Loading...
U-1988-08 (rev)b8-U-88 (Revised) CTPY OF CUPERPIN0 10300 TORRE AVENUE CUPZM!I 10, CALIFORNIA 95014 RESO=ON NO. 4131 OF THE PLANNING CC fISSION OF THE CITY OF CNPIIRrMO APPROVING A MDM Al4ES 4DU OF USE PERMIT APPLICATION 8 U-88 BY APPVMM* A REVISED PHASING PLAN FOR THE CONSRUCTION OF A 36,000 SgUIUM FOOT OFFICE 00KP= Application No(s): 8-U-88 (Revised) and 15-EA-88 Applicant: Cali Land Property Owner: Same Location: Southwest quadrant of Blaney Avenue and Stevens Creek Blvd. Parcel Area: 2.1 Acres L : FINDINGS: The Planning O mmnission finds as follows with regard to this application: 1. Zha proposed phasing plan will result in the hmiediate implementation of the SCB Conceptual Zoning Plan. 2. The proposed work will inprove and enhance the property. 3. The fencing off of the undeveloped southerly portion of the property will lessen the noise impact to the adjoining residential neighborhood. 1. Condition 25 of 8-U-88 is modified as follows: The intention of the revised phasing plan is to cmplete public streetscape improvements in the initial stages of the project. Accordingly, the first phase shall excoapass the following and shall reflect the revised exhibit labeled "Conceptual Grading Plan" dated 1/21/89. - Installation of storm drains, curbs, gutters, sidewalk and walkways around the Hamasushi Restaurant Building and SCB frontage. - Relocation of two driveways on SCB. - Installation of landscaping and irrigation along east and west property lines and SCB frontage. - Installation of a temporary chain link fence and gate between the parking lot and undeveloped southerly portion of the property, to be removed when phase two construction beings. Resolution No. 4131 (8-U-88 (Revised) 02/13/89 Page -2- The external remodeling of the Hamasush{ Restaurant building and the completion of the noise attenuation wall and perimeter landscaping may be deferred until the new co mnercial/office building construction beings (phase two). 2. larrl.capirxt Prior to issuance of a building permit for on -site improvements, a bowl shall be secured to ensure completion of the landscaping in accordance with the SCB Conceptual Zoning Plan. All landscaping shall be reviewed and approved by the A.S.A.C. 3. Previous Conditions All previous conditions pertaining to Application 8-U-88 not in conflict with conditions contained herein shall remain in full form and effect. PASSED AND ADOPTED this 13th day of February, 1989, at a regular resting of the Planning Commission of the City of Cupertino, State of California, by the following roll call vote: AYES: NAYS: ABSTAIN: ABSENT: /s/ Robert Cowan Robert Cagan Community Development Director reso\rS8u88 (2) /s/ Victor Adams Victor Adams, Chairperson Planning Commission 10300 Torte Avenue Cupertino, CA 9SO14.3255 Telephone: )40a) 2524505 TAX: (408) 252-07S3 February 22, 1994 Cali Land Associates P.O. Box 1239 Cupertino, California 95015 Regarding: Conditional Use Permit 8-U-88 P.O. Box 580 Cupertino, CA 9SO15-OSa0 This letter is a follow-up to mine of November 8, 1993, which requires compliance with Condition No. 27 of City Council Action letter dated November 2, 1988. This letter provided a 30 day compliance date for recordation of said ingress/egrcss agreement. As agreed by Steven Hoffman in his letter of December 6, 1993, the agreement would be recorded within 60 days (February 6, 1994). This document was received on January 18, 1994, and comments were given and reviewed with Mr. Hoffman on January 26, 1994. To date we have yet to receive the final recorded document and we are forced to forward the revocation proceeding to City Council. As a final concession we will allow five working days to receive the recorded document before the referral is forwarded to City Council. If 1 canbe of any assistance, please do not hesitate to call me at (408) 777-3277. Sincerely, V Michele Bjurman Steven Hoffman Kim Williams g/mm/Ictters/hoff 10300 Torre Avenue Cupertino. California 95014 Telephone: (400) 252.4505 DEPARTMENT OF PLANNING AND DEVELOPMENT February 16, 1989 Joseph Bellomo 221 Kiplin3 Street Palo Alto, California 94301 Subject: Application 8-U-88 (Revised) Cali Land Dear Mr. Bellamo: P.O. eo. 580 Cupertino, California 95015 This letter oanfirms the decision of the Cupertino Planning Ormlmission, given at its regular meeting of February 13, 3.989 to approve the subject application according