Loading...
HomeMy WebLinkAboutAH Summary 01-09-2020 To: Mayor and City Council Members Planning Commissioners From: Benjamin Fu, Director of Community Development Date: January 16, 2020 Subj: REPORT OF ADMINISTRATIVE HEARING DECISION MADE January 9, 2020 Chapter 19.12.170 of the Cupertino Municipal code provides for Appeal of decisions made at an Administrative Hearing 1. Application ASA-2019-005, Scott Stotler (Dutchins Development Inc), 10100 Bubb Rd Description Architectural and Site approval to allow site improvements to an existing 13,250 square foot industrial building Action The application was approved at the Administrative Hearing. The approval is effective January 9, 2020. The fourteen-calendar day appeal will expire on January 23, 2020. Enclosures: Administrative Hearing Report of January 9, 2020 Resolution No(s) 111 Plan set 2. Application DP-2019-001, ASA-2019-006, TR-2019-032, Nathan Ung (19900 Stevens Creek Blvd, LLC) 19900 Stevens Creek Blvd Description Development Permit to allow the construction of 2,235 square feet of new commercial use space to an existing retail building (Scandinavian Design); An Architectural and Site approval to allow façade, landscaping and site improvements, and a Tree Removal permit to allow the removal and replacement of twenty-five (25) development trees OFFICE OF COMMUNITY DEVELOPMENT CITY HALL 10300 TORRE AVENUE • CUPERTINO, CA 95014-3255 (408) 777-3308 • FAX (408) 777-3333 • planning@cupertino.org Action The application was approved at the Administrative Hearing. The approval is effective January 9, 2020. The fourteen-calendar day appeal will expire on January 23, 2020 Enclosures: Administrative Hearing Report of January 9, 2020 Resolution No(s) 112, 113, 114 Plan set ADMINISTRATIVE HEARING STAFF REPORT Meeting Date: January 9, 2020 Subject Development Permit to consider allowing a 2,235 square feet addition to an existing retail building (Scandinavian Design) for commercial uses; an Architectural and Site Approval to allow facade, parking, and site improvements; and a Tree Removal Permit to allow for the removal and replacement of twenty-five (25) development trees. (Application No(s).: DP-2019-001; ASA-2019-006; TR-2019-032; Applicant: Nathan Ung; Location: 19900 Stevens Creek Blvd.; APN(s): 369-05-038) Recommended Action That the Hearing Officer adopt the draft resolutions (Attachments 1 – 3) to: 1. Find that the proposed actions are exempt from CEQA; and 2. Approve the Development Permit, Architectural and Site Approval Permit, and Tree Removal Permit. Discussion Project Data: General Plan Designation Office/Commercial/Residential General Plan Special Area Central Stevens Creek Sub -area of the Heart of the City Special Area Zoning Designation P(CG, Res) Lot Size 83,766 sq. ft. (no change) Allowed Existing Proposed Floor Area N/A 26,578 SF 28,813 SF Building Height 45 feet 20’-1” 21’-3” Setbacks Required Existing Proposed Front 35 feet from back of curb 40 feet No change Side (Greater of one-half (1/2) times height of building, or ten (10) feet) 10’-8” West side - 11’-1” East side - 71’-10” No change DP-2019-001; 19900 Stevens Creek Blvd. January 9, 2020 ASA-2019-006; TR-2019-032 Page 2 Rear (Greater of one and one-half (1.5) times height of building or 20 feet) 30’-11” 117 feet No change Project Consistency With: General Plan Yes Zoning Yes Environmental Assessment Categorically Exempt per Section 15301 and 15332 (Class 1) of the California Environmental Quality Act (CEQA) Background: The property is located south of Stevens Creek Blvd, between S. Blaney and S. Portal Avenues. The property is located within the Central Stevens Creek sub- area of the Heart of the City Special Area, which serves as the main commercial corridor in the City. The property is currently occupied by a Scandinavian Design furniture store and situated among other commercial and commercial office uses (Cort Furniture, Pacific Workplaces, Travigne retail) to the north, single family residences to the south, a condominium complex to the east, and commercial uses (Arya Restaurant, a bank and a gas station) to the west. Application Summary The applicant is requesting to add 2,235 square feet by enclosing existing covered arcade areas and an existing loading dock and to improve the building with an updated façade, outdoor amenity spaces, landscaping, and parking lot upgrades (see Attachment 4). The property is currently leased to a single tenant. The property owners plan to improve the building to have the flexibility to accommodate multiple tenants in the future and are proposing improvements to that end. The individual interior improvements and demising will occur when the tenanting process is completed. At this time, it is anticipated that all future tenants would be permitted uses allowed under the general commercial ordinance. Figure 1: Site aerial STEVENS CREEK BLVD BLANEY AVENUE PORTAL AVENUE DP-2019-001; 19900 Stevens Creek Blvd. January 9, 2020 ASA-2019-006; TR-2019-032 Page 3 Analysis: Development Permit The building is currently designed with a covered arcade with arches leading to the storefront. The property owner will enclose two arcades that are located along the front (north) and in the southwest corner at the rear of the building and an existing dock at the southeast corner at the rear of the building (see orange areas in Figure 2 below). These additions increase the size of the building by 2,235 square feet. The Heart of the City Special Area has 814,670 square feet available for allocation. With approval of this application, the available balance will be 812,435 sq uare feet. Architectural and Site Approval A new interior hallway (see area highlighted blue in Figure 2 above) is proposed which will divide the space into two sections. As previously mentioned, interior improvements are not proposed at this time since the final number of tenants is unknown. The reconfiguration will activate the northern (facing Stevens Creek Boulevard) and eastern (facing the driveway) elevation by adding storefront window and door systems for access into potential future tenant spaces (see areas highlighted green in Figure 2 above ). Tenants along the west side of the building will not have direct exterior access to the west but instead would have entrances from the new interior hallway. The existing red brick façade will largely be maintained as the base material. The applicant proposes to introduce metal cladding and wood plank finish painted in tones Figure 2: Floor Plan REAR PARKING LOT STEVENS CREEK BLVD DP-2019-001; 19900 Stevens Creek Blvd. January 9, 2020 ASA-2019-006; TR-2019-032 Page 4 of gray, silver, and black as secondary materials. A metal clad architectural feature will be added to the northeastern corner of the building which will raise the height at this corner by 1’-2”. The entrance leading to the new hallway will be updated with a new glass storefront system with aluminum finishes. Other accents proposed to the building include metal canopies painted orange which provide a modern component to the existing, more traditional, red brick (see page A4-5 of the Plan Set for materials). Two outdoor patio areas are proposed along the Stevens Creek Boulevard frontage. These will be within the front setback area on either side of the entrance to the new hallway but outside the required landscape easement in the Heart of the City Specific Plan (see Figure 3 for a rendering.) The patios will include low concrete seat walls (1-6” in height) and landscaping to delineate the space from the public sidewalk. Trees and Landscaping In compliance with the Heart of the City landscape requirements, the applicant will install eight new flowering pear trees on either side of the public sidewalk within the required landscape easement. The applicant proposes to remove a total of 25 trees on the property. The arborist report (see Attachment 5) indicates that, of the 25 trees proposed to be removed, 14 Camphor trees are in poor condition due to crown dieback and 11 Canary Island pines are in moderate to poor condition due to inadequate pruning leading to a top-heavy hazardous condition. The property owner is required to provide replacement trees consistent with the Protected Trees ordinance throughout the site. The final landscape plan will be reviewed prior to building permit approval. All other mature trees were identified for preservation; therefore, these will be protected during construction. The applicant must also comply with Chapter 14.15, Landscape Ordinance, of the Municipal Code. As a condition of approval, the applicant must demonstrate to the City that the replacement trees for the trees being removed and other landscaping proposed meet the Municipal Code req uirements prior to issuance of building permits. Figure 3 Front patio rendering viewed from the northwest (proposed mural location circled in red) DP-2019-001; 19900 Stevens Creek Blvd. January 9, 2020 ASA-2019-006; TR-2019-032 Page 5 Bicycle and Vehicular Parking Based on the proposed tenant mix of 25% office uses (the maximum allowed in General Commercial CG zones) and 75% other permitted commercial uses, the project must include 112 parking spaces. The applicant proposes 114 vehicular spaces which is adequate. The project must provide 22 Class II bicycle parking spaces. The applicant proposes to provide 7 long-term bicycle stalls in a bike locker room and 18 short-term bicycle stalls provided at the front and east of the building to meet this requirement. Public Art The proposed project is not required to provide public art as a project requirement. However, the property owner has interest in incorporating an art mural to activate the building to support the Fine Arts Commission’s “Art in Unexpected Areas” program. The proposed location is circled in red in Figure 3 above. This is not an ongoing obligation to keep the art work. However, this allows the property owner to maintain the artwork for as long as they retain it. Once the property has determined the featured art, the proposed art will be reviewed by the Fine Art Commission prior to installation. Environmental Review This project is categorically exempt from the requirements of the California Environmental Quality Act (CEQA) per Section 15301 – Existing Facilities and 15332 - In- Fill Development Projects. Other Department/Agency Review The City’s Building Division, Environmental Programs Division, Public Works Department, Cupertino Sanitary District, and the Santa Clara County Fire Department have no objections to the project. Public Noticing And Community Outreach The following table is a summary of the noticing for this project: Notice of Public Hearing Agenda  Site Signage (at least 10 days prior to hearing)  120 notices mailed to property owners within 300 feet of the project site (at least 10 days prior to the hearing)  Posted on the City's official notice bulletin board (five days prior to hearing)  Posted on the City of Cupertino’s Web site (five days prior to hearing) No comments have been received at the time of production of this staff report. DP-2019-001; 19900 Stevens Creek Blvd. January 9, 2020 ASA-2019-006; TR-2019-032 Page 6 Permit Streamlining Act This project is subject to the Permit Streamlining Act (Government Code Section 65920 – 65964). The City has complied with the deadlines found in the Permit Streamlining Act. Plans Received: September 21, 2019; Deemed Incomplete: October 21, 2019 Revisions Received: November 26, 2019; Deemed Complete: December 12, 2019 Since this project is Categorically Exempt, the City has 60 days (until February 12, 2020) to make a decision on the project. Conclusion Staff recommends approval of the Development Permit, Architectural and Site Approval permit and Tree Removal Permit, since the plans and conditions of approval address all concerns related to the proposed project. Additionally, all applicable findings for approval of the proposed project, consistent with chapters 14.18, 19.156, and 19.168 of the Cupertino Municipal Code, may be made as follows: Development Permit 1. The proposed development, at the proposed location, will not be detrimental or injurious to property or improvements in the vicinity, and will not be detrimental to the public health, safety, general welfare, or convenience; The current building is a one-story retail commercial building that is located within the Heart of the City Special Area that promotes retail and active uses. The zoning district allows the construction of building of up to 45 feet in height while the existing building is measured approximately 20’. The proposal will not change the height of the building. The project will enclose the two arcades that are located along the front and in the southwest corner of the rear of the building. There will be no change to the massing and setbacks. Therefore, the proposal will not be detrimental or injurious to property or improvements in the vicinity. 