Loading...
HomeMy WebLinkAboutAH Packet 07-22-2021CITY OF CUPERTINO ADMINISTRATIVE HEARING AGENDA This will be a teleconference meeting without a physical location Thursday, July 22, 2021 5:00 PM Teleconference Meeting TELECONFERENCE / PUBLIC PARTICIPATION INFORMATION TO HELP STOP THE SPREAD OF COVID-19 In accordance with Governor Newsom’s Executive Order No-29-20, this will be a teleconference meeting without a physical location to help stop the spread of COVID-19. Members of the public wishing comment on an item on the agenda may do so in the following ways: 1) E-mail comments by 4:00 p.m. on Thursday, July 22nd, to the Hearing Officer at planning@cupertino.org. These e-mail comments will be received by the Hearing Officer before the meeting and posted to the City’s website after the meeting. 2) E-mail comments during the times for public comment during the meeting to the Hearing Officer at planning@cupertino.org. The staff liaison will read the emails into the record, and display any attachments on the screen, for up to 3 minutes (subject to the Hearing Officer’s discretion to shorten time for public comments). Members of the public that wish to share a document must email planning@cupertino.org prior to speaking. 3) Teleconferencing Instructions Members of the public may observe the teleconference meeting or provide oral public comments as follows: Oral public comments will be accepted during the teleconference meeting. Comments may be made during “oral communications” for matters not on the agenda, and during the public comment period for each agenda item. Online: To address the Commission, click on the link below to register in advance and access the Page 1 AH 7-22-2021 1 of 50 Administrative Hearing Agenda July 22, 2021 meeting: Please click the link below to join the webinar: https://cityofcupertino.zoom.us/webinar/register/WN_CLsQlGeUQJutQoIq2gt74A Phone Dial 669-900-6833 and enter Webinar ID: 930 1525 1080 (Type * 9 to raise hand to speak) Unregistered participants will be called on by the last four digits of their phone number. Or an H.323/SIP room system: H.323: 162.255.37.11 (US West) 162.255.36.11 (US East) Meeting ID: 930 1525 1080 SIP: 93015251080@zoomcrc.com After registering, you will receive a confirmation email containing information about joining the webinar. Please read the following instructions carefully: 1. You can directly download the teleconference software or connect to the meeting in your internet browser. If you are using your browser, make sure you are using a current and up-to-date browser: Chrome 30+, Firefox 27+, Microsoft Edge 12+, Safari 7+. Certain functionality may be disabled in older browsers, including Internet Explorer. 2. You will be asked to enter an email address and a name, followed by an email with instructions on how to connect to the meeting. Your email address will not be disclosed to the public. If you wish to make an oral public comment but do not wish to provide your name, you may enter “Cupertino Resident” or similar designation. 3. When the Hearing Officer calls for the item on which you wish to speak, click on “raise hand.” Speakers will be notified shortly before they are called to speak. 4. When called, please limit your remarks to the time allotted and the specific agenda topic. In compliance with the Americans with Disabilities Act (ADA), anyone who is planning to attend this teleconference meeting who is visually or hearing impaired or has any disability that needs special assistance should call the City Clerk's Office at 408-777-3223, at least 48 hours in advance of the meeting to arrange for assistance. In addition, upon request, in advance, by a person with a disability, meeting agendas and writings distributed for the meeting that are public records will be made available in the appropriate alternative format. Page 2 AH 7-22-2021 2 of 50 Administrative Hearing Agenda July 22, 2021 ROLL CALL APPROVAL OF MINUTES 1.Subject: Draft Minutes of June 24, 2021 Recommended Action: Approve or modify the Draft Minutes of June 11, 2021 1 - Draft Minutes of June 24, 2021 ORAL COMMUNICATIONS This portion of the meeting is reserved for persons wishing to address the Committee on any matter within the jurisdiction of the Committee and not on the agenda. Speakers are limited to three (3) minutes. In most cases, State law will prohibit the Commission from making any decisions with respect to a matter not on the agenda. WRITTEN COMMUNICATIONS PUBLIC HEARINGS 2.Subject: Architectural and Site Approval Permit to consider façade and landscape alterations to a bank building (Bank of America) located in the Crossroads Area of the Heart of the City Specific Plan Recommended Action: That the Hearing Officer adopt the draft resolutions (Attachment 1) to: 1. Find that the proposed actions are exempt from CEQA; and 2. Approve the Architectural and Site Approval Permit (ASA-2020-007) Staff Report 1 - Draft Resolution for ASA-2020-007 2 - Plan Set OLD BUSINESS NEW BUSINESS ADJOURNMENT In compliance with the Americans with Disabilities Act (ADA), anyone who is planning to attend this teleconference meeting who is visually or hearing impaired or has any disability that needs special assistance should call the City Clerk's Office at 408-777-3223, at least 48 hours in advance of the meeting to arrange for assistance. In addition, upon request, in advance, by a person with a disability, meeting agendas and writings distributed for the meeting that are public records will be made available in the appropriate alternative format. Any writings or documents provided to a majority of the members after publication of the agenda will Page 3 AH 7-22-2021 3 of 50 Administrative Hearing Agenda July 22, 2021 be made available for public inspection. Please contact the City Clerk’s Office in City Hall located at 10300 Torre Avenue during normal business hours. IMPORTANT NOTICE: Please be advised that pursuant to Cupertino Municipal Code 2.08.100 written communications sent to the Cupertino City Council, Commissioners or City staff concerning a matter on the agenda are included as supplemental material to the agendized item. These written communications are accessible to the public through the City’s website and kept in packet archives. You are hereby admonished not to include any personal or private information in written communications to the City that you do not wish to make public; doing so shall constitute a waiver of any privacy rights you may have on the information provided to the City. Members of the public are entitled to address the members concerning any item that is described in the notice or agenda for this meeting, before or during consideration of that item. If you wish to address the members on any other item not on the agenda, you may do so during the public comment. Page 4 AH 7-22-2021 4 of 50 CITY OF CUPERTINO Agenda Item 21-9642 Agenda Date: 7/22/2021 Agenda #: 1. Subject: Draft Minutes of June 24, 2021 Approve or modify the Draft Minutes of June 11, 2021 CITY OF CUPERTINO Printed on 7/15/2021Page 1 of 1 powered by Legistar™ AH 7-22-2021 5 of 50 Cupertino, CA  95014  (408) 777‐3308          ACTION MINUTES OF THE REGULAR MEETING OF  THE ADMINISTRATIVE HEARING HELD ON JUNE 24, 2021    ROLL CALL    Hearing Officer present:       Albert Salvador, Assistant Community Development Director    Staff present:                          Erick Serrano, Senior Planner         Applicant(s) present:    Eric Clapp, Senior Managing Director      APPROVAL OF MINUTES:  1. Subject: Draft Minutes of March 11, 2021  The minutes of March 11, 2021 were approved as written.    2. Subject: Draft Minutes of June 10, 2021  The minutes of June 10, 2021 were approved as written.     POSTPONEMENTS/REMOVAL FROM CALENDAR:   None    ORAL COMMUNICATIONS:  None      WRITTEN COMMUNICATIONS:    Hearing Officer requested to add written communications to the agenda.                                                    PUBLIC MEETING ITEMS:    3.   Application No.(s):  ASA‐2021‐001, TR‐2021‐021   Applicant:  Brian Bolandi (Rubicon Point Partners)   Location:  10200 S. De Anza Blvd. and 10201 Torre Ave.: (APN: 369‐01‐035,   369‐01‐995, 369‐41‐005)  Architectural and Site Approval Permit to consider exterior and landscape alteration to an  existing office building, and a Tree Removal Permit to allow the removal and replacement  of 15 protected trees.   AH 7-22-2021 6 of 50 2 Administrative Hearing   June 24, 2021        Administrative Hearing Officer’s decision final unless appealed.    Erick Serrano, Senior Planner gave a presentation consisting of the proposed modifications.    The Hearing Officer asked questions and made comments.    The Hearing Officer opened the public comment period.    ‐ Jennifer Griffin spoke and was concerned that the project was removing trees along De  Anza Blvd.     The Hearing Officer closed the comment period.     The Hearing Officer concurred with Staff’s findings.     