Loading...
HomeMy WebLinkAbout20-147 Encroachment Agreement, GTE Mobilnet of California Limited Partnership, dba Verizon Wireless, R.O.W, 19500 Pruneridge AvenueSF_CUPERTINO_103 / 474598 ENCROACHMENT AGREEMENT This Encroachment Agreement ("Encroachment Agreement"), made this day of , 20_ ("Effective Date") between the City of Cupertino, a political subdivision of the State of California, hereinafter designated "Licensor" and GTE Mobilnet of California Limited Partnership, d/b/a Verizon Wireless, with its principal offices at c/o Verizon Wireless, 180 Washington Valley Road, Bedminster, New Jersey 07921, hereinafter designated "Licensee": 1. Encroachment Agreement. This is an Encroachment Agreement as referenced in that certain Small Cell License Agreement between Licensor and Licensee dated May 16, 2017 ("Agreement"). This Encroachment Agreement shall serve as an encroachment license. All of the terms and conditions of the Agreement are incorporated hereby by reference and made a part hereof without the necessity of repeating or attaching the Agreement. In the event of a contradiction, modification or inconsistency between the terms of the Agreement and this Encroachment Agreement, the terms of the Encroachment Agreement shall govern. Capitalized terms used in this Encroachment Agreement shall have the same meaning described for them in the Agreement unless otherwise indicated herein. 2. Project Description and Locations. Licensee shall have the right to use the ROW for a Small Cell at the designated areas in the ROW as further described in Attachment 1 attached hereto (the "Licensed Area"). 3. Equipment. The Small Cell to be installed at the Licensed Area is described in Attachment 1 attached hereto. 4. Term. The term of this Encroachment Agreement shall be as set forth in Section 2 of the Agreement. 5. Fees. The initial Rent for the term of this Encroachment Agreement shall be $1,500.00, as determined in accordance with Paragraph 5.1 of the Agreement, as adjusted by Paragraph 5.2. 6. Commencement Date. The first day of the month following the date Licensee has Commenced Installation of its Equipment at the Licensed Area. 7. Approvals/Fiber. It is understood and agreed that Licensee's ability to use the Licensed Area is contingent upon its obtaining all of the certificates, permits and other approvals (collectively the "Governmental Approvals") that may be required by any Federal, State or Local authorities, as well as a satisfactory fiber and electrical connection which will permit Licensee use of the Licensed Area as set forth above. In the event that (i) any of such applications for such Governmental Approvals should be finally rejected; (ii) any Governmental Approval issued to Licensee is canceled, expires, lapses, or is otherwise withdrawn or terminated by governmental authority; (iii) Licensee determines that such Governmental Approvals may not be obtained in a timely manner; (iv) Licensee determines that it will be unable to obtain in a satisfactory manner, or maintain any fiber or