2. The proposed development will be located and conducted in a manner in accord with the Cupertino Comprehensive General Plan and the purpose of this title and complies with the California Environmental Quality Act (CEQA). The proposed development is in conformance with the Cupertino General Plan and the proposal has met the development standards specified in the Heart of the City Specific Plan and the City Municipal Code such as heights, setbacks and landscaping requirements. Furthermore, the use of the building is proposed to be consistent with the goals of the General Plan to maintain a commercial core along Stevens Creek Blvd. The project is categorically exempt from CEQA under Section 15301 since it is an addition to an existing structure of less than 10,000 sq. ft. Furthermore, since the building is already a developed site and merely DP-2019-001; 19900 Stevens Creek Blvd. January 9, 2020 ASA-2019-006; TR-2019-032 Page 7 proposes to enclose existing areas already covered by a roof, the project is also categorically exempt from CEQA under Section 15332 - In-Fill Development Projects. Architectural and Site Approval 3. The proposed development, at the proposed location, will not be detrimental or injurious to property or improvements in the vicinity, and will not be detrimental to the public health, safety, general welfare, or convenience; The applicant proposes to enclose existing covered arcades; therefore, not increasing the lot coverage and overall massing. In addition, the project proposes a façade modification to modernize the existing building. The changes include material changes from an all brick façade to one with metal and wood accents in addition to the brick. The proposal includes the creation of two front patios on each side of the central walkway that leads to the entrance. The project also includes improvements in the parking lot and within the landscaped areas. All the proposed changes are minor improvements to the existing building and site and will not be detrimental or injurious to property or improvements in the vicinity. 4. The proposal is consistent with the purposes of Chapter 19.168, the General Plan any specific plan, zoning ordinances, applicable planned development permit, conditional use permits, variances, subdivision maps or other entitlements to use which regulate the subject property including, but not limited to, adherence to the following specific criteria: a) Abrupt changes in building scale should be avoided. A gradual transition related to height and bulk should be achieved between new and existing buildings. There are no changes in building scale except the addition of a metal clad architectural feature at the northeast corner of the building. The architectural feature will add 1’-3” to 13’-7” feet along the north elevation (Stevens Creek Boulevard) and 13’-10” feet along the east elevation (facing the main driveway) at the northeast corner of the building. No other height or scale modifications are proposed that will impact the existing massing. b) In order to preserve design harmony between new and existing buildings and in order to preserve and enhance property values, the materials, textures and colors of new building should harmonize with adjacent development by being consistent or compatible with design and color schemes with the future character of the neighborhoods and purposes of the zone in which they are situated. The location, height and materials of walls, fencing, hedges and screen planting should harmonize with adjacent development. Unsightly storage areas, utility installations and unsightly elements of parking lots should be concealed. The planting of ground cover or various types of pavements should be used to prevent dust and erosion, and the unnecessary destruction of existing healthy trees should DP-2019-001; 19900 Stevens Creek Blvd. January 9, 2020 ASA-2019-006; TR-2019-032 Page 8 be avoided. Lighting for development should be adequate to meet safety requirements as specified by the engineering and building departments and provide shielding to prevent spill-over light to adjoining property owners. Through this proposal the applicant has incorporated existing materials with attractive contemporary metal and wood elements that are suited and compatible with the character of the area. In addition, the applicant proposes to enhance the landscaping on the property. Existing mature trees that are in good health are proposed to be retained. Outdoor lighting incorporates appropriate shielding and is designed to meet the parking lot lighting requirements of the Municipal Code. c) The number, location, color, size, height, lighting and landscaping of outdoor advertising signs and structures have been designed to minimize traffic hazard, positively affect the general appearance of the neighborhood and harmonize with adjacent development. There is currently a ground sign located within the front setback area and the applicant intends to reface the sign to reflect the new architectural style and tenants. At this point, no signs are proposed, nor approved, as part of this project. d) With respect to new projects within existing residential neighborhoods, new development should be designed to protect residents from noise, traffic, light and visually intrusive effects by use of buffering, setbacks, landscaping, walls and other appropriate design measures. This application is not a new project and will maintain the existing buffering and setbacks established adjacent to the existing residential neighborhoods. Tree Removal Permit 5. That the trees are irreversibly diseased, are in danger of falling, can cause potential damage to existing or proposed essential structures, or interferes with private on- site utility services and cannot be controlled or remedied through reasonable relocation or modification of the structure or utility services; The trees proposed for removal are either in conflict with the proposed site improvements, not suitable for preservation or relocation, or have an existing canopy form that would be hazardous under strong winds. These have been documented by an ISA certified arborist. Next Steps The permit will be effective 14 calendar days from the date of the hearing. The decision of the Administrative Hearing Officer is final, unless appealed within 14 calendar days from the date of the hearing. The applicant team may apply for building and/or other permits with the City at the end of the appeal period. DP-2019-001; 19900 Stevens Creek Blvd. January 9, 2020 ASA-2019-006; TR-2019-032 Page 9 This approval is valid until January 9, 2022. The applicant may apply for a one-time two year extension before the approval expires. Prepared by: Ellen Yau, Associate Planner Reviewed and Approved for submission by: Piu Ghosh, Planning Manager ATTACHMENTS 1. Draft Resolution for DP-2019-001 2. Draft Resolution for ASA-2019-006 3. Draft Resolution for TR-2019-032 4. Plan Set 5. Arborist Report DP-2019-001 CITY OF CUPERTINO 10300 Torre Avenue Cupertino, California 95014 RESOLUTION NO. 112 OF THE ADMINISTRATIVE HEARING OFFICER OF THE CITY OF CUPERTINO APPROVING A DEVELOPMENT PERMIT TO ALLOW A 2,235 SQUARE FEET ADDITION TO AN EXISTING RETAIL BUILDING FOR COMMERCIAL USES LOCATED AT 19900 STEVENS CREEK BLVD. SECTION I: PROJECT DESCRIPTION Application No.: DP-2019-001 Applicant: Nathan Ung Location: 19900 Stevens Creek Blvd. (APN 369-05-038) SECTION II: FINDINGS FOR ARCHITECTURAL AND SITE APPROVAL PERMIT: WHEREAS, the City of Cupertino received an application for a Development Permit to consider allowing a 2,235 square feet addition to an existing retail building for commercial uses, as described in Section I. of this Resolution; and WHEREAS, the necessary public notices have been given as required by the Procedural Ordinance of the City of Cupertino, and the Administrative Hearing Officer has held at least one public meeting in regard to the application; and WHEREAS, pursuant to the provisions of the California Environmental Quality Act of 1970 (Public Resources Code section 21000 et seq.) (“CEQA”), together with the State CEQA Guidelines (California Code of Regulations, Title 14, Section 15000 et seq.) (hereinafter, "CEQA Guidelines"), the City staff has independently studied the proposed Project and has determined that the Project is exempt from environmental review pursuant to the categorical exemption in CEQA Guidelines section 15301 and 15332 for the reasons set forth in the staff report dated January 9, 2019 and incorporated herein; and WHEREAS, the applicant has met the burden of proof required to support said application; and Resolution No. 112 DP-2019-001 January 9, 2020 Page 2 WHEREAS, the Administrative Hearing Officer finds as follows with regard to this application: 1. The proposed development, at the proposed location, will not be detrimental or injurious to property or improvements in the vicinity, and will not be detrimental to the public health, safety, general welfare, or convenience; The current building is a one-story retail commercial building that is located within the Heart of the City Special Area that promotes retail and active uses. The zoning district allows the construction of building of up to 45 feet in height while the existing building is measured approximately 20’. The proposal will not change the height of the building. The project will enclose the two arcades that are located along the front and in the southwest corner of the rear of the building. There will be no change to the massing and setbacks. Therefore, the proposal will not be detrimental or injurious to property or improvements in the vicinity. 2. The proposed development will be located and conducted in a manner in accord with the Cupertino Comprehensive General Plan and the purpose of this title and complies with the California Environmental Quality Act (CEQA). The proposed development is in conformance with the Cupertino General Plan and the proposal has met the development standards specified in the Heart of the City Specific Plan and the City Municipal Code such as heights, setbacks and landscaping requirements. Furthermore, the use of the building is proposed to be consistent with the goals of the General Plan to maintain a commercial core along Stevens Creek Blvd. The project is categorically exempt from CEQA under Section 15301 since it is an addition to an existing structure of less than 10,000 sq. ft. Furthermore, since the building is already a developed site and merely proposes to enclose existing areas already covered by a roof, the project is also categorically exempt from CEQA under Section 15332 - In-Fill Development Projects. NOW, THEREFORE, BE IT RESOLVED: That after careful consideration of the maps, facts, exhibits, testimony, staff’s report and presentation, and other evidence submitted in this matter, subject to the conditions which are enumerated in this Resolution beginning on PAGE 2 thereof,: The application for a Development Permit, Application no. DP-2019-001 is hereby approved and that the subconclusions upon which the findings and conditions specified in this resolution are based and contained in the Public Hearing record concerning Application no. DP-2019-001 as set forth in the Minutes of the Administrative Hearing Meeting of January 9, 2020 and are incorporated by reference as though fully set forth herein. Resolution No. 112 DP-2019-001 January 9, 2020 Page 3 SECTION III: CONDITIONS ADMINISTERED BY THE COMMUNITY DEVELOPMENT DEPT. 1. APPROVED EXHIBITS Approval is based on the plan set drawn by M/A Design Group and HMH titled “Charles Dunn 19900 Stevens Creek Blvd. Building Remodel and Renovations” consisting of forty-five (45) sheets labeled A0-1, A1-1, A1-2, A1-3, A2-1, A2-2, A3-1, A4-1, A4-2, A4-3, A4-4, A4-5, A5-1, G0.01, C1.1, C1.2, C2.1, C2.2, C3.1, C3.2, C4.1, L0.01, L0.02, L1.01, L1.02, L1.03, L2.01, L3.01, L3.02, L3.03, L3.04, L3.05, L3.06, L3.07, L4.01, L4.02, L4.03, L4.04, L5.01, L5.02, L5.03, L5.04, and L5.05, except as may be amended by conditions in this resolution. 2. ACCURACY OF PROJECT PLANS The applicant/property owner is responsible to verify all pertinent property data including but not limited to property boundary locations, building setbacks, property size, building square footage, any relevant easements and/or construction records. Any misrepresentation of any property data may invalidate this approval and may require additional review. 3. ANNOTATION OF THE CONDITIONS OF APPROVAL The conditions of approval set forth shall be incorporated into and annotated on the first page of the building plans. 4. CONCURRENT APPROVAL CONDITIONS The conditions of approval contained in file nos. ASA-2019-006 and TR-2019-032 shall be applicable to this approval. 5. DEVELOPMENT ALLOCATION The applicant shall receive an allocation of 2,235 square feet of the retail commercial allocations from the Heart of the City Special Area. 6. BELOW MARKET RATE PROGRAM The applicant shall participate in the City’s Below Market Rate (BMR) Housing Program by paying the Below Market Rate linkage fee for Commercial use concurrent with issuance of building permits at the rate in effect at that time. The current fee is $12.30 per net new square feet (~2,235 sq.ft.) for commercial use. 7. CONSULTATION WITH OTHER DEPARTMENTS The applicant is responsible to consult with other departments and/or agencies with regard to the proposed project for additional conditions and requirements. Any Resolution No. 112 DP-2019-001 January 9, 2020 Page 4 misrepresentation of any submitted data may invalidate an approval by the Community Development Department. 8. BUILDING AND FIRE CODE The applicant shall apply for and obtain building permits to allow the construction of the approved project. The applicant shall provide information and plans to allow the Building Official and the Fire Marshall or their designee that the proposed plans comply with Building and Fire Codes in effect at the time of application for a building permit. 9. CONSTRUCTION MANAGEMENT PLAN A construction management plan shall be prepared by the applicant and approved by staff prior to issuance of building permits. Staging of construction equipment shall not occur within 40 feet of any residential property. 