HomeMy WebLinkAboutAH 08-13-2015 Cupertino, CA 95014
(408) 777-3308
APPROVED MINUTES OF THE REGULAR MEETING OF
THE ADMINISTRATIVE HEARING HELD ON August 13, 2015
ROLL CALL
Hearing Officer present: Gary Chao, Assist. Director of Community Development
Staff present: Gian Martire, Assistant Planner
Applicant(s) present: Kevin Chiang, Architect, Home of Christ Church
APPROVAL OF MINUTES:
1. July 9, 2015
The minutes of July 9, 2015 were approved as written
POSTPONEMENTS/REMOVAL FROM CALENDAR:
None
ORAL COMMUNICATION:
None
WRITTEN COMMUNICATIONS:
None
PUBLIC MEETING:
2. Application No.(s): ASA-2015-17, TR-2015-33
Applicant: Kevin Chiang (Home of Christ Church)
Location: 10420 Bubb Rd
Architectural and Site approval application to allow facade improvements, roof
modifications, and parking lot and trash enclosure improvements to an existing office
building for church assembly use;
A Tree Removal Permit to allow the removal and replacement of three trees that are
part of a previously approved landscape plan
Administrative Hearing decision final unless appealed.
2 Administrative Hearing
August 13,2015
Staff Member Martire explained that the applicant is proposing to finalize the architectural
details of some improvements to the fagade and parking lot at the Home of Christ Church. The
applicant received an approval from the Hearing Officer in October of 2014, but has since
changed the design of the project. They are seeking an approval for new entryways on the
north and west side of the building. These new entryways are in keeping with the light
industrial design of the building and are a reduction in scope from the project that was
approved in October 2014. The tree removal application is the same as what was approved last
fall. The applicant is proposing to remove three ornamental trees on the west elevation and
will be replaced with 5 trees in the parking lot. The parking lot will be re-configured to have
195 spaces, where 180 are required. The trash enclosure and exterior sport court area are the
same as in the prior application.
The Hearing Officer confirmed that the Architectural and Site application proposed today is a
reduction in the project in architectural features and scope from what was approved in
October 2014. He asked the applicant about the trash enclosure and play ground area.
The applicant, Kevin Chiang, said the trash enclosures will be screened by 6 foot CMU walls.
The trash enclosure is at the back of the property along Highway 85. The play area will be
installed once they get the permits from a certified inspector for playground safety.
The Hearing Officer asked about the landscape lighting. He made the applicant aware of
concerns regarding excess lighting and light overflow onto adjacent properties.
DECISION: The application was approved by the Hearing Officer per the draft resolution with
the following additions/modifications:
Prior to the issuance of the Building Permit, the applicant shall provide details of the new
exterior lighting features and design to the Planning Department for approval;
Prior to the issuance of the Building Permit, the applicant shall provide details of the final
design, size and materials of the trash enclosure to the Planning and Public Works
Departments for approval
ADJOURNMENT
Respectfully submitted:
-&;AJ e)"9/2z"�c
Beth Ebben
Administrative Clerk
g:planning/AH CommitteelMinutes081315