to make a decision on the project. Conclusion Staff recommends approval of the Sign Exception since the overall design package addresses the intent of the Sign Ordinance to identify and enhance the business while maintain the aesthetic standards of the City. The requested Sign Exception will maintain the City’s design standards and support the business in its endeavor to meet corporate branding requirements. Staff recommends approval of the project since the project and conditions of approval address all concerns related to the proposed development and all DRC 10/21/2021 46 of 56 the findings for approval of the proposed project, consistent with Chap ter 19.104.290 of the Cupertino Municipal Code, may be made. Next Steps Should the project be approved, the Design Review Committee’s decision on this proposal is final unless an appeal is filed within 14 calendar days of the date of the decision, on November 4, 2021. The applicant may apply for building and other permits at the end of the appeal period. If the project were approved, the approval would expire on October 21, 2021, at which time the applicant may apply for a one-year extension. Prepared by: Erick Serrano, Senior Planner Reviewed and Approved by: Piu Ghosh, Planning Manager ATTACHMENTS: 1 – Draft Resolution 2 – Plan Set DRC 10/21/2021 47 of 56 EXC-2021-002 CITY OF CUPERTINO 10300 Torre Avenue Cupertino, California 95014 DRAFT RESOLUTION OF THE DESIGN REVIEW COMMITTEE OF THE CITY OF CUPERTINO APPROVING A SIGN EXCEPTION TO ALLOW FOR A SECONF WALL SIGN ON A COMMERICAL BUILDING WHERE ONLY ONE WALL SIGN IS PERMITTED (MATTRESS FIRM) LOCATED AT 20510 STEVENS CREEK BOULEVARD SECTION I: PROJECT DESCRIPTION Application No.: EXC-2021-002 Applicant: Tracey Diehl (Expedite the Diehl) Location: 20510 Stevens Creek Boulevard (APN 359-08-018) SECTION II: FINDINGS FOR SIGN EXCEPTION: WHEREAS, the Design Review Committee of the City of Cupertino received an application for a Sign Exception as described in Section I. of this Resolution; and WHEREAS, the necessary public notices have been given as required by the Procedural Ordinance of the City of Cupertino, and the Design Review Committee has held at least one public meeting in regard to the application; and WHEREAS, the project is determined to be categorically exempt from the California Environmental Quality Act (CEQA) pursuant to Section 15301 Existing Facilities; and WHEREAS, the applicant has met the burden of proof required to support said application; and WHEREAS, the Design Review Committee finds as follows with regard to this application: 1. The literal enforcement of the provisions of this title will result in restrictions inconsistent with the spirit and intent of this title. The project is consistent with the intent of the Sign Ordinance in that it provides architectural and aesthetic harmony with the building/canopy design and provides good visibility for the public and the needs of the business while minimizing distraction to the DRC 10/21/2021 48 of 56 Draft Resolution EXC-2021-002 October 21, 2021 Page - 2 - pedestrian, bicyclist, and motorist. The size location, size, and illumination are consistent with the City’s Sign Oridnance. 2. That the granting of the exception will not result in a condition which is materially detrimental to the public health, safety, or welfare. The proposed signs will not be detrimental or injurious to property or improvements in the vicinity, and will not be detrimental to the public health, safety, or welfare. Besides the number of signs, all other aspects of the City’s Sign Ordinance are met. The illumination intensity, appeance, and location of the proposed signs would not create distractions for pedestrians, bicyclists and vehicles nor would it negatively impact the City’s aesthetic appearance. 3. That the exception granted is one that will require the least modification of the prescribed regulations and the minimum variance that will accomplish the purpose. The exception granted is one that will require the least modification of the regulations because the project will only propose one additional sign. Other aspects of the Sign Oridnance (size, location, and lighting) remain consistent with the regulations. NOW, THEREFORE, BE IT RESOLVED: That after careful consideration of maps, facts, exhibits, testimony and other evidence submitted in this matter, subject to the conditions which are enumerated in this Resolution beginning on Page 3 thereof, The application for a Sign Exception, Application no. EXC-2021-002, is hereby approved and that the subconclusions upon which the findings and conditions specified in this Resolution are based and contained in the Public Meeting record concerning Application no. EXC-2021-002 as set forth in the Minutes of Design Review Committee Meeting of October 21, 2021, and are incorporated by reference as though fully set forth herein. SECTION III: CONDITIONS ADMINISTERED BY THE COMMUNITY DEVELOPMENT DEPT. 1. APPROVED EXHIBITS Approval is based on the plan set dated October 20, 2020 entitled, “Mattress Firm 20510 Stevens Creek Blvd. Cupertino CA 95014” drawn by Apex Sign Group consisting of four (4) sheets labled 1-4; except as may be amended by conditions in this resolution. DRC 10/21/2021 49 of 56 Draft Resolution EXC-2021-002 October 21, 2021 Page - 3 - 2. ACCURACY OF PROJECT PLANS The applicant/property owner is responsible to verify all pertinent property data including but not limited to property boundary locations, building setbacks, property size, building square footage, any relevant easements and/or construction records. Any misrepresentation of any property data may invalidate this approval and may require additional review. 3. ANNOTATION OF THE CONDITIONS OF APPROVAL The conditions of approval set forth shall be incorporated into and annotated on the first page of the building plans. 4. EXCEPTION APPROVAL A Sign Expetion is hereby granted to allow for two alls signs where only one wall sign is permitted. 5. ILLUMINATION INTENSITY The intensity of all signs shall not exceed 250 foot-lamberts. A note acknowledging this condition of approval shall be incorporated in the building permit plans. 6. LIGHTING INTENSITY VERIFICATION Prior to final inspections of sign permits, a licensed lighting engineer shall confirm that the lighting intensity is in compliance with the conditions of approval in this resolution. 7. SIGN EXCEPTION REVIEW/ADDITIONAL RESTRICTIONS If complaints are received related to the intensity of the LED signage under this Sign Exception, and the complaints are not addressed immediately by the property management, then the Design Review Committee or Planning Commission shall conduct a public hearing on the Sign Exception at which time, the approval for LED signage may be modified or revoked. The City reserves the right to require additional measures to reduce lighting intensity if deemed necessary. 8. SIGN PERMITS REQUIRED The applicant shall consult with the City’s Building Division to obtain the necessary sign permits for this project. 9. TEMPORARY SIGNS Temporary signs shall comply with the Temporary Sign regulations of the City’s Sign Ordinance (Chapter 19.104 of the Municipal Code). A temporary sign permit is DRC 10/21/2021 50 of 56 Draft Resolution EXC-2021-002 October 21, 2021 Page - 4 - required for all banners, a-frame or other freestanding signs (except those required by the State of California), and promotional devices. 10. CONSULTATION WITH OTHER DEPARTMENTS The applicant is responsible to consult with other departments and/or agencies with regard to the proposed project for additional conditions and requirements. Any misrepresentation of any submitted data may invalidate an approval by the Community Development Department. 11. INDEMNIFICATION The applicant agrees that, to the fullest extent permitted by law, the applicant shall indemnify, defend with the attorneys of the City’s choice, and hold harmless the City, its City Council, and its officers, employees, and agents (collectively, the “indemnified parties”) from and against any liability, claim, action, cause of action, suit, damages, judgment, lien, levy, or proceeding brought by a third party against one or mor e of the indemnified parties or one or more of the indemnified parties and the applicant related to any Ordinance, Resolution, or action approving the project, the related entitlements, environmental review documents, finding or determinations, or any other permit or approval authorized for the project, including (without limitation) reimbursing the City its actual attorneys’ fees and costs incurred in defense of the litigation. The applicant shall pay such attorneys’ fees and costs within 30 (thirty) days following receipt of invoices from City. Such attorneys’ fees and costs shall include amounts paid to the City’s outside counsel and shall include City Attorney time and overhead costs and other City staff overhead costs and any costs directly related to the litigation reasonably incurred by City. The applicant shall likewise indemnify, defend, and hold harmless the indemnified parties from and against any damages, attorneys’ fees, or costs awards, including attorneys’ fees awarded under Code of Civil Procedure section 1021.5, assessed or awarded against the indemnified parties. The Applicant further agrees to defend, indemnify and hold harmless the indemnified parties for all cost incurred in additional investigation or study of, or for supplementing, redrafting, revising, or amending any document (such as an Environmental Impact Report, negative declaration, specific plan, or general plan amendment) if made necessary by proceedings challenging the project approvals and related environmental review if the applicant desires to continue to pursue the project. 12. NOTICE OF FEES, DEDICATIONS, RESERVATIONS, OR OTHER EXACTIONS The Conditions of Project Approval set forth herein may include certain fees, dedication requirements, reservation requirements, and other exactions. Pursuant to Government Code Section 66020(d) (1), these Conditions constitute written notice of DRC 10/21/2021 51 of 56 Draft Resolution EXC-2021-002 October 21, 2021 Page - 5 - a statement of the amount of such fees, and a description of the dedications, reservations, and other exactions. You are hereby further notified that the 90-day approval period in which you may protest these fees, dedications, reservations, and other exactions, pursuant to Government Code Section 66020(a), has begun. If you fail to file a protest within this 90-day period complying with all of the requirements of Section 66020, you will be legally barred from later challenging such exactions. PASSED AND ADOPTED this 21st day of October 2021, Regular Meeting of the Design Review Committee of the City of Cupertino, State of California, by the following vote: AYES: COMMISSIONERS: NOES: COMMISSIONERS: ABSTAIN: COMMISSIONERS: ABSENT: COMMISSIONERS: ATTEST: APPROVED: Erick Serrano R Wang, Senior Planner Chair, Design Review Committee DRC 10/21/2021 52 of 56 20510 Stevens Creek Blvd. Cupertino CA 95014 Mattress Firm 20510 Stevens Creek Blvd. Cupertino CA 95014 Project ID#: Project Mgr: Designer: Created on: apexsigngroup.com 125607 Cheryl Roberts Mike DeMarco 10/29/2020 R3 12/11/20 KF - Updated Cl’s to red no backer for all elevations R4 01/06/20 KF - Changed Signs back to white on backer for all elevations R5 01/25/21 KF - Modified Sign B for Parapet mounting, updated Monument specifications R6 02/05/21 KF - Updated package to reflect latest feedback from client & LL R7 02/08/21 KF - Updated variance notes, updated photo for Side Elevation R8 02/12/21 KF - Update City & LL code information, added note on monument page SIGN B SIGN A SIGN C Square Footage: Ready-to-Apply Vinyl Graphics on existing Tenant Panel 1.78 Type: SIGN C Mattress Firm - RTA Vinyl 11 57.52 Internally Illuminated LED 24" Mattress Firm linear Type: Illumination: Square Footage: SIGN A Individual Channel letters/ Remote Wired 57.52 Internally Illuminated LED 24" Mattress Firm linear Type: Illumination: Square Footage: SIGN B Individual Channel letters/ Remote Wired BLD-2021-0418 was approved with Sign A. sign exception request is for the Sign B which is facing the Chevron/S. De Anza Blvd LOT AREA 139,940 SQ FT BUILDING AREA 4200 SQ FT The building is setback 30’ from Stevens Creek Blvd to the north , 141’ from the east property line, 24’ from the west property line, and 340 ft from the south property line DRC 10/21/2021 53 of 56 Front Elevation (North) Scale: 1/8” = 1’-0”18'-4"64'-11" Lease Dimension 5'-0"Mattress Firm 20510 Stevens Creek Blvd. Cupertino CA 95014 Project ID#: Project Mgr: Designer: Created on: apexsigngroup.com 125607 Cheryl Roberts Mike DeMarco 10/29/2020 R3 12/11/20 KF - Updated Cl’s to red no backer for all elevations R4 01/06/20 KF - Changed Signs back to white on backer for all elevations R5 01/25/21 KF - Modified Sign B for Parapet mounting, updated Monument specifications R6 02/05/21 KF - Updated package to reflect latest feedback from client & LL R7 02/08/21 KF - Updated variance notes, updated photo for Side Elevation R8 02/12/21 KF - Update City & LL code information, added note on monument page 3324"33 3/8"20'-7 1/4" Allowable Square Footage this Elevation: Actual Square Footage this Elevation:57.52 NOTE: DRAWING IS FOR REPRESENTATIONAL PURPOSES ONLY. EXACT DIMENSIONS (FIELD SURVEY) REQUIRED PRIOR TO FABRICATION Formula: 200.00 SqFt Aggregate for entire site 87.48 CL10.30"10.30" Existing 57.52 Internally Illuminated LED 24" Mattress Firm linear Type: Illumination: Square Footage: SIGN A Individual Channel letters/ Remote Wired The illumination intensity of signs located within commercial areas is not to exceed approximately 250 foot-lambers, see Cupertino Municipal Code (CMC) Section 19.104.230 (A) DRC 10/21/2021 54 of 56 Mattress Firm 20510 Stevens Creek Blvd. Cupertino CA 95014 Project ID#: Project Mgr: Designer: Created on: apexsigngroup.com 125607 Cheryl Roberts Mike DeMarco 10/29/2020 R3 12/11/20 KF - Updated Cl’s to red no backer for all elevations R4 01/06/20 KF - Changed Signs back to white on backer for all elevations R5 01/25/21 KF - Modified Sign B for Parapet mounting, updated Monument specifications R6 02/05/21 KF - Updated package to reflect latest feedback from client & LL R7 02/08/21 KF - Updated variance notes, updated photo for Side Elevation R8 02/12/21 KF - Update City & LL code information, added note on monument page White LEDs (X) 60w Power Supplies @ 0.85 amps each Total Amps: X.XX (1) 20 amp 120V Circuit Req. 1. Existing Facade: To be determined 2. 0.040” Aluminum letter returns painted to match Dark Brown 3. 1”Jewelite trimcap (Dark Brown) bonded to face, #8 pan head screws to returns .125” ACM backs (pre-finished white) fastened to returns. Seal w/ VOC compliant4. 360 white latex caulk to prevent moisture penetration. 5. GE Tetra Powermax LEDs (Red) 6. 3/16” Red acrylic faces 7. Disconnect switch UL Outdoor rated toggle type w/ neoprene boot per NEC 600-6 8. Primary electrical feed in UL conduit / customer supplied UL junction box 9. Power Supplies within UL enclosure (removable lid), 1/4” x 1” min screws 10. Mounting Hardware to suit 11. 0.080 Aluminum backer panel painted Black Specifications: Channel Letters on backer panelElectrical Detail: ¼” Drain holes at bottom of letter cans (2) per letter Scale: N.T.S. 4” Section @ LED Channel Letter Front-Lit (Remote) 1 2 3 11 9 10 7 8 4 5 6 General Notes: This sign is to be installed in accordance with the requirements of Article 600 of the National Electrical Code. - Grounded and bonded per NEC 600.7/NEC 250 - Existing branch circuit in compliance with NEC 600.5, not to exceed 20 amps - Sign is to be UL listed per NEC 600.3 - UL disconnect switch per NEC 600.6- required per sign component before leaving manufacturer. For multiple signs, a disconnect is permitted but not required for each section - The location of the disconnect switch after installa- tion shall comply with article 600.6 (A) (1) per NEC 55 Scale: 3/8" = 1'-0" Sign Layout Detail24”8 1/4”33 1/2”[247 1/4”] 81 1/4” 20’-7 1/4” 57.52 Internally Illuminated LED 24" Mattress Firm linear Type: Illumination: Square Footage: SIGN A Individual Channel letters/ Remote Wired 57.52 Internally Illuminated LED 24" Mattress Firm linear Type: Illumination: Square Footage: SIGN B Individual Channel letters/ Remote Wired The illumination intensity of signs located within commercial areas is not to exceed approximately 250 foot- lambers, see Cupertino Municipal Code (CMC) Section 19.104.230 (A) DRC 10/21/2021 55 of 56 57.52 Internally Illuminated LED 24" Mattress Firm linear Type: Illumination: Square Footage: SIGN B Individual Channel letters/ Remote Wired Mattress Firm 20510 Stevens Creek Blvd. Cupertino CA 95014 Project ID#: Project Mgr: Designer: Created on: apexsigngroup.com 125607 Cheryl Roberts Mike DeMarco 10/29/2020 R3 12/11/20 KF - Updated Cl’s to red no backer for all elevations R4 01/06/20 KF - Changed Signs back to white on backer for all elevations R5 01/25/21 KF - Modified Sign B for Parapet mounting, updated Monument specifications R6 02/05/21 KF - Updated package to reflect latest feedback from client & LL R7 02/08/21 KF - Updated variance notes, updated photo for Side Elevation R8 02/12/21 KF - Update City & LL code information, added note on monument page Side Elevation (East) Scale: 1/8” = 1’-0” 44 Existing 75’-2 1/2” Lease Dimension 18'-4"5'-0"24"33 3/8"20'-7 1/4" CLEQ EQ Allowable Square Footage this Elevation: Actual Square Footage this Elevation:57.52 NOTE: DRAWING IS FOR REPRESENTATIONAL PURPOSES ONLY. EXACT DIMENSIONS (FIELD SURVEY) REQUIRED PRIOR TO FABRICATION Formula: 200.00 SqFt Aggregate for entire site 87.48 DRC 10/21/2021 56 of 56