10. COVENANT DISCLOSURE The property is under a Cupertino planned development zoning and property purchasers should check with the City to determine the specific restrictions under the Planned Development Zone and related permits. 11. RESTAURANT ODOR ABATEMENT All new restaurants shall install odor abatement systems to reduce odor impacts from the restaurants to the adjacent community. The odor abatement systems shall be installed prior to final occupancy of the associated restaurant(s). Detailed plans shall be reviewed and approved by the Director of Community Development prior to issuance of building permits. 12. SCREENING All mechanical and other equipment on the building or on the site shall be screened so they are not visible from public street areas or adjoining developments. Screening materials/colors shall match building features and materials. The height of the screening shall be taller than the height of the mechanical equipment that it is designed to screen. The location of equipment and necessary screening shall be reviewed and approved by the Director of Community Development prior to issuance of building permits. 13. SITE IMPROVEMENTS All proposed site improvements shall be completed prior to final occupancy of any structures approved in conjunction with the project. Resolution No. 112 DP-2019-001 January 9, 2020 Page 5 14. INDEMNIFICATION To the fullest extent permitted by law, the applicant shall indemnify, defend with the attorneys of the City’s choice, and hold harmless the City, its City Council, and its officers, employees, and agents (collectively, the “indemnified parties”) from and against any liability, claim, action, cause of action, suit, damages, judgment, lien, levy, or proceeding brought by a third party against one or more of the indemnified parties or one or more of the indemnified parties and the applicant related to this Resolution/Action Letter, the related entitlements, or any permit or approval authorized hereby for the project, including (without limitation) reimbursing the City its actual attorneys’ fees and costs incurred in defense of the litigation. The applicant shall pay such attorneys’ fees and costs within 30 (thirty) days following receipt of invoices from City. Such attorneys’ fees and costs shall include amounts paid to the City’s outside counsel and shall include City Attorney time and overhead costs and other City staff overhead costs and any costs directly related to the litigation reasonably incurred by City. The applicant shall likewise indemnify, defend, and hold harmless the indemnified parties from and against any damages, attorneys’ fees, or costs awards, including attorneys’ fees awarded under Code of Civil Procedure section 1021.5, assessed or awarded against the indemnified parties. 15. NOTICE OF FEES, DEDICATIONS, RESERVATIONS, OR OTHER EXACTIONS The Conditions of Project Approval set forth herein may include certain fees, dedication requirements, reservation requirements, and other exactions. Pursuant to Government Code Section 66020(d) (1), these Conditions constitute written notice of a statement of the amount of such fees, and a description of the dedications, reservations, and other exactions. You are hereby further notified that the 90-day approval period in which you may protest these fees, dedications, reservations, and other exactions, pursuant to Government Code Section 66020(a), has begun. If you fail to file a protest within this 90-day period complying with all of the requirements of Section 66020, you will be legally barred from later challenging such exactions. PASSED AND ADOPTED this 9th day of January 2020 at a noticed Public Meeting of the Administrative Hearing Officer of the City of Cupertino, State of California, held by the Director of Community Development, or his or her designee, pursuant to Cupertino Municipal Code Section 19.12.120. ATTEST: APPROVED: /s/Ellen Yau /s/Albert Salvador Ellen Yau Albert Salvador Associate Planner Assistant Director of Community Development ASA-2019-006 CITY OF CUPERTINO 10300 Torre Avenue Cupertino, California 95014 RESOLUTION NO. 113 OF THE ADMINISTRATIVE HEARING OFFICER OF THE CITY OF CUPERTINO APPROVING AN ARCHITECTURAL AND SITE PERMIT TO ALLOW FACADE, PARKING, AND SITE IMPROVEMENTS TO AN EXISTING RETAIL BUILDING LOCATED AT 19900 STEVENS CREEK BLVD. SECTION I: PROJECT DESCRIPTION Application No.: ASA-2019-006 Applicant: Nathan Ung Location: 19900 Stevens Creek Blvd. (APN 369-05-038) SECTION II: FINDINGS WHEREAS, the City of Cupertino received an application for an Architectural and Site Approval to consider allowing modifications to the exterior building materials and landscaping for an existing retail building, as described in Section I. of this Resolution; and WHEREAS, the necessary public notices have been given as required by the Procedural Ordinance of the City of Cupertino, and the Administrative Hearing Officer has held at least one public meeting with regard to the application; and WHEREAS, pursuant to the provisions of the California Environmental Quality Act of 1970 (Public Resources Code section 21000 et seq.) (“CEQA”), together with the State CEQA Guidelines (California Code of Regulations, Title 14, Section 15000 et seq.) (hereinafter, "CEQA Guidelines"), the City staff has independently studied the proposed Project and has determined that the Project is exempt from environmental review pursuant to the categorical exemption in CEQA Guidelines section 15301 and 15332 for the reasons set forth in the staff report dated January 9, 2020 and incorporated herein; and Resolution No. 113 ASA-2019-006 January 9, 2020 Page 2 WHEREAS, the applicant has met the burden of proof required to support said application; and WHEREAS, the Administrative Hearing Officer finds as follows with regard to this application: 1. The proposal, at the proposed location, will not be detrimental or injurious to property or improvements in the vicinity, and will not be detrimental to the public health, safety, general welfare, or convenience; The applicant proposes to enclose existing covered arcades; therefore, not increasing the lot coverage and overall massing. In addition, the project proposes a façade modification to modernize the existing building. The changes include material changes from an all brick façade to one with metal and wood accents in addition to the brick. The proposal includes the creation of two front patios on each side of the central walkway that leads to the entrance. The project also includes improvements in the parking lot and within the landscaped areas. All the proposed changes are minor improvements to the existing building and site and will not be detrimental or injurious to property or improvements in the vicinity. 2. The proposal is consistent with the purposes of Chapter 19.168, the General Plan any specific plan, zoning ordinances, applicable planned development permit, conditional use permits, variances, subdivision maps or other entitlements to use which regulate the subject property including, but not limited to, adherence to the following specific criteria: a) Abrupt changes in building scale should be avoided. A gradual transition related to height and bulk should be achieved between new and existing buildings. There are no changes in building scale except the addition of a metal clad architectural feature at the northeast corner of the building. The architectural feature will add 1’-3” to 13’-7” feet along the north elevation (Stevens Creek Boulevard) and 13’-10” feet along the east elevation (facing the main driveway) at the northeast corner of the building. No other height or scale modifications are proposed that will impact the existing massing. b) In order to preserve design harmony between new and existing buildings and in order to preserve and enhance property values, the materials, textures and colors of new building should harmonize with adjacent development by being consistent or compatible with design and color schemes with the future character of the neighborhoods and purposes of the zone in which they are situated. The location, height and materials of walls, fencing, hedges and screen planting should harmonize with adjacent development. Unsightly storage areas, utility installations and unsightly elements of parking lots should be concealed. The Resolution No. 113 ASA-2019-006 January 9, 2020 Page 3 planting of ground cover or various types of pavements should be used to prevent dust and erosion, and the unnecessary destruction of existing healthy trees should be avoided. Lighting for development should be adequate to meet safety requirements as specified by the engineering and building departments and provide shielding to prevent spill-over light to adjoining property owners. Through this proposal the applicant has incorporated existing materials with attractive contemporary metal and wood elements that are suited and compatible with the character of the area. In addition, the applicant proposes to enhance the landscaping on the property. Existing mature trees that are in good health are proposed to be retained. Outdoor lighting incorporates appropriate shielding and is designed to meet the parking lot lighting requirements of the Municipal Code. c) The number, location, color, size, height, lighting and landscaping of outdoor advertising signs and structures have been designed to minimize traffic hazard, positively affect the general appearance of the neighborhood and harmonize with adjacent development. There is currently a ground sign located with the front setback area and the applicant intends to reface the sign to reflect the new architectural style and tenants. At this point, no signs are proposed, nor approved, as part of this project. d) With respect to new projects within existing residential neighborhoods, new development should be designed to protect residents from noise, traffic, light and visually intrusive effects by use of buffering, setbacks, landscaping, walls and other appropriate design measures. This application is not a new project and will maintain the existing buffering and setbacks established adjacent to the existing residential neighborhoods. NOW, THEREFORE, BE IT RESOLVED: That after careful consideration of the maps, facts, exhibits, testimony, staff’s report and presentation, and other evidence submitted in this matter, subject to the conditions which are enumerated in this Resolution beginning on PAGE 3 thereof, The application for an Architectural and Site Approval, Application no. ASA-2019-006 is hereby approved and that the subconclusions upon which the findings and conditions specified in this resolution are based and contained in the Public Meeting record concerning Application no. ASA-2019-006 as set forth in the Minutes of the Administrative Hearing Meeting of January 9, 2020 and are incorporated by reference as though fully set forth herein. Resolution No. 113 ASA-2019-006 January 9, 2020 Page 4 SECTION III: CONDITIONS ADMINISTERED BY THE COMMUNITY DEVELOPMENT DEPARTMENT 1. APPROVED EXHIBITS Approval is based on the plan set drawn by M/A Design Group and HMH titled “Charles Dunn 19900 Stevens Creek Blvd. Building Remodel and Renovations” consisting of forty-five (45) sheets labeled A0-1, A1-1, A1-2, A1-3, A2-1, A2-2, A3- 1, A4-1, A4-2, A4-3, A4-4, A4-5, A5-1, G0.01, C1.1, C1.2, C2.1, C2.2, C3.1, C3.2, C4.1, L0.01, L0.02, L1.01, L1.02, L1.03, L2.01, L3.01, L3.02, L3.03, L3.04, L3.05, L3.06, L3.07, L4.01, L4.02, L4.03, L4.04, L5.01, L5.02, L5.03, L5.04, and L5.05, except as may be amended by conditions in this resolution. 2. ACCURACY OF PROJECT PLANS The applicant/property owner is responsible to verify all pertinent property data including but not limited to property boundary locations, building setbacks, property size, building square footage, any relevant easements and/or construction records. Any misrepresentation of any property data may invalidate this approval and may require additional review. 3. CONCURRENT APPROVAL CONDITIONS The conditions of approval contained in file nos. DP-2019-001 and TR-2019-032 shall be applicable to this approval. 4. ANNOTATION OF THE CONDITIONS OF APPROVAL The conditions of approval set forth shall be incorporated into and annotated on the first page of the building plans. 5. INGRESS/EGRESS EASEMENT Prior to final occupancy, the property owner shall record an appropriate deed restriction and covenant running with the land subject to the approval of the City Attorney, to provide the necessary reciprocal ingress and egress easements to and from the adjoining properties for purposes of pedestrian and vehicular access and cross circulation. The easement language shall provide that construction of any driveways shall be completed to the City’s satisfaction at such time as the city can require the adjacent property owners to agree to construct driveway(s) and provide reciprocal ingress/egress easements through a planning permit. The agreement language including the driveway(s) and easement layout shall be reviewed and approved by the City prior to recordation with the County Recorder’s Office. The easement shall contain a provision that it may not be modified or removed without express written approval from the City. Resolution No. 113 ASA-2019-006 January 9, 2020 Page 5 6. EXTERIOR BUILDING MATERIALS/TREATMENTS a. The final building exterior plan shall closely resemble the details shown on the original approved plans. b. No fencing is approved within the front setback area. c. All final building exterior treatment plan (including but not limited to details on exterior color, materials, architectural treatments, doors, windows, lighting fixtures, and/or embellishments) shall be reviewed and approved by the Director of Community Development prior to issuance of building permits to ensure quality and consistency. d. Any exterior changes determined to be substantial by the Director of Community Development shall either require a modification to this permit or a new permit based on the extent of the change. 