DECISION: The application was approved by the Hearing Officer per the draft resolution(s)                                                       ADJOURNMENT      Respectfully submitted:    _____/s/Abby Ayende     Abby Ayende  Management Analyst  AH 7-22-2021 7 of 50 CITY OF CUPERTINO Agenda Item 21-9641 Agenda Date: 7/22/2021 Agenda #: 2. Subject: Architectural and Site Approval Permit to consider façade and landscape alterations to a bank building (Bank of America) located in the Crossroads Area of the Heart of the City Specific Plan That the Hearing Officer adopt the draft resolutions (Attachment 1) to: 1. Find that the proposed actions are exempt from CEQA; and 2. Approve the Architectural and Site Approval Permit (ASA-2020-007) CITY OF CUPERTINO Printed on 7/15/2021Page 1 of 1 powered by Legistar™ AH 7-22-2021 8 of 50 ADMINISTRATIVE HEARING STAFF REPORT Meeting Date: July 22, 2021 Subject Architectural and Site Approval Permit to consider façade and landscape alterations to a bank building (Bank of America) located in the Crossroads Area of the Heart of the City Specific Plan (Application No.: ASA-2020-007; Applicant: Melissa Lee; Location: 20563 Stevens Creek Blvd; APN(s): 326-34-044) Recommended Action That the Hearing Officer adopt the draft resolutions (Attachment 1) to: 1. Find that the proposed actions are exempt from CEQA; and 2. Approve the Architectural and Site Approval Permit (ASA-2020-007) Discussion Project Data General Plan Designation Commercial/Office/Residential General Plan Special Area Heart of the City Special Area Zoning Designation P(CG, Res): Planned Development with General Commercial and Residential Uses Lot Size (entire project) 38,950 sq. ft. (0.89 acres) Existing Proposed Floor Area (entire project) 7,933 (20%) No Change Lot Coverage (entire project) 6,605 sq. ft. (17%) No Change Project Consistency With: General Plan Yes Zoning Yes Environmental Assessment Categorically Exempt per Section 15301 Existing Facilities (Class 1) of the California Environmental Quality Act (CEQA) AH 7-22-2021 9 of 50 ASA-2020-007 20563 Stevens Creek Blvd July 22, 2021 Page 2 Background The project site is located north of Stevens Creek Boulevard and west of N. De Anza Boulevard within the Crossroads Area in the Heart of the City. The Heart of the City is a major commercial corridor primarily comprised of commercial and office uses. The project site is developed with a free-standing single-story building currently occupied by Bank of America surrounded by an on-site parking lot. The Bank of America site is bounded by a commercial shopping center (Marina Plaza) to the north, office uses to the east, a free-standing building (Chase bank) to the west, and Stevens Creek Boulevard to the south (see Figure 1). The existing building was constructed in the early 1960’s, which is prior to the property being designated as part of the Heart of the City Special area. The applicant is requesting to upgrade the exterior façade of the building, update on-site landscaping, replace bicycle racks, improve pedestrian pathways, and restripe on-site parking spaces to improve the overall site design. The proposed modifications to the building and the site are subject to the design regulation, guidelines, and concepts of the Heart of the City Specific Plan and the Cupertino Municipal Code. Analysis The applicant is proposing exterior building façade and on-site modifications. The scope of work for the project is as follows:  Façade modifications include repainting, replacing existing roof tiles with standing seam metal roof, replacing existing stone finish with painted stucco, adding faux wood metal panel cladding, adding four new windows, and replacing existing storefront fenestrations such as windows and doors.  Landscape modifications include improving the landscape at the west and south facades with aesthetically pleasing and drought tolerant plantings.  Replace existing bicycle racks with Class I facility bicycle lockers to comply with Cupertino Municipal Code Parking Regulations Ordinance (Chapter 19.124).  Additional site modifications include restriping existing parking stalls, adding decorative pedestrian pathway, and upgrading the waste collection area with a raised curb and trash cans. Figure 1. Project Site AH 7-22-2021 10 of 50 ASA-2020-007 20563 Stevens Creek Blvd July 22, 2021 Page 3 Exterior Building Facade Modifications The existing exterior materials of the building are mainly stucco with a terracotta tile roof. The south (front) elevation features a covered arcade with stucco finish. The north (rear) and east (right) side elevations of the building are plain stucco. The west (left) elevation has a stone finish with a covered arcade with stucco columns (See Figures 2-5 below). The applicant is proposing to modernize the exterior building façade by repainting the stucco and window trims in a neutral color palette of white and grey and replacing the existing terracotta tile roof with a contemporary standing seam metal roof. The proposed building design incorporates a white base color on the building facades with grey accent colors incorporated into the windows, trim, and upgraded roof design. The applicant has proposed design features, including faux wood metal panel cladding, to emphasize the main building entrance on the south elevation. Four new windows on the rear (north) elevation are also proposed (see figures 6-9). Figure 2 & 3 – Existing Front (South) & Rear (North) Elevations Figure 4 & 5 – Existing Left-Side (West) & Right-Side (East) Elevations Figure 6 & 7 – Proposed Front (South) & Rear (North) Elevations Figure 8 & 9 – Proposed Left-Side (West) & Right-Side (East) Elevations AH 7-22-2021 11 of 50 ASA-2020-007 20563 Stevens Creek Blvd July 22, 2021 Page 4 The proposed design was reviewed by the City’s consulting architectural review firm, RRM Design Group. The applicant has adequately modified the proposed design to be compatible with RRM’s recommendations and the Heart of the City Specific Plan design guidelines. Consistent with the Heart of the City Specific Plan, the proposed design features articulation of the façade through various colors and materials, provides a prominent main entrance, and incorporates building design accents to create a harmonious color palette. Therefore, staff finds that the proposed building design complies with the Heart of the City Specific Plan design guidelines, and no further design considerations are recommended. Lighting: The applicant is not proposing new lighting for the site. However, the existing, unpermitted, flood light fixtures affixed to the building are considered a prohibited light fixture type pursuant to Cupertino’s Municipal Code Section 19.102.040 Outdoor Lighting Requirements of the Glass and Lighting Standards Ordinance. The Planning Division has included a condition of approval requiring the applicant/property owner to remove the existing flood light fixtures, unless required by State law, and submit a lighting plan that complies with Cupertino Municipal Glass and Lighting Standards Ordinance (Chapter 19.102) prior to building permit issuance. Landscape Modifications & Existing Tree Maintenance The applicant is proposing to modify approximately 260 square feet of the existing landscape on the west (left) and south (front) elevations of the building by replacing the existing plants along the building with new drought tolerant ground cover (Sheets L1.0 & L1.1, See Figure 10). The project is subject to a Prescriptive Compliance Application pursuant to the Cupertino Municipal Code Landscape Ordinance (Chapter 14.15). The Landscape Ordinance requires the applicant to submit a Water-Efficient Landscape Checklist and finalized landscape and irrigation plans prior to building permit issuance. Additional landscape documentation is required prior to final occupancy in accordance with the Landscape Ordinance. Figure 10 – Landscape Plan AH 7-22-2021 12 of 50 ASA-2020-007 20563 Stevens Creek Blvd July 22, 2021 Page 5 The proposed landscaping will be compatible with the new design of the building façade. However, Staff has found that the proposed planting plan at the main entrance of the building (south elevation) lacks visual interest. Staff has included a condition of approval for the project requiring the applicant/ property owner provide an assortment of shrub types with various heights and/or color profiles along the south elevation. Incorporating a variety of plantings will improve the visual interest of the façade that is most visible from the public right of way and bring the project into compliance with the Heart of the City Specific Plan landscaping guidelines, which encourages framing building entrances with flowering shrubs or trees. The project site consists of a variety of existing trees planted in tree wells along the perimeter of the parking lot adjacent to the public right-of-way on Stevens Creek Boulevard. The trees were approved with a Building Permit processed in 2011 (Permit No. 11060151) and are required to be maintained on-site as protected development trees. To ensure consistency with the approved planting plan, Staff has included a condition of approval that the applicant/property owner show the existing trees on the site plan and verify that the tree species and locations as approved in the Building Permit plan are retained on-site. Vehicular/Bicycle Parking & On-Site Improvements Bank of America is classified as a commercial office by the Cupertino Municipal Code and is subject to the vehicular and bicycle parking standards of Parking Regulations Ordinance (CMC Chapter 12.124). The Parking Regulations Ordinance requires one parking space per 285 square feet of gross building area. The existing project site consists of 52 vehicular parking stalls, which exceeds the required 28 vehicular parking spaces for the office use. One parking stall will be displaced by the trash enclosure/are