01_ASA-2020-007 Staff Report CITY OF
COMMUNITY DEVELOPMENT DEPARTMENT
PLANNING DIVISION
CITY HALL
10300 TORRE AVENUE • CUPERTINO, CA 95014-3255
TELEPHONE: (408) 777-3308 • FAX: (408) 777-3333
CUPERTINO CUPERTINO.ORG
ADMINISTRATIVE HEARING STAFF REPORT
Meeting Date: Ly 22, 2021
Subject
Architectural and Site Approval Permit to consider fagade and landscape alterations to a
bank building (Bank of America) located in the Crossroads Area of the Heart of the City
Specific Plan (Application No.: ASA-2020-007; Applicant: Melissa Lee; Location: 20563
Stevens Creek Blvd; APN(s): 326-34-044)
Recommended Action
That the Hearing Officer adopt the draft resolutions (Attachment 1) to:
1. Find that the proposed actions are exempt from CEQA; and
2. Approve the Architectural and Site Approval Permit (ASA-2020-007)
Discussion
Project Data
General Plan Designation Commercial/Office/Residential
General Plan Special Area Heart of the City Special Area
Zoning Designation P(CG, Res): Planned Development with General
Commercial and Residential Uses
Lot Size (entire project) 38,950 sq. ft. (0.89 acres)
Existing Proposed
Floor Area (entire project) 7,933 (20%) No Change
Lot Coverage (entireproject) 6,605 s . ft. (17%) No Change
Project Consistency With:
General Plan Yes
Zoning Yes
Environmental Assessment Categorically Exempt per Section 15301 Existing
Facilities (Class 1) of the California Environmental
Quality Act (CEQA)
ASA-2020-007 20563 Stevens Creek Blvd July 22,2021
Page 2
Background
The project site is located north of Stevens Creek Boulevard and west of N. De Anza
Boulevard within the Crossroads Area in the Heart of the City. The Heart of the City is a
major commercial corridor primarily comprised
of commercial and office uses. _
ERCIAL
i
The project site is developed with a free-standing f sa�OPPING CENTER- -
single-story building currently occupied by Bank
of America surrounded by an on-site parking lot. z
The Bank of America site is bounded by a m
commercial shopping center Marina Plaza to ' =Ez
PP g ( ) o _
the north, office uses to the east, a free-standing ,. .
building (Chase bank) to the west, and Stevens <' :A
Creek Boulevard to the south (see Figure 1). The SAMN FFfC
existing building was constructed in the early
1960's, which is prior to the property being A
designated as part of the Heart of the City Special N
area. Figure 1.Project Site
The applicant is requesting to upgrade the exterior facade of the building,update on-site
landscaping, replace bicycle racks, improve pedestrian pathways, and restripe on-site
parking spaces to improve the overall site design. The proposed modifications to the
building and the site are subject to the design regulation, guidelines, and concepts of the
Heart of the City Specific Plan and the Cupertino Municipal Code.
Analysis
The applicant is proposing exterior building fagade and on-site modifications. The scope
of work for the project is as follows:
■ Fagade modifications include repainting, replacing existing roof tiles with standing
seam metal roof, replacing existing stone finish with painted stucco, adding faux
wood metal panel cladding, adding four new windows, and replacing existing
storefront fenestrations such as windows and doors.
■ Landscape modifications include improving the landscape at the west and south
facades with aesthetically pleasing and drought tolerant plantings.
■ Replace existing bicycle racks with Class I facility bicycle lockers to comply with
Cupertino Municipal Code Parking Regulations Ordinance (Chapter 19.124).
■ Additional site modifications include restriping existing parking stalls, adding
decorative pedestrian pathway, and upgrading the waste collection area with a
raised curb and trash cans.
ASA-2020-007 20563 Stevens Creek Blvd July 22,2021
Page 3
Exterior Building Facade Modifications
The existing exterior materials of the building are mainly stucco with a terracotta tile roof.
The south (front) elevation features a covered arcade with stucco finish. The north (rear)
and east (right) side elevations of the building are plain stucco. The west (left) elevation
has a stone finish with a covered arcade with stucco columns (See Figures 2-5 below).
Figure 2&3-Existing Front(South) &Rear(North) Elevations
Figure 4&5-Existing Left-Side(West) &Right-Side(East)Elevations
The applicant is proposing to modernize the exterior building fagade by repainting the
stucco and window trims in a neutral color palette of white and grey and replacing the
existing terracotta tile roof with a contemporary standing seam metal roof. The proposed
building design incorporates a white base color on the building facades with grey accent
colors incorporated into the windows,trim, and upgraded roof design. The applicant has
proposed design features, including faux wood metal panel cladding, to emphasize the
main building entrance on the south elevation. Four new windows on the rear (north)
elevation are also proposed (see figures 6-9).