7. WINDOW DETAILS All storefront windows shall be kept open and transparent to the greatest extent possible. The final storefront design and window display shall be reviewed and approved by the Director of Community Development prior to issuance of building permits for tenant improvements. No changes shall be made to the transparency of the windows without the express approval of the Director of Community Development. 8. LANDSCAPE PROJECT SUBMITTAL Prior to issuance of building permits, the applicant shall submit a full Landscape Documentation Package, per sections 14.15.050 A, B, C, and D of the Landscape Ordinance, for projects with landscape area 500 square feet or more or elect to submit a Prescriptive Compliance Application per sections 14.15.040 A, B, and C for projects with landscape area between 500 square feet and 2,500 square feet. The Landscape Documentation Package or Prescriptive Compliance Application shall be reviewed and approved to the satisfaction of the Director of Community Development prior to issuance of building permits, and additional requirements per sections 14.15.040 D, E, F, and G or 14.15.050 E, F, G, H, and I will be required to be reviewed and approved prior to final inspections. 9. LANDSCAPE INSTALLATION REPORT The project is subject to all provisions delineated in the Landscape Ordinance (CMC, Chapter 14.15). A landscape installation audit shall be conducted by a certified landscape professional after the landscaping and irrigation system have been installed. The findings of the assessment shall be consolidated into a landscape installation report. Resolution No. 113 ASA-2019-006 January 9, 2020 Page 6 The landscape installation report shall include but is not limited to: inspection to confirm that the landscaping and irrigation system are installed as specified in the landscape and irrigation design plan, system tune-up, system test with distribution uniformity, reporting overspray or run-off that causes overland flow, and preparation of an irrigation schedule. The landscape installation report shall include the following statement: “The landscape and irrigation system have been installed as specified in the landscape and irrigation design plan and complies with the criteria of the ordinance and the permit.” 10. LANDSCAPE AND IRRIGATION MAINTENANCE Per the Landscape Ordinance (CMC, Chapter 14.15), a maintenance schedule shall be established and submitted to the Director of Community Development or his/her designee, either with the landscape application package, with the landscape installation report, or any time before the landscape installation report is submitted. a. Schedules should take into account water requirements for the plant establishment period and water requirements for established landscapes. b. Maintenance shall include, but not be limited to the following: routine inspection; pressure testing, adjustment and repair of the irrigation system; aerating and de-thatching turf areas; replenishing mulch; fertilizing; pruning; replanting of failed plants; weeding; pest control; and removing obstructions to emission devices. c. Failed plants shall be replaced with the same or functionally equivalent plants that may be size-adjusted as appropriate for the stage of growth of the overall installation. Failing plants shall either be replaced or be revived through appropriate adjustments in water, nutrients, pest control or other factors as recommended by a landscaping professional. 11. ARTWORK All artwork to be installed within the project shall be reviewed by the Fine Arts Commission. Said artwork may be retained for as long as desired. However, if retained the artwork shall be maintained by the property owner appropriately and adequately on a regular basis. 11. SIGNAGE Signage is not approved with this application. Signage shall conform to the City Sign Code. Resolution No. 113 ASA-2019-006 January 9, 2020 Page 7 12. LIGHTING On-site lighting must be in conformance with Cupertino Municipal Code Chapters 19.60 and 19.124. 13. DEMOLITION REQUIREMENTS All demolished building and site materials shall be recycled to the maximum extent feasible subject to the Building Official. The applicant shall provide evidence that materials were recycled prior to occupancy. 14. GRADING AND CONSTRUCTION HOURS AND NOISE LIMITS The applicant shall indicate compliance with the following grading and construction hours and noise limit requirements on all demolition, construction and grading permits, and in the construction management plan(s), unless otherwise indicated. a. All grading activities shall be limited to the dry season (April 15 to October 1), unless permitted otherwise by the Director of Public works. b. Construction hours and noise limits shall be compliant with all requirements of Chapter 10.48 of the Cupertino Municipal Code. c. Grading, street construction, underground utility and demolition hours for work done more than 750 feet away from residential areas shall be limited to Monday through Friday, 7 a.m. to 8 p.m. and Saturday and Sunday, 9 a.m. to 6 p.m. Grading, street construction, demolition or underground utility work within 750 feet of residential areas shall not occur on Saturdays, Sundays, holidays, and during nighttime period as defined in Section 10.48.053(b) of the Municipal Code. d. Construction activities shall be limited to Monday through Friday, 7 a.m. to 8 p.m. and Saturday and Sunday, 9 a.m. to 6 p.m. Construction activities are not allowed on holidays as defined in Chapter 10.48 of the Municipal Code. Night time construction is allowed if compliant with nighttime standards of Section 10.48 of the Cupertino Municipal Code. e. Rules and regulations pertaining to all construction activities and limitations identified in this permit, along with the name and telephone number of an applicant appointed disturbance coordinator, shall be posted in a prominent location at the entrance to the job site. f. The applicant shall be responsible for educating all contractors and subcontractors of said construction restrictions. 15. BAAQMD BASIC CONTROL MEASURES (DUST CONTROL) Project shall comply with the Bay Area Quality Management District’s Basic Construction Mitigation Measures as follows: Resolution No. 113 ASA-2019-006 January 9, 2020 Page 8 a. All exposed surfaces (e.g., parking areas, staging areas, soil piles, graded areas, and unpaved access roads) shall be watered two times per day. b. All haul trucks transporting soil, sand, or other loose material off-site shall be covered. c. All visible mud or dirt tracked-out onto adjacent public roads shall be removed using wet power vacuum street sweepers at least once per day. The use of dry power sweeping is prohibited. d. All vehicle speeds on unpaved roads shall be limited to 15 mph. e. All roadways, driveways, and sidewalks to be paved shall be completed as soon as possible. Building pads shall be laid as soon as possible after grading unless seeding or soil binders are used. f. Idling times shall be minimized either by shutting equipment off when not in use or reducing the maximum idling time to 5 minutes (as required by the California airborne toxics control measure Title 13, Section 2485 of California Code of Regulations [CCR]). Clear signage shall be provided for construction workers at all access points. g. All construction equipment shall be maintained and properly tuned in accordance with manufacturer’s specifications. All equipment shall be checked by a certified mechanic and determined to be running in proper condition prior to operation. h. A publicly visible sign shall be posted with the telephone number and person to contact at the City of Cupertino regarding dust complaints. This person shall respond and take corrective action within 48 hours. The BAAQMD phone number shall also be visible to ensure compliance with applicable regulations. Applicant shall indicate compliance with BAAQMD’s basic control measures on all demolition, construction and grading permits and construction management plan(s). 16. CONSULTATION WITH OTHER DEPARTMENTS The applicant is responsible to consult with other departments and/or agencies with regard to the proposed project for additional conditions and requirements. Any misrepresentation of any submitted data may invalidate an approval by the Community Development Department. 17. INDEMNIFICATION To the fullest extent permitted by law, the applicant shall indemnify, defend with the attorneys of the City’s choice, and hold harmless the City, its City Council, and its officers, employees, and agents (collectively, the “indemnified parties”) from and against any liability, claim, action, cause of action, suit, damages, judgment, lien, levy, or proceeding brought by a third party against one or more of the Resolution No. 113 ASA-2019-006 January 9, 2020 Page 9 indemnified parties or one or more of the indemnified parties and the applicant related to this Resolution/Action Letter, the related entitlements, or any permit or approval authorized hereby for the project, including (without limitation) reimbursing the City its actual attorneys’ fees and costs incurred in defense of the litigation. The applicant shall pay such attorneys’ fees and costs within 30 (thirty) days following receipt of invoices from City. Such attorneys’ fees and costs shall include amounts paid to the City’s outside counsel and shall include City Attorney time and overhead costs and other City staff overhead costs and any costs directly related to the litigation reasonably incurred by City. The applicant shall likewise indemnify, defend, and hold harmless the indemnified parties from and against any damages, attorneys’ fees, or costs awards, including attorneys’ fees awarded under Code of Civil Procedure section 1021.5, assessed or awarded against the indemnified parties. 18. NOTICE OF FEES, DEDICATIONS, RESERVATIONS, OR OTHER EXACTIONS The Conditions of Project Approval set forth herein may include certain fees, dedication requirements, reservation requirements, and other exactions. Pursuant to Government Code Section 66020(d) (1), these Conditions constitute written notice of a statement of the amount of such fees, and a description of the dedications, reservations, and other exactions. You are hereby further notified that the 90-day approval period in which you may protest these fees, dedications, reservations, and other exactions, pursuant to Government Code Section 66020(a), has begun. If you fail to file a protest within this 90-day period complying with all of the requirements of Section 66020, you will be legally barred from later challenging such exactions. SECTION IV: CONDITIONS ADMINISTERED BY THE PUBLIC WORKS DEPARTMENT 19. STREET IMPROVEMENTS & DEDICATION Provide a street dedication in fee title and frontage improvements along the project to the satisfaction of the Director of Public Works Street improvement plan design must be completed and approved prior to issuance of Building Permit. Street improvements may include, but not be limited to, remove and replace uplifted and broken curb, gutter, sidewalk, and driveway, and street tree. All improvements must be completed and accepted by the City prior to Building Final Occupancy or Street Improvement Encroachment Permit acceptance whichever comes first. Resolution No. 113 ASA-2019-006 January 9, 2020 Page 10 17. ACCEPTANCE OF PROPERTY RIGHTS The Public Works Director, or his/her designee, shall have the authority to accept all offers of dedications, easements, quitclaims and other property rights and interests on behalf of the City. 18. PEDESTRIAN AND BICYCLE IMPROVEMENTS Developer shall provide pedestrian and bicycle related improvements (eg. walkway and bicycle racks, etc.) consistent with the Cupertino Bicycle Transportation Plan and the Pedestrian Transportation Guidelines, and as approved by the Director of Public Works. 19. DRAINAGE Drainage shall be provided to the satisfaction of the Director of Public. All storm drain inlets shall be clearly marked with the words “No Dumping – Flows to Creek” using permanently affixed metal medallions or equivalent, as approved by the Environmental Programs Division. 20. C.3 REQUIREMENTS C.3 regulated improvements are required for all projects creating and/or replacing 10,000 S.F. or more of impervious surface (collectively over the entire project site). The developer shall reserve a minimum of 4% of developable surface area for the placement of low impact development measures, for storm water treatment, unless an alternative storm water treatment plan, that satisfies C.3 requirements, is approved by the Director of Public Works. 21. IMPROVEMENT AGREEMENT The project developer shall enter into a development agreement with the City of Cupertino providing for payment of fees, including but not limited to checking and inspection fees, storm drain fees, park dedication fees and fees for under grounding of utilities. Said agreement and fees shall be executed and paid prior to issuance of Building. Fees: a. Checking & Inspection Fees: Per current fee schedule ($891) b. Storm Drainage Fee: Per current fee schedule ($9,566 per AC) c. Transportation Impact Fee: Per current fee schedule: $22,439 (2,235SF X $10.04/SF). d. Encroachment Permit Fee: Per current fee schedule ($2,638 or less) e. Street Tree By Developer Resolution No. 113 ASA-2019-006 January 9, 2020 Page 11 Bonds: Faithful Performance Bond: 100% of Off-site and On-site Improvements Labor & Material Bond: 100% of Off-site and On-site Improvement -The fees described above are imposed based upon the current fee schedule adopted by the City Council. However, the fees imposed herein may be modified at the time of recordation of a final map or issuance of a building permit in the event of said change or changes, the fees changed at that time will reflect the then current fee schedule. 