power connection; or (v) Licensee determines that the Licensed Area is no longer technically compatible for its use, Licensee shall have the right to terminate this Encroachment Agreement. Notice of Licensee's exercise of its right to terminate shall be given to Licensee in writing by certified mail, return receipt requested, and shall be effective upon the mailing of such notice by Licensee, or upon such later date as designated by Licensee. All rentals paid to said termination date shall be retained by Licensor. Upon such termination, this Encroachment Agreement shall be of no further force or effect except to the extent of the representations, warranties and indemnities made by each party to the other hereunder. Otherwise, Licensee shall have no further obligations for the payment of Rent to Licensor. S. Miscellaneous. N/A [signature page follows] EXECUTED to be effective as of the date shown above. LICENSOR: City of Cupertino, a political subdivision of the State of California By: Name: Title: ATTEST: Kr: -,fen Squarcia IV12120 Clerk APPROVED AS TO FORM CITY ATTORNEY' S OFFICE fle�tlie�M. M�ru2e-� Randolph Hom City Attorney LICENSEE: GTE MOBILNET OF CALIFORNIA LIMITED PARTNERSHIP, DB/A VERIZON WIRELESS by Cellco Partnership, its General Partner By: Name: Alba Barber Title: Senior Real Estate Manager q � ►420h� Exhibits: Attachment 1 ■ veriz APPLICANT: VERIZON WIRELESS 2785 MITCHELL DRIVE, SUITE 9 WALNUT CREEK, CA 94598 CONTACT: CHRIS MOLLER PHONE: (925) 339.2778 EMAIL: CHRIS.MOLLER@VERIZONWIRELESS.COM SITE ACQUISITION: MODUS, LLC 240 STOCKTON ST., 3RD FLOOR SAN FRANCISCO, CA 94108 PHONE: (415) 989.1 102 EMAIL: VERIZONPOLYGONTEAM@MODUSLLC.COM LAND USE PLANNER: MODUS, LLC 240 STOCKTON ST., 3RD FLOOR SAN FRANCISCO, CA 94108 PHONE: (415) 989.1102 EMAIL: VERIZONPOLYGONTEAM@MODUSLLC.COM PROJECT TEAM MODUS PROJECT MANAGER: MODUS, LLC 240 STOCKTON ST., 3RD FLOOR SAN FRANCISCO, CA 94108 PHONE: (415) 989.1102 EMAIL: VERIZONPOLYGONTEAM@MODUSLLC.COM A&E PROJECT MANAGER: MODUS, LLC 240 STOCKTON ST., 3RD FLOOR SAN FRANCISCO, CA 94108 PHONE: (415) 989.1102 EMAIL: VERIZONPOLYGONTEAM@MODUSLLC.COM CONSTRUCTION/IMPLEMENTATION MANAGER: MODUS, LLC 240 STOCKTON ST., 3RD FLOOR SAN FRANCISCO, CA 94108 PHONE: (415) 989.1102 EMAIL: VERIZONPOLYGONTEAM@MODUSLLC.COM SF CUPERTINO 103 (NEAR) 19500 PRUNERIDGE AVENUE CUPERTINO, CA 95014 SITE ID: SF CUPERTINO-] 03 SITE TYPE: LIGHT POLE POLE #: NO POLE ID H COUNTY: SANTA CLARA PROJECT DESCRIPTION VERIZON WIRELESS PROPOSES TO INSTALL A NEW WIRELESS COMMUNICATION SITE ON A LIGHT POLE IN THE PUBLIC RIGHT-OF-WAY. SCOPE: • INSTALL (1) 2' NEW CANISTER ANTENNA INSIDE NEW FRP CONCEALMENT SHROUD ON TOP OF POLE • INSTALL (2) 5G ANTENNA/RADIOS INSIDE NEW FRP CONCEALMENT SHROUD ON TOP OF POLE • INSTALL (1) RRUS 8843, (1) RRUS 4408, (1) RRUS 2205 RADIOS IN EQUIPMENT CONCEALED PEDESTAL BASE • INSTALL (2) PSU-AC08 BEHIND RADIOS IN EQUIPMENT CONCEALED PEDESTAL BASE • INSTALL NEW COAX FROM EQUIPMENT TO NEW ANTENNA WITHIN POLE • INSTALL (1) NEW DISCONNECT / SMART METER ON SIDE OF POLE • INSTALL (1) NEW AC LOAD CENTER IN EQUIPMENT CONCEALED PEDESTAL BASE • INSTALL NEW PEDESTAL BASE POLE AND FOUNDATION TO REPLACE EXISTING VICINITY MAP Ranch Market 1 0 nell pl Q. QCupertino Village r 0 m Apple Park 19 Apple pw*�Y SITE 19500 PRUNERIDGE Hilton Garden � AVENUE Inn CuP ertino 19500 Pruneridge Vard by Marriott Avenue Jose Cupertino 1; m 280 N,p C< Steve Jobs Theate Hyatt House Sari, Jose / Cupertino N z 0 A s SITE INFORMATION SITE ADDRESS: OWNER: APPLICANT: LATITUDE: LONGITUDE: COUNTY: ASSESSORS PARCEL NUMBER ZONING: ELEVATION: (NEAR) 19500 PRUNERIDGE AVENUE CUPERTINO, CA 95014 CITY OF CUPERTINO 10300 TORRE AVE CUPERTINO, CA 95014 VERIZON WIRELESS 2785 MITCHELL DRIVE, SUITE 9 WALNUT CREEK, CA 94598 37.33379167 NAD83 -122.0139528 NAD83 SANTA CLARA PUBLIC RIGHT OF WAY NEAR 316-06-060 CITY OF CUPERTINO 169.2' AMSL / o CALL 811 BEFORE YOU DIG IT'S THE LAW THE UTILITIES SHOWN HEREIN ARE FOR THE CONTRACTORS CONVENIENCE ONLY. THERE MAY BE OTHER UTILITIES NOT SHOWN ON THESE PLANS. THE ENGINEER/SURVEYOR ASSUMES NO RESPONSIBILITY FOR THE LOCATIONS SHOWN AND IT SHALL BE THE CONTRACTOR'S RESPONSIBILITY TO VERIFY ALL THE UTILITIES WITHIN THE LIMITS OF THE WORK. ALL DAMAGE MADE TO THE (E) UTILITIES BY THE CONTRACTOR SHALL BE THE SOLE RESPONSIBILITY OF THE CONTRACTOR. DRAWING INDEX SHEET NO. SHEET TITLE T-1 TITLE SHEET T-2 GENERAL NOTES C-1 SURVEY A-1 SITE PLAN & ENLARGED SITE PLAN A-2 ELEVATIONS A-3 ELEVATIONS A-4 CIRCUIT DIAGRAM D-1 DETAILS D-2 DETAILS D-3 DETAILS E-1 ELECTRICAL GENERAL NOTES E-2 ONE -LINE DIAGRAM & GROUNDING SCHEMATIC E-3 ELECTRICAL DETAILS CODE COMPLIANCE ALL WORK AND MATERIALS SHALL BE PERFORMED AND INSTALLED IN ACCORDANCE WITH THE CURRENT EDITIONS OF THE FOLLOWING CODES AS ADOPTED BY THE LOCAL GOVERNING AUTHORITIES. NOTHING IN THESE PLANS IS TO BE CONSTRUCTED TO PERMIT WORK NOT CONFORMING TO THESE CODES. • 2019 CALIFORNIA CODE • 2019 CALIFORNIA BUILDING CODE (CBC), BASED ON THE 2018 IBC • 2019 CALIFORNIA RESIDENTIAL CODE (CRC), BASED ON THE 2018 IRC • 2019 CALIFORNIA ELECTRICAL CODE (CEC), BASED ON THE 2017 NEC • 2019 CALIFORNIA MECHANICAL CODE (CMC), BASED ON THE 2018 UMC • 2019 CALIFORNIA PLUMBING CODE (CPC), BASED ON THE 2018 UPC • 2019 CALIFORNIA GREEN BUILDINGS STANDARDS CODE (CALGREEN) • 2019 CALIFORNIA FIRE CODES WITH ALL LOCAL AMENDMENTS • ANY LOCAL BUILDING CODE AMENDMENTS TO THE ABOVE • CITY / COUNTY ORDINANCES ACCESSIBILITY REQUIREMENTS FOR PERSONS WITH DISABILITIES: FACILITY IS UNMANNED AND NOT FOR HUMAN HABITATION. ACCESSIBILITY IS NOT REQUIRED IN ACCORDANCE WITH CALIFORNIA ADMINISTRATIVE STATE CODE PART 2, TITLE 24, CHAPTER 11 B, SECTION 1 103B. verizonN/ VERIZON WIRELESS 2785 MITCHELL DRIVE, SUITE 9 WALNUT CREEK, CA 94598 MO D U S MODUS, LLC 240 STOCKTON ST., 3RD FLOOR SAN FRANCISCO, CA 94108 DRAWN BY: APE CHECKED BY: BM �A�PPROVEDBY: LJB REV DATE DESCRIPTION 0 04/06/20 100% CD 1 05/1 1 /20 100% CD PLAN CHECK QRof ESS /0 f D =� ° can: M w _ r- -_ * NO. C64533 * _- CIVIL��� CAL��o IT IS A VIOLATION OF THE LAW FOR ANY PERSON, UNLESS THEY ARE ACTING UNDER THE DIRECTION