HomeMy WebLinkAboutAH Packet 07-22-2021CITY OF CUPERTINO
ADMINISTRATIVE HEARING
AGENDA
This will be a teleconference meeting without a physical location
Thursday, July 22, 2021
5:00 PM
Teleconference Meeting
TELECONFERENCE / PUBLIC PARTICIPATION INFORMATION TO HELP STOP THE
SPREAD OF COVID-19
In accordance with Governor Newsom’s Executive Order No-29-20, this will be a
teleconference meeting without a physical location to help stop the spread of COVID-19.
Members of the public wishing comment on an item on the agenda may do so in the
following ways:
1) E-mail comments by 4:00 p.m. on Thursday, July 22nd, to the Hearing Officer at
planning@cupertino.org. These e-mail comments will be received by the Hearing Officer
before the meeting and posted to the City’s website after the meeting.
2) E-mail comments during the times for public comment during the meeting to the
Hearing Officer at planning@cupertino.org. The staff liaison will read the emails into the
record, and display any attachments on the screen, for up to 3 minutes (subject to the
Hearing Officer’s discretion to shorten time for public comments). Members of the public
that wish to share a document must email planning@cupertino.org prior to speaking.
3) Teleconferencing Instructions
Members of the public may observe the teleconference meeting or provide oral public
comments as follows:
Oral public comments will be accepted during the teleconference meeting. Comments may
be made during “oral communications” for matters not on the agenda, and during the
public comment period for each agenda item.
Online:
To address the Commission, click on the link below to register in advance and access the
Page 1
AH 7-22-2021
1 of 50
Administrative Hearing Agenda July 22, 2021
meeting:
Please click the link below to join the webinar:
https://cityofcupertino.zoom.us/webinar/register/WN_CLsQlGeUQJutQoIq2gt74A
Phone
Dial 669-900-6833 and enter Webinar ID: 930 1525 1080 (Type * 9 to raise hand to speak)
Unregistered participants will be called on by the last four digits of their phone number.
Or an H.323/SIP room system: H.323:
162.255.37.11 (US West)
162.255.36.11 (US East)
Meeting ID: 930 1525 1080
SIP: 93015251080@zoomcrc.com
After registering, you will receive a confirmation email containing information about
joining the webinar.
Please read the following instructions carefully:
1. You can directly download the teleconference software or connect to the meeting in your
internet browser. If you are using your browser, make sure you are using a current and
up-to-date browser: Chrome 30+, Firefox 27+, Microsoft Edge 12+, Safari 7+. Certain
functionality may be disabled in older browsers, including Internet Explorer.
2. You will be asked to enter an email address and a name, followed by an email with
instructions on how to connect to the meeting. Your email address will not be disclosed to
the public. If you wish to make an oral public comment but do not wish to provide your
name, you may enter “Cupertino Resident” or similar designation.
3. When the Hearing Officer calls for the item on which you wish to speak, click on “raise
hand.” Speakers will be notified shortly before they are called to speak.
4. When called, please limit your remarks to the time allotted and the specific agenda
topic.
In compliance with the Americans with Disabilities Act (ADA), anyone who is planning to
attend this teleconference meeting who is visually or hearing impaired or has any disability
that needs special assistance should call the City Clerk's Office at 408-777-3223, at least 48
hours in advance of the meeting to arrange for assistance. In addition, upon request, in
advance, by a person with a disability, meeting agendas and writings distributed for the
meeting that are public records will be made available in the appropriate alternative
format.
Page 2
AH 7-22-2021
2 of 50
Administrative Hearing Agenda July 22, 2021
ROLL CALL
APPROVAL OF MINUTES
1.Subject: Draft Minutes of June 24, 2021
Recommended Action: Approve or modify the Draft Minutes of June 11, 2021
1 - Draft Minutes of June 24, 2021
ORAL COMMUNICATIONS
This portion of the meeting is reserved for persons wishing to address the Committee on any matter
within the jurisdiction of the Committee and not on the agenda. Speakers are limited to three (3)
minutes. In most cases, State law will prohibit the Commission from making any decisions with respect
to a matter not on the agenda.
WRITTEN COMMUNICATIONS
PUBLIC HEARINGS
2.Subject: Architectural and Site Approval Permit to consider façade and landscape
alterations to a bank building (Bank of America) located in the Crossroads Area of the
Heart of the City Specific Plan
Recommended Action: That the Hearing Officer adopt the draft resolutions
(Attachment 1) to:
1. Find that the proposed actions are exempt from CEQA; and
2. Approve the Architectural and Site Approval Permit (ASA-2020-007)
Staff Report
1 - Draft Resolution for ASA-2020-007
2 - Plan Set
OLD BUSINESS
NEW BUSINESS
ADJOURNMENT
In compliance with the Americans with Disabilities Act (ADA), anyone who is planning to attend this
teleconference meeting who is visually or hearing impaired or has any disability that needs special
assistance should call the City Clerk's Office at 408-777-3223, at least 48 hours in advance of the
meeting to arrange for assistance. In addition, upon request, in advance, by a person with a disability,
meeting agendas and writings distributed for the meeting that are public records will be made available
in the appropriate alternative format.
Any writings or documents provided to a majority of the members after publication of the agenda will
Page 3
AH 7-22-2021
3 of 50
Administrative Hearing Agenda July 22, 2021
be made available for public inspection. Please contact the City Clerk’s Office in City Hall located at
10300 Torre Avenue during normal business hours.
IMPORTANT NOTICE: Please be advised that pursuant to Cupertino Municipal Code 2.08.100
written communications sent to the Cupertino City Council, Commissioners or City staff concerning a
matter on the agenda are included as supplemental material to the agendized item. These written
communications are accessible to the public through the City’s website and kept in packet archives. You
are hereby admonished not to include any personal or private information in written communications to
the City that you do not wish to make public; doing so shall constitute a waiver of any privacy rights
you may have on the information provided to the City.
Members of the public are entitled to address the members concerning any item that is described in the
notice or agenda for this meeting, before or during consideration of that item. If you wish to address the
members on any other item not on the agenda, you may do so during the public comment.
Page 4
AH 7-22-2021
4 of 50
CITY OF CUPERTINO
Agenda Item
21-9642 Agenda Date: 7/22/2021
Agenda #: 1.
Subject: Draft Minutes of June 24, 2021
Approve or modify the Draft Minutes of June 11, 2021
CITY OF CUPERTINO Printed on 7/15/2021Page 1 of 1
powered by Legistar™
AH 7-22-2021
5 of 50
Cupertino, CA 95014
(408) 777‐3308
ACTION MINUTES OF THE REGULAR MEETING OF
THE ADMINISTRATIVE HEARING HELD ON JUNE 24, 2021
ROLL CALL
Hearing Officer present: Albert Salvador, Assistant Community Development Director
Staff present: Erick Serrano, Senior Planner
Applicant(s) present: Eric Clapp, Senior Managing Director
APPROVAL OF MINUTES:
1. Subject: Draft Minutes of March 11, 2021
The minutes of March 11, 2021 were approved as written.
2. Subject: Draft Minutes of June 10, 2021
The minutes of June 10, 2021 were approved as written.
POSTPONEMENTS/REMOVAL FROM CALENDAR:
None
ORAL COMMUNICATIONS:
None
WRITTEN COMMUNICATIONS:
Hearing Officer requested to add written communications to the agenda.
PUBLIC MEETING ITEMS:
3. Application No.(s): ASA‐2021‐001, TR‐2021‐021
Applicant: Brian Bolandi (Rubicon Point Partners)
Location: 10200 S. De Anza Blvd. and 10201 Torre Ave.: (APN: 369‐01‐035,
369‐01‐995, 369‐41‐005)
Architectural and Site Approval Permit to consider exterior and landscape alteration to an
existing office building, and a Tree Removal Permit to allow the removal and replacement
of 15 protected trees.
AH 7-22-2021
6 of 50
2 Administrative Hearing
June 24, 2021
Administrative Hearing Officer’s decision final unless appealed.
Erick Serrano, Senior Planner gave a presentation consisting of the proposed modifications.
The Hearing Officer asked questions and made comments.
The Hearing Officer opened the public comment period.
‐ Jennifer Griffin spoke and was concerned that the project was removing trees along De
Anza Blvd.
The Hearing Officer closed the comment period.
The Hearing Officer concurred with Staff’s findings.
DECISION: The application was approved by the Hearing Officer per the draft resolution(s)
ADJOURNMENT
Respectfully submitted:
_____/s/Abby Ayende
Abby Ayende
Management Analyst
AH 7-22-2021
7 of 50
CITY OF CUPERTINO
Agenda Item
21-9641 Agenda Date: 7/22/2021
Agenda #: 2.
