Loading...
U-1995-16bto 16-U-95 CITY OF CUPERTINO 10300 Torre Avenue Cupertino, California 95014 RESOLUTION NO. 4677 OF THE PLANNING COMMISSION OF THE CITY OF CUPERTINO RECOMMENDING APPROVAL OF A USE PERMIT TO CONSTRUCT 8 RESIDENTIAL UNITS IN A PLANNED DEVELOPMENT ZONING DISTRICT ON THE EAST SIDE OF BLANEY AVENUE BETWEEN STEVENS CREEK BOULEVARD AND PRICE AVENUE SECTION I- FINDINGS WHEREAS, the Planning Commission of the City of Cupertino received an application for a Use Permit, as described in Section II. of this Resolution; and WHEREAS, the necessary public notices have been given in accordance with the Procedural Ordinance of the City of Cupertino, and the Planning Commission has held one or more public hearings on this matter; and WHEREAS, the applicant has met the burden of proof required to support said application; and has satisfied the following requirements: 1) The proposed use, at the proposed location, will not be detrimental or injurious to property or improvements in the vicinity, and will not be detrimental to the public health, safety, general welfare, or convenience; 2) The proposed use will be located and conducted in a manner in accord with the Cupertino Comprehensive General Plan and the purpose of this title. NOW, THEREFORE, BE IT RESOLVED: t That after careful consideration of maps, facts, exhibits, testimony and other evidence submitted in this matter, the application for Use Permit is hereby recommended for approval, subject to the conditions which are enumerated in this Resolution beginning on Page 2 thereof; and That the subconclusions upon which the findings and conditions specified in this resolution are based and contained in the public hearing record concerning Application No. 16-U-95 as set forth in the Minutes of the Planning Commission Meetings of January 22, 1996 and February 12, 1996, and are incorporated by reference as though fully set forth herein. Application No.: 16-U-95 Applicant: Mary Jozovich, Don & Sue Jozovich and Nick & Viola Lazaneo Property Owner: Same Location: 10106 - 10132 Blaney Avenue Resolution No. 4677 16-U-95 February 12, 1996 Page-2- The recommendation of approval is based on plans title Blaney Avenue P.U.D., Sheets No. 1, 2, 4, 5, 7, 8, 10, 12, grading & tentative map dated revised 2/l/96, plans title Blaney Avenue P.U.D., Sheets No. 3, 6, 9, 11 and landscape plan dated 2/2/96, perspective dated 1996, except as may be amended by the conditions contained in this Resolution. The property owner shall consult with the Santa Clara Valley Water District to confirm abandoned or unused water wells do not exist on the site. If wells are discovered they shall be sealed in accordance with District standards and proof shall be provided to staff that the well was sealed or none existed on the site originally. REENFIXT-M-M OREL9111fi u The redwood tree #7 shall be saved contingent upon arborist report confirming long term health. A contract shall be entered into with an Internationally Certified Arborist and a copy submitted to staff. The purpose of the contract will include an agreement to participate in initial site inspection prior to demolition, grading or construction activity to confirm protection measures are in place, participation in plan development which requires the arborist be involved prior to building demolition, grading and road construction plans to confirm recommended practices are proposed. The contract shall also require that the arborist submit quarterly written reports to staff confirming site inspections have been completed and recommended protection measures are being met. A