Loading...
HomeMy WebLinkAboutAH Summary 08-13-2020 To: Mayor and City Council Members Planning Commissioners From: Benjamin Fu, Director of Community Development Date: August 17, 2020 Subj: REPORT OF ADMINISTRATIVE HEARING DECISION MADE August 13, 2020 Chapter 19.12.170 of the Cupertino Municipal code provides for Appeal of decisions made at an Administrative Hearing 1. Application ASA-2020-004, EA-2020-002, City of Cupertino (Public Works Dept), 10800 Torre Avenue Description Architectural and Site Approval to consider approving a 5,600 square foot two-story expansion to the existing Cupertino Public Library and an Environmental Assessment to consider adopting an amendment to a Mitigated Negative Declaration (Project Title: Civic Center Master Plan, filed 7- 9-2015). Action The application was approved at the Administrative Hearing. The approval is effective August 13, 2020. The fourteen-calendar day appeal will expire on August 27, 2020. Enclosures: Administrative Hearing Report of August 13, 2020 Resolution No(s) 119 Plan set (s) OFFICE OF COMMUNITY DEVELOPMENT CITY HALL 10300 TORRE AVENUE • CUPERTINO, CA 95014-3255 (408) 777-3308 • FAX (408) 777-3333 • planning@cupertino.org ADMINISTRATIVE HEARING STAFF REPORT Agenda Date: August 13, 2020 Subject Architectural and Site Approval Permit to consider a proposal to the construct a new 5,600 square-foot, two-story expansion to the existing Cupertino Public Library. (Application No.: ASA-2020-004 and EA-2020-002; Applicant: Michael Zimmermann (City of Cupertino Public Works); Location: 10800 Torre Avenue; APN(s): 369-31-033) Recommended Action Staff recommends that the Hearing Officer approve the Architectural and Site Approval Permit and associated environmental review, in accordance with the draft resolution (Attachment 1). Discussion General Plan Designation Public Facilities General Plan Special Center Heart of the City Zoning Designation P(BA) Lot Size 424,710 sq. ft. (9.75 acres) Site Development Existing Proposed Floor Area Ratio 53,000sf (12.5%) 57,425 sf (13.5%) Lot Coverage 32,550 sf (7.7%) 34,175 sf (8%) Maximum Building Height 44’-10” No change (maximum height for addition is 34’-1½”) Parking Existing Proposed Bicycle Parking 32 44 (10 stalls; 2 lockers) Off-street Vehicular Parking 226 No Change Project Consistency With General Plan Yes Zoning Yes Environmental Assessment Mitigated Negative Declaration adopted on July 2015. Addendum dated August 2020. ASA-2020-004 and EA-2020-002 10800 Torre Avenue August 13, 2020 Page 2 Background: The Cupertino Library is located on a 9.75-acre city-owned parcel in the Heart of the City special area. The property is developed with three buildings (Cupertino City Hall, Cupertino Community Hall, and Cupertino Library) and includes the 3-acre Cupertino Library Field. The property is bounded by the Villagio development and single-story office buildings to the west, a three story office building to the northwest, the Pinntage and Waterfall residential developments to the north, single- family residential homes separated by Regnart Creek to the east, and single-family cluster developments and some single family homes to the south. In October 2004, as part of a Civic Center improvement project , the City Council approved the demolition of the former 39,000 square-foot library and approved the construction of the current 53,000 square-foot two-story library, a new 6,300 square foot single-story Community Hall located between the library and City Hall buildings, and accompanying site improvements to the Civic Center plaza (U-2002-07 and EA-2002-12). In July 2015, the City Council adopted an Initial Study/Mitigated Negative Declaration (“IS/MND”) and adopted the Civic Center Master Plan (“Master Plan”). The IS/MND analyzed demolition of the existing, seismically-challenged City Hall, construction of a new 40,000 square-foot City Hall, a 2,000 square-foot single-story addition on the south side of the library between the existing east and west wings and a surface parking lot on the eastern portion of the Library field. No construction work for the Master Plan has been initiated since. Now, the City of Cupertino Public Works, represented by the applicant, Michael Zimmermann, is proposing to move forward with the Library component of the Master Plan with minor modifications from what was envisioned in the Master Plan and analyzed in the IS/MND. The modifications include the demolition of 1,175 square feet of Figure 1: Project Aerial ASA-2020-004 and EA-2020-002 10800 Torre Avenue August 13, 2020 Page 3 existing library space and replacing it with a two-story ~5,600 square-foot addition for a net increase of 2,451 square feet. The project will be located at the rear of the existing library and generally occupy the same footprint as the single-story addition envisioned in the Master Plan (see red outline in Figure 1). The new library space will be used for a larger Story Room on the ground floor , new Program Room space on the first and second floors, and accessory spaces such as stair access, restrooms, and storage areas. Currently, no other aspects of the Master Plan are being reviewed. Analysis: Site Planning & Architectural Style The expansion is located at the rear of the library and will have a footprint marginally larger than the footprint anticipated in the Master Plan. It is designed with minimal visual impacts to the closest residential properties to the west (see Figure 2). The modified library expansion will have program and story time spaces with access to the second floor via stairs. The program and story time spaces on each level are designed so that they can be combined to create larger spaces if needed. The form and materials proposed are complementary to the existing library and proposes a curtain wall façade for the program spaces and painted stucco for the stairways and utility areas (see Figures 2, 3, and 4). The addition is proposed at a maximum exterior height of 29’-11 ¾” for the program areas and 34’-1½ “for the stairway (stairway pictured prominently in Figure 3). The applicant is proposing a curtain wall façade to the expansion but will incorporate bird-safe design to mitigate potentially hazardous conditions for birds. In order to address transparent or reflective glass hazards, the applicant has designed the façade of Figure 2 (L) and 3 (R): View from the southwest corner and view from the southeast corner ASA-2020-004 and EA-2020-002 10800 Torre Avenue August 13, 2020 Page 4 the addition with opaque spandrel along the header to reduce exposed glazing, which will also screen interior ceiling utilities, and exterior aluminum horizontal sunshades above the window, which will act as a visual barrier. The applicant will incorporate bird- safe treatments to the exposed glazing by including fritting and motion-sensors for interior lighting and will provide additional details and specifications during the building permit phase. There will be minimal lighting impacts to the surrounding neighborhood from exterior lights since the proposal includes the addition of only one exterior light located above the exit door along the eastern façade. As with all existing interior lighting at the library, the lights will be controlled by motion sensor and will turn off if there is no activity in the space. The project will incorporate low-impact development (LID) as required by the Municipal Code, and Green Building Measures as required by the California Green Building Code and will be reviewed for conformance during review of construction permit plans. The expansion will also be constructed to meet LEED Silver standards. Trees & Landscaping (WELO) Although the project is adjacent to Memorial Grove , there will be no tree removals associated with the proposed expansion. Therefore, this modified library expansion would protect the three trees that were previously anticipated for removal as part of the former library project. All existing trees and landscaping will be required to be protected during construction. Any landscaping or trees that are determined to be unhealthy or damaged during construction will require appropriate review, permits and replacement prior to final occupancy. Vehicular Parking Currently, the Civic Center parking lot provides 226 off-street parking stalls with 96 on- street parking stalls on adjacent streets (Pacifica Drive, Torre Avenue, and Rodrigues Avenue). While the adopted Civic Center Master Plan had envisioned relieving parking Figure 2: South elevation; view from Memorial Grove ASA-2020-004 and EA-2020-002 10800 Torre Avenue August 13, 2020 Page 5 congestion at the Civic Center by constructing a 68-stall parking lot on the eastern end of the Library Field, the City Council has elected not to proceed with this due to impacts to the field and concerns from a portion of the community. Additionally, since parking is no longer considered a significant impact to the environment in urban infill areas, the applicant is proposing to alleviate this parking congestion by implementing a TDM program developed upon conducting a parking study, dated June 2020, and prepared by Kimley-Horn (see Attachment 3A). The parking study includes the results of an occupancy survey that was conducted on Tuesday, October 15, 2019 from 10:00 AM and 11:00 PM while schools were in session and a Council meeting was being held at Community Hall in the evening. The survey indicated that the peak hour for parking demand at the Civic Center was at 5:00 pm, when occupancy was at 96% with 8 vacant stalls for off-street parking, and occupancy was at 93% with 23 vacant stalls for off- and on-street parking combined. Ideally, a parking lot would have 10%-15% vacancy to provide for good site circulation and turnover; therefore, the existing parking lot exceeds the 85% capacity threshold for weekday peak hours and is effectively full. The future demand analysis was calculated utilizing the program spaces’ maximum occupancy of almost 400 attendees, the percentage of surveyed patrons who drove, and a vehicle occupancy rate of 1.5 patrons per vehicle (see Attachment 3A – section “Future Parking Demand”). The parking demand study identifies that there will be an ongoing operational parking impact with a maximum deficiency of 185 stalls. The applicant presented the parking study with transportation demand measures (TDM) to the City Council for its review and approval on July 2020. As a part of the TDM strategy, the applicant is proposing the phased implementation of the following in the next two years:  Convert one Rodrigues Avenue parking stall into motorcycle parking  Move pick-up/drop-off and 4-minute book return stalls to Torre Avenue  Provide option for eligible employees to telecommute  Continue the guaranteed ride home program  Designate carpool stalls  Add secure bicycle parking close to City Hall entrance  Create Healthy Families program to encourage families to bike/walk to the library  Education on Transportation Demand Management  Continue to provide commuter checks to employees to encourage bike, walking, carpooling and transit ridership  Provide free after-school shuttles/bus from local schools to the library  Parking cash-out for employees  Restrict all 4-hour regular parking stalls on-site and on-street to 2 hours or less ASA-2020-004 and EA-2020-002 10800 Torre Avenue August 13, 2020 Page 6 Should implementation of the some or all of the above strategies reduce the parking demand within the next two years, no other strategies need to be implemented or considered. However, if the parking demand is not alleviated upon implementation of all the strategies discussed in the parking study, the applicant will consider other options (see Attachment 3A –section Parking Solutions) for review and consideration by the City Council. Construction Parking Impacts: While currently, due to the COVID-19 Shelter in Place Orders, operational or construction parking impacts are not being experienced, should the Shelter-in-Place Orders be lifted and if parking demand picks up, it is anticipated that parking impacts will be felt. The applicant has stated that the target construction period is expected to take approximately 10-12 months (from Spring 2021 to the end of that year). The construction plans to use 40 stalls on the southern and eastern end of the library as follows:  19 stalls directly to the east of Memorial Grove for the construction yard;  5 stalls south of Memorial Grove for the construction trailer; and  16 stalls south of Memorial Grove for construction worker parking. Although the construction trailer and construction yard will be required to be maintained throughout the entire construction phase, the demand for the 16 stalls for construction worker parking will be variable depending on the project’s progress. The applicant proposes implementation of the following traffic demand measures, from the list above during/before construction, to alleviate the parking impact during construction:  Convert all existing 4-hour parking stalls to 2-hour parking stalls  Provide an option for city employees to telecommute  Convert one Rodrigues Avenue parking stall to motorcycle parking  Install 2 additional bike lockers near the entrance of the library Finally, due to the construction and associated activity on the south side of the parking lot, there will be limited access for pedestrians directly adjacent to the construction site. However, there is other existing pedestrian access around the site. Bicycle Parking The Cupertino Municipal Code does not have an established parking requirement for libraries and other civic uses. However, when approved in 2004, the library was required to install a total of 15 bicycle parking stalls on the eastern and western sides of the building. Currently, the library provides 16 bicycle parking stalls each at the northeast and northwest corners of the library, for a total of 32 stalls. The applicant is willing to ASA-2020-004 and EA-2020-002 10800 Torre Avenue August 13, 2020 Page 7 install additional parking stalls and will indicate their location to reduce congestion but enhance visibility for bicycling library patrons. The applicant will install 2 bike lockers near the entrance of the library as discussed above. Environmental Review In 2015, the City Council adopted the IS/MND for the Master Plan and analyzed the impacts of the entire project, which included the library addition. Since then the library component analyzed in the IS/MND has been modified from a 2,000 square foot addition to a 5,600 square foot addition, which is to replace 1,175 square foot of demolished existing library space (net increase of 2,451 square feet). The proposed plans have been evaluated by Jodi Starbird, of Starbird Consulting, in an Addendum to the IS/MND dated August 2020 (Attachment 3, including Appendix A & B – together the “Addendum”), and the analysis indicates that the minor changes that the applicant is seeking would not require major revisions to the IS/MND adopted on July 2015, due to new or substantially more severe significant environmental effects. After the IS/MND was approved, the CEQA Guidelines were amended to exclude parking impacts (by themselves) as a significant effect on the environment , analysis of secondary impacts caused by traffic and parking, such as air quality, noise, greenhouse gas emissions, and safety is still required. The City has determined that these secondary impacts of the proposed modifications to the library component of the Master Plan are consistent with the conclusions of the analysis in the IS/MND; therefore, no new or substantially more severe significant environmental impacts would occur . Additionally, the proposed modifications would not create significant transportation impacts because:  The project site is located within a Transit Priority Area within 1/2 -mile of a Bus Rapid Transit Line on Stevens Creek Boulevard with at least 15 -minute headways during peak hours, as defined by Public Resources Code Section 21064.3.  The approved Civic Center project with the modified library expansion would be exempt from completing an air quality or greenhouse gas analysis, as described in Sections 4.4 and 4.6 of the Addendum.  Traffic congestion and vehicle delay (level of service LOS) are no longer considered to be significant effects under CEQA, per Senate Bill 743, and is now measured by Vehicle Miles Travelled (VMT). A VMT analysis was prepared for the modified library expansion by Fehr & Peers in July 2020 (see Attachment 3B) which indicates the following: o Because the City does not have adopted VMT thresholds for screening or review, the VMT analysis suggests the use of the Governor’s Office of Planning and Research’s (OPR) Technical Advisory for screening small ASA-2020-004 and EA-2020-002 10800 Torre Avenue August 13, 2020 Page 8 nonresidential projects of 10,000 square feet or less, and data from the California Household Travel Survey, small projects that generate 836 vehicle miles traveled or less should be considered for small project screening. o The analysis indicates that the net new library addition would generate 771 VMT, which is lower than the 836 VMT threshold for projects smaller than 10,000 square feet. Furthermore, there have been no substantial changes with respect to the circumstances under which these refinements would be undertaken that would require major revisions of the IS/MND due to new or substantially more severe significant environmental effects, and there has been no discovery of new information of substantial importance t hat would trigger or require major revisions to the adopted IS/MND due to new or substantially more severe significant environmental effects. The adopted IS/MND adequately identified all environmental effects and adequate mitigation measures for the proposed modifications to the previously approved project. The City has determined that the additional 2,451 square feet of program space is a minor change to the project; therefore, for the reasons summarized above and discussed in the Addendum to the IS/MND, n o subsequent or supplemental EIR or IS/MND is required prior to approval of the Architectural and Site Approval of the proposed project described above. Other Department/Agency Review The City’s Public Works Department, Building Department, Santa Clara County Fire Department, reviewed the proposal and have provided comments to the project. Their review comments have been incorporated as conditions of approval. Public Noticing And Community Outreach The following table is a brief summary of the noticing for this project: Notice of Public Hearing Agenda  Site Signage (at least 10 days prior to hearing)  60 notices mailed to property owners adjacent to the project site (at least 10 days prior to the hearing)  Posted on the City's official notice bulletin board (five days prior to hearing)  Posted on the City of Cupertino’s Web site (three days prior to hearing) No comments have been received at the time of production of this staff report. The library project has had extensive community outreach with multiple hearings/meetings at the Library Commission and the City Council. ASA-2020-004 and EA-2020-002 10800 Torre Avenue August 13, 2020 Page 9 Conclusion Staff recommends approval of the Architectural and Site Approval permit, since the plans and conditions of approval address all concerns related to the proposed project. Additionally, all of the findings for approval of the proposed project, consistent with chapter 19.168 of the Cupertino Municipal Code, may be made as follows: 1. The proposal, at the proposed location, will not be detrimental or injurious to property or improvements in the vicinity, and will not be detrimental to the public health, safety, general welfare, or convenience; The applicant proposes a 5,600 square foot two-story expansion to the existing Cupertino Public Library. The proposed project complies with the development requirements under Cupertino Municipal Code Chapter 19.76 for public facilities. The project will include the demolition of a 1,175 square-foot portion of the existing library and the construction of the addition, with a slightly larger footprint, in its place. Most of the addition will be within the envelope of the existing building and does not protrude much further than the existing wall plane. This project will not be detrimental or injurious to property or improvements in the vicinity, nor will it be detrimental to the public health, safety, general welfare, or convenience. 2. The proposal is consistent with the purposes of this chapter, the General Plan, any specific plan, zoning ordinances, applicable planned development permit, conditional use permits, variances, subdivision maps or other entitlements to use which regulate the subject property including, but not limited to, adherence to the following specific criteria: a) Abrupt changes in building scale should be avoided. A gradual transition related to height and bulk should be achieved between new and existing buildings. The expansion is proposed in existing library space with a minor expansion in footprint. Due to the design of the current library, the western and eastern wings will reduce much of the bulk of the proposed addition. The added area is comparable in massing, height and bulk of the rest of the library and its construction will not lead to any abrupt changes in building scale. b) In order to preserve design harmony between new and existing buildings and in order to preserve and enhance property values, the materials, textures and colors of new building should harmonize with adjacent development by being consistent or compatible with design and color schemes with the future character of the neighborhoods and purposes of the zone in which they are situated. The location, height and materials of walls, fencing, hedges and screen planting should harmonize with adjacent development. Unsightly storage areas, utility installations and unsightly elements of parking lots should be concealed. The planting of ground cover or various types of pavements should be used to prevent ASA-2020-004 and EA-2020-002 10800 Torre Avenue August 13, 2020 Page 10 dust and erosion, and the unnecessary destruction of existing healthy trees should be avoided. Lighting for development should be adequate to meet safety requirements as specified by the engineering and building departments and provide shielding to prevent spill-over light to adjoining property owners. The addition is located at the rear of the library and tucked between the existing west and east wings on the sides and further screened from the south by the Memorial Grove – a grove of 50-60 foot tall redwood trees. The addition will utilize materials and a style compatible with the existing library. The proposal is designed with a modern curtain wall glazing system, like the larger windows in existing reading areas of the library. Additionally, the non-programmed space (e.g. stairways) will be finished with stucco to complement the exterior paint colors of the existing library. The glass and stucco combination of the addition will integrate well with the existing building. The proposal does not include any detached storage areas or require exterior utility installations and therefore does not require screening. The proposal includes only one exterior wall-mounted light on the eastern façade of the expansion and is located above an exit door for the safety of library patrons. c) The number, location, color, size, height, lighting and landscaping of outdoor advertising signs and structures have been designed to minimize traffic hazard, positively affect the general appearance of the neighborhood and harmonize with adjacent development. No signs are proposed as part of this expansion. d) With respect to new projects within existing residential neighborhoods, new development should be designed to protect residents from noise, traffic, light and visually intrusive effects by use of buffering, setbacks, landscaping, walls and other appropriate design measures. The proposed addition will not be visually intrusive to the surrounding neighborhood as it is compatible in size with the existing library and located in an area that is generally tucked away from the public right-of-way and views of residential properties. Additionally, the architectural style and colors are consistent with the existing library. The existing Memorial Grove redwood trees will be protected during, and retained after, construction. Therefore, the trees will continue to provide adequate screening. Thus, the project will not be visually intrusive or cause noise, traffic, and light impacts to the adjacent properties. Next Steps If approved, the permit will be effective 14 calendar days from the date of the hearing. The decision of the Administrative Hearing Officer is final, unless appealed within 14 ASA-2020-004 and EA-2020-002 10800 Torre Avenue August 13, 2020 Page 11 calendar days from the date of the hearing. The applicant team may apply for building and/or other permits with the City at the end of the appeal period. This approval is valid until August 13, 2022. The applicant team may apply for a one-time one-year extension before the approval expires. Prepared by: Ellen Yau, Associate Planner Reviewed and Approved for submission by: Piu Ghosh, Planning Manager ATTACHMENTS 1. Draft Resolution for ASA-2020-004 2. Plan Set 3. Draft Addendum to the Mitigated Negative Declaration 3A. Appendix A – Civic Center Parking Analysis 3B. Appendix B – VMT Analysis CITY OF CUPERTINO 10300 Torre Avenue Cupertino, California 95014 RESOLUTION NO. 119 OF THE ADMINISTRATIVE HEARING OFFICER OF THE CITY OF CUPERTINO ADOPTING AN ADDENDUM TO THE MITIGATED NEGATIVE DECLARATION AND APPROVING AN ARCHITECTURAL AND SITE APPROVAL PERMIT TO ALLOW THE CONSTRUCTION OF A 5,600 SQUARE FOOT, TWO-STORY EXPANSION TO THE EXISTING CUPERTINO PUBLIC LIBRARY, LOCATED AT 10800 TORRE AVENUE (APN 369 31 033) SECTION I: PROJECT DESCRIPTION Application No.: EA-2020-002 and ASA-2020-004 Applicant: Michael Zimmermann (City of Cupertino Public Works) Location: 10800 Torre Avenue SECTION II: FINDINGS FOR ARCHITECTURAL AND SITE APPROVAL PERMIT: WHEREAS, the City of Cupertino received an application for an Architectural and Site Approval to consider allowing a 5,600 square foot, two-story expansion to the existing Cupertino Public Library, as described in Section I. of this Resolution; and WHEREAS, the necessary public notices have been given as required by the Procedural Ordinance of the City of Cupertino, and the Administrative Hearing Officer has held at least one public meeting in regard to the application; and WHEREAS, on July 7, 2015, the City of Cupertino’s City Council held a duly noticed public hearing where it reviewed and considered the information contained in the Draft IS/MND, voted 3-2-0 to adopt the MND and mitigation measures; and WHEREAS, the City has prepared an Addendum (“Addendum”) to the Mitigated Negative Declaration for the Cupertino Civic Center Master Plan for adoption of the Civic Center Master Plan in compliance with the California Environmental Quality Act (Public Resources Code Section 21000 et seq.) (“CEQA”) together with the State CEQA Guidelines (California Code of Regulations, Title 14, Section 15000 et seq.) (hereinafter, “CEQA Guidelines”); and WHEREAS, following necessary public notices given as required by the procedural ordinances of the City of Cupertino and the Government Code, the Administrative Resolution No. 119 EA-2020-002 and ASA-2020-004 August 13, 2020 Page 2 Hearing Officer held a public meeting on August 13, 2020 to consider library expansion project; and WHEREAS, on August 13, 2020, the Addendum was presented to the Administrative Hearing Officer; WHEREAS, the applicant has met the burden of proof required to support said application; and WHEREAS, prior to taking action on this Resolution, the Administrative Hearing Officer has exercised his independent judgment and reviewed and considered the information in the Addendum, which concludes that no further environmental review is required for the library expansion project. WHEREAS, the Administrative Hearing Officer finds as follows with regard to this application: 1. The proposed development, at the proposed location, will not be detrimental or injurious to property or improvements in the vicinity, and will not be detrimental to the public health, safety, general welfare, or convenience; The applicant proposes a 5,600 square foot two-story expansion to the existing Cupertino Public Library. The proposed project complies with the development requirements under Cupertino Municipal Code Chapter 19.76 for public facilities. The project will include the demolition of a 1,175 square-foot portion of the existing library and the construction of the addition, with a slightly larger footprint, in its place. Most of the addition will be within the envelope of the existing building and does not protrude much further than the existing wall plane. This project will not be detrimental or injurious to property or improvements in the vicinity, nor will it be detrimental to the public health, safety, general welfare, or convenience. 