K. BANK Of AM EKICA
BANK OFAMEKICA
Figure 6&7-Proposed Front(South) &Rear(North)Elevations
Figure 8 &9-Proposed Left-Side(West) &Right-Side(East)Elevations
ASA-2020-007 20563 Stevens Creek Blvd July 22,2021
Page 4
The proposed design was reviewed by the City's consulting architectural review firm,
RRM Design Group. The applicant has adequately modified the proposed design to be
compatible with RRM's recommendations and the Heart of the City Specific Plan design
guidelines. Consistent with the Heart of the City Specific Plan, the proposed design
features articulation of the facade through various colors and materials, provides a
prominent main entrance, and incorporates building design accents to create a
harmonious color palette. Therefore, staff finds that the proposed building design
complies with the Heart of the City Specific Plan design guidelines, and no further design
considerations are recommended.
Lighting: The applicant is not proposing new lighting for the site. However, the existing,
unpermitted, flood light fixtures affixed to the building are considered a prohibited light
fixture type pursuant to Cupertino's Municipal Code Section 19.102.040 Outdoor
Lighting Requirements of the Glass and Lighting Standards Ordinance. The Planning
Division has included a condition of approval requiring the applicant/property owner to
remove the existing flood light fixtures, unless required by State law, and submit a
lighting plan that complies with Cupertino Municipal Glass and Lighting Standards
Ordinance (Chapter 19.102) prior to building permit issuance.
Landscape Modifications &Existing Tree Maintenance
The applicant is proposing to modify approximately 260 square feet of the existing
landscape on the west (left) and south (front) elevations of the building by replacing the
existing plants along the
building with new drought
++ hike locker,typ,see
tolerant ground cover(Sheets +; architectural drawings
L1.0 & L1.1, See Figure 10). 45AR t2V5 rac
The project is subject to a hike k,typ,see
— architectural drawings
4-Prescriptive Compliance r• existing planter,typ
overhang,typ_ EXISTING
Application pursuant to the existing pavement,typ. BANK OF AMERICA
Cupertino Municipal Code ` 141-HO AMR
Landscape Ordinance j
(Chapter 14.15). The L 19L-OM L-ON
Landscape Ordinance 24�AMR architectural trash can ,typ,see
—
Landscape chitectural drawings
requires the applicant to --
submit a Water-Efficient I
Landscape Checklist and I————L __1 _ J____L
IL
finalized landscape and Figure 10—Landscape Plan
irrigation plans prior to
building permit issuance. Additional landscape documentation is required prior to final
occupancy in accordance with the Landscape Ordinance.
ASA-2020-007 20563 Stevens Creek Blvd July 22,2021
Page 5
The proposed landscaping will be compatible with the new design of the building facade.
However, Staff has found that the proposed planting plan at the main entrance of the
building(south elevation)lacks visual interest. Staff has included a condition of approval
for the project requiring the applicant/ property owner provide an assortment of shrub
types with various heights and/or color profiles along the south elevation. Incorporating
a variety of plantings will improve the visual interest of the facade that is most visible
from the public right of way and bring the project into compliance with the Heart of the
City Specific Plan landscaping guidelines, which encourages framing building entrances
with flowering shrubs or trees.
The project site consists of a variety of existing trees planted in tree wells along the
perimeter of the parking lot adjacent to the public right-of-way on Stevens Creek
Boulevard. The trees were approved with a Building Permit processed in 2011 (Permit
No. 11060151) and are required to be maintained on-site as protected development trees.
To ensure consistency with the approved planting plan, Staff has included a condition of
approval that the applicant/property owner show the existing trees on the site plan and
verify that the tree species and locations as approved in the Building Permit plan are
retained on-site.
Vehicular/Bicycle Parking & On-Site Improvements
Bank of America is classified as a commercial office by the Cupertino Municipal Code
and is subject to the vehicular and bicycle parking standards of Parking Regulations
Ordinance (CMC Chapter 12.124). The Parking Regulations Ordinance requires one
parking space per 285 square feet of gross building area. The existing project site consists
of 52 vehicular parking stalls, which exceeds the required 28 vehicular parking spaces for
the office use. One parking stall will be displaced by the trash enclosure/are
improvements required by the Environmental Services Division, resulting in 51 parking
stalls on site. The proposed parking lot restriping will not change the total number of
remaining vehicular parking stalls. The project is conditioned to accurately indicate the
parking stall and aisleway dimensions on the site plan to verify that the restriping is
consistent with the standards of Cupertino's Public Works Department and shall be
reviewed and approved to the satisfaction of the Planning Division prior to building
permit issuance.