bond in the amount of $10,000 shall be submitted for all specimen sized trees required to be protected during development (demolition, grading and construction). t This money may be released following final inspection by the above referenced arborist. The arborist shall submit in writing that the trees have been adequately protected during construction and are expected to survive. •u' 1 r♦• Modifications to the approved plans are allowed if in compliance with the single family residential zoning district and the accessory structure ordinances. Jill •► fiu:� ./ • •firth:► �• :►� :►� �9191911jvl . The Declarant warrants that this Declaration of Covenants, Conditions and Restrictions is in conformance with all ordinances, regulations, and land use conditions imposed by the City of Cupertino or any other government agency with respect to this Development. In any case where this Declaration of Covenants, Conditions and Restrictions is found to be in conflict with any ordinance, regulation or land use condition imposed on the development by the City of Resolution No. 4677 16-U-95 February 12, 1996 Page-3- Cupertino or any other governmental agency, then said ordinance, regulation or land use condition shall prevail over this declaration. 1 u• Ito] ► C *41111.01u All existing structures on the site shall be removed prior to or concurrently with project construction. The -developer shall assume the responsibility to obtain all required demolition permits in accordance with City Ordinances. The grading concept and building location for each lot shall substantially reflect the approved Exhibits upon which the subject application is based. A plan for protection of the pine tree adjacent to lot #6 shall be submitted with the grading plan. rnmP.T073 • J► •0 1 Is]2101914105 alri%g.� The Homeowners Association documents, and enabling declaration shall be reviewed by the applicants attorney, the Department of Community Development and by the City Attorney prior to recordation and should substantially reflect all conditions of this approval and plans. DINIEffff.rUIPW4,16WARVI�xr.Ti The applicant shall submit a comprehensive landscape planting and irrigation plan in conformance with chapter 14.15, Xeriscape Landscaping, of the Cupertino Municipal Code. A reciprocal maintenance agreement shall be required for all parcels which share a common private drive or private roadway with one or more other parcels within the tract. Said agreement shall be recorded in conjunction with recordation of the final map, and shall be subject to prior approval as to form and content by the City Attorney. •T:fllll► 1► 11 • `•1 The private street light standards height, material type and color shall be approved by staff. A lighting contour plan shall be submitted with the building permit to confirm conformance with the Lighting Design Statement. RMNNFPPMDPIu: Staff shall review and approve the building materials and color palette for lot No. 7. Staff shall approve the color and pattem of the entry pattern concrete. Resolution No. 4677 16-U-95 February 12, 1996 Page-4- PASSED AND ADOPTED this 12th day of February, 1996, at a Regular Meeting of the Planning Commission of the City of Cupertino, State of California, by the following roll call vote: AYES: COMMISSIONERS: Austin, Doyle, Harris, Mahoney, Roberts NOES: COMMISSIONERS: ABSTAIN: COMMISSIONERS: ABSENT: COMMISSIONERS: ATTEST: APPROVED: /s/ Robert S. Cowan /s/ Paul Roberts Robert S. Cowan Paul Roberts, Chairman Director of Community Development Cupertino Planning Commission g:/pdicpon1es16u97 Ciry H311 10300 Torre Avenue Cupertino. CA 