to the findings and conditions specified in the enclosed copy of Planning Ccmnission Resolution No. 4131. Please note these carxiitiens carefully. Subsequent submittal of materials for building permits or other entitlements will be checked for compliance with the conditions listed in the Resolution; discrepancies may result in processing delays. Please contact our office if you have questions about this matter. M • • • ]1•J ■ '• Robert S. Cowan Director of CamF nlity Development Enclosure mist\ac8u88(1) City of Cupertino [hturtment of Cc 10300 Torre Avenue, Cupertino, CA. 95014 (409) 252.4642 TO: CHAIRMAN AND MEMBERS OF THE PLANNING COMMISSION FROM: SUZANNE GYOREY, PLANNER I DATE: FEBRUARY 13, 1989 1) APPLICANT'S REQUEST: APPLICATION NO.: 8- 1-88 (Revised) and 15- A-98 APPLICANT: Cali Land PROPERTY OWNER: ;Zama LOCATION: Southwest Quadrant of Blaney Avenue and Stevens Creek Boulevard PARCEL AREA: 2.1 Acres USE PERMIT Requesting approval of the first phase development plan for a multi -tenant retail complex, as required by condition 25 of Use Permit 8-U-88. 2) jQISCLISSION: A. The applicant is preparing to begin some necessary repair work for the existing parking lot on the subject property. Since the existing paving will be removed, the applicant saw this as an appropriate time to begin implementing the approved development plan for the site. A condition of approval for 8-U-88 stipulates that the first phase shall include the restaurant building remodel, and installation of perimeter landscaping and noise attenuation walls. B. The applicant proposes to complete the following work as phase one of the project: 1. Installation of storm drains. 2. Relocation of two driveways on Stevens Creek Boulevard and installation of curbs and gutters. 3. Removal of existing sidewalk and installation of new sidewalk along Stevens Creek Boulevard frontage. 4. Removal of pavement, grading and repaving and restriping of parking area surrounding the restaurant. 5. Patching and overlay (as needed) of a portion of the parking lot to the rear of the restaurant. 6. Installation of new walkways around the existing restaurant and connecting to the frontage sidewalk. 7. Installation of curbs, irrigation systems and landscaping along the cast and west side property lines. 8. Installation of landscaping and irrigation system along Stevens Creek Boulevard frontage. 9. Installation of a temporary chain link fence and gate to close off the undeveloped southerly portion of the property (to be removed once phase two is underway). C. It is proposed that the remodeling of the Hamasushi restaurant building and the installation of a masonry wall along the south property line be done at the same time that the new building is constructed at the rear of the property (phase two). D. Phase two will include the demolition of the existing 6500 square foot retail building (Blaney Center), construction of the new 28,000 square foot retail/office building, the remodel of the restaurant building, installation of the masonry wall and completion of parking lot improvements and landscaping on the rear portion of the property. E. Staff feels that it is a positive step that the Stevens Creek Boulevard frontage improvements and landscaping will be implemented as a part of the proposed first phase. From the applicant's perspective, it is more cost effective to tic the construction of the new building and the remodeling of the restaurant building together. Due to lease constraints construction of the new building cannot take place for several years. The installation of the masonry noise attenuation wall along the rear property line could be deferred until such time that construction of the new building begins since access to the southerly portion of the site will be controlled by the temporary fence, and there will not be any construction taking place at the rear of the property. 3. RECOMMENDATION A. Staff recommends approval of the proposed phasing plan for application 8-U-88 per the findings and conditions contained within the model resolution. B. The environmental review for this project was previously completed. ENCLOSURES: 1. Model Resolution 2. City Council Action Letter on 8-U-88, dated November 2, 1988 3. Site plan and landscape plan (two sheets) PREPARED BY: Suzanne Cyo y Planner I SUBMITTED BY: DtT cft� Robert S. Cowan Director of Community Development