U-1970-04b 80,000.6
4-U-70
RESOLUTION N0. 743
OF THE PLANNING COMMISSION OF THE CITY OF CUPERTINO
GRANTING A USE PERMIT for temporary construction yard
for two-year term.
APPLICANT: Pacific Gas & Electric Company
ADDRESS: 20065 Stevens Creek Boulevard,_Cupertino,-California
SUBMITTED: February 11, 1970
LOCATION: Westerly of and ad�acent to Stevens Canyon Road,
approx. 1200 feet north of face of Stevens Creek Reservoir
ZONING: A1-43 AREA: 3.13 acres
--------------------------------------------------------------------------------
1-12 Standard Conditions ,
13 The Use Permit shall be granted for a two-year period ending
March 9, 1972.
14 Provision shall be made for proper visibility for vehicles entering
Stevens Canyon Road from the proposed construction yard in a manner
as approved by the City Engineer. �
--------------------------------------------------------------------------------
PASSED AND ADOPTED this 9th day of March, 1970, at a regular meeting of the
Planning Commission of the City of Cupertino, State of California, by the
following roll call vote:
AYES: Commissioners Buthenuth, Frolich, Irwin, Puetz, Hirshon
NAYS: None
APPROVED:
�
` �� -
ack T. Hirshon, Chairman
Planning Commission
ATTEST: �
James H. Sisk
Planning Director
City of Cupertino
California
STANDARD CONDITIONS
l. Install ornamental street lights. All lighting shall be
designed to in no way interfere with adjacent residential
district.
2. Street trees will be planted in the public right-of-wa,y and
shall be of a type approved by the City in place� d�,;ignated
by the City.
3. Traffic control signs will be placed at locations to be
specified by the City.
�. Fire hydrants shall be located as requested by the City.
5. A masonry wall will be built separating any commercial area
from any residential area; which wall shall be six feet high
above the highest adjoining finished grade.
6. All parking area and driveways will be paved as shown on
the plot plan.
'�. Curbs, gutters, sidewalks, and structures shall be installed
to grades and to be constru�t�c� in accordance with standards
specif ied by the City Engine�r.
8. Drainage within and without the development shall be to the
satisfaction of the City Engineer.
9. ,�treet improvement abutting the applicant's property shall
be according to �ity standards and specification.
10. The applicant shall be responsible for completing site as
shown on approved plot plan, and shall be required to pay
for required engineering, checking and inspection fees prior
to issuance of building permit.
11. I,andscaping shall be as approved and maintained as shown on
plot plan.
12. �treet widening and dedications shall be in accordance with
street widths approved by the City Engineer.