improvements required by the Environmental Services Division , resulting in 51 parking stalls on site. The proposed parking lot restriping will not change the total number of remaining vehicular parking stalls. The project is conditioned to accurately indicate the parking stall and aisleway dimensions on the site plan to verify that the restriping is consistent with the standards of Cupertino’s Public Works Department and shall be reviewed and approved to the satisfaction of the Planning Division prior to building permit issuance. The Parking Regulations Ordinance also requires one Class I Facility bicycle parking space per 1,250 square feet of gross building area. In accordance with the Code, the project requires seven Class I Facility bicycle parking spaces for the 7,933 square-foot building. As part of the project, the applicant is proposing to remove three existing bicycle rack parking spaces and provide replacement spaces for the site consisting of four bicycle locker stalls and three bicycle rack stalls. Staff reviewed the proposed bicycle parking and AH 7-22-2021 13 of 50 ASA-2020-007 20563 Stevens Creek Blvd July 22, 2021 Page 6 found the three bicycle rack spaces to be insufficient as they are defined by the Parking Regulations Ordinance as a Class II Type Facility, which is inconsistent with the required Class I Type Facility. Therefore, the project is conditioned to provide a total of seven Class I Type Facility bicycle lockers to comply with the Parking Regulations Ordinance of the Cupertino Municipal Code. Bicycle lockers are fully enclosed spaces accessible only by the owner or operator of the bicycle. The proposed location of bicycle parking areas and class facility types are shown outlined in green (see Figure 11)and the final location and class facility type shall be reviewed and approved by the Planning Division prior to building permit issuance. Additional on-site improvements include adding a pedestrian pathway from the public right-of-way on Stevens Creek Boulevard to the main entrance of the building as shown outlined in red and a waste collection area with a raised curb and garbage, recycling, and organics bins outlined in blue (see Figure 11). The Heart of the City Specific Plan Section 2.01.040(A)(1) recommends a variety of paving materials for pedestrian pathways to improve the visibility of pedestrian crossings. The applicant has proposed a grey pedestrian pathway leading to the building. However, t o further comply with the Heart of the City Specific Plan, the Planning Division has conditioned the project to indicate an alternative color or material (e.g., stamped concrete or colored/decorative brick) for the pathway and on the plan set prior to building permit issuance. The proposed waste collection area will have minimal impact to existing on-site parking as it will displace only one parking stall, resulting in 51 parking stalls on site where only 28 stalls are required by the Parking Regulations Ordinance. The waste collection area will be reviewed and approved by Cupertino’s Environmental Services Division prior to building permit issuance. Environmental Review This project is categorically exempt from the requirements of the California Environmental Quality Act (CEQA) per Section 15301 – Existing Facilities. Figure 11 – On Site Improvements AH 7-22-2021 14 of 50 ASA-2020-007 20563 Stevens Creek Blvd July 22, 2021 Page 7 Other Department/Agency Review The City’s Building Division, Environmental Programs Division, Public Works Department, and the Santa Clara County Fire Department have no objections to the project. Public Noticing & Community Outreach The following table is a brief summary of the noticing for this project: Notice of Public Hearing Agenda  Site Signage (at least 10 days prior to hearing)  13 notices mailed to property owners adjacent to the project site (at least 10 days prior to the hearing)  Posted on the City's official notice bulletin board (five days prior to hearing)  Posted on the City of Cupertino’s Web site (five days prior to hearing) No comments have been received at the time of production of this staff report. Permit Streamlining Act This project is subject to the Permit Streamlining Act (Government Code Section 65920 – 65964). The City has complied with the deadlines found in the Permit Streamlining Act. Project Received: January 19, 2021; Deemed Incomplete: February 18, 2021 Revisions Received: April 29, 2021; Deemed Complete: May 27, 2021 The City has 60 days from when the project is deemed categorically exempt to decide on the project. Conclusion The scope of work does not include any changes to existing uses, required parking supply or demand, floor area, lot coverage, or building height for the subject site and will not result in an increased intensity of the existing use. Staff therefore recommends approval of the Architectural and Site Approval Permit as the proposed project will not create adverse impacts to the surrounding area. Additionally, all the findings for approval of the proposed project, consistent with Chapter 19.168 of the Cupertino Municipal Code, may be made as reflected in the draft resolutions. With respect to the Architectural and Site Approval Permit, the following findings may be made: AH 7-22-2021 15 of 50 ASA-2020-007 20563 Stevens Creek Blvd July 22, 2021 Page 8 1. The proposal, at the proposed location, will not be detrimental or injurious to property or improvements in the vicinity, and will not be detrimental to the public he alth, safety, general welfare, or convenience; The proposed project includes exterior building façade, landscape, and site modifications to an existing commercial office building occupied by Bank of America that would improve the design of the site and upgrade building materials. The exterior façade enhancements incorporate a fresh coat of paint to the stucco, accent paint to the window trim, a new metal seamed roof, and metal clad design at the main entrance. The landscaping on the south and west elevations of the building would be improved with new drought-tolerant plantings that frame the building entrances. Additional site improvements include a new waste collection area with garbage, recycling, and organics bins and curb to provide separation from the parking lot, restriping of parking stalls, and adding a pedestrian pathway to better delineate pedestrian access. Staff has also conditioned the project to remove the prohibited flood lighting, unless required by State law, and submit a lighting plan to be reviewed and approved by the Planning Division prior to building permit issuance to reduce the spill-over of light to adjoining property owners. There are no changes to the existing building square footage, height, location, or intensity of use on the site. The exterior building façade, landscape, and site modifications will not be detrimental or injurious to property or improvements in the vicinity, and will not be detrimental to the public health, safety, general welfare, or convenience. 2. The proposal is consistent with the purposes of Chapter 19.168, the General Plan, any specific plan, zoning ordinances, applicable planned development permit, conditional use permits, variances, subdivision maps or other entitlements to use which regulate the subject property including, but not limited to, adherence to the following specific criteria: a) Abrupt changes in building scale should be avoided. A gradual transition related to height and bulk should be achieved between new and existing buildings. The project scope includes exterior façade modifications that do not increase floor area, lot coverage, or height of the existing building on the project site. The proposed exterior façade modifications include new paint on existing stucco walls, a new standing seam metal roof, adding four additional windows, and a metal cladding design at the main entrance. The south and west elevations also include new landscaping along the building façade to break up massing of the building and provide visual interest of the site. The building design would be an improvement to the shopping center and would not be modified in height or bulk compared to existing buildings within the vicinity. Therefore, there will be no abrupt changes in building scale related to height and bulk and no new buildings are being proposed. AH 7-22-2021 16 of 50 ASA-2020-007 20563 Stevens Creek Blvd July 22, 2021 Page 9 b) In order to preserve design harmony between new and existing buildings and in order to preserve and enhance property values, the materials, textures and colors of new building should harmonize with adjacent development by being consistent or compatible with design and color schemes with the future character of the neighborhoods and purposes of the zone in which they are situated. The location, height and materials of walls, fencing, hedges and screen planting should harmonize with adjacent development. Unsightly storage areas, utility installations and unsightly elements of parking lots should be concealed. The planting of ground cover or various types of pavements should be used to prevent dust and erosion, and the unnecessary destruction of existing healthy trees should be avoided. Lighting for development should be adequate to meet safety requirements as specified by the engineering and building departments and provide shielding to prevent spill-over light to adjoining property