2. The proposal is consistent with the purposes of Chapter 19.168, the General Plan any specific plan, zoning ordinances, applicable planned development permit, conditional use permits, variances, subdivision maps or other entitlements to use which regulate the subject property including, but not limited to, adherence to the following specific criteria: a) Abrupt changes in building scale should be avoided. A gradual transition related to height and bulk should be achieved between new and existing buildings. The expansion is proposed in existing library space with a minor expansion in footprint. Due to the design of the current library, the western and eastern wings will reduce much of the bulk of the proposed addition. The added area is comparable in massing, height and bulk of the rest of the library and its construction will not lead to any abrupt changes in building scale. Resolution No. 119 EA-2020-002 and ASA-2020-004 August 13, 2020 Page 3 b) In order to preserve design harmony between new and existing building and in order to preserve and enhance property values, the materials, textures and colors of new building should harmonize with adjacent development by being consistent or compatible with design and color schemes with the future character of the neighborhoods and purposes of the zone in which they are situated. The location, height and materials of walls, fencing, hedges and screen planting should harmonize with adjacent development. Unsightly storage areas, utility installations and unsightly elements of parking lots should be concealed. The planting of ground cover or various types of pavements should be used to prevent dust and erosion, and the unnecessary destruction of existing healthy trees should be avoided. Lighting for development should be adequate to meet safety requirements as specified by the engineering and building departments, and provide shielding to prevent spill-over light to adjoining property owners. The addition is located at the rear of the library and tucked between the existing west and east wings on the sides and further screened from the south by the Memorial Grove – a grove of 50-60 foot tall redwood trees. The addition will utilize materials and a style compatible with the existing library. The proposal is designed with a modern curtain wall glazing system, like the larger windows in existing reading areas of the library. Additionally, the non-programmed space (e.g. stairways) will be finished with stucco to complement the exterior paint colors of the existing library. The glass and stucco combination of the addition will integrate well with the existing building. The proposal does not include any detached storage areas or require exterior utility installations and therefore does not require screening. The proposal includes only one exterior wall-mounted light on the eastern façade of the expansion and is located above an exit door for the safety of library patrons. c) The number, location, color, size, height, lighting and landscaping of outdoor advertising signs and structures have been designed to minimize traffic hazard, positively affect the general appearance of the neighborhood and harmonize with adjacent development. No signs are proposed as part of this expansion. d) With respect to new projects within existing residential neighborhoods, new development should be designed to protect residents from noise, traffic, light and visually intrusive effects by use of buffering, setbacks, landscaping, walls and other appropriate design measures. The proposed addition will not be visually intrusive to the surrounding neighborhood as it is compatible in size with the existing library and located in an area that is generally tucked away from the public right-of-way and views of residential properties. Additionally, the Resolution No. 119 EA-2020-002 and ASA-2020-004 August 13, 2020 Page 4 architectural style and colors are consistent with the existing library. The existing Memorial Grove redwood trees will be protected during, and retained after, construction. Therefore, the trees will continue to provide adequate screening. Thus, the project will not be visually intrusive or cause noise, traffic, and light impacts to the adjacent properties. NOW, THEREFORE, BE IT RESOLVED: That after careful consideration of the maps, facts, exhibits, testimony, staff’s report and presentation, and other evidence submitted in this matter, subject to the conditions which are enumerated in this Resolution beginning on PAGE 4 thereof, the Administrative Hearing Officer resolves that the subconclusions upon which the findings and conditions specified in this resolution are based and contained in the Public Meeting record concerning Application no. EA-2020-002 and ASA-2020-004 as set forth in the Minutes of the Administrative Hearing Meeting of August 13, 2020 and are incorporated by reference as though fully set forth herein, and hereby takes the following actions: 1. Determines that the Addendum reflects the independent judgement of the City. 2. Adopts the Addendum to the Civic Center Master Plan IS/MND, and 3. Approves an Architectural and Site Approval, Application no. ASA-2020-004. SECTION III: CONDITIONS ADMINISTERED BY THE COMMUNITY DEVELOPMENT DEPT. 1. APPROVED EXHIBITS Approval is based on the plan set drawn by EHDD Architecture entitled “Cupertino Library Expansion” consisting of forty-seven (47) sheets labeled as G0.00-G4.01, C1.0-C9.0, A0.11- A9.01, and S0.11-S5.22, except as may be amended by conditions in this resolution. 2. ACCURACY OF PROJECT PLANS The applicant/property owner is responsible to verify all pertinent property data including but not limited to property boundary locations, building setbacks, property size, building square footage, any relevant easements and/or construction records. Any misrepresentation of any property data may invalidate this approval and may require additional review. 3. ANNOTATION OF THE CONDITIONS OF APPROVAL The conditions of approval set forth shall be incorporated into and annotated on the first page of the building plans. Resolution No. 119 EA-2020-002 and ASA-2020-004 August 13, 2020 Page 5 5. BIRD-SAFE DEVELOPMENT The applicant shall submit plans, incorporating bird-safe treatment on all new windows and glass and provide specifications on indoor lighting with provisions for motion-sensored interior lighting, for review and approval by the Director of Community Development, prior to issuance of building permits. 6. BICYCLE PARKING The applicant shall provide 10 bicycle parking stalls and 2 bike lockers to be located at or near the library. The location of the bicycle racks and lockers shall not create an adverse visual impact and shall be reviewed and approved by the Director of Community Development prior to issuance of building permits. 7. BUILDING AND FIRE CODE The applicant shall apply for and obtain building permits to allow the construction of the approved project. The applicant shall provide information and plans to allow the Building Official and the Fire Marshall, or their designee, to determine that the proposed plans comply with Building and Fire Codes in effect at the time of application for a building permit. 8. GREEN BUILDING COMPONENTS The expansion portion of the library shall be designed and constructed to meet California Green Building Standards Code (Title 24) which requires efficient windows, insulation, lighting, ventilation systems, and other features that reduce water and energy consumption, as well as the Cupertino Municipal Code (Chapter 16.58: Green Building Standards). Consistent with the City’s Climate Action Plan and General Plan policies, the project proposes to achieve LEED Silver status and would include various sustainability measures 9. CONSTRUCTION MANAGEMENT PLAN A construction management plan shall be prepared by the applicant and approved by staff prior to issuance of building permits. Staging of construction equipment shall not occur within 150 feet of any residential property or on the library field. 10. EXTERIOR BUILDING MATERIALS/TREATMENTS Final building exterior treatment plan (including but not limited to details on exterior color, material, architectural treatments, lighting fixtures, and/or embellishments) shall be reviewed and approved by the Director of Community Development prior to issuance of building permits. Any exterior changes determined to be substantial by the Director of Community Development shall require a modification approval. Prior to issuance of building permits, staff will Resolution No. 119 EA-2020-002 and ASA-2020-004 August 13, 2020 Page 6 review exterior material, architectural elements, and building scale and massing to ensure quality and consistency with the approved findings in Section II above. 11. TRAFFIC DEMAND MANAGEMENT MEASURES As a part of the TDM strategy, the applicant is proposing the phased implementation of the following in the next two years:  Convert one Rodrigues Avenue parking stall into motorcycle parking  Move pick-up/drop-off and 4-minute book return stalls to Torre Avenue  Provide option for eligible employees to telecommute  Continue the guaranteed ride home program  Designate carpool stalls  Add secure bicycle parking close to City Hall entrance  Create Healthy Families program to encourage families to bike/walk to the library  Education on Transportation Demand Management  Continue to provide commuter checks to employees to encourage bike, walking, carpooling and transit ridership  Provide free after-school shuttles/bus from local schools to the library  Parking cash-out for employees  Restrict all 4-hour regular parking on-site and on-street to 2 hours or less These TDMs will be implemented as needed based on monitoring and as determined by City staff, to alleviate parking issues should they occur. City Staff from the Department of Public Works and Administrative Services and the Office of Sustainability will implement these measures over time and will monitor their effectiveness on an annual basis. If the implemented TDM measures prove to be ineffective or inadequate, additional measures will be implemented. At the end of two years, if the annual monitoring indicates continued parking deficiencies, the City shall reevaluate the parking study and associated TDM measures, and determine next steps. 12. STORMWATER DRAINAGE Any required stormwater treatment measures shall be consistent with the Santa Clara Valley Stormwater Municipal Permit’s C.3 provisions and the City’s Climate Action Plan, to the satisfaction of the City Engineer. Should the project be required to implement stormwater treatment measures, some Construction-Related and Post-Construcion Related Measures are identified below and shall be implemented, as applicable. a. Construction-Related Measures Resolution No. 119 EA-2020-002 and ASA-2020-004 August 13, 2020 Page 7 In conformance with the City of Cupertino’s Municipal Code Chapter 9.18, the project includes the following standard measures:  The project shall implement construction BMPs to avoid impacts to surface water quality during construction, to the satisfaction of the Director of Public Works. Construction BMPs would include, but would not be limited to the following measures: − Preclude non-stormwater discharges to the stormwater system. − Incorporate site-specific Best Management Practices for erosion and sediment control during the construction period consistent with the NPDES permit. − Cover soil, equipment, and supplies that could contribute to non-visible pollution prior to rainfall events or monitor runoff. − Perform monitoring of discharges to the stormwater system to ensure that stormwater runoff during construction is contained prior to discharge to allow sediment to settle out and filtered, if necessary to ensure that only clear water is discharged to the storm system. b. Post-Construction Measures In conformance with the City of Cupertino’s Municipal Code Chapter 9.18, the project would include the following standard measures, as applicable:  The project shall comply with Provision C.3 of NPDES Permit Number CAS612008, and will provide enhanced performance standards for the management of stormwater for new development, as applicable. Prior to issuance of building and grading permits, the project shall comply with the NPDES C.3 permit provisions, including applicable BMPs for reducing contamination in stormwater runoff as permanent features of the project. The project BMPs may include the incorporation of vegetated swales, rain gardens, and flow-through planters to treat and reduce the amount of runoff from the site. The specific BMPs to be used in each phase of development shall be determined based on design and site-specific considerations and will be determined prior to issuance of building and grading permits.  To protect groundwater from pollutant loading of urban runoff, BMPs which are primarily infiltration devices (such as infiltration trenches and infiltration basins) must meet, at a minimum, the following conditions: − Pollution prevention and source control BMPs shall be implemented to protect groundwater; Resolution No. 119 EA-2020-002 and ASA-2020-004 August 13, 2020 Page 8 − Use of infiltration BMPs cannot cause or contribute to degradation of groundwater; − Infiltration BMPs must be adequately maintained; − Vertical distance from the base of any infiltration device to the seasonal high groundwater mark must be at least 10 feet. In areas of highly porous soils and/or high groundwater table, BMPs shall be subject to a higher level of analysis (considering potential for pollutants such as on- site chemical use, level of pretreatment, similar factors); and  Best Management Practices (BMPs) shall be selected and designed to the satisfaction of the Director of Public Works in accordance with the requirements contained in the most recent versions of the following documents: − City of Cupertino Post-Construction BMP Section Matrix; − SCVURPPP “Guidance for Implementing Storm Water Regulations for New and Redevelopment Projects;” − NPDES Municipal Stormwater Discharge Permit issued to the City of Cupertino by the California Regional Water Quality Control Board, San Francisco Bay Region; − California BMP Handbooks; − Bay Area Stormwater Management Agencies Association (BASMAA) “Start at the Source” Design Guidance Manual; − BASMAA “Using Site Design Standards to Meet Development Standards for Stormwater Quality – A Companion Document to Start at the Source;” and − City of Cupertino Planning Procedures Performance Standard.  To maintain effectiveness, all stormwater treatment facilities installed shall include long-term maintenance programs.  If any plantings are planted, pest resistant plants shall be used to minimize pesticide use. Plant selection will be reflected in the landscape plans. 13. INITIAL STUDY/MITIGATED NEGATIVE DECLARATION MITIGATION MEASURES The proposed project shall implement the following mitigation measures (MM) to reduce impacts as identified in the IS/MND approved by City Council on July 2015. The applicant shall indicate on the building permit submissions how these mitigation measures are being implemented, prior to building permit issuance: A. MM BIO-1.1: Removal of trees on the project site will be scheduled between September and December (inclusive) to avoid the nesting season for birds and so that no additional surveys would be required. Resolution No. 119 EA-2020-002 and ASA-2020-004 August 13, 2020 Page 9 B. MM BIO-1.2: If removal of the trees on-site is planned to take place between January and August (inclusive), a pre-construction survey for nesting birds shall be conducted by a qualified ornithologist to identify active nesting raptor or other bird nests that may be disturbed during project implementation. Between January and April (inclusive), preconstruction surveys shall be conducted no more than 14 days prior to the initiation of construction activities or tree relocation or removal. Between May and August (inclusive), pre- construction surveys shall be conducted no more than thirty (30) days prior to the initiation of these activities. The surveying ornithologist shall inspect all trees in and immediately adjacent to the construction area for nests. If an active raptor nest is found in or close enough to the construction area to be disturbed by these activities, the ornithologist shall, in consultation with the State of California, Department of Fish & Wildlife (CDFW), designate a construction- free buffer zone around the nest until the end of the nesting activity. Buffers for other birds shall be determined by the ornithologist. C. MM BIO-1.3: A report summarizing the results of the pre-construction survey and any designated buffer zones or protection measures for tree nesting birds shall be submitted to the Public Works Director prior to the start of grading or tree removal D. MM CUL-1.1: In the event of the discovery of prehistoric or historic archaeological deposits or paleontological deposits, work shall be halted within 50 feet of the discovery and a qualified professional archaeologist (or paleontologist, as applicable) shall examine the find and make appropriate recommendations regarding the significance of the find and the appropriate mitigation. The recommendation shall be implemented and could include collection, recordation, and analysis of any significant cultural materials. E. MM CUL-1.2: Pursuant to Section 7050.5 of the Health and Safety Code and Section 5097.94 of the Public Resources Code of the State of California: a. In the event of the discovery of human remains during construction, there shall be no further excavation or disturbance of the site or any nearby area reasonably suspected to overlie adjacent remains. The Santa Clara County Coroner shall be notified and shall make a determination as to whether the remains are Native American. If the Coroner determines that the remains are not subject to his authority, he shall notify the Native American Heritage Commission who shall attempt to identify descendants of the deceased Native American. If no satisfactory agreement can be reached as to the disposition of the remains pursuant to this State law, then the land owner shall re-inter the human remains and items associated with Native Resolution No. 119 EA-2020-002 and ASA-2020-004 August 13, 2020 Page 10 American burials on the property in a location not subject to further subsurface disturbance. F. MM CUL-1.3: If cultural resources are encountered, a final report summarizing the discovery of cultural materials shall be submitted to the Director of Public Works prior to issuance of building permits. This report shall contain a description of the mitigation program that was implemented (e.g., monitoring and testing program), a list of the resources found, a summary of the resources analysis methodology and conclusion, and a description of the disposition/curation of the resources. The report shall verify completion of the mitigation program to the satisfaction of the Director Public Works. G. MM GEO-1.1: The project proposes to be constructed in accordance with standard pracrices in the California Building Code, as adopted by the City of Cupertino, to reduce expansive soil impacts to a less than significant level. H. MM HAZ-2.1: In conformance with local, state, and federal laws, an asbestos building survey and a lead-based paint survey shall be completed by a qualified professional to determine the presence of ACMs and/or lead-based paint on the structures prior to demolition. I. MM HAZ-2.2: A registered asbestos abatement contractor shall be retained to remove and dispose of all potentially friable asbestos-containing materials, in accordance with the National Emissions Standards for Hazardous Air Pollutants (NESHAP) guidelines, prior to building demolition or renovation that may disturb the materials. All demolition activities shall be undertaken in accordance with Cal/OSHA standards, contained in Title 8 of the California Code of Regulations (CCR), Section 1529, to protect workers from exposure to asbestos. Materials containing more than one percent asbestos are also subject to Bay Area Air Quality Management District (BAAQMD) regulations. J. MM HAZ-2.3: During demolition activities, all building materials containing lead-based paint shall be removed in accordance with Cal/OSHA Lead in Construction Standard, Title 8, CCR 1532.1, including employee training, employee air monitoring and dust control. Any debris or soil containing lead- based paint or coatings shall be disposed of at landfills that meet acceptance criteria for the waste being disposed. K. MM HAZ-2.4: Hazardous waste shall be appropriately managed, labeled, transported, and disposed of in accordance with local, state, and/or federal requirements by trained workers. L. MM NOI-1.1: Develop a construction noise mitigation plan including, but not limited to, the following controls: Resolution No. 119 EA-2020-002 and ASA-2020-004 August 13, 2020 Page 11  All equipment driven by internal combustion engines shall be equipped with mufflers, which are in good condition and appropriate for the equipment.  The construction contractor shall utilize “quiet” models of air compressors and other stationary noise sources where technology exists.  Unnecessary idling of internal combustion engines shall be prohibited.  Construction staging areas shall be established at locations that will create the greatest distance between the construction-related noise sources and noise-sensitive receptors nearest the project site during all project construction.  Locate stationary noise sources as far from sensitive receptors as feasible. If they must be located near receptors, adequate muffling (with enclosures where feasible and appropriate) will be used. Any enclosure openings or venting will face away from sensitive receptors.  Locate material stockpiles as well as maintenance/equipment staging and parking areas as far as feasible from residential receptors.  Neighbors located adjacent to the construction site shall be notified of the construction schedule in writing.  Designate a project liaison that will be responsible for responding to noise complaints during the construction phase. The name and phone number of the liaison will be conspicuously posted at construction areas and on all advanced notifications. This person will take steps to resolve complaints, including periodic noise monitoring, if necessary. Results of noise monitoring will be presented at regular project meetings with the project contractor, and the liaison will coordinate with the contractor to modify any construction activities that generated excessive noise levels to the extent feasible.  