22. TRANSPORTATION IMPACT FEES The Project may be subject to the payment of Transportation Impact Fees under City’s Transportation Impact Fee Program (Chapter 14.02 of the Cupertino Municipal Code). The current fee schedule rate is $10.04 per square feet and the estimated cost is $22,439 for the proposed 2,235 square feet addition. 23. TRASH, RECYCLING AND COMPOST ENCLOSURES Trash enclosure plans must be designed in accordance with the City’s “Public Works Guidelines posted at www.cupertino.org/nowaste, and to the satisfaction of the Environmental Programs Manager. Clearance by the Public Works Department is required prior to obtaining a building permit. (CMC 9.18.210 H & K). 24. OPERATIONS & MAINTENANCE AGREEMENT Developer shall enter into an Operations & Maintenance Agreement with the City before issuance of a building permit approval. The Agreement shall include the operation and maintenance for non-standard appurtenances in the public road right-of-way that may include, but is not limited to, sidewalk, pavers, and street lights. 25. UNDERGROUND UTILITIES Developer shall comply with the requirements of the Underground Utilities Ordinance No. 331 and other related Ordinances and regulations of the City of Cupertino and shall coordinate with affected utility providers for installation of underground utility devices. Developer shall submit detailed plans showing utility underground provisions. Said plans shall be subject to prior approval of the affected Utility provider and the Director of Public Works. 26. TRANSFORMERS & CABINETS Electrical transformers, telephone cabinets and similar equipment shall be placed in underground vaults. The developer must receive written approval from both Resolution No. 113 ASA-2019-006 January 9, 2020 Page 12 the Public Works Department and the Community Development Department prior to installation of any above ground equipment. Should above ground equipment be permitted by the City, equipment and enclosures shall be screened with fencing and landscaping such that said equipment is not visible from public street areas, as determined by the Community Development Department. Transformers shall not be located in the front or side building setback area. 27. WATER BACKFLOW PREVENTERS Domestic and Fire Water Backflow preventers and similar above ground equipment shall be placed away from the public right of way and site driveways to a location approved by the Cupertino Planning Department, Santa Clara County Fire Department and the water company. 28. BEST MANAGEMENT PRACTICES Utilize Best Management Practices (BMPs), as required by the State Water Resources Control Board, for construction activity, which disturbs soil. BMP plans shall be included in grading and street improvement plans. 29. EROSION CONTROL PLAN Developer must provide an approved erosion control plan by a Registered Civil Engineer. This plan should include all erosion control measures used to retain materials on site. Erosion control notes shall be stated on the plans. 30. WORK SCHEDULE Every 6 months, the developer shall submit a work schedule to the City to show the timetable for all grading/erosion control work in conjunction with this project. 31. TRAFFIC CONTROL PLAN The developer must submit a traffic control plan by a Registered Traffic Engineer to be approved by the City. The plan shall include a temporary traffic control plan for work in the right of way as well as a routing plan for all vehicles used during construction. All traffic control signs must be reviewed and approved by the City prior to commencement of work. The City has adopted Manual on Uniform Traffic Control Devices (MUTCD) standards for all signage and striping work throughout the City. 32. STREET TREES Street trees shall be planted within the Public Right of Way to the satisfaction of the Director of Public Works and shall be of a type approved by the City in accordance with Ordinance No. 125. Resolution No. 113 ASA-2019-006 January 9, 2020 Page 13 33. FIRE PROTECTION Fire sprinklers shall be installed in any new construction to the approval of the City. 34. SANTA CLARA COUNTY FIRE DEPARTMENT A letter of clearance for the project shall be obtained from the Santa Clara County Fire Department prior to issuance of building permits. Clearance should include written approval of the location of any proposed Fire Backflow Preventers, Fire Department Connections and Fire Hydrants (typically Backflow Preventers should be located on private property adjacent to the public right of way, and fire department connections must be located within 100’ of a Fire Hydrant). 35. FIRE HYDRANT Fire hydrants shall be located as required by the City and Santa Clara County Fire Department as needed. 36. CALIFORNIA WATER SERVICE COMPANY CLEARANCE Provide California Water Service Company approval for water connection, service capability and location and layout of water lines and backflow preventers before issuance of a building permit approval. 37. DEDICATION OF UNDERGROUND WATER RIGHTS Developer shall “quit claim” to the City all rights to pump, take or otherwise extract water from the underground basin or any underground strata in the Santa Clara Valley. 38. SANITARY DISTRICT A letter of clearance for the project shall be obtained from the Cupertino Sanitary District prior to issuance of building permits. 39. UTILITY EASEMENTS Clearance approvals from the agencies with easements on the property (including PG&E, AT&T, and California Water Company, and/or equivalent agencies) will be required prior to issuance of building permits. SECTION V: CONDITIONS ADMINISTERED BY THE FIRE DEPARTMENT 40. FIRE SPRINKLER MODIFICATIONS The fire sprinkler system shall be modified to provide complete coverage for the revised space configuration (if applicable). A separate Fire Prevention Office Resolution No. 113 ASA-2019-006 January 9, 2020 Page 14 submittal and permit are required for the sprinkler modifications. CFC §105.7.1 & 2016 Edition of NFPA 13 §23.1.3 41. EGRESS PATHWAYS Entrance/Egress pathways shall be maintained and unobstructed during all phases of construction. 42. FIRE LANE & HYDRANTS The circulating fire lane and associated fire hydrants shall be maintained and unobstructed at all times. PASSED AND ADOPTED this 9th day of January 2020 at a noticed Public Meeting of the Administrative Hearing Officer of the City of Cupertino, State of California, held by the Director of Community Development, or his or her designee, pursuant to Cupertino Municipal Code Section 19.12.120. ATTEST: APPROVED: /s/Ellen Yau /s/Albert Salvador Ellen Yau Albert Salvador Associate Planner Assistant Director of Community Development TR-2019-032 CITY OF CUPERTINO 10300 Torre Avenue Cupertino, California 95014 RESOLUTION NO. 114 OF THE ADMINISTRATIVE HEARING OFFICER OF THE CITY OF CUPERTINO APPROVING A TREE REMOVAL PERMIT TO ALLOW THE REMOVAL AND REPLACEMENT OF TWENTY-FIVE PROTECTED TREES LOCATED AT 19900 STEVENS CREEK BLVD. SECTION I: PROJECT DESCRIPTION Application No.: TR-2019-032 Applicant: Nathan Ung Location: 19900 Stevens Creek Blvd. (APN 369-05-038) SECTION II: FINDINGS TREE REMOVAL PERMIT: WHEREAS, the City of Cupertino received an application for a Tree Removal permit as described in Section I of this Resolution; and WHEREAS, the necessary public notices have been given as required by the Procedural Ordinance of the City of Cupertino, and the Administrative Hearing Officer has held at least one public meeting in regard to the application; and WHEREAS, pursuant to the provisions of the California Environmental Quality Act of 1970 (Public Resources Code section 21000 et seq.) (“CEQA”), together with the State CEQA Guidelines (California Code of Regulations, Title 14, Section 15000 et seq.) (hereinafter, "CEQA Guidelines"), the City staff has independently studied the proposed Project and has determined that the Project is exempt from environmental review pursuant to the categorical exemption in CEQA Guidelines section 15301 and 15332 for the reasons set forth in the staff report dated January 9, 2020 and incorporated herein; and WHEREAS, the applicant has met the burden of proof required to support said application; and WHEREAS, the Administrative Hearing Officer finds as follows with regard to this application: Resolution No. 114 TR-2019-032 January 9, 2020 Page 2 1. That the trees are irreversibly diseased, are in danger of falling, can cause potential damage to existing or proposed essential structures, or interferes with private on- site utility services and cannot be controlled or remedied through reasonable relocation or modification of the structure or utility services; The trees proposed for removal are either in conflict with the proposed site improvements, not suitable for preservation or relocation, or have an existing canopy form that would be hazardous under strong winds. These have been documented by an ISA certified arborist. NOW, THEREFORE, BE IT RESOLVED: That after careful consideration of the maps, facts, exhibits, testimony, staff’s report and presentation, and other evidence submitted in this matter, subject to the conditions which are enumerated in this Resolution beginning on PAGE 2 thereof: The application for a Tree Removal permit, Application no. TR-2019-032 is hereby approved and that the subconclusions upon which the findings and conditions specified in this resolution are based and contained in the Public Meeting record concerning Application no. TR-2019-032 as set forth in the Minutes of the Administrative Hearing Meeting of January 9, 2020 and are incorporated by reference as though fully set forth herein. SECTION III: CONDITIONS ADMINISTERED BY THE COMMUNITY DEVELOPMENT DEPT. 1. APPROVED EXHIBITS Approval is based on the arborist review dated November 4, 2019, consisting of 33 pages and the plan set drawn by M/A Design Group and HMH titled “Charles Dunn 19900 Stevens Creek Blvd. Building Remodel and Renovations” consisting of forty- five (45) sheets, except as may be amended by conditions in this resolution. 2. ACCURACY OF PROJECT PLANS The applicant/property owner is responsible to verify all pertinent property data including but not limited to property boundary locations, building setbacks, property size, building square footage, any relevant easements and/or construction records. Any misrepresentation of any property data may invalidate this approval and may require additional review. 3. CONCURRENT APPROVAL CONDITIONS The conditions of approval contained in file nos. DP-2019-001 and ASA-2019-006 shall be applicable to this approval. Resolution No. 114 TR-2019-032 January 9, 2020 Page 3 4. FINAL PLANTING PLAN The applicant shall plant replacement trees in accordance with the replacement requirements of the Protected Tree Ordinance. The trees shall be planted prior to final occupancy of site permits. The final planting plan shall be reviewed and approved by the Director of Community Development prior to issuance of building permits. The Director of Community Development shall have the discretion to require additional tree replacements as deemed necessary. An ISA Certified Arborist shall confirm that the replacement trees were planted properly and according to plan prior to final occupancy. 5. TREE REPLACEMENTS The applicant is required to plant replacement trees in accordance with the Protected Tree Ordinance and per the approved replacement plan. 6. TREE PROTECTION As part of the demolition or building permit drawings, a tree protection plan shall be prepared by a certified arborist for the trees to be retained. In addition, the following measures shall be added to the protection plan: a. For trees to be retained, chain link fencing and other root protection shall be installed around the dripline of the tree prior to any project site work. b. Signs indicating the protected status of the tree shall be installed on the protective fencing. c. Tree protection conditions shall be posted on the tree protection fencing. d. No parking or vehicle traffic shall be allowed under root zones, unless using buffers approved by the Project Arborist. e. No trenching within the critical root zone area is allowed. If trenching is needed in the vicinity of trees to be retained, the City’s consulting arborist shall be consulted before any trenching or root cutting beneath the dripline of the tree. f. Wood chip mulch shall be evenly spread inside the tree projection fence to a four- inch depth. g. Retained trees shall continue to be irrigated or hand-watered to maintain them in good health. The tree protection measures shall be inspected and approved by the certified arborist prior to issuance of building permits. The City’s consulting arborist shall inspect the trees to be retained and shall provide reviews prior to issuance of demolition, grading or building permits. Additionally, a report ascertaining the good health of the trees mentioned above shall be provided prior to issuance of final occupancy. Any trees identified to be in poor health or Resolution No. 114 TR-2019-032 January 9, 2020 Page 4 incongruent with the site-wide tree replacement plan in the report shall be required to be removed and replaced. 