owners. The exterior and landscape modifications are harmonious with the existing building form and are compatible with the proposed design upgrades of the adjacent buildings within the area. The neutral color palette of the design would be compatible with the existing office buildings at the rear and suitable for the location. The project site is located in a developed area with various commercial and office uses that consist of similar materials and colors as the proposed project. The proposed project does not include tree removal and staff has conditioned the project to maintain the trees on-site as protected development trees. Additionally, the proposed landscape improvements would provide visual interest to the main entrance of the building. Staff has also conditioned the project to remove the unpermitted, prohibited flood lighting, unless required by State law, and submit a lighting plan to be reviewed and approved by the Planning Division prior to building permit issuance to reduce the spill-over of light to adjoining property owners. Furthermore, the project includes restriping parking stalls and adding a decorative pedestrian pathway which would increase pedestrian access and would complement the new building design for the site. c) The number, location, color, size, height, lighting and landscaping of outdoor advertising signs and structures have been designed to minimize traffic hazard, positively affect the general appearance of the neighborhood and harmonize with adjacent development. No signs are proposed as part of this project. Proposed signage would be reviewed and approved to the satisfaction of the Community Development Department upon submittal for Building Permits. d) With respect to new projects within existing residential neighborhoods, new development should be designed to protect residents from noise, traffic, light and AH 7-22-2021 17 of 50 ASA-2020-007 20563 Stevens Creek Blvd July 22, 2021 Page 10 visually intrusive effects by use of buffering, setbacks, landscaping, walls and other appropriate design measures. This application is not a new development project. Next Steps The permit will become effective 14 calendar days from the date of the hearing. The decision of the Administrative Hearing Officer is final, unless appealed within 14 calendar days from the date of the hearing. The applicant team may apply for building and/or other permits with the City at the end of the appeal period (August 5, 2021, at 5:00pm). This approval is valid until July 22, 2023. The applicant team may apply for a one-time two-year extension before the approval expires. Prepared by: Brianne Reyes, Associate Planner Erika Poveda, Associate Planner Reviewed and Approved for submission by: Piu Ghosh, Planning Manager ATTACHMENTS 1. Draft Resolution for ASA-2020-007 2. Plan Set AH 7-22-2021 18 of 50 ASA-2020-007 CITY OF CUPERTINO 10300 Torre Avenue Cupertino, California 95014 RESOLUTION NO. OF THE ADMINISTRATIVE HEARING OFFICER OF THE CITY OF CUPERTINO APPROVING AN ARCHITECTURAL AND SITE PERMIT TO ALLOW FACADE AND LANDSCAPE MODIFICATIONS AT AN EXISTING BANK OF AMERICA LOCATED AT 20563 STEVENS CREEK BLVD SECTION I: PROJECT DESCRIPTION Application No.: ASA-2020-007 Applicant: Melissa Lee (Gensler Architecture Firm) Location: 20563 Stevens Creek Blvd (APN 326-34-044) SECTION II: FINDINGS WHEREAS, the City of Cupertino received an application for an Architectural and Site Approval (minor) to consider allowing façade and landscape modifications at an existing bank (Bank of America) located in a Planned Development Zoning District (Crossroads Area of Heart of the City Specific Plan), as described in Section I. of this Resolution; and WHEREAS, the necessary public notices have been given as required by the Procedural Ordinance of the City of Cupertino, and the Administrative Hearing Officer has held at least one public meeting with regard to the application; and WHEREAS, pursuant to the provisions of the California Environmental Quality Act of 1970 (Public Resources Code section 21000 et seq.) (“CEQA”), together with the State CEQA Guidelines (California Code of Regulations, Title 14, Section 15000 et seq.) (hereinafter, "CEQA Guidelines"), the City staff has independently studied the proposed Project and has determined that the Project is exempt from environmental review pursuant to the categorical exemption in CEQA Guidelines section 15301 for the reasons set forth in the staff report dated July 22, 2021 and incorporated herein; and WHEREAS, the applicant has met the burden of proof required to support said application; and WHEREAS, the Administrative Hearing Officer finds as follows with regard to this application: AH 7-22-2021 19 of 50 Resolution No. ASA-2020-007 July 22, 2021 Page 2 1. The proposal, at the proposed location, will not be detrimental or injurious to property or improvements in the vicinity, and will not be detrimental to the public health, safety, general welfare, or convenience; The proposed project includes exterior building façade, landscape, and site modifications to an existing commercial office building occupied by Bank of America that would improve the design of the site and upgrade building materials. The exterior façade enhancements incorporate a fresh coat of paint to the stucco, accent paint to the window trim, a new metal seamed roof, and metal clad design at the main entrance. The landscaping on the south and west elevations of the building would be improved with new drought-tolerant plantings that frame the building entrances. Additional site improvements include a new waste collection area with garbage, recycling, and organics bins and curb to provide separation from the parking lot, restriping of parking stalls, and adding a pedestrian pathway to better delineate pedestrian access. Staff has also conditioned the project to remove the prohibited flood lighting, unless required by State law, and submit a lighting plan to be reviewed and approved by the Planning Division prior to building permit issuance to reduce the spill-over of light to adjoining property owners. There are no changes to the existing building square footage, height, location, or intensity of use on the site. The exterior building façade, landscape, and site modifications will not be detrimental or injurious to property or improvements in the vicinity, and will not be detrimental to the public health, safety, general welfare, or convenience. 2. The proposal is consistent with the purposes of Chapter 19.168, the General Plan any specific plan, zoning ordinances, applicable planned development permit, conditional use permits, variances, subdivision maps or other entitlements to use which regulate the subject property including, but not limited to, adherence to the following specific criteria: a) Abrupt changes in building scale should be avoided. A gradual transition related to height and bulk should be achieved between new and existing buildings. The project scope includes exterior façade modifications that do not increase floor area, lot coverage, or height of the existing building on the project site. The proposed exterior façade modifications include new paint on existing stucco walls, a new standing seam metal roof, adding four additional windows, and a metal cladding design at the main entrance. The south and west elevations also include new landscaping along the building façade to break up massing of the building and provide visual interest of the site. The building design would be an improvement to the shopping center and would not be modified in height or bulk compared to existing buildings within the vicinity. Therefore, there will be no abrupt changes in building scale related to height and bulk and no new buildings are being proposed. AH 7-22-2021 20 of 50 Resolution No. ASA-2020-007 July 22, 2021 Page 3 b) In order to preserve design harmony between new and existing buildings and in order to preserve and enhance property values, the materials, textures and colors of new building should harmonize with adjacent development by being consistent or compatible with design and color schemes with the future character of the neighborhoods and purposes of the zone in which they are situated. The location, height and materials of walls, fencing, hedges and screen planting should harmonize with adjacent development. Unsightly storage areas, utility installations and unsightly elements of parking lots should be concealed. The planting of ground cover or various types of pavements should be used to prevent dust and erosion, and the unnecessary destruction of existing healthy trees should be avoided. Lighting for development should be adequate to meet safety requirements as specified by the engineering and building departments and provide shielding to prevent spill-over light to adjoining property owners. The exterior and landscape modifications are harmonious with the existing building form and are compatible with the proposed design upgrades of the adjacent buildings within the area. The neutral color palette of the design would be compatible with the existing office buildings at the rear and suitable for the location. The project site is located in a developed area with various commercial and office uses that consist of similar materials and colors as the proposed project. The proposed project does not include tree removal and staff has conditioned the project to maintain the