Loading...
HomeMy WebLinkAboutAH 09-27-2018 Cupertino, CA 95014 (408) 777-3308 APPROVED MINUTES OF THE REGULAR MEETING OF THE ADMINISTRATIVE HEARING HELD ON September 27, 2018 ROLL CALL Hearing Officer present: Benjamin Fu, Assistant Director of Community Development Staff present: Erick Serrano, Associate Planner Ellen Yau, Associate Planner Applicant(s) present: Susan Chen, Architect for Medina Lane Josh Selo, Director of West Valley Community Services APPROVAL OF MINUTES: 1. August 9, 2018 The minutes of August 9, 2018 were approved as written POSTPONEMENTS/REMOVAL FROM CALENDAR: None ORAL COMMUNICATIONS: None WRITTEN COMMUNICATIONS: None PUBLIC MEETING ITEMS: 2. Application No.(s): ASA-2017-06 Applicant: Hanna Smiloch (Gu/Ming residence) Location: 22861 Medina Ln APN#(s): 342-30-013 Architectural and Site approval to consider allowing a 1,161 square foot first floor addition and a 326 square foot second floor addition to an existing duplex. Administrative Hearing decision final unless appealed. Staff member Serrano addressed the Hearing Officer. He explained the specific scope of the project, the FAR, the zoning designations and neighborhood conditions. The project meets the requirements of the City's Municipal Code. During the noticing period, Staff member Serrano heard from neighbors concerning noise construction and noise from the proposed air conditioning system. He explained that these concerns are subject to conditions outlined in the 2 Administrative Hearing September 27,2018 in the Nuisance Ordinance. The applicant is required to adhere to these conditions regarding construction hours and noise levels of equipment or be subject to Code Enforcement action. He heard concerns regarding privacy. Duplex Zones are not required to plant trees for privacy, however, there are Cypress trees on site that currently provide screening. Those trees will not be removed as part of this project. Views are also currently obscured by an existing fence. The fence will remain as is and is not included in the scope of the project. Staff supports the project and recommends it approval. The Hearing Officer asked how the proposed lot coverage of 35.3% compares with the lot coverage of other homes in the neighborhood. Staff member Serrano stated that the 10 homes he surveyed in the neighborhood have lot coverages ranging from 25% to 32.6%. The hearing Officer asked for clarification of the surrounding lot sizes and for clarification how many other homes on the street have second stories. Staff member Serrano stated that the majority of the surrounding homes have a net lot size of between 8500 and 9500. One has a net lot size of 12,000, there are a few homes farther up the street with second story additions and the townhome development behind the subject lot are all two story. The Hearing Officer asked how far the rear building wall will be from the building wall to the property in the rear. Staff member Serrano said it is about 38' or 39' building to building. The project Architect, Susan Chen, addressed the Hearing Officer. She explained the project scope and the thought process behind the project. She said that the addition was designed to reduce as much as possible, the impact to the neighbors. The Hearing Officer opened the public comment period. Farah Tabatabai, 22841 Medina Lane — She rents out this address, but plans to move back when she retires. To one side there is a wall. On the other side there is open space. She wants to retain her privacy and views. The Hearing Officer closed the comment period. Staff member Serrano explained again the Duplex Zones are not required to provide privacy screening, however, homeowners have options available to mitigate privacy concerns such as opaque glass, inoperable windows and landscape plantings. Staff member Serrano reviewed the title reports for both properties. He can confirm that there are no "light and air" easements. The Hearing Officer explained that the City's needs to balance the rights of the property owner to develop their properties and the needs of the neighborhood. Homes should "fit" and be of good design. The City cannot take factor in sunlight and sight lines. This proposed development is on a flag lot which makes this balance even more difficult. The Hearing Officer reviewed the findings as listed in the Staff Report. He felt that the project meets development zoning requirements per the Code with the exception of the "gradual transition" required in the mass and scale of the project. He asked for a revision to the project design. He wanted the second floor addition reduced. Staff member Serrano asked for clarification of where the second story should terminate and if there were other design features that should be modified. The Hearing Officer asked Staff to continue to work with the Architect to refine the design and scale of the addition to accommodate reasonable access and connection to the ground floor. The Hearing Officer approved the project with the following modification: Amend the design to minimize the second story expansion to the minimum necessary connection between the 3 Administrative Hearing September 27,2018 second floor and the ground floor and to allow architectural details and materials to be consistent with the existing building. DECISION: The application was approved by the Hearing Officer with the above mentioned revision to the Draft Resolution. 3. Application No.(s): DP-2018-06,ASA-2018-07 Applicant: West Valley Community Services(SCC Fire Protection District) Location: 10104 Vista Drive APN#(s):316-24-059 Development Permit and Architectural and Site Approval to consider a 1,016 square foot second floor addition to an existing office building. Administrative Hearing decision final unless appealed. Staff member Yau addressed the Hearing Officer.The parcel was originally developed with 12 one-bedroom and 12 two-bedroom housing units and a 5177 square foot community center and administrative offices building for West Valley Community Services. The proposed project is to add square footage to the multi-use building to facilitate the reconfiguration of interior space to improve efficiency and functionality. They will move conference rooms around and be able to better use the food pantry. They will not be increasing staff so the parking space count (52) will not be affected. The building is located in the Heart of the City Specific Plan, so the design has been structured to include architectural features and minimize wall massing. Staff recommends approval of the project. The Hearing Officer asked the applicant to describe the partnership they have with the residents. A representative of West Valley explained the public outreach process. They noticed property owners within 500' of the project site. They held 2 evening, neighborhood meetings, but had a very low turnout. The Hearing Officer opened the public comment period. There were no speakers: The Hearing Officer closed the comment period. The Hearing Officer thanked the Staff at West Valley Community Services for their service to the community.He agrees with Staff's recommendation to approve the applications. DECISION:The application was approved by the Hearing Officer per the draft resolutions. ADJOURNMENT Respectfully submitted: 6LAL a,9� Beth Ebben Deputy Board Clerk