7. TREE AND LANDSCAPE MAINTENANCE The property owner shall be responsible for ensuring that the existing trees and newly planted trees are properly maintained including but not limited to ensuring that there is adequate soil drainage, that the soil is well-aerated, and irrigation systems are thoroughly tested to provide sufficient water to landscaped areas while reducing water waste. 8. DISCLOSURE OF PROTECTED TREES AND COVENANT The property owner/applicant understands that the replacement trees may not be removed without a Tree Removal Permit and that they shall be responsible for ensuring the ongoing proper maintenance and care of the trees. The location and species of all replacements trees on site shall be disclosed upon sale of the property. In addition, a covenant shall be recorded on the property that identifies all the protected trees, prior to final occupancy. 9. CONSULTATION WITH OTHER DEPARTMENTS The applicant is responsible for consulting with other departments and/or agencies with regard to the proposed project for additional conditions and requirements. Any misrepresentation of any submitted data may invalidate an approval by the Community Development Department. 10. INDEMNIFICATION To the fullest extent permitted by law, the applicant shall indemnify, defend with the attorneys of the City’s choice, and hold harmless the City, its City Council, and its officers, employees, and agents (collectively, the “indemnified parties”) from and against any liability, claim, action, cause of action, suit, damages, judgment, lien, levy, or proceeding brought by a third party against one or more of the indemnified parties or one or more of the indemnified parties and the applicant related to this Resolution/Action Letter, the related entitlements, or any permit or approval authorized hereby for the project, including (without limitation) reimbursing the City its actual attorneys’ fees and costs incurred in defense of the litigation. The applicant shall pay such attorneys’ fees and costs within 30 (thirty) days following receipt of invoices from City. Such attorneys’ fees and costs shall include amounts paid to the City’s outside counsel and shall include City Attorney time and overhead costs and other City staff overhead costs and any costs directly related to the litigation reasonably incurred by City. The applicant shall likewise indemnify, defend, and hold harmless the indemnified parties from and against any damages, attorneys’ fees, or Resolution No. 114 TR-2019-032 January 9, 2020 Page 5 costs awards, including attorneys’ fees awarded under Code of Civil Procedure section 1021.5, assessed or awarded against the indemnified parties. 11. NOTICE OF FEES, DEDICATIONS, RESERVATIONS, OR OTHER EXACTIONS The Conditions of Project Approval set forth herein may include certain fees, dedication requirements, reservation requirements, and other exactions. Pursuant to Government Code Section 66020(d) (1), these Conditions constitute written notice of a statement of the amount of such fees, and a description of the dedications, reservations, and other exactions. You are hereby further notified that the 90-day approval period in which you may protest these fees, dedications, reservations, and other exactions, pursuant to Government Code Section 66020(a), has begun. If you fail to file a protest within this 90-day period complying with all of the requirements of Section 66020, you will be legally barred from later challenging such exactions. PASSED AND ADOPTED this 9th day of January 2020 at a noticed Public Meeting of the Administrative Hearing Officer of the City of Cupertino, State of California, held by the Director of Community Development, or his or her designee, pursuant to Cupertino Municipal Code Section 19.12.120. ATTEST: APPROVED: /s/Ellen Yau /s/Albert Salvador Ellen Yau Albert Salvador Associate Planner Assistant Director of Community Development DP-2019-001, ASA-2019-006, TR-2019-032 01/10/20 Ellen Yau DP-2019-001, ASA-2019-006, TR-2019-032 01/10/20 Ellen Yau DP-2019-001, ASA-2019-006, TR-2019-032 01/10/20 Ellen Yau DP-2019-001, ASA-2019-006, TR-2019-032 01/10/20 Ellen Yau DP-2019-001, ASA-2019-006, TR-2019-032 01/10/20 Ellen Yau DP-2019-001, ASA-2019-006, TR-2019-032 01/10/20 Ellen Yau DP-2019-001, ASA-2019-006, TR-2019-032 01/10/20 Ellen Yau DP-2019-001, ASA-2019-006, TR-2019-032 01/10/20 Ellen Yau DP-2019-001, ASA-2019-006, TR-2019-032 01/10/20 Ellen Yau DP-2019-001, ASA-2019-006, TR-2019-032 01/10/20 Ellen Yau DP-2019-001, ASA-2019-006, TR-2019-032 01/10/20 Ellen Yau DP-2019-001, ASA-2019-006, TR-2019-032 01/10/20 Ellen Yau DP-2019-001, ASA-2019-006, TR-2019-032 01/10/20 Ellen Yau DP-2019-001, ASA-2019-006, TR-2019-032 01/10/20 Ellen Yau DP-2019-001, ASA-2019-006, TR-2019-032 01/10/20 Ellen Yau WILL NOT BE RESPONSIBLE FOR, OR LIABLE FOR, UNAUTHORIZED CHANGES TO AND MUST BE APPROVED BY THE PREPARER OF THESE PLANS. OR USES OF THESE PLANS. ALL CHANGES TO THE PLANS MUST BE IN WRITING UNAUTHORIZED CHANGES & USES: THE ENGINEER PREPARING THESE PLANS SCALE: 1"=50' SITE MAP TITLE SHEET AS SHOWN ENGINEER'S STATEMENT THIS PLAN HAS BEEN PREPARED BY ME OR UNDER MY DIRECTION IN ACCORDANCE WITH STANDARD ENGINEERING PRACTICE. DATENAME: TITLE: PROJECT ENGINEER COMPANY: HMH P.E. No.STEVENS CREEK BLVD19900 STEVENS CREEK GRADING AND DRAINAGE CUPERTINO, CALIFORNIA ASSUMED ASSUMED SHEET INDEX BENCHMARK HORIZONTAL CONTROL ABBREVIATIONS LEGEND PROPOSED EXISTING DIRECTION OF SURFACE DRAINAGE PROPERTY LINE STORM DRAIN MANHOLE OVERLAND RELEASE PATH STANDARD CURB INLET FIELD INLET LANDSCAPE DRAIN PIPE AREA DRAIN PLANTING AREA AREA DRAIN TURF AREA DRAIN CLEAN OUT STORM DRAIN PIPE EASEMENT BOUNDARY RIGHT-OF-WAY CURB AND GUTTER GRADE BREAK RESPONSIBILITY TO INDEPENDENTLY ESTIMATE APPROXIMATE. IT SHALL BE THE CONTRACTOR'S NOTE: EARTHWORK QUANTITIES SHOWN ARE EARTHWORK QUANTITIES FILL: CUT: EXPORT: IMPORT: QUANTITIES FOR HIS/HER OWN USE. 133 CY 63 CY 196 CY 0 CY RCHREENIGNEL A NOISSEFORPDERETSIGER CA L I F O R NIAFO E T ATS V I LIC No. 68876MARTIN L .DEF O R GEC1.1 TITLE SHEET C1.2 ADDITIONAL NOTES AND DETAILS C2.1-2.2 DEMOLITION PLAN C3.1-3.2 GRADING AND DRAINAGE PLAN C4.1 BLUEPRINT FOR A CLEAN BAY @ AT AC ASPHALT CONCRETE BW BOTTOM OF WALL CSC CITY OF CUPERTINO DIP DUCTILE IRON PIPE EG EXISTING GROUND ES EXISTING SURFACE EX/(E) EXISTING FF FINISHED FLOOR FG FINISHED GRADE FS FINISHED SURFACE GB GRADE BREAK HP HIGH POINT LP LOW POINT NTS NOT TO SCALE PA PLANTING AREA P / PL PROPERTY LINE PIP PROTECT IN PLACE PVC POLYVINYL CHLORIDE RCP REINFORCED CONCRETE PIPE SD STORM DRAIN SDCB STORM DRAIN CATCH BASIN SDCI STORM DRAIN CURB INLET SDFI STORM DRAIN FIELD INLET SDJB STORM DRAIN JUNCTION BOX SDMH STORM DRAIN MANHOLE SSCO SANITARY SEWER CLEANOUT SSMH SANITARY SEWER MANHOLE TC TOP OF CURB TDC TOP OF DEPRESSED CURB TDVC TOP OF DEPRESSED VERTICAL CURB TRC TOP OF ROLLED CURB TG TOP OF GRATE TVC TOP OF VERTICAL CURB TW TOP OF WALL TYP TYPICAL DRAWN BY: PROJECT NO: CAD DWG FILE: CHECKED BY: DESIGNED BY: DATE: SCALE: HMHC NOT FOR CONSTRUCTION19900 STEVENS CREEKGRADING AND DRAINAGECUPERTINO, CALIFORNIAS:\PROJECTS\520200\LD\GRADING AND DRAINAGE PLAN\PLOT DRAWINGS\520200GP01-TS.DWG 520200GP01-TS.DWG C1.1 Land Use Entitlements Land Planning Landscape Architecture Civil Engineering Utility Design Land Surveying Stormwater Compliance 1570 Oakland Road (408) 487-2200 San Jose, CA 95131 HMHca.com REENIGNEL A NOISSEFORPDERETSIGER CA L I F O R NIAFO E T ATS V I LIC No. 68876MARTINL.DEF O R GE2ND SUBMITTAL 5202.00 RCH BC NOV. 15, 2019 CITY OF CUPERTINO GENERAL NOTES 1. All work shall be in accordance with the State of California Department of Transportation Standard Specifications (latest edition, as amended), and Standard Plans (latest edition, as amended), and City of Cupertino Standard Details. The Contractor shall perform the work described in the specification, and as shown on the drawings, and to the satisfaction of the City Engineer. 2. Approval of these plans shall not release the Owner or Contractor of the responsibility for corrections of mistakes, errors, or omissions contained therein. If during the course of construction of improvements, public interest requires a modification of/or a departure from the City of Cupertino Standard Details or these improvements plans, the City Engineer shall have the authority to require such modification or departure and to specify the manner in which the same is to be completed, at the sole expense of the Owner or Contractor. 3. Approval of these plans by the City Engineer is only for public right-of-way improvements (including storm drain in the right of way), and not for water, sewer or dry utilities. It is the Developer's/Owner's responsibility to coordinate reviews and approval from each of the Utility companies, and to provide approval letters as requested. 4. It shall be the responsibility of the Contractor to ensure the approved plans or the latest revised plans are furnished to its subcontractors, and to ensure the latest approved plans are onsite at all times during construction. 5. The Contractor shall notify the City of Cupertino Public Works Inspector two (2) working days prior to requiring an inspection. Call (408) 777-3104 to schedule Public Works inspections. 6. Construction area traffic control devices shall be installed prior to beginning of work. 7. Notify City of Cupertino Traffic Signal Maintenance for inspection of traffic signal facility foundation excavations at (408) 777-1366, two (2) working days prior to pouring any cabinet or signal foundations relating to the job. 8. The Contractor shall locate underground facilities in the area of work. The Contractor shall contact Underground Service Alert (USA) at 811 two (2) working days in advance of any work for location of the underground facilities. 9. All underground utilities shall be installed and backfilled before placement of the base material and surface structures. If utilities are to be installed subsequently, a written notification from the affected utility company indicating its commitment to bore or tunnel shall be submitted to the City Engineer before proceeding with the work. Underground utilities, except storm drains and sanitary sewers, shall not be permitted in pavement area, with the exception of street crossings, unless approved by the City Engineer. 10. All water lines, valves, hydrants, and appurtenances thereto installed within the public right-of-way shall be the property of the water utility company. 11. Storm drain lines installed as part of the work on these plans shall be cleared of all debris and obstructions prior to final acceptance. 12. All trench backfill, fill areas, and base material shall attain a minimum 95% relative compaction. For typical trench sections, except for sanitary sewers, refer to the City Standard Details. 13. The Developer shall pay all costs for moisture-density curves (Calif. Test No. 216E) and any other tests required by the City Engineer during street construction. 14. Trees, roots, and foreign matter in existing or proposed right-of-way shall be removed to a depth of two (2) feet below subgrade and disposed of per Caltrans Standards. In the case of live tree roots from City street trees, Contractor shall contact the City for field observation prior to removing tree roots. 15. Trench plates in the traveled way shall be traffic rated, property secured and shall be recessed upon the request of the Director of Public Works. 16. All trenches located within 5' of the edge of pavement (ie. curb, lip of gutter, edge of pavement, etc.) shall be repaved to the edge of pavement. 17. All new pavement shall match the existing pavement section. A minimum pavement section of 3” AC/6” Class 2 AB is required. 18. Existing pavement that is removed or damaged shall be replaced as required by the City Engineer. 19. Manhole frames and covers shall be brought to finish grade prior to final signoff. 20. Five (5) working days prior to installing permanent striping, the Contractor shall cat track the striping and request review of the cat tracks by the City Traffic Engineer. The City Engineer shall have the right to make changes in the location of the alignment of traffic stripes, pavement markings, and pavement markers. 21. Concrete for use in all concrete structures shall conform to California Department of Transportation Standard Specifications Section 90. Drop inlets, sidewalks, curbs and gutters shall contain 590 lbs. of cement per cubic yard and shall attain a minimum strength of 3,000 psi in 28 days. 22. Drop inlets shall be constructed conforming to City Standard Details unless otherwise noted on the plans. Drop Inlets shall be installed concurrent with the construction of the curb and gutter “No Dumping Flows to the Bay.” plaque shall be installed on the curb adjacent to all inlets. 23. A minimum thickness of five (5) inches of concrete shall be required for commercial driveway approaches and four (4) inches for residential. The driveway approach shall be installed concurrent with the construction of the curb and gutter. 24. One pound of dispersing black shall be mixed with each cubic yard of concrete at the batch plant. 25. City Standard Street Lights shall be installed as required by the Director of Public Works, and shall conform to the City Standard Details and Notes. During construction operations, temporary street lighting shall be provided as necessary to ensure the public safety. Temporary street lights shall be installed at the discretion of, and to the satisfaction of, the Director of Public Works. 