Require a reporting program that documents complaints received, actions taken to resolve problems, and effectiveness of these actions.  Hold a preconstruction meeting with the job inspectors and the general contractor/on-site project manager to confirm that noise mitigation and practices (including construction hours, construction schedule, and noise coordinator) are completed. 14. TREE PROTECTION As part of the demolition or building permit drawings, a tree protection plan shall be prepared by a certified arborist for the trees to be retained. In addition, the following measures shall be added to the protection plan:  For trees to be retained, chain link fencing and other root protection shall be installed around the dripline of the tree prior to any project site work. Resolution No. 119 EA-2020-002 and ASA-2020-004 August 13, 2020 Page 12  No parking or vehicle traffic shall be allowed under root zones, unless using buffers approved by the Project Arborist.  No trenching within the critical root zone area is allowed. If trenching is needed in the vicinity of trees to be retained, the City’s consulting arborist shall be consulted before any trenching or root cutting beneath the dripline of the tree.  Wood chip mulch shall be evenly spread inside the tree projection fence to a four-inch depth.  Tree protection conditions shall be posted on the tree protection barriers.  Retained trees shall be watered to maintain them in good health.  A covenant on the property shall be recorded that identifies all the protected trees, prior to final occupancy. The tree protection measures shall be inspected and approved by the certified arborist prior to issuance of building permits. The City’s consulting arborist shall inspect the trees to be retained and shall provide reviews prior to issuance of demolition, grading or building permits. A report ascertaining the good health of the trees mentioned above shall be provided prior to issuance of final occupancy. 15. DEMOLITION REQUIREMENTS All demolished building and site materials shall be recycled to the maximum extent feasible subject to the Building Official. The applicant shall provide a Construction and Demolition Waste Management Plan prior to building permit issuance, and evidence that materials were recycled prior to occupancy in a Construction Recycling Report. 16. GRADING AND CONSTRUCTION HOURS AND NOISE LIMITS The applicant shall indicate compliance with the following grading and construction hours and noise limit requirements on all demolition, construction and grading permits, and in the construction management plan(s), unless otherwise indicated. a. All grading activities shall be limited to the dry season (April 15 to October 1), unless permitted otherwise by the Director of Public works. b. Construction hours and noise limits shall be compliant with all requirements of Chapter 10.48 of the Cupertino Municipal Code. c. Grading, street construction, underground utility and demolition hours for work done more than 750 feet away from residential areas shall be limited to Monday through Friday, 7 a.m. to 8 p.m. and Saturday and Sunday, 9 a.m. to 6 p.m. Grading, street construction, demolition or underground utility work within 750 feet of residential areas shall not occur on Saturdays, Sundays, Resolution No. 119 EA-2020-002 and ASA-2020-004 August 13, 2020 Page 13 holidays, and during nighttime period as defined in Section 10.48.053(b) of the Municipal Code. d. Construction activities shall be limited to Monday through Friday, 7 a.m. to 8 p.m. and Saturday and Sunday, 9 a.m. to 6 p.m. Construction activities are not allowed on holidays as defined in Chapter 10.48 of the Municipal Code. Night time construction is allowed if compliant with nighttime standards of Section 10.48 of the Cupertino Municipal Code. e. Rules and regulations pertaining to all construction activities and limitations identified in this permit, along with the name and telephone number of an applicant appointed disturbance coordinator, shall be posted in a prominent location at the entrance to the job site. f. The applicant shall be responsible for educating all contractors and subcontractors of said construction restrictions. 17. BAAQMD CONSTRUCTION MITIGATION MEASURES (DUST CONTROL) a. Project shall comply with the Bay Area Quality Management District’s Basic Construction Mitigation Measures to reduce construction fugitive dust impacts as follows: i. All exposed surfaces (e.g., parking areas, staging areas, soil piles, graded areas, and unpaved access roads) shall be watered two times per day. ii. All haul trucks transporting soil, sand, or other loose material off-site shall be covered. iii. All visible mud or dirt tracked-out onto adjacent public roads shall be removed using wet power vacuum street sweepers at least once per day. The use of dry power sweeping is prohibited. iv. All vehicle speeds on unpaved roads shall be limited to 15 mph. v. All roadways, driveways, and sidewalks to be paved shall be completed as soon as possible. Building pads shall be laid as soon as possible after grading unless seeding or soil binders are used. vi. Idling times shall be minimized either by shutting equipment off when not in use or reducing the maximum idling time to 5 minutes (as required by the California airborne toxics control measure Title 13, Section 2485 of California Code of Regulations [CCR]). Clear signage shall be provided for construction workers at all access points. vii. All construction equipment shall be maintained and properly tuned in accordance with manufacturer’s specifications. All equipment shall be checked by a certified mechanic and determined to be running in proper condition prior to operation. viii. A publicly visible sign shall be posted with the telephone number and person to contact at the City of Cupertino regarding dust complaints. This Resolution No. 119 EA-2020-002 and ASA-2020-004 August 13, 2020 Page 14 person shall respond and take corrective action within 48 hours. The BAAQMD phone number shall also be visible to ensure compliance with applicable regulations. b. The Contractor shall also implement the following measures, consistent with BAAQMD’s Additional Construction Mitigation Measures Recommended for Projects with Construction Emissions Above the Threshold: i. All exposed surfaces shall be watered at a frequency adequate to maintain minimum soil moisture of 12 percent. Moisture content can be verified by lab samples or moisture probe. ii. All excavation, grading, and/or demolition activities shall be suspended when average wind speeds exceed 20 mph. iii. Wind breaks (e.g., trees, fences) shall be installed on the windward side(s) of actively disturbed areas of construction. Wind breaks should have at maximum 50 percent air porosity. iv. Vegetative ground cover (e.g., fast-germinating native grass seed) shall be planted in disturbed areas as soon as possible and watered appropriately until vegetation is established. v. The simultaneous occurrence of excavation, grading, and ground- disturbing construction activities on the same area at any one time shall be limited. Activities shall be phased to reduce the amount of disturbed surfaces at any one time. vi. All trucks and equipment, including their tires, shall be washed off prior to leaving the site. vii. Site accesses to a distance of 100 feet from the paved road shall be treated with a 6 to 12 inch compacted layer of wood chips, mulch, or gravel. viii. Sandbags or other erosion control measures shall be installed to prevent silt runoff to public roadways from sites with a slope greater than one percent. ix. Minimizing the idling time of diesel powered construction equipment to two minutes. x. The project shall develop a plan demonstrating that the off-road equipment (more than 50 horsepower) to be used in the construction project (i.e., owned, leased, and subcontractor vehicles) would achieve a project wide fleet-average 20 percent NOX reduction and 45 percent PM reduction compared to the most recent ARB fleet average. Acceptable options for reducing emissions include the use of late model engines, low-emission diesel products, alternative fuels, engine retrofit technology, after- treatment products, add-on devices such as particulate filters, and/or other options as such become available. Resolution No. 119 EA-2020-002 and ASA-2020-004 August 13, 2020 Page 15 xi. Use low VOC (i.e., ROG) coatings beyond the local requirements (i.e., Regulation 8, Rule 3: Architectural Coatings). xii. Requiring that all construction equipment, diesel trucks, and generators be equipped with Best Available Control Technology for emission reductions of NOx and PM. xiii. Requiring all contractors use equipment that meets CARB’s most recent certification standard for off-road heavy duty diesel engines. c. Additional measures are included to reduce localized construction equipment exhaust emissions: i. All mobile diesel-powered off-road equipment larger than 50 horsepower and operating on the site for more than two days continuously shall meet U.S. EPA particulate matter emissions standards for Tier 2 engines or equivalent; ii. All portable diesel-powered off-road equipment (e.g., air compressors) operating on the site for more than two days continuously shall meet U.S. EPA particulate matter emissions standards for Tier 4 engines or equivalent; and Note that the construction contractor could use other measures to minimize construction period DPM emissions. Such measures may be the use of alternative powered equipment (e.g., LPG-powered lifts), alternative fuels (e.g., biofuels), added exhaust devices, or a combination of measures. Applicant shall indicate compliance with BAAQMD’s construction measures on all demolition, construction and grading permits and construction management plan(s). 18. CONSULTATION WITH OTHER DEPARTMENTS The applicant is responsible to consult with other departments and/or agencies with regard to the proposed project for additional conditions and requirements. Any misrepresentation of any submitted data may invalidate an approval by the Community Development Department. 19. NOTICE OF FEES, DEDICATIONS, RESERVATIONS, OR OTHER EXACTIONS The Conditions of Project Approval set forth herein may include certain fees, dedication requirements, reservation requirements, and other exactions. Resolution No. 119 EA-2020-002 and ASA-2020-004 August 13, 2020 Page 16 SECTION V: CONDITIONS ADMINISTERED BY SANTA CLARA COUNTY FIRE DEPT. The following are preliminary conditions provided by the Fire Department and may be modified administratively by the Fire Chief, or his/her designee. 20. FIRE SPRINKLERS REQUIRED (As noted on Sheet G0.02) An approved and monitored automatic sprinkler system shall be provided throughout all new buildings and structures. Exceptions: a. Buildings and structures that do not exceed 1,000 square feet of building area and that are not located in the Wildland-Urban Interface Fire Area. b. Buildings and structures that are located in the Wildland-Urban Interface Fire Area and do not exceed 500 square feet of building area. An automatic sprinkler system shall be provided throughout existing buildings and structures when alterations or additions are made that create conditions described in Sections 903.2.1 through 903.2.18. 21. REQUIRED AERIAL ACCESS a. The new addition exceeds the maximum 30' height requirement. Lower the top of the parapet or provide aerial access. b. Where required: Buildings or portions of buildings or facilities exceeding 30 feet (9144 mm) in height above the lowest level of fire department vehicle access shall be provided with approved fire apparatus access roads capable of accommodating fire department aerial apparatus. Overhead utility and power lines shall not be located within the aerial fire apparatus access roadway. c. Width: Fire apparatus access roads shall have a minimum unobstructed width of 26 feet (7925) in the immediate vicinity of any building or portion of building more than 30 feet (9144 mm) in height. d. Proximity to building: At least one of the required access routes meeting this condition shall be located within a minimum of 15 feet (4572) and a maximum of 30 feet (9144mm) from the building, and shall be positioned parallel to one entire side of the building, as approved by the fire code official. SCCFD SD&S A-1. 22. FIRE ALARM MODIFICATION MAY BE REQUIRED (As noted on Sheet G0.02) A monitored fire sprinkler system is provided. A deferred submittal for the fire alarm system is required as necessary by new construction. Submit shop drawings (3 sets) and a permit application to the Santa Resolution No. 119 EA-2020-002 and ASA-2020-004 August 13, 2020 Page 17 Clara County Fire Department for approval. Call (408) 341-4420 for more information. 23. PUBLIC/PRIVATE FIRE HYDRANT(S) REQUIRED (As shown on Sheet C-9.0) Provide public/private fire hydrant(s) at location(s) to be determined jointly by the Fire Department and San Jose Water Company. Maximum hydrant spacing shall be 500 feet, with a minimum single hydrant flow of 1000 GPM at 20 psi, residual. Fire hydrants shall be provided along required fire apparatus access roads and adjacent public streets. CFC Sec. 507, and Appendix B and associated Tables, and Appendix C. Two new public fire hydrants are proposed along Torre Ave. 24. FIRE DEPARTMENT CONNECTION Please note the location of the FDC on Sheet C-9.0. The fire department connection (FDC) shall be installed at the street on the street address side of the building. It shall be located within 100 feet of a public fire hydrant and within ten (10) feet of the main PIV (unless otherwise approved by the Chief due to practical difficulties). FDC's shall be equipped with a minimum of two (2), two-and-one-half (2- 1/2”) inch national standard threaded inlet couplings. Exception: FDC's supplying private on-site fire hydrants shall have a minimum four (4) way inlet coupling. Revise plans accordingly. SCCFD Standard SP-2. 25. WATER SUPPLY REQUIREMENTS Potable water supplies shall be protected from contamination caused by fire protection water supplies. It is the responsibility of the applicant and any contractors and subcontractors to contact the water purveyor supplying the site of such project, and to comply with the requirements of that purveyor. Such requirements shall be incorporated into the design of any water-based fire protection systems, and/or fire suppression water supply systems or storage containers that may be physically connected in any manner to an appliance capable of causing contamination of the potable water supply of the purveyor of record. Final approval of the system(s) under consideration will not be granted by this office until compliance with the requirements of the water purveyor of record are documented by that purveyor as having been met by the applicant(s). 2019 CFC Sec. 903.3.5 and Health and Safety Code 13114.7. 26. BUILDINGS AND FACILITIES ACCESS (As noted on Sheet C-9.0) Approved fire apparatus access roads shall be provided for every facility, building or portion of a building hereafter constructed or moved into or with the jurisdiction. The fire apparatus access road shall comply with the requirements of this section and shall extend to within 150 feet of all portions of Resolution No. 119 EA-2020-002 and ASA-2020-004 August 13, 2020 Page 18 the facility and all portions of the exterior walls of the first story of the building as measured by an approved route around the exterior of the building or facility. [CFC, Section 503.1.1]. 27. REQUIRED EMERGENCY ACCESS The minimum clear width of fire department access roads shall be 20 feet. Facilities, buildings or portions of buildings hereafter constructed shall be accessible to fire department apparatus by way of an approved fire apparatus access road (including bridges and culverts) with an asphalt, concrete or other approved driving surface capable of supporting the imposed load of fire apparatus weighing at least 75,000 pounds (34050 kg) or as otherwise determined by the fire code official. CFC Sec. 503 and SCCFD A-1 Standard. If the height of the building is reduced to meet the maximum 30' to the top of the parapet, 20' wide access roadways are required. The path of travel is noted on Sheet C-9.0 however with all of the unrelated information shown on the sheet it is extremely difficult to verify the 20' roadways. Please remove any unrelated information from this sheet. 28. ADDRESS IDENTIFICATION New and existing buildings shall have approved address numbers, building numbers or approved building identification placed in a position that is plainly legible and visible from the street or road fronting the property. These numbers shall contrast with their background. Where required by the fire code official, address numbers shall be provided in additional approved locations to facilitate emergency response. Address numbers shall be Arabic numbers or alphabetical letters. Numbers shall be a minimum of 4 inches (101.6 mm) high with a minimum stroke width of 0.5 inch (12.7 mm). Where access is by means of a private road and the building cannot be viewed from the public way, a monument, pole or other sign or means shall be used to identify the structure. Address numbers shall be maintained. CFC Sec. 505.1. 29. CONSTRUCTION SITE FIRE SAFETY All construction sites must comply with applicable provisions of the CFC Chapter 33 and our Standard Detail and Specification S1-7. Provide appropriate notations on subsequent plan submittals, as appropriate to the project. CFC Chp. 33. Resolution No. 119 EA-2020-002 and ASA-2020-004 August 13, 2020 Page 19 PASSED AND ADOPTED this 13th day of August, 2020 at a noticed Public Meeting of the Administrative Hearing Officer of the City of Cupertino, State of California, held by the Director of Community Development, or his or her designee, pursuant to Cupertino Municipal Code Section 19.12.120. ATTEST: APPROVED: /s/ Ellen Yau /s/Albert Salvador Ellen Yau Albert Salvador Associate Planner Assistant Director of Community Development PROJECT LOCATION: CUPERTINO PUBLIC LIBRARY PROGRAM EXPANSION BUILDING PROJECT SCOPE: APPROXIMATELY 5,600 SF TWO STORY ADDITION OF PROGRAM SPACE, RESTROOMS, STORAGE, PANTRY APPLICABLE CODES (BASIS OF DESIGN): CODE REQUIREMENTS INCLUDE BUT ARE NOT LIMITED TO THE FOLLOWING: APPLICABLE STATE CODES: 2019 BUILDING STANDARDS ADMINISTRATIVE CODE, PART 1, CBSC 2019 CALIFORNIA BUILDING CODE (CBC), PART 2, CBSC 2019 CALIFORNIA ELECTRICAL CODE (CEC), PART 3, CBSC 2019 CALIFORNIA MECHANICAL CODE (CMC), PART 4, CBSC 2019 CALIFORNIA PLUMBING CODE (CPC), PART 5, CBSC 2019 CALIFORNIA ENERGY CODE (CPC), PART 6, CBSC 2019 CALIFORNIA FIRE CODE, PART 9, CBSC 2019 CALIFORNIA EXISTING BUILDING CODE PART 10 2019 CALIFORNIA GREEN BUILDING CODE PART 11 2019 CALIFORNIA REFERENCED STANDARDS, PART 12, CBSC 2019 CALIFORNIA EXISTING BUILDING CODE PART 10 TITLE 8 C.C.R., CH. 4, SUB-CH. 6-ELEVATOR SAFETY ORDERS TITLE 19 C.C.R., PUBLIC SAFETY, SFM REGULATIONS APPLICABLE FEDERAL CODES & STANDARDS: 2010 ADA STANDARDS FOR ACCESSIBLE DESIGN, TITLE II OCCUPANCY CLASSIFICATION & TYPE OF CONSTRUCTION: OCCUPANCY TYPE A-3, CONSTRUCTION TYPE II-A; SPRINKLERED PROJECT DATA CUPERTINO PUBLIC LIBRARY EXPANSION 100% BRIDGING DOCUMENT SET JUNE 1, 2020 ARCHITECT EHDD ARCHITECTURE PIER 1, BAY 2 THE EMBARCADERO SAN FRANCISCO, CA 941 1 1 T: (415) 285-9193 CIVIL ENGINEER SANDIS 1700 S WINCHESTER BLVD. #200 CAMPBELL, CA 95008 T: (408) 636-0900 STRUCTURAL ENGINEER DAEDALUS 12930 SARATOGA AVE SARATOGA, CA 95070 T: (408) 517-0373 MECHANICAL/ ELECTRICAL/ PLUMBING ENGINEER GAYNER ENGINEERS 311 POST STREET SAN FRANCISCO, CA 94109 T: (415) 474-9500 PROJECT TEAM 10800 TORRE AVENUE CUPERTINO, CA 95014 Stamp Consultant Sheet Number Sheet Title EHDD Job Number Drawn by Scale Printing Date COST MODEL DRAWINGS 05.04.2020 PIER 1, BAY 2 THE EMBARCADERO SAN FRANCISCO, CA 94111 INFO@EHDD.COM +1 415-285-9193 Revisions and Description Date BRIDGING DOCUMENTS 100% SD 06.01 .2020 6/2/2020 9:31:10 AMC:\Users\j.manzo\Documents\20013-A-CUPERTINO LIBRARY EXP-CENTRAL_j.manzo@ehdd.com.rvt 12" = 1'-0" G0.00 COVER SHEET AND INDEX CUPERTINO PUBLIC LIBRARY EXPANSION Author 2001 3 SOUTH EAST PERSPECTIVE VIEW VICINITY MAP SHEET INDEX GENERAL G0.00 COVER SHEET AND INDEX G0.01 ARCHITECTURAL ABBREVIATIONS AND SYMBOLS G0.0 2 CODE ANALYSIS G0.03 ACCESSIBILITY SITE PLAN G0.04 LIFE SAFETY PLAN AND CODE REVIEW G3.01 ACCESSIBLE MOUNTING HEIGHTS G4.01 PERSPECTIVE VIEWS CIVIL C1.0 COVER SHEET C1.1 NOTES C2.0 TOPOGRAPHIC SURVEY C3.0 DEMOLITION PLAN C4.0 SITE ACCESS AND PARKING PLANS C5.0 GRADING AND DRAINAGE PLAN C6.0 UTILITY PLAN C7.0 CONSTRUCTION DETAILS C8.0 EROSION CONTROL PLAN C8.1 EROSION CONTROL DETAILS C9.0 FIRE ACCESS PLANS ARCHITECTURAL A0.11 SITE PLAN A0.1 2 SITE PLAN -CONSTRUCTION LOGISTICS A1.01 LEVEL 1 - DEMOLITION PLAN A1 .02 LEVEL 2 -DEMOLITION PLAN A2.1 1 LEVEL 1 & 2 - FLOOR PLANS A2.1 2 ROOF PLAN A2.21 LEVEL 1 & 2 -FINISH PLANS A2.41 LEVEL 1 - FURNITURE PLANS A2.42 LEVEL 2 - FURNITURE PLANS A3.01 BUILDING ELEVATIONS A3.11 BUILDING SECTIONS A3.1 2 BUILDING WALL SECTIONS A4.01 ENLARGED TOILET PLANS & ELEVATIONS A5.01 INTERIOR ELEVATIONS A6.01 LEVEL 1 & 2 - REFLECTED CEILING PLANS A7.01 STAIR PLANS AND SECTIONS A9.01 TYPICAL ACOUSTIC DETAILS STRUCTURAL S0.11 NOTES S0.1 2 GENERAL NOTES S2.1 1 LEVEL 1 FRAMING PLAN S2.1 2 LEVEL 2 FRAMING PLAN S2.21 BRACE FRAME ELEVATIONS S3.11 TYPICAL CONCRETE DETAILS S3.1 2 TYPICAL CONCRETE DETAILS S5.11 TYPICAL STEEL DETAILS S5.1 2 TYPICAL STEEL DETAILS S5.13 TYPICAL STEEL DETAILS S5.21 COLD FORMED STEEL DETAILS S5.22 COLD FORMED STEEL DETAILS ASA-2020-004, EA-2020-002 08/17/20 Ellen Yau THE FOLLOWING GENERAL NOTES APPLY TO ALL A-SERIES DRAWINGS. FOR GENERAL NOTES APPLICABLE TO ALL DRAWINGS REFER TO THE "PROJECT GENERAL NOTES". FOR NON A-SERIES GENERAL NOTES AND SYMBOLS REFER TO APPLICABLE DRAWINGS. THE A-SERIES DRAWINGS ARE A PART OF A LARGER SET OF DRAWINGS. REVIEW AND COORDINATE THE WORK ALL ASPECTS OF THE CONTRACT DOCUMENTS. 1. 2. 3. 4. ARCHITECTURAL GENERAL NOTES SECOND LEVEL +10'-0" BUILDING SECTION BLDG SECTION NUMBER DIRECTION OF VIEW SHEET WHERE DRAWN WALL SECTION NORTH ARROW REFERENCE PROJECT NORTH NEW GRID IDENTIFICATION EXISTING GRID IDENTIFICATION LAYOUT GRID LINES BASIC DRAWING TITLE LEVEL LINE REVISION NUMBER AND EXTENT ROOM NAME AND NUMBER PLAN DETAIL REFERENCE EXTERIOR ELEVATION SEE PARTITION SYMBOL DESCRIPTION ON SHEET A9.X.X PARTITION TYPE IDENTIFICATION MARK ELEVATION NUMBER AND DIRECTION SHEET WHERE DRAWN SHEET WHERE DRAWN, HYPHEN INDICATES DETAIL ON SAME SHEET. DETAIL NUMBER AX.X.X X WINDOW AND LOUVER TYPE MARK WINDOW MARK NAME OF LEVEL INDICATES HEIGHT ABOVE PROJECT DATUM REVISION NUMBER - SEE REVISION HISTORY ON THE TITLE BLOCK OF EACH SHEET EXTENT OF CURRENT REVISION KEYED NOTE MARK MATCH LINE REFERENCE DRAWING TITLE SYMBOLS 1 SEE CORRESPONDING NUMBERED KEY NOTE ON SHEET WHERE REFERENCE OCCURS DRAWING SIDE DRAWING WHERE CONTINUATION IS FOUND SCALE: 1/8" = 1'-0" AX.XX X SIM 1 A101 Room Name 101 W-X A3E3 WALL SECTION NUMBER DIRECTION OF VIEW SHEET WHERE DRAWN SECTION DETAIL REFERENCE ELEVATION NUMBER SHEET WHERE DRAWN DETAIL REFERENCE SHEET WHERE DRAWN, HYPHEN INDICATES DETAIL ON SAME SHEET. DETAIL NUMBERAX.XX X SIM SIM AX.XX X INTERIOR ELEVATION REFERENCE ELEVATION NUMBER AND DIRECTION OF VIEW SHEET WHERE DRAWN AX.XX X AX.XX X SIM AX.XX X SIM DOOR IDENTIFICATION MARK A3E3 DOOR OPENING MARK ARCHITECTURAL REFERENCE SYMBOLS View Name VERIFY ALL DIMENSIONS BEFORE PROCEEDING WITH THE WORK. NOTIFY THE ARCHITECT IMMEDIATELY OF ANY DISCREPANCY OR VARIATION. DO NOT PROCEED WITH AFFECTED WORK UNTIL THE VARIATION OR DISCREPANCY IS RESOLVED. DO NOT SCALE DRAWINGS. IF UNABLE TO LOCATE DIMENSIONS FOR ANY ITEM OF WORK, CONSULT ARCHITECT FOR DIRECTION BEFORE PROCEEDING. PLAN DIMENSIONING: DIMENSIONS ARE TO: FACE OF INTERIOR GYPSUM BOARD FACE OF EXT. FINISH CENTER LINE OF COLUMN GRID FACE OF DOOR JAMBS HEIGHTS SHOWN OR NOTED AFF (ABOVE FINISH FLOOR) ARE TO BE MEASURED FROM TOP OF FINISH FLOOR MATERIAL. EXCEPTIONS: AT AREAS THAT RECEIVE CARPET OR RESILIENT FLOORING, HEIGHTS ARE MEASURED FROM TOP OF CONCRETE. IF DRAWING IS LESS THAN 30" X 42", IT HAS BEEN REDUCED FROM ORIGINAL. DETAILS SHOWN ON DRAWINGS SHALL BE INCORPORATED INTO THE PROJECT AT ALL APPROPRIATED LOCATIONS WHETHER SPECIFICALLY REFERENCED AT EACH LOCATION OR NOT. INSTALL NECESSARY BLOCKING, BACKING, FRAMING, HANGERS, AND OTHER SUPPORT FOR FIXTURES, EQUIPMENT, SHELVING AND CASEWORK. PROVIDE GYPSUM WALL BOARD OR PLASTER BEHIND AND AROUND ALL OPENINGS INCLUDING WALL CABINETS, RECESSED FIRE HOSE VALVE AND FIRE EXTINGUISHER CABINETS, ELECTRICAL PANELS AND ELECTRICAL BOXES WHERE REQUIRED BY CODE TO MAINTAIN FIRE RATED CONSTRUCTION SHOWN ON DRAWINGS. THE CONTRACTOR SHALL BE RESPONSIBLE FOR AND SHALL SUPERVISE ALL CUTTING AND PATCHING OF FINISHED WORK ALREADY INSTALLED IF MADE NECESSARY BY ERRORS, CHANGES, OR OTHER REASONS. ALL REPLACEMENT WORK SHALL MATCH ADJOINING SURFACES WITH NO VISIBLE MARKINGS OF REDO/REPAIR WORK. FOR EQUIPMENT WEIGHING MORE THAN 400 LBS AND SUPPORTED DIRECTLY ON THE FLOOR OR ROOF STRUCTURE AND FOR TEMPORARY OR MOVABLE EQUIPMENT AND FOR EQUIPMENT WEIGHING MORE THAN 20 LBS THAT IS SUPPORTED BY VIBRATION DEVICES SUSPENDED FROM THE ROOF, WALL OR FLOOR ANCHORAGE MUST BE ENGINEERED BY A PROFESSIONAL ENGINEER LICENSED IN THE STATE OF CALIFORNIA TO MEET CCR TITLE 24 PART 2. COORDINATE WITH STRUCTURAl DWGS IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO PROVIDE ALL SUPPORTS, ANCHORS, CLIPS, FASTENERS, BRACES, AND REINFORCEMENTS FOR ALL ASSEMBLIES, SYSTEMS, FIXED EQUIPMENT, ACCESSORIES, AND SO FORTH, THAT ARE A PART OF THE STRUCTURAL SYSTEM, HAVE BEEN SHOWN, SPECIFIED, OR SIZED OR ARE REASONABLY REQUIRED TO COMPLETE THE WORK IN CONFORMANCE WITH THE CONTRACT DOCUMENTS. THE CONTRACTOR SHALL ALSO PROVIDE CALCULATIONS FOR ALL SUCH ITEMS AS REQUIRED BY THE AUTHORITY HAVING JURISDICTION. IF A DISCREPANCY EXISTS BETWEEN DRAWINGS, BETWEEN DRAWINGS AND SPECIFICATIONS OR WITHIN THE SPECIFICATIONS, SUCH DISCREPANCY SHALL BE BROUGHT TO THE ATTENTION OF THE ARCHITECT PRIOR TO INSTALLATION OF SAID WORK. DO NOT PROCEED WITH AFFECTED WORK UNTIL THE VARIATION OR DISCREPANCY IS RESOLVED. THE CONTRACTOR SHALL NOT FABRICATE OR INSTALL ANY WORK WHERE THEY HAVE REASONABLE KNOWLEDGE THAT THE CONTRACT DOCUMENTS MAY BE IN CONFLICT WITH APPLICABLE CODES OR INTERPRETATION OF THE AUTHORITY HAVING JURISDICTION. ANY SUCH INFORMATION SHALL BE IMMEDIATELY BROUGHT TO THE ATTENTION OF THE ARCHITECT WHO SHALL ISSUE A RESOLUTION OF THE CONFLICT. SHOULD ANY CONDITIONS DEVELOP NOT COVERED BY THE CONTRACT DOCUMENTS SUCH THAT THE FINISHED WORK WILL NOT COMPLY WITH TITLE 24 OF THE CALIFORNIA CODE OF REGULATIONS, A CHANGE ORDER DETAILING AND SPECIFYING THE REQUIRED WORK SHALL BE SUBMITTED TO AND APPROVED BY THE OWNER BEFORE PROCEEDING WITH THE WORK. 1. 