trees on-site as protected development trees. Additionally, the proposed landscape improvements would provide visual interest to the main entrance of the building. Staff has also conditioned the project to remove the unpermitted, prohibited flood lighting, unless required by State law, and submit a lighting plan to be reviewed and approved by the Planning Division prior to building permit issuance to reduce the spill-over of light to adjoining property owners. Furthermore, the project includes restriping parking stalls and adding a decorative pedestrian pathway which would increase pedestrian access and would complement the new building design for the site. c) The number, location, color, size, height, lighting and landscaping of outdoor advertising signs and structures have been designed to minimize traffic hazard, positively affect the general appearance of the neighborhood and harmonize with adjacent development. No signs are proposed as part of this project. Proposed signage would be reviewed and approved to the satisfaction of the Community Development Department upon submittal for Building Permits. d) With respect to new projects within existing residential neighborhoods, new development should be designed to protect residents from noise, traffic, light and AH 7-22-2021 21 of 50 Resolution No. ASA-2020-007 July 22, 2021 Page 4 visually intrusive effects by use of buffering, setbacks, landscaping, walls and other appropriate design measures. This application is not a new development project. NOW, THEREFORE, BE IT RESOLVED: That after careful consideration of the maps, facts, exhibits, testimony, staff’s report and presentation, and other evidence submitted in this matter, subject to the conditions which are enumerated in this Resolution beginning on PAGE 4 thereof, The application for an Architectural and Site Approval, Application No. ASA-2020-007 is hereby approved and that the sub conclusions upon which the findings and conditions specified in this resolution are based and contained in the Public Meeting record concerning Application No. ASA-2020-007 as set forth in the Minutes of the Administrative Hearing Meeting of July 22, 2021 and are incorporated by reference as though fully set forth herein. SECTION III: CONDITIONS ADMINISTERED BY THE COMMUNITY DEVELOPMENT DEPARTMENT 1. APPROVED EXHIBITS Approval is based on the plan set drawn by Gensler, titled “Bank of America” consisting of 19 sheets labeled A0.00, A0.01, A0.01a, A0.02, A0.02a, A0.03, A0.04, A4.00, A4.01, A4.02, A9.00, A9.01, A9.02, A9.03, A9.20, A9.21, A9.30, L1.0, and L1.1, except as may be amended by conditions in this resolution. 2. ACCURACY OF PROJECT PLANS The applicant/property owner is responsible to verify all pertinent property data including but not limited to property boundary locations, building setbacks, property size, building square footage, any relevant easements and/or construction records. Any misrepresentation of any property data may invalidate this approval and may require additional review. 3. ANNOTATION OF THE CONDITIONS OF APPROVAL The conditions of approval set forth shall be incorporated into and annotated on the first page of the building plans. 4. BUILDING AND FIRE CODE The applicant shall apply for and obtain building permits to allow the construction of the approved project. The applicant shall provide information and plans to allow the Building Official and the Fire Marshall, or their designee, to determine AH 7-22-2021 22 of 50 Resolution No. ASA-2020-007 July 22, 2021 Page 5 that the proposed plans comply with Building and Fire Codes in effect at the time of application for a building permit. 5. CONSULTATION WITH OTHER DEPARTMENTS The applicant is responsible to consult with other departments and/or agencies with regard to the proposed project for additional conditions and requirements. Any misrepresentation of any submitted data may invalidate an approval by the Community Development Department. 6. DEMOLITION REQUIREMENTS All demolished building and site materials shall be recycled to the maximum extent feasible subject to the Building Official. The applicant shall provide evidence that materials were recycled prior to occupancy. 7. DUST CONTROL The following construction practices shall be implemented during all phases of construction for the proposed project to prevent visible dust emissions from leaving the site: a. Water all exposed surfaces areas (e.g., parking areas, staging areas, soil piles, graded areas, and unpaved access roads) at least twice daily and more often during windy periods to prevent visible dust from leaving the site; active areas adjacent to windy periods; active areas adjacent to existing land uses shall be kept damp at all times, or shall be treated with non-toxic stabilizers or dust palliatives. b. All haul trucks transporting soil, sand, or other loose material off-site shall be covered. c. All visible mud or dirt track-out onto adjacent public roads shall be removed using wet power vacuum street sweepers at least once per day. The use of dry power sweeping is prohibited. d. All vehicle speeds on unpaved roads shall be limited to 15 mph. e. All roadways, driveways, and sidewalks to be paved shall be completed as soon as possible. Building pads shall be laid as soon as possible after grading unless seeding or soil binders are used. f. Idling times shall be minimized either by shutting equipment off when not in use or reducing the maximum idling time to 5 minutes (as required by the California airborne toxics control measure Title 13, Section 2485 of California Code of Regulations [CCR]). Clear signage shall be provided for construction workers at all access points. g. All construction equipment shall be maintained and properly tuned in accordance with manufacturer’s specifications. All equipment shall be checked AH 7-22-2021 23 of 50 Resolution No. ASA-2020-007 July 22, 2021 Page 6 by a certified mechanic and determined to be running in proper condition prior to operation. h. Post a publicly visible sign with the telephone number and person to contact at the Lead Agency regarding dust complaints. This person shall respond and take corrective action within 48 hours. The Air District’s phone number shall also be visible to ensure compliance with applicable regulations. The applicant shall incorporate the City’s construction best management practices into the building permit plan set prior to any grading, excavation, foundation or building permit issuance. 8. EXTERIOR BUILDING MATERIALS/TREATMENTS The final building exterior plan shall closely resemble the details shown on the original approved plans. Final building exterior treatment plan (including but not limited to details on exterior color, materials, architectural treatments, doors, windows, lighting fixtures, and/or embellishments) shall be reviewed and approved by the Director of Community Development prior to issuance of building permits to ensure quality and consistency. Any exterior changes determined to be substantial by the Director of Community Development shall either require a modification to this permit or a new permit based on the extent of the change. 9. PEDESTRIAN PATHWAY MATERIAL MODIFICATION The applicant/property owner shall propose an alternative color and/or material(s) for the proposed paved pedestrian pathway from the public right-of-way to the building to comply with the Heart of the City Specific Plan Sections 1.01.040(A)(1) and 2.01.040(A). Paving materials for pedestrian pathways recommended per the Heart of the City Specific Plan include stone, such as slate or granite, brick pavers, concrete unit pavers, or poured-in-place concrete with any of the following treatments: integral pigment color, special aggregate, special scoring pattern, ornamental insets (e.g., tile), or a stamped pattern. All concrete walks should be tinted to reduce glare. The Building Permit construction drawings shall indicate the revisions on the site plan and materials sheet. The pedestrian pathway modification shall be reviewed and approved to the satisfaction of the Planning Division to verify that the intent of a required decorative pathway is met pursuant to the Heart of the City Specific Plan, prior to issuance of Building Permits. 10. DARK SKY COMPLIANCE Prior to issuance of Building Permits, the applicant/property owner shall submit final plans in compliance with the approved lighting plans to comply with AH 7-22-2021 24 of 50 Resolution No. ASA-2020-007 July 22, 2021 Page 7 development standards of Cupertino Municipal Code Section 19.102.040 Outdoor Lighting Requirements. In the event changes are proposed from the approved plans, said changes must be reviewed and approved by the Director of Community Development or their designee. The applicant shall provide all documentation required to determine compliance with the Municipal Code. 11. LIGHT FIXTURE REMOVAL Prior to issuance of Building Permits, the applicant/property owner shall submit construction drawings indicating the removal of the existing flood lights installed on the existing building to comply with Cupertino Municipal Code Section 19.102.040 Outdoor Lighting Requirements, unless explicitly required by State law. The proposed lighting replacement shall be reviewed and approved to the satisfaction of the Planning Division prior to issuance of Building Permits. 