Loading...
HomeMy WebLinkAboutCIP presentation Planning Commission 2020 0615June 15, 2020 Proposed FY 2020-21 Capital Improvement Projects FY20-21 Proposed Projects Annual Playground Replacement ●Replacement of older playground equipment that is dated and worn starting with Creekside Park in Year 1 followed by Varian Park in Year 2 ●Estimated Project Cost:$300,000 annually BBF Golf Course Alternatives Analysis A study to determine options for the BBF Golf Course from minor repairs, major renovations to alternative use. ESTIMATED PROJECT COST:$50,000 Park Amenity Improvements -City-wide Funding for various park amenities such as benches, hydration stations, outdoor table tennis, cornhole, shade (structures and/or trees), dog-off-leash, pickleball striping, etc Estimated Project Cost: $1,000,000 (5-year total), $200,000 annually Stevens Creek Blvd Class IV Bikeway Ph 2 Design The next Phase of the SCB Cl IV bikeway, from Wolfe Road to US- 85.Design includes signal improvements and a concrete island separating vehicles from bicyclists. Estimated Project Cost: $350,000 Est. Measure B Funding: $350,000 Traffic Calming Funding to respond to citizen requests for traffic calming to reduce vehicle speeds, improve pedestrian and bike safety.Improvements include RRFB's, speed tables, raised crosswalks, bulb-outs and bollards City-wide Estimated Project Cost: $1,000,000 (5-year total), $200,000 annually Cordova Road Retaining Wall Repair Replace failing retaining wall lagging with City forces Estimated Project Cost: $25,000 Quinlan Community Center Emergency Generator Provides reliable emergency back-up power for QCC which is a designated cooling center Estimated Project Cost: $350,000 (PG&E Grant: $217,000) Quinlan Community Center HVAC Equipment Evaluation Evaluate the existing equipment and operations to identify cost effective heating and cooling solutions. Estimated Project Cost: $59,500 Sports Center Facility Needs Analysis Evaluate the potential long-term needs of the facility, the cost of renovations and repairs and the cost effectiveness of those improvements Estimated Project Cost: $25,000 Comments and Questions