2. 3. 4. 5. 6. 7. 8. 9. 10. 11. 12. 13. 14. PROJECT GENERAL NOTES &..............................................................And °..........................................Angle in Degrees ∠….......................................................Angle @................................................................At X.................................................................By C.....................................................Centerline ø.......................................Diameter or Round (E)......................................................Existing (N)...........................................................New P............................................................Plate %.......................................................Percent #.........................................Pound or Number ⅊................................................Property Line ²...........................................................Square A.C........................................Air Conditioning A/V..............................................Audio Visual AB................................................Anchor Bolt ABRSV..............................................Abrasive ABV......................................................Above ACC..............................................Accessible ACOUS.......................................Acoustic (al) ACP.....................Acoustical Concrete Paving ACU...............................Air Conditioning Unit AWT......................Acoustical Wall Treatment AD..............................................Access Door AD.................................................Area Drain ADC............................Automatic Door Closer ADDL..............................................Additional ADH.................................................Adhesive ADJ...............................................Adjustable ADJC................................................Adjacent AFF...................................Above Finish Floor AFG.............................Above Finished Grade AFS................................Above Finished Slab AGGR.............................................Aggregate AHR.....................................................Anchor AHU.....................................Air Handling Unit AL...................................................Aluminum ALM.......................................................Alarm ALT...................................................Alternate AMT....................................................Amount ANN..............................................Annunciator ANOD...............................................Anodized ANT....................................................Antenna AP..............................................Access Panel APPROX................................Approximate (ly) ARCH.......................................Architect (ural) ASPH..................................................Asphalt ASSN............................................Association ASSY...............................................Assembly AC.........................................Acoustic Ceiling ATCH............................................Attachment AWG...............................American Wire Gage B.O.F.................................Bottom of Footing B.U....................................................Built Up B.U.R........................................Built Up Roof BB...........................................Bulletin Board BC................................................Bridge Clip BD........................................................Board BETW...............................................Between BEV.......................................................Bevel BITUM...........................................Bituminous BLDG.................................................Building BLKG................................................Blocking BLW......................................................Below BM.........................................................Beam BM...............................................Bench Mark BOT.....................................................Bottom BP.................................................Base Plate BRDG................................................Bridging BRG...................................................Bearing BRKT..................................................Bracket BRS.......................................................Brass BRZ.....................................................Bronze BS.................................................Both Sides BSMT.............................................Basement C..............................................................Civil CAB...................................................Cabinet CPT.....................................................Carpet CAV......................................................Cavity C.B.............................................Catch Basin CEM...................................................Cement CER...................................................Ceramic CFM............................Cubic Foot per Minute CFLG...................................Counter Flashing C & G.................................Curb and Gutter C.G...........................................Corner Guard C.H...........................................Ceiling Height CHAN................................................Channel CHFR................................................Chamfer CHK BD.....................................Chalk Board CIP..........................................Cast-in-Place CJ......................................Construction Joint CL................................................Center Line CLG.....................................................Ceiling CLJ............................................Control Joint CLO......................................................Closet CLR........................................................Clear CMPST...........................................Composite CMU...........................Concrete Masonry Unit CNR.....................................................Corner CNTR.................................................Counter CO.........................................Cased Opening C.O.................................................Clean Out COL....................................................Column COMB.........................................Combination COMP..............................................Compact COMPL........................................Compliance COMPT.....................................Compartment CONC...............................................Concrete CONF...........................................Conference CONN...........................................Connection CONSTR.....................................Construction CONT.................................Continuous (ation) CONTR.......................................Contract (or) COORD..........................................Coordinate CORR................................................Corrid or COV PL........................................Cover Plate C.P...........................................Control Panel CPT.....................................................Carpet CRC...............................Cold Rolled Channel CRL......................................................Carrel CS................................................Cast Stone C.S.B.........................Concrete Splash Block CSMT.............................................Casement CSWK.............................................Casework CT...............................................Ceramic Tile CTD & R..........................Combination Towel ..................Dispenser & Receptacle CTR......................................................Center CTSK..........................................Countersunk CU.........................................................Cubic CUB....................................................Cubicle CYL L........................................Cylinder Lock (D)....................................................Demolish D...........................................................Depth D.A...........................................Drainage Area D.CL............................................Door Closer D.F...............................................Douglas Fir D.H.............................................Double Hung DBL......................................................Double DIA...................................................Diameter DEG.....................................................Degree DEMO.............................................Demolition DEPT............................................Department DET.......................................................Detail DF.......................................Drinking Fountain DFR..............................................Door Frame DIF..................................................Difference DIFF....................................................Diffuser DIM.................................................Dimension DISP................................................Dispenser DIST..................................................Distance DIV.......................................................Divider DLV..............................................Door Louver DMPF........................................Dampproofing DMPR.................................................Damper DN..........................................................Down DOP..........................................Door Opening DR..........................................................Door DS.................................................Downspout DSP..........................................Dry Standpipe DST.................................................Door Stop DT....................................................Drain Tile DUPL................................................Duplicate DWG..................................................Drawing DWR...................................................Drawer (E)......................................................Existing E..............................................................East E.......................................................Electrical EA...........................................................Each EDF........................Electric Drinking Fountain EF................................................Electric Fan EJ..........................................Expansion Joint EL.....................................................Elevation ELAST.........................................Elastometric ELEC................................................Electrical ELEV..................................................Elevator EMER............................................Emergency EMP........................Electrical Metallic Tubing ENAM..................................................Enamel ENCL...............................................Enclosure ENGR...............................................Engineer EO..........................................Electrical Outlet E.O.S..........................................Edge of Slab EP..........................................Electrical Panel EQ.........................................................Equal EQPT.............................................Equipment EQUIV............................................Equivalent ERECT...............................................Erection ESMT..............................................Easement EST...................................................Estimate ETR...................................Existing to Remain EWC..............................Electric Water Cooler EXC...................................................Excavate EXIST..................................................Existing EXP BT...................................Expansion Bolt EXP................................Expanded/Expansion EXP JT...................................Expansion Joint EXT.....................................................Exterior EXTN...............................................Extension EXTR................................Extrusion, Extruded F/...........................................................From F&F........................Furniture and Furnishings FA...................................................Fire Alarm FBD................................................Fiberboard FD.................................................Floor Drain FDMPR........................................Fire Damper FDN...............................................Foundation FEC........................Fire Extinguisher Cabinet FEXT....................................Fire Extinguisher FF.................................................Finish Floor FGL.................................................Fiberglass FH...................................................Fire Hose FHC...................................Fire Hose Cabinet FHCS.......................Flat Head Counter Sunk F.H.V.E.C.......................Fire Hose Valve and ......................................Extinguisher Cabinet F.H.W.S......................Flat Head Wood Screw FIN.........................................................Finish FIN.FL...........................................Finish Floor FIN GR........................................Finish Grade FIXT......................................................Fixture FL............................................................Floor FLDG...................................................Folding FLR................................................Floor (ing) FLUOR.........................................Fluorescent FOC....................................Face of Concrete FOF..........................................Face of Finish FOM.....................................Face of Masonry FOS..........................................Face of Studs FOSTL.......................................Face of Steel FPRF...........................................Fireproofing FR.................................................Fire Rating FRP............................Fiber Reinforced Panel F.R.P.T........Fire Retardant Pressure Treated F.R.T...........................Fire Retardant Treated FS.....................................................Far Side F.S....................................................Full Size FSH..................................Fire Sprinkler Head FSP..........................................Fire Standpipe FSTNR..............................................Fastener F.T...............................................Fire Treated FT...............................................Foot or Feet FTG.....................................................Footing FURN................................................Furniture FURR...................................................Furring FUT.......................................................Future F.V.C......................Fire Hose Valve Cabinet FXTR....................................................Fixture GA...........................................Gage or Gauge GAL.......................................................Gallon GALV.............................................Galvanized GB...................................................Grab Bar GDR...............................................Guard Rail GEN................................................Generator GENL..................................................General G.F.R.C…..Glass Fiber Reinforced Concrete GL..........................................................Glass GMKD.............................Grand Master Keyed GND.....................................................Ground GOVT...........................................Government GP..........................................Gypsum Plaster GR............................................Grade (e)(ing) GR.LN............................................Grade Line GRL.........................................................Grille GRP.......................................................Group GSKT...................................................Gasket GRTG...................................................Grating GSM..........................Galvanized Sheet Metal GT...........................................................Grout GUT.......................................................Gutter GV................................................Gravity Vent GWB.................................Gypsum Wall Board GYP BD...................................Gypsum Board GYP....................................................Gypsum GYP PLAS..............................Gypsum Plaster H PLAM....................High Pressure Laminate HB...................................................Hose Bib HCMU.............Hollow Concrete Masonry Unit HD..........................................................Hand H.D...............................................Hand Dryer HDR.....................................................Header HDWD.............................................Hardwood HDWE..............................................Hardware HGR.....................................................Hanger HM..............................................Hollow Metal H.M.D.................................Hollow Metal Door H.M.F...............................Hollow Metal Frame HNDRL............................................Hand Rail HO.................................................Hold-Open HORIZ.............................................Horizontal HR...........................................................Hour H.S.B................................High Strength Bolt HT.........................................................Height HTG....................................................Heating HTR......................................................Heater HV.................................................Hose Valve HVAC…………..…….Heating, Ventilation and ………………………………...Air Conditioning HYDR...............................................Hydraulic ID...........................................Inside Diameter IN................................................Inch, Inches INC............................................Inside Corner INCAND.....................................Incandescent INDL.................................................Industrial INFO..............................................Information INL...........................................................Inlet INSTL.............................................Installation INSUL...............................................Insulation INSUL PNL.............................Insulated Panel INT.......................................................Interior INV.........................................................Invert JAN.......................................................Janitor J.B.............................................Junction Box JST..........................................................Joist JT............................................................Joint KD...................................................Kiln Dried KO...................................................Knockout K.O.P......................................Knockout Panel KPL.................................................Kick Plate L...........................................................Length LAB................................................Laboratory LAM...............................................Lamination LATL....................................................Lateral LAV...................................................Lavatory LB.......................................................Pound LBR.....................................................Lumber LD............................................Linear Diffuser LDG....................................................Landing LDR......................................................Leader LF.................................................Linear Foot LG........................................................Length LH...................................................Left Hand LIB.......................................................Library LIN.........................................................Linear LIQ.........................................................Liquid LKR.......................................................Locker LL....................................................Live Load LOC...................................................Location LONG...........................................Longitudinal LT............................................................Light LT. WT.........................................Light Weight LTG.....................................................Lighting LTG. PNL..................................Lighting Panel LVR.......................................................Louver LW PLAST.........................Lightweight Plaster M.B............................................Machine Bolt MAC RM..................................Machine Room MAINT.........................................Maintenance MAN.....................................................Manual MAS...................................................Masonry MATL..................................................Material MAX.................................................Maximum M.B.H.................................Mop/Broom Holder MECH............................................Mechanical MEP............... Mechanical/Electrical/Plumbing MEMB.............................................Membrane MTL........................................................Metal MEZZ..............................................Mezzanine MFR............................................Manufacturer MH.....................................................Manhole MIN...................................................Minimum MIR........................................................Mirror MISC.........................................Miscellaneous MLDG..................................................Molding M.O......................................Masonry Opening MOD..............................................Module (ar) MTD...................................................Mounted MTG..................................................Mounting MULT...................................................Multiple MWP.......................Membrane Waterproofing N..............................................................North NA............................................Not Applicable NIC........................................Not in Contract NPRN...............................................Neoprene NO......................................................Number NOM...................................................Nominal NTS............................................Not to Scale O/............................................................Over OA........................................................Overall O.C.................................................On Center OD.......................................Outside Diameter OFCI...Owner Furnished, Contractor Installed OFOI..........Owner Furnished, Owner Installed OFF........................................................Office OPNG.................................................Opening OPP...................................................Opposite OPP HD...................................Opposite Hand OUC........................................Outside Corner OVC............................................Over Current OVFL..................................................Overflow OVHD...............................................Overhead PLBG................................................Plumbing PAR.....................................................Parallel PC, POLYCARB........................Polycarbonate P.C. CON..........................Pre-Cast Concrete PCP.........................Portland Cement Plaster PED...................................................Pedestal PERF..............................................Perforated PERIM..............................................Perimeter PERM.............................................Permanent PERP.........................................Perpendicular PL...........................................................Plate PI.P......................................Poured-in-Place PLAM....................................Plastic Laminate PLAS....................................................Plaster PLYWD, PWD....................................Plywood PNL........................................................Panel PT, PTD..................................................Paint POL....................................................Polished POLY...........................................Polyethylene POS.....................................................Positive