Subject: Architectural and Site Approval Permit to consider façade and landscape alterations to a
bank building (Bank of America) located in the Crossroads Area of the Heart of the City Specific Plan
That the Hearing Officer adopt the draft resolutions (Attachment 1) to:
1. Find that the proposed actions are exempt from CEQA; and
2. Approve the Architectural and Site Approval Permit (ASA-2020-007)
CITY OF CUPERTINO Printed on 7/15/2021Page 1 of 1
powered by Legistar™
AH 7-22-2021
8 of 50
ADMINISTRATIVE HEARING STAFF REPORT
Meeting Date: July 22, 2021
Subject
Architectural and Site Approval Permit to consider façade and landscape alterations to a
bank building (Bank of America) located in the Crossroads Area of the Heart of the City
Specific Plan (Application No.: ASA-2020-007; Applicant: Melissa Lee; Location: 20563
Stevens Creek Blvd; APN(s): 326-34-044)
Recommended Action
That the Hearing Officer adopt the draft resolutions (Attachment 1) to:
1. Find that the proposed actions are exempt from CEQA; and
2. Approve the Architectural and Site Approval Permit (ASA-2020-007)
Discussion
Project Data
General Plan Designation Commercial/Office/Residential
General Plan Special Area Heart of the City Special Area
Zoning Designation P(CG, Res): Planned Development with General
Commercial and Residential Uses
Lot Size (entire project) 38,950 sq. ft. (0.89 acres)
Existing Proposed
Floor Area (entire project) 7,933 (20%) No Change
Lot Coverage (entire project) 6,605 sq. ft. (17%) No Change
Project Consistency With:
General Plan Yes
Zoning Yes
Environmental Assessment Categorically Exempt per Section 15301 Existing
Facilities (Class 1) of the California Environmental
Quality Act (CEQA)
AH 7-22-2021
9 of 50
ASA-2020-007 20563 Stevens Creek Blvd July 22, 2021
Page 2
Background
The project site is located north of Stevens Creek Boulevard and west of N. De Anza
Boulevard within the Crossroads Area in the Heart of the City. The Heart of the City is a
major commercial corridor primarily comprised
of commercial and office uses.
The project site is developed with a free-standing
single-story building currently occupied by Bank
of America surrounded by an on-site parking lot.
The Bank of America site is bounded by a
commercial shopping center (Marina Plaza) to
the north, office uses to the east, a free-standing
building (Chase bank) to the west, and Stevens
Creek Boulevard to the south (see Figure 1). The
existing building was constructed in the early
1960’s, which is prior to the property being
designated as part of the Heart of the City Special
area.
The applicant is requesting to upgrade the exterior façade of the building, update on-site
landscaping, replace bicycle racks, improve pedestrian pathways, and restripe on-site
parking spaces to improve the overall site design. The proposed modifications to the
building and the site are subject to the design regulation, guidelines, and concepts of the
Heart of the City Specific Plan and the Cupertino Municipal Code.
Analysis
The applicant is proposing exterior building façade and on-site modifications. The scope
of work for the project is as follows:
Façade modifications include repainting, replacing existing roof tiles with standing
seam metal roof, replacing existing stone finish with painted stucco, adding faux
wood metal panel cladding, adding four new windows, and replacing existing
storefront fenestrations such as windows and doors.
Landscape modifications include improving the landscape at the west and south
facades with aesthetically pleasing and drought tolerant plantings.
Replace existing bicycle racks with Class I facility bicycle lockers to comply with
Cupertino Municipal Code Parking Regulations Ordinance (Chapter 19.124).
Additional site modifications include restriping existing parking stalls, adding
decorative pedestrian pathway, and upgrading the waste collection area with a
raised curb and trash cans.
Figure 1. Project Site
AH 7-22-2021
10 of 50
ASA-2020-007 20563 Stevens Creek Blvd July 22, 2021
Page 3
Exterior Building Facade Modifications
The existing exterior materials of the building are mainly stucco with a terracotta tile roof.
The south (front) elevation features a covered arcade with stucco finish. The north (rear)
and east (right) side elevations of the building are plain stucco. The west (left) elevation
has a stone finish with a covered arcade with stucco columns (See Figures 2-5 below).
The applicant is proposing to modernize the exterior building façade by repainting the
stucco and window trims in a neutral color palette of white and grey and replacing the
existing terracotta tile roof with a contemporary standing seam metal roof. The proposed
building design incorporates a white base color on the building facades with grey accent
colors incorporated into the windows, trim, and upgraded roof design. The applicant has
proposed design features, including faux wood metal panel cladding, to emphasize the
main building entrance on the south elevation. Four new windows on the rear (north)
elevation are also proposed (see figures 6-9).
Figure 2 & 3 – Existing Front (South) & Rear (North) Elevations
Figure 4 & 5 – Existing Left-Side (West) & Right-Side (East) Elevations
Figure 6 & 7 – Proposed Front (South) & Rear (North) Elevations
Figure 8 & 9 – Proposed Left-Side (West) & Right-Side (East) Elevations
AH 7-22-2021
11 of 50
ASA-2020-007 20563 Stevens Creek Blvd July 22, 2021
Page 4
The proposed design was reviewed by the City’s consulting architectural review firm,
RRM Design Group. The applicant has adequately modified the proposed design to be
compatible with RRM’s recommendations and the Heart of the City Specific Plan design
guidelines. Consistent with the Heart of the City Specific Plan, the proposed design
features articulation of the façade through various colors and materials, provides a
prominent main entrance, and incorporates building design accents to create a
harmonious color palette. Therefore, staff finds that the proposed building design
complies with the Heart of the City Specific Plan design guidelines, and no further design
considerations are recommended.
Lighting: The applicant is not proposing new lighting for the site. However, the existing,
unpermitted, flood light fixtures affixed to the building are considered a prohibited light
fixture type pursuant to Cupertino’s Municipal Code Section 19.102.040 Outdoor
Lighting Requirements of the Glass and Lighting Standards Ordinance. The Planning
Division has included a condition of approval requiring the applicant/property owner to
remove the existing flood light fixtures, unless required by State law, and submit a
lighting plan that complies with Cupertino Municipal Glass and Lighting Standards
Ordinance (Chapter 19.102) prior to building permit issuance.
Landscape Modifications & Existing Tree Maintenance
The applicant is proposing to modify approximately 260 square feet of the existing
landscape on the west (left) and south (front) elevations of the building by replacing the
existing plants along the
building with new drought
tolerant ground cover (Sheets
L1.0 & L1.1, See Figure 10).
The project is subject to a
Prescriptive Compliance
Application pursuant to the
Cupertino Municipal Code
Landscape Ordinance
(Chapter 14.15). The
Landscape Ordinance
requires the applicant to
submit a Water-Efficient
Landscape Checklist and
finalized landscape and
irrigation plans prior to
building permit issuance. Additional landscape documentation is required prior to final
occupancy in accordance with the Landscape Ordinance.
Figure 10 – Landscape Plan
AH 7-22-2021
12 of 50
ASA-2020-007 20563 Stevens Creek Blvd July 22, 2021
Page 5
The proposed landscaping will be compatible with the new design of the building façade.
However, Staff has found that the proposed planting plan at the main entrance of the
building (south elevation) lacks visual interest. Staff has included a condition of approval
for the project requiring the applicant/ property owner provide an assortment of shrub
types with various heights and/or color profiles along the south elevation. Incorporating
a variety of plantings will improve the visual interest of the façade that is most visible
from the public right of way and bring the project into compliance with the Heart of the
City Specific Plan landscaping guidelines, which encourages framing building entrances
with flowering shrubs or trees.
The project site consists of a variety of existing trees planted in tree wells along the
perimeter of the parking lot adjacent to the public right-of-way on Stevens Creek
Boulevard. The trees were approved with a Building Permit processed in 2011 (Permit
No. 11060151) and are required to be maintained on-site as protected development trees.
To ensure consistency with the approved planting plan, Staff has included a condition of
approval that the applicant/property owner show the existing trees on the site plan and
verify that the tree species and locations as approved in the Building Permit plan are
retained on-site.
Vehicular/Bicycle Parking & On-Site Improvements
Bank of America is classified as a commercial office by the Cupertino Municipal Code
and is subject to the vehicular and bicycle parking standards of Parking Regulations
Ordinance (CMC Chapter 12.124). The Parking Regulations Ordinance requires one
parking space per 285 square feet of gross building area. The existing project site consists
of 52 vehicular parking stalls, which exceeds the required 28 vehicular parking spaces for
the office use. One parking stall will be displaced by the trash enclosure/are
improvements required by the Environmental Services Division , resulting in 51 parking
stalls on site. The proposed parking lot restriping will not change the total number of
remaining vehicular parking stalls. The project is conditioned to accurately indicate the
parking stall and aisleway dimensions on the site plan to verify that the restriping is
consistent with the standards of Cupertino’s Public Works Department and shall be
reviewed and approved to the satisfaction of the Planning Division prior to building
permit issuance.
The Parking Regulations Ordinance also requires one Class I Facility bicycle parking
space per 1,250 square feet of gross building area. In accordance with the Code, the project
requires seven Class I Facility bicycle parking spaces for the 7,933 square-foot building.
As part of the project, the applicant is proposing to remove three existing bicycle rack
parking spaces and provide replacement spaces for the site consisting of four bicycle
locker stalls and three bicycle rack stalls. Staff reviewed the proposed bicycle parking and
AH 7-22-2021
13 of 50
ASA-2020-007 20563 Stevens Creek Blvd July 22, 2021
Page 6
found the three bicycle rack spaces
to be insufficient as they are defined
by the Parking Regulations
Ordinance as a Class II Type
Facility, which is inconsistent with
the required Class I Type Facility.