26. City standard street monuments shall be constructed at the locations shown on the plans or as directed by the City Engineer. 27. New City standard street monuments and other permanent monuments disturbed during construction shall be replaced before acceptance of the improvements by the City Engineer. Attention is directed to Section 8771 of the California Business and Professions Code for the requirements concerning survey monuments. Existing survey monuments shall be located and referenced by or under the direction of a licensed land surveyor or registered civil engineer prior to construction operations, and a corner record or record of survey shall be filed with the County Surveyor of the County of Santa Clara. Existing survey monuments shall be reset to finish grade, and a corner record or record of survey shall be filed with the County Surveyor of the County of Santa Clara prior to the recording of the certificate of completion for the project. 28. Construction survey stakes or marks (control stakes) to establish lines and grades shall be set by the Contractor's surveyor or engineer. 29. Notify the City Inspector two (2) working days in advance of requiring services for checking field staking. Three (3) copies of the cut sheets shall be furnished to the City Inspector. 30. Grading of lots shall be completed as determined by the City Engineer, as shown on the plans, and shall follow requirements and standards as set forth in the City Standard Grading and Drainage notes. 31. Demolition of septic tanks shall conform to Santa Clara County Environmental Health Department regulations. Work shall be done prior to construction. 32. All public improvements must be completed prior to occupancy. 33. Contractor is responsible for dust control and ensuring the area adjacent to the work is left in a clean condition. 34. Contractor shall review City Detail 6-4 on tree protection prior to accomplishing any work or removing any trees. 35. Utilize Best Management Practices (BMP's), as required by the State Water Resources Control Board, for ANY activity, which disturbs the soil. 36. A work schedule of grading and Erosion & Sediment Control Plan shall be provided to the City Engineer by August 15. No hillside grading shall be performed between October 1 to April 15. 37. All new electrical service (power, phone, and/or cable) shall be undergrounded. 38. To initiate release of bonds, contact the Public Works Inspector for Final Inspection. 39. All downspouts to be released to the ground surface, directed away from building foundations and directed to landscaped areas. 40. Prior to beginning any work within the Public Right of Way, the Contractor will be responsible for pulling an encroachment permit from the Public Works Department. EX BUILDING 19900 STEVENS CREEK BLVD SHEET C2.1/C3.1 SHEET C2.2/C3.2 VICINITY MAP NOT TO SCALE S I T E SANITARY SEWER MANHOLE SANITARY SEWER CLEANOUT SANITARY SEWER PIPE DP-2019-001, ASA-2019-006, TR-2019-032 01/10/20 Ellen Yau 1 TOP OF DEPRESSED VERTICAL CURB (TDVC) 2 AC PAVING 3 COMPACTED AGGREGATE BASE ROCK 4 COMPACTED SUBGRADE R0.5" 2 3 4 1 3"FOC 6" VERTICAL CURB NTS 1 TOP OF VERTICAL CURB (TVC) 2 AC PAVING 3 COMPACTED AGGREGATE BASE ROCK 4 COMPACTED SUBGRADE 2 3 43"6" TYP6" 1 TOP OF VERTICAL CURB (TVC) 2 FLUSH WITH ADJACENT FINISHED GRADE 24" 1 2 TRANSITION 1 5 EXTEND 3" MIN INTO NATIVE MATERIAL OR PREPARED SUBGRADE 51/4" MAXFOC 5 EXTEND 3" MIN INTO NATIVE MATERIAL OR PREPARED SUBGRADE 5 R0.5" 1 DEPRESSED VERTICAL CURB NTS2 2' CURB TRANSITION NTS 4 VERTICAL CURB TO BE 6" TYPICAL UNLESS OTHERWISE STATED ON THE PLANS ADDITIONAL NOTES AND DETAILS AS SHOWN RCHDRAWN BY: PROJECT NO: CAD DWG FILE: CHECKED BY: DESIGNED BY: DATE: SCALE: HMHC NOT FOR CONSTRUCTION19900 STEVENS CREEKGRADING AND DRAINAGECUPERTINO, CALIFORNIAS:\PROJECTS\520200\LD\GRADING AND DRAINAGE PLAN\PLOT DRAWINGS\520200GP01-TS.DWG 520200GP01-TS.DWG C1.2 Land Use Entitlements Land Planning Landscape Architecture Civil Engineering Utility Design Land Surveying Stormwater Compliance 1570 Oakland Road (408) 487-2200 San Jose, CA 95131 HMHca.com REENIGNEL A NOISSEFORPDERETSIGER CA L I F O R NIAFO E T ATS V I LIC No. 68876MARTINL.DEF O R GE2ND SUBMITTAL 5202.00 RCH BC NOV. 15, 2019 7. THE CONTRACTOR SHALL COMPLY WITH ALL OSHA REQUIREMENTS RELATED TO SHORING OF EXCAVATIONS. 8. CONTRACTOR SHALL CLEAN STREETS TO REMOVE ACCUMULATION OF MUD AND DEBRIS RESULTING FROM CONSTRUCTION ACTIVITIES. 9. THE CONTRACTOR IS RESPONSIBLE FOR CONFORMING TO EXISTING PAVEMENT, ADJACENT LANDSCAPE AND OTHER IMPROVEMENTS WITH A SMOOTH TRANSITION IN PAVING, CURBS, GUTTERS, SIDEWALK, ETC. TO AVOID ABRUPT OR APPARENT CHANGES IN GRADES OR CROSS SLOPES, LOW SPOTS OR HAZARDOUS CONDITIONS. 10. CONTRACTOR TO OBTAIN REQUIRED PERMITS FOR HAUL ROUTES PRIOR TO DEMOLITION AND CONSTRUCTION. 11. CONTRACTOR IS RESPONSIBLE FOR SCHEDULING ALL INSPECTIONS AS REQUIRED. 12. CONTRACTOR IS TO PROVIDE STREET CROSS SLOPES BETWEEN 2% AND 4% UNLESS SPECIFICALLY NOTED OTHERWISE ON PLANS, AND TO ALLOW CITY INSPECTOR AND ENGINEER TO INSPECT FORMS PRIOR TO POURING OF CURB AND GUTTER 13. CONTRACTOR IS TO POTHOLE ALL UTILITY CONNECTIONS PRIOR TO CONSTRUCTION TO VERIFY INFORMATION PROVIDED ON PLAN REGARDING EXISTING UTILITIES. 14. THE MAINTENANCE OF EACH FULL CAPTURE DEVICE SHALL BE ADEQUATE TO PREVENT PLUGGING, INCLUDING PLUGGING OF THE 5MM SCREEN LEADING TO TRASH OVERFLOW AND BYPASS, FLOODING, OR A FULL CONDITION OF THE DEVICE'S TRASH RESERVOIR CAUSING BYPASSING OF TRASH. ALL FULL TRASH CAPTURE DEVICES SHALL BE INSPECTED AND MAINTAINED AT LEAST TWICE PER YEAR OR TO THE MANUFACTURER'S MINIMUM SPECIFICATIONS AT LEAST THREE MONTHS OR MORE APART. IF ANY SUCH DEVICE IS FOUND TO HAVE A PLUGGED OR BLINDED SCREEN OR IS GREATER THAN 50 PERCENT FULL OF TRASH DURING A MAINTENANCE EVENT OR CITY INSPECTION, THE MAINTENANCE FREQUENCY SHALL BE INCREASED SO THAT THE DEVICE IS NEITHER PLUGGED NO MORE THAN HALF FULL OF TRASH AT THE NEXT MAINTENANCE EVENT. EXISTING CONDITIONS 1. GRADES ENCOUNTERED ON-SITE MAY VARY FROM THOSE SHOWN. CONTRACTOR SHALL REVIEW THE PLANS AND CONDUCT INVESTIGATIONS AS REQUIRED TO VERIFY EXISTING CONDITIONS AT THE PROJECT SITE. 2. EXISTING GRADES AND CONFORM DESIGNS SHOWN ARE BASED OFF OF INTERMITTENT FIELD TOPO DATA AND MAY NOT INCLUDE ALL CONFORM SITUATIONS. CONTRACTOR SHALL REVIEW ALL CONFORM CONDITIONS AND NOTIFY ENGINEER OF ANY AREAS THAT MAY REQUIRE FIELD FIT ADJUSTMENTS. ALL PAVING AND HARDSCAPE CONFORMS MUST COMPLY WITH ADA REQUIREMENTS AND MAINTAIN POSITIVE DRAINAGE TO DRAIN INLETS. 3. INFORMATION REGARDING EXISTING UTILITIES IS FROM RECORD DATA AND MAY NOT REPRESENT ACTUAL CONDITIONS. CONTRACTOR SHALL CONDUCT FIELD EVALUATION OF ALL EXISTING SUBSURFACE IMPROVEMENTS AND UTILITIES, WHETHER SHOWN ON THESE PLANS OR NOT, PRIOR TO THE COMMENCEMENT OF WORK. CONTRACTOR SHALL CONTACT HMH IF ANY DISCREPANCIES ARE DISCOVERED. ADDITIONAL NOTES THE FOLLOWING NOTES ARE NOT PART OF THE CITY OF CUPERTINO STANDARD NOTES AND ARE PROVIDED AS SUPPLEMENTAL NOTES BY HMH. EARTHWORK AND GRADING 1. THE DESIGN INTENT OF THIS PLAN IS TO SET LINES AND GRADES ONLY. REFER TO THE GEOTECHNICAL REPORT REFERENCED IN NOTE 3 BELOW FOR GEOTECHNICAL DESIGN AND MITIGATION. 2. THE GEOTECHNICAL ENGINEER OF RECORD IS _N/A_. IN CASE OF CONFLICTS, BETWEEN THE INFORMATION SHOWN ON THIS PLAN AND THE REQUIREMENTS CONTAINED IN THE GEOTECHNICAL REPORT, THE GEOTECHNICAL REPORT SHALL GOVERN WITH PRIOR APPROVAL BY THE CITY. 3. THE DESIGN FOR THE GEOTECHNICAL AND SOILS REPAIR, MITIGATION, NOTES AND STABILIZATION DEPICTED ON THIS PLAN (ALL SHEETS OF THE PLAN SET) IS BASED ON THE DESIGN AND RECOMMENDATIONS PROVIDED TO HMH BY _N/A_. HMH MAKES NO WARRANTY, EXPRESS OR IMPLIED, AS TO THE ADEQUACY OF THE PROPOSED GEOTECHNICAL DESIGN AND MITIGATION. HMH ACCEPTS NO LIABILITY AND/OR RESPONSIBILITY THAT MAY ARISE DUE TO SLIDE MOVEMENT, SETTLEMENT, OR SIMILAR RELATED OCCURRENCES WITH RESPECT TO THE DESIGN OR CONSTRUCTION OF GEOTECHNICAL CORRECTIVE SCHEMES. 4. BASE KEYS AND SUBDRAINS SHALL BE INSTALLED PER THE PROJECT GEOTECHNICAL REPORTS AS DIRECTED BY THE PROJECT GEOTECHNICAL ENGINEER IN THE FIELD. 5. THE CONTRACTOR SHALL POTHOLE AND VERIFY LOCATIONS AND ELEVATIONS OF ALL CONNECTIONS TO EXISTING UNDERGROUND FACILITIES BEFORE ANY CONSTRUCTION. THE ENGINEER MUST BE NOTIFIED IMMEDIATELY IF CONDITIONS DIFFER FROM THOSE SHOWN ON THE PLANS SO THAT DESIGN CHANGES CAN BE MADE. 6. IT IS THE CONTRACTOR'S RESPONSIBILITY TO VERIFY THE LOCATIONS OF ALL EXISTING UNDERGROUND UTILITIES. CALL USA (UNDERGROUND SERVICE ALERT) 2 WORKING DAYS BEFORE DIGGING AT 811. LOCATIONS SHOWN ON THE PLANS WERE TAKEN FROM AVAILABLE RECORDS AND ARE APPROXIMATE AND SHOWN FOR GENERAL INFORMATION ONLY, AND MAY BE INCOMPLETE. RELOCATION OR REPAIR OF ANY DAMAGE TO UTILITIES OR PIPELINES AND PLUGGING OR REMOVAL OF ABANDONED LINES SHALL BE THE CONTRACTOR'S RESPONSIBILITY. 7. THE CONTRACTOR SHALL TAKE ALL NECESSARY PRECAUTIONS TO PRESERVE AND PROTECT ANY FENCES WHICH MAY BE REQUIRED TO REMAIN BY THE OWNER. 8. ALL EXISTING CESSPOOLS, FOUNDATIONS, BASEMENTS, TANKS OR OTHER UNDERGROUND STRUCTURES SHALL BE REMOVED AND THE RESULTING DEPRESSIONS BACKFILLED AND COMPACTED UNDER THE OBSERVATION OF THE SOILS ENGINEER. ALL COST INVOLVED IN THIS WORK SHALL BE CONSIDERED AS INCLUDED IN THE CONTRACT PRICE FOR THE GRADING ITEMS UNLESS COVERED IN SEPARATE PAY ITEMS. 9. THE CONTRACTOR SHALL TAKE ALL NECESSARY PRECAUTIONS TO PRESERVE AND PROTECT THOSE TREES WHICH ARE TO REMAIN. 10. EARTHWORK QUANTITIES HAVE BEEN ESTIMATED BY THE OWNER'S ENGINEER, BASED UPON AVAILABLE INFORMATION IN ORDER TO ASSIST THE CONTRACTOR. HOWEVER, IT SHALL BE THE CONTRACTOR'S RESPONSIBILITY TO INDEPENDENTLY ESTIMATE QUANTITIES FOR HIS USE. IF ADJUSTMENTS TO ELEVATIONS ARE NECESSARY TO EFFECT A BALANCE, THE CONTRACTOR SHALL NOTIFY THE ENGINEER IMMEDIATELY. THE COSTS INVOLVED TO EFFECT A BALANCE SHALL BE CONSIDERED AS INCLUDED IN THE CONTRACT PRICE FOR GRADING ITEMS AND NO EXTRA COMPENSATION WILL BE ALLOWED. BANK YARDAGE DOES NOT INCLUDE SHRINKAGE, SWELL SUBSIDENCE, GEOTECHNICAL REMEDIATION OR TRENCHING AND FOUNDATION SPOILS. 11. COMPACTION TO BE DETERMINED USING ASTM D 1557-78. 12. ALL WORK AND MATERIALS SHALL CONFORM TO THE REQUIREMENTS OF THE 2019 CITY OF CUPERTINO STANDARD SPECIFICATIONS FOR PUBLIC WORKS CONSTRUCTION UNLESS SPECIFICALLY NOTED OTHERWISE. 13. ALL GRADING SHALL COMPLY WITH THE REQUIREMENTS CONTAINED IN THE PROJECT E.I.R. AND PROJECT GEOLOGIC/GEOTECHNICAL REPORT REGARDING ANY ASBESTOS REMOVAL, ENCAPSULATION, AND/OR GEOTECHNICAL OBSERVATION AND TESTING REQUIRED. 14. CONSTRUCTION ENTRANCES SHALL BE INSTALLED PRIOR TO COMMENCEMENT OF GRADING. ALL CONSTRUCTION TRAFFIC ACCESSING AND EXITING THE SITE MUST CROSS THE STABILIZED CONSTRUCTION ENTRANCE WAYS. 15. SEE PROJECT STRUCTURAL PLANS (PREPARED BY OTHERS) FOR RETAINING WALL DESIGN AND DETAILS. SEPARATE PERMITS FOR RETAINING WALLS ARE REQUIRED. STATEMENT OF RESPONSIBILITY 1. CONTRACTOR AGREES THAT HE SHALL ASSUME SOLE AND COMPLETE RESPONSIBILITY FOR JOB SITE CONDITIONS DURING THE COURSE OF CONSTRUCTION OF THIS PROJECT, INCLUDING SAFETY OF ALL PERSONS AND PROPERTY; THAT THIS REQUIREMENT SHALL APPLY CONTINUOUSLY AND NOT BE LIMITED TO NORMAL WORKING HOURS AND THAT THE CONTRACTOR SHALL DEFEND, INDEMNIFY AND HOLD THE OWNER AND THE ENGINEER HARMLESS FROM ANY AND ALL LIABILITY, REAL OR ALLEGED, IN CONNECTION WITH THE PERFORMANCE OR WORK ON THIS PROJECT, EXCEPTING FOR LIABILITY ARISING FROM THE SOLE NEGLIGENCE OF THE OWNER OR THE ENGINEER. DEMOLITION NOTES 1. ITEMS DEMOLISHED ARE TO BECOME THE PROPERTY OF THE CONTRACTOR AND SHALL BE DISPOSED OF IN A LEGAL MANNER. 2. PROTECT TREES TO REMAIN, BOTH ON-SITE AND ADJACENT PROPERTIES. 3. PROTECT NEIGHBORING PROPERTIES FROM DAMAGE DURING CONSTRUCTION AND DEMOLITION ACTIVITIES. 4. IT IS THE CONTRACTOR'S RESPONSIBILITY TO MAINTAIN AND PRESERVE THE EXISTING MONUMENTS OF RECORD. SHOULD THE CONTRACTOR DESTROY OR DISTURB ANY MONUMENTS OF RECORD, THE CONTRACTOR SHALL, AT ITS SOLE EXPENSE, RETAIN A CALIFORNIA LICENSED LAND SURVEYOR TO REPLACE SAID MONUMENTS AND FILE AN APPROPRIATE CORNER RECORD. GENERAL NOTES 1. REVISIONS TO THESE PLANS MUST BE REVIEWED AND APPROVED IN WRITING BY HMH AND THE CITY OF CUPERTINO PRIOR TO CONSTRUCTION OF AFFECTED ITEMS. 2. THE CONTRACTOR SHALL NOTIFY HMH, AT (408) 487 2200 BEFORE PROCEEDING WITH ANY WORK THAT APPEARS TO BE INSUFFICIENTLY DETAILED. 3. CONTRACTOR SHALL REPLACE OR REPAIR, AT HIS OWN EXPENSE, ALL DAMAGED, REMOVED OR OTHERWISE DISTURBED EXISTING UTILITIES, OR IMPROVEMENTS IN KIND. 4. IF TEMPORARY LANE CLOSURES ARE REQUIRED FOR CONSTRUCTION OPERATIONS, THE CONTRACTOR SHALL PREPARE A TRAFFIC CONTROL PLAN AND OBTAIN APPROVAL FROM THE CITY OF CUPERTINO BEFORE COMMENCING WORK. THE CONTRACTOR SHALL ALSO PROVIDE FLAG MEN, CONES OR BARRICADES, AS NECESSARY TO CONTROL TRAFFIC AND PREVENT HAZARDOUS CONDITIONS, PER CALTRANS STANDARDS. 5. EXISTING PEDESTRIAN WALKWAYS, BIKE PATHS AND DISABLED ACCESS PATHWAYS SHALL BE MAINTAINED DURING CONSTRUCTION TO THE SATISFACTION OF THE CITY INSPECTOR. 