PREFAB.....................................Prefabricated PREFIN..........................................Prefinished PR............................................................Pair PROJ....................................................Project PROP.................................................Property P.SH.............................................Purse Shelf P.T.......................................Pressure Treated PTN....................................................Partition P.T.R.........................Paper Towel Receptacle PTD.........................................................Paint PV................................................Photovoltaic PVC.....................................Polyvinyl Chloride QT..........................................................Quart QT..................................................Quarry Tile QTR.....................................................Quarter QTY....................................................Quantity QUAL....................................................Quality R.............................................................Riser RAD......................................................Radius RBR.....................................................Rubber RCP.............................Reflected Ceiling Plan R.D.................................................Roof Drain REC.................................................Recessed RECMD............................Recommend (ation) REF.............................................Refer (ence) REFR...........................................Refrig erator REINF...................Reinforce (d) (ing) (ment) REM..............................................Removable REQD...............................................Required REQMTS...................................Requirements RESIL................................................Resilient RFG....................................................Roofing RGTR................................................Register RH................................................Right Hand RLG.....................................................Railing RM........................................................Room RND.....................................................Round R.O........................................Rough Opening R.W.C..........................Rain Water Conductor R.W.L................................Rain Water Leader S............................................................South S.A.D....................See Architectural Drawings SAN....................................................Sanitary SASF...................Self Adhered Sheet Flashing SAWDF..Self Adhered Window & Door Flashing S.B.............................................Splash Block SC.................................................Solid Core S.C.D.................................See Civil Drawings SCHED..............................................Schedule S.DET.....................................Smoke Detector SD...............................................Storm Drain SECT...................................................Section S.E.D.........................See Electrical Drawings S.EX.D...........................See Exhibit Drawings SF................................................Square Feet SGL........................................................Single SHT...............................................Sheet (ing) SHV............................................Shelves (ing) SIM.......................................................Similar SL...........................................................Slope S.L.A.D....................See Landscape Drawings SLV........................................................Sleeve S.M.D......................See Mechanical Drawings SMS.................................Sheet Metal Screws SND.......................Sanitary Napkin Dispenser SNR.....................Sanitary Napkin Receptacle SPC.......................Suspended Plaster Ceiling S.P.D.........................See Plumbing Drawings SPEC...........................................Specification SPKLR...............................................Sprinkler SPKR..................................................Speaker SPLY.....................................................Supply SQ........................................................Square SQ FT..........................................Square Foot SQ IN..........................................Square Inch SQ YD.........................................Square Yard SS...........................................Sanitary Sewer S.STL.. ...................................Stainless Steel S.S.M.B.............Stainless Steel Machine Bolt S.S.D........................See Structural Drawings STA......................................................Station STD...................................................Standard STL.........................................................Steel STOR...................................................Storage STRUCT.....................................Structure (al) SURF...................................................Surface SUSP..............................................Suspended SUSP. CLG........................Suspended Ceiling SVCE...................................................Service SVCE.SK......................................Service Sink S.W....................................................Sidewalk SYM.....................................................Symbol SYS......................................................System T................................................................Tee T.C.S................Terne-Coated Stainless Steel T.D.R...................Towel Dispenser/Receptacle T&G.................................Tongue and Groove TEL..................................................Telephone TEMP....................Temperature or Temporary TER....................................................Terrazzo THK..................................................Thickness THRES.............................................Threshold THRU..................................................Through TK BD..........................................Tack Board TMPD...............................................Tempered T.O.......................................................Top of T.O.B.........................................Top of Beam T.O.C..........................................Top of Curb T.O.P...................................Top of Pavement T.O.SL..........................................Top of Slab T.O.S...........................................Top of Steel T.O.W...........................................Top of Wall TPH..................................Toilet Paper Holder TRANS.........................................Transparent TRD........................................................Tread NOTE: 1. Not all abbreviations listed below appear in the documents 2. Abbreviations apply whether or not they contain periods 3. Definitions for abbreviations for particular drawings may appear on those drawings. Abbreviations for engineering drawings may appear on the general information sheets for those discipines. ARCHITECTURAL ABBREVIATIONS TS..................................................Tube Steel TV.....................................................Television TYP.......................................................Typical UFCI...Owner Furnished, Contractor Installed UFUI...........Owner Furnished, Owner Installed UNEX...........................................Unexcavated UNFIN..............................................Unfinished UON...........................Unless Otherwise Noted UTIL........................................................Utility VAP........................................................Vapor VAP.BAR....................................Vapor Barrier VAP PRF......................................Vapor Proof VAT....................................Vinyl Asbestos Tile VAV..................................Variable Air Volume VB..................................................Vinyl Base VCT..............................Vinyl Composition Tile VDT.............................Video Display Terminal VENT................................................Ventilator V.E.J.........................Vertical Expansion Joint VERT....................................................Vertical VEST..................................................Vestibule VFAT........................Vinyl Faced Acoustic Tile VIF............................................Verify In Field VIN...........................................................Vinyl VNR......................................................Veneer VTR....................................Vent through Roof VWC..................................Vinyl Wall Covering W............................................................Water W.............................................................West W............................................................Width W/............................................................With WO............................................Where Occurs W/O.....................................................Without W/D...........................................Washer/Dryer WC..............................................Water Closet WD..........................................................Wood WDW...................................................Window W GL..............................................Wire Glass W.H..................................................Wall Hung WLD.....................................................Welded WP.........................................Waterproof (ing) W.P............................................Working Point WP MEMB....................Waterproof Membrane WR.........................................Water Resistant WS........................................Weatherstripping WSCT...............................................Wainscot WT........................................................Weight WTRPRF....................................Waterproofing WSP........................................Wet Stand Pipe DETAILS ARE NUMBERED ACCORDING TO THEIR LOCATION ON EACH SHEET AND ARE NOT NUMBERED CONSECUTIVELY. EACH MODULE MAINTAINS THE NUMBER ASSOCIATED WITH IT THIS SYSTEM CAN BE APPLIED TO ANY DRAWING THAT CONTAINS MULTIPLE IMAGES. THE IMAGES ARE NUMBERED ACCORDING TO THE MODULE SYSTEM SHOWN ILLUSTRATED TO THE LEFT EACH DETAIL MAY OCCUPY ONE OR MORE WHOLE MODULES. THE DETAIL MODULE IS USED TO ESTABLISH THE IDENTIFYING LABEL FOR EACH DETAIL, NOT TO LIMIT THE SIZE OF THE DETAIL DETAIL MODULE LAYOUT DETAIL NUMBERING EXAMPLE THE NUMBER OF THE MODULE WHICH OCCURS IN THE LOWER LEFT CORNER OF A SINGLE MODULE OR SEVERAL MODULES GROUPED TOGETHER WILL DEFINE THE FINAL DETAIL NUMBER AS SHOWN IN THE ILLUSTRATION TO THE LEFT. ALTHOUGH THE MODULE NUMBERS OCCUR IN CONSECUTIVE ORDER, NOT ALL NUMBERS ARE NECESSARILY USED ON EACH SHEET 20 19 18 17 16 15 14 13 12 11 10 9 8 7 6 5 4 3 2 1 10 9 6 5 2 1 8 7 20 19 17 15 MODULAR LAYOUT DETAIL NUMBER OVERHEAD ROLLING DOOR PAIR DOORS - UNEQUAL SIZES DOUBLE ACTING DOOR SINGLE OPENING DOOR 2 PANEL BI-FOLD DOOR PAIR - BI FOLD DOOR DOOR OPENING MARK PAIR DOORS - EQUAL SIZES PAIR DOORS - DOUBLE EGRESS DOOR WITH SIDE LIGHT SLIDING DOOR - BETWEEN JAMBS SLIDING POCKET DOOR 122 INTERIOR GLAZED WINDOW 122122 122 122122122122122 122 DOOR AND INTERIOR OPENINGS SYMBOLS ARCHITECTURAL MATERIAL INDICATIONS EARTH AGGREGATE BASE COURSE CONCRETE CONCRETE MASONRY UNIT BRICK MASONRY SOLID SURFACE STEEL, STAINLESS STEEL ALUMINUM STONE WOOD FRAMING - CONTINUOUS WOOD FRAMING - DISCONTINUOUS PLYWOOD VERTICAL GRAIN WOOD RIGID INSULATION MINERAL FIBER INSULATION BATT INSULATION PLASTER, MORTAR, SAND, FIREPROOFING, TERRAZZO COMPOSITE BOARD ACOUSTIC CEILING TILE GLASS ELEVATION - PLAN - RCP SECTION BUILDING PAPER & FABRIC FLASHING EXPANDED METAL LATH WIRE MESH STONE HORIZONTAL GRAIN WOOD WOOD PLASTER GYPSUM BOARD ACOUSTIC PANEL PERFORATED METAL GYPSUM BOARD CEILING BASE CABINETS BASE AND WALL CABINETS WALL CABINETS TOILET PARTITION AND DOOR TOILET - WALL HUNG URINAL - FLOOR/WALL HUNG LAVATORY - COUNTERTOP LAVATORY - PEDESTAL/WALL HUNG GENERAL SYMBOLS PLUMBING SYMBOLS 10' - 0" HANDRAIL BUMPER GUARD CG CG CORNER GUARD EDGE GUARD OVERHEAD ITEMS UNDER-COUNTER ITEMS NIC NOT-IN-CONTRACT ITEMS 10' - 0" 10' - 0" JANITOR'S RECEPTOR DRINKING FOUNTAIN / EWC EG DIMENSION SYMBOLS UTILITY SINK BATHTUB SHOWER FLOOR DRAIN IN SLOPING FLOOR FEC FEC FEXT FEC FIRE EXTINGUISHER BRACKET MOUNTED FIRE EXTINGUISHER SURFACE MOUNTED FIRE EXTINGUISHER CABINET SEMI-RECESSED FIRE EXTINGUISHER CABINET RECESSED DIMENSION SHOWN TO: - STRUCTURAL GRID - LAYOUT GRID GRID LINE TYPICAL DIMENSION SHOWN TO: - CENTERLINE OF ASSEMBLY - CENTER OF OPENING - CENTER OF EQUIP/ FURN CENTER LINE TYPICAL DIMENSION SHOWN TO: - PARTITION ASSEMBLY - EDGE OF DOOR OPENING - OTHER BUILDING ELEMENT - WPT INDICATED ON DETAIL FD ARCH FLOOR PLAN SYMBOLS 10800 TORRE AVENUE CUPERTINO, CA 95014 Stamp Consultant Sheet Number Sheet Title EHDD Job Number Drawn by Scale Printing Date COST MODEL DRAWINGS 05.04.2020 PIER 1, BAY 2 THE EMBARCADERO SAN FRANCISCO, CA 94111 INFO@EHDD.COM +1 415-285-9193 Revisions and Description Date BRIDGING DOCUMENTS 100% SD 06.01.20206/1/2020 6:03:10 PMC:\Users\l.quinones\Documents\20013-A-CUPERTINO LIBRARY EXP-CENTRAL_l.quinones.rvt As indicated G0.01 ARCHITECTURAL ABBREVIATIONS AND SYMBOLS CUPERTINO PUBLIC LIBRARY EXPANSION Author 20013 ASA-2020-004, EA-2020-002 08/17/20 Ellen Yau 10800 TORRE AVENUE CUPERTINO, CA 95014 Stamp Consultant Sheet Number Sheet Title EHDD Job Number Drawn by Scale Printing Date COST MODEL DRAWINGS 05.04.2020 PIER 1, BAY 2 THE EMBARCADERO SAN FRANCISCO, CA 94111 INFO@EHDD.COM +1 415-285-9193 Revisions and Description Date BRIDGING DOCUMENTS 100% SD 06.01.20206/1/2020 10:00:18 AMC:\Users\j.manzo\Documents\20013-A-CUPERTINO LIBRARY EXP-CENTRAL_j.manzo@ehdd.com.rvt G0.02 CODE ANALYSIS CUPERTINO PUBLIC LIBRARY EXPANSION Author 20013 SECTION NO. (CBC, u.o.n.) 1 CBC CEC CMC CPC CFC CGBSC 2 3 OCCUPANCY CHAPTER 3 Library Patrons: Adults and Children Occupancy Group A-3 Nonseparated occupancy 303.4 Group B Nonseparated occupancy/Accessory 304.1 S Nonseparated occupancy/Accessory 311.3 Pantry/Storage BUILDING CODE ANALYSIS A. 2019 California Building Code (CBC) Part 1 – California Administrative Code Two story Library expansion for Program rooms; accessible bathrooms; pantry; storage Part 3 – Electrical Code Building Area Part 2 - California Building Code Part 5 – Plumbing Code Part 6 – Energy Code Part 7 – Not Used: Elevator Code Now will be Title 8 of CCR Part 9 – Fire Code Part 10 –California Existing Building Code Part 11 – California Green Building Standards Code Part 12 – Referenced Standards Multipurpose program rooms APPLICABLE BUILDING CODE BUILDING DESCRIPTION Storage Part 4 – Mechanical Code 4 CHAPTER 5 503.1.2 504.3 502.1 FLOOR LEVEL EXPANSION A-3 GSF Existing LIBRARY-B GSF TOTAL GSF (NON SEPARATED) Level 1 2,816 27,150 29,966 Level 2 2,816 27,150 29,966 TOTALS 5,632 54,300 59,932 504.3 Occupancy Group A sprinklered with area increase, Type IIA: 65 feet Occupancy Group B sprinklered, Type IIA: 85 feet B. Table 504.4 Allowable number of stories Occupancy A Group, S with area increase, Type IIA: 3 stories Occupancy B Group , S Type IIA:6 stories C. Table 506.2: Allowable area factor in square feet Occupancy Group A-3, SM without height increase: 46,500 SF Ocupancy Group B sprinklered, 112,500 SF D. Mixed occupancy of Group A-3 and B. 508.3 E. Frontage increase: Not used 506.3 F. Base Allowable area determination: Mix-occupancy, Nonseparated, multistory building, with most restrictive use of Group A-3 Aa = [At + (NSX If)] X Sa (Equation 5-2) 506.2.3 Aa = [46,500 + (5632 X0)] X 2 = 93,000 G. Complies 59,932<93,000 SF allowable area CFC 503.1.1 4A: BUILDING HEIGHT 4B: BUILDING AREA A. Multiple buildings on Civic Center campus For code purposes, assumed property lines are used. A. Table 504.3 Allowable building heights above grade plane A. Maximum distance from fire lane to any point on building elevation = 150 feet. Increased distances allowed for sprinklered buildings with the approval of the Fire Marshal. 4D: FIRE ACCESS GENERAL BUILDING HEIGHTS AND AREA/ MIXED USE AND OCCUPANCY 4C: ALLOWABLE AREA AND HEIGHT B. Building height is 31'-0" to top of parapet CODE ANALSYIS A. Incidental Uses N/A 509.1 B. Special Provisions N/A 510.1 5 CHAPTER 6FIRE RESISTIVE REQUIREMENTS FOR BUILDING ELEMENTS 4E: OCCUPANCY SEPARATIONS 602.2 A. Primary structural Frame: 1-hour Table 601, g 2. Exterior: 1-hour Table 601 Table 602 10 ≤ x < 30 feet 1 hour Table 602 x ≥ 30 feet 0 hour Table 602 D. Floor construction & secondary members: 1-hour Table 601 E. Roof construction & secondary members: 1-hour Table 601 7 CHAPTER 7 A. East >200' B. West 112'-0" C. North >200' D. South 106' -0 " to centerline of Parking Access road Table 705.8 Fire Separation Distance (ft) Allowable Area 15 to less than 20 75% 20 to less than 30 No Limit FIRE RESISTENCE RATED CONSTRUCTION Table 602: Fire-Resistance Rating Requirements for Exterior Walls (based on Fire Separation Distance) to east curb of Torre Ave 2. Exterior: Based on fire separation distance (Table 602, below) Parking Lot property line to Cupertino City Hall A. Table 705.8: Maximum area of exterior wall openings based on fire separation distance with unprotected openings in 7B: EXTERIOR WALL OPENINGS 1. Type IIA construction; exterior walls are of any noncombustible material permitted by this code [2013 CBC]. 5A: CONSTRUCTION TYPE DESCRIPTION 7A: BUILDING SEPARATIONS (Actual Fire Separation Distance) B. Bearing Walls: 5B: FIRE RESISTIVE REQUIREMENTS, CONSTRUCTION TYPE IIA 713.4 710 710.3 710.4 3006.2 3006.3 C. Smoke Partitions e. Is not open to a corridor in the Group I occupancy f. n/a g. Is separated from floor openings and air transfer openings serving other floors by 3. Elevator shafts 1 hr rated for elevators serving A-3 and B Occupancy (less than 4-stories) 1. Unless stated otherwise, no fire resistive rating is required D. Hoistway opening protection is required except at the level of exit discharge. The opening protection shall be provided by additional door comply with smoke and draft control reqruirements. d. Is not concealed within the construction of a wall or a floor/ceiling assembly 2. Continuous to membranes to limit the transfer of smoke and self closing doors. 717.6.3 712.1.9 b. The duct connects not more than two stories, and the annular space around the penetrating duct is protected with an approved noncombustible material that resists the free passage of flame and the products of combustion. c. The duct connects not more than three stories, and the annular space around the penetrating duct is protected with an approved noncombustible material that resists the free passage of flame and products of combustion and a fire damper is installed at each floor line. 2. Not required for floor openings per the following: In other than Group I-3, a floor opening that is not used as one of the applications listed in this section shall be permitted if it complies with all of the items below: a. Does not connect more than 2 stories b. Does not contain a stairway or ramp required by CBC 10 c. Does not penetrate a horizontal assembly that separates fire areas or smoke barriers that separate smoke compartments 30 or greater No Limit 707 707.5 707.6 707.3 4. Opening protection Type IIA Table 716.5 Wall Type Opening Rating Shaft/Exit Enclosure 1 hr (less than 4-stories) Door.shutter/window 1hr 707 2. Openings limited to 25 percent of length of wall 1. Extend from floor to floor 3. Applies to shafts, exit enclosures, occupancy separations, fire control room, fire pump room, incidental use areas, and other areas as noted. A. Fire Barriers 7C: INTERIOR WALLS B. Shaft Enclosures 1. Duct systems constructed of approved materials in accordance with the CMC that penetrate non-fire-resistance-rated floor assemblies shall be protected by any of the following methods: a. A shaft enclosure in accordance with Section 713. 714 714.3.1.2 714.4.1.1.2 718 1. Through penetration fire stop systems protecting wall penetrations shall have an F rating equal to the rated wall E. Penetrations 2. Through penetration fire stop systems protecting rated horizontal assemblies not in a wall shall have an F and a T rating of 1 hour or equal to the rated assembly F. Concealed Spaces 8 CHAPTER 8 Classification Flame Spread Smoke Developed 803 Interior exit stairways, interior exit ramps and passagewaysa,b Corridors and enclosure for exit access stairways and exit access ramps Rooms and enclosed spaces A-3 B B C 808.1.1.1 804 804.4.1 804.4.2 804.4.3 E. Interior floor finish C. Wall and Ceiling Finish Requirements Sprinklered Group INTERIOR FINISH 803.1.1 Table 803.9 A. Wall and ceiling finishes classified by tests in accordance with ASTM E-84 c. Requirements for rooms and enclosed spaces shall be based upon spaces enclosed by partitions. Where a fire- resistance rating is required for structural elements, the enclosing partitions shall extend from the floor to the ceiling. Partitions that do not comply with this shall be considered enclosing spaces and the rooms or spaces on both sides shall be considered one. In determining the applicable requirements for rooms and enclosed spaces, the j. Class B materials shall be permitted as wainscotting extending not more than 48 inches above the finished floor in corridors and exit access stairways and ramps. D. Suspended acoustical ceilings to be installed in accordance with ASTM C 635 or ASTM C 636 EXCEPTION: Noncombustible floor finish and floor coverings in areas where restraint is not used may have carpet or other floor covering materials applied in areas protected by an automatic sprinkler system and meeting ASTM Standard Class II b. In buildings less than three stories above grade plane of other than Group I-3, Class C interior finish for sprinklered buildings shall be permitted in interior exit stairways and ramps. a. Class C interior finish materials shall be permitted for wainscotting or paneling of not more than 1,000 square feet of applied surface area in the grade lobby where applied directly to a noncombustible base or over furring strips applied to a noncombustible base and fireblocked as required by Section 803.11.1. Interior floor finish to be Class I or Class II in all exit enclosures, exit passageways, corridors and unseparated areas. Classification shall be in accordance with NFPA 253 2011 CTCFS 20.BG. Wood used in construction that is required to be fire retardant must be treated with fire retardant chemicals by a pressure impregnation process or other method that treats the materials throughout (as opposed to surface treatment). 9 CHAPTER 9 506.2 903.2.1.3 903.3.1.1 901.6.1 907, 907.3 907.2.1.1 907.5.2.2. C.ERRS If required by Fire Marshal CBC 918 CFC 510 C. Sprinklers required to be monitored by approved supervising station A. CBC 907.2.1.1 System initiation in Group A occupancies with an occupant load of 1,000 or more. FIRE PROTECTION SYSTEMS: AUTOMATIC SPRINKLER SYSTEMS, AND FIRE ALARM SYSTEMS Automatic Sprinkler Systems Fire Alarm Systems B. Activation of the fire alarm in Group A occupancies with an occupant load of 1,000 or more shall initiate a signal using an emergency voice/alarm communications system. B. Sprinklers installed in accordance with NFPA 13 A. Sprinkler system provided throughout the building. 10 CHAPTER 10 Occupant Load Factor 7 net 15 net 300 gross B. Travel distance – Occupancy Travel Distance Group A-3 250 feet Group B 300 feet C. Corridors: Corridors Table 1020.1 1020.4 D. Minimum number of Occupant Load Number of Exits 1006.2 1 thru 49 (typical) 1 50 - 500 2 501 – 1,000 3 E. Minimum number of Occupant Load (per story) Number of Exits (per story) Table 1006.3.1 per conditions 1 1 - 500 2 501 – 1,000 3 Over 1,001 4 F. Vertical Exit Enclosures 1023.2 1. Required rating – 1 hour fire barrier 3. Unenclosed stairs and ramps - Existing Stair 1: Exit access stairway that atmospherically communicates between only two stories. 2. Dead ends may not exceed 20 feet in Group A-3 occupancies Table 1004.1.2 Table 1017.2 Assembly without fixed seats: concentrated Function of Space Assembly without fixed seats: unconcentrated A. Occupant Load Factors Accessory storage areas/Mechanical equipment rooms MEANS OF EGRESS 1019.3.1 G. Exterior Exit Stairs and Ramps 1027.4 1027.3 1023.7 H. Exit Discharge 1027.5 I.1 Assembly Exit 1029.3 1.2 Assembly Occupant Loads 1029.3.1 J. Accessible Egress 1009.1 2. Must be open on at least one side 1. Exterior stairways and ramps shall be located 10 feet from adjacent lot lines and from other buildings on the same lot 1. Shall be adjoined by yards, courts, or public ways 3. Fire separation: 1-hr rated within 10', openings shall be 3/4-hr rated. Accessible spaces shall be provided with not less than one accessible means of egress. Where more than one means of egress are required by Section 1006 or 1022 from any accessible space, each accessible portion of the space shall be served by accessible means of egress in at least the same number as required by Section 1015.1 or 1021.1. In addition to the requirements of this chapter, means of egress, which provide access to, or egress from, buildings for persons with disabilities, shall also comply with the requirements of Chapter 11A or 11B as applicable. Assembly Other Exit: Not less than one exit shall discharge on a street or an unoccupied space of not less than 20 feet in capacity that ajoins a street or public way. Assembly occupancies with an occupant load of 100 or more and 300 or less, shall have at least one required means of egress directly to an exit, or through a lobby that is not used to access the other required exit. At least one exit shall discharge on a street or unoccupied space of not less than 20 feet in width that adjoins a street or a public way. 1028.8 1005.5 1005.3.1 1004.1.1.1 Use Area Allowance for buildings with sprinkler Stairways 0.30 inches 1005.3.1 Other egress component (Assembly) 0.20 inches 1005.3.2 Occupant Width Required 0.30 inches 1005.3.1 3. Capacity of stairways is calculated for floors individually, not cumulatively. 