Therefore, the project is conditioned
to provide a total of seven Class I
Type Facility bicycle lockers to
comply with the Parking
Regulations Ordinance of the
Cupertino Municipal Code. Bicycle
lockers are fully enclosed spaces
accessible only by the owner or
operator of the bicycle. The
proposed location of bicycle parking areas and
class facility types are shown outlined in green (see Figure 11)and the final location and
class facility type shall be reviewed and approved by the Planning Division prior to
building permit issuance.
Additional on-site improvements include adding a pedestrian pathway from the public
right-of-way on Stevens Creek Boulevard to the main entrance of the building as shown
outlined in red and a waste collection area with a raised curb and garbage, recycling, and
organics bins outlined in blue (see Figure 11). The Heart of the City Specific Plan Section
2.01.040(A)(1) recommends a variety of paving materials for pedestrian pathways to
improve the visibility of pedestrian crossings. The applicant has proposed a grey
pedestrian pathway leading to the building. However, t o further comply with the Heart
of the City Specific Plan, the Planning Division has conditioned the project to indicate an
alternative color or material (e.g., stamped concrete or colored/decorative brick) for the
pathway and on the plan set prior to building permit issuance. The proposed waste
collection area will have minimal impact to existing on-site parking as it will displace
only one parking stall, resulting in 51 parking stalls on site where only 28 stalls are
required by the Parking Regulations Ordinance. The waste collection area will be
reviewed and approved by Cupertino’s Environmental Services Division prior to
building permit issuance.
Environmental Review
This project is categorically exempt from the requirements of the California
Environmental Quality Act (CEQA) per Section 15301 – Existing Facilities.
Figure 11 – On Site Improvements
AH 7-22-2021
14 of 50
ASA-2020-007 20563 Stevens Creek Blvd July 22, 2021
Page 7
Other Department/Agency Review
The City’s Building Division, Environmental Programs Division, Public Works
Department, and the Santa Clara County Fire Department have no objections to the
project.
Public Noticing & Community Outreach
The following table is a brief summary of the noticing for this project:
Notice of Public Hearing Agenda
Site Signage (at least 10 days prior to
hearing)
13 notices mailed to property owners
adjacent to the project site (at least 10
days prior to the hearing)
Posted on the City's official notice
bulletin board (five days prior to
hearing)
Posted on the City of Cupertino’s
Web site (five days prior to hearing)
No comments have been received at the time of production of this staff report.
Permit Streamlining Act
This project is subject to the Permit Streamlining Act (Government Code Section 65920 –
65964). The City has complied with the deadlines found in the Permit Streamlining Act.
Project Received: January 19, 2021; Deemed Incomplete: February 18, 2021
Revisions Received: April 29, 2021; Deemed Complete: May 27, 2021
The City has 60 days from when the project is deemed categorically exempt to decide on
the project.
Conclusion
The scope of work does not include any changes to existing uses, required parking supply
or demand, floor area, lot coverage, or building height for the subject site and will not
result in an increased intensity of the existing use. Staff therefore recommends approval
of the Architectural and Site Approval Permit as the proposed project will not create
adverse impacts to the surrounding area. Additionally, all the findings for approval of
the proposed project, consistent with Chapter 19.168 of the Cupertino Municipal Code,
may be made as reflected in the draft resolutions.
With respect to the Architectural and Site Approval Permit, the following findings may
be made:
AH 7-22-2021
15 of 50
ASA-2020-007 20563 Stevens Creek Blvd July 22, 2021
Page 8
1. The proposal, at the proposed location, will not be detrimental or injurious to property
or improvements in the vicinity, and will not be detrimental to the public he alth,
safety, general welfare, or convenience;
The proposed project includes exterior building façade, landscape, and site modifications to an
existing commercial office building occupied by Bank of America that would improve the
design of the site and upgrade building materials. The exterior façade enhancements
incorporate a fresh coat of paint to the stucco, accent paint to the window trim, a new metal
seamed roof, and metal clad design at the main entrance. The landscaping on the south and
west elevations of the building would be improved with new drought-tolerant plantings that
frame the building entrances. Additional site improvements include a new waste collection
area with garbage, recycling, and organics bins and curb to provide separation from the
parking lot, restriping of parking stalls, and adding a pedestrian pathway to better delineate
pedestrian access. Staff has also conditioned the project to remove the prohibited flood lighting,
unless required by State law, and submit a lighting plan to be reviewed and approved by the
Planning Division prior to building permit issuance to reduce the spill-over of light to
adjoining property owners. There are no changes to the existing building square footage,
height, location, or intensity of use on the site. The exterior building façade, landscape, and
site modifications will not be detrimental or injurious to property or improvements in the
vicinity, and will not be detrimental to the public health, safety, general welfare, or
convenience.
2. The proposal is consistent with the purposes of Chapter 19.168, the General Plan, any
specific plan, zoning ordinances, applicable planned development permit, conditional
use permits, variances, subdivision maps or other entitlements to use which regulate
the subject property including, but not limited to, adherence to the following specific
criteria:
a) Abrupt changes in building scale should be avoided. A gradual transition related
to height and bulk should be achieved between new and existing buildings.
The project scope includes exterior façade modifications that do not increase floor area, lot
coverage, or height of the existing building on the project site. The proposed exterior façade
modifications include new paint on existing stucco walls, a new standing seam metal roof,
adding four additional windows, and a metal cladding design at the main entrance. The
south and west elevations also include new landscaping along the building façade to break
up massing of the building and provide visual interest of the site. The building design
would be an improvement to the shopping center and would not be modified in height or
bulk compared to existing buildings within the vicinity. Therefore, there will be no abrupt
changes in building scale related to height and bulk and no new buildings are being
proposed.
AH 7-22-2021
16 of 50
ASA-2020-007 20563 Stevens Creek Blvd July 22, 2021
Page 9
b) In order to preserve design harmony between new and existing buildings and in
order to preserve and enhance property values, the materials, textures and colors
of new building should harmonize with adjacent development by being consistent
or compatible with design and color schemes with the future character of the
neighborhoods and purposes of the zone in which they are situated. The location,
height and materials of walls, fencing, hedges and screen planting should
harmonize with adjacent development. Unsightly storage areas, utility
installations and unsightly elements of parking lots should be concealed. The
planting of ground cover or various types of pavements should be used to prevent
dust and erosion, and the unnecessary destruction of existing healthy trees should
be avoided. Lighting for development should be adequate to meet safety
requirements as specified by the engineering and building departments and
provide shielding to prevent spill-over light to adjoining property owners.
The exterior and landscape modifications are harmonious with the existing building form
and are compatible with the proposed design upgrades of the adjacent buildings within the
area. The neutral color palette of the design would be compatible with the existing office
buildings at the rear and suitable for the location. The project site is located in a developed
area with various commercial and office uses that consist of similar materials and colors
as the proposed project. The proposed project does not include tree removal and staff has
conditioned the project to maintain the trees on-site as protected development trees.
Additionally, the proposed landscape improvements would provide visual interest to the
main entrance of the building. Staff has also conditioned the project to remove the
unpermitted, prohibited flood lighting, unless required by State law, and submit a lighting
plan to be reviewed and approved by the Planning Division prior to building permit
issuance to reduce the spill-over of light to adjoining property owners. Furthermore, the
project includes restriping parking stalls and adding a decorative pedestrian pathway
which would increase pedestrian access and would complement the new building design
for the site.
c) The number, location, color, size, height, lighting and landscaping of outdoor
advertising signs and structures have been designed to minimize traffic hazard,
positively affect the general appearance of the neighborhood and harmonize with
adjacent development.
No signs are proposed as part of this project. Proposed signage would be reviewed and
approved to the satisfaction of the Community Development Department upon submittal
for Building Permits.
d) With respect to new projects within existing residential neighborhoods, new
development should be designed to protect residents from noise, traffic, light and
AH 7-22-2021
17 of 50
ASA-2020-007 20563 Stevens Creek Blvd July 22, 2021
Page 10
visually intrusive effects by use of buffering, setbacks, landscaping, walls and
other appropriate design measures.
This application is not a new development project.
Next Steps
The permit will become effective 14 calendar days from the date of the hearing. The
decision of the Administrative Hearing Officer is final, unless appealed within 14
calendar days from the date of the hearing. The applicant team may apply for building
and/or other permits with the City at the end of the appeal period (August 5, 2021, at
5:00pm).
This approval is valid until July 22, 2023. The applicant team may apply for a one-time
two-year extension before the approval expires.
Prepared by: Brianne Reyes, Associate Planner
Erika Poveda, Associate Planner
Reviewed and Approved for submission by: Piu Ghosh, Planning Manager
ATTACHMENTS
1. Draft Resolution for ASA-2020-007
2. Plan Set
AH 7-22-2021
18 of 50
ASA-2020-007
CITY OF CUPERTINO
10300 Torre Avenue
Cupertino, California 95014
RESOLUTION NO.
