U-1969-12b 80,000.6
12-U-69
RESOLUTION N0. 668
OF THE PL�NNING COMMISSION OF THE CITY OF CUPERTINO
GR.ANTING A USE PERMIT for ambulance s�rvice head-
quarters (including permit to use present building
for one year, and to use a mobile home for office
during construction of new building)
APPLICANT: M. R. Bell, dba AAA Ambulance Company
ADDRESS: 807 Benton Street, Santa Clara, California
SUBMITTED: June 27, 1969
LOCATION: East side of Orange Avenue, 100 feet south
of Stevens Creek Boulevard
ZONING: CG AREA: 50' x 135' lot
-------------------------------------------------------------------------------
(Continued from Page 1)
CONDITIONS AND FURTHER FINDINGS:
1-12 Standard Conditions
13 Orange Avenue shall be dedicated and improved to a distance of 30 feet
from the center line.
14 The requirement for a 6-ft high masonry wall on the southern boundary
of the lot is waived; adjacent lot is an isolated R1 lot within a block
that othe�wise is zoned General Commercial, and as a r.ezoning of this
lot to General Commercial can be foreseen.
15 Location of the building, parking spaces, and landscaping shall be
essentially as shown on the presented site plan, sub�ect to such
changes as may be imposed by the Architectural and Site Control
Committee.
16 The sirens of ambulances shall not be turned on until they have turned
into Stevens Creek Boulevard, Imperial Avenue or McClellan Road.
---------------------------------------------------------------------------------
PASSED AND ADOPTED this 14th day of July, 1969, at a regular meeting of the
Planning Commission of the City of Cupertino, State of California, by the
following roll call vote:
AYES: Commissioners Buthenuth, Frolich, Irwin, Puetz, Hirshon
NAYS: None
APPROVED:
� -, -
, j.
ATTEST• � J ck T. Hirshon, Chairman
� Planning Commission
��� �M
Adde Laurin, Senior �lanner
-1-
♦
City of Cupertino
14 CITY ST DEVELOPME C
1. Street widening, improvements, and dedications shall be in accordance with City
standards and specifications and as required by the City Engineer.
2. Curbs, gutters, sidewalks and structures shall be installed to grades and t.o be
constructed in accordance with standards specified by the City Engineer.
3. Street lighting shall be installed and shall be as approved by the City Engineer.
On-site lighting shall be as required by the Architectural and Site Approval
Committee and ordinances and regulations of the City. All on and off site lighting
shall be designed to in no way interfere with adjacent areas and shall be no higher
than the maximum height permitted by the zone in which the property is located.
4. Fire hydrants shall be located as required by the City.
5. Traffic control signs will be placed at locations to be specified by the City.
6. Street trees will be planted in the public right-of-way and shall be of a type
approved by the City in accordance with Ordinance No. 125.,
7. Grading shall be as approved and required by the City Engineer in accordance with
Ordinance No. 21.4(a).
8. Drainage within and without the deveiopment shall be to the satisfaction of the
City Engineer.
9. The applicant shall be responsible for complying with the requirements of the
Underground Util-ity Ordinance No. 331 and other related ordinances �.n�', regulations
of the City of Cupertino, and shall make the necessary arrangements with the'utility
companies involved for the installation of said facilities. The applicant sha11
submit a detailed plan showing utility undergrounding provisions. (This plan must
have prior approval of the utility companies and the City Engineer).
10. The location of all buildings, fences, roadways, parking areas, landscaping and
other facilities or features shall be as shown on the site plan submitted labeled
"Exhibit A", except or unless indicated otherwise herein.
�11. Parking must meet the requirements set forth in Cupertino City Ordinance No. 002(q)
and must be in accordance with the approved plot plan.
12. A masonry wall will be built by any commercial developer to separate such commercial
area from any residential area; such wall shall be six feet high above the highest
adjoining finished grade.
13. Landscaping areas shall be maintained as shown on site plan. Detailed landscaping
plans, related to arrangement, selection of plant materials and sizes, shall be
approved by the Architectural and Site Approval Committee and City Council prior to
issuance of a building permit.
14. The applicant shall be responsible for completing the site as shown on approved
plot plan and shall be required to enter into a development agreement with the City
of Cupertino providing for payment of necessary fees, including but not limited to,
checking and inspection fees, storm drain fee, and underground utilit_y fee. Said
agreement shall be executed prior to the issuance of a building permit.
. 9/23/70