5. Egress width per occupant served, in sprinklered buildings 1. The common path of egress travel shall not exceed 30 feet (9144 mm) from any seat to a point where an occupant has a choice of two paths of egress travel to two exits. 2. Where more than one exit, or access to more than one exit, is required, the means of egress shall be configured such that the loss of any one exit, or access to one exit, shall not reduce the available capacity to less than 50% of the required capacity. 4. Where occupants egress from one or more rooms, areas or spaces through others, the design occupant load shall be the combined occupant load of interconnected accessory or intervening spaces. Design of egress path capacity shall be based on the cumulative portion of occupant loads of all rooms, areas or spaces to that point along the path of egress travel. 0.20 inches 1005.3.2 K. Lighting 1008.2.1 1008.3 a) Illumination under emergency power must be 1 foot candle average, with a minimum of 0.1 foot candles at any point with 1/40 max ratio. These may decline 40 percent at the end of the emergency duration 1006.3.1 3. Emergency power provided for 90 minutes minimum 1. Means of egress illumination to be 1 foot candle minimum (11 lux) at the walking surface until discharge at exterior L. Exit Signs 1010.9 Q. Handrails and Guards 1009.15, 1010.9 1012.9 1013.2 1. Accessible means of egress are required in the same numbers as required for other means of egress 1. Shall be provided on both sides of stairs and ramps greater than 6 inches 2. Intermediate handrails to be provided when necessary, so that all parts of egress capacity on stairs and ramps are within 30 inches of a handrail 3. Guards required on elevated surfaces with an adjacent drop more than 30 inches 1013.2 1013.4 R. Exit Signs 1013.1.1 1013.1 1013.3 1013.6.3 Title 19 S. Exit Access 1016.2 Table 1006.2.1 3. Common path of travel in assembly seating area limited to 30 feet 1029.8 1007.1.1.23. When two or more exits are required, they shall be separated by one third the diagonal dimension of the space in fully sprinklered buildings. 1. Egress shall not pass through adjoining rooms except where such rooms are accessory, not high-hazard, and provide a discernable path to an exit 2. Common path of travel limited to 75 feet in Group A when the building is equipped with sprinklers 1. Not required in rooms or areas requiring only one exit 5. Emergency evacuation signage required. 4. Illumination required to be on emergency power with 90 minute duration 3. Exit signs may be either internally or externally illuminated 4. Guards required to be 42 inches high minimum 5. Guards shall have opening protection that will not allow a 4 inch diameter sphere to pass 2. Required at exit and exit access doors and other areas so that no place in a corridor is more than 100 feet from an exit sign 13 ROOF ASSEMBLY AND ROOFTOP STRUCTURES CHAPTER 15 A. Roofing classification Table 1505.1 Class B 27 EMERGENCY POWER CHAPTER 27 A. Where required: 2702.2.3 2702.2.43. Means of egress illumination 2. Exit signs CPC 2019 PLUMBING FIXTURE CALCULATIONS-CUPERTINO LIBRARY EXPANSION TYPE OF OCCUPANCY (see CPC Table 422.1) TOTAL SQ. FT. (net, this occupancy, this floor) OCCUPANT LOAD FACTOR: Occ's/sq. ft. (see CPC Table A) NUMBER OF FIXED SEATS, GROUP A OCUPANCIES OCCUPANT LOAD FACTOR: Occ's/seat (see CPC Table A) TOTAL OCCUPANT LOAD (this occupancy, this floor, rounded up) GENDER LOAD FACTOR (half total occ. is women, half is men) NUMBER OF WOMEN (1/2 total occ. Load, not rounded up) NUMBER OF MEN (1/2 total occ. load; not rounded up) WOMEN'S WATER CLOSETS MEN'S WATER CLOSETS URINALS WOMEN'S LAVS MEN'S LAVS DRINKING FOUNTAINS (if any req'd: one high and one low, minimum.) SERVICE SINK OR LAUNDRY TRAY (**only 1 total per building required) BATHTUBS OR SHOWERS COMMENTS 1 Group A-3: Conference rooms, museums, libraries, lecture halls, lounges, gyms (without spectator seating); places of worship 1622 1/30 N/A N/A 55 Group A-3 fixed seating: Conference rooms, museums, libraries, lecture halls, lounges, places of worship N/A N/A 0.5 0 Table 422.1 Women's WC's: Big increases in fixt count, at 101 and 201 women occupants TOTAL GROUP A-3 OCCUPANCY 55 0.5 27.5 27.5 1.10 0.78 0.14 0.28 0.14 0.22 ** N/A TOTAL LEVEL 2 1 1 1 1 2 1 0 FLOOR LEVEL* FACTORS AND CALCULATIONS FIXTURE COUNT PER CPC TABLE 422.1 PLUMBING FIXTURE CALCULATIONS CPC 2019 PLUMBING FIXTURE CALCULATIONS-CUPERTINO LIBRARY EXPANSION TYPE OF OCCUPANCY (see CPC Table 422.1) TOTAL SQ. FT. (net, this occupancy, this floor) OCCUPANT LOAD FACTOR: Occ's/sq. ft. (see CPC Table A) NUMBER OF FIXED SEATS, GROUP A OCUPANCIES OCCUPANT LOAD FACTOR: Occ's/seat (see CPC Table A) TOTAL OCCUPANT LOAD (this occupancy, this floor, rounded up) GENDER LOAD FACTOR (half total occ. is women, half is men) NUMBER OF WOMEN (1/2 total occ. Load, not rounded up) NUMBER OF MEN (1/2 total occ. load; not rounded up) WOMEN'S WATER CLOSETS MEN'S WATER CLOSETS URINALS WOMEN'S LAVS MEN'S LAVS DRINKING FOUNTAINS (if any req'd: one high and one low, minimum.) SERVICE SINK OR LAUNDRY TRAY (**only 1 total per building required) BATHTUBS OR SHOWERS COMMENTS 2 Group A-3: Conference rooms, museums, libraries, lecture halls, lounges, gyms (without spectator seating); places of worship 1512 1/30 N/A N/A 51 Group A-3 fixed seating: Conference rooms, museums, libraries, lecture halls, lounges, places of worship N/A N/A 0.5 0 Table 422.1 Women's WC's: Big increases in fixt count, at 101 and 201 women occupants TOTAL GROUP A-3 OCCUPANCY 51 0.5 25.5 25.5 1.02 0.76 0.13 0.26 0.13 0.20 ** N/A TOTAL LEVEL 2 1 1 1 1 2 1 0 FLOOR LEVEL* FACTORS AND CALCULATIONS FIXTURE COUNT PER CPC TABLE 422.1 ASA-2020-004, EA-2020-002 08/17/20 Ellen Yau UP UP UP TORRE AVENUE(60' R.O.W.)SIGN6 FOOT CLFSDEV EV 4 MIN. PARKING 4 MIN. PARKING 4 MIN. PARKING 4 MIN. PARKING EV EV TR T RTR TRUP ACCESSIBLE BUILDING ENTRANCES LEGEND ACCESSIBLE BUILDING EXITS ACCESSIBLE FEATURE ACCESSIBLE PATH OF TRAVEL EXPANSION EXISTING LIBRARY EXISTING LIBRARY EXISTING COMMUNITY HALL NEW SIDEWALK CONNECTION TO EXISTING SIDEWALK ACCESSIBLE AND EV PARKING MEMORIAL GROVE EXPANSION 10800 TORRE AVENUE CUPERTINO, CA 95014 Stamp Consultant Sheet Number Sheet Title EHDD Job Number Drawn by Scale Printing Date COST MODEL DRAWINGS 05.04.2020 PIER 1, BAY 2 THE EMBARCADERO SAN FRANCISCO, CA 94111 INFO@EHDD.COM +1 415-285-9193 Revisions and Description Date BRIDGING DOCUMENTS 100% SD 06.01.20206/1/2020 6:03:13 PMC:\Users\l.quinones\Documents\20013-A-CUPERTINO LIBRARY EXP-CENTRAL_l.quinones.rvt As indicated G0.03 ACCESSIBILITY SITE PLAN CUPERTINO PUBLIC LIBRARY EXPANSION Author 20013 S CALE: 1" = 20'-0"G0.03 2 ACCESSIBILITY Level 2 SCALE: 1" = 20'-0"G0.03 3 ACCESSIBILITY Level 1 ASA-2020-004, EA-2020-002 08/17/20 Ellen Yau F.E.C. F.E.C. F.E.C. F.E.C. FLOOR AREA EXCLUDING SHAFTS AND EXITS: 3972 SF FLOOR AREA AND OCCUPANCY LOAD OCCUPANT LOAD: 4 OCCUPANTS - BUSINESS AREAS 450 OCCUPANTS - ACCESSORY UNCONCENTRATED ASSEMBLY WITHOUT FIXED SEATS 4 OCCUPANTS - ACCESSORY STORAGE, MECHANICAL EQUIPMENT ROOMS 458 TOTAL OCCUPANTS NOTES: CBC 2019, SECTION 303.1 ASSEMBLY AREAS EXCEPTION 2: A ROOM OR SPACE USED FOR ASSEMBLY PURPOSES WITH AN OCCUPANCY LOAD OF LESS THAN 50 PERSONS AND ACCESSORY TO ANOTHER OCCUPANCY SHALL BE CLASSIFIED AS A GROUP B OCCUPANCY OR AS PART OT THAT OCCUPANCY. LIFE SAFETY AND EXITING LEGEND 0 AREA FLOOR AREA PER OCCUPANT OCCUPANT COUNT START POINT OF TRAVEL ACCUMULATED LOAD AND TRAVEL DIRECTION EXIT PATH OF TRAVEL 1 HOUR FIRE BARRIER 2 HOUR FIRE BARRIER (HORIZONTAL EXIT) AREA NAME 150 SF XX SF/OCC XX OCC FUNCTION OF SPACE ASSEMBLY, UNCONCENTRATED BUSINESS AREAS KITCHENS, COMMERCIAL LOCKER ROOMS MECHANICAL EQUIPMENT ROOM STORAGE ROOMS PATTERN OCCUPANT LOAD FACTOR 15 NET 100 GROSS 200 GROSS 50 GROSS 300 GROSS 300 GROSS COMMON PATH OF TRAVEL 0 OCCUPANT LOAD WITHIN INDIVIDUAL SPACE AND TRAVEL DISTANCE FEC FIRE EXTINGUISHER CABINET X' - X" X' - X" EXIT SIGN, SINGLE-SIDED EXIT SIGN, DOUBLE-SIDED DOOR XX XX XX DOOR NUMBER PROVIDED WIDTH REQUIRED WIDTH (0.2 FACTOR) DOOR LOAD STAIR XX XX XX STAIR NUMBER PROVIDED WIDTH REQUIRED WIDTH (0.3 FACTOR) STAIR LOAD 687 SF 99 OCC PROGRAM B 7 SF/OCC GROUP A-3 915 SF 131 OCC PROGRAM A 7 SF/OCC GROUP A-3 117 SF 2 OCC PANTRY 100 SF/OCC GROUP B 1 1 1 SF 1 OCC AV STORAGE 300 SF/OCC GROUP S 171 SF 1 OCC STORAGE 300 SF/OCC GROUP S 26' -6" 66 50 49 65 58' -10" 14' -6" 64' -7" 2 275 202 148 98 98 Existing load from Childrens Room 26' -0" 73' - 3 1/8"58' - 6"43' - 1"32' - 9"39' - 11"31' - 11 1/2"200 Existing Exit load from Courtyard + Staff Wing DOOR 275 41" 43" DOOR 1 1 5 32" 32" DOOR 62 13" 66" EXDOOR 202 40" 43" DOOR 100 20" 32" EXDOOR 148 22" 32" EXDOOR 304 61" 68" 117' - 0" 66' -0" 12' -8" Existing load from Childrens Room COMBINED A+B LOAD= 229 OCC 614 SF 88 OCC PROGRAM D 7 SF/OCC GROUP A-3 888 SF 127 OCC PROGRAM C 7 SF/OCC GROUP A-3 117 SF 2 OCC PANTRY 100 SF/OCC GROUP B 64 47 46 64 1 1 1 SF 1 OCC AV STORAGE 300 SF/OCC GROUP S 102 SF 1 OCC AV STORAGE 300 SF/OCC GROUP S STAIR 1 1 2 44" 52" DOOR 64 13" 32"58' -10" 244 101' - 0" 66' -0" 15' -0" EXSTAIR 244 73" 86" (E) STACKS (E) STAFF AREA (E) STACKS 240' TOTAL EXIT ACCESS DISTANCE < 250'-0" COMBINED C+D LOAD= 215 OCC 10800 TORRE AVENUE CUPERTINO, CA 95014 Stamp Consultant Sheet Number Sheet Title EHDD Job Number Drawn by Scale Printing Date COST MODEL DRAWINGS 05.04.2020 PIER 1, BAY 2 THE EMBARCADERO SAN FRANCISCO, CA 94111 INFO@EHDD.COM +1 415-285-9193 Revisions and Description Date BRIDGING DOCUMENTS 100% SD 06.01.20206/1/2020 6:03:17 PMC:\Users\l.quinones\Documents\20013-A-CUPERTINO LIBRARY EXP-CENTRAL_l.quinones.rvt As indicated G0.04 LIFE SAFETY PLAN AND CODE REVIEW CUPERTINO PUBLIC LIBRARY EXPANSION JAM 20013 SCALE:1 /1 6" = 1'-0" G0.04 2 FIRE LIFE SAFETLY PLAN - LEVEL 1 SCALE:1 /1 6" = 1'-0"G0.04 4 FIRE LIFE SAFETY PLAN - LEVEL 2 LIBRARY EXPANSION (E) CHILDREN'S COLLECTION (E) LOBBY AND CIRCULATION (E) STAFF AREA 193'-0' TOTAL EXIT ACCESS DISTANCE < 250'-0"65'-0' TOTAL EXIT ACCESSDISTANCE < 250'-0"65'-0' TOTAL EXIT ACCESS DISTANCE < 250'-0" ASA-2020-004, EA-2020-002 08/17/20 Ellen Yau MIN. @ EXTERIOR DOORS MIN. @ INTERIOR DOORS OPERABLE PARTS OF CONTROLS SURFACE MOUNTED TOILET SEAT COVER DISPENSER SURFACE MOUNTED TRASH RECEPTACLE WITH HAND TOWEL DISPENSER FULL LENGTH MIRROR MIRROR COAT HOOK WITH BUMPER EXTRA HEAVY DUTY SHOWER CURTAIN ROD WITH S.STL SHOWER CURTAIN HOOKS S.STL SHOWER CURTAIN HOOKS SURFACE MOUNTED ROBE HOOK TOWEL PIN REVERSIBLE SOLID PHENOLIC FOLDING SHOWER SEAT SURFACE MOUNTED SINGLE ROLL TOILET TISSUE DISPENSER SURFACE MOUNTED HAND DRYER SURFACE MOUNTED TOWEL BARS SURFACE MOUNTED MULTI-ROLL TOILET TISSUE DISPENSER SANITARY NAPKIN DISPOSAL SURFACE MOUNTED MULTI-ROLL TOILET TISSUE DISPENSER NOT USED RECESSED SINGLE ROLL TOILET TISSUE DISPENSER CORNER SOAP DISH FOLDING BATHTUB SEAT SURFACE MOUNTED SOAP DISPENSER CLEAR MANEUVERING SPACE PULL SIDE PUSH SIDE HINGE APPROACH PROVIDE THIS ADDITIONAL SPACE IF DOOR IS EQUIPPED WITH BOTH A LATCH AND A CLOSER PUSH SIDE FRONT APPROACH PULL SIDE PULL SIDE PUSH SIDE LATCH APPROACH PERPENDICULAR APPROACH PARALLEL APPROACH REQUIRED LEVEL MANEUVERING CLEARANCE AT DOORS TOP OF FINISH FLOOR TYPICAL INTERIOR SIGNAGE AND FIXTURES ELEVATION DOOR JAMB SIGN W/FLOOR NUMBER HALL CALL BUTTON (ELEVATOR) TOP OF F.E. HANDLE FIRE EXTINGUISHER CABINET HALL LANTERN (ELEVATOR) FIRE ALARM DEVICES ACCESSIBLE ROLL IN SHOWER - ELEVATIONS ACCESSIBLE TOILET - WALL MOUNTED TYP. ACCESSIBLE TOILET SEAT HEIGHT ACCESSORIES TOP OF FINISH FLOOR CONT. LONG L-SHAPED GRAB BAR, EXTEND AROUND SHOWER TO FOLD DOWN SEAT, PROVIDE BACKING FOR 250# PT. LOAD SEE GRAB BAR ACCESSORIES SEE TOILET PAPER - SEE PANELBOARDS PROJECTING WALL OR COLUMN MOUNTED OBJECTS LIGHT SWITCH EXIT SIGNS AT DOORWAYS (CEILING MOUNTED OR WALL MOUNTED) EXIT 1" MIN. CONT. PHOTOLUMINESCENT GUIDE STRIP MOUNTED ON DOOR FRAME EXIT DOOR IDENTIFICATION SYMBOL REFER TO SIGNAGE DRAWINGS SIDE ELEVATION LAVATORY, VANITY & MIRROR (MULTIPLE) FRONT ELEVATION SIDE ELEVATION WRAP PIPE- S.P.D. WRAP PIPE- S.P.D. VANITY & MIRROR (SINGLE) FRONT ELEVATION WRAP PIPE- S.P.D. AUDIBLE NOTIFICATION APPLIANCE, LOCATE NOT LESS THAN 6" BELOW CEILING ALIGNNON-ACCESSIBLE TUB30" X 60" MIN. ACCESSIBLE ROLL IN SHOWER - PLAN 42" MIN. GRAB BAR - SEE 36" MIN. GRAB BAR - SEE FLUSH ACTIVATOR ON WIDE SIDE ACCESSIBLE TOILET COMPARTMENT (SIDE OPENING INSWING DOOR) - PLAN ALL DISPENSERS EXCEPT TOILET PAPER DISPENSERS 40" MAX. TO HIGHEST OPERABLE PART SIDE ELEVATION FRONT ELEVATION LAVATORY & MIRROR (SINGLE) SIDE ELEVATION FRONT ELEVATION ACCESSIBLE TOILET - FLOOR MOUNTED TANK TOILET OF DOOR U.O.N. SHARED CLOSETS AND DESIGNATED ACCESSIBLE CLOSETS CLOTHES ROD + SHELVES BACK HEAD ACCESSIBLE PLUMBING FIXTURES ACCESSIBLE TUB WITH SEAT IN TUB PERPENDICULAR APPROACH ELECTRICAL RECEPTACLE + TELECOM OUTLET FOOT CONTROL AREA CONTROL AREA FOLDING SHOWER SEAT - SEE U 4" MAX. PROJECTION AUDIBLE/VISIBLE NOTIFICATION APPLIANCE, LOCATE NOT LESS THAN 90" TO TOP OF DEVICE AND NOT LESS THAN 6" BELOW CEILING RECESSED SOAP DISH WITHIN SEAT REACH AREA; SHELF AT 3'-4", W.O. FOLDING SHOWER SEAT - SEE U 1/4" MAX. THRESHOL D STANDARD NON-ACCESSIBLE STANDARD ACCESSIBLE 2% MAX. GRAB BAR GRAB BAR CONTINUOUS L-SHAPED GRAB BAR PLAN GRAB BAR GRAB BAR GRAB BARS RESTS ON RIM OF BATHTUB2' - 8" 1' - 3" ACCESSIBLE URINAL FRONT ELEVATION X=36" : MIN. CLR. @ RECESS MORE THAN 24" DEEP, CENTERED ON FIXTURE X=30" @ RECESS LESS THAN 24" DEEP, CENTERED ON FIXTURE SIDE ELEVATION CARD READER OF SPRAYER UNIT: NO MORE THAN 27" FROM BACK EDGE OF SEAT THERMOSTAT CERAMIC ACCESSORIES 14" MIN. FOOT GREATER THAN 4" CLR. 60" MIN. 34" MIN CLR 36" MIN DOOR CLR.60" MIN. 1-6" MAX. 1-5" MIN.60" MIN. FLEXIBLE HOSE 3'-4" CONTROLS (3'-3" CODE MIN., 3'-5" CODE MAX.) NON-ACCESSIBLE SECOND SHOWER HEAD, W/DIVERTER IN CONTROL AREA. ONLY ONE SHOWER HEAD TO BE ON AT ANY ONE TIME PARALLEL APPROACH 1/4" MAXIMUM OPENING @ DRAIN GRATE 60" MIN. F.O.F. 1:48 MAX. SLOPE 30" MIN. SHOWER FLOOR THRESHOLD: 1/4" MAX. VERTICAL, 1/2" MAX. W/ 1/4" MAX. VERTICAL AND THE REST BEVELED @ 1 VERTICAL TO 2 HORIZONTAL CLEAR FLOOR SPACE60" MIN.CLEAR FLOOR SPACE 36" MIN MIN. 60"X60" MANEUVERING SPACE 6' - 7"FIRE VALVE CABINET 1' - 6"3' - 0"6' - 0" MIN. 1' - 6"1' - 6" MIN. TO BOTTOM3' - 0" TYP.1' - 0" MIN. SEE J 3' - 0" MIN. 6" MAX. 18" MAX. 17" MIN. OBSTRUCTION 60" MIN TO MAX. 1' - 0" SEE K 3' - 6" MIN. 54" MIN. 30" MIN. CLR.40" MAX. TO SURFACE AT COUNTER OR LAV40" MAX. TO REFLECTIVE W/SPLASH COORDINATE 3' - 0"8"4' - 0"5' - 6"6' - 8"90" MIN4' - 0" MAX BAR- TYPE DOOR ACTUATOR 5" MAX.35" MIN(ATYPICAL HEIGHT AS INDICATED IN ELEVATIONS)6' - 0"TOP OF FVC HANDLE40" MAX. TOPAPER TOWEL DISPENSER TELECOM/DATA RECEPTACLE + CABLE OUTLET TYP. 6" (ATYPICAL HEIGHT AS INDICATED IN ELEVATIONS) WALL MOUNTED TV OR MONITOR6' - 0 1/2" SHOWER CURTAIN ROD40" MAX.96" MAX TO TOP OF LENSTO THE ACTIVATIN G HANDLE OR LEVER OF THE BOX14" MIN19" MAX14" MIN19" MAX7"-9" IN FRONTOF TOILET14" MIN19" MAX. . . CL 3' - 0" 36" MAX33" MIN3' - 6" 12" MIN. 24" MIN. 24" MIN. T1 = 60" MIN. T = 36" +/-6'-8" U.O.N.5' - 6" TYP.5' - 6"2' - 6"CLCL CL CLCL CL CLC L CL CL CL CL A B C D E F G H J K L M N P Q R X T U V W S Y AA T1 BB CC FF 4'-0" BASE OFTOP OF SEAT17"-19"18" MAX. 17" MIN. SEE J 3'-0" MIN. 6" MAX. MIN. 1' - 0" 7"-9" MAX. 54" MIN. MAX. 1' - 0" SEE K 3'-6" MIN.CLR.1 1/2".CL17" MAXX OPERABLE PART44" MAX TOOPERABLE PART44" MAX TO2'-10" MAX.TO RETURN 1' - 6" MIN. CLR. 30" MIN.33" - 36".33" - 36"OF SINK, WHICHEVER IS HIGHER2'-10" MAX. TO T.O. CNTR. OR RIMOF SINK, WHICHEVER IS HIGHER2'-10" MAX. TO T.O. CNTR. OR RIMEQ EQ 2' - 8"1' - 8"6' - 4"4' - 0"2' - 5"RECESSED SOAP DISH 9"12" MAX. 24" MAX.48" MIN.30" MIN.60" MIN. PERMANENT FOLD-DOWN SHOWER SEAT - SEE 3' - 6"5' - 0"48" MAX.48" MAX.6' - 8" MIN.6' - 6"TOP OF BOX4' - 0" TOTOP OF BOX4' - 0" TYP. TO5' - 0"4'-0" MIN. 5'-0" MIN.1' - 0" 1' - 6" 2'-0" . 3'-8" MIN. 5'-0" MIN.2'-0" MIN. MIN. 3' - 0"5'-0" MIN.3'-8" MIN. 7" MIN - 9" MAX. CL CL CL TOP OF DISPENSERNOT LESS THAN 1 1/2"BELOW GRAB BAR7"-9" IN FRONTOF TOILET7"-9" IN FRONTOF TOILET7"-9" INFRONTOF TOILETTOP OF ACCESSIBLE DISPENSER NOT LESS THAN 1 1/2" BELOW GRAB BAR 60" MIN. GG 40" MAX. TOWALL MOUNTED SOAP DISPENSER 40" MAX.ROOM SCHEDULERTOP OF BOX4' - 0" TYP. TOTOP OF BOX4' - 0" TYP. TOLIGHTING AND SHADE CONTROL36" TYP.CL 3" 96" TYP. TO TOP OF DEVICEEND OF DOOR, DOOR IN OPEN POSITION, OR SIDELITE JAMB WHERE OCCURS U.O.N. 3" END OF DOOR OR SIDELITE JAMB WHERE OCCURS3" DUAL-SIDED CLOCK7' - 6" TYP.CL WALL MOUNTED SMOKE DETECTORTYP.1' - 0"LOCATE NOT LESS THAN 4" OR GREATER THAN 12" BELOW CEILING FROM TOP OF DEVICE (WITHIN 36" HORIZONTALLY OF PEAK OF CEILING) WALL CLOCK CL 6' - 6" TYP.3" ALERT BEACONTO TOP OF BOX4' - 0" TYP.3" END OF DOOR, DOOR IN OPEN POSITION, OR SIDELITE JAMB WHERE OCCURS U.O.N. END OF DOOR, DOOR IN OPEN POSITION, OR SIDELITE JAMB WHERE OCCURS U.O.N. END OF DOOR, DOOR IN OPEN POSITION, OR SIDELITE JAMB WHERE OCCURS U.O.N. GUIDE STRIP CBC 1024.4/5 & 1 01 1 .5 EQ. EQ.1' - 0"5' - 0"1' - 2"40" MAX.3' - 4"CL CL CLR. MIN1 1/2"TOP OF BAR MIN. CLR.1 1/2"TO T.P. OUTLET14" MIN19" MAX42" MIN. GRAB BAR - SEE 36" MIN. GRAB BAR - SEE FLUSH ACTIVATOR ON WIDE SIDE ACCESSIBLE TOILET COMPARTMENT (END OPENING INSWING DOOR) - PLAN CLR. 60" MIN.CLR.60" MIN. 1-6" MAX. 1-5" MIN.MIN. 60"X60" MANEUVERING SPACECL32" MIN CLR34" MIN DOORCLR.MINTO T.P. OUTLET14" MIN19" MAXTO RETURN 1' - 6" MINCL TACTILE AND OTHER EXIT SIGNAGE ON LATCH SIDE: REFER TO SIGNAGE DRAWINGS TOILET ROOM SIGN ON DOOR MIN. 22" PERMANENT FOLD-DOWN SHOWER SEAT - SEE GRAB BAR -SEE GRAB BAR -SEE 15" MAX 14" MIN23" MAX 22" MINFOLDING SHOWER SEAT - SEE U OF SHOWER FLOOR 3" MAX. SEAT TO EDGE 2 1/2" MAX.SEAT TO WALL 1 1/2" MAX. 19" MIN. 27" MAX. 1:48 MAX. SLOPE ANY DIRECTION, TYP. IN ACCESSIBLE SHOWER FLOOR 1 1/2" MIN.PULL SIDE18" MIN.59" MIN. CLR. @ FLOOR-MTD. W.C. WHEN DOOR SWINGS IN 56" MIN. CLR. AT WALL-MOUNTED W.C. WHEN DOOR SWINGS IN 36" MIN WHEN DOOR SWINGS IN TOE CLEARANCE, 6" DEEP BY 9" HIGH MINIMUM, AT EITHER LONG SIDE OF ACCESSIBLE STALLS THAT ARE LESS THAN 66" WIDE. PARTITION SUPPORTS MAY INTERRUPT THE TOE CLEARANCE SANITARY NAPKIN DISPOSAL - SEE 2' - 0" MIN. DISPENSER,NON-ACCESSIBLEMINIMUM CLEARANCES FOR APPROACH. ACCESSIBLE LAVATORY IS ALLOWED IN THE CLEARANCE NEXT TO THE CONTROL END OF THE TUB.CL48" MAX. TO T.O.ACCESSIBLE HOOK47" MAX. TO T.O.ACCESSIBLE HOOKACCESSIBLEOPERABLEPARTNON-ACCESSIBLETO DISPENSEROUTLET ANDOPERABLE PARTSTO OUTLET OF THE DISPENSER AT ACCESSIBLE LOCATIONS 36" MAX33" MINCLR. MIN1 1/2"CLR. MIN1 1/2"37" MAX.35" MIN.60" MIN. 44" MIN. AMBULATORY ACCESSIBLE TOILET CL 8" MAX.7" MIN.CL44" MAX.30" MIN.1 1/2" TYP. MIRROR - SEE 4' MIN. IF DOORHAS BOTHLATCH ANDCLOSER4' MIN. IF DOORHAS BOTHLATCH ANDCLOSERBUTTON- TYPE DOOR ACTUATOROUTLETAND TOOPERABLEPARTS OFDISPENSEROUTLETAND TOOPERABLEPARTS OFDISPENSEROUTLETAND TOOPERABLEPARTS OFDISPENSER35" MAXWHERENOT ATCOUNTEROR LAV25" MAX. 19" MIN. ACCESSIBLE DINING & WORK SURFACES ACCESSIBLE LAVATORIES NOTE REGARDING SLOPED OR UNEVEN FLOORS: CLEAR HEIGHTS ARE MEASURED TO THE WORST CONDITION, NOT NECESSARILY AT THE WALL. EXCEPTION: PER CBC 11B-606.2 EXCEPTION 6, THE DIP OF THE OVERFLOW SHALL NOT BE CONSIDERED IN DETERMINING KNEE AND TOE CLEARANCES. 27" MIN.27" MIN.FOR CLEARANCES - SEE TOE & KNEE CLEARANCE FOR CLEARANCES - SEE TOE & KNEE CLEARANCE FOR CLEARANCES - SEE TOE & KNEE CLEARANCE FOR DIMENSIONS SEE - 30" X 60" MIN. ACCESSIBLE ROLL IN SHOWER - PLAN 1' - 6"ACCESSIBLEOPERABLEPART ACCESSIBLEOPERABLEPARTNON-ACCESSIBLE SHOWER TOP OF FINISH FLOOR6' - 7"6' - 7"4' - 0"9" MIN. TOE CLR.29" MIN.6" MAX. 11" MIN.27" MIN.OTHER ACCESSIBLE SURFACES9" MIN. TOE CLR. 8" MIN. 11" MIN. 25" MAX 17" MIN.27" MIN.ACCESSIBLE SINKS 6" MAX. 11" MIN. 25" MAX 19" MIN. 8" MIN. TOE & KNEE CLEARANCE SCALE: 1/2" = 1' - 0" KNEE & TOE CLEARANCE SHALL BE 30" WIDE MIN. 19" MAX. 17" MIN. 6" MAX.9" MIN. TOE CLR.DRINKING FOUNTAIN - ALCOVE FRONT ELEVATION SIDE ELEVATION 5" MAX. FROM OF BUBBLER OUTLET TO FRONT EDGE OF D.F. @ RECESSES UP TO 24" DEEP @ AT WHEELCHAIR- ACCESSIBLE LOW DF @ RECESSES MORE THAN 24" DEEP CL CL 18" MIN. 15" MIN. D.F.: 18" MIN, 19" MAX . 32" MIN. CLR. AT RECESSES OF D.F., MIN MATCH DEPTH 15" MIN 38" MIN 43" MAXUP TO 24" DEEP; 36" MIN. CLR. AT RECESSES MORE THAN 24" DEEP FOR CLEARANCES - SEE TOE & KNEE CLEARANCE 8" MIN. MIRROR - SEE MIRROR - SEE ACCESSORIES TO OUTLET OF THE DISPENSER AT ACCESSIBLE LOCATIONS ACCESSIBLE PLUMBING FIXTURES 36" MIN WHEN DOOR SWINGS IN ACCESSIBLE PLUMBING FIXTURES C R N M V R R DOOR HEADER6" TOP OFEXIT DOOR14" MIN19" MAX. CL 18" MIN 16" MIN @ RECESSES UP TO 24" DEEP @ RECESSES MORE THAN 24" DEEP STANDING OF TACTILE 9" TO CL OF TACTILE 9" TO CL G V K J K J J K BUBBLER FORSTANDING D.F.36" MAX. TOWHEELCHAIRACCESSIBLEBUBBLER4'-0" MAX.SPRAYER UNITMOUNTINGBRACKET2 CBC 10800 TORRE AVENUE CUPERTINO, CA 95014 Stamp Consultant Sheet Number Sheet Title EHDD Job Number Drawn by Scale Printing Date COST MODEL DRAWINGS 05.04.2020 PIER 1, BAY 2 THE EMBARCADERO SAN FRANCISCO, CA 94111 INFO@EHDD.COM +1 415-285-9193 Revisions and Description Date BRIDGING DOCUMENTS 100% SD 06.01.20206/1/2020 6:03:18 PMC:\Users\l.quinones\Documents\20013-A-CUPERTINO LIBRARY EXP-CENTRAL_l.quinones.rvt 1/4" = 1'-0" G3.01 ACCESSIBLE MOUNTING HEIGHTS CUPERTINO PUBLIC LIBRARY EXPANSION Author 20013 ASA-2020-004, EA-2020-002 08/17/20 Ellen Yau 10800 TORRE AVENUE CUPERTINO, CA 95014 Stamp Consultant Sheet Number Sheet Title EHDD Job Number Drawn by Scale Printing Date COST MODEL DRAWINGS 05.04.2020 PIER 1, BAY 2 THE EMBARCADERO SAN FRANCISCO, CA 94111 INFO@EHDD.COM +1 415-285-9193 Revisions and Description Date BRIDGING DOCUMENTS 100% SD 06.01.20206/1/2020 6:03:28 PMC:\Users\l.quinones\Documents\20013-A-CUPERTINO LIBRARY EXP-CENTRAL_l.quinones.rvt G4.01 PERSPECTIVE VIEWS CUPERTINO PUBLIC LIBRARY EXPANSION Author 20013 LEVEL 1 - SE CORNERSOUTHWEST CORNER SOUTHEAST CORNER COURTYARD ASA-2020-004, EA-2020-002 08/17/20 Ellen Yau W W W W W W W WW W W W W W 10800 TORRE AVENUE CUPERTINO, CA 95014 Stamp Consultant Sheet Number Sheet Title EHDD Job Number Drawn by Scale Printing Date COST MODEL 05.04.2020 PIER 1, BAY 2 THE EMBARCADERO SAN FRANCISCO, CA 94111 INFO@EHDD.COM +1 41 5-285-91 93 Revisions and Description Date4/29/2020 2:27:28 PMCUPERTINO LIBRARY EXPANSION 20013 1700 S. Winchester Blvd, Suite 200, Campbell, CA 95008 P. 408.636.0900 F. 408.636.0999 www.sandis.net Þ C-1.0 COVER SHEET TN NO SCALE ASA-2020-004, EA-2020-002 08/17/20 Ellen Yau 10800 TORRE AVENUE CUPERTINO, CA 95014 Stamp Consultant Sheet Number Sheet Title EHDD Job Number Drawn by Scale Printing Date COST MODEL 05.04.2020 PIER 1, BAY 2 THE EMBARCADERO SAN FRANCISCO, CA 94111 INFO@EHDD.COM +1 41 5-28 5-91 93 Revisions and Description Date4/29/2020 2:27:28 PMCUPERTINO LIBRARY EXPANSION 20013 1700 S. Winchester Blvd, Suite 200, Campbell, CA 95008 P. 408.636.0900 F. 408.636.0999 www.sandis.net C-1.1 NOTES TN NO SCALE ASA-2020-004, EA-2020-002 08/17/20 Ellen Yau XX XXX X X X X X X X X X X X X X X X X X X X X X X X X X X X XX XXSEE SHEET 1R EGNART CREE K (S.C.V.W .D.)W W W W W W W W W W W W W W W W WW W W W W W W W W W W W W W W W WW W W W W W W WWWTORRE AVENUE 10800 TORRE AVENUE CUPERTINO, CA 95014 Stamp Consultant Sheet Number Sheet Title EHDD Job Number Drawn by Scale Printing Date COST MODEL 05.04.2020 PIER 1, BAY 2 THE EMBARCADERO SAN FRANCISCO, CA 94111 INFO@EHDD.COM +1 41 5-285-91 93 Revisions and Description Date4/29/2020 2:27:28 PMCUPERTINO LIBRARY EXPANSION 20013 1700 S. Winchester Blvd, Suite 200, Campbell, CA 95008 P. 408.636.0900 F. 408.636.0999 www.sandis.net C-2.0 TOPOGRAPHIC SURVEY TN 1" = 20' SURVEY NOTES UNDERGROUND UTILITY NOTE ASA-2020-004, EA-2020-002 08/17/20 Ellen Yau W W W W W W W W W W W W W W W W W W W W W W W W W W W W WW W W W W W W W W W W W W W W W W W 10800 TORRE AVENUE CUPERTINO, CA 95014 Stamp Consultant Sheet Number Sheet Title EHDD Job Number Drawn by Scale Printing Date COST MODEL 05.04.2020 PIER 1, BAY 2 THE EMBARCADERO SAN FRANCISCO, CA 94111 INFO@EHDD.COM +1 41 5-285-91 93 Revisions and Description Date4/29/2020 2:27:28 PMCUPERTINO LIBRARY EXPANSION 20013 1700 S. Winchester Blvd, Suite 200, Campbell, CA 95008 P. 408.636.0900 F. 408.636.0999 www.sandis.net C-3.0 DEMOLITION PLAN TN 1" = 10' ASA-2020-004, EA-2020-002 08/17/20 Ellen Yau X XX XX X XX X X X X X X X X X X X X X X X X X X X X X X X X X XX XXSEE SHEET 2SEE SHEET 1R EGNART CREE K (S.C.V.W .D.)W W W W W W W W W W W W W W W W WW W W W W W W W W W W W W W W W WW W W W W W W WWWTORRE AVENUE EX. LIBRARY 10800 TORRE AVENUE CUPERTINO, CA 95014 Stamp Consultant Sheet Number Sheet Title EHDD Job Number Drawn by Scale Printing Date COST MODEL 05.04.2020 PIER 1, BAY 2 THE EMBARCADERO SAN FRANCISCO, CA 94111 INFO@EHDD.COM +1 41 5-285-91 93 Revisions and Description Date4/29/2020 2:27:28 PMCUPERTINO LIBRARY EXPANSION 20013 1700 S. Winchester Blvd, Suite 200, Campbell, CA 95008 P. 408.636.0900 F. 408.636.0999 www.sandis.net C-4.0 SITE ACCESS & PARKING PLAN TN 1" = 20' ASA-2020-004, EA-2020-002 08/17/20 Ellen Yau W W W W W W W W W W W W W W W W W W W W W W W W W W W W W WW W W W W W W W W W W W W W W W W W W 10800 TORRE AVENUE CUPERTINO, CA 95014 Stamp Consultant Sheet Number Sheet Title EHDD Job Number Drawn by Scale Printing Date COST MODEL 05.04.2020 PIER 1, BAY 2 THE EMBARCADERO SAN FRANCISCO, CA 94111 INFO@EHDD.COM +1 41 5-285-91 93 Revisions and Description Date4/29/2020 2:27:28 PMCUPERTINO LIBRARY EXPANSION 20013 1700 S. Winchester Blvd, Suite 200, Campbell, CA 95008 P. 408.636.0900 F. 408.636.0999 www.sandis.net C-5.0 GRADING & DRAINAGE PLAN TN 1" = 10' ASA-2020-004, EA-2020-002 08/17/20 Ellen Yau W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W10800 TORRE AVENUE CUPERTINO, CA 95014 Stamp Consultant Sheet Number Sheet Title EHDD Job Number Drawn by Scale