OF THE ADMINISTRATIVE HEARING OFFICER OF THE CITY OF
CUPERTINO APPROVING AN ARCHITECTURAL AND SITE PERMIT
TO ALLOW FACADE AND LANDSCAPE MODIFICATIONS AT AN
EXISTING BANK OF AMERICA
LOCATED AT 20563 STEVENS CREEK BLVD
SECTION I: PROJECT DESCRIPTION
Application No.: ASA-2020-007
Applicant: Melissa Lee (Gensler Architecture Firm)
Location: 20563 Stevens Creek Blvd (APN 326-34-044)
SECTION II: FINDINGS
WHEREAS, the City of Cupertino received an application for an Architectural and Site
Approval (minor) to consider allowing façade and landscape modifications at an existing
bank (Bank of America) located in a Planned Development Zoning District (Crossroads
Area of Heart of the City Specific Plan), as described in Section I. of this Resolution; and
WHEREAS, the necessary public notices have been given as required by the Procedural
Ordinance of the City of Cupertino, and the Administrative Hearing Officer has held at
least one public meeting with regard to the application; and
WHEREAS, pursuant to the provisions of the California Environmental Quality Act of
1970 (Public Resources Code section 21000 et seq.) (“CEQA”), together with the State
CEQA Guidelines (California Code of Regulations, Title 14, Section 15000 et seq.)
(hereinafter, "CEQA Guidelines"), the City staff has independently studied the proposed
Project and has determined that the Project is exempt from environmental review
pursuant to the categorical exemption in CEQA Guidelines section 15301 for the reasons
set forth in the staff report dated July 22, 2021 and incorporated herein; and
WHEREAS, the applicant has met the burden of proof required to support said
application; and
WHEREAS, the Administrative Hearing Officer finds as follows with regard to this
application:
AH 7-22-2021
19 of 50
Resolution No. ASA-2020-007 July 22, 2021
Page 2
1. The proposal, at the proposed location, will not be detrimental or injurious to property
or improvements in the vicinity, and will not be detrimental to the public health,
safety, general welfare, or convenience;
The proposed project includes exterior building façade, landscape, and site modifications to an
existing commercial office building occupied by Bank of America that would improve the
design of the site and upgrade building materials. The exterior façade enhancements
incorporate a fresh coat of paint to the stucco, accent paint to the window trim, a new metal
seamed roof, and metal clad design at the main entrance. The landscaping on the south and
west elevations of the building would be improved with new drought-tolerant plantings that
frame the building entrances. Additional site improvements include a new waste collection
area with garbage, recycling, and organics bins and curb to provide separation from the
parking lot, restriping of parking stalls, and adding a pedestrian pathway to better delineate
pedestrian access. Staff has also conditioned the project to remove the prohibited flood lighting,
unless required by State law, and submit a lighting plan to be reviewed and approved by the
Planning Division prior to building permit issuance to reduce the spill-over of light to
adjoining property owners. There are no changes to the existing building square footage,
height, location, or intensity of use on the site. The exterior building façade, landscape, and
site modifications will not be detrimental or injurious to property or improvements in the
vicinity, and will not be detrimental to the public health, safety, general welfare, or
convenience.
2. The proposal is consistent with the purposes of Chapter 19.168, the General Plan any
specific plan, zoning ordinances, applicable planned development permit, conditional
use permits, variances, subdivision maps or other entitlements to use which regulate
the subject property including, but not limited to, adherence to the following specific
criteria:
a) Abrupt changes in building scale should be avoided. A gradual transition related
to height and bulk should be achieved between new and existing buildings.
The project scope includes exterior façade modifications that do not increase floor area, lot
coverage, or height of the existing building on the project site. The proposed exterior façade
modifications include new paint on existing stucco walls, a new standing seam metal roof,
adding four additional windows, and a metal cladding design at the main entrance. The
south and west elevations also include new landscaping along the building façade to break
up massing of the building and provide visual interest of the site. The building design
would be an improvement to the shopping center and would not be modified in height or
bulk compared to existing buildings within the vicinity. Therefore, there will be no abrupt
changes in building scale related to height and bulk and no new buildings are being
proposed.
AH 7-22-2021
20 of 50
Resolution No. ASA-2020-007 July 22, 2021
Page 3
b) In order to preserve design harmony between new and existing buildings and in
order to preserve and enhance property values, the materials, textures and colors
of new building should harmonize with adjacent development by being consistent
or compatible with design and color schemes with the future character of the
neighborhoods and purposes of the zone in which they are situated. The location,
height and materials of walls, fencing, hedges and screen planting should
harmonize with adjacent development. Unsightly storage areas, utility
installations and unsightly elements of parking lots should be concealed. The
planting of ground cover or various types of pavements should be used to prevent
dust and erosion, and the unnecessary destruction of existing healthy trees should
be avoided. Lighting for development should be adequate to meet safety
requirements as specified by the engineering and building departments and
provide shielding to prevent spill-over light to adjoining property owners.
The exterior and landscape modifications are harmonious with the existing building form
and are compatible with the proposed design upgrades of the adjacent buildings within the
area. The neutral color palette of the design would be compatible with the existing office
buildings at the rear and suitable for the location. The project site is located in a developed
area with various commercial and office uses that consist of similar materials and colors
as the proposed project. The proposed project does not include tree removal and staff has
conditioned the project to maintain the trees on-site as protected development trees.
Additionally, the proposed landscape improvements would provide visual interest to the
main entrance of the building. Staff has also conditioned the project to remove the
unpermitted, prohibited flood lighting, unless required by State law, and submit a lighting
plan to be reviewed and approved by the Planning Division prior to building permit
issuance to reduce the spill-over of light to adjoining property owners. Furthermore, the
project includes restriping parking stalls and adding a decorative pedestrian pathway
which would increase pedestrian access and would complement the new building design
for the site.
c) The number, location, color, size, height, lighting and landscaping of outdoor
advertising signs and structures have been designed to minimize traffic hazard,
positively affect the general appearance of the neighborhood and harmonize with
adjacent development.
No signs are proposed as part of this project. Proposed signage would be reviewed and
approved to the satisfaction of the Community Development Department upon submittal
for Building Permits.
d) With respect to new projects within existing residential neighborhoods, new
development should be designed to protect residents from noise, traffic, light and
AH 7-22-2021
21 of 50
Resolution No. ASA-2020-007 July 22, 2021
Page 4
visually intrusive effects by use of buffering, setbacks, landscaping, walls and
other appropriate design measures.
This application is not a new development project.
NOW, THEREFORE, BE IT RESOLVED:
That after careful consideration of the maps, facts, exhibits, testimony, staff’s report and
presentation, and other evidence submitted in this matter, subject to the conditions which
are enumerated in this Resolution beginning on PAGE 4 thereof,
The application for an Architectural and Site Approval, Application No. ASA-2020-007 is
hereby approved and that the sub conclusions upon which the findings and conditions
specified in this resolution are based and contained in the Public Meeting record
concerning Application No. ASA-2020-007 as set forth in the Minutes of the
Administrative Hearing Meeting of July 22, 2021 and are incorporated by reference as
though fully set forth herein.
SECTION III: CONDITIONS ADMINISTERED BY THE COMMUNITY DEVELOPMENT
DEPARTMENT
1. APPROVED EXHIBITS
Approval is based on the plan set drawn by Gensler, titled “Bank of America”
consisting of 19 sheets labeled A0.00, A0.01, A0.01a, A0.02, A0.02a, A0.03, A0.04,
A4.00, A4.01, A4.02, A9.00, A9.01, A9.02, A9.03, A9.20, A9.21, A9.30, L1.0, and L1.1,
except as may be amended by conditions in this resolution.
2. ACCURACY OF PROJECT PLANS
The applicant/property owner is responsible to verify all pertinent property data
including but not limited to property boundary locations, building setbacks,
property size, building square footage, any relevant easements and/or
construction records. Any misrepresentation of any property data may invalidate
this approval and may require additional review.
3. ANNOTATION OF THE CONDITIONS OF APPROVAL
The conditions of approval set forth shall be incorporated into and annotated on
the first page of the building plans.
4. BUILDING AND FIRE CODE
The applicant shall apply for and obtain building permits to allow the construction
of the approved project. The applicant shall provide information and plans to
allow the Building Official and the Fire Marshall, or their designee, to determine
AH 7-22-2021
22 of 50
Resolution No. ASA-2020-007 July 22, 2021
Page 5
that the proposed plans comply with Building and Fire Codes in effect at the time
of application for a building permit.
5. CONSULTATION WITH OTHER DEPARTMENTS
The applicant is responsible to consult with other departments and/or agencies
with regard to the proposed project for additional conditions and requirements.
Any misrepresentation of any submitted data may invalidate an approval by the
Community Development Department.
6. DEMOLITION REQUIREMENTS
All demolished building and site materials shall be recycled to the maximum
extent feasible subject to the Building Official. The applicant shall provide
evidence that materials were recycled prior to occupancy.