95014-3202 Telephone: (408) i, i-3223 FAX: (403) 777.3366 OFFICE OF THE CITY CLERK *vlarch 6, 1996 Nick and Viola Lazaneo 10132 South Blaney Avenue Cupertino, California 95014 CITY COUNCIL ACTION - APPLICATION NOS. 12-Z-95, 16-U-95, 10-TM-95 AND 33-EA-95 - ,,MARY JOZOVICH, DON & SUE JOZOVICH AND VIOLA LAZANEO - REZONING OF APPROXIMATELY ONE ACRE; USE PERMIT TO CONSTRUCT 8 RESIDENTIAL UNITS IN A PLANNED DEVELOPMENT ZONING DISTRICT AND TENTATIVE MAP TO CONSOLIDATE 3 LOTS AND TO SUBDIVIDE AN APPROXIMATELY ONE ACRE PARCEL INTO 8 LOTS; PROJECT IS LOCATED AT 10106-10132 BLANEY AVENUE At the regular meeting of March 4, 1996. the Cupertino City Council granted negative declarations and took the following action on the applications: Applicntion No. 12-7—99: The application was approved per Planning Commission Resolution No. 4678 with the following conditions: SECTION III• CONDITIONS ADMINISTERED BY THE COMMIWITY DEVFLOPMENT D PT APPROVFD FXHIBITS Ordinance No. 1721 and attached plat map and legal descriptions. Council then conducted the first reading of Ordinance No. 1721. a cope of the ordinance is enclosed. ARplication No 16-U-95: y� �• Sul► � � /.1 �uu l � � � 1. "APPROVED FXHIBITS The recommendation of approval is based on plans title Blaney Avenue P.U.D., Sheets No. 1, 2. 4, 5, 7, 8, 10, 12, grading & tentative map dated revised 211/96, plans title Blaney Avenue P.U.D.. Sheets No. 3, 6, 9, 11 and landscape plan dated 2P2/96, perspective dated 1996, except as may be amended by the conditions contained in this resolution. ABANDONED WATER \VEI LS The property owner shall consult with the Santa Clara Valley Water District to -confirm abandoned or unused water wells do not exist on the site. If wells are discovered they shall be sealed in accordance with District standards and proof shall be provided to staff that the well was sealed or none existed on the site originally. .4 BORIST RFQTJIREN,,fENTS The redwood tree 47 shall be saved contingent upon arborist report confirming long term health. A contract shall be entered into with an Internationally Certified Arborist and a copy submitted to staff. The purpose of the contract will include an agreement to participate in initial site inspection prior to demolition, grading or construction activity to confirm protection measures are in place, participation in plan development which requires the arborist be involved prior to building demolition, grading and road construction plans to confirm recommended practices are proposed. The contract shall also require that the arborist submit quarterly written reports to staff confirming site inspections have been completed and recommended protection measures are being met. A bond in the amount of $10,000 shall be submitted for all specimen sized trees required to be protected during development (demolition, grading and construction). This money may be released following final inspection by the above referenced arborist. The arborist shall submit in writing that the trees have been adequately protected during construction and are expected to survive. 4. COWLIANCF WITH SIN T .. FAMILY REGULAMONS Modifications to the approved plans are allowed if in compliance with the single family residential zoning district and the accessory structure ordinances. CONFORMAN F WITH ORDINANCES. RFCYULATIONS AND LAhM USE CONDITIONS The Declarant warrants that this Declaration of Covenants, Conditions and Restrictions is in conformance with all ordinances, regulations, and land use conditions imposed by the City of Cupertino or any other government agency with respect to this Development. In any case where this Declaration of Covenants, Conditions and Restrictions is found to be in conflict with any ordinance, regulation or land use condition imposed on the development by the City of Cupertino or any other governmental agency, then said ordinance, regulation or land use condition shall prevail over this declaration. 