Loading...
B-2018-0308InspectionRecordINSPECTION RECORD CITY HALL 10300 Torre Avenue • Cupertino, CA 95014-3255 PHONE 408-777-3228 WWW.CUPERTINO.ORG BUILDING ADDRESS: 1258 S STELLING RD CUPERTINO, CA 95014-5257 CUPERTINO APN: 366 11 109 PERMIT NO: B-2018-0308 OWNER'S NAME: VASAVAKUL THAVEESINN AND THITIPORN OWNER'S PHONE: Not Provided CONTRACTOR: NO LICENSE INFO,CONTRACTOR PHONE: DATE ISSUED 1/21/2021 11:33:19 AM ISSUED BY:VALUATION: $500000 JOB DESCRIPTION 1ST FLOOR ADDITION (1401 S.F.); GARAGE ADDITION (113 S.F.); REMODEL EXISTING RESIDENCE (1234 S.F.); (N) PORCH (37 S.F); PANEL UPGRADE (400 AMPS); (N) FURNACE AND TANKLESS WATER HEATER. INSPECTION TYPE DATE STATUS INSPECTOR ELECTRIC METER RELEASE 2019-01-25 Passed   EXTERIOR LATH 2019-02-01 Cancelled   EXTERIOR LATH 2019-02-08 Passed   EXTERIOR SHEAR 2018-12-10 Passed   FOUNDATION 2018-09-12 Passed   GAS METER RELEASE 2019-02-12 Failed   GAS METER RELEASE 2019-04-22 Passed   INSULATION 2019-02-01 Passed   INSULATION 2019-02-01 Passed   INTERIOR LATH 2019-02-20 Passed   INTERIOR SHEAR 2018-12-10 Passed   PIERS 2018-09-06 Failed   PIERS 2018-09-11 Failed   ROOF NAIL 2018-12-10 Passed   ROUGH ELECTRICAL 2019-01-25 Passed   ROUGH FRAME 2018-12-10 Cancelled   ROUGH MECHANICAL 2019-01-25 Passed   ROUGH PLUMBING 2019-01-25 Failed   ROUGH PLUMBING 2019-02-01 Passed   SCRATCH COAT 2019-02-20 Passed   SHEETROCK 2019-02-12 Passed   SHEETROCK 2019-02-20 Passed   SHOWER PAN 2019-02-20 Passed   UFER GROUND 2018-09-06 Passed   UNDERFLOOR FRAMING 2018-09-25 Passed   UNDERFLOOR INSULATION 2018-09-28 Passed   UNDERFLOOR PLUMBING 2018-09-25 Passed   UNDERGROUND SEWER 2019-04-05 Passed   UNDERGROUND WATER SERVICE 2019-04-15 Passed   PW - DEPARTMENT FINAL 2020-05-26 Passed Kevin Rieden FINAL MECHANICAL 2020-07-06 Cancelled   FINAL PLUMBING 2020-07-06 Cancelled   FINAL ELECTRICAL 2020-07-06 Rescheduled   FINAL MECHANICAL 2020-07-08 Rescheduled   FINAL PLUMBING 2020-07-09 Rescheduled   FINAL ELECTRICAL 2020-07-06 Passed Jeff Greef FINAL MECHANICAL 2020-07-08 Rescheduled   FINAL PLUMBING 2020-07-09 Rescheduled   FINAL MECHANICAL 2020-07-06 Passed Jeff Greef TEMPORARY OCCUPANCY 2020-07-06 Conditional Jeff Greef FINAL PLUMBING 2020-07-06 Passed Jeff Greef FINAL BUILDING 2021-01-21 Passed Bob Sabich FINAL ELECTRICAL 2021-01-21 Cancelled   FINAL MECHANICAL 2021-01-21 Cancelled   FINAL PLUMBING 2021-01-21 Cancelled   EVERY PERMIT ISSUED SHALL BECOME INVALID UNLESS THE WORK ON THE SITE AUTHORIZED BY SUCH PERMIT IS COMMENCED WITHIN 12 MONTHS AFTER ITS ISSUANCE, OR IF THE WORK AUTHORIZED ON THE SITE BY SUCH PERMIT IS SUSPENDED OR ABANDONED FOR A PERIOD OF 12 MONTHS AFTER THE TIME THE WORK IS COMMENCED.