7. DUST CONTROL
The following construction practices shall be implemented during all phases of
construction for the proposed project to prevent visible dust emissions from
leaving the site:
a. Water all exposed surfaces areas (e.g., parking areas, staging areas, soil piles,
graded areas, and unpaved access roads) at least twice daily and more often
during windy periods to prevent visible dust from leaving the site; active areas
adjacent to windy periods; active areas adjacent to existing land uses shall be
kept damp at all times, or shall be treated with non-toxic stabilizers or dust
palliatives.
b. All haul trucks transporting soil, sand, or other loose material off-site shall be
covered.
c. All visible mud or dirt track-out onto adjacent public roads shall be removed
using wet power vacuum street sweepers at least once per day. The use of dry
power sweeping is prohibited.
d. All vehicle speeds on unpaved roads shall be limited to 15 mph.
e. All roadways, driveways, and sidewalks to be paved shall be completed as
soon as possible. Building pads shall be laid as soon as possible after grading
unless seeding or soil binders are used.
f. Idling times shall be minimized either by shutting equipment off when not in
use or reducing the maximum idling time to 5 minutes (as required by the
California airborne toxics control measure Title 13, Section 2485 of California
Code of Regulations [CCR]). Clear signage shall be provided for construction
workers at all access points.
g. All construction equipment shall be maintained and properly tuned in
accordance with manufacturer’s specifications. All equipment shall be checked
AH 7-22-2021
23 of 50
Resolution No. ASA-2020-007 July 22, 2021
Page 6
by a certified mechanic and determined to be running in proper condition prior
to operation.
h. Post a publicly visible sign with the telephone number and person to contact
at the Lead Agency regarding dust complaints. This person shall respond and
take corrective action within 48 hours. The Air District’s phone number shall
also be visible to ensure compliance with applicable regulations.
The applicant shall incorporate the City’s construction best management practices
into the building permit plan set prior to any grading, excavation, foundation or
building permit issuance.
8. EXTERIOR BUILDING MATERIALS/TREATMENTS
The final building exterior plan shall closely resemble the details shown on the
original approved plans. Final building exterior treatment plan (including but not
limited to details on exterior color, materials, architectural treatments, doors,
windows, lighting fixtures, and/or embellishments) shall be reviewed and
approved by the Director of Community Development prior to issuance of
building permits to ensure quality and consistency. Any exterior changes
determined to be substantial by the Director of Community Development shall
either require a modification to this permit or a new permit based on the extent of
the change.
9. PEDESTRIAN PATHWAY MATERIAL MODIFICATION
The applicant/property owner shall propose an alternative color and/or material(s)
for the proposed paved pedestrian pathway from the public right-of-way to the
building to comply with the Heart of the City Specific Plan Sections 1.01.040(A)(1)
and 2.01.040(A). Paving materials for pedestrian pathways recommended per the
Heart of the City Specific Plan include stone, such as slate or granite, brick pavers,
concrete unit pavers, or poured-in-place concrete with any of the following
treatments: integral pigment color, special aggregate, special scoring pattern,
ornamental insets (e.g., tile), or a stamped pattern. All concrete walks should be
tinted to reduce glare. The Building Permit construction drawings shall indicate
the revisions on the site plan and materials sheet. The pedestrian pathway
modification shall be reviewed and approved to the satisfaction of the Planning
Division to verify that the intent of a required decorative pathway is met pursuant
to the Heart of the City Specific Plan, prior to issuance of Building Permits.
10. DARK SKY COMPLIANCE
Prior to issuance of Building Permits, the applicant/property owner shall submit
final plans in compliance with the approved lighting plans to comply with
AH 7-22-2021
24 of 50
Resolution No. ASA-2020-007 July 22, 2021
Page 7
development standards of Cupertino Municipal Code Section 19.102.040 Outdoor
Lighting Requirements. In the event changes are proposed from the approved
plans, said changes must be reviewed and approved by the Director of
Community Development or their designee. The applicant shall provide all
documentation required to determine compliance with the Municipal Code.
11. LIGHT FIXTURE REMOVAL
Prior to issuance of Building Permits, the applicant/property owner shall submit
construction drawings indicating the removal of the existing flood lights installed
on the existing building to comply with Cupertino Municipal Code Section
19.102.040 Outdoor Lighting Requirements, unless explicitly required by State
law. The proposed lighting replacement shall be reviewed and approved to the
satisfaction of the Planning Division prior to issuance of Building Permits.
12. PARKING STALL DIMENSIONS
The applicant/property owner shall indicate parking stall dimensions on the
building permit plan set that comply with the Cupertino’s Public Work’s
Department standards, which shall be reviewed and approved to the satisfaction
of the Planning Division, prior to issuance of Building Permits.
13. BICYCLE PARKING
Prior to issuance of Building Permits, the applicant/property owner shall indicate
the required Class I Facility parking spaces on the building permit set in
accordance with the City’s Parking Regulations under Chapter 19.124 of the
Cupertino Municipal Code.
14. DRIVEWAYS AND MOBILITY
The property owner shall not propose development (e.g., walls, traffic barriers, or
obstructions) along the shared property lines of the existing curb cuts that would
obstruct driveway or curb cut access to vehicles or pedestrians accessing the
subject parcel without further review and approval to the satisfaction of the
Community Development Director.
15. GRADING AND CONSTRUCTION HOURS AND NOISE LIMITS
a. All grading activities shall be limited to the dry season (April 15 to October 1),
unless permitted otherwise by the Director of Public works.
b. Construction hours and noise limits shall be compliant with a ll requirements
of Chapter 10.48 of the Cupertino Municipal Code.
c. Grading, street construction, underground utility and demolition hours for
work done more than 750 feet away from residential areas shall be limited to
Monday through Friday, 7 a.m. to 8 p.m. and Saturday and Sunday, 9 a.m. to
AH 7-22-2021
25 of 50
Resolution No. ASA-2020-007 July 22, 2021
Page 8
6 p.m. Grading, street construction, demolition or underground utility work
within 750 feet of residential areas shall not occur on Saturdays, Sundays,
holidays, and during the nighttime period as defined in Section 10.48.053(b) of
the Municipal Code.
d. Construction activities shall be limited to Monday through Friday, 7 a.m. to 8
p.m. and Saturday and Sunday, 9 a.m. to 6 p.m. Construction activities are not
allowed on holidays as defined in Chapter 10.48 of the Municipal Code. Night
time construction is allowed if compliant with nighttime standards of Section
10.48 of the Cupertino Municipal Code.
e. Rules and regulations pertaining to all construction activities and limitations
identified in this permit, along with the name and telephone number of an
applicant appointed disturbance coordinator, shall be posted in a prominent
location at the entrance to the job site.
f. The applicant shall be responsible for educating all contractors and
subcontractors of said construction restrictions.
The applicant shall comply with the above grading and construction hours and
noise limit requirements unless otherwise indicated.
16. NESTING BIRDS
Nests of raptors and other birds shall be protected when in active use, as required
by the federal Migratory Bird Treaty Act and the California Department of Fish
and Game Code.
a. Construction and tree removal/pruning activities shall be scheduled to avoid
the nesting season to the extent feasible. If feasible, tree removal and/or
pruning shall be completed before the start of the nesting season to help
preclude nesting. The nesting season for most birds and raptors in the San
Francisco Bay area extends from February 1 through August 31.
Preconstruction surveys (described below) are not required for tree removal or
construction activities outside the nesting period.
b. If construction activities and any required tree removal occur during the
nesting season (February 1 and August 31), a qualified ornithologist shall be
required to conduct surveys prior to tree removal or construction activities.
Preconstruction surveys shall be conducted no more than 14 days prior to the
start of tree removal, pruning or construction. Preconstruction surveys shall be
repeated at 14-day intervals until construction has been initiated in the area
after which surveys can be stopped. During this survey, the ornithologist shall
inspect all trees and other possible nesting habitats in and immediately
adjacent to the construction areas for nests.
AH 7-22-2021
26 of 50
Resolution No. ASA-2020-007 July 22, 2021
Page 9
c. If the survey does not identify any nesting birds that would be affected by
construction activities, no further mitigation is required. If an active nest
containing viable eggs or young birds is found sufficiently close to work areas
to be disturbed by these activities, their locations shall be documented and
protective measures implemented under the direction of the qualified
ornithologist until the nests no longer contain eggs or young birds.
d. Protective measures shall include establishment of clearly delineated exclusion
zones (i.e. demarcated by identifiable fencing, such as orange construction
fencing or equivalent) around each nest location as determined by the qualified
ornithologist, taking into account the species of birds nesting, their tolerance
for disturbance and proximity to existing development. In general, exclusion
zones shall be a minimum of 300 feet for raptors and 75 feet for passerines and
other birds. The active nest within an exclusion zone shall be monitored on a
weekly basis throughout the nesting season to identify signs of disturbance and
confirm nesting status. The radius of an exclusion zone may be increased by
the qualified biologist, if project activities are determined to be adversely
affecting the nesting birds. Exclusion zones may be reduced by the qualified
biologist only in consultation with California Department of Fish and Wildlife.
The protection measures and buffers shall remain in effect until the young have
left the nest and are foraging independently or the nest is no longer active.
e. A final report on nesting birds and raptors, including survey methodology,
survey date(s), map of identified active nests (if any), and protection measures
(if required), shall be submitted to the Planning Manager, through the building
permit review process, and be completed to the satisfaction of the Community
Development Director prior to the start of grading.
17. SIGNAGE
Signage is not approved with this application. Signage shall conform to the City
Sign Code.
18. LANDSCAPE PROJECT SUBMITTAL
Prior to issuance of building permits, the applicant shall submit a full Landscape
Documentation Package, per sections 14.15.050 A, B, C, and D of the Landscape
Ordinance, for projects with landscape area 500 square feet or more or elect to
submit a Prescriptive Compliance Application per sections 14.15.040 A, B, and C
for projects with landscape area between 500 square feet and 2,500 square feet.