6. DEMOLITION RFOtffR_ EMENT All existing structures on the site shall be removed prior to or concurrently with project construction. The developer shall assume the responsibility to obtain all required demolition permits in accordance with City Ordinances. ADTNQT STANDARDS The grading concept and building location for each lot shall substantially reflect the approved Exhibits upon which the subject application is based. A plan for protection of the pine tree adjacent to lot #6 shall be submitted with the grading plan. g. HOMEOWNERS ASSOCIATION DOCUMENTS The Homeowners Association documents, and enabling declaration shall be reviewed by the applicants attorney, the Department of Community Development and by the City Attorney prior to recordation and should substantially reflect all conditions of this approval and plans. 9. LANDSCAPF REVIEW The applicant shall submit a comprehensive landscape planting and irrigation plan in conformance with Chapter 14.15. \eriscape Landscaping, of the Cupertino Municipal Code. 10. ROAD M.AINTFNANCE AGR_FFMENT A reciprocal maintenance agreement shall be required for all parcels which share a common private drive or private roadway with one or more other parcels within the tract. Said agreement shall be recorded in conjunction with recordation of the final map, and shall be subject to prior approval as to form and content by the City Attorney. 11. STREET LIGHTING INSTALLATION The private street light standards height. material type and color shall be approved by staff. A lighting contour plan shall be submitted with the building permit to confirm conformance with the Lighting Design Statement. 12. BUILDING MATERIALS Staff shall review and approve the building materials and color palette for lot No. 7. Staff shall r approve the color and pattern of the entry pattern concrete. Application No. 13-TM-95r SECTION III: CONDITIONS ADMIMSTERED BY THE CObM WITY DEVELOPMENT DEPT. 1. APPROVED EXHIBI s r--t q(, ', The tentative map dated Dec r, 1995, Kirkeby Engineering, except as amended by the conditions herein. SECTION TV- ONDiT1ONS ADMIMSTF ED BY THE PU13LIC WORKS DEPARTMENT 2. STREET WIDENING Street widening, improvements and dedications shall be provided in accordance with City Standards and specifications and as required by the City Engineer. Public Service Easement (PSE) over the driveways of lot 3 & 4 is required for turn around purposes. 3. STREET LIGHTINNG INSTALLATION Street lighting shall be installed and shall be as approved by the City Engineer. Lighting fixtures shall be positioned so as to preclude glare and other forms of visual interference to adjoining,' properties, and shall be no higher than the maximum height permitted by the zone in which the site is located. 4. CURB AND UTJTTER IMPROVEMENTS Curbs and gutters, sidewalks, handicap ramps, and related structures shall be installed in accordance with grades and standards as specified by the City Engineer. 5. FIRE HYDRANT Fire hydrants shall be located as required by the City. 12. TRANSFORMERS MERS Electrical transformers, telephone vaults and similar above ground equipment enclosures shall be screened with fencing and landscaping or located underground such that said equipment is not visible from public street areas. 