12. PARKING STALL DIMENSIONS The applicant/property owner shall indicate parking stall dimensions on the building permit plan set that comply with the Cupertino’s Public Work’s Department standards, which shall be reviewed and approved to the satisfaction of the Planning Division, prior to issuance of Building Permits. 13. BICYCLE PARKING Prior to issuance of Building Permits, the applicant/property owner shall indicate the required Class I Facility parking spaces on the building permit set in accordance with the City’s Parking Regulations under Chapter 19.124 of the Cupertino Municipal Code. 14. DRIVEWAYS AND MOBILITY The property owner shall not propose development (e.g., walls, traffic barriers, or obstructions) along the shared property lines of the existing curb cuts that would obstruct driveway or curb cut access to vehicles or pedestrians accessing the subject parcel without further review and approval to the satisfaction of the Community Development Director. 15. GRADING AND CONSTRUCTION HOURS AND NOISE LIMITS a. All grading activities shall be limited to the dry season (April 15 to October 1), unless permitted otherwise by the Director of Public works. b. Construction hours and noise limits shall be compliant with a ll requirements of Chapter 10.48 of the Cupertino Municipal Code. c. Grading, street construction, underground utility and demolition hours for work done more than 750 feet away from residential areas shall be limited to Monday through Friday, 7 a.m. to 8 p.m. and Saturday and Sunday, 9 a.m. to AH 7-22-2021 25 of 50 Resolution No. ASA-2020-007 July 22, 2021 Page 8 6 p.m. Grading, street construction, demolition or underground utility work within 750 feet of residential areas shall not occur on Saturdays, Sundays, holidays, and during the nighttime period as defined in Section 10.48.053(b) of the Municipal Code. d. Construction activities shall be limited to Monday through Friday, 7 a.m. to 8 p.m. and Saturday and Sunday, 9 a.m. to 6 p.m. Construction activities are not allowed on holidays as defined in Chapter 10.48 of the Municipal Code. Night time construction is allowed if compliant with nighttime standards of Section 10.48 of the Cupertino Municipal Code. e. Rules and regulations pertaining to all construction activities and limitations identified in this permit, along with the name and telephone number of an applicant appointed disturbance coordinator, shall be posted in a prominent location at the entrance to the job site. f. The applicant shall be responsible for educating all contractors and subcontractors of said construction restrictions. The applicant shall comply with the above grading and construction hours and noise limit requirements unless otherwise indicated. 16. NESTING BIRDS Nests of raptors and other birds shall be protected when in active use, as required by the federal Migratory Bird Treaty Act and the California Department of Fish and Game Code. a. Construction and tree removal/pruning activities shall be scheduled to avoid the nesting season to the extent feasible. If feasible, tree removal and/or pruning shall be completed before the start of the nesting season to help preclude nesting. The nesting season for most birds and raptors in the San Francisco Bay area extends from February 1 through August 31. Preconstruction surveys (described below) are not required for tree removal or construction activities outside the nesting period. b. If construction activities and any required tree removal occur during the nesting season (February 1 and August 31), a qualified ornithologist shall be required to conduct surveys prior to tree removal or construction activities. Preconstruction surveys shall be conducted no more than 14 days prior to the start of tree removal, pruning or construction. Preconstruction surveys shall be repeated at 14-day intervals until construction has been initiated in the area after which surveys can be stopped. During this survey, the ornithologist shall inspect all trees and other possible nesting habitats in and immediately adjacent to the construction areas for nests. AH 7-22-2021 26 of 50 Resolution No. ASA-2020-007 July 22, 2021 Page 9 c. If the survey does not identify any nesting birds that would be affected by construction activities, no further mitigation is required. If an active nest containing viable eggs or young birds is found sufficiently close to work areas to be disturbed by these activities, their locations shall be documented and protective measures implemented under the direction of the qualified ornithologist until the nests no longer contain eggs or young birds. d. Protective measures shall include establishment of clearly delineated exclusion zones (i.e. demarcated by identifiable fencing, such as orange construction fencing or equivalent) around each nest location as determined by the qualified ornithologist, taking into account the species of birds nesting, their tolerance for disturbance and proximity to existing development. In general, exclusion zones shall be a minimum of 300 feet for raptors and 75 feet for passerines and other birds. The active nest within an exclusion zone shall be monitored on a weekly basis throughout the nesting season to identify signs of disturbance and confirm nesting status. The radius of an exclusion zone may be increased by the qualified biologist, if project activities are determined to be adversely affecting the nesting birds. Exclusion zones may be reduced by the qualified biologist only in consultation with California Department of Fish and Wildlife. The protection measures and buffers shall remain in effect until the young have left the nest and are foraging independently or the nest is no longer active. e. A final report on nesting birds and raptors, including survey methodology, survey date(s), map of identified active nests (if any), and protection measures (if required), shall be submitted to the Planning Manager, through the building permit review process, and be completed to the satisfaction of the Community Development Director prior to the start of grading. 17. SIGNAGE Signage is not approved with this application. Signage shall conform to the City Sign Code. 18. LANDSCAPE PROJECT SUBMITTAL Prior to issuance of building permits, the applicant shall submit a full Landscape Documentation Package, per sections 14.15.050 A, B, C, and D of the Landscape Ordinance, for projects with landscape area 500 square feet or more or elect to submit a Prescriptive Compliance Application per sections 14.15.040 A, B, and C for projects with landscape area between 500 square feet and 2,500 square feet. The Landscape Documentation Package or Prescriptive Co mpliance Application shall be reviewed and approved to the satisfaction of the Director of Community Development prior to issuance of building permits, and additional requirements AH 7-22-2021 27 of 50 Resolution No. ASA-2020-007 July 22, 2021 Page 10 per sections 14.15.040 D, E, F, and G or 14.15.050 E, F, G, H, and I will be required to be reviewed and approved prior to final inspections. 19. PLANTING PLAN MODIFICATIONS (SOUTH SIDE) Prior to issuance of Building Permits, the applicant/property owner shall submit a revised landscape and planting plan that incorporates a variety of shrub types that grow at different heights and/or various color profiles to be installed along the main entrance to the building along the south elevation. 20. EXISTING TREES RETAINED ON-SITE Prior to issuance of Building Permits, the applicant/property owner shall submit a landscape and site plan that verifies the existing trees per the approved Building Permit (Permit No. 11060151) are maintained. The protected development trees shall be retained on-site. 21. TREE AND LANDSCAPE MAINTENANCE The property owner shall be responsible for ensuring that the existing trees and newly planted trees are properly maintained including but not limited to ensuring that there is adequate soil drainage, that the soil is well -aerated, and irrigation systems are thoroughly tested to provide sufficient water to landscaped areas while reducing water waste. 22. TREE PROTECTION As part of the demolition or building permit drawings, a tree protection plan shall be prepared by a certified arborist for the trees to be retained. In addition, the following measures shall be added to the protection plan:  For trees to be retained, chain link fencing and other root protection shall be installed around the dripline of the tree prior to any project site work.  No parking or vehicle traffic shall be allowed under root zones, unless using buffers approved by the Project Arborist.  No trenching within the critical root zone area is allowed. If trenching is needed in the vicinity of trees to be retained, the City’s consulting arborist shall be consulted before any trenching or root cutting beneath the dripline of the tree.  Wood chip mulch shall be evenly spread inside the tree projection fence to a four-inch depth.  Tree protection conditions shall be posted on the tree protection barriers.  Retained trees shall be watered to maintain them in good health.  A covenant on the property shall be recorded that identifies all the protected trees, prior to final occupancy. AH 7-22-2021 28 of 50 Resolution No. ASA-2020-007 July 22, 2021 Page 11 The tree protection measures shall be inspected and approved by the certified arborist prior to issuance of building permits. The City’s consulting arborist shall inspect the trees to be retained and shall provide reviews prior to issuance of demolition, grading or building permits. A report ascertaining the good health of the trees mentioned above shall be provided prior to issuance of final occupancy. 