The Landscape Documentation Package or Prescriptive Co mpliance Application
shall be reviewed and approved to the satisfaction of the Director of Community
Development prior to issuance of building permits, and additional requirements
AH 7-22-2021
27 of 50
Resolution No. ASA-2020-007 July 22, 2021
Page 10
per sections 14.15.040 D, E, F, and G or 14.15.050 E, F, G, H, and I will be required
to be reviewed and approved prior to final inspections.
19. PLANTING PLAN MODIFICATIONS (SOUTH SIDE)
Prior to issuance of Building Permits, the applicant/property owner shall submit a
revised landscape and planting plan that incorporates a variety of shrub types that
grow at different heights and/or various color profiles to be installed along the
main entrance to the building along the south elevation.
20. EXISTING TREES RETAINED ON-SITE
Prior to issuance of Building Permits, the applicant/property owner shall submit a
landscape and site plan that verifies the existing trees per the approved Building
Permit (Permit No. 11060151) are maintained. The protected development trees
shall be retained on-site.
21. TREE AND LANDSCAPE MAINTENANCE
The property owner shall be responsible for ensuring that the existing trees and
newly planted trees are properly maintained including but not limited to ensuring
that there is adequate soil drainage, that the soil is well -aerated, and irrigation
systems are thoroughly tested to provide sufficient water to landscaped areas
while reducing water waste.
22. TREE PROTECTION
As part of the demolition or building permit drawings, a tree protection plan shall
be prepared by a certified arborist for the trees to be retained. In addition, the
following measures shall be added to the protection plan:
For trees to be retained, chain link fencing and other root protection shall be
installed around the dripline of the tree prior to any project site work.
No parking or vehicle traffic shall be allowed under root zones, unless using
buffers approved by the Project Arborist.
No trenching within the critical root zone area is allowed. If trenching is
needed in the vicinity of trees to be retained, the City’s consulting arborist shall
be consulted before any trenching or root cutting beneath the dripline of the
tree.
Wood chip mulch shall be evenly spread inside the tree projection fence to a
four-inch depth.
Tree protection conditions shall be posted on the tree protection barriers.
Retained trees shall be watered to maintain them in good health.
A covenant on the property shall be recorded that identifies all the protected
trees, prior to final occupancy.
AH 7-22-2021
28 of 50
Resolution No. ASA-2020-007 July 22, 2021
Page 11
The tree protection measures shall be inspected and approved by the certified
arborist prior to issuance of building permits. The City’s consulting arborist shall
inspect the trees to be retained and shall provide reviews prior to issuance of
demolition, grading or building permits. A report ascertaining the good health of
the trees mentioned above shall be provided prior to issuance of final occupancy.
23. INDEMNIFICATION
As part of the application, to the fullest extent permitted by law, the applicant shall
agree to indemnify, defend with the attorneys of the City’s choice, and hold
harmless the City, its City Council, and its officers, employees, and agents
(collectively, the “indemnified parties”) from and against any liability, claim,
action, cause of action, suit, damages, judgment, lien, levy, or proceeding
(collectively referred to as “proceeding”) brought by a third party against one or
more of the indemnified parties or one or more of the indemnified parties and the
applicant related to any Ordinance, Resolution, or action approving the project,
the related entitlements, environmental review documents, finding or
determinations, or any other permit or approval authorized for the project. The
indemnification shall include but not be limited to damages, fees, and costs
awarded against the City, if any, and cost of suit, attorneys’ fees, and other costs,
liabilities, and expenses incurred in connection with such proceeding whether
incurred by the Applicant, the City, or the parties initiating or bringing such
proceeding.
The applicant shall agree to (without limitation) reimburse the City its actual
attorneys’ fees and costs incurred in defense of the litigation. Such attorneys’ fees
and costs shall include amounts paid to the City’s outside counsel and shall
include City Attorney time and overhead costs and other City staff overhead costs
and any costs directly related to the litigation reasonably incurred by City. The
applicant shall likewise agree to indemnify, defend, and hold harmless the
indemnified parties from and against any damages, attorneys’ fees, or costs
awards, including attorneys’ fees awarded under Code of Civil Procedure section
1021.5, assessed or awarded against the indemnified parties. The Applicant shall
cooperate with the City to enter a Reimbursement Agreement to govern any such
reimbursement.
The Applicant shall agree to (without limitation) reimburse the City for all costs
incurred in additional investigation or study of, or for supplementing, redrafting,
revising, or amending, any document (such as an Environmental Impact Report,
negative declaration, specific plan, or general plan amendment) if made necessary
AH 7-22-2021
29 of 50
Resolution No. ASA-2020-007 July 22, 2021
Page 12
by proceedings challenging the project approvals and related environmental
review, if the applicant desires to continue to pursue the project.
The Applicant shall agree that the City shall have no liability to the Applic ant for
business interruption, punitive, speculative, or consequential damages.
24. NOTICE OF FEES, DEDICATIONS, RESERVATIONS, OR OTHER EXACTIONS
The Conditions of Project Approval set forth herein may include certain fees,
dedication requirements, reservation requirements, and other exactions.
SECTION IV: CONDITIONS ADMINISTERED BY THE PUBLIC WORKS
DEPARTMENT
25. STREET IMPROVEMENTS
Street improvements along the project will be required to the satisfaction of the
Director of Public Works. Street improvements shall include the removal of
concrete panels in the park strip along Stevens Creek Blvd. All improvements
must be completed and accepted by the City prior to Building Final Occupancy or
Street Improvement Encroachment Permit acceptance whichever comes first.
Additional comments will be provided and shall be incorporated prior to Building
Permit approval.
26. DRAINAGE
Drainage shall be provided to the satisfaction of the Director of Public Works.
Hydrology and pre- and post-development hydraulic calculations must be
provided to indicate whether additional storm water control measures are to be
constructed or renovated. The storm drain system may include, but is not limited
to, subsurface storage of peak stormwater flows (as needed), bioretention basins,
vegetated swales, and hydrodynamic separators to reduce the amount of runoff
from the site and improve water quality. Any storm water overflows or surface
sheeting should be directed away from neighboring private properties and to the
public right of way as much as reasonably possible.
All storm drain inlets shall be clearly marked with the words “No Dumping –
Flows to Creek” using permanently affixed metal medallions or equivalent, as
approved by the Environmental Programs Division.
SECTION IV: CONDITIONS ADMINISTERED BY THE ENVIRONMENTAL
PROGRAMS DIVISION
AH 7-22-2021
30 of 50
Resolution No. ASA-2020-007 July 22, 2021
Page 13
27. WASTE DIVERSION & SOLID WASTE/RECYCLING MANAGEMENT
Prior to issuance of Building Permits, the project shall be reviewed and approved
by Cupertino’s Environmental Services Division for compliance with all
requirements related to construction and demolition waste diversion and
waste/recycling management of the business operations.
PASSED AND ADOPTED this 22nd day of July 2021 at a noticed Public Meeting of the
Administrative Hearing Officer of the City of Cu pertino, State of California, held by the
Director of Community Development, or his or her designee, pursuant to Cupertino
Municipal Code Section 19.12.120.
ATTEST: APPROVED:
Erika Poveda Albert Salvador
Associate Planner Assistant Director of Community Development
AH 7-22-2021
31 of 50
PLANNING SET
CUPERTINO | CA4-175
04/29/21
SHEET INDEX
A0.00 Cover Sheet
A0.01 Existing Conditions
A0.01a Existing Conditions
A0.02 Design Concept
A0.02a Design Concept
A0.03 Site Plan
A0.04 Site Map
A4.00 Existing Lighting Plan
A4.01 Site Photometrics Plan
A4.02 ATM Photometrics Plan
A9.00 West Elevations
A9.01 South Elevations
A9.02 East Elevations
A9.03 North Elevations
A9.20 Cross Sections
A9.21 Cross Sections
A9.30 Materials and Finishes
L1.0 Landscape Plan
L1.1 Landscape Notes, Plan
Schedule and Materials
PROJECT INFORMATION
Project Address:20563 Stevens Creek Blvd
APN:326-34-044
Zoning:P (CG, Res)
Land Use:Commercial/Office/Residential
Lot Area: 38,950 SF
FAR: gross floor area = (6,605 SF + 1,328 SF)= 7,933 SF = 0.2 (no change)
lot area 38,950 SF 38,950 SF
Lot Coverage: 6,605 SF (no change)
Vehicular Parking:51 stalls provided. See sheet A0.03.
Bicycle Parking: 7 stalls provided. See sheet A0.03.
Scope of Work: Facade upgrades include new paint, replacing existing roof
tiles with new standing seam metal roof, replacing existing stone finish with
new painted stucco, adding new metal panel cladding, and replacing existing
storefront entrances. Upgrade existing landscape at West and South
facades. Restripe existing parking stalls. Provide new bike lockers per
Parking Ordinance and replace existing bike racks. New colored concrete at
pedestrian vehicular crossing, new curb for waste collection area, and
replace existing trash cans.
