Loading...
U-1992-10b 10-U-92 CITY OF CUPERTINO 10300 Tone Avenue Cupertino, California 95014 RESOLUTION NO. 4439 OF TI� PLANNING CONIIvIISSION OF TI� CITY OF CUPERTINO RECONIIvIENDING APPROVAL OF Tf� FUNDAMENTAL ARCHITECTURAL DESIGN CONCEPT FOR A PARKING STRUCTURE LOCATED ON TI� SEARS PARKING LOT SECTION I: FINDINGS WHEREAS, the Planning Commission of the City of Cupertino received an application for a Use Permit, as described on Page 1 of this Resolution; and WHEREAS, the applicant has met the burden of proof required to support said applications; and WHEREAS, the Planning Commission finds that the application meets the following requirements: a) That the use or uses are in conformance with the General Plan of the City of Cupertino, and are not detrimental to existing uses or to uses specifically permitted in the zone in which the proposed use is to be located. b) That the property involved is adequate in size and shape to accommodate the proposed use. c) That the proposed use will not generate a level of traffic over and above that of the capacity of the existing street system. d) That the proposed use is otherwise not detrimental to the health, safety, peace, morals and general welfare of persons residing or working in the neighborhood of such proposed uses, nor injurious to property and improvements in the neighborhood. NOW, TI-�REFORE, BE IT RESOLVED: That after careful consideradon of maps, facts, exhibits, testimony and other evidence submitted in this matter, the application for Use Permit is hereby recommended for approval, subject to the conditions which are enumerated on Page 2 of this Resolution; and That the subconclusions upon which the findings and conditions specif ed in this Resolution are based and contained in the Public Hearing record concerning Applicadon 10-U-92 as set forth in the Minutes of the Planning Commission Meeting of January 11, 1993, and are incorporated by reference as though fully set forth herein. SECTION II: PROJECT DESCRIPTION Applicant No(s): 10-U-92 and 19-EA-92 Applicant: Westfield, Inc. Property Owner: Westfield, Inc. Location: Corner Stevens Creek Blvd. and Wolfe Road Resolution No. 4439 (10-U-92) January 11, 1993 Page -2- SECTION III: CONDITIONS ADNIINISTERED BY THE COMMiJIVITY DEVELOPMENT DEPARTMENT 1. The Commission recommends a design theme represented by a drawing labeled Altemative C subject to the following modifications and design studies which will be reviewed in the context of a detailed architectural review by the Planning Commission and City Council: a. The openings between columns on the lower level of the south elevation (Stevens Creek Boulevard frontage) shall be filled with height, colored, reflective materials. The intent of this condidon is to emulate a retail building rather than conventional parking structure. b. The final azchitectural presentadon should provide an alternadve design which includes an arch design for the horizontal beams located between the lower level columns. � c. The building materials shall be high quality. Finished concrete shall be used rather than stucco. The ' concrete should be a light color. ( d. The pedestrian access shall be incorporated into the tower elements. The tower elements should be shifted to the east to facilitate a covered walkway connecting the two towers and thence to the Sears building and Stevens Creek Boulevard bus stop. The design shall incorporate a bus stop and arched (elevated) roof over the driveway isles. The bus shelter design must not disrupt existing street trees. The final walkway design shall not give the impression that pedestrians must enter the garage other than the pedestrian oriented tower elements. e. The horizontal fascia and balustrades on the second and third levels shall include rectangulaz shaped landscaping containers. � f. Architectural detailing shall be used on all four sides of the structure. PASSED AND ADOPTED this l lth day of January, 1993, at a regular meeting of the Planning Commission of the City of Cupertino, State of California, by the following roll call vote: AYES: CONIIvIISSIONERS: Austin, Mackenzie, Mahoney and Chairman Fazekas NOES: COT�IIvIISSIONERS: Mann ABSTAIN: CO1VIlVIISSIONERS: None ABSENT: COMNIISSIONERS: None ATTEST: APPROVED: ��� � Robert S. Cowan Daryl Fazekas, C'rman Director of Community Development C�pertino Planning Commission g:�nmlperesos�pc l 0u92 10-U-92 CTTY OF CUPERTINO ( 10300 Torre Avenue Cupertino, Califomia 95014 ( RESOLUTION NO. 4448 OF'THE PLANNING CONIIvIISSION OF TI� CITY OF CUPERTINO RECOMNIENDING APPROVAL OF TF� FINAL ARCHITECTURAL, LANDSCAPING AND SIGN PLANS FOR T'HE "SEARS" PARKING STRUCTURE LOCATED ON STEVENS CREEK BOULEVARD 1 I WHEREAS, the City Council directed the Planning Commission to informally review the detailed drawing of the � parking structure and submit a report to the City Council, and � WHEREAS, the Planning Commission previously reviewed the parking structure concept and design concept and determined both to be in conformance with the General Plan. � NOW, TI�REFORE, BE IT RESOLVED: � That after careful consideradon of exhibits and public discussion, that the Planning Commission recommends approval of the final design plan pursuant to the conditions enumerated below: 1. APPROVED EXI-IIBITS The recommended approval is based upon the elevation exhibit describing the east and south elevations dated I January 25, 1993, site and landscaping drawing dated January 25, 1993, covered walkway dated January 25, 1993, cross section dated January 25, 1993 and perspective drawing of southeast comer dated January 25, 1993. The approval of said plans are modified by addidonal conditions contained herein. / � 2. LATTICE DESIGN 1 The lattice installed between the column openings shall be a light color. The plant materials which grow on � the lattice shall consist of light colored leaves. The plant materials may include flowers to add color to the building. Staff shall approve the plant materials. � 3. ORNAMENTATION 1 The final design describing detailed omamentation of columns, planter boxes, connecting bridges, and other architectural detailing shall be approved by staff. 4. LIGHTING � The lighdng plan shall be approved by staff. The structure shall be well lighted to provide comfort and security to patrons. � 5. BUS STOP I The final design for the bus stop shall be approved by staff following consultation with the Santa Clara County � Transit District. The design of the bus stop may include a different roof shape than described on the approved exhibit. A rounded or "umbrella" shape which emulates the tree canopy will be considered. Said design shall not cause significant removal of existing tree canopy. Resolution No. 4448 (10-U-92) January 25, 1993 Page -2- � 6. SIGN PROGRAM ( The sign program for the parking structure shall substantially match the size and locadon of signs as shown on the architectural elevadon exhibit dated January 25, 1993, with final approval by the Department of Community Development. Additional display cases may be added with final approval from the Director of Community Development. I L The Sign Program for the parking structure shall be additional to the sign program as contained in Application ASAC 51,908.2. � 7. WALKWAY ROOF ! The walkway roof should be constructed with solid material to provide protection during inclement weather. ` ff a metal roof is the only practical solution, various materials should be explored and presented to City Council for final approval. � 8. SOUTH AND WEST ELEVATIONS The proposed planters located on the east elevation shall be repeated on the south and west elevations. ` PASSED AND ADOPTED this 25th day of January, 1993 at a Regular Meeting of the Planning Commission of � the City of Cupertino, State of Califomia, by the following roll call vote: AYES: CONIlVIISSIONERS: Baudsta, Doyle, Mahoney, Roberts and Chairwoman Austin NOES: CONIlvIISSIONERS: None � ABSTAIN: CONIIvIISSIONERS: None , ABSENT: COT�IlVIISSIONERS: None ( ATTEST: APPROVED: � I �r,.�. J � �,--,�___ �"' Robert S. Cowan Donna Austin, Chairwoman Director of Community Development Cupertino Planning Commission I g:�,�►y��os�W�r �