13. DDT ATTON OF WATERLINE The developer shall execute a quitclaim deed for underground water runts to San Jose Water Company and shall reach an agreement with San Jose Water Company for water service to the subject development. Please review conditions carefully. If you have any questions regarding the conditions of approval, please contact the Department of Community Development staff members for clarification. Failure to incorporate conditions into your plan set will result in delays at the plan checking stage. If development conditions require tree preservations, do not clear the site until required tree protection devices are installed. The expiration date for the use permit is March 4, 1998. (Section 6.4 of Ordinance No. 652 as revised by Ordinance No. 1136). The expiration date for the tentative map is March 4, 1999. (Section 66452.6 of the Subdivision Ivfap Act). Sincerely, I KIMBERLY SMITH, CMC CITY CLERK KS/cs cc: Department of Community Development Department of Public Works Phillip Savio Cupertino Sanitary District 20065 Stevens Creek Blvd. Cupertino, CA 95014 Brian Kelly 4030 Moorpark Ave. 4125 San Jose, CA 951I7 Mary Jozovich 350 South Henry Avenue San Jose. CA 95117 Don and Sue Jozovich 1333 Haines Road Aptos, CA 95003 6. TRA.FFIC SIGNS Traffic and signs shall be placed at locations specified by the City Engineer. 7. STRFFT TRFFS Street trees shall be planted within the Public Right of Way and shall be of a type approved by the City in accordance with Ordinance No. 125. 8. G 6DIINS Grading shall be as approved and required by the City Engineer in accordance with Chapter 16.08 of the Cupertino Municipal Code. 9. D AINA T . Drainage shall be provided to the satisfaction of the City Engineer. Surface flow across public sidewalks may be allowed in the R•1, R-2 and R-3 zones unless storm drain facilities are deemed necessary by the City Engineer. Development in all other zoning districts shall be served by on" i site storm drainage facilities connected to the City storm drainage system. If City storm drains are not available, drainage facilities shall be installed to the satisfaction of the City Engineer. 10. UNDERGROUND TTM,MFS The developer shall comply with the requirements of the Underground Utilities Ordinance No. 331 and other related Ordinances and regulations of the City of Cupertino, and shall coordinate with affected utility providers for installation of tderground utility devices. The developer shall submit detailed plans showing utility underground provisions. Said plans shall be subject to prior approval of the affected Utility provider and the City Engineer. 11. IN4PRO MFNC AGREEMENT The project developer shall enter into a development agreement with the City of Cupertino providing for payment of fees, including but not limited to checking and inspection fees, storm drain fees, park dedication fees and fees for undergrounding of utilities. Said agreement shall be executed prior to issuance of construction permits. a. Checking & Inspection Fees: S 5% of Improvement Cost or $1,744.00 minimum b. Development Maintenance Deposit: $3,000.00 c. Storm Drainage Fee: 51290/acre d. Power Cost: $75.00/light ` e. Water Main Reimbursement Fee: N/A f. Map Checking Fees: 5399 + ((9)•(#lots - 4)) = $435.00 g. Park Fees: 515,750/lot -The fees described above are imposed based upon the current fee schedule adopted by the City Council. However, the fees imposed herein may be modified at the time of recordation of a final map or issuance of a building permit in the event of said change or changes, the fees charged at that time will reflect the then current fee schedule. 