JLL
Third Party Project Management
Address: 2000 Clayton Road
Concord, CA 94520
Contact: Tom Cox
Email: thomas.cox@am.jll.com
Tel: 415.310.6847
Gensler
Architect
Address: 2101 Webster Street
Ste 2000, Oakland, CA 94612
Contact: Melissa Vai Lee
Email: melissav_lee@gensler.com
Tel: 510.645.1752
CONTACT INFORMATION
Property Owner
Name: John M. Saich and Nichole
L. Saich
Address: 580 California Street
Ste 1200, San Francisco, CA 94104
Contact: Gale Connor
Email: gale.connor@msrlegal.com
Tel: 415.638.4809
Cover Sheet | A0.00
AH 7-22-2021
32 of 50
Bank of America | 04/29/21 | Planning Set | A0.01
CUPERTINO | CA4-175
20563 STEVENS CREEK BLVD
CUPERTINO, CA 95014
Existing Conditions
The existing Bank of America
building has an extremely dark
interior, confusing entrance to
the building and missing tiles on
the roof.
AH 7-22-2021
33 of 50
Bank of America | 04/29/21 | Planning Set | A0.01a
CUPERTINO | CA4-175
20563 STEVENS CREEK BLVD
CUPERTINO, CA 95014
Existing Conditions
AH 7-22-2021
34 of 50
Bank of America | 04/29/21 | Planning Set | A0.02
CUPERTINO | CA4-175
20563 STEVENS CREEK BLVD
CUPERTINO, CA 95014
Design Concept
The proposed exterior renovation will provide a
much needed facade refresh by introducing new
standing seam metal roof that requires less
mantainance and more durability, new color,
material, and landscape to emphasize the two
entrances, and four additional windows to let
more natural light into the building.
The color of the metal roof will match the new
gray at the accent walls that will emphasize
each of the two entrances. The stone veneer at
the West entrance will be replaced with stucco
to match the overall stucco material of the
existing building and new metal panels on the
South facade facing the main street Stevens
Creek Blvd will be added to provide wood
elements at human scale. Both existing
storefronts will be replaced with bank standard
aluminum frame and power assisted doors.
The new windows will match the existing
window bays at the North facade and will
provide natural lighting to the existing offices as
well as the central lobby areas through the
office's existing glass front wall systems.
AH 7-22-2021
35 of 50
Bank of America | 04/29/21 | Planning Set | A0.02a
CUPERTINO | CA4-175
20563 STEVENS CREEK BLVD
CUPERTINO, CA 95014
Design Concept
AH 7-22-2021
36 of 50
S T E V E N S C R E E K B L V D
A9.00 02
A9.01
02
A9.03
02
02
A9.20
________________
2
A9.21
________________
205'
205'190'190'0102
03
04
01 | SITE PLAN
SCALE: 3/64" = 1'-0"
05
05
05 TYP.12"TYP.
3' - 11"
06
06 EXISTING
BANK OF AMERICA
EXISTING SIDEWALK
07
08
09
09
09
09
09
09
10
(E) SETBACK77' - 1"(E) SETBACK
57' - 7"
(E) SETBACK
37' - 3"(E) SETBACK51' - 11"49' - 3"62' - 7"
(E) DRIVE AISLE
21' - 10"TYP.
8
'
-
10"(E) DRIVE AISLE25' - 8"(E) DRIVE AISLE
16' - 9"(TYP.)9' - 6"(T Y P .)8 ' - 9 "(TYP.)20' - 2"9' - 0"
9' - 0"
11' - 3"PSE10' - 0"(TYP.
)20'
-
7"(T Y P .)2 0 ' - 3 "(E) DRIVE AISLE18' - 10"11
A9.022
12
12 12
13
(T
Y
P.)
8' - 9"20' - 0"14
12
a
b
c
a. 2-cy trash (4'x7')
b. 96-gal. recycle (30''x36'')
c. 32-gal. organics (20"x25")7'
-
6"1 4 ' - 1 "Legend
X
X
Sheet where shown
Elevation Number on
Sheet
Direction of Elevation
Existing Property Line
Existing Building
Bank of America | 04/29/21 | Planning Set | A0.03
CUPERTINO | CA4-175
20563 STEVENS CREEK BLVD
CUPERTINO, CA 95014
Site Plan
Vehicular Parking:
7,933 SF/285 SF = 28 stalls required
Existing standard stalls = 50
Existing standard acessible stalls = 1
Existing van accessible stalls = 1
Total existing stalls = 52
Total standard stalls displaced = -1
Total stalls provided = 51
Bicycle Parking:
7,933/1,250 SF = 7 stalls required
(E) Conc. stands to be removed = -3
New steel racks = 3
New class I stalls = 4
Total stalls provided = 7
North
SHEET NOTES
01 EXISTING WINDOWS TO
REMAIN
02 NEW WINDOWS TO
MATCH EXISTING
03 EXISTING CONCRETE
BICYCLE STANDS TO BE
REPLACED WITH NEW
BIKE RACKS
04 NEW DOUBLE CAPACITY
BICYCLE LOCKER
05 EXISTING PLANTING ON
LANDSCAPED AREA TO
BE REMOVED AND
REPLACED WITH NEW
LOW HEDGE PLANTING
06 EXISTING STOREFRONT
TO BE REPLACED WITH
NEW ALUMINUM
STOREFRONT AND
POWER ASSISTED
DOORS
07 EXISTING MONUMENT
SIGN TO BE REPLACED
UNDER SEPARATE
PERMIT
08 REPAIR EXISTING CURB
09 EXISTING PARKING
STALLS TO BE
RESTRIPED AND
EXISTING CURBS TO BE
POWER WASHED AND
PAINTED WHERE
REQUIRED
10 EXISTING PLANTING AND
LANDSCAPED AREA TO
REMAIN
11 PAINT EXISTING DOOR
TO MATCH ADJACENT
WALL
12 EXISTING TRASH CAN TO
BE REPLACED
13 NEW COLORED
CONCRETE PAVING AT
PEDESTRIAN CROSSING.
MATCH EXPT-16
14 NEW 6" CURB FOR
WASTE COLLECTION
AREA
AH 7-22-2021
37 of 50
Bank of America | 04/29/21 | Planning Set | A0.04
CUPERTINO | CA4-175
20563 STEVENS CREEK BLVD
CUPERTINO, CA 95014
Site Map
AH 7-22-2021
38 of 50
Bank of America | 04/29/21 | Planning Set | A4.00
CUPERTINO | CA4-175
20563 STEVENS CREEK BLVD
CUPERTINO, CA 95014
Existing Lighting Plan
AH 7-22-2021
39 of 50
Bank of America | 04/29/21 | Planning Set | A4.01
CUPERTINO | CA4-175
20563 STEVENS CREEK BLVD
CUPERTINO, CA 95014
Site Photometrics Plan
AH 7-22-2021
40 of 50
Bank of America | 04/29/21 | Planning Set | A4.02
CUPERTINO | CA4-175
20563 STEVENS CREEK BLVD
CUPERTINO, CA 95014
ATM Photometrics Plan
Bank of America | 04/29/21 | Planning Set | A4.02
CUPERTINO | CA4-175
20563 STEVENS CREEK BLVD
CUPERTINO, CA 95014
ATM Photometrics Plan
NOTE:
1. READINGS ARE MEASURED AT 36" ABOVE GRADE.
AH 7-22-2021
41 of 50
01 | EXISTING WEST ELEVATION
SCALE: 3/32" = 1'-0"
02
01
04EL. 0' - 0"
EL. 20' - 7"
03
04
05
13
02 | PROPOSED WEST ELEVATION
SCALE: 3/32" = 1'-0"
07
06
11
EXPT-16
EXPT-15
EXPT-15 TYP.
EL. 0' - 0"
EL. 20' - 7"
EXPT-16
08
12 TYP.
09
10
EXPT-15
EXPT-15
14
Bank of America | 04/29/21 | Planning Set | A9.00
CUPERTINO | CA4-175
20563 STEVENS CREEK BLVD
CUPERTINO, CA 95014
West Elevations
SHEET NOTES
GENERAL NOTES
SEE SHEET A9.30 FOR MATERIAL & FINISH DETAILS
01 EXISTING ROOF TILES TO BE REMOVED
02 EXISTING STONE FINISH TO BE REMOVED
03 EXISTING ALUMINUM/GLASS
STOREFRONT TO BE REMOVED
04 EXISTING LANDSCAPE PLANTING TO BE
REMOVED
05 EXISTING NIGHT DEPOSITORY TO REMAIN
06 NEW STANDING SEAM METAL ROOF
07 NEW STUCCO FINISH AND PAINT
08 EXISTING STUCCO WALL TO RECEIVE
NEW PAINT, TYP.
09 EXISTING PARAPET METAL FLASHING CAP
TO RECEIVE NEW PAINT, TYP.
10 EXISTING WOOD FASCIA TO RECEIVE
NEW PAINT
11 NEW LOW LANDSCAPE HEDGES
12 NEW ALUMINUM/GLASS STOREFRONT
WITH POWER ASSISTED DOORS
13 EXITING CONCRETE BIKE STANDS TO BE
REMOVED
14 NEW GALVANIZED STEEL BIKE RACKS
AH 7-22-2021
42 of 50
01 | EXISTING SOUTH ELEVATION
SCALE: 3/32" = 1'-0"
EL. 0' - 0"
EL. 20' - 7"
04 03
05
01
02
02 | PROPOSED SOUTH ELEVATION
SCALE: 3/32" = 1'-0"
EL. 0' - 0"
EL. 20' - 7"
06
08 08
09 EXPT-15
EXPT-16
09
EXPT-16
09
EPS-5 EPS-5
EXPT-15 TYP.