The Parking Regulations Ordinance also requires one Class I Facility bicycle parking
space per 1,250 square feet of gross building area.In accordance with the Code,the project
requires seven Class I Facility bicycle parking spaces for the 7,933 square-foot building.
As part of the project, the applicant is proposing to remove three existing bicycle rack
parking spaces and provide replacement spaces for the site consisting of four bicycle
locker stalls and three bicycle rack stalls. Staff reviewed the proposed bicycle parking and
ASA-2020-007 20563 Stevens Creek Blvd July 22,2021
Page 6
found the three bicycle rack spaces77
— — — — — — —to be insufficient as they are defined �V
by the Parking Regulations
� V
Ordinance as a Class II Type F
Facility, which is inconsistent with P
the required Class I Type Facility.
Therefore,the project is conditioned
- - I
to provide a total of seven Class I
Type Facility bicycle lockers to
comply with the Parking
Regulations Ordinance of thebq
a
Cupertino Municipal Code. Bicycle goy 2
E d E
lockers are fully enclosed spaces
accessible only by the owner or --
operator of the bicycle. The Figure 11—On Site Improvements
proposed location of bicycle parking areas and
class facility types are shown outlined in green (see Figure Wand the final location and
class facility type shall be reviewed and approved by the Planning Division prior to
building permit issuance.
Additional on-site improvements include adding a pedestrian pathway from the public
right-of-way on Stevens Creek Boulevard to the main entrance of the building as shown
outlined in red and a waste collection area with a raised curb and garbage, recycling, and
organics bins outlined in blue (see Figure 11). The Heart of the City Specific Plan Section
2.01.040(A)(1) recommends a variety of paving materials for pedestrian pathways to
improve the visibility of pedestrian crossings. The applicant has proposed a grey
pedestrian pathway leading to the building. However, to further comply with the Heart
of the City Specific Plan, the Planning Division has conditioned the project to indicate an
alternative color or material (e.g., stamped concrete or colored/decorative brick) for the
pathway and on the plan set prior to building permit issuance. The proposed waste
collection area will have minimal impact to existing on-site parking as it will displace
only one parking stall, resulting in 51 parking stalls on site where only 28 stalls are
required by the Parking Regulations Ordinance. The waste collection area will be
reviewed and approved by Cupertino's Environmental Services Division prior to
building permit issuance.
Environmental Review
This project is categorically exempt from the requirements of the California
Environmental Quality Act (CEQA) per Section 15301 —Existing Facilities.
ASA-2020-007 20563 Stevens Creek Blvd July 22,2021
Page 7
Other Department/Agency Review
The City's Building Division, Environmental Programs Division, Public Works
Department, and the Santa Clara County Fire Department have no objections to the
project.
Public Noticing & Community Outreach
The following table is a brief summary of the noticing for this project:
Notice of Public Hearing Agenda
■ Site Signage (at least 10 days prior to ■ Posted on the City's official notice
hearing) bulletin board (five days prior to
■ 13 notices mailed to property owners hearing)
adjacent to the project site (at least 10 ■ Posted on the City of Cupertino's
days prior to the hearing) Web site ve days prior to hearing)
No comments have been received at the time of production of this staff report.
Permit Streamlining Act
This project is subject to the Permit Streamlining Act (Government Code Section 65920 -
65964). The City has complied with the deadlines found in the Permit Streamlining Act.
Project Received:January 19, 2021; Deemed Incomplete: February 18, 2021
Revisions Received:April 29, 2021; Deemed Complete:May 27, 2021
The City has 60 days from when the project is deemed categorically exempt to decide on
the project.
Conclusion
The scope of work does not include any changes to existing uses,required parking supply
or demand, floor area, lot coverage, or building height for the subject site and will not
result in an increased intensity of the existing use. Staff therefore recommends approval
of the Architectural and Site Approval Permit as the proposed project will not create
adverse impacts to the surrounding area. Additionally, all the findings for approval of
the proposed project, consistent with Chapter 19.168 of the Cupertino Municipal Code,
may be made as reflected in the draft resolutions.
With respect to the Architectural and Site Approval Permit, the following findings may
be made:
ASA-2020-007 20563 Stevens Creek Blvd July 22,2021
Page 8
1. The proposal,at the proposed location,will not be detrimental or injurious to property
or improvements in the vicinity, and will not be detrimental to the public health,
safety, general welfare, or convenience;
The proposed project includes exterior building fagade, landscape, and site modifications to an
existing commercial office building occupied by Bank of America that would improve the
design of the site and upgrade building materials. The exterior facade enhancements
incorporate afresh coat of paint to the stucco, accent paint to the window trim, a new metal
seamed roof, and metal clad design at the main entrance. The landscaping on the south and
west elevations of the building would be improved with new drought-tolerant plantings that
frame the building entrances. Additional site improvements include a new waste collection
area with garbage, recycling, and organics bins and curb to provide separation from the
parking lot, restriping of parking stalls, and adding a pedestrian pathway to better delineate
pedestrian access. Staff has also conditioned the project to remove the prohibited flood lighting,
unless required by State law, and submit a lighting plan to be reviewed and approved by the
Planning Division prior to building permit issuance to reduce the spill-over of light to
adjoining property owners. There are no changes to the existing building square footage,
height, location, or intensity of use on the site. The exterior building fagade, landscape, and
site modifications will not be detrimental or injurious to property or improvements in the
vicinity, and will not be detrimental to the public health, safety, general welfare, or
convenience.