1 � 1 I KITCMEM DINING 40011 Ir I LIVING MOON EA •°r_-- OEN T GARAGE --- SECOND FLOOR PLAN FIRST FLOOR PLAN TofrL Llvi.�p: I'S IKA�P s �U•� +,A rT. • L•9 �Iror . t+•b �a •T• �JTAL s I ls7•f 7G tT. Q N •r y ` b � Q GO Q C V1 •C' � v O h R 4 V II 1111 I III II I • BLANEY AVENUE P.U.D. Plan IV Floor Plan VIP. N -.. .. _ ...:.- I.:_Tt .,.-_._: � _qa< C..,r,Y , •'t e, 'i'�;. Y4arit�•1�$.zs�' .tN .Y - �. MEE REAR ELEVATION I��■� 1r' _�L __ ',FRONT. ELEVATION I LEFT ELVATION ENTRY ELEVATION 11 ■T E , ■/^\■■■■■ ■■■■■■■■■■ ■■■T.i��il�\:�IEFrr\■■ r ♦ ♦ ■f r I._:.1■■■■■ I:'L'�!IC G�'711"a■■■■ ■■�. is ♦ a. iu u. F i ■■■ ■1 i (1 ■■■R L1. tirT71�!1<7fTIRR�tT�la■ ?�l""i"Z�ww .srwa , , ■►i r :A■■■dlul i�t,�rrtWrr Aq/III■■■■■ B!3u'in2 iF ii �lT■■ ■■■C')'"� *7l"F!?"iiF'1■r■ w �r• ■■■ ■C!4t11T1'R■■1 ■■■■■-- A- I ram■■■■17- Plan IV Elevation "A" Q N 1 h O a b LL a t to V u C CZ U 1? e U �= fil APPROVAL 16-U-95 PlaMiug Commission: $8 February 12, 1996 - - _ QV Council: 39 Marcb 4, 1996 Signature: Casc Manager b Q Q N i' � C i . e a �o Gti w 1.1 •• y vQl Q C U ,n qqpp 00 Qr v C V `4 v I KT. wm".r.■■ �aWL%.1 IULI tu■■ �iY%iI/1L I.NO Iot ■�...�*• �■... B=Y AVENUE • BLANEY AVENUE P.U.D. • CUFF MNO. CA Conceptual Landscape Plan . 1•.Wr ® CONCRETE FLATWOM SCHEME 1_• �Q, el rv4nnv Tvre mvr+ervn>!�Tarwr a.rvtw.n 1Ot 11. 7.4. �>' Clod aay.i WIt J NV w...m..o..r ..a. lr b LOT.ttit Ck-do..ww4 NgW bw fiW lr.e..ws aw.l Ynd. ro.twtt � wAurlAls LOT.1. t 4..T CW."m.o.w. r1. ex.n awd rnw .• wr. aa•wl b— LO[. t f I, t Cd mna.a uw bms t.Fl wa. r .w ..rau ww buN. NOTES: 1. nnr.w.T we.. 1... YWib bdd vlw.vro. •aw. pae ~wPiu1�W • w Y' w'I� las L•W .f—t b •py.aosu�� T.od.qu.J/. 1 Cmaw ml>wYti0.w. w.ppnwd-r-L $P—k man l7 .fP--tit 11cwO..W11v L.. "MO- 1 AY fl—w .4.t Yw • w.ao• 1/t• f.. bw Jap.r.y 6m Y— wYl./bW..... =•a.1.1ar „�/, .+.v�t,..l.� gal.. Greg G.InA A,sodate3 I 1 1 �ro 1 u.n..rr..+al a.v/ew f I avv♦• 7.2.94. r I If/. loL• 16 L-J PnP.wd idRcl. l+b// ` yte srl l\F �i' -ts7A ss �S 6 3 / ra4.r ,'' Pod Lo3.r 7- And ra3.4 i s• M I • sa. . % FF. Za1.11 i W—Z iw-'filN 'r 1a oi• ,r.i�d Fy /..ia. / ON zor..oS� 'Q e ON to c l� � rs !L 20 Z77 e w C`.1 '.FEt.Wo/1 .Pnpeaad 4 O It C 4 ytt ��nf.sf • yl' I r/. ZaaOZ I 4 �•b I S/ Pod ¢:l � f • I __"—_ t �•• L rF I l.F Pad fa4 sl f tr to ILI r jilt a.t � Ak Is* ss SEC i/ON X -X S.k, //. i ✓ /-./ , ,t Imt IrK>0 .sla aaa ... �P1. 1. . 94"SI. MOM .•S1 �.•' ; 1 NlF aF. alas V. .W "_•1 .e= .•.. "ji. .. !. and v. ..s N)!L. ZOOS V. .!M ..yr r7Tr--� l Nal1J. " W V. .an -� y S.I. 7M! Sl. Y!! ; 1 r •`tA/�. ,f. t R\tl {�r tOTK !la/Nil. :12S1". .laS + w BLANEY AVENUE wCINTY MAP y.vd a,l ro — 111 9so/o APPROVAL 16-U-95 Planning Commission: $8 February12, 1996 City Counci • 3C March 4, 1996 Signature: Case Manager !/ t 40 N . y . !%i•AG. i�.N rjre• SECTION A -A ✓.rl. tt lttena•• �Kb I I I Y fi. 2a5.3. ��J,7J.fs" \ d.rr•! C.1I// Pod re♦.sue \ 4 J• .y 'S V ytllot I et . �%• IlrJ Sf. . I •: a Pad 203R fbd z03.4 s L•----� 3 Pod tD,.e t\ /I r �' I � ; �• .rout. •� � V J \ --_- J � r..l..+ -t-�' I �: C.3i aV I L I i � oe•-ir sa y +•.m, sa.!' _ f \ I I:� ,{;t I ZZ I / N.IJ true I f �/ �i.'� °�i� r.J�•? ____ I � -te '(,/•y llf! l�It r1 , J»mil. f, �—_-, —� ' S T , I K 9• I r lea/e: I'•10 / f. _ If PodtoRJ .._I J I r/t.c. s' S.S.E. I I rs lJN/ L_ ,I I ....' 7 .•'• " „� ''I. •; L -rc �Jl _ NOTE: Lot 9 is C-- r ArcPi—tcrcE.A.E3 PUE, Podr toi2 I �r I ex it N'q del✓...ye I l I J, �z 6.. I I �" it I + , I fF 2a1.♦ I Vc I -- art: ie 6e rc .—d and I I c 7� I ,bd14 toes L_ re /Deed WiM Slandord L---J •° —' r--: J C-6, C✓der0-d 5ilewo%t I I `�, — ' J •t ~I I �' -t r � I ►— , ,� � ,, ,,..,I : • i .fir., • ,� r s.__.. la � I ,: wawa .,• ,,. I r, :. aLANEY AVENUE .m LL l•GIYY p J'_•3L a'� ,r+rr t•.r wAwr r� G, a s ... .., p L • L0I S n+slfrA w..s �4 .Y"Ge.dcf Rr/-No,l SEC. C-c LOT } laLr��e s F.a. Li..Pll..fl• sec e•e IdA I eb i .,jII PoEJ�LL' — FG- rw. 1L'a/. f8E 56G A A n� I • V' "�' EPA •-�... ii�nn:�•onu.-m MEMO= MNKEENEKMMNI= WOMEN= mmmmm:: mmmlku= MENEM= momano� FTr SHEETfQfX 1 STORY .2 STORY I Sne mi,n EXISTING 2 pt" : Fic- plan. EXISTING • 3 R. EW-1— A I s F4_ w F;­ M... J. 6 pan a [I—,— A Pan I V—­a r- 11 Fi— 01- A 10 1 STORY r- N fl— p4n EXISTING- 11 m. N LI-1— A ic: �71 12 St. Ell. 2 STORY M'p STORY. UtAtlos Plan I. All. Sil- P,.—.y G,.d.9 F4- EXISTING EXISTING Ll Concepwai Llnlhcs.g PIs" ON 4— T VD LOT 6 LOT ryl.o C4. '40 Ch PLAN III A lull 2 STORY q PLAN I B I PLAN I A 12.31I.L — . LOT 4 EXIST' mi� ­Tt: IL. rIv 1 LOTS 51 p"v a l IISTIN' -2 STORY. PLAN I B 21AN a L FTUFF cut'. 7c.eAc r JOT& STORY-- Y t le uj 1:4 EXISTING• 39 4UPLAN I A PLAN IV At', :A. .2 STORY LQi J!A. — LOT 2 0 r-- - tt LOT 7 Si — �7 —LOT Lu: 777 - - a 7 T LOT I Hie I STORY TE EXISTING PLAN 11 B PLAN 11 A 4m MUMMA ■ R nL 0471.' 7 M momsis B BLANEY AVENUE; *BLANEY AVENUE P.U.D. • Ell rAtn CUMMVO. CA dd pijb(dd Site Plan r.wr APPROVAL 16-U-95 Planning Commission: 3$ February]2, 1996 City Council: X March 4, 1996 Signature Case Atanager SECOND FLOOR PLAN a ME ii■ ■.<��.� .0 �r4 i�ii� �iiii-="�■■i FIRST FLOOR PLAN • I+r Sao:. �ioe �a n lot>� -rx6o ae r't Gaa►ea .}to 44 tr • BLANEY AVENUE P.U.D. • CUMMO, CA Plan 1 Floor Plans w..r. LEMON wlwm■ ■■i1�J■■■iYYY REAR ELEVATION • FRONT ELEVATION ON WOMEN M ON am ■i■ lRn ► ►►�4'.� ■■■"�nVr■�■ u�icioius: •aur+su�w sms• y • BLANEY AVENUE P.U.D. • CUFF TMO, CA Plan I IIevation'A' vu•. ro ;•LEFT ELEVATION) RIGHT ELEVATION I lil I I I IIII ' aeAw-aestra+s�n.iwwr►c}�- -P1Ut1�00I � � ►-nq�-N�h "'� � a a �i i a CM a � � .a •1 � r V 1 C � �l 0 z m 0 z m r- m 0 0 z RUM I m m m m r m 0 z f- m m I- m 0 z APPROVAL 16-U-95 P'"ll"'n9CO"I'llissi011: M FebriraU,12,1996 C41, Council. N jilt, c 14,1 96 Signature: Case Manager SECOND FLOOR PLAN • BLANEY AVENUE P.U.D. • CUpMMNO. CA Plan II Floor Plana Hw'-r. �o a a N Z a Q12G 4 Z 'eg a C ea a c FIRST FLOOR PLAN 1'� F�.s+ • 177o ' -4 rT 'r'mra + Iooa }a rT ;lrot. • 2f�0 sari ypAlyQ.i s /f I O 46 rT I ESkiN�e-A � NIN Lw4i6614+7 or 1 m' m r O z m r m T m r m n 0 z T m O: Z. --1 m O z APPROVAL 16-U-95 Planning Cnnrrnissian: X February 12, 1996 - - - - - CUp Cururcil: 8S Ala rc 4, 199 Signature: Case Manager t _ - •m ,z m r � c O Z • r �Z r� �c b a Q. d� o tv d m m a m I r m m r m a 0 Z APPROVAL 16-U-95 Planning Coninrissioir: X February 12, 1996 City C01111cil: X Mar h 4,19 Signature Case Manager _ a _ r �• O WAS IN OATH O - ■lOROOY ! OU[Oi WOTU OlOROOY nonooY a K[oaooY a -• J I wAuc-Iw ' 0 0 FAMILY KooY• i I I cl -. C: [NTRY Kr at 1I1 OINIMO ROOMRITCNIM _ f ORlAK►A[T UYIXO ROOM 1 1 r I OMAO! i �II � � I FIRST FLOOR PLAN LI41Nh bRti • fiOo +'LT bsasp=. '.(•ne '� n • BLANEY AVENUE P.U.D. CUPERTINO. CA A� I Plan III Floor Plan yam y�,M %o a c� N a � >L � G 4 w $$ 41 U APPROVAL 16-U-95 Planning Commission: X February12, 1996 Gty Council; X /March 4, 1996 Signature /A- Case Manager REAR ELEVATION FRONT ELEVATION �Uj:�'L:i Ill 11 1 �lvll itlf� d,• MAnZA a,sr w .�r�...�..� • BLANEY AVENUE P.U.D. • CUPWIN0. CA Plan III Mevatioa'A' mr. ry LEFT ELEVATION wu lti•ry 'RIGHT ELEVATION - .=, -,■11111W■AHM ■■■■■■Itll•tlt■1r APPROVAL 16-U-95 Planning CO1l"issi011: 3$ February Il, 1996 Gtity COrurcil: X Mar 4, 1996 Signature Case Manager fi " r i n 0 s t� C If M � Y x