Loading...
HomeMy WebLinkAboutAH 11-12-2015 Cupertino, CA 95014 (408) 777-3308 APPROVED MINUTES OF THE REGULAR MEETING OF THE ADMINISTRATIVE HEARING HELD ON November 12, 2015 ROLL CALL Hearing Officer present: Piu Ghosh, Senior Planner Staff present: Gian Martire, Assistant Planner Applicant(s) present: Jackson Derler (HMH Architects), Agent for the Property Owner APPROVAL OF MINUTES: None POSTPONEMENTS/REMOVAL FROM CALENDAR: None ORAL COMMUNICATION: None WRITTEN COMMUNICATIONS: None PUBLIC MEETING: 1. Application No.(s): ASA-2015-19, TR-2015-40 Applicant: Bob Farman (I&G Direct Real Estate) Location: 10050 N Wolfe Rd APN#316-20-086 Architectural and Site approval to allow landscape and site improvements to the common area of an office building; Tree Removal Permit to allow the removal and replacement of 21 protected trees to facilitate landscape improvements in the common area of an office building Administrative Hearing decision final unless appealed. 2 Administrative Hearing November 12,2015 Staff Member Martire explained that the applicant, the Cupertino Financial Center, would like to make some much needed updates to the common areas of the center. In the courtyard of the center, they are proposing architectural changes that include the addition of two large seating areas comprised of wooden decks with planters, the fountain will be replaced with a smaller water feature and a 1,000 square foot trellis-type structure with a built in multi-media feature to be used by employees and guests of the center. There 3,700 square feet of landscaping will be revamped for the installation of drought and water efficient plants and trees. At the front of the building, the applicant is proposing to replace 6,875 square feet of landscaping along the corner of the building where the art structure is currently located. The lawn area will be replaced with drought tolerant and native plantings. The Tree Removal Permit is to allow the removal of 21 ornamental trees in the courtyard area. They are not typically protected trees, but as they were installed as part of an approved landscape plan, they are considered protected. The trees proposed to be removed are 13 Honey Locust trees and 8 Kwanzan Cherry trees, all are small, ranging in size from 2.2 inches to 11 inches in diameter. The applicant has proposed 18 replacement trees consisting of 36 inch box fruitless olives trees. The Tree Ordinance requires replacements at a 2 to 1 ratio with 24" box trees. The applicant is replanting larger size trees than are required (which will count towards 15 replacement trees) and will be paying an in-lieu replacement fee for the remaining 3 trees. The draft resolution, condition 5, leaves room to approve the proposed tree replacement plan or require the applicant to replant the 3 remaining trees. The Hearing Officer asked if the parking podium was below ground or at grade. The applicant's architect replied that it was at grade. He went on to explain that the courtyard redesign was undertaken to keep the existing tenants happy and give the employees more flexibility with their work environment. The existing trees on site are mostly along the perimeter, so don't provide shaded areas in which to sit. Currently there is a lot of concrete so walking between the buildings is like walking in a parking lot. The applicant wants to bring in the larger trees and landscaping along with the seating features to create a more park-like setting. The Hearing Officer asked Staff member Martire about the public comments that had been received. He stated that the comments were by phone and that he had not received anything in writing. One person who commented was in attendance at the meeting. The Hearing Officer opened the public hearing to the resident in attendance. The resident, Jennifer Griffin, said that her initial concern about the removal of the Ash trees along the perimeter was in error. She walked the site and agrees that the courtyard area is in need of upgrading. She did have a concern about the grass being removed along the sidewalk by the inner row of Ash trees and in front of the building as people sit on the grass and wait for the bus and the corner has historically been viewed by the public as a park. She wanted this item continued for further evaluation. The Hearing Officer closed the public hearing. 3 Administrative Hearing November 12,2015 She then asked the applicant for clarification about where exactly the grass was proposed to be removed. The applicant reviewed the site plan. The grass and ivy along the front (in a small strip) and back to the bridge and the flowers near and around the art feature will be replanted. The grass in the park strip will remain. It was pointed out that the area is not all grass currently and people are cutting through the grass and flower beds to pick up the sidewalk on the other side. This is creating a maintenance issue for the property owners. The applicant has designed an extension of the sidewalk to alleviate that problem. Along the north side, the grass in the front park strip is staying. The uphill area for about 60 feet will be replanted. The existing planters near the wall will be replanted with native and drought tolerant plants. He explained that the new irrigation methods will better water the existing perimeter trees ensuring that they remain healthy. The arborist's report states that the trees in the courtyard are in decline due to where they are planted and/or because they are in planter boxes. The landscaping for the corner near the bridge will be native evergreen and deciduous grasses. The Hearing Officer asked if the applicant would consider keeping some of the grass along the frontage and add some plants around the public art feature to add some color. He said he was open to the ideas and would ask the property owners if they would also be willing to revise the landscaping plan. The Hearing Officer also asked that they clarify on the plans the minor sidewalk extension. DECISION: The application was approved by the Hearing Officer per the draft resolution with the following additions/modifications: The turf area at the corner of N. Wolfe Road and Stevens Creek Boulevard shall be maintained in a width at least to match the width of the park strip. The area in front of the public art shall have native and/or drought tolerant plant additions that will add color; Condition 5 should be revised for the tree replacements to replace as many trees as possible as confirmed by the City's Arborist. The indemnification clauses need to be updated with the current language. ADJOURNMENT Respectfully submitted: A", hAJ41" Beth Ebben Administrative Clerk g:planning/AH Committee/Minutes111215