Loading...
TUP-2020-002 Action Letter CITY OF CUPERTINO 10300 Torre Avenue, Cupertino, California 95014 (408) 777-3308 To: Mayor and City Council members Chairman and Planning Commissioners From: Benjamin Fu, Director of Community Development Prepared by: Jeffrey Tsumura, Associate Planner � Date. September 8, 2020 �"fo=njamin Fu, 9/8/2020 Subject: Director's Temporary Use Permit,TUP-2020-002, to allow for the continued operations of a temporary wireless facility for a period of 12 months at 18920 Forge Drive. Chapter 19.12.030 of the Cupertino Municipal Code allows for administrative approval of a temporary use permit, authorizing the use of a site in any zoning district for a temporary use. The Director reports his/her decision to the City Council & Planning Commission in time to allow an appeal of the decision within 14 calendar days. DISCUSSION The applicant, Benjamin Louie, on behalf of Apple, Inc., is requesting approval to allow the continued operations of a temporary wireless facility for a period of 12 months, located on the office building at 18920 Forge Drive (Attachment 1). Background The antennas were previously approved on February 12, 2019 under TUP-2019-01 for a period of 12 months. During this time, the temporary facility was used to test equipment and fill coverage gaps while the three carriers (Verizon Wireless, T-Mobile, and AT&T) identify permanent cell sites in the area. The applicant is requesting a Temporary Use Permit to allow continued testing and operations of the existing equipment for a period of an additional 12 months. No additional equipment or changes to the layout and locations are proposed. Location The subject property is an existing office complex occupied by Apple, Inc. The property is bounded by office buildings to the north and west. Kaiser Permanente Medical Center overflow parking is located to the east and single—family residences to the south, both of which are within the City of Santa Clara jurisdiction. TUP-2020-002 18920 Forge Drive Temporary Wireless Facility Page 2 WC �I I I �I I I � (P)AT&T •` PROJECT AREA REFER TO PROPOSED ANTENNA PLAN ON SHEET A� I I r r I j u I -Iq awmucwcew I nii ii u iii a iiu i I n I _ I The facility is located at the southwesterly corner of the south and west-facing building walls. Equipment The equipment includes a total of six new wireless panel antennas mounted on saddle mount brackets. Each antenna is approximately 23.6"H X 11.8"W X 3.5"D in size and extends up to 12 inches from the t building, depending on how the antennas are oriented. Consistent with the temporary nature of the equipment, the bracket system fits over the building parapet and is _- fixed on the other side, as opposed to being installed directly on the exterior building wall. The mounting Antenna configuration looking northeast(2019) system provides better stability and is painted to match the building. TUP-2020-002 18920 Forge Drive Temporary Wireless Facility Page 3 Three antennas are installed on the west-facing building wall at the southernmost corner, and three antennas are installed on the south-facing building wall at the westernmost corner. Elevation View 0 South Elevation 11 LIL F1 West Elevation Visibility The antennas are located towards the rear of the property and should not create any visual impacts from Forge Drive. The antennas are located approximately 225 feet from the nearest single-family residence and are further obstructed from neighboring residences by mature coast redwood trees along the southern property line. The office building to the west is located approximately 267 feet from the antennas (approximately 70 feet from the shared property line), is separated by two parking lots, and is also screened by existing perimeter trees. No impacts are anticipated to the overflow Medical Center parking to the east. No neighbor complaints were received for the allowed operations under TUP-2019-01. Noise The antennas will not run on generators or similar power sources that can cause significant stationary noise. Additionally, the the distance from nearby residential and office uses is substantial—they are surrounded by large parking areas and further screened by existing redwood trees. Therefore, no significant noise impacts are TUP-2020-002 18920 Forge Drive Temporary Wireless Facility Page 4 anticipated. RF Study A radio frequency (RF) energy emissions exposure report was prepared by Hammett & Edison, Inc., to analyze the RF energy exposure of the temporary wireless equipment at the project site(Attachment 2). The report determined that the equipment will not expose members of the general public to hazardous levels of RF energy as determined per FCC General Population limits. However, to prevent occupational exposures in excess of the FCC Guidelines, appropriate RF safety training and explanatory signs posted on the antennas have been recommended to help mitigated unintended exposure during certain maintenance activities high on the side of the building. A condition of approval has been added to ensure these recommendations are carried out. ACTION The Director of Community Development deems this application as minor, and approves the temporary COW subject to the following conditions of approval. SECTION I: CONDITIONS ADMINISTERED BY THE COMMUNITY DEVELOPMENT DEPT. 1. APPROVED PROTECT This approval is based on the plan set entitled "CCL04017, Apple Campus-Forge 1 Building, Rooftop, 18920 Forge Drive, Cupertino, CA 95014" consisting of 11 sheets labeled as T-1, A-1 through A-6, D-1, GN-1, GN-2, and S-1, dated January 7, 2019, and an RF study from Hammett & Edison, Inc., dated August 20, 2020, except as may be amended by the following conditions. 