OF A LICENSED PROFESSIONAL ENGINEER, TO ALTER THIS DOCUMENT SF_CUPERTINO_103 'NEAR) 19500 PRUNERIDGE AVENUE CUPERTINO, CA 95014 TITLE SHEET T-1 NOTES: 1. OLD FOUNDATION BASE TO BE FILLED WITH CONTROLLED DENSITY FILL TO WITHIN 12" OF FINISH GRADE. CAP WITH PLANTING SOIL. 2. LANDSCAPE AND IRRIGATION TO BE RESTORED TO MATCH EXISTING FINISH ELEVATIONS (E) CURB & GUTTER (E) TREE LEGEND FFIBEI FIBER LINE(S) ELECTRICAL LINE STREET LIGHT LINE verizonN/ VERIZON WIRELESS 2785 MITCHELL DRIVE, SUITE 9 WALNUT CREEK, CA 94598 I I I I (U NUtK Jth'AKA It F'tKMI I) " \\\ \\ PULL BOX TABLE I \\ \ DESIGNATION DESCRIPTION /\ a \ I moDus El EXISTING STREET LIGHT PULL BOX / N1 NEW FIBER PU LLBOX (UNDER SEPARATE PERMIT) U \ 0 MODUS, LLC 240 STOCKTON ST., 3RD FLOOR \ \ SAN FRANCISCO, CA 94108 CIO IDRAWN BY: APE II I I CHECKED BY: BM I APPROVED BY: LJB El (N) EQUIPMENT CONCEALED PEDESTAL BASE BY MANUFACTURER (E) LUMINAIRE � (E) LIGHT POLE AND FOUNDATION TO BE REMOVED. (N) n LIGHT POLE & FOUNDATION TO BE INSTALLED IN PLACE (N) LOCATION OF VERIZON WIRELESS CANISTER ANTENNA IN FRP / SHROUD MOUNTED ON LIGHT POLE (E) STEEL MAST ARM TO BE (N) LOCATION OF VERIZON WIRELESS 1&2 RELOCATED ON (N) LIGHT POLE / EQUIPMENT MOUNTED ON LIGHT POLE A-3 - _ V 13'-9"± BACK OF CABINET TO NRO W LINE n Q O ry Lu O 1111010 F'- O z (E) TREE i ENLARGED SITE PLAN l A N1 /I 15'-0°± CENTER OF POLE TO ROW LINE ■ � I I J W 0 Z a W a0 CLI I FAJ 24"x36" SCALE: 1/2" = l'-0" 11"07" SCALE: 1/4" = l'-0" 2, 1' 0" 2, n Q O (E) PULL BOX ui (E) STREET LIGHT LL J O O z N \\ \ w Iw SCALE 2 SITE PLAN 1 /2"=1 '-0" (E) MANHOLE 2 A-1 ENLARGED SITE PLAN (E) CURB & GUTTER 0 15'-0"± CENTER OF POLE TO ROW LINE A.P.N.: 316-06-060 (N) LOCATION OF VERIZON WIRELESS CANISTER ANTENNA AND EQUIPMENT (E) TREE, TYP. 24"x36" SCALE: 1/16" = l'-0" 11"xl7" SCALE: 1/32" = l'-0" 16' 12' 8' 4' 0" 16' (E) BUILDING SCALE 1 / 16"=1 '-0" UP REV DATE DESCRIPTION 0 04/06/20 100% CD 1 05/1 1 /20 100% CD PLAN CHECK 2 07/22/20 100% CD PLAN CHECK q WE 80 rrl - IN 0. C64533 - CIVIL��� OF CA1-��O IT IS A VIOLATION OF THE LAW FOR ANY PERSON, UNLESS THEY ARE ACTING UNDER THE DIRECTION OF A LICENSED PROFESSIONAL ENGINEER, TO ALTER THIS DOCUMENT TED 9-4-2020 SF CUPERTINO 103 NNEAR) 19500 PRUNERIDGE AVENUE CUPERTINO, CA 95014 SITE PLAN A-1 NOTES: 1. ALL NEW ANTENNAS, BRACKETS, AND OTHER EQUIPMENT WILL BE PAINTED TO MATCH LIGHT POLE. 2. ALL EXISTING SIGNAGE TO BE RELOCATED SHALL BE FASTENED USING STEEL BANDING PER SHEET T-2. T.O. E LIGHT SENSOR 39'-0" AGL (E) LUMINAIRE (E) LIGHT ARM MAST T.O. P CONCEALMENT SHROUD (N) FRP CONCEALMENT 1 SHROUD D-1 verizonN/ TO BE RELOCATED TO (N) LIGHT POLE 35'-6" AGL F-- I I (N) VERIZON WIRELESS 4 T.O. E STEEL LIGHT POLE 35-2"AGL B.O. E LIGHT ARM 34'-7'AGL RAID CENTER OF P CANISTER ANTENNA 34'-3"AGL T.O. N LIGHT SENSOR 32'-10" AGL fr L�- II II I I CANISTER ANTENNA D_1 (N) (2) 5G ANTENNAS 6 VERIZON WIRELESS 2785 MITCHELL DRIVE, SUITE 9 WALNUT CREEK, CA 94598 RAID CENTER OF P 5G ANTENNA IN FRP SHROUD D-1 31'-7" AGL 1 2 (E) LUMINAIRE (E) RELOCATED MAST ARM T.O. N STEEL