23. INDEMNIFICATION As part of the application, to the fullest extent permitted by law, the applicant shall agree to indemnify, defend with the attorneys of the City’s choice, and hold harmless the City, its City Council, and its officers, employees, and agents (collectively, the “indemnified parties”) from and against any liability, claim, action, cause of action, suit, damages, judgment, lien, levy, or proceeding (collectively referred to as “proceeding”) brought by a third party against one or more of the indemnified parties or one or more of the indemnified parties and the applicant related to any Ordinance, Resolution, or action approving the project, the related entitlements, environmental review documents, finding or determinations, or any other permit or approval authorized for the project. The indemnification shall include but not be limited to damages, fees, and costs awarded against the City, if any, and cost of suit, attorneys’ fees, and other costs, liabilities, and expenses incurred in connection with such proceeding whether incurred by the Applicant, the City, or the parties initiating or bringing such proceeding. The applicant shall agree to (without limitation) reimburse the City its actual attorneys’ fees and costs incurred in defense of the litigation. Such attorneys’ fees and costs shall include amounts paid to the City’s outside counsel and shall include City Attorney time and overhead costs and other City staff overhead costs and any costs directly related to the litigation reasonably incurred by City. The applicant shall likewise agree to indemnify, defend, and hold harmless the indemnified parties from and against any damages, attorneys’ fees, or costs awards, including attorneys’ fees awarded under Code of Civil Procedure section 1021.5, assessed or awarded against the indemnified parties. The Applicant shall cooperate with the City to enter a Reimbursement Agreement to govern any such reimbursement. The Applicant shall agree to (without limitation) reimburse the City for all costs incurred in additional investigation or study of, or for supplementing, redrafting, revising, or amending, any document (such as an Environmental Impact Report, negative declaration, specific plan, or general plan amendment) if made necessary AH 7-22-2021 29 of 50 Resolution No. ASA-2020-007 July 22, 2021 Page 12 by proceedings challenging the project approvals and related environmental review, if the applicant desires to continue to pursue the project. The Applicant shall agree that the City shall have no liability to the Applic ant for business interruption, punitive, speculative, or consequential damages. 24. NOTICE OF FEES, DEDICATIONS, RESERVATIONS, OR OTHER EXACTIONS The Conditions of Project Approval set forth herein may include certain fees, dedication requirements, reservation requirements, and other exactions. SECTION IV: CONDITIONS ADMINISTERED BY THE PUBLIC WORKS DEPARTMENT 25. STREET IMPROVEMENTS Street improvements along the project will be required to the satisfaction of the Director of Public Works. Street improvements shall include the removal of concrete panels in the park strip along Stevens Creek Blvd. All improvements must be completed and accepted by the City prior to Building Final Occupancy or Street Improvement Encroachment Permit acceptance whichever comes first. Additional comments will be provided and shall be incorporated prior to Building Permit approval. 26. DRAINAGE Drainage shall be provided to the satisfaction of the Director of Public Works. Hydrology and pre- and post-development hydraulic calculations must be provided to indicate whether additional storm water control measures are to be constructed or renovated. The storm drain system may include, but is not limited to, subsurface storage of peak stormwater flows (as needed), bioretention basins, vegetated swales, and hydrodynamic separators to reduce the amount of runoff from the site and improve water quality. Any storm water overflows or surface sheeting should be directed away from neighboring private properties and to the public right of way as much as reasonably possible. All storm drain inlets shall be clearly marked with the words “No Dumping – Flows to Creek” using permanently affixed metal medallions or equivalent, as approved by the Environmental Programs Division. SECTION IV: CONDITIONS ADMINISTERED BY THE ENVIRONMENTAL PROGRAMS DIVISION AH 7-22-2021 30 of 50 Resolution No. ASA-2020-007 July 22, 2021 Page 13 27. WASTE DIVERSION & SOLID WASTE/RECYCLING MANAGEMENT Prior to issuance of Building Permits, the project shall be reviewed and approved by Cupertino’s Environmental Services Division for compliance with all requirements related to construction and demolition waste diversion and waste/recycling management of the business operations. PASSED AND ADOPTED this 22nd day of July 2021 at a noticed Public Meeting of the Administrative Hearing Officer of the City of Cu pertino, State of California, held by the Director of Community Development, or his or her designee, pursuant to Cupertino Municipal Code Section 19.12.120. ATTEST: APPROVED: Erika Poveda Albert Salvador Associate Planner Assistant Director of Community Development AH 7-22-2021 31 of 50 PLANNING SET CUPERTINO | CA4-175 04/29/21 SHEET INDEX A0.00 Cover Sheet A0.01 Existing Conditions A0.01a Existing Conditions A0.02 Design Concept A0.02a Design Concept A0.03 Site Plan A0.04 Site Map A4.00 Existing Lighting Plan A4.01 Site Photometrics Plan A4.02 ATM Photometrics Plan A9.00 West Elevations A9.01 South Elevations A9.02 East Elevations A9.03 North Elevations A9.20 Cross Sections A9.21 Cross Sections A9.30 Materials and Finishes L1.0 Landscape Plan L1.1 Landscape Notes, Plan Schedule and Materials PROJECT INFORMATION Project Address:20563 Stevens Creek Blvd APN:326-34-044 Zoning:P (CG, Res) Land Use:Commercial/Office/Residential Lot Area: 38,950 SF FAR: gross floor area = (6,605 SF + 1,328 SF)= 7,933 SF = 0.2 (no change) lot area 38,950 SF 38,950 SF Lot Coverage: 6,605 SF (no change) Vehicular Parking:51 stalls provided. See sheet A0.03. Bicycle Parking: 7 stalls provided. See sheet A0.03. Scope of Work: Facade upgrades include new paint, replacing existing roof tiles with new standing seam metal roof, replacing existing stone finish with new painted stucco, adding new metal panel cladding, and replacing existing storefront entrances. Upgrade existing landscape at West and South facades. Restripe existing parking stalls. Provide new bike lockers per Parking Ordinance and replace existing bike racks. New colored concrete at pedestrian vehicular crossing, new curb for waste collection area, and replace existing trash cans. JLL Third Party Project Management Address: 2000 Clayton Road Concord, CA 94520 Contact: Tom Cox Email: thomas.cox@am.jll.com Tel: 415.310.6847 Gensler Architect Address: 2101 Webster Street Ste 2000, Oakland, CA 94612 Contact: Melissa Vai Lee Email: melissav_lee@gensler.com Tel: 510.645.1752 CONTACT INFORMATION Property Owner Name: John M. Saich and Nichole L. Saich Address: 580 California Street Ste 1200, San Francisco, CA 94104 Contact: Gale Connor Email: gale.connor@msrlegal.com Tel: 415.638.4809 Cover Sheet | A0.00 AH 7-22-2021 32 of 50 Bank of America | 04/29/21 | Planning Set | A0.01 CUPERTINO | CA4-175 20563 STEVENS CREEK BLVD CUPERTINO, CA 95014 Existing Conditions The existing Bank of America building has an extremely dark interior, confusing entrance to the building and missing tiles on the roof. AH 7-22-2021 33 of 50 Bank of America | 04/29/21 | Planning Set | A0.01a CUPERTINO | CA4-175 20563 STEVENS CREEK BLVD CUPERTINO, CA 95014 Existing Conditions AH 7-22-2021 34 of 50 Bank of America | 04/29/21 | Planning Set | A0.02 CUPERTINO | CA4-175 20563 STEVENS CREEK BLVD CUPERTINO, CA 95014 Design Concept The proposed exterior renovation will provide a much needed facade refresh by introducing new standing seam metal roof that requires less mantainance and more durability, new color, material, and landscape to emphasize the two entrances, and four additional windows to let more natural light into the building. The color of the metal roof will match the new gray at the accent walls that will emphasize each of the two entrances. The stone veneer at the West entrance will be replaced with stucco to match the overall stucco material of the existing building and new metal panels on the South facade facing the main street Stevens Creek Blvd will be added to provide wood elements at human scale. Both existing storefronts will be replaced with bank standard aluminum frame and power assisted doors. The new windows will match the existing window bays at the North facade and will provide natural lighting to the existing offices as well as the central lobby areas through the office's existing glass front wall systems. AH 7-22-2021 35 of 50 Bank of America | 04/29/21 | Planning Set | A0.02a CUPERTINO | CA4-175 20563 STEVENS CREEK BLVD CUPERTINO, CA 95014 Design Concept AH 7-22-2021 36 of 50 S T E V E N S C R E E K B L V D A9.00 02 A9.01 02 A9.03 02 02 A9.20 ________________ 2 A9.21 ________________ 205' 205'190'190'0102 03 04 01 | SITE PLAN SCALE: 3/64" = 1'-0" 05 05 05 TYP.12"TYP. 3' - 11" 06 06 