6. CONTRACTOR SHALL BACKFILL TRENCHES, OR PLACE STEEL PLATING AND/OR HOT-MIX ASPHALT, AS REQUIRED BY THE CITY INSPECTOR, TO PROTECT OPEN TRENCHES AT THE END OF EVERY WORK DAY. DP-2019-001, ASA-2019-006, TR-2019-032 01/10/20 Ellen Yau REMOVE STRIPING REMOVE STRIPING TRANSFORMER, PIP REMOVE LIGHTS, TYP REMOVE SIGN, TYP REMOVE LIGHT POST, TYP EX SDCB, CONVERT TO JUNCTION BOX SEE GRADING PLANS EX PILLARS PIP, TYP EX OVERHANG REMOVE SIGN, TYP REMOVE STRIPING, TYPREMOVE STRIPING, TYP AC, PIP NEW SANITARY SEWER LINE TRENCH THROUGH AC AND LANDSCAPE, TYP EX CONC, PIP EX SIGN, PIP E X 4 " S D EX 12"SD EX 12"SD EX 8"SD EX 15"SDEX 6"W EX CO, PIP EX DRAIN, PIP EX CONC, PIP EX FENCE, PIP REMOVE SIGN, TYP EX CURB, PIP REMOVE LIGHTPOST, PIP NEW STORM DRAIN LINE TRENCH THROUGH AC, TYP REMOVE TRUNCATED DOMES, TYP DRAWN BY: PROJECT NO: CAD DWG FILE: CHECKED BY: DESIGNED BY: DATE: SCALE: HMHC NOT FOR CONSTRUCTION19900 STEVENS CREEKGRADING AND DRAINAGECUPERTINO, CALIFORNIAS:\PROJECTS\520200\LD\GRADING AND DRAINAGE PLAN\PLOT DRAWINGS\520200GP02-DEMO.DWG 520200GP02-DEMO.DWG C2.1 PLOTTED: 11/15/2019 1:14 PMLand Use Entitlements Land Planning Landscape Architecture Civil Engineering Utility Design Land Surveying Stormwater Compliance 1570 Oakland Road (408) 487-2200 San Jose, CA 95131 HMHca.com REENIGNEL A NOISSEFORPDERETSIGER CA L I F O R NIAFO E T ATS V I LIC No. 68876MARTIN L . DEF O R GE2ND SUBMITTAL 5202.00 RCH BC NOV. 15, 2019 ST EVEN S CR EEK BL VD. KEY M A P C2.2 C2.1 1" = 10' RCH DEMOLITION PLAN MATCHLINE, SEE SHEET C2.2 1 INCH = 10 FEET 2010 5 0 EX BUILDING 19900 STEVENS CREEK BLVD STEVENS CREEK BLVD DEMOLITION LEGEND REMOVE PLANTING AREA PROTECT ALL UTILITIES IN PLACE UNLESS OTHERWISE NOTED SEE LANDSCAPE PLANS FOR LIMITS OF PLANTING AREA DEMOLITION REMOVE CONCRETE SAWCUT LINE REMOVE CURB REMOVE AC EX TREE PROTECT IN PLACE (SIZE MAY VARY) REMOVE TREE DP-2019-001, ASA-2019-006, TR-2019-032 01/10/20 Ellen Yau REMOVE STRIPING REMOVE STRIPING REMOVE STRIPING REMOVE TRUNCATED DOMES, TYP REMOVE LIGHT POST, TYP REMOVE FENCE, TYP REMOVE FENCE, TYP AC, PIP AC, PIP AC, PIP EX CURB, PIP EX OVERHANG REMOVE LIGHT POST, TYP EX 8"SD EX 10"SDEX DRAIN, PIP EX CONC, PIP EX FENCE, PIP EX LOADING DOCK, PIP EX DRAIN, PIP DRAWN BY: PROJECT NO: CAD DWG FILE: CHECKED BY: DESIGNED BY: DATE: SCALE: HMHC NOT FOR CONSTRUCTION19900 STEVENS CREEKGRADING AND DRAINAGECUPERTINO, CALIFORNIAS:\PROJECTS\520200\LD\GRADING AND DRAINAGE PLAN\PLOT DRAWINGS\520200GP02-DEMO.DWG 520200GP02-DEMO.DWG C2.2 PLOTTED: 11/15/2019 1:14 PMLand Use Entitlements Land Planning Landscape Architecture Civil Engineering Utility Design Land Surveying Stormwater Compliance 1570 Oakland Road (408) 487-2200 San Jose, CA 95131 HMHca.com REENIGNEL A NOISSEFORPDERETSIGER CA L I F O R NIAFO E T ATS V I LIC No. 68876MARTIN L . DEF O R GE2ND SUBMITTAL 5202.00 RCH BC NOV. 15, 2019 1" = 10' RCH ST EVEN S CR EEK BL VD. KEY M A P C2.2 C2.1 DEMOLITION PLAN MATCHLINE, SEE SHEET C2.1 1 INCH = 10 FEET 2010 5 0 EX BUILDING 19900 STEVENS CREEK BLVD DEMOLITION LEGEND REMOVE PLANTING AREA PROTECT ALL UTILITIES IN PLACE UNLESS OTHERWISE NOTED SEE LANDSCAPE PLANS FOR LIMITS OF PLANTING AREA DEMOLITION REMOVE CONCRETE SAWCUT LINE REMOVE CURB REMOVE AC EX TREE PROTECT IN PLACE (SIZE MAY VARY) REMOVE TREE DP-2019-001, ASA-2019-006, TR-2019-032 01/10/20 Ellen Yau E X 4 " S D EX 12"SD EX 8"SD EX 15"SDEX 6"W EX 12"SD x EX AC 201.49 FF 202.81FS 202.77 x FS 202.70x7.8%9' 8' 9' 9' 5'9'18' 4.5' 2.7' 3.8' 9'8.5'1.5%7.8% FF 202.821.5% 1.5% FS 202.77x x FS 202.76 x FS 202.48 3.6% 7.8%7.8%EFF 202.81 24.5' 18' FS 202.00 x FS 202.59 x FS 202.41 x x FS 202.41 FS 202.59 x ES 202.44± CONFORM x ES 202.44± CONFORM x FF 202.81 FF 202.81 FF 202.81 FF 202.81 FS 202.59 x x FS 202.60 1.8%0.5%0.5% 0.5%1.0%0.5%1.1%FS 202.67 x FS 202.67x1.5% FS 202.51x x FS 202.63 0.5% 0.5% x FS 202.56 x FS 202.66 FS 202.66xx FS 202.72 1.5%0.5%FS 202.48x 1 . 5% 1.5% 1.8% 1.5%0.7%1.5%1.7%1.5%1.5%0.5% 0.5% x EX AC 201.12± CONFORM x EX AC 201.09± CONFORM x EX AC 201 .55± x EX AC 201.15±FF 202.81 FF 202.81 EFF 202.81 FF 202.81 1.5% TVC 202.69 1.5% TVC 202.69 1.8% 1.5% TVC 202.69 TVC 202.23 EX AC 201.73± CONFORM TVC 202.69 TVC 202.16 EX AC 201.66± 2.8% TVC 201.97 EX AC 201.47± CONFORM TVC 201.54 EX AC 201.04± TVC 202.66 TVC 202.66 1.5% 6.0% TVC 201.85 (7" CURB) EX AC 201.27± 7.0%± TVC 202.11 EX AC 201.61± CONFORM TVC 202.07 EX AC 201.57± TVC 202.34 TVC 202.34 FS 202.66 x x FS 202.66 TRASH ENCLOSURE SEE ARCHITECTURAL PLANS EX AC 201.66± CONFORM x TW 204.06 FS 202.56 SS AD RIM 200.89 INV 199.25 ~ 4" SDR-26 PVC OUT153'~8" SDR -26 PVC @ 0 .01 TW 204.25 FS 202.69 TW 204.25 FS 202.31 TW 204.06 FS 202.72 TW 204.06 FS 202.72 TVC 202.54 FS 202.13 TDVC 202.13 TVC 202.34 FS 201.87 TDVC 201.87 FS 202.68 x x FS 202.81 x FS 202.81x FS 202.81 x FS 202.81 x AC 201.65± x AC 201.74± x EX AC 201 .63± CONFORM x AC 201.09± x CONFORM AC 201.32± CONFORM x GB FS 202.55x GB GB GB GB GB GB GB GB GBTVC 202.02 EX AC 201.52±GBGB GBGBGB AC 201 .31 ± x CONFORMGBGB x FS 202.77 0.7 %GBGBGB x FS 202.74 x FS 202.74 0.7%1.8% x FS 202.40 TW 204.25 FS 202.751. 5 % GB 2' CURB TRANSITION 4 C 1.2 2' CURB TRANSITION 4 C 1.2 VERTICAL CURB 1 C 1.2 VERTICAL CURB 1 C 1.2 VERTICAL CURB 1 C 1.2 FS 202.71 x GBx FS 202.78 x FS 202.70 TVC 201.85 (7" CURB) 8' ~ 8" PVC @ 0.02 4.9% 1.1%3.3%2.9%3 . 6%2.2%±0.8%JUNCTION BOX RIM 201.19 INV 199.00 ~ 8" IN E EX INV 198.04 ~ 8" IN W EX INV 198.00 ~ 12" IN S EX INV 197.94 ~ 12" OUT N TDVC 201.95 AC 201.95 TDVC 201.95 AC 201.95 TDVC 201.95 AC 201.95 TDVC 201.95 AC 201.95 TVC 202.33 AC 201.95 x FS 202.81 x FS 202.63 CONCRETE SLAB x FS 202.55 0.5' ROADWAY DEDICATION 29'~4" SDR-26 PVC @ 0.025'INV ±196.25 (SEE PLUMBING PLANS FOR CONTINUATION) 24' EX SDFI RIM 200.69 INV 197.77 IN INV 197.74 IN INV 197.74 OUT TVC 202.49 TVC 202.69 TVC 202.16 AC 201.68± CONFORM x AC 201.77± CONFORM AC 201.83± CONFORM x x AC 201.84± CONFORM x AC 201.45± CONFORM xAC 201.42± CONFORM 2 . 8% SADDLE WYE INTO EX SS CO EX RIM ±202.40 INV 196.40 ~ 8" SDR-26 PVC IN INV ±1 95.67 ~ 4" SDR-26 PVC IN INV ±195.67 ~ 4" OUT SS CO RIM 202.20 INV 197.37 ~ 8" SDR-26 PVC IN INV 197.34 ~ 8" SDR-26 PVC OUT SAND AND OIL SEPARATOR RIM 201.10 INV 199.15 ~ 8" SDR-26 PVC IN INV 198.90 ~ 8" SDR-26 PVC OUT 94'~8" SDR-26 PVC @ 0 . 0 1 EX AC 201.67 CONFORM x EX AC 201.50 CONFORM x x AC 201.68 x AC 201.63 x AC 201.68 SDCB RIM @ 200.79 INV 199.16 (INSTALL REM TRITON FULL TRASH CAPTURE (FTC) DEVICE FILTER OR CITY APPROVED EQUIVALENT) DRAWN BY: PROJECT NO: CAD DWG FILE: CHECKED BY: DESIGNED BY: DATE: SCALE: HMHC NOT FOR CONSTRUCTION19900 STEVENS CREEKGRADING AND DRAINAGECUPERTINO, CALIFORNIAS:\PROJECTS\520200\LD\GRADING AND DRAINAGE PLAN\PLOT DRAWINGS\520200GP03-GR.DWG 520200GP03-GR.DWG C3.1 PLOTTED: 11/26/2019 9:14 AMLand Use Entitlements Land Planning Landscape Architecture Civil Engineering Utility Design Land Surveying Stormwater Compliance 1570 Oakland Road (408) 487-2200 San Jose, CA 95131 HMHca.com REENIGNEL A NOISSEFORPDERETSIGER CA L I F O R NIAFO E T ATS V I LIC No. 68876MARTIN L .DEF O R GE2ND SUBMITTAL 5202.00 RCH BC NOV. 15, 2019 ST EVEN S CR EEK BL VD. KEY M A P C3.2 C3.1 1" = 10' RCH GRADING AND DRAINAGE PLAN EX BUILDING 19900 STEVENS CREEK BLVD STEVENS CREEK BLVD PA PA PA PA PA PA PA PAPA PA PA PA PA PA PA PA PA PA PA PA PA C ON ST R U C T I ON L EGEN D DESC R I P T I ON SY M B OL DET A I L C ON C R ET E P A V I N G NOTES: 1. SEE SHEET L2.01 FOR CONSTRUCTION DETAILS, MATERIALS LIST AND CONSTRUCTION NOTES. 2. LOCATE EXPANSION JOINTS ADJACENT TO ALL STRUCTURES (BUILDINGS, WALLS, AND STEPS) AND AT 10' MAXIMUM SPACING. COORDINATE WITH PROJECT LANDSCAPE ARCHITECT PRIOR TO LAYING OUT ALL EXPANSION JOINTS IN FIELD. C EN T ER L I N E C ON T R OL JOI N T CLA L I GN EQ P A P L A N T I N G A R EA EQUA L T Y P T Y P I C A L FOBFACE OF B UI L DI N G L 2.01 C EXP A N SI ON JOI N T C ON C R ET E P A V ER S, T Y P E A L A N DSC A P E WA L L WI T H WOOD C A P L A N DSC A P E WA L L CONCRETE PAVERS, TYPE B L 2.01 D L 2.01 E L 2.01 C L 2.01 A L 2.01 B L 2.01 B OV ER L A Y A C N EW A C SA WC UT EA SEM EN T SA N I T A R Y SEWER L I N E ST OR M DR A I N L I N E 1 INCH = 10 FEET 2010 5 0 MATCHLINE, SEE SHEET C3.2 NEW BUILDING EXTENSION PA DP-2019-001, ASA-2019-006, TR-2019-032 01/10/20 Ellen Yau EX 8"SD EX 10"SD9'8.5'FF 202.81 x EX AC 201 .1 1 ± CONFORM x EX AC 201 .80± CONFORM EX AC 202.10± x CONFORM EX AC 202.37± x CONFORM AC 202.69 x 1.0%1.5% x AC 202.73 x EX AC 201 .62± x EX AC 202.20± x EX AC 201.96± x EX AC 202.03± x EX AC 201.87± x EX AC 201.46± x EX AC 201.33±FF 202.81EFF 202.81 FF 202.81 FF 202.811.5% TVC 202.69 1.5% TVC 202.69 1.3%TVC 202.69 1.5% TVC 202.69 TVC 202.73 TVC 203.21 AC 202.71 EX TVC 203.24± AC 202.82 TVC 202.67 EX AC 202.1 7± CONFORM TVC 202.69 TVC 202.69 TVC 202.52 TVC 202.63 EX AC 202.1 3± TVC 202.72± EX AC 202.22± CONFORM TVC 201.97 EX AC 201.47± CONFORM TVC 202.66 1.5%7.0%± INV 199.25 ~ 4" SDR-26 PVC OUT AC 201.09± x CONFORM AC 201.16± x CONFORM TVC 202.04 EX AC 201.54± CONFORM TVC 202.96± EX AC 202.46± CONFORM EX AC 201 .87± x x SDFI RIM @ 201.48 INV @ 197.77 IN INV 197.74 ~8" IN INV 197.74 ~10" OUT VERTICAL CURB 1 C 1.2 VERTICAL CURB 1 C 1.2 VERTICAL CURB 1 C 1.2 AC 202.00± CONFORM x X AC 202.00± CONFORM TVC 201.85 (7" CURB) xAC 201.42± CONFORM AC 201.93± CONFORM x TVC 202.48 TVC 202.47 TVC 202.65 TVC 202.52 NEW BUILDING EXTENSION NEW BUILDING EXTENSION EX SDCB WRAP IN FILTER FABRIC AND BURY GR @ 199.55± CONTRACTOR TO VERIFY EX TVC 203.26± EX AC 202.77± EX TVC 203.05± EX TVC 203.1 1± EX AC 202.58± CONFORM 2.0% MAXGB x FS 202.81 x AC 202.56 DRAWN BY: PROJECT NO: CAD DWG FILE: CHECKED BY: DESIGNED BY: DATE: SCALE: HMHC NOT FOR CONSTRUCTION19900 STEVENS CREEKGRADING AND DRAINAGECUPERTINO, CALIFORNIAS:\PROJECTS\520200\LD\GRADING AND DRAINAGE PLAN\PLOT DRAWINGS\520200GP03-GR.DWG 520200GP03-GR.DWG C3.2 PLOTTED: 11/15/2019 1:15 PMLand Use Entitlements Land Planning Landscape Architecture Civil Engineering Utility Design Land Surveying Stormwater Compliance 1570 Oakland Road (408) 487-2200 San Jose, CA 95131 HMHca.com REENIGNEL A NOISSEFORPDERETSIGER CA L I F O R NIAFO E T ATS V I LIC No. 68876MARTIN L . DEF O R GE2ND SUBMITTAL 5202.00 RCH BC NOV. 15, 2019 1" = 10' RCH ST EVEN S CR EEK BL VD. KEY M A P C3.2 C3.1 GRADING AND DRAINAGE PLAN EX BUILDING 19900 STEVENS CREEK BLVD PA PA PA PA PA PA PAPA PA PA C ON ST R U C T I ON L EGEN D DESC R I P T I ON SY M B OL DET A I L C ON C R ET E P A V I N G NOTES: 1. SEE SHEET L2.01 FOR CONSTRUCTION DETAILS, MATERIALS LIST AND CONSTRUCTION NOTES. 2. LOCATE EXPANSION JOINTS ADJACENT TO ALL STRUCTURES (BUILDINGS, WALLS, AND STEPS) AND AT 10' MAXIMUM SPACING. COORDINATE WITH PROJECT LANDSCAPE ARCHITECT PRIOR TO LAYING OUT ALL EXPANSION JOINTS IN FIELD. C EN T ER L I N E C ON T R OL JOI N T CLA L I GN EQ P A P L A N T I N G A R EA EQUA L T Y P T Y P I C A L FOBFACE OF B UI L DI N G L2.01 C EXP A N SI ON JOI N T C ON C R ET E P A V ER S, T Y P E A L A N DSC A P E WA L L WI T H WOOD C A P L A N DSC A P E WA L L CONCRETE PAVERS, TYPE B L2.01 D L2.01 E L2.01 C L2.01 A L2.01 B L2.01 B OV ER L A Y A C N EW A C SA WC UT EA SEM EN T SA N I T A R Y SEWER L I N E ST OR M DR A I N L I N E MATCHLINE, SEE SHEET C3.1 1 INCH = 10 FEET 2010 5 0 PA DP-2019-001, ASA-2019-006, TR-2019-032 01/10/20 Ellen Yau DRAWN BY: PROJECT NO: CAD DWG FILE: CHECKED BY: DESIGNED BY: DATE: SCALE: HMHC NOT FOR CONSTRUCTION19900 STEVENS CREEKGRADING AND DRAINAGECUPERTINO, CALIFORNIAS:\PROJECTS\520200\LD\GRADING AND DRAINAGE PLAN\PLOT DRAWINGS\520200GP03-GR.DWG 520200GP03-GR.DWG C4.1 PLOTTED: 11/15/2019 1:15 PMLand Use Entitlements Land Planning Landscape Architecture Civil Engineering Utility Design Land Surveying Stormwater Compliance 1570 Oakland Road (408) 487-2200 San Jose, CA 95131 HMHca.com REENIGNEL A NOISSEFORPDERETSIGER CA L I F O R NIAFO E T ATS V I LIC No. 68876MARTIN L . DEF O R GE2ND SUBMITTAL 5202.00 RCH BC NOV. 15, 2019 1" = 10' RCH BLUEPRINT FOR A CLEAN BAY DP-2019-001, ASA-2019-006, TR-2019-032 01/10/20 Ellen Yau DRAWN BY: PROJECT NO: CAD DWG FILE: CHECKED BY: DESIGNED BY: DATE: SCALE: HMHC DATE DESCRIPTIONNO 19900 STEVENS CREEKLANDSCAPE IMPROVEMENTSCUPERTINO, CAS:\PROJECTS\520200\LA\PRODUCTION\520201\520201CVC.DWG520201CVC.DWG G0.01 5202.00 LS BS 11/11/2019 PLOTTED: 11/14/2019 10:46 AMLand Use Entitlements Land Planning Landscape Architecture Civil Engineering Utility Design Land Surveying Stormwater Compliance 1570 Oakland Road (408) 487-2200 San Jose, CA 95131 HMHca.com NOT FOR CONSTRUCTION PLANNING COMMENTS11/14/19 1 COVER SHEET AMC AS SHOWN L A N D S C A P E A R C H I T E C T U R A L D R A W I N G S 1 9 9 0 0 S T E V E N S C R E E K B L V D . C I T Y O F C U P E R T IN O , C A L I F O R N IA G EN E R A L D R A W IN G S PLANS WERE DESIGNED BY REFERENCING: 1. GRADING PLANS PREPARED BY HMH DATED: 9/9/2019 . NOTES SOIL MANAGEMENT REPORT SHALL BE PROVIDED BY LANDSCAPE CONTRACTOR AND SOIL AMENDMENTS SHALL BE FOLLOWED PER THE REPORT. PHYSICAL COPIES OF THE SOIL MANAGEMENT REPORT SHALL BE PROVIDED TO CLIENT, PROJECT LANDSCAPE ARCHITECT AND LOCAL AGENCY AS REQUIRED. SOIL MANAGEMENT REPORT SHALL CONFORM TO STATE AB1881 WATER EFFICIENT LANDSCAPE ORDINANCE OR AGENCY ADOPTED WELO AS FOLLOWS: (1) SUBMIT SOIL SAMPLES TO A LABORATORY FOR ANALYSIS AND RECOMMENDATIONS. (A) SOIL SAMPLING SHALL BE CONDUCTED IN ACCORDANCE W ITH LABORATORY PROTOCOL, INCLUDING PROTOCOLS REGA RDING ADEQUATE SAMPLING DEPTH FOR THE INTENDED PLANTS. (B) THE SOIL ANALYSIS MAY INCLUDE: SOIL TEXTURE, INFILTRATION RATE DETERMINED BY LABORATORY TEST OR SOIL TEXTURE INFILTRATION RATE TABLE, PH, TOTAL SOLUBLE SALTS, SODIUM, PERCENT ORGANIC MATTER, AND RECOMMENDATIONS. (2) THE PROJECT APPLICANT, OR HIS/HER DESIGNEE, SHALL COMPLY WITH ONE OF THE FOLLOWING: (A) IF SIGNIFICANT MASS GRA DING IS NOT PLANNED, THE SOIL ANALYSIS REPORT SHALL BE SUBMITTED TO THE LOCAL AGENCY AS PART OF THE LANDSCAPE DOCUMENTATION PACKAGE; OR (B) IF SIGNIFICANT MASS GRA DING IS PLANNED, THE SOIL ANALYSIS REPORT SHALL BE SUBMITTED TO THE LOCAL AGENCY AS PART OF THE CERTIFICATE OF COMPLETION. (3) THE SOIL ANALYSIS REPORT SHALL BE MADE AVAILABLE, IN A TIMELY MANNER, TO THE PROFESSIONALS PREPARING THE LANDSCAPE DESIGN PLANS AND IRRIGATION DESIGN PLANS TO MAKE ANY NECESSARY ADJUSTMENTS TO THE DESIGN PLANS. (4) THE PROJECT APPLICANT, OR HIS/HER DESIGNEE, SHALