Loading...
U-1970-04b 80,000.6 4-U-70 RESOLUTION N0. 743 OF THE PLANNING COMMISSION OF THE CITY OF CUPERTINO GRANTING A USE PERMIT for temporary construction yard for two-year term. APPLICANT: Pacific Gas & Electric Company ADDRESS: 20065 Stevens Creek Boulevard,_Cupertino,-California SUBMITTED: February 11, 1970 LOCATION: Westerly of and ad�acent to Stevens Canyon Road, approx. 1200 feet north of face of Stevens Creek Reservoir ZONING: A1-43 AREA: 3.13 acres -------------------------------------------------------------------------------- 1-12 Standard Conditions , 13 The Use Permit shall be granted for a two-year period ending March 9, 1972. 14 Provision shall be made for proper visibility for vehicles entering Stevens Canyon Road from the proposed construction yard in a manner as approved by the City Engineer. � -------------------------------------------------------------------------------- PASSED AND ADOPTED this 9th day of March, 1970, at a regular meeting of the Planning Commission of the City of Cupertino, State of California, by the following roll call vote: AYES: Commissioners Buthenuth, Frolich, Irwin, Puetz, Hirshon NAYS: None APPROVED: � ` �� - ack T. Hirshon, Chairman Planning Commission ATTEST: � James H. Sisk Planning Director City of Cupertino California STANDARD CONDITIONS l. Install ornamental street lights. All lighting shall be designed to in no way interfere with adjacent residential district. 2. Street trees will be planted in the public right-of-wa,y and shall be of a type approved by the City in place� d�,;ignated by the City. 3. Traffic control signs will be placed at locations to be specified by the City. �. Fire hydrants shall be located as requested by the City. 5. A masonry wall will be built separating any commercial area from any residential area; which wall shall be six feet high above the highest adjoining finished grade. 6. All parking area and driveways will be paved as shown on the plot plan. '�. Curbs, gutters, sidewalks, and structures shall be installed to grades and to be constru�t�c� in accordance with standards specif ied by the City Engine�r. 8. Drainage within and without the development shall be to the satisfaction of the City Engineer. 9. ,�treet improvement abutting the applicant's property shall be according to �ity standards and specification. 10. The applicant shall be responsible for completing site as shown on approved plot plan, and shall be required to pay for required engineering, checking and inspection fees prior to issuance of building permit. 11. I,andscaping shall be as approved and maintained as shown on plot plan. 12. �treet widening and dedications shall be in accordance with street widths approved by the City Engineer.