Printing Date COST MODEL 05.04.2020 PIER 1, BAY 2 THE EMBARCADERO SAN FRANCISCO, CA 94111 INFO@EHDD.COM +1 41 5-2 85-91 93 Revisions and Description Date4/29/2020 2:27:28 PMCUPERTINO LIBRARY EXPANSION 20013 1700 S. Winchester Blvd, Suite 200, Campbell, CA 95008 P. 408.636.0900 F. 408.636.0999 www.sandis.net C-6.0 UTILITY PLAN TN 1" = 10' NEW HYDRANT 47 LF ~ 6" DUCTILE IRON FW (INCLUDE TRENCHING ACROSS ROADWAY AND SIDEWALK) CONNECT TO EX WATER LINE WATER VALVE ASA-2020-004, EA-2020-002 08/17/20 Ellen Yau 10800 TORRE AVENUE CUPERTINO, CA 95014 Stamp Consultant Sheet Number Sheet Title EHDD Job Number Drawn by Scale Printing Date COST MODEL 05.04.2020 PIER 1, BAY 2 THE EMBARCADERO SAN FRANCISCO, CA 94111 INFO@EHDD.COM +1 41 5-285-91 93 Revisions and Description Date4/29/2020 2:27:28 PMCUPERTINO LIBRARY EXPANSION 20013 1700 S. Winchester Blvd, Suite 200, Campbell, CA 95008 P. 408.636.0900 F. 408.636.0999 www.sandis.net C-7.0 CONSTRUCTION DETAILS TN NO SCALE ” ” “ ” ASA-2020-004, EA-2020-002 08/17/20 Ellen Yau TORRE AVENUE(60' R.O.W.)W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W10800 TORRE AVENUE CUPERTINO, CA 95014 Stamp Consultant Sheet Number Sheet Title EHDD Job Number Drawn by Scale Printing Date COST MODEL 05.04.2020 PIER 1, BAY 2 THE EMBARCADERO SAN FRANCISCO, CA 94111 INFO@EHDD.COM +1 41 5-285-91 93 Revisions and Description Date4/29/2020 2:27:28 PMCUPERTINO LIBRARY EXPANSION 20013 1700 S. Winchester Blvd, Suite 200, Campbell, CA 95008 P. 408.636.0900 F. 408.636.0999 www.sandis.net Ü C-8.0 EROSION CONTROL PLAN TN 1" = 10' ASA-2020-004, EA-2020-002 08/17/20 Ellen Yau 10800 TORRE AVENUE CUPERTINO, CA 95014 Stamp Consultant Sheet Number Sheet Title EHDD Job Number Drawn by Scale Printing Date COST MODEL 05.04.2020 PIER 1, BAY 2 THE EMBARCADERO SAN FRANCISCO, CA 94111 INFO@EHDD.COM +1 41 5-285-91 93 Revisions and Description Date4/29/2020 2:27:28 PMCUPERTINO LIBRARY EXPANSION 20013 1700 S. Winchester Blvd, Suite 200, Campbell, CA 95008 P. 408.636.0900 F. 408.636.0999 www.sandis.net C-8.1 EROSION CONTROL DETAILS TN 1" = 10' ASA-2020-004, EA-2020-002 08/17/20 Ellen Yau XXXXXX X XX X XX XX X X X X X X X X X X X X X X X X X X XXXMATCH LINESEE SHEET 2SEE SHEET 1REGNART CREEK (S.C.V.W.D.)W W W W W W W W W W WW W W W W W W W W W WW W W W WWWTORRE AVENUE 10800 TORRE AVENUE CUPERTINO, CA 95014 Stamp Consultant Sheet Number Sheet Title EHDD Job Number Drawn by Scale Printing Date COST MODEL 05.04.2020 PIER 1, BAY 2 THE EMBARCADERO SAN FRANCISCO, CA 94111 INFO@EHDD.COM +1 41 5-285-91 93 Revisions and Description Date4/29/2020 2:27:28 PMCUPERTINO LIBRARY EXPANSION 20013 1700 S. Winchester Blvd, Suite 200, Campbell, CA 95008 P. 408.636.0900 F. 408.636.0999 www.sandis.net C-9.0 FIRE ACCESS PLAN TN 1" = 30' LEGEND FIRE FLOW REQUIREMENTS FIRE PROTECTION NOTES new hydrant new hydrant ASA-2020-004, EA-2020-002 08/17/20 Ellen Yau EBTORRE AVENUESIGN6 FOOT CLFAC BERM6 FOOT CLFSDEV EV 4 MIN. PARKING 4 MIN. PARKING 4 MIN. PARKING 4 MIN. PARKING EV EV TORRE AVENUE TR T RTR TRTRSS SS SS SS SS 10' P.U.E.AND S.D.E.10' P.U.E.AND S.S.E. D S UP UP EXPANSION EXISTING LIBRARY EXISTING COMMUNITY HALL EXISTING CITY HALL 210' - 7 1/2" 106' - 5 1/2"112' - 8 1/2"NEW SIDEWALK CONNECTION TO EXISTING SIDEWALK ACCESSIBLE AND EV PARKING MEMORIAL GROVE 10800 TORRE AVENUE CUPERTINO, CA 95014 Stamp Consultant Sheet Number Sheet Title EHDD Job Number Drawn by Scale Printing Date COST MODEL DRAWINGS 05.04.2020 PIER 1, BAY 2 THE EMBARCADERO SAN FRANCISCO, CA 94111 INFO@EHDD.COM +1 415-285-9193 Revisions and Description Date BRIDGING DOCUMENTS 100% SD 06.01.20206/1/2020 6:02:44 PMC:\Users\l.quinones\Documents\20013-A-CUPERTINO LIBRARY EXP-CENTRAL_l.quinones.rvt 1" = 20'-0" A0.11 SITE PLAN CUPERTINO PUBLIC LIBRARY EXPANSION Author 20013 SCALE: 1" = 20'-0"A0.11 1 SITE PLAN ASA-2020-004, EA-2020-002 08/17/20 Ellen Yau EBTORRE AVENUESIGN6 FOOT CLFAC BERM6 FOOT CLFSDEV EV 4 MIN. PARKING 4 MIN. PARKING 4 MIN. PARKING 4 MIN. PARKING EV EV TORRE AVENUE TR T RTR TRTRUP UP 51' - 10 1/4" EXPANSION EXISTING LIBRARY EXISTING COMMUNITY HALL EXISTING CITY HALL POTENTIAL TEMPORARY AHU AREA ACCESSIBLE AND EV PARKING MEMORIAL GROVE CHAIN LINK CONSTRUCTION FENCE AROUND GROVE. MAINTAINED BY CONTRACTOR TEMPORARY ACCESS CONSTRUCTION YARD: SUB CONNEX BOXES; SIDEWALK ACCESS TO TORRE; DELIVERY AREA; LAYDOWN; SOME WORKER PARKING. 20 PARKING SPOTS TAKENCONSTRUCION WORKER PARKING(TO DECREASE AS PROJECTAPPROACHES COMPLETION)CONSTRUCIONTRAILERCRANE AREA STEEL PICKS BY CRANE ARE LIMITED TIMES LIBRARY AREAS TO BE VACANT DURING STEEL PICK LIBRARY AREAS TO BE VACANT DURING STEEL PICK CONSTRUCTION ACCESSPATRON ACCESS (DEPENDING ON CONSTRUCTION DELIVERIES)PATRON ACCESSPATRON ACCESS LIMIT OF PATRONACCESS10800 TORRE AVENUE CUPERTINO, CA 95014 Stamp Consultant Sheet Number Sheet Title EHDD Job Number Drawn by Scale Printing Date COST MODEL DRAWINGS 05.04.2020 PIER 1, BAY 2 THE EMBARCADERO SAN FRANCISCO, CA 94111 INFO@EHDD.COM +1 415-285-9193 Revisions and Description Date BRIDGING DOCUMENTS 100% SD 06.01.20206/1/2020 6:02:45 PMC:\Users\l.quinones\Documents\20013-A-CUPERTINO LIBRARY EXP-CENTRAL_l.quinones.rvt 1" = 20'-0" A0.12 SITE PLAN - CONSTRUCTION LOGISTICS CUPERTINO PUBLIC LIBRARY EXPANSION Author 20013 SCALE: 1" = 20'-0"A0.12 1 SITE PLAN Construction Logistics ASA-2020-004, EA-2020-002 08/17/20 Ellen Yau UP UP UP 1 2 2.5 3 4 5 6 7 8 9 10 AB C D E F G G H H J K 5.8 5.4 4.5 L K.9 J.5 H.5 C.2 7.5 8.3 8.4 8.5 8.8 2.2 3.3 M 5.6 E.9 AFFECTED AREAS DEMOLISH (E) ONE STORY CHILDRENS' PICTURE BOOK AREA DEMOLISH (E) GLAZING AND CONCRETE STEM WALL DEMOLISH (E) DOOR AND SIDE LIGHTS DESIGN BUILDER TO BUILD TEMPORARY ACOUSTIC WALL (STC 50 MIN. ) FOR MINIMAL DISTRUPTION TO LIBRARY DESIGN BUILDER TO BUILD TEMPORARY COURTYARD SEPARATION CONSTRUCTION WALL--8'-0" PAINTED PLYWOOD EXACT LOCATION IN COURTYARD TBD. DESIGN BUILDER TO SURVEY,INSURE AND REESTABLISH ALL SYSTEM CONNECTIONS BETWEEN BUILDING WINGS BEFORE DEMOLITION. FIRE PROTECTION AND ALARM SYSTEMS ARE BE MAINTAINED AT ALL TIMES 11' - 5" 22' - 0" 22' - 0" 22' - 0" 22' - 0" 22' - 0" 22' - 0" 22' - 0" 20' - 5" 12' - 5 1/2" 3' - 0"11' - 0" 11' - 0" 8' - 7" 1' - 4" 22' - 0" 22' - 0" 22' - 0" 22' - 0" 22' - 0" 22' - 0" 23' - 4" 9' - 8"7' - 6"4' - 10"4' - 6" 11' - 0"16' - 10" 11' - 0" 2' - 1"4' - 0"7"6' - 5" REMOVE (E) WINDOW 10800 TORRE AVENUE CUPERTINO, CA 95014 Stamp Consultant Sheet Number Sheet Title EHDD Job Number Drawn by Scale Printing Date COST MODEL DRAWINGS 05.04.2020 PIER 1, BAY 2 THE EMBARCADERO SAN FRANCISCO, CA 94111 INFO@EHDD.COM +1 415-285-9193 Revisions and Description Date BRIDGING DOCUMENTS 100% SD 06.01.20206/1/2020 6:02:46 PMC:\Users\l.quinones\Documents\20013-A-CUPERTINO LIBRARY EXP-CENTRAL_l.quinones.rvt 1/8" = 1'-0" A1.01 LEVEL 1 - DEMOLITION PLAN CUPERTINO PUBLIC LIBRARY EXPANSION Author 20013 SCALE: 1/8" = 1'-0"A1.01 1 LEVEL 1 - DEMO PLAN NASA-2020-004, EA-2020-002 08/17/20 Ellen Yau UP UP UP 1 2 2.5 3 4 5 6 7 8 9 10 AB C D E F G H J K 5.8 5.4 5.4 4.5 L K.9 J.5 H.5 C.2 7.5 8.3 8.4 8.5 8.8 2.2 3.3 M 5.6 E.9 AFFECTED AREAS DEMOLISH (E) ONE STORY CHILDRENS' PICTURE BOOK AREA DESIGN BUILDER TO BUILD TEMPORARY ACOUSTIC WALL (STC 50 MIN.) FOR MINIMAL DISTRUPTION TO LIBRARY DEMOLISH (E) GLAZING AND PLASTER WALL 1' - 4" 22' - 0" 22' - 0" 22' - 0" 22' - 0" 22' - 0" 22' - 0" 23' - 4" 9' - 8"7' - 6"4' - 10"4' - 6" 11' - 0" 2' - 1"4' - 0"7"6' - 5"11' - 0" 16' - 10" 11' - 5" 22' - 0" 22' - 0" 22' - 0" 22' - 0" 22' - 0" 22' - 0" 22' - 0" 20' - 5" 12' - 5 1/2" 3' - 0"11' - 0" 11' - 0" 8' - 7" DESIGN BUILDER TO BUILD TEMPORARY ACOUSTIC WALL (STC 54 MIN.) FOR MINIMAL DISTRUPTION TO LIBRARY REMOVE WINDOWS 10800 TORRE AVENUE CUPERTINO, CA 95014 Stamp Consultant Sheet Number Sheet Title EHDD Job Number Drawn by Scale Printing Date COST MODEL DRAWINGS 05.04.2020 PIER 1, BAY 2 THE EMBARCADERO SAN FRANCISCO, CA 94111 INFO@EHDD.COM +1 415-285-9193 Revisions and Description Date BRIDGING DOCUMENTS 100% SD 06.01.20206/1/2020 6:02:46 PMC:\Users\l.quinones\Documents\20013-A-CUPERTINO LIBRARY EXP-CENTRAL_l.quinones.rvt 1/8" = 1'-0" A1.02 LEVEL 2 - DEMOLITION PLAN CUPERTINO PUBLIC LIBRARY EXPANSION Author 20013 SCALE: 1/8" = 1'-0"A1.02 1 LEVEL 2 - DEMO PLAN NASA-2020-004, EA-2020-002 08/17/20 Ellen Yau F.E.C. F.E.C.F.E.C. F.E.C. A3.01 1 1 2 2.5 3 4 5 6 7 8 9 10 J K 5.8 5.4 4.5 L K.9 J.5 H.5 7.5 8.5 2.2 3.3 M A3.01 2 A3.01 4 3 A3.11 3 A3.11 1 A3.11 1 A3.11 A 698 SF PROGRAM / STORY TIME B A 123 SF PANTRYA 104 SF AV. STOR. A 157 SF STOR. A 184 SF TOILETS A 934 SF PROGRAM / STORY TIME A STAIR A 99 SF HALLWAY A4.01 1 ACOUSTIC GLASS MANUAL OPERABLE PARTITION A5.01 1 A5.01 3 2 A5.014 A3.013 A7.01 1 GLASS DOOR W/ PANIC HARDWARE (EXIT ONLY) GLASS DOOR W/ PANIC HARDWARE PANIC HARDWARE RESERVE APPX. 100 SF FOR POTENTIAL ADDITIONAL STORAGE. SLIDING GLASS MULTIPLE PANEL DOOR SEISMIC JOINT COVER SEISMIC JOINT COVER 22' - 10"28' - 3" 3' - 9 1/4" 1' - 0" 16' - 10"12' - 0 1/4"59' - 9 1/2"11"1' - 10"49' - 7"C.R.C.R.C.R.A 18 SF JAN. UP 2 A3.11 2 A3.11 B C C C C C C B B C CC B C C C C C C A3.01 1 1 2 2.5 3 4 5 6 7 8 9 10 J K 5.8 5.4 4.5 L K.9 J.5 H.5 7.5 8.5 2.2 3.3 M A3.01 2 A3.01 4 3 A3.11 3 A3.11 1 A3.11 1 A3.11 A 895 SF PROGRAM ROOM C A 633 SF PROGRAM ROOM D A 117 SF PANTRY A 104 SF AV. STOR.A 185 SF TOILETS A 97 SF HALLWAY A 86 SF STOR. SHAFT A 109 SF ENTRY STAIR A4.01 1 ACOUSTIC GLASS MANUAL OPERABLE PARTITION SLIDING GLASS WALL WITH SWING DOOR A5.01 4 SIMA5.01 5 6 7 A3.013 A7.01 2 PANIC HARDWARE SEISMIC JOINT COVER SEISMIC JOINT COVER INFILL WALL AT FORMER WINDOWC.R.C.R.C.R. A 18 SF JAN.DN 2 A3.11 2 A3.11 C C B B C C B C C B B C CC B FLOOR PLAN NOTES 1. REFER TO SHEET G3.01 FOR ACCESSIBLE MOUNTING HEIGHTS AND DIAGRAMS. 2. REFER TO SPECIFICATIONS FOR STAIR AND RAILING TYPES. 3. ALL DOORS INTO PROGRAM ROOMS TO HAVE SOUND GASKETS SEE SHEET A9.01. 4. REFER TO ACOUSTICAL NARRATIVE FOR MORE INFORMATION. 5. REFER TO SHEET A9.01 FOR TYPICAL ACOUSTIC INTERIOR DETAILS. FLOOR PLAN LEGEND NEW PARTITION AND DOOR 1-HR FIRE BARRIER EXISTING TO REMAIN SHAFT OR OPENING IN FLOOR SLAB RECESSED FIRE EXTINGUISHER CABINET CARD READER ACCESS F.E.C. C.R. WALL TYPES SCHEDULE B C REFER TO SHEET A9.01 FOR WALL TYPE DETAILS. FULL HEIGHT 42 STC FULL HEIGHT 47 STC A WALL TYPE TAG 10800 TORRE AVENUE CUPERTINO, CA 95014 Stamp Consultant Sheet Number Sheet Title EHDD Job Number Drawn by Scale Printing Date COST MODEL DRAWINGS 05.04.2020 PIER 1, BAY 2 THE EMBARCADERO SAN FRANCISCO, CA 94111 INFO@EHDD.COM +1 415-285-9193 Revisions and Description Date BRIDGING DOCUMENTS 100% SD 06.01.20206/1/2020 6:02:48 PMC:\Users\l.quinones\Documents\20013-A-CUPERTINO LIBRARY EXP-CENTRAL_l.quinones.rvt As indicated A2.11 LEVEL 1 & 2 - FLOOR PLANS CUPERTINO PUBLIC LIBRARY EXPANSION Author 20013 SCALE: 1/8" = 1'-0" A2.11 1 LEVEL 1 SCALE: 1/8" = 1'-0"A2.11 2 LEVEL 2 NNASA-2020-004, EA-2020-002 08/17/20 Ellen Yau A3.01 1 1 2 2.5 3 4 5 6 7 8 9 10 HJ K 5.8 5.4 4.5 L K.9 J.5 H.5 7.5 8.5 2.2 3.3 M A3.01 2 A3.01 4 3 A3.11 3 A3.11 1 A3.11 1 A3.11 A3.01 3 MEP EQUIPMENT SEE MEP BOD EXHAUST FAN 10'-0" MIN. SEPARATION FROM INTAKE ROOF DRAIN AND OVERFLOW SEISMIC JOINT COVER PVC ROOFING SYSTEM "COOL ROOF" OVER TAPERED INSULATION SEISMIC JOINT COVER 1/4"/1'-0" LANDING STEP4' - 6"6' - 0" 3 COAT STUCCO 42" PARAPET 4' - 0"6' - 0" 15' - 0" 10' - 0" 2 A3.11 2 A3.11 CRICKET TYP. AL. COPING AL. COPING 10800 TORRE AVENUE CUPERTINO, CA 95014 Stamp Consultant Sheet Number Sheet Title EHDD Job Number Drawn by Scale Printing Date COST MODEL DRAWINGS 05.04.2020 PIER 1, BAY 2 THE EMBARCADERO SAN FRANCISCO, CA 94111 INFO@EHDD.COM +1 415-285-9193 Revisions and Description Date BRIDGING DOCUMENTS 100% SD 06.01.20206/1/2020 6:02:48 PMC:\Users\l.quinones\Documents\20013-A-CUPERTINO LIBRARY EXP-CENTRAL_l.quinones.rvt 1/8" = 1'-0" A2.12 ROOF PLAN CUPERTINO PUBLIC LIBRARY EXPANSION Author 20013 SCALE: 1/8" = 1'-0" A2.12 1 LEVEL ROOF NASA-2020-004, EA-2020-002 08/17/20 Ellen Yau F.E.C. UP F.E.C.F.E.C. F.E.C. 1 2 2.5 3 4 5 6 7 8 9 10 J K 5.8 5.4 4.5 L K.9 J.5 H.5 7.5 8.5 2.2 3.3 M PROGRAM / STORY TIME A PROGRAM / STORY TIME B PANTRYAV. STOR. TOILETS STOR. HALLWAY STAIR UP 1 2 2.5 3 4 5 6 7 8 9 10 J K 5.8 5.4 4.5 L K.9 J.5 H.5 7.5 8.5 2.2 3.3 M PROGRAM ROOM C PROGRAM ROOM D ENTRY PANTRYAV. STOR. TOILETS HALLWAY STOR. SHAFT STAIR DN FINISH PLAN NOTES 1. REFER TO SPECIFICATIONS FOR FINISH MATERIAL INFORMATION 2. REFER TO SHEET A6.01 FOR CEILING FINISHES 3. WHITE WALL PAINT, TYPICAL 4. GREY WALL BASE, TYPICAL 5. ALL EXPOSED STEEL TO BE PAINTED TO MATCH EXISTING BUILDING EXPOSED STRUCTURE 6. REFER TO INTERIOR ELEVATIONS A5.01 FOR MORE INFORMATION FINISH PLAN LEGEND SHEE RUBBER FLOORING CARPET TILE 6" X 6" PORCELAIN TILE SEALED CONCRETE 10800 TORRE AVENUE CUPERTINO, CA 95014 Stamp Consultant Sheet Number Sheet Title EHDD Job Number Drawn by Scale Printing Date COST MODEL DRAWINGS 05.04.2020 PIER 1, BAY 2 THE EMBARCADERO SAN FRANCISCO, CA 94111 INFO@EHDD.COM +1 415-285-9193 Revisions and Description Date BRIDGING DOCUMENTS 100% SD 06.01.20206/1/2020 6:02:49 PMC:\Users\l.quinones\Documents\20013-A-CUPERTINO LIBRARY EXP-CENTRAL_l.quinones.rvt As indicated A2.21 LEVEL 1 & 2 - FINISH PLAN CUPERTINO PUBLIC LIBRARY EXPANSION Author 20013 SCALE: 1/8" = 1'-0" A2.21 1 LEVEL 1 FINISH PLAN SCALE: 1/8" = 1'-0"A2.21 2 LEVEL 2 FINISH PLAN NNASA-2020-004, EA-2020-002 08/17/20 Ellen Yau F.E.C. F.E.C. F.E.C. F.E.C. F.E.C. F.E.C. F.E.C. F.E.C. F.E.C. F.E.C. F.E.C. F.E.C. RETRACTABLE 120" PROJECTION SCREENS 170 SEATS 72" X 144" X 8" MOBILE PLATFORM PANTRYAV. STOR. TOILETS STOR. STAIR HALLWAY A 698 SF PROGRAM / STORY TIME B A 934 SF PROGRAM / STORY TIME A MOBILE PODIUM 72 SEATS 36 TABLES (24" x 66") A 698 SF PROGRAM / STORY TIME B A 934 SF PROGRAM / STORY TIME A PANTRYAV. STOR. TOILETS STOR. STAIR HALLWAY RETRACTABLE 120" PROJECTION SCREEN RETRACTABLE 120" PROJECTION SCREEN 66 SEATS MOBILE PODIUM 33 TABLES (24" x 66") PANTRY AV. STOR. TOILETS STOR. STAIR HALLWAY A 934 SF PROGRAM / STORY TIME A A 698 SF PROGRAM / STORY TIME B RETRACTABLE 120" PROJECTION SCREEN RETRACTABLE 120" PROJECTION SCREEN 72" x 144" x 8" MOBILE PLATFORM 94 SEATS 61 SEATS PANTRY A 698 SF PROGRAM / STORY TIME B A 934 SF PROGRAM / STORY TIME A AV. STOR. TOILETS STOR. HALLWAY STAIR RETRACTABLE 120" PROJECTION SCREENS RETRACTABLE 120" PROJECTION SCREEN RETRACTABLE 120" PROJECTION SCREEN 48 SEATS 34 SEATS MOBILE PODIUM MOBILE PODIUM 17 TABLES (24" x 66") 24 TABLES (24" x 66") PANTRY AV. STOR. TOILETS STOR. HALLWAY STAIR A 698 SF PROGRAM / STORY TIME B A 934 SF PROGRAM / STORY TIME A RETRACTABLE 120" PROJECTION SCREEN RETRACTABLE 120" PROJECTION SCREEN 40 SEATS 30 SEATS MOBILE PODIUM MOBILE PODIUM 15 TABLES (24" x 66") 20 TABLES (24" x 66") A 698 SF PROGRAM / STORY TIME B A 934 SF PROGRAM / STORY TIME A PANTRY AV. STOR. TOILETS STOR. HALLWAY STAIR RETRACTABLE 120" PROJECTION SCREEN RETRACTABLE 120" PROJECTION SCREEN 10800 TORRE AVENUE CUPERTINO, CA 95014 Stamp Consultant Sheet Number Sheet Title EHDD Job Number Drawn by Scale Printing Date COST MODEL DRAWINGS 05.04.2020 PIER 1, BAY 2 THE EMBARCADERO SAN FRANCISCO, CA 94111 INFO@EHDD.COM +1 415-285-9193 Revisions and Description Date BRIDGING DOCUMENTS 100% SD 06.01.20206/1/2020 6:02:55 PMC:\Users\l.quinones\Documents\20013-A-CUPERTINO LIBRARY EXP-CENTRAL_l.quinones.rvt 1/8" = 1'-0" A2.41 LEVEL 1 - FURNITURE PLANS CUPERTINO PUBLIC LIBRARY EXPANSION Author 20013 SCALE: 1/8" = 1'-0"A2.41 1 LEVEL 1 - OPEN AUDIENCE SEATING SCALE: 1/8" = 1'-0"A2.41 2 LEVEL 1 - OPEN COMMUNAL SEATING SCALE: 1/8" = 1'-0"A2.41 3 LEVEL 1 - OPEN CLASSROOM SEATING SCALE: 1/8" = 1'-0"A2.41 4 LEVEL 1 - CLOSED AUDIENCE SEATING SCALE: 1/8" = 1'-0"A2.41 5 LEVEL 1 - CLOSED COMMUNAL SEATING SCALE: 1/8" = 1'-0" A2.41 6 LEVEL 1 - CLOSED CLASSROOM SEATING N N N NNNASA-2020-004, EA-2020-002 08/17/20 Ellen Yau F.E.C. F.E.C. F.E.C. F.E.C. F.E.C. F.E.C. F.E.C. F.E.C. F.E.C. F.E.C. F.E.C. F.E.C. 72" x 144" x 8" MOBILE PLATFORM RETRACTABLE 120" PROJECTION SCREEN 141 SEATS A 633 SF PROGRAM ROOM D A 895 SF PROGRAM ROOM C PANTRYAV. STOR. TOILETS STOR. HALLWAY STAIR SHAFT ENTRY RETRACTABLE 120" PROJECTION SCREEN MOBILE PODIUM 70 SEATS 35 TABLES (24" x 66") A 895 SF PROGRAM ROOM C A 633 SF PROGRAM ROOM D PANTRY AV. STOR. TOILETS STOR. HALLWAY STAIR SHAFT ENTRY RETRACTABLE 120" PROJECTION SCREEN RETRACTABLE 120" PROJECTION SCREEN MOBILE PODIUM 62 SEATS 31 TABLES (24" x 66") PANTRY AV. STOR. TOILETSSTOR. SHAFT HALLWAY STAIR ENTRY A 895 SF PROGRAM ROOM C A 633 SF PROGRAM ROOM D RETRACTABLE 120" PROJECTION SCREEN RETRACTABLE 120" PROJECTION SCREEN 72" x 144" x 8" MOBILE PLATFORM 80 SEATS 54 SEATS A 633 SF PROGRAM ROOM D A 895 SF PROGRAM ROOM C ENTRY HALLWAY PANTRYAV. STOR. TOILETS STOR. SHAFT STAIR RETRACTABLE 120" PROJECTION SCREEN RETRACTABLE 120" PROJECTION SCREENMOBILE PODIUM 30 SEATS 15 TABLES (24" x 66") 40 SEATS 20 TABLES (24" x 66") MOBILE PODIUM ENTRY PANTRY AV. STOR. TOILETS STOR. SHAFT STAIR HALLWAY A 895 SF PROGRAM ROOM C A 633 SF PROGRAM ROOM D RETRACTABLE 120" PROJECTION SCREEN RETRACTABLE 120" PROJECTION SCREEN MOBILE PODIUM 24 SEATS 12 TABLES (24" x 66") 38 SEATS 19 TABLES (24" x 66") MOBILE PODIUM A 633 SF PROGRAM ROOM D A 895 SF PROGRAM ROOM C PANTRY AV. STOR. TOILETS STOR. HALLWAY STAIR SHAFT ENTRY RETRACTABLE 120" PROJECTION SCREEN RETRACTABLE 120" PROJECTION SCREEN 10800 TORRE AVENUE CUPERTINO, CA 95014 Stamp Consultant Sheet Number Sheet Title EHDD Job Number Drawn by Scale Printing Date COST MODEL DRAWINGS 05.04.2020 PIER 1, BAY 2 THE EMBARCADERO SAN FRANCISCO, CA 94111 INFO@EHDD.COM +1 415-285-9193 Revisions and Description Date BRIDGING DOCUMENTS 100% SD 06.01.20206/1/2020 6:03:01 PMC:\Users\l.quinones\Documents\20013-A-CUPERTINO LIBRARY EXP-CENTRAL_l.quinones.rvt 1/8" = 1'-0" A2.42 LEVEL 2 - FURNITURE PLANS CUPERTINO PUBLIC LIBRARY EXPANSION 20013 SCALE: 1/8" = 1'-0"A2.42 1 LEVEL 2 - OPEN AUDIENCE SEATING SCALE: 1/8" = 1'-0"A2.42 2 LEVEL 2 - OPEN COMMUNAL SEATING SCALE: 1/8" = 1'-0" A2.42 3 LEVEL 2 - OPEN CLASSROOM SEATING SCALE: 1/8" = 1'-0"A2.42 4 LEVEL 2 - CLOSED AUDIENCE SEATING SCALE: 1/8" = 1'-0" A2.42 5 LEVEL 2 - CLOSED COMMUNAL SEATING SCALE: 1/8" = 1'-0" A2.42 6 LEVEL 2 - CLOSED CLASSROOM SEATING N N N NNNASA-2020-004, EA-2020-002 08/17/20 Ellen Yau LEVEL 1 EL +0' - 0" LEVEL 2 EL +15' - 0" 1 2 2.5 3 4 5 6 7 8 9 105.8 4.5 7.5 8.5 2.2 3.3 (E) ROOF EL +27' - 8"23' - 0"34' - 1 1/2"3 COAT STUCCO SYSTEM HIGH PERFORMANCE CURTAIN WALL SYSTEM HIGH PERFORMANCE ALUMINUM CURTAIN WALL SYSTEM AL. HORIZONTAL SUNSHADES AND 2' - 0"OPAQUE GLASS SPANDREL 2 A3.11 2 A3.11 A3.12 1 3' - 4" LEVEL 1 EL +0' - 0" LEVEL 2 EL +15' - 0" L (E) ROOF EL +27' - 8" 1 A3.11 1 A3.11 27' - 8"3 COAT PLASTER SYSTEM SEISMIC JOINT COVER SURFACE MOUNTED EXTERIOR LIGHT (E) LIBRARY 4' - 2 1/4" LEVEL 1 EL +0' - 0" LEVEL 2 EL +15' - 0" (E) ROOF EL +27' - 8" AL. HORIZONTAL SUNSHADE LEVEL 1 EL +0' - 0" LEVEL 2 EL +15' - 0" 5 6 5.8 (E) ROOF EL +27' - 8" 3 A3.11 3 A3.11 DONOR WALL AREA OPAQUE GLASS SPANDREL 10' - 0"10' - 0" 29' - 11 3/4"5' - 0" 32' - 4" MULTI-PANEL SLIDING DOOR 3' - 8" 4' - 0"2' - 6"3 COAT STUCCO SYSTEM 10800 TORRE AVENUE CUPERTINO, CA 95014 Stamp Consultant Sheet Number Sheet Title EHDD Job Number Drawn by Scale Printing Date COST MODEL DRAWINGS 05.04.2020 PIER 1, BAY 2 THE EMBARCADERO SAN FRANCISCO, CA 94111 INFO@EHDD.COM +1 415-285-9193 Revisions and Description Date BRIDGING DOCUMENTS 100% SD 06.01.20206/1/2020 6:03:01 PMC:\Users\l.quinones\Documents\20013-A-CUPERTINO LIBRARY EXP-CENTRAL_l.quinones.rvt 1/8" = 1'-0" A3.01 BUILDING ELEVATIONS CUPERTINO PUBLIC LIBRARY EXPANSION Author 20013 S CALE: 1/8" = 1'-0"A3.01 1 SOUTH ELEVATION SCALE: 1/8" = 1'-0"A3.01 2 EAST ELEVATION SCALE: 1/8" = 1'-0"A3.01 4 WEST ELEVATION SCALE: 1/8" = 1'-0"A3.01 3 NORTH ELEVATION-COURTYARD ASA-2020-004, EA-2020-002 08/17/20 Ellen Yau LEVEL 1 EL +0' - 0" LEVEL 2 EL +15' - 0" 4 5 6 7 5.8 4.5 7.55.6 (E) ROOF EL +27' - 8" 3 A3.11 3 A3.11 SEISMIC JOINT COVER HVAC EQUIPMENT 2 A3.11 2 A3.11 LEVEL 1 EL +0' - 0" LEVEL 2 EL +15' - 0" J K L K.9 J.5 H.5 (E) ROOF EL +27' - 8" UTILITY EASEMENT SCD Pipe (TBD size and depth by City) Utility Easement extension SJWC SCD 1' - 5" 1' - 11" 6" 15' - 0" 5' - 0" NOTE: DESIGN BUILD TEAM CONFIRM UTILITY EASEMENT AND PIPE LOCATION WITH CITY LEVEL 1 EL +0' - 0" LEVEL 2 EL +15' - 0" J K L K.9 J.5 H.5 (E) ROOF EL +27' - 8" 10800 TORRE AVENUE CUPERTINO, CA 95014 Stamp Consultant Sheet Number Sheet Title EHDD Job Number Drawn by Scale Printing Date COST MODEL DRAWINGS 05.04.2020 PIER 1, BAY 2 THE EMBARCADERO SAN FRANCISCO, CA 94111 INFO@EHDD.COM +1 415-285-9193 Revisions and Description Date BRIDGING DOCUMENTS 100% SD 06.01.20206/1/2020 6:03:03 PMC:\Users\l.quinones\Documents\20013-A-CUPERTINO LIBRARY EXP-CENTRAL_l.quinones.rvt 1/8" = 1'-0" A3.11 BUILDING SECTIONS CUPERTINO PUBLIC LIBRARY EXPANSION Author 20013 SCALE: 1/8" = 1'-0"A3.11 1 SECTION 4 EAST WEST SCALE: 1/8" = 1'-0"A3.11 3 SECTION 2 NORTH-SOUTH SHOWING WATER EASEMENT SCALE: 1/8" = 1'-0"A3.11 2 SECTION 6 NORTH SOUTH ASA-2020-004, EA-2020-002 08/17/20 Ellen Yau LEVEL 1 EL +0' - 0" LEVEL 2 EL +15' - 0" 54.5 (E) ROOF EL +27' - 8" 2 A3.12 LEVEL 1 EL +0' - 0" LEVEL 2 EL +15' - 0" (E) ROOF EL +27' - 8" AL. HORIZONTAL SUNSHADE HIGH PERFORMANCE CURTAIN WALL LINEAR WOOD CEILING PANELS ACOUSTIC SOUND RATED CEILING SEE 11/A9.01 FIRE SAFING AND AL. BACK PAN AL. COPING SINGLE PLY COOL ROOF OVER INSULATION OPAQUE GLASS SPANDREL 10800 TORRE AVENUE CUPERTINO, CA 95014 Stamp Consultant Sheet Number Sheet Title EHDD Job Number Drawn by Scale Printing Date COST MODEL DRAWINGS 05.04.2020 PIER 1, BAY 2 THE EMBARCADERO SAN FRANCISCO, CA 94111 INFO@EHDD.COM +1 415-285-9193 Revisions and Description Date BRIDGING DOCUMENTS 100% SD 06.01.20206/1/2020 6:03:03 PMC:\Users\l.quinones\Documents\20013-A-CUPERTINO LIBRARY EXP-CENTRAL_l.quinones.rvt 1/4" = 1'-0" A3.12 BUILDING WALL SECTIONS CUPERTINO PUBLIC LIBRARY EXPANSION Author 20013 SCALE: 1/4" = 1'-0" A3.12 1 SOUTH ELEVATION ENLARGED SCALE: 1/4" = 1'-0"A3.12 2 SOUTH WALL SECTION ASA-2020-004, EA-2020-002 08/17/20 Ellen Yau F.E.C. 6 KL K.9 3 A3.11 3 A3.11 ø 5' - 0" 1' - 6"7' - 8" ø 5' - 0"1' - 6"A4.01 4 5 A4.013 A4.01 6 7 TOILETS 5' - 9" SENSOR ACTIVATED SURFACE MOUNTED PAPER TOWEL DISPENSER MOP RACK BOTTLE FILLING STATION / HIGH-LOW DRINKING FOUNTAIN RECESSED BABY CHANGING STATION 23 GALLON COMPOST BIN A4.01 8 MOP SINK FRP4" MAX.JAN.STOR. NOTE: SEE SHEET A2.11 FOR WALL TYPES. 6 K L K.9 TOILETS + 10' - 0" +7 '-6" +7 '-6" +7 '-6" JAN. STOR. NOTE: ALL WATER CLOSETS ARE SEPARATE ROOMS WITH FULL HEIGHT WALLS AND WILL REQUIRE THEIR OWN VENTING AND FIRE SPRINKLER. LEVEL 1 EL +0' - 0" 6 2' - 10" RECESSED BABY CHANGING STATION MIRROR SOLID SURFACE COUNTERTOP AND BACKSPLASH 4"1' - 0" STAINLESS STEEL CORNER GUARDS LEVEL 1 EL +0' - 0" 6 OPEN BEYOND STAINLESS STEEL CORNER GUARDS 23 GALLON COMPOST BINSENSOR ACTIVATED SURFACE MOUNTED PAPER TOWEL DISPENSER LEVEL 1 EL +0' - 0"7' - 6"PORCELAIN TILE, TYP. ON ALL TOILET COMPARTMENT WALLS LEVEL 1 EL +0' - 0"3' - 0"7' - 6"PORCELAIN TILE, TYP. ON ALL TOILET COMPARTMENT WALLS LEVEL 1 EL +0' - 0"7' - 6"RECESSED SEAT COVER, TOILET PAPER AND RECEPTACLE COMBO UNIT, TYP. AT ALL TOILET COMPARTMENTS LEVEL 1 EL +0' - 0" K LK.9 OPEN BEYOND STAINLESS STEEL CORNER GUARDS BOTTLE FILLING STATION / HIGH-LOW DRINKING FOUNTAIN 10800 TORRE AVENUE CUPERTINO, CA 95014 Stamp Consultant Sheet Number Sheet Title EHDD Job Number Drawn by Scale Printing Date COST MODEL DRAWINGS 05.04.2020 PIER 1, BAY 2 THE EMBARCADERO SAN FRANCISCO, CA 94111 INFO@EHDD.COM +1 415-285-9193 Revisions and Description Date BRIDGING DOCUMENTS 100% SD 06.01.20206/1/2020 6:03:06 PMC:\Users\l.quinones\Documents\20013-A-CUPERTINO LIBRARY EXP-CENTRAL_l.quinones.rvt 1/2" = 1'-0" A4.01 ENLARGED TOILET PLANS & ELEVATIONS CUPERTINO PUBLIC LIBRARY EXPANSION Author 20013 SCALE: 1/2" = 1'-0" A4.01 1 LEVEL 1 - ENLARGED TOILETS PLAN (LEVEL 2 SIM.) SCALE: 1/2" = 1'-0" A4.01 2 LEVEL 1 - ENLARGED TOILET RCP (LEVEL 2 SIM.) SCALE: 1/2" = 1'-0"A4.01 5 TOILETS NORTH SCALE: 1/2" = 1'-0"A4.01 4 TOILETS SOUTH SCALE: 1/2" = 1'-0"A4.01 3 TOILET COMPARTMENTS SOUTH SCALE: 1/2" = 1'-0"A4.01 6 ADA TOILET COMPARTMENT EAST SCALE: 1/2" = 1'-0" A4.01 7 ADA TOILET COMPARTMENT NORTH NNSCALE: 1/2" = 1'-0"A4.01 8 DRINKING FOUNTAIN ASA-2020-004, EA-2020-002 08/17/20 Ellen Yau LEVEL 1 EL +0' - 0" M WOOD DOWEL GRILLE CEILINGLINEAR PENDANT LED LIGHT FIXTURES, TYP.10' - 0"12 A9.01 12 A9.01 12 A9.01 12 A9.01 7' - 6"LEVEL 1 EL +0' - 0" 56 5.8 ACOUSTIC GLASS MANUAL OPERABLE PARTITION WOOD DOWEL GRILLE CEILING 9' - 10"7' - 6"13 A9.01 LEVEL 1 EL +0' - 0" J K LK.9 J.5 12' - 0" 10' - 0"WOOD DOWEL GRILLE CEILINGLINEAR PENDANT LED LIGHT FIXTURES, TYP. LINEAR SLOT DIFFUSER, TYP. 13 A9.01 13 A9.01 13 A9.01 RECESSED FIRE EXTINGUISHER CABINET LEVEL 1 EL +0' - 0"2' - 10" SOLID SURFACE COUNTERTOP AND BACKSPLASH SOLID WOOD BASE CABINETS 4"MIN.2' - 3"LEVEL 2 EL +15' - 0" JK L K.9 J.5 12' - 0"ACOUSTIC GLASS MANUAL OPERABLE PARTITION WITH SWING DOOR.10' - 0"7' - 6"LEVEL 2 EL +15' - 0" 5 6 5.8 ACOUSTIC GLASS MANUAL OPERABLE PARTITION WOOD DOWEL GRILLE CEILING LINEAR PENDANT LED LIGHT FIXTURES, TYP.10' - 0"12' - 0"ENTRYPROGRAM ROOM D SEISMIC JOINT COVER 13 A9.01 13 A9.017' - 6"LEVEL 2 EL +15' - 0" J K LK.9 J.5 WOOD DOWEL GRILLE CEILINGLINEAR LED PENDANT FIXTURES, TYP. LINEAR SLOT DIFFUSER, TYP. 13 A9.01 13 A9.01 13 A9.01 RECESSED FIRE EXTINGUISHER CABINET10' - 0"7' - 6"12' - 0"10800 TORRE AVENUE CUPERTINO, CA 95014 Stamp Consultant Sheet Number Sheet Title EHDD Job Number Drawn by Scale Printing Date COST MODEL DRAWINGS 05.04.2020 PIER 1, BAY 2 THE EMBARCADERO SAN FRANCISCO, CA 94111 INFO@EHDD.COM +1 415-285-9193 Revisions and Description Date BRIDGING DOCUMENTS 100% SD 06.01.20206/1/2020 6:03:07 PMC:\Users\l.quinones\Documents\20013-A-CUPERTINO LIBRARY EXP-CENTRAL_l.quinones.rvt 1/4" = 1'-0" A5.01 INTERIOR ELEVATIONS CUPERTINO PUBLIC LIBRARY EXPANSION Author 20013 SCALE: 1/4" = 1'-0" A5.01 1 PROGRAM ROOMS A & B WEST SCALE: 1/4" = 1'-0"A5.01 2 PROGRAM ROOM A SOUTH SCALE: 1/4" = 1'-0"A5.01 3 PROGRAM ROOMS A & B EAST SCALE: 1/4" = 1'-0" A5.01 4 PANTRY SOUTH (LEVEL 1 & 2 SIM.) SCALE: 1/4" = 1'-0"A5.01 5 PROGRAM ROOMS C & D WEST SCALE: 1/4" = 1'-0"A5.01 6 PROGRAM ROOMS D SOUTH SCALE: 1/4" = 1'-0"A5.01 7 PROGRAM ROOMS C & D EAST ASA-2020-004, EA-2020-002 08/17/20 Ellen Yau 1 2 2.5 3 4 5 6 7 8 9 10 J K 5.8 5.4 4.5 L K.9 J.5 H.5 7.5 8.5 2.2 3.3 M 3 A3.11 3 A3.11 1 A3.11 1 A3.11 PROGRAM / STORY TIME A PROGRAM / STORY TIME B PANTRYAV. STOR. TOILETSSTOR. STAIR + 10' - 0" + 9' - 0"+ 9' - 0" + 10' - 0" HALLWAY A4.01 2 RETRACTABLE 120" PROJECTION SCREENS,TYP. GYPSUM BOARD CEILING BETWEEN SLAB AND WOOD GRILLE CEILING. SEE DTLS SEISMIC JOINT COVER SEISMIC JOINT COVER +10' - 0" +12' - 0" + 7' - 3" + 10' - 0" CEILING SUSPENDED PROJECTORS, TYP. GYPSUM BOARD CEILING BETWEEN SLAB AND WOOD GRILLE CEILING. SEE ACOUSTICAL NARRATIVE. 