EXPT-16
0712
11
10 EXPT-15
EXPT-15
13
Bank of America | 04/29/21 | Planning Set | A9.01
CUPERTINO | CA4-175
20563 STEVENS CREEK BLVD
CUPERTINO, CA 95014
South Elevations SHEET NOTES GENERAL NOTES
SEE PAGE A9.30 FOR MATERIAL & FINISH DETAILS08 NEW METAL PANEL CLADDING
09 EXISTING STUCCO WALL TO RECEIVE NEW
PAINT, TYP.
10 EXISTING PARAPET METAL FLASHING CAP TO
RECEIVE NEW PAINT, TYP.
11 EXISTING WOOD FASCIA TO RECEIVE NEW PAINT
12 NEW LOW LANDSCAPE HEDGES
13 NEW BUILDING SIGNAGE UNDER SEPARATE
PERMIT
01 EXISTING BUILDING SIGNAGE TO BE REMOVED.
EXISTING WALL TO BE PATCHED AND REPAIRED
TO RECEIVE NEW PAINT
02 EXISTING ROOF TILES TO BE REMOVED
03 EXISTING ALUMINUM/GLASS STOREFRONT TO BE
REMOVED
04 EXISTING LANDSCAPE SHRUBS TO BE REMOVED
05 EXISTING ATMS TO REMAIN
06 NEW STANDING SEAM METAL ROOF
07 NEW ALUMIN/GLASS STOREFRONT WITH POWER
ASSISTED DOORS
AH 7-22-2021
43 of 50
01 | EXISTING EAST ELEVATION
SCALE: 3/32" = 1'-0"
EL. 0' - 0"
EL. 20' - 7"01
02 | PROPOSED EAST ELEVATION
SCALE: 3/32" = 1'-0"
EXPT-15
EL. 0' - 0"
EL. 20' - 7"
EXPT-15
02
04 05 EXPT-16 03
EXPT-16
Bank of America | 04/29/21 | Planning Set | A9.02
CUPERTINO | CA4-175
20563 STEVENS CREEK BLVD
CUPERTINO, CA 95014
East Elevations
SHEET NOTES
GENERAL NOTES
SEE SHEET A9.30 FOR MATERIAL & FINISH DETAILS
01 EXISTING BUILDING SIGNAGE TO BE REMOVED
AND EXISTING WALL TO BE PATCHED AND
REPAIRED TO RECEIVE NEW PAINT.
02 EXISTING STUCCO WALL TO RECEIVE NEW
PAINT, TYP.
03 EXISTING PARAPET METAL FLASHING CAP TO
RECEIVE NEW PAINT, TYP.
04 NEW BUILDING SIGNAGE TO BE REVIEWED AND
APPROVED UNDER SEPARATE PERMIT
05 EXISTING WOOD TRELLIS TO RECEIVE NEW
PAINT
AH 7-22-2021
44 of 50
01 | EXISTING NORTH ELEVATION
SCALE: 3/32" = 1'-0"
EL. 0' - 0"
EL. 20' - 7"
01 02 02
02 | PROPOSED NORTH ELEVATION
SCALE: 3/32" = 1'-0"
EL. 0' - 0"
EL. 20' - 7"
03 03 EXPT-1504
11"TYP.9' - 3"06
05 EXPT-15
EXPT-1607
Bank of America | 04/29/21 | Planning Set | A9.03
CUPERTINO | CA4-175
20563 STEVENS CREEK BLVD
CUPERTINO, CA 95014
North Elevations SHEET NOTES
01 EXISTING WINDOWS TO REMAIN
02 EXISTING WALL TO BE REMOVED FOR NEW
WINDOW OPENINGS
03 NEW WINDOWS TO MATCH EXISTING
04 EXISTING STUCCO WALL TO RECEIVE NEW
PAINT, TYP.
05 EXISTING PARAPET METAL FLASHING CAP
TO RECEIVE NEW PAINT, TYP.
06 NEW BICYCLE LOCKERS. SEE SHEET A9.30
FOR ADDITIONAL DETAILS
07 WINDOW PROTRUSIONS TO BE PAINTED
EXPT-16, TYP.
GENERAL NOTES
SEE PAGE A9.30 FOR MATERIAL & FINISH DETAILS
AH 7-22-2021
45 of 50
01 | EXISTING SECTION
SCALE: 3/32" = 1'-0"
2ND FLR
EL. 0' - 0"
EL. 11' - 0"
(E) CB
OFFICE 4
(E)
VAULT
(E) VAULT
VESTIBULE
(E) CALLING
CUBES (E)
SEMINAR RM
(E) STORAGE
EL. 20' - 7"
(E) CB
OFFICE 7
(E) CB
OFFICE 6
(E) CL OFFICE(E) CB OFFICE 8
01
02 TYP.
TYP. OF 4 03 03
GROUND FLR
T.O. PARAPET
EL. 0' - 0"
02 | PROPOSED SECTION
SCALE: 3/32" = 1'-0"
EL. 11' - 0"
EL. 20' - 7"
(E) CB
OFFICE 7
(E) CB
OFFICE 6
(E) CL OFFICE
(E) CB
OFFICE 4
(E) CB OFFICE 8
(E)
VAULT
(E) VAULT
VESTIBULE
(E) CALLING
CUBES (E)
SEMINAR RM
(E) STORAGE
2ND FLR
GROUND FLR
T.O. PARAPET
Bank of America | 04/29/21 | Planning Set | A9.20
CUPERTINO | CA4-175
20563 STEVENS CREEK BLVD
CUPERTINO, CA 95014
Cross Sections SHEET NOTES
01 EXISTING WALL TO BE REMOVED FOR
NEW WINDOW OPENINGS
02 EXISTING CEILING TO BE MODIFIED TO
ACCOMODATE NEW WINDOWS
03 EXISTING WINDOWS TO REMAIN
AH 7-22-2021
46 of 50
01 | EXISTING SECTION
SCALE: 3/32" = 1'-0"
EL. 0' - 0"
(E)
VESTIBULE
(E)
CENTRAL
ZONE
(E) CL
OFFICE
01
02
EL. 20' - 7"
02 | PROPOSED SECTION
SCALE: 3/32" = 1'-0"
EL. 0' - 0"
EL. 20' - 7"
(E)
VESTIBULE
(E)
CENTRAL
ZONE
(E) CL
OFFICE
03
04
Bank of America | 04/29/21 | Planning Set | A9.21
CUPERTINO | CA4-175
20563 STEVENS CREEK BLVD
CUPERTINO, CA 95014
Cross Sections SHEET NOTES
01 EXISTING ALUMINUM/GLASS
STOREFRONT TO BE REMOVED
02 EXISTING WALL TO BE REMOVED FOR
NEW WINDOW OPENINGS
03 NEW ALUMINUM/GLASS STOREFRONT
WITH POWER ASSISTED DOORS
04 NEW WINDOW TO MATCH EXISTING
AH 7-22-2021
47 of 50
Bank of America | 04/29/21 | Planning Set | A9.30
CUPERTINO | CA4-175
20563 STEVENS CREEK BLVD
CUPERTINO, CA 95014
Materials and Finishes
EPS-5
MATERIAL: ALUMINUM METAL PANEL
MFR: PURE & FREEFORM - FLUSH
REVEAL SYSTEM
SPEC: ROMA NOCE SN043
SIZE: 12” W
FINISH: SATIN
EXPT-15
MATERIAL: WHITE PAINT
MFR: BENJAMIN MOORE
COLOR: SUPER WHITE OC-152
FINISH : FLAT
EXPT-16
MATERIAL: GRAY PAINT
MFR: BENJAMIN MOORE
COLOR: 1472 LRC:57 SILVER CHAIN
FINISH: FLAT
METAL ROOF
MATERIAL: STANDING SEAM STEEL
PANEL
COLOR: MATCH EXPT-16
STOREFRONT
MATERIAL: ALUMINUM
FINISH: CLEAR ANODIZED ALUMINUM
SIZE: 2" x 4 1/2" FRAMING SYSTEM
GLAZING: 1" CLEAR TEMPERED
INSULATED
BICYCLE LOCKER
MATERIAL: HIGH DENSITY POLYESTER
SMC, POWDER COATED STEEL SIDE
PANELS
MFR: CYCLESAFE ECOPARK SM-M02
FINISH: MATCH EXPT-16
SIZE: 33" x 77 1/2" x 50 1/2"
CAPACITY: 2 BIKES
BICYCLE RACK
MATERIAL: STEEL PIPE
SIZE: 2" DIA.
FINISH: GALVANIZED STEEL
CAPACITY: 2 BIKES
TRASH RECEPTACLE
MATERIAL: POWDER COATED STEEL
MFR: BELSON OUTDOORS, DC-728501
COLOR: BLACK
SIZE: 23-1/4" DIA. x 34" H
PLAN VIEW
AH 7-22-2021
48 of 50
monument sign,
see architectural
drawings
existing vegetation
to remain
trash can , typ, see
architectural drawings
bike rack, typ, see
architectural drawings
bike locker, typ, see
architectural drawings
existing planter, typ
overhang, typ.
existing pavement, typ.
AH 7-22-2021
49 of 50
AH 7-22-2021
50 of 50