EXISTING BANK OF AMERICA EXISTING SIDEWALK 07 08 09 09 09 09 09 09 10 (E) SETBACK77' - 1"(E) SETBACK 57' - 7" (E) SETBACK 37' - 3"(E) SETBACK51' - 11"49' - 3"62' - 7" (E) DRIVE AISLE 21' - 10"TYP. 8 ' - 10"(E) DRIVE AISLE25' - 8"(E) DRIVE AISLE 16' - 9"(TYP.)9' - 6"(T Y P .)8 ' - 9 "(TYP.)20' - 2"9' - 0" 9' - 0" 11' - 3"PSE10' - 0"(TYP. )20' - 7"(T Y P .)2 0 ' - 3 "(E) DRIVE AISLE18' - 10"11 A9.022 12 12 12 13 (T Y P.) 8' - 9"20' - 0"14 12 a b c a. 2-cy trash (4'x7') b. 96-gal. recycle (30''x36'') c. 32-gal. organics (20"x25")7' - 6"1 4 ' - 1 "Legend X X Sheet where shown Elevation Number on Sheet Direction of Elevation Existing Property Line Existing Building Bank of America | 04/29/21 | Planning Set | A0.03 CUPERTINO | CA4-175 20563 STEVENS CREEK BLVD CUPERTINO, CA 95014 Site Plan Vehicular Parking: 7,933 SF/285 SF = 28 stalls required Existing standard stalls = 50 Existing standard acessible stalls = 1 Existing van accessible stalls = 1 Total existing stalls = 52 Total standard stalls displaced = -1 Total stalls provided = 51 Bicycle Parking: 7,933/1,250 SF = 7 stalls required (E) Conc. stands to be removed = -3 New steel racks = 3 New class I stalls = 4 Total stalls provided = 7 North SHEET NOTES 01 EXISTING WINDOWS TO REMAIN 02 NEW WINDOWS TO MATCH EXISTING 03 EXISTING CONCRETE BICYCLE STANDS TO BE REPLACED WITH NEW BIKE RACKS 04 NEW DOUBLE CAPACITY BICYCLE LOCKER 05 EXISTING PLANTING ON LANDSCAPED AREA TO BE REMOVED AND REPLACED WITH NEW LOW HEDGE PLANTING 06 EXISTING STOREFRONT TO BE REPLACED WITH NEW ALUMINUM STOREFRONT AND POWER ASSISTED DOORS 07 EXISTING MONUMENT SIGN TO BE REPLACED UNDER SEPARATE PERMIT 08 REPAIR EXISTING CURB 09 EXISTING PARKING STALLS TO BE RESTRIPED AND EXISTING CURBS TO BE POWER WASHED AND PAINTED WHERE REQUIRED 10 EXISTING PLANTING AND LANDSCAPED AREA TO REMAIN 11 PAINT EXISTING DOOR TO MATCH ADJACENT WALL 12 EXISTING TRASH CAN TO BE REPLACED 13 NEW COLORED CONCRETE PAVING AT PEDESTRIAN CROSSING. MATCH EXPT-16 14 NEW 6" CURB FOR WASTE COLLECTION AREA AH 7-22-2021 37 of 50 Bank of America | 04/29/21 | Planning Set | A0.04 CUPERTINO | CA4-175 20563 STEVENS CREEK BLVD CUPERTINO, CA 95014 Site Map AH 7-22-2021 38 of 50 Bank of America | 04/29/21 | Planning Set | A4.00 CUPERTINO | CA4-175 20563 STEVENS CREEK BLVD CUPERTINO, CA 95014 Existing Lighting Plan AH 7-22-2021 39 of 50 Bank of America | 04/29/21 | Planning Set | A4.01 CUPERTINO | CA4-175 20563 STEVENS CREEK BLVD CUPERTINO, CA 95014 Site Photometrics Plan AH 7-22-2021 40 of 50 Bank of America | 04/29/21 | Planning Set | A4.02 CUPERTINO | CA4-175 20563 STEVENS CREEK BLVD CUPERTINO, CA 95014 ATM Photometrics Plan Bank of America | 04/29/21 | Planning Set | A4.02 CUPERTINO | CA4-175 20563 STEVENS CREEK BLVD CUPERTINO, CA 95014 ATM Photometrics Plan NOTE: 1. READINGS ARE MEASURED AT 36" ABOVE GRADE. AH 7-22-2021 41 of 50 01 | EXISTING WEST ELEVATION SCALE: 3/32" = 1'-0" 02 01 04EL. 0' - 0" EL. 20' - 7" 03 04 05 13 02 | PROPOSED WEST ELEVATION SCALE: 3/32" = 1'-0" 07 06 11 EXPT-16 EXPT-15 EXPT-15 TYP. EL. 0' - 0" EL. 20' - 7" EXPT-16 08 12 TYP. 09 10 EXPT-15 EXPT-15 14 Bank of America | 04/29/21 | Planning Set | A9.00 CUPERTINO | CA4-175 20563 STEVENS CREEK BLVD CUPERTINO, CA 95014 West Elevations SHEET NOTES GENERAL NOTES SEE SHEET A9.30 FOR MATERIAL & FINISH DETAILS 01 EXISTING ROOF TILES TO BE REMOVED 02 EXISTING STONE FINISH TO BE REMOVED 03 EXISTING ALUMINUM/GLASS STOREFRONT TO BE REMOVED 04 EXISTING LANDSCAPE PLANTING TO BE REMOVED 05 EXISTING NIGHT DEPOSITORY TO REMAIN 06 NEW STANDING SEAM METAL ROOF 07 NEW STUCCO FINISH AND PAINT 08 EXISTING STUCCO WALL TO RECEIVE NEW PAINT, TYP. 09 EXISTING PARAPET METAL FLASHING CAP TO RECEIVE NEW PAINT, TYP. 10 EXISTING WOOD FASCIA TO RECEIVE NEW PAINT 11 NEW LOW LANDSCAPE HEDGES 12 NEW ALUMINUM/GLASS STOREFRONT WITH POWER ASSISTED DOORS 13 EXITING CONCRETE BIKE STANDS TO BE REMOVED 14 NEW GALVANIZED STEEL BIKE RACKS AH 7-22-2021 42 of 50 01 | EXISTING SOUTH ELEVATION SCALE: 3/32" = 1'-0" EL. 0' - 0" EL. 20' - 7" 04 03 05 01 02 02 | PROPOSED SOUTH ELEVATION SCALE: 3/32" = 1'-0" EL. 0' - 0" EL. 20' - 7" 06 08 08 09 EXPT-15 EXPT-16 09 EXPT-16 09 EPS-5 EPS-5 EXPT-15 TYP. EXPT-16 0712 11 10 EXPT-15 EXPT-15 13 Bank of America | 04/29/21 | Planning Set | A9.01 CUPERTINO | CA4-175 20563 STEVENS CREEK BLVD CUPERTINO, CA 95014 South Elevations SHEET NOTES GENERAL NOTES SEE PAGE A9.30 FOR MATERIAL & FINISH DETAILS08 NEW METAL PANEL CLADDING 09 EXISTING STUCCO WALL TO RECEIVE NEW PAINT, TYP. 10 EXISTING PARAPET METAL FLASHING CAP TO RECEIVE NEW PAINT, TYP. 11 EXISTING WOOD FASCIA TO RECEIVE NEW PAINT 12 NEW LOW LANDSCAPE HEDGES 13 NEW BUILDING SIGNAGE UNDER SEPARATE PERMIT 01 EXISTING BUILDING SIGNAGE TO BE REMOVED. EXISTING WALL TO BE PATCHED AND REPAIRED TO RECEIVE NEW PAINT 02 EXISTING ROOF TILES TO BE REMOVED 03 EXISTING ALUMINUM/GLASS STOREFRONT TO BE REMOVED 04 EXISTING LANDSCAPE SHRUBS TO BE REMOVED 05 EXISTING ATMS TO REMAIN 06 NEW STANDING SEAM METAL ROOF 07 NEW ALUMIN/GLASS STOREFRONT WITH POWER ASSISTED DOORS AH 7-22-2021 43 of 50 01 | EXISTING EAST ELEVATION SCALE: 3/32" = 1'-0" EL. 0' - 0" EL. 20' - 7"01 02 | PROPOSED EAST ELEVATION SCALE: 3/32" = 1'-0" EXPT-15 EL. 0' - 0" EL. 20' - 7" EXPT-15 02 04 05 EXPT-16 03 EXPT-16 Bank of America | 04/29/21 | Planning Set | A9.02 CUPERTINO | CA4-175 20563 STEVENS CREEK BLVD CUPERTINO, CA 95014 East Elevations SHEET NOTES GENERAL NOTES SEE SHEET A9.30 FOR MATERIAL & FINISH DETAILS 01 EXISTING BUILDING SIGNAGE TO BE REMOVED AND EXISTING WALL TO BE PATCHED AND REPAIRED TO RECEIVE NEW PAINT. 02 EXISTING STUCCO WALL TO RECEIVE NEW PAINT, TYP. 03 EXISTING PARAPET METAL FLASHING CAP TO RECEIVE NEW PAINT, TYP. 04 NEW BUILDING SIGNAGE TO BE REVIEWED AND APPROVED UNDER SEPARATE PERMIT 05 EXISTING WOOD TRELLIS TO RECEIVE NEW PAINT AH 7-22-2021 44 of 50 01 | EXISTING NORTH ELEVATION SCALE: 3/32" = 1'-0" EL. 0' - 0" EL. 20' - 7" 01 02 02 02 | PROPOSED NORTH ELEVATION SCALE: 3/32" = 1'-0" EL. 0' - 0" EL. 20' - 7" 03 03 EXPT-1504 11"TYP.9' - 3"06 05 EXPT-15 EXPT-1607 Bank of America | 04/29/21 | Planning Set | A9.03 CUPERTINO | CA4-175 20563 STEVENS CREEK BLVD CUPERTINO, CA 95014 North Elevations SHEET NOTES 01 EXISTING WINDOWS TO REMAIN 02 EXISTING WALL TO BE REMOVED FOR NEW WINDOW OPENINGS 03 NEW WINDOWS TO MATCH EXISTING 04 EXISTING STUCCO WALL TO RECEIVE NEW PAINT, TYP. 05 EXISTING PARAPET METAL FLASHING CAP TO RECEIVE NEW PAINT, TYP. 06 NEW BICYCLE LOCKERS. SEE SHEET A9.30 FOR ADDITIONAL DETAILS 07 WINDOW PROTRUSIONS TO BE PAINTED EXPT-16, TYP. GENERAL NOTES SEE PAGE A9.30 FOR MATERIAL & FINISH DETAILS AH 7-22-2021 45 of 50 01 | EXISTING SECTION SCALE: 3/32" = 1'-0" 2ND FLR EL. 0' - 0" EL. 11' - 0" (E) CB OFFICE 4 (E) VAULT (E) VAULT VESTIBULE (E) CALLING CUBES (E) SEMINAR RM (E) STORAGE EL. 20' - 7" (E) CB OFFICE 7 (E) CB OFFICE 6 (E) CL OFFICE(E) CB OFFICE 8 01 02 TYP. TYP. OF 4 03 03 GROUND FLR T.O. PARAPET EL. 0' - 0" 02 | PROPOSED SECTION SCALE: 3/32" = 1'-0" EL. 11' - 0" EL. 20' - 7" (E) CB OFFICE 7 (E) CB OFFICE 6 (E) CL OFFICE (E) CB OFFICE 4 (E) CB OFFICE 8 (E) VAULT (E) VAULT VESTIBULE (E) CALLING CUBES (E) SEMINAR RM (E) STORAGE 2ND FLR GROUND FLR T.O. PARAPET Bank of America | 04/29/21 | Planning Set | A9.20 CUPERTINO | CA4-175 20563 STEVENS CREEK BLVD CUPERTINO, CA 95014 Cross Sections SHEET NOTES 01 EXISTING WALL TO BE REMOVED FOR NEW WINDOW OPENINGS 02 EXISTING CEILING TO BE MODIFIED TO ACCOMODATE NEW WINDOWS 03 EXISTING WINDOWS TO REMAIN AH 7-22-2021 46 of 50 01 | EXISTING SECTION SCALE: 3/32" = 1'-0" EL. 0' - 0" (E) VESTIBULE (E) CENTRAL ZONE (E) CL OFFICE 01 02 EL. 20' - 7" 02 | PROPOSED SECTION SCALE: 3/32" = 1'-0" EL. 0' - 0" EL. 20' - 7" (E) VESTIBULE (E) CENTRAL ZONE (E) CL OFFICE 03 04 Bank of America | 04/29/21 | Planning Set | A9.21 CUPERTINO | CA4-175 20563 STEVENS CREEK BLVD CUPERTINO, CA 95014 Cross Sections SHEET NOTES 01 EXISTING ALUMINUM/GLASS STOREFRONT TO BE REMOVED 02 EXISTING WALL TO BE REMOVED FOR NEW WINDOW OPENINGS 03 NEW ALUMINUM/GLASS STOREFRONT WITH POWER ASSISTED DOORS 04 NEW WINDOW TO MATCH EXISTING AH 7-22-2021 47 of 50 Bank of America | 04/29/21 | Planning Set | A9.30 CUPERTINO | CA4-175 20563 STEVENS CREEK BLVD CUPERTINO, CA 95014 Materials and Finishes EPS-5 MATERIAL: ALUMINUM METAL PANEL MFR: PURE & FREEFORM - FLUSH REVEAL SYSTEM SPEC: ROMA NOCE SN043 SIZE: 12” W FINISH: SATIN EXPT-15 MATERIAL: WHITE PAINT MFR: BENJAMIN MOORE COLOR: SUPER WHITE OC-152 FINISH : FLAT EXPT-16 MATERIAL: GRAY PAINT MFR: BENJAMIN MOORE COLOR: 1472 LRC:57 SILVER CHAIN FINISH: FLAT METAL ROOF MATERIAL: STANDING SEAM STEEL PANEL COLOR: MATCH EXPT-16 STOREFRONT MATERIAL: ALUMINUM FINISH: CLEAR ANODIZED ALUMINUM SIZE: 2" x 4 1/2" FRAMING SYSTEM GLAZING: 1" CLEAR TEMPERED INSULATED BICYCLE LOCKER MATERIAL: HIGH DENSITY POLYESTER SMC, POWDER COATED STEEL SIDE PANELS MFR: CYCLESAFE ECOPARK SM-M02 FINISH: MATCH EXPT-16 SIZE: 33" x 77 1/2" x 50 1/2" CAPACITY: 2 BIKES BICYCLE RACK MATERIAL: STEEL PIPE SIZE: 2" DIA. FINISH: GALVANIZED STEEL CAPACITY: 2 BIKES TRASH RECEPTACLE MATERIAL: POWDER COATED STEEL MFR: BELSON OUTDOORS, DC-728501 COLOR: BLACK SIZE: 23-1/4" DIA. x 34" H PLAN VIEW AH 7-22-2021 48 of 50 monument sign, see architectural drawings existing vegetation to remain trash can , typ, see architectural drawings bike rack, typ, see architectural drawings bike locker, typ, see architectural drawings existing planter, typ overhang, typ. existing pavement, typ. AH 7-22-2021 49 of 50 AH 7-22-2021 50 of 50