Loading...
HomeMy WebLinkAboutAH 02-09-2017 Cupertino, CA 95014 (408) 777-3308 APPROVED MINUTES OF THE REGULAR MEETING OF THE ADMINISTRATIVE HEARING HELD ON February 9, 2017 ROLL CALL Hearing Officer present: Benjamin Fu, Assist. Director of Community Development Staff present: Ellen Yau, Assistant Planner Applicant(s) present: Aaron Zuzack, Browman Development APPROVAL OF MINUTES: 1. Minutes of December 8, 2016 The minutes of December 8, 2016 were approved as written POSTPONEMENTS/REMOVAL FROM CALENDAR: Item #2 Amendment to an existing Use Permit to allow a private school/daycare center to expand their hours of operation to 7:OOam to 6:00pm and a Director's Minor Modification to allow modifications to the site including installation of an outdoor play structure Postponed to February 23, 2017 ORAL COMMUNICATION: None WRITTEN COMMUNICATIONS: None PUBLIC HEARING ITEMS: 2. Application No.(s): U-2016-02, DIR-2016-34 Applicant: Dian Hsu (Christian Light &Salt Foundation) Location: 940 S Stellling Road APN#: 359-25-041 2 Administrative Hearing February 9,2017 Amendment to an existing Use Permit to allow a private school/daycare center to expand their hours of operation to 7:OOam to 6:OOpm; Director's Minor Modification to allow modifications to the site including installation of an outdoor play structure. Postponed to the February 23, 2017 meeting PUBLIC MEETING: 3. Application No.(s): ASA-2015-14, ASA-2015-28, TR-2015-27, SP-2015-06 Applicant: Aaron Zuzack (BDC Hayward, LP) Location: 10385-10497 S De Anza Boulevard APN#:359-17-019, 023 Architectural and Site application to allow building facade improvements and site modifications at an existing shopping center (McClellan Square); Tree Removal Permit to allow the removal and replacement of twenty-nine protected trees in conjunction with the site modifications; Sign Program application to make changes to the Master Sign Program for the shopping center. Administrative Hearing decision final unless appealed. Staff Member Yau went over the site plan. The McClellan Square is a shopping center located on the corner of McClellan Road and S. De Anza Boulevard and is comprised of one large pad building and three smaller pad buildings. It is located in a CG Zone. The applicant is proposing to make contemporary fagade changes to update the look of the buildings (roofing, wooden slats around the windows, stone wall treatments, and cantilevered roofs). The heights of the buildings will not change as a result of these fagade upgrades. The applicant is also proposing landscaping improvements including planters of various sizes, benches and lighting. Two new trash enclosures will be installed - one behind the multi-tenant building and one behind the bank. The applicant is requesting to remove 29 trees, to be replaced with 31 trees. The removal and replacement of these trees will be done in phases. The applicant has an expired Tree Removal Permit for different 12 trees on the site. The applicant is required to submit a new Tree Removal Permit for those trees, their removal is not part of the application being heard today. Additionally, the applicant is requesting changes to the Master Sign Program for the shopping center.The modifications will incorporate the new fagade colors and aesthetics. The ground signs will also be upgraded to match the new site improvements. The applicant will be making significant street improvements consisting of a detached sidewalk and modification of the curb and driveway approaches. They will be adding art and green screens to provide visual enhancements, a pedestrian walkway and bike racks. All the landscaping will be evaluated to ensure compliance with the Water Efficiency Ordinance. Staff supports the approval of the applications per the draft resolutions. 3 Administrative Hearing February 9,2017 The Hearing Officer asked for clarification regarding the building heights. The applicant, Aaron Zuzack, addressed the Hearing Officer. He said that the building heights are not generally changing. There is a tower feature on one of the buildings that will be about 31/2' feet above the roofline. He pointed out a couple of sheets in the plan set that show that the rooflines are the same or are slightly lower. He also mentioned that the proposal includes a change in the parking lot between the two parcels to improve the traffic circulation. The Hearing Officer asked the applicant about the rooftop mechanical equipment as they weren't shown on the plans. The applicant said that the equipment will be screened from view to the best of their ability. The Hearing Officer opened the item for Public Comment: A City resident, Jennifer Griffin, thanked the applicant for keeping the grocery store and the CVS pharmacy in the center. She felt that these businesses were needed in this part of town. She appreciated that the building heights were going to remain the same. She commented on street frontage and wanted large street and parking lot trees that will provide shade. The Hearing Officer closed the Public Comment period. Staff member Yau wanted to let the Hearing Officer know that comments had been received regarding the project and that those comments had been addressed by Staff and in the Staff Report. Staff member asked the applicant to clarify the construction time line. He stated that they hoped to start construction in June and that is was anticipated to take about 4 to 6 months. The trees would be removed and replaced in phases. He was aware of the City's construction hours and of the shopping center's operating hours. The Hearing Officer concurred with Staff's findings that the proposed new changes will be a great enhancement to the shopping center. He thanked the applicant for their thoughtful design. DECISION: The applications were approved per the draft resolutions ADJOURNMENT Respectfully submitted: I2t,ti,L "2� Beth Ebben Administrative Assistant g:ptanning/AH CommitteelMinutes020917