2. ACCURACY OF PROTECT PLANS The applicant/property owner is responsible for verifying all pertinent property data including,but not limited to, property boundary locations,building setbacks, property size, building square footage, any relevant easements and/or construction records. Any misrepresentation of any project data may invalidate this approval and require additional review. 3. DURATION The wireless antennas and all associated equipment shall be removed from the site no later than 12 months after installation, or September 8, 2021, whichever occurs first. The Applicant shall notify the City when the equipment is installed. A new Temporary Use Permit with updated justification shall be submitted to the City for review and approval prior to the Temporary Use Permit expiration. TUP-2020-002 18920 Forge Drive Temporary Wireless Facility Page 5 4. BUILDING PERMIT REQUIRED Issuance of a building permit shall be required prior to installation of proposed equipment and facilities. 5. RF SAFETY MITIGATIONS RF Safety measures are required to protect the health of workers and contractors authorized to work on equipment located on the building rooftop. These measures include: a) Appropriate RF safety training, to include review of personal monitor use and lockout/tagout procedures, be provided to all authorized personnel who have access to the antennas. b) No access within six feet directly in front of the antennas themselves while the pertinent group of antennas are in operation, unless other measures can be demonstrated to ensure that occupational protection requirements are met. c) Explanatory/RF warning signs and carrier contact information be posted on the antennas, readily visible from any angle of approach to persons who might need to work within that distance. 6. ANNOTATION OF THE CONDITIONS OF APPROVAL The conditions set forth shall be attached to, incorporated into, or annotated on the first page of the building plans. 7. CONSULATION WITH OTHER DEPARMENTS The applicant is responsible to consult with other departments and/or agencies with regard to the proposed project for additional conditions and requirements. Any misrepresentation of any submitted data may invalidate an approval by the Community Development Department. 8. INDEMNIFICATION As part of the application,to the fullest extent permitted by law, the applicant shall agree to indemnify, defend with the attorneys of the City's choice, and hold harmless the City, its City Council, and its officers, employees, and agents (collectively, the "indemnified parties") from and against any liability, claim, action, cause of action, suit, damages, judgment, lien, levy, or proceeding (collectively referred to as "proceeding") brought by a third party against one or more of the indemnified parties or one or more of the indemnified parties and the applicant related to any Ordinance, Resolution, or action approving the project, the related entitlements, environmental review documents, finding or determinations, or any other permit or approval authorized for the project. The TUP-2020-002 18920 Forge Drive Temporary Wireless Facility Page 6 indemnification shall include but not be limited to damages, fees, and costs awarded against the City, if any, and cost of suit, attorneys' fees, and other costs, liabilities, and expenses incurred in connection with such proceeding whether incurred by the Applicant, the City, or the parties initiating or bringing such proceeding. The applicant shall agree to (without limitation) reimburse the City its actual attorneys' fees and costs incurred in defense of the litigation. Such attorneys' fees and costs shall include amounts paid to the City's outside counsel and shall include City Attorney time and overhead costs and other City staff overhead costs and any costs directly related to the litigation reasonably incurred by City. The applicant shall likewise agree to indemnify, defend, and hold harmless the indemnified parties from and against any damages, attorneys' fees, or costs awards, including attorneys' fees awarded under Code of Civil Procedure section 1021.5, assessed or awarded against the indemnified parties. The Applicant shall cooperate with the City to enter a Reimbursement Agreement to govern any such reimbursement. The Applicant shall agree to (without limitation) reimburse the City for all costs incurred in additional investigation or study of, or for supplementing, redrafting, revising, or amending, any document (such as an Environmental Impact Report, negative declaration, specific plan, or general plan amendment)if made necessary by proceedings challenging the project approvals and related environmental review, if the applicant desires to continue to pursue the project. The Applicant shall agree that the City shall have no liability to the Applicant for business interruption, punitive, speculative, or consequential damages. 9. NOTICE OF FEES, DEDICATIONS, RESERVATIONS OR OTHER EXACTIONS The Conditions of Project Approval set forth herein may include certain fees, dedication requirements,reservation requirements, and other exactions. Pursuant to Government Code Section 66020(d) (1), these Conditions constitute written notice of a statement of the amount of such fees, and a description of the dedications,reservations,and other exactions. You are hereby further notified that the 90-day approval period in which you may protest these fees, dedications, reservations, and other exactions, pursuant to Government Code Section 66020(a), has begun. If you fail to file a protest within this 90-day period complying with all of the requirements of Section 66020, you will be legally barred from later challenging such exactions. TUP-2020-002 18920 Forge Drive Temporary Wireless Facility Page 7 This approval of the temporary use permit is effective September 8,2020. The 14-calendar appeal period will expire on September 22, 2020. Attachments Attachment 1 —Plan Set Attachment 2—RF Study Attachment 3—Request Letter Attachment 4—Coverage Maps P:\PDREPORT\DIR-TUPreports\TUP REPORTS\2020\TUP-2020-002.docx