2. The proposal is consistent with the purposes of Chapter 19.168, the General Plan, any
specific plan,zoning ordinances,applicable planned development permit,conditional
use permits, variances, subdivision maps or other entitlements to use which regulate
the subject property including, but not limited to, adherence to the following specific
criteria:
a) Abrupt changes in building scale should be avoided. A gradual transition related
to height and bulk should be achieved between new and existing buildings.
The project scope includes exterior facade modifications that do not increase floor area, lot
coverage, or height of the existing building on the project site. The proposed exterior fagade
modifications include new paint on existing stucco walls, a new standing seam metal roof,
adding four additional windows, and a metal cladding design at the main entrance. The
south and west elevations also include new landscaping along the building fagade to break
up massing of the building and provide visual interest of the site. The building design
would be an improvement to the shopping center and would not be modified in height or
bulk compared to existing buildings within the vicinity. Therefore, there will be no abrupt
changes in building scale related to height and bulk and no new buildings are being
proposed.
ASA-2020-007 20563 Stevens Creek Blvd July 22,2021
Page 9
b) In order to preserve design harmony between new and existing buildings and in
order to preserve and enhance property values, the materials, textures and colors
of new building should harmonize with adjacent development by being consistent
or compatible with design and color schemes with the future character of the
neighborhoods and purposes of the zone in which they are situated. The location,
height and materials of walls, fencing, hedges and screen planting should
harmonize with adjacent development. Unsightly storage areas, utility
installations and unsightly elements of parking lots should be concealed. The
planting of ground cover or various types of pavements should be used to prevent
dust and erosion, and the unnecessary destruction of existing healthy trees should
be avoided. Lighting for development should be adequate to meet safety
requirements as specified by the engineering and building departments and
provide shielding to prevent spill-over light to adjoining property owners.
The exterior and landscape modifications are harmonious with the existing building form
and are compatible with the proposed design upgrades of the adjacent buildings within the
area. The neutral color palette of the design would be compatible with the existing office
buildings at the rear and suitable for the location. The project site is located in a developed
area with various commercial and office uses that consist of similar materials and colors
as the proposed project. The proposed project does not include tree removal and staff has
conditioned the project to maintain the trees on-site as protected development trees.
Additionally, the proposed landscape improvements would provide visual interest to the
main entrance of the building. Staff has also conditioned the project to remove the
unpermitted,prohibited flood lighting, unless required by State law, and submit a lighting
plan to be reviewed and approved by the Planning Division prior to building permit
issuance to reduce the spill-over of light to adjoining property owners. Furthermore, the
project includes restriping parking stalls and adding a decorative pedestrian pathway
which would increase pedestrian access and would complement the new building design
for the site.
c) The number, location, color, size, height, lighting and landscaping of outdoor
advertising signs and structures have been designed to minimize traffic hazard,
positively affect the general appearance of the neighborhood and harmonize with
adjacent development.
No signs are proposed as part of this project. Proposed signage would be reviewed and
approved to the satisfaction of the Community Development Department upon submittal
for Building Permits.
d) With respect to new projects within existing residential neighborhoods, new
development should be designed to protect residents from noise, traffic, light and
ASA-2020-007 20563 Stevens Creek Blvd July 22,2021
Page 10
visually intrusive effects by use of buffering, setbacks, landscaping, walls and
other appropriate design measures.
This application is not a new development project.
Next Steps
The permit will become effective 14 calendar days from the date of the hearing. The
decision of the Administrative Hearing Officer is final, unless appealed within 14
calendar days from the date of the hearing. The applicant team may apply for building
and/or other permits with the City at the end of the appeal period (August 5, 2021, at
5:OOpm).
This approval is valid until July 22, 2023. The applicant team may apply for a one-time
two-year extension before the approval expires.
Prepared by: Brianne Reyes, Associate Planner
Erika Poveda, Associate Planner
Reviewed and Approved for submission b Piu Ghosh, Planning Manager
ATTACHMENTS
1. Draft Resolution for ASA-2020-007
2. Plan Set