LIGHT POLE 29'-1 1" AGL m o o n s MODUS, LLC 240 STOCKTON ST., 3RD FLOOR SAN FRANCISCO, CA 94108 T.O. N NOTICE SIGNAGE 24'-9" AGL (N) NOTICE SIGNAGE 12 FACING STREETSIDE D-1 DRAWN BY: APE CHECKED BY: BM APPROVED BY: LJB REV DATE DESCRIPTION 0 04/06/20 100% CD 1 05/1 1 /20 100% CD PLAN CHECK 2 07/22/20 100% CD PLAN CHECK (E) LIGHT POLE TO BE REPLACED (N) LIGHT POLE = s� FI N0. C64533 - (E) ROAD SIGN (E) ROAD SIGN s�9�" CIVIL OF FO T.O. N DISCONNECT 3 4 l 1 1 T.O. E ROAD SIGN 8'-4" AGL 8'-9" AGL T.O. E ROAD SIGN 8'-4" AGL (N) SMART METER / DISCONNECT w/ SHUTDOWN SIGNAGE E-3 D-3 D-1 D-1 IT IS A VIOLATION OF THE LAW FOR ANY PERSON, UNLESS THEY ARE ACTING UNDER THE DIRECTION OF A LICENSED PROFESSIONAL ENGINEER, TO ALTER THIS DOCUMENT B.O. E ROAD SIGN 6'-10" AGL B.O. N DISCONNECT 7'-0" AGL T.O. E ROAD SIGN 6'-10" AGL PORT HOLE LOCATION 5 15-0" CENTER OF POLE TO ROW LINE 13'-9" BACK OF CABINET TO ROW LINE FOR DISCONNECT D-3 TATED 9-4-2020 SF_CUPERTINO_103 5 3 4 T.O. N EQUIPMENT ENCLOSURE 4'-0" AGL (N) VERIZON WIRELESS EQUIPMENT CONCEALED WITHIN PEDESTAL BASE -(1) RRUS8843, (1) 4408, (1) 2205 D-1 7 D-1 E-3 1 (NEAR) 19500 PRUNERIDGE AVENUE -(2) PSU AC08 -(1) AC LOAD CENTER D-1 D-2 C U P E RTI N O, CA 95014 -(1) TWIN DIPLEXER 8 9 -(1) FIBER DEMARC BOX D-1 D-1 EXISTING & PROPOSED ELEVATIONS (E) FOUNDATION TO BE REPLACED (N) FOUNDATION 4 D-2 EXISTING SURFACE EXISTING SURFACE 0'-0" AGL 0'-0" AGL A-2 EXISTING ELEVATION SCALE 2 PROPOSED ELEVATION SCALE0„ 1 1/2 0„ 1/2 Encroachment Agreement - Cuper 103.planshts Final Audit Report 2020-11-12 Created: 2020-10-29 By: Julia Kinst Quliak@cupertino.org) Status: Signed Transaction ID: CBJCHBCAABAALVmDjMx4iclgTdHuKXFYAbODF48lgVL7 "Encroachment Agreement - Cuper 103.planshts" History Document created by Julia Kinst Ouliak@cupertino.org) 2020-10-29 - 5:28:54 PM GMT- IP address: 64.165.34.3 Document emailed to HeatherM. Minner (minner@smwlaw.com) for signature 2020-10-29 - 5:29:46 PM GMT Email viewed by HeatherM. Minner (minner@smwlaw.com) 2020-11-12 - 5:45:06 PM GMT- IP address: 104.143.198.23 dp Document e-signed by HeatherM. Minner (minner@smwlaw.com) Signature Date: 2020-11-12 - 5:45:35 PM GMT - Time Source: server- IP address: 52.39.49.65 Document emailed to Chad Mosley (chadm@cupertino.org) for signature 2020-11-12 - 5:45:37 PM GMT Email viewed by Chad Mosley (chadm@cupertino.org) 2020-11-12 - 7:08:07 PM GMT- IP address: 104.47.44.254 &9 Document e-signed by Chad Mosley (chadm@cupertino.org) Signature Date: 2020-11-12 - 7:08:23 PM GMT - Time Source: server- IP address: 67.164.60.110 Icy Document emailed to Kirsten Squarcia 11/12/20 (kirstens@cupertino.org) for signature 2020-11-12 - 7:08:25 PM GMT Email viewed by Kirsten Squarcia 11/12/20 (kirstens@cupertino.org) 2020-11-12 - 7:31:43 PM GMT- IP address: 104.47.45.254 Document e-signed by Kirsten Squarcia 11/12/20 (kirstens@cupertino.org) Signature Date: 2020-11-12 - 7:32:13 PM GMT - Time Source: server- IP address: 148.64.105.190 Agreement completed. 2020-11-12 - 7:32:13 PM GMT FMIi Adobe OI)2 Slgl'1 CVrLR INO