2 A3.11 2 A3.11 ACCESS PANELS A9.01 10 A9.01 11 1 2 2.5 3 4 5 6 7 8 9 10 J K 5.8 5.4 4.5 L K.9 J.5 H.5 7.5 8.5 2.2 3.3 M 3 A3.11 3 A3.11 1 A3.11 1 A3.11 SHAFT PROGRAM ROOM C PROGRAM ROOM D ENTRY PANTRYAV. STOR. TOILETSSTOR. HALLWAY STAIR + 10' - 0"+ 10' - 0" + 10' - 0"+ 10' - 0" + 10' - 0" A4.01 2 Sim RETRACTABLE 120" PROJECTION SCREENS, TYP. SEISMIC JOINT COVER SEISMIC JOINT COVER +12' - 0" +12' - 0" CEILING SUSPENDED PROJECTORS, TYP. 2 A3.11 2 A3.11 ACCESS PANELS REFLECTED CEILING LEGEND 2'X2' LAY IN ACOUSTIC TILE CEILING GYPSUM BOARD CEILING 2'X2' LAY IN LED FIXTURE HEIGHT OF CEILING+12'-8" WALL MOUNTED LINEAR LED FIXTURE SUSPENDED LINEAR LED FIXTURE RECESSED LED DOWNLIGHT WOOD DOWEL GRILLE CEILING REFLECTED CEILING NOTES 1. REFER TO INTERIOR ELEVATIONS ON SHEET A5.01 FOR MORE INFORMATION. 2. REFER TO SPECIFICATIONS FOR FINISH MATERIAL DESCRIPTIONS. 3. REFER TO ACOUSTICAL NARRATIVE FOR MORE INFORMATION. 4. REFER TO SHEET A9.01 FOR TYPICAL ACOUSTIC INTERIOR DETAILS. DUAL WINDOW / BLACK-OUT SHADE 10800 TORRE AVENUE CUPERTINO, CA 95014 Stamp Consultant Sheet Number Sheet Title EHDD Job Number Drawn by Scale Printing Date COST MODEL DRAWINGS 05.04.2020 PIER 1, BAY 2 THE EMBARCADERO SAN FRANCISCO, CA 94111 INFO@EHDD.COM +1 415-285-9193 Revisions and Description Date BRIDGING DOCUMENTS 100% SD 06.01.20206/1/2020 6:03:08 PMC:\Users\l.quinones\Documents\20013-A-CUPERTINO LIBRARY EXP-CENTRAL_l.quinones.rvt As indicated A6.01 LEVEL 1 & 2 - REFLECTED CEILING PLAN CUPERTINO PUBLIC LIBRARY EXPANSION Author 20013 SCALE: 1/8" = 1'-0" A6.01 1 LEVEL 1 - RCP SCALE: 1/8" = 1'-0"A6.01 2 LEVEL 2 - RCP NNASA-2020-004, EA-2020-002 08/17/20 Ellen Yau F.E.C.F.E.C. 6 7 M 4 A7.01 4 A7.01 3 A7.01 3 A7.01 MIN.11"MIN.1' - 0"UP CODE COMPLIANT TREAD STRIPING 6 7 M 4 A7.01 4 A7.01 3 A7.01 3 A7.01 DN CODE COMPLIANT TREAD STRIPING CODE COMPLIANT TREAD STRIPING LEVEL 1 EL +0' - 0" LEVEL 2 EL +15' - 0" 6 7 (E) ROOF EL +27' - 8" METAL PAN STAIR WITH CONCRETE TREADS METAL RAILINGS WALL MOUNTED LINEAR LED FIXTURES, TYP.7' - 3"6' - 8"3' - 6"LEVEL 1 EL +0' - 0" LEVEL 2 EL +15' - 0" 6 7 OPEN TO STORAGE ROOM BEYOND 3' - 0"10800 TORRE AVENUE CUPERTINO, CA 95014 Stamp Consultant Sheet Number Sheet Title EHDD Job Number Drawn by Scale Printing Date COST MODEL DRAWINGS 05.04.2020 PIER 1, BAY 2 THE EMBARCADERO SAN FRANCISCO, CA 94111 INFO@EHDD.COM +1 415-285-9193 Revisions and Description Date BRIDGING DOCUMENTS 100% SD 06.01.20206/1/2020 6:03:08 PMC:\Users\l.quinones\Documents\20013-A-CUPERTINO LIBRARY EXP-CENTRAL_l.quinones.rvt 1/2" = 1'-0" A7.01 STAIR PLANS AND SECTIONS CUPERTINO PUBLIC LIBRARY EXPANSION Author 20013 SCALE: 1/2" = 1'-0" A7.01 1 LEVEL 1 - ENLARGED STAIR PLAN SCALE: 1/2" = 1'-0" A7.01 2 LEVEL 2 - ENLARGED STAIR PLAN SCALE: 1/2" = 1'-0"A7.01 3 STAIR NORTH 1 SCALE: 1/2" = 1'-0"A7.01 4 STAIR NORTH 2 ASA-2020-004, EA-2020-002 08/17/20 Ellen Yau 10800 TORRE AVENUE CUPERTINO, CA 95014 Stamp Consultant Sheet Number Sheet Title EHDD Job Number Drawn by Scale Printing Date COST MODEL DRAWINGS 05.04.2020 PIER 1, BAY 2 THE EMBARCADERO SAN FRANCISCO, CA 94111 INFO@EHDD.COM +1 415-285-9193 Revisions and Description Date BRIDGING DOCUMENTS 100% SD 06.01.20206/1/2020 6:03:09 PMC:\Users\l.quinones\Documents\20013-A-CUPERTINO LIBRARY EXP-CENTRAL_l.quinones.rvt 1 1/2" = 1'-0" A9.01 TYPICAL ACOUSTIC DETAILS CUPERTINO PUBLIC LIBRARY EXPANSION Author 20013 NOT TO SCALEA9.01 11 SOUND RATED CEILING NOT TO SCALE A9.01 1 ACOUSTIC WALL TYPE B NOT TO SCALEA9.01 3 SOUND-RATED PARTITION AT DECK NOT TO SCALEA9.01 13 SOUND-GASKETED DOOR UPGRADED SOUND-GASKETED DOOR NOT TO SCALE A9.01 12 SOUND-GASKETED DOOR ASTRAGAL NOT TO SCALEA9.01 4 JUNCTION BOX IN SOUND-RATED CONSTRUCTION NOT TO SCALEA9.01 10 SOUND-ABSORBING SPACED WOOD SLATS NOT TO SCALE A9.01 9 CONCEPTUAL RETURN AIR BOOT NOT TO SCALEA9.01 2 ACOUSTIC WALL TYPE C SCALE: 1 1/2" = 1'-0"A9.01 5 JUNTION BOX ISOLATION SCALE: 1 1/2" = 1'-0"A9.01 7 TYP. SMALL PIPE/CONDUIT PENETRATION SCALE: 1 1/2" = 1'-0"A9.01 8 TYP. LARGE PIPE/CONDUIT PENETRATION SCALE: 1 1/2" = 1'-0"A9.01 6 TYP. MULTIPLE PIPE/CONDUIT PENETRATION ASA-2020-004, EA-2020-002 08/17/20 Ellen Yau ┴ S S FX DAEDALUS # 10800 TORRE AVENUE CUPERTINO, CA 95014 Stamp Consultant Sheet Number Sheet Title EHDD Job Number Drawn by Scale Printing Date COST MODEL DRAWINGS 05.04.2020 PIER 1, BAY 2 THE EMBARCADERO SAN FRANCISCO, CA 94111 INFO@EHDD.COM +1 41 5-2 85-91 93 Revisions and Description Date 100% CONSTRUCTION DOCUMENTS 1 0.07.201 5 12930 Saratoga Ave., Ste. B9 Saratoga, ca 95070 TEL: 408.517.0373 FAX: 408.877.1686 www.daedalus-eng.com 20015 1/8" = 1'-0" CUPERTINO LIBRARY EXPANSION Author O:\20015 Cupertino Library Expansion\Struc\CAD\20015 DE_S0_NOTES.dwg DATE:5/27/201 MM/DD/YYYYDESCRIPTION GENERAL NOTES S0.11 NONE 20013 1 00% BRIDGING DOCUMENTS 06.01.2020 ASA-2020-004, EA-2020-002 08/17/20 Ellen Yau ˳) DAEDALUS # 10800 TORRE AVENUE CUPERTINO, CA 95014 Stamp Consultant Sheet Number Sheet Title EHDD Job Number Drawn by Scale Printing Date COST MODEL DRAWINGS 05.04.2020 PIER 1, BAY 2 THE EMBARCADERO SAN FRANCISCO, CA 94111 INFO@EHDD.COM +1 41 5-2 8 5-91 93 Revisions and Description Date 100% CONSTRUCTION DOCUMENTS 1 0.07.201 5 12930 Saratoga Ave., Ste. B9 Saratoga, ca 95070 TEL: 408.517.0373 FAX: 408.877.1686 www.daedalus-eng.com 20015 1/8" = 1'-0" CUPERTINO LIBRARY EXPANSION Author O:\20015 Cupertino Library Expansion\Struc\CAD\20015 DE_S0_NOTES.dwg DATE:5/27/201 MM/DD/YYYYDESCRIPTION GENERAL NOTES S0.12 NONE 20013 1 00% BRIDGING DOCUMENTS 06.01.2020 ASA-2020-004, EA-2020-002 08/17/20 Ellen Yau HJ K L K.9 J.5 H.5 11 22 2.52.5 33 44 55 66 77 88 99 1010 5.85.8 4.5 4.5 7.57.5 8.38.3 8.48.4 8.58.5 8.88.8 2.22.2 3.33.3 5.4 5" CONCRETE S.O.G. W/ #4 @ 12" O.C. E.W. SUPPORTED BY CONTINUOUS SPREAD FOOTINGS OR GRADE BEAMS M UP STANDARD STEEL STAIR FRAMING WITH C12x STRINGERS AND CONCRETE FILLED BENT STEEL TREADS DOWN FROM 2ND FLOOR HSS 7 . 6 2 5 X 0 . 3 2 8CONT.HSS7.625X0.328CONT.HSS7.625X0.328HSS7.625X0.328HSS7.625X0.328CONT.HSS7.625X0.328HSS7.625X0.328CONT.HSS7.625X0.328HSS7.625X0.328HSS7.625X0.328HSS7.625X0.328CONT.HSS7.625X0.328HSS7.625X0.328HSS7.625X0.328F4 F4 F8 18" Wx18"D CONT. PERIMITER FOOTING, TYP. 4'-0" WIDTH x 3'-6" DEPTH x 25'-0" LONG SPREAD FOOTING AT BRACED FRAME F4 4'-0" WIDTH x 3'-6" DEPTH x 25'-0" LONG SPREAD FOOTING AT BRACED FRAME 4'-0" WIDTH x 3'-6"DEPTH x 25'-0" LONG SPREAD FOOTING AT BRACED FRAME 4'-0" WIDTH x 3'-6" DEPTH x 25'-0" LONG SPREAD FOOTING AT BRACED FRAME (E) 7' SQ FTG 2'-6 1/16" COL TO GL S2.13 11'-9 9/16" COL TO GL2'-9" COL TO GL(E) 10' SQ FTG 5.2S2.13 4 N 6.96.9 3 S2.13 S2.13 2 (E) 10' SQ FTG HJ K L K.9 J.5 H.5 1 1 2 2 2.5 2.5 3 3 4 4 5 5 6 6 7 7 8 8 9 9 10 10 5.8 5.8 4.5 4.5 7.5 7.5 8.38.3 8.48.4 8.58.5 8.88.8 2.2 2.2 3.3 3.3 5.4 5.4 M W16X36W16X36W16X36W16X36W16X36W16X57 W12X22W12X22CONT. W16X40 W12X26W12X26 W16X36W12X26 CONT. W16X40 CONT. W16X40CONT. W16X40VERCO 18 GA. PLW3 DECKING W/ 5 1/4" TOTAL LW CONCRETE DEPTH OPEN TO BELOW UP UP STANDARD STEEL STAIR FRAMING WITH C12x STRINGERS AND CONCRETE FILLED BENT STEEL TREADS DOWN FROM 2ND FLOOR HSS7.625X0.328HSS7.625X0.328HSS7.625X0.328HSS7.625X0.328HSS7.625X0.328HSS7.625X0.328HSS7.625X0.328HSS7.625X0.328HSS7.625X0.328CONT.S2.13 1 5.2 5.2S2.13 4 N 6.9 6.9 3 S2.13 S2.13 2 1. SEE SHEET S1.12 FOR FOUNDATION PLAN NOTES FOUNDATION PLAN NOTES: 1. SEE SHEET S2.12 FOR FRAMING PLAN NOTES FRAMING PLAN NOTES: DAEDALUS # 10800 TORRE AVENUE CUPERTINO, CA 95014 Stamp Consultant Sheet Number Sheet Title EHDD Job Number Drawn by Scale Printing Date COST MODEL DRAWINGS 05.04.2020 PIER 1, BAY 2 THE EMBARCADERO SAN FRANCISCO, CA 94111 INFO@EHDD.COM +1 415-285-9193 Revisions and Description Date 100% CONSTRUCTION DOCUMENTS 1 0.07.201 5 1 2930 Saratoga Ave., Ste. B9 Saratoga, CA 95070 TEL: 408.51 7.0373 FAX: 408.877.1686 www.da eda lus-eng.com 20015 As indicated 28-May-20 17:26:41C:\Users\ebarraza\Documents\20015_RST2019_ebarraza.rvt S2.11 LEVEL 1 AND 2 FRAMING PLANS CUPERTINO LIBRARY EXPANSION EB 20013 1/8" = 1'-0" 1 LEVEL 1 FRAMING PLAN 1/8" = 1'-0" 2 LEVEL 2 FRAMING PLAN N1 00% BRIDGING DOCUMENTS 06.01.2020 ASA-2020-004, EA-2020-002 08/17/20 Ellen Yau HJ K L K.9 J.5 H.5 11 22 2.52.5 33 44 55 66 77 88 99 1010 5.85.8 4.5 4.5 7.57.5 8.3 8.3 8.48.4 8.58.5 8.88.8 2.22.2 3.33.3 5.4 M W12X14 W12X14 W12X26W12X26W12X26W12X26W12X26W12X26W12X26W12X14 W12X14 W12X26CONT. W16X40 W12X45 CONT. W16X40 W12X35W12X35W12X14W12X14W12X14CONT. W16X40 CONT. W16X40 W12X26 6" MAX. CONCRETE OVER STEEL DECK AT MECHANICAL EQUIPTMENT VERCO 18 GA. PLB-36 DECKING S2.13 1 5.2S2.13 4 N 6.96.9 3 S2.13 S2.13 2 1. SEE GENERAL NOTES AND DETAILS ON SHEET S0.11 AND S0.12. 2. SEE ARCHITECTURAL PLANS FOR ACTUAL FINISH FLOOR AND PAD ELEVATIONS. 3.EXCAVATIONS SHALL BE MADE AS NEAR AS POSSIBLE TO THE LINES REQUIRED BY THE FOOTING. NO MATERIAL IS TO BE OVER-EXCAVATED UNNECESSARILY. 4.VERIFY LOCATION OF UNDERGROUND UTILITIES BEFORE EXCAVATION. NOTIFY ARCHITECT PRIOR TO EXCAVATION IN THE EVENT SUCH UTILITIES ARE ENCOUNTERED. 5.FOR DRAINAGE DETAILS, SUMPS, PITS, DAMPROOFING, TRENCHES, CURBS, EXTERIOR WALKS, UTILITIES, EQUIPMENT DETAILS, STEPS, DIMENSIONS NOT SHOWN, ETC., SEE DRAWINGS OTHER THAN STRUCTURAL. 6.SETBACK CONDITIONS SHALL BE VERIFIED IN THE FIELD PRIOR TO TRENCHING AND FORMING FOUNDATION. THE FOUNDATION SUBCONTRACTOR SHALL COORDINATE WITH THE GENERAL CONTRACTOR, SURVEYOR AND THE ARCHITECT. 7.GEOTECHNICAL ENGINEER SHALL BE RETAINED TO PROVIDE OBSERVATION AND TESTING SERVICES DURING THE GRADING AND FOUNDATION PHASE OF CONSTRUCTION, AND THAT INSPECTION AND TESTING REPORTS SHALL BE SUBMITTED TO THE BUILDING DEPARTMENT. 8. IF NON-NATIVE FILL, EXPANSIVE CLAY OR SOFT/LOOSE SOIL IS ENCOUNTERED AT THE BASE OF STEPPED FOUNDATION, THAT THE SOIL WILL BE REMOVED (OVER-EXCAVATED) AND REPLACED WITH EITHER COMPACTED AGGREGATE BASEROCK OR LEAN CONCRETE AS RECOMMENDED BY THE GEOTECHNICAL ENGINEER. 9. T.O. FOOTING IS MIN. [-0'-6"] BELOW TOP OF SLAB, U.O.N. ON PLAN 1 0.WHERE DENOTED T.O.FTG IS [-0'-6"] BELOW TOP OF SLAB, TYP. SEE 1/S3.XX FOR FOOTING SCHEDULE. 1 1 .COLUMN SIZE PER PLAN, WHERE [XX] THE FOLLOWING DENOTES: [2] = TOP OF COLUMN TERMINATES AT 2ND FL T.O.S. [R] = TOP COLUMN TERMINATES AT ROOF T.O.S. 1 2.WHERE DENOTED FRAMING IS PART OF THE LFRS. SEE SHEETS S2.13 FOR ADD'L INFORMATION. 1 3.ASTERISK FOLLOWING STEEL POST/COLUMN SIZE INDICATES POST/COLUMN USED AS PART OF THE LATERAL FORCE RESISTING SYSTEM SEE S0.11 FOR ADD'L REQUIREMENTS. FOUNDATION PLAN NOTES: F# SCBF 1 .SEE GENERAL NOTES AND DETAILS ON SHEETS S0.01 AND S0.02. 2.SEE DRAWING OTHER THAN STRUCTURAL FOR FLOOR DEPRESSIONS, MECHANICAL, ELECTRICAL, AND SHAFT OPENINGS, ETC. 3.SEE DETAIL 20/S5.01 FOR ALLOWABLE HOLE PENETRATIONS THROUGH FRAMING MEMBERS. 4.SEE S5 STRUCTURAL SHEETS FOR TYPICAL STEEL AND CONNECTION DETAILS. 5.SEE S5.02 FOR DECK DETAILING REQUIREMENTS 6. T.O.STL = 7. , AND/OR DENOTE STEP IN DECK ELEVATION AND/OR SLAB TYPE, PER PLAN 8.SHEAR STUD IS 3/4" DIA. AT 12" SPC'G, TYP. ALL BEAMS, U.O.N. ON PLAN BY [XX], IN WHICH "XX" DENOTES NUMBER OF STUDS REQ'D AND INDICATES THAT THE BEAM IS REQUIRES MORE STUDS THAN THE 12" O.C. SPACING PROVIDES 9.(C=X") DENOTES BEAM CAMBER AT MIDSPAN 1 0.ALL PERIMETER BEAMS TO BE BRACED AT 10'-0" O.C. SEE 16A/S5.02, NON SEISMIC CONN. TYP. U.O.N. ON PLAN, SEE NOTE 10. 1 1 .WHERE DENOTED: BRACE BOTT. FLANGE OF PERIMETER BEAM PER 20/S5.12, SEISMIC CONN. 1 2.WHERE DENOTED: BEAM IS PART OF THE LATERAL FORCE RESISTING SYSTEM, SEE LEGEND S0.01. 1 3.WHERE DENOTED FRAMING IS PART OF THE SEISMIC LATERAL FORCE RESISTING SYSTEM. SEE SHEET S2.13 FOR ADD'L INFORMATION. 1 4.ASTERISK FOLLOWING STEEL POST/COLUMN SIZE INDICATES POST/COLUMN USED AS PART OF THE LATERAL FORCE RESISTING SYSTEM SEE S0.01 FOR ADD'L REQUIREMENTS. 1 5. SEE S5.09 & S5.10 STRUCTRAL SHEETS FOR TYPICAL COLD-FORMED STEEL DETAILS, GC TO COORDINATE WITH SUBCONTRACTOR ON DETAILING. FRAMING PLAN NOTES: SCBF DAEDALUS # 10800 TORRE AVENUE CUPERTINO, CA 95014 Stamp Consultant Sheet Number Sheet Title EHDD Job Number Drawn by Scale Printing Date COST MODEL DRAWINGS 05.04.2020 PIER 1, BAY 2 THE EMBARCADERO SAN FRANCISCO, CA 94111 INFO@EHDD.COM +1 415-285-9193 Revisions and Description Date 100% CONSTRUCTION DOCUMENTS 1 0.07.201 5 1 2930 Saratoga Ave., Ste. B9 Saratoga, CA 95070 TEL: 408.51 7.0373 FAX: 408.877.1686 www.da eda lus-eng.com 20015 As indicated 28-May-20 17:20:12C:\Users\ebarraza\Documents\20015_RST2019_ebarraza.rvt S2.12 ROOF FRAMING PLAN CUPERTINO LIBRARY EXPANSION EB 20013 1/8" = 1'-0" ROOF FRAMING PLAN N1 00% BRIDGING DOCUMENTS 06.01.2020 ASA-2020-004, EA-2020-002 08/17/20 Ellen Yau LEVEL 1 0" LEVEL 2 15'-0" ROOF 27'-8" T.O. FOOTING -1'-0" 5 6 75.8 4.5 LEVEL 2 T.O.S. 14'-6 3/4" ROOF T.O.S. 28'-8 1/4" 14'-4 3/8" 2'-8" CONT. W16X40 CONT. W16X40HSS7.625X0.328HSS3-1/2X3-1/2X1/4HSS3-1/2X3-1/2X1/4HSS4X4X1/4HSS4X4X1/4HSS7.625X0.328HSS7.625X0.328 6.9 LEVEL 1 0" LEVEL 2 15'-0" ROOF 27'-8" T.O. FOOTING -1'-0" LEVEL 2 T.O.S. 14'-6 3/4" ROOF T.O.S. 28'-8 1/4" CONT. W16X40 HSS7.625X0.328HSS7.625X0.328HSS4X4X1/4HSS4X4X1/4HSS3-1/2X3-1/2X1/4HSS3-1/2X3-1/2X1/4CONT. W16X40 HSS7.625X0.328HSS7.625X0.328LEVEL 1 0" LEVEL 2 15'-0" ROOF 27'-8" T.O. FOOTING -1'-0" 5 6 7 5.8 4.5 LEVEL 2 T.O.S. 14'-6 3/4" ROOF T.O.S. 28'-8 1/4" 6.9 CONT. W16X40 HSS4X4X1/4HSS4X4X1/4HSS7.625X0.328 HSS7.625X0.328HSS7.625X0.328CONT. W16X40 HSS3-1/2X3-1/2X1/4HSS3-1/2X3-1/2X1 /4 2'-4 3/16" 3'-10 5/8" 6'-11 15/16" LEVEL 1 0" LEVEL 2 15'-0" ROOF 27'-8" T.O. FOOTING -1'-0" J K L K.9 J.5 LEVEL 2 T.O.S. 14'-6 3/4" ROOF T.O.S. 28'-8 1/4" N HSS4X4X1/4HSS4X4X1/4HSS3-1/2X3-1/2X1/4HSS3-1/2X3-1/2X1/4HSS7.625X0.328 HSS7.625X0.328CONT. W16X40HSS7.625X0.328HSS7.625X0.328 CONT. W16X40 5'-0 15/16" 2'-5 9/16" 1'-5 1/16" DAEDALUS # 10800 TORRE AVENUE CUPERTINO, CA 95014 Stamp Consultant Sheet Number Sheet Title EHDD Job Number Drawn by Scale Printing Date COST MODEL DRAWINGS 05.04.2020 PIER 1, BAY 2 THE EMBARCADERO SAN FRANCISCO, CA 94111 INFO@EHDD.COM +1 415-285-9193 Revisions and Description Date 100% CONSTRUCTION DOCUMENTS 1 0.07.201 5 1 2930 Saratoga Ave., Ste. B9 Saratoga, CA 95070 TEL: 408.51 7.0373 FAX: 408.877.1686 www.da eda lus-eng.com 20015 1/4" = 1'-0"28-May-20 17:28:36C:\Users\ebarraza\Documents\20015_RST2019_ebarraza.rvt S2.21 BF ELEVATIONS CUPERTINO LIBRARY EXPANSION EB 20013 1/4" = 1'-0" 1 NORTH BF ELEVATION 1/4" = 1'-0" 4 WEST BF ELEVATION 1/4" = 1'-0"3 SOUTH BF ELEVATION 1/4" = 1'-0" 2 EAST BF ELEVATION 1 00% BRIDGING DOCUMENTS 06.01.2020 ASA-2020-004, EA-2020-002 08/17/20 Ellen Yau 18TYP. PLUMING/CONDUIT PENETRATION INTO CONC. TOPPING SLAB NO SCALE 1 TYPICAL SLAB-ON-GRADE DETAILS NO SCALE f 2TYPICAL CONCRETE COVER OVER REINFORCING STEEL NO SCALE 7 - TYPICAL STANDARD HOOK DIMENSIONS NO SCALE 6 - TYPICAL STIRRUP BEND AND HOOKS NO SCALE 10 - TYPICAL REINFORCING AT FOOTING/GRADE BM CORNERS AND INTERSECTIONS NO SCALE 15 - TYPICAL PIPE TRENCHES AND PENETRATIONS AT FOUN DATION SNO SCALE 14 - TYPICAL EPOXIED DOWEL ANCHORAGE IN CONCRETE NO SCALE 13 TYPICAL EXTERIOR STAIR ON GRADE NO SCALE 8 TYPICAL HORIZ. WALL REINF. AT CORNERS AND INTERSECTIONS NO SCALE 17TYP. SLAB-ON-GRADE BARS AT INSIDE CORNER NO SCALE 16 TRIM REINFORCING AT OPENINGS IN WALLS OR SLAB FROM 12"-24" NO SCALE 12 TYPICAL REINFORCING AT JAMB EDGES OF CONCRETE WALLS NO SCALE 20 TRIM REINFORCING AT OP'GS IN WALLS OR SLAB GREATER THAN 24" NO SCALE 19 TYPICAL SLAB RAISED PAD NO SCALE 3TYPICAL LAP SPLICE SCHEDULE N.T.S. 11 - TYPICAL STEPPED FOOTING OR GRADE BEAM NO SCALE 4TYPICAL REINFORCEMENT EMBED LAP SPLICE AND OFFSET 1" = 1'-0" DAEDALUS # 10800 TORRE AVENUE CUPERTINO, CA 95014 Stamp Consultant Sheet Number Sheet Title EHDD Job Number Drawn by Scale Printing Date COST MODEL DRAWINGS 05.04.2020 PIER 1, BAY 2 THE EMBARCADERO SAN FRANCISCO, CA 94111 INFO@EHDD.COM +1 41 5-285-91 93 Revisions and Description Date 100% CONSTRUCTION DOCUMENTS 1 0.07.201 5 12930 Saratoga Ave., Ste. B9 Saratoga, ca 95070 TEL: 408.517.0373 FAX: 408.877.1686 www.daedalus-eng.com 20015 1/8" = 1'-0" CUPERTINO LIBRARY EXPANSION Author O:\20015 Cupertino Library Expansion\Struc\CAD\20015_DETAILS_30x42.dwg DATE:6/01/201 MM/DD/YYYYDESCRIPTION S3.11 TYPICAL CONCRETE DETAILS 1 00% BRIDGING DOCUMENTS 06.01.2020 ASA-2020-004, EA-2020-002 08/17/20 Ellen Yau 5 TYPICAL HSS COLUMN BASE DETAIL NO SCALE 6 TYPICAL WIDE FLANGE COLUMN BASE DETAIL NO SCALE 12TYP. HSS POST BASE DETAIL ON CURB NO SCALE 7 TYP. HSS POST CAST IN BASE PLATE NO SCALE 10 TYP. COLUMN TO BASE PLATE WELD LIMITS NO SCALE 2CONTINUOUS STRIP FOOTING REINFORCEMENT SCHEDULE NO SCALE 9ELEVATOR PIT N.T.S. F9 F7.5 F3 1 TYPICAL INTERIOR ISOLATED SPREAD FOOTING 1 "=1 '-0" 4TYP. CONCRETE COLUMN BLOCKOUT NO SCALE B COL - EDGE OF SLAB A COL- INTERIOR SLAB 3 TYPICAL CONTINUOUS FOOTING AT INTERIOR N.T.S. 11 TYP. CONCRETE CURB AT EXTERIOR COLUMN NO SCALE CF-1 CF-2 CF-3 DAEDALUS # 10800 TORRE AVENUE CUPERTINO, CA 95014 Stamp Consultant Sheet Number Sheet Title EHDD Job Number Drawn by Scale Printing Date COST MODEL DRAWINGS 05.04.2020 PIER 1, BAY 2 THE EMBARCADERO SAN FRANCISCO, CA 94111 INFO@EHDD.COM +1 41 5-2 8 5-91 93 Revisions and Description Date 100% CONSTRUCTION DOCUMENTS 1 0.07.201 5 12930 Saratoga Ave., Ste. B9 Saratoga, ca 95070 TEL: 408.517.0373 FAX: 408.877.1686 www.daedalus-eng.com 20015 1/8" = 1'-0" CUPERTINO LIBRARY EXPANSION Author O:\20015 Cupertino Library Expansion\Struc\CAD\20015_DETAILS_30x42.dwg DATE:6/01/201 MM/DD/YYYYDESCRIPTION S3.12 TYPICAL CONCRETE DETAILS 1 00% BRIDGING DOCUMENTS 06.01.2020 ASA-2020-004, EA-2020-002 08/17/20 Ellen Yau 20 TYPICAL REINFORCED WEB OPENING IN STEEL BEAMS FOR PIPES NO SCALE 2TYP. BOLTED SHEAR PLATE CONN. SCHEDULE NO SCALE 1 STEEL FRAMING NOTES NO SCALE 15 TYPICAL BASE PLATE CONNECTION AT POST-UP COLUMNS NO SCALE 16 TYPICAL BEAM CONTINUOUS OVER HSS COLUMN NO SCALE 6 TYP. MOMENT CONNECTION OF BEAM TO COLUMN FLANGE (N ON -SEISMIC)NO SCALE 14 TYP.HSS BEAM TO HSS COLUMN (MOMENT NON-SEISMIC) NO SCALE 18 SHEAR CONNECTOR PLATES AT SKEWED BEAMS CONNECTIONNO SCALE 5/16 5/16 C PLAN-DETAIL CORNER CONN.B PLAN-DETAIL 3-WAY CONN. A PLAN-DETAIL 4-WAY CONN. SECTION 11 TYPICAL CONNECTION OF WF BEAM(S) TO HSS TUBE COLUMN NO SCALE A BEAM TO COLUMN TOP B BEAM TO COLUMN MID HEIGHT 13 TYPICAL HSS BEAM TO HSS COLUMN CONNECTION NO SCALE 17TYP. BOTTOM FLANGE BRACING DET. NO SCALE A PLAN 12 TYPICAL INTERIOR WF BEAM TO HSS COLUMN 8 TYP. MOMENT CONN. OF BEAM TO COLUMN WEB (NON-SEISMIC) NO SCALE 9 TYP. MOMENT CONNECTION OF BM. TO COLUMN FLANGE (SEISMIC) 1 "=1 '-0" 10 TYP. COLUMN CONTINUITY PLATE 7 TYP. MOMENT CONNECTION OF BEAM TO GIRDER (NON-SEISMIC) 1 "=1 '-0" 3 TYPICAL CONNECTION OF BEAM TO GIRDER NO SCALE 4TYP. SIMPLE CONN. OF BEAM TO COL. WEB (FOR SQUARE PROPORTION COLUMNS) 5TYP. SIMPLE CONN. OF BEAM TO COL. WEB (COL. FLG. WIDTH < COL. DEPTH) 1 "=1 '-0" DAEDALUS # 10800 TORRE AVENUE CUPERTINO, CA 95014 Stamp Consultant Sheet Number Sheet Title EHDD Job Number Drawn by Scale Printing Date COST MODEL DRAWINGS 05.04.2020 PIER 1, BAY 2 THE EMBARCADERO SAN FRANCISCO, CA 94111 INFO@EHDD.COM +1 41 5-285-91 93 Revisions and Description Date 100% CONSTRUCTION DOCUMENTS 1 0.07.201 5 12930 Saratoga Ave., Ste. B9 Saratoga, ca 95070 TEL: 408.517.0373 FAX: 408.877.1686 www.daedalus-eng.com 20015 1/8" = 1'-0" CUPERTINO LIBRARY EXPANSION Author O:\20015 Cupertino Library Expansion\Struc\CAD\20015_DETAILS_30x42.dwg DATE:6/01/201 MM/DD/YYYYDESCRIPTION S5.11 TYPICAL STEEL DETAILS 1 00% BRIDGING DOCUMENTS 06.01.2020 ASA-2020-004, EA-2020-002 08/17/20 Ellen Yau 19 STEEL DECK SUPPORT AT COLUMN NO SCALE 17 TYPICAL WEDGE TYPE EXPANSION ANCHOR 1 "=1 '-0" 8 TYPICAL SHEAR STUD CONNECTOR 1 "=1 '-0" 9TYP. SHEAR STUD PLACEMENT 1 "=1 '-0" 1 TYPICAL STEEL DECK & STUD NOTES NO SCALE 3 TYPICAL STEEL DECK ATTACHMENT LOCATIONS N.T.S. 7TYPICAL REBAR PLACEMENT 1 "=1 '-0" 2STEEL DECK MINIMUM PROPERTIES AND ATTACHMENT SCHEDULE NO SCALE A LAP JOINT B BUTT JOINT C DECK DIRECTION CHANGE D DECK OFFSET 4TYPICAL DECK ATTACHMENT N.T.S. ±1 1 3/16 WF TYP. 10 TYP. OPENINGS IN STEEL DECK LESS THAN 2'-0" NO SCALE B AT STEEL DECK A AT CONCRETE OVER STEEL DECK 16 TYP. BEAM BOTT. FLANGE BRACING AT DECK (NON-SEISMIC) NO SCALE PLAN-STUD SHEAR CONNECTORS (UNIFORM SPACING) PLAN-STUD SHEAR CONNECTORS (VARIABLE SPACING) 1/4 1/4 A A 11 OPENINGS IN STEEL DECK GREATER THAN 2'-0" NO SCALE 20 TYP. BEAM BOTT. FLANGE BRACING AT DECK (SEISMIC) NO SCALE 5 TYPICAL DECK TO WF ATTACHMENT NO SCALE C ALT. 12 - TYP. DECK SLOPE CHANGE AT WF BEAM 1 1/2" = 1'-0" 14 - TYP. EDGE OF DECK (PERPENDICULAR TO WF) 1 1/2" = 1'-0" 13 - TYP. EDGE OF DECK (PARALLEL TO WF) 1 1/2" = 1'-0" 15 - TYP. DEPRESSED SLAB 1 1/2" = 1'-0" DAEDALUS # 10800 TORRE AVENUE CUPERTINO, CA 95014 Stamp Consultant Sheet Number Sheet Title EHDD Job Number Drawn by Scale Printing Date COST MODEL DRAWINGS 05.04.2020 PIER 1, BAY 2 THE EMBARCADERO SAN FRANCISCO, CA 94111 INFO@EHDD.COM +1 41 5-2 85-91 93 Revisions and Description Date 100% CONSTRUCTION DOCUMENTS 1 0.07.201 5 12930 Saratoga Ave., Ste. B9 Saratoga, ca 95070 TEL: 408.517.0373 FAX: 408.877.1686 www.daedalus-eng.com 20015 1/8" = 1'-0" CUPERTINO LIBRARY EXPANSION Author O:\20015 Cupertino Library Expansion\Struc\CAD\20015_DETAILS_30x42.dwg DATE:6/01/201 MM/DD/YYYYDESCRIPTION S5.12 TYPICAL STEEL DETAILS 1 00% BRIDGING DOCUMENTS 06.01.2020 ASA-2020-004, EA-2020-002 08/17/20 Ellen Yau 1 TYP. EDGE OF DECK PARALLEL TO WF N.T.S. 2TYP. EDGE OF DECK PERPENDICULAR TO WF N.T.S. £ £ £ DAEDALUS # 10800 TORRE AVENUE CUPERTINO, CA 95014 Stamp Consultant Sheet Number Sheet Title EHDD Job Number Drawn by Scale Printing Date COST MODEL DRAWINGS 05.04.2020 PIER 1, BAY 2 THE EMBARCADERO SAN FRANCISCO, CA 94111 INFO@EHDD.COM +1 41 5-28 5-91 93 Revisions and Description Date 100% CONSTRUCTION DOCUMENTS 1 0.07.201 5 12930 Saratoga Ave., Ste. B9 Saratoga, ca 95070 TEL: 408.517.0373 FAX: 408.877.1686 www.daedalus-eng.com 20015 1/8" = 1'-0" CUPERTINO LIBRARY EXPANSION Author O:\20015 Cupertino Library Expansion\Struc\CAD\20015_DETAILS_30x42.dwg DATE:6/01/201 MM/DD/YYYYDESCRIPTION S5.13 TYPICAL STEEL DETAILS 1 00% BRIDGING DOCUMENTS 06.01.2020 ASA-2020-004, EA-2020-002 08/17/20 Ellen Yau 1TYPICAL COLD-FORMED STL. STUD DESIGNATIONS N.T.S. 2COLD-FORMED STEEL FRAMING SCHEDULES N.T.S. ELEVATION A A A PLAN 4TYPICAL HEAD AND SILL DETAILS AT JAMB NON BEARING WALL N.T.S. A B TYPICAL BRIDGING SPLICE SOLID BLOCKING STRAP BLOCKING 8'-0" TO 14'-0" OPENING 4'-0" TO 8'-0" OPENING 0'-0" TO 4'-0" OPENING 0'-0" TO 4'-0" OPENING 4'-0" TO 8'-0" OPENING 8'-0" TO 14'-0" OPENING BA C C C AT WINDOWAT DOOR DOUBLE STUD ALT. ALT. ALT. 10TYPICAL STUD BLOCKING N.T.S. 19TYPICAL DOUBLE STUD JAMB BASE SIMILAR AT TOP N.T.S. 12TYPICAL STUD BRACING WITH SHEATHING N.T.S. 5TYPICAL HEADER NON-BEARING N.T.S. 3TYPICAL COLD-FORMED STL. FRAMING - NON BEARING N.T.S. 7 TYPICAL CFS SILL N.T.S. 15 TYPICAL BRIDGING N.T.S. 16 TYPICAL NON BEARING WALL TOP CONNECTION N.T.S. THREE STUDSTWO STUDS 13TYPICAL CORNER FRAMING N.T.S. 11 TYPICAL BACKING DETAIL N.T.S. 6POST AND HEADER SCHEDULE BEARING N.T.S. 14 TYPICAL CORNER FRAMING N.T.S. A PLAN VIEW A ℄ ℄ 20TYPICAL TOP TRACK SPLICE DETAIL N.T.S. 8TYPICAL BUILT-UP POST, BOX BEAM OR HEADER N.T.S. B AT ROOF DECK A AT FLOOR DECK 18TYPICAL FLOOR BYPASS CONNECTION SPLICE DETAIL 1 "=1 '-0" A B C A A 17TYP. TOP-OF-WALL CONN. NON-BEARING 1 "=1 '-0" 9TYPICAL BOX HEADER W/ JACK-STUD BEARING N.T.S. DAEDALUS # 10800 TORRE AVENUE CUPERTINO, CA 95014 Stamp Consultant Sheet Number Sheet Title EHDD Job Number Drawn by Scale Printing Date COST MODEL DRAWINGS 05.04.2020 PIER 1, BAY 2 THE EMBARCADERO SAN FRANCISCO, CA 94111 INFO@EHDD.COM +1 41 5-2 85-91 93 Revisions and Description Date 100% CONSTRUCTION DOCUMENTS 1 0.07.201 5 12930 Saratoga Ave., Ste. B9 Saratoga, ca 95070 TEL: 408.517.0373 FAX: 408.877.1686 www.daedalus-eng.com 20015 1/8" = 1'-0" CUPERTINO LIBRARY EXPANSION Author O:\20015 Cupertino Library Expansion\Struc\CAD\20015_DETAILS_30x42.dwg DATE:6/01/201 MM/DD/YYYYDESCRIPTION COLD-FORMED STEEL DETAILS S5.21 1 00% BRIDGING DOCUMENTS 06.01.2020 ASA-2020-004, EA-2020-002 08/17/20 Ellen Yau 13METAL STUD SOFFIT FRAMING TYP. EXTERNAL BEARING WALL N.T.S. B A STUD JOIST A B ALTERNATE BLOCKING ALTERNATE BLOCKING 14 TYPICAL PARTITION BRACE N.T.S. 5TOLERANCE FOR JOIST, RAFTER, TRUSS AND STUD: IN-LINE FRAMING ALIGNMENT N.T.S. 9 TYPICAL JOIST AND STUD WEB HOLES REINFORCING N.T.S. 4TYPICAL BLOCKING CONNECTION N.T.S. ℄ ℄ ℄ ℄ 8 - TYPICAL RIM TRACK SPLICE CONNECTION N.T.S. B CLIP ANGLE B C-SHAPE & TRACK SECTION A A A A WEB STIFFENER WITH BEND 7TYPICAL LAPPED JOIST DETAIL N.T.S. 6 TYPICAL WEB STIFFENER N.T.S. 3TYPICAL HEADING-OFF JOISTS AT OPENING N.T.S. 2TYPICAL OPENING IN FRAMING N.T.S. 1TYPICAL JOIST TO JOIST N.T.S. 10 CFS DEFLECTION TRACK WITH SPACER BAR N.T.S. 12ANCHOR BOLT AND BOTTOM TRACK REQUIREMENTS N.T.S. DAEDALUS # 10800 TORRE AVENUE CUPERTINO, CA 95014 Stamp Consultant Sheet Number Sheet Title EHDD Job Number Drawn by Scale Printing Date COST MODEL DRAWINGS 05.04.2020 PIER 1, BAY 2 THE EMBARCADERO SAN FRANCISCO, CA 94111 INFO@EHDD.COM +1 41 5-2 85-91 93 Revisions and Description Date 100% CONSTRUCTION DOCUMENTS 1 0.07.201 5 12930 Saratoga Ave., Ste. B9 Saratoga, ca 95070 TEL: 408.517.0373 FAX: 408.877.1686 www.daedalus-eng.com 20015 1/8" = 1'-0" CUPERTINO LIBRARY EXPANSION Author O:\20015 Cupertino Library Expansion\Struc\CAD\20015_DETAILS_30x42.dwg DATE:6/01/201 MM/DD/YYYYDESCRIPTION S5.22 COLD-FORMED STEEL DETAILS 100% BRIDGING DOCUMENTS 06.01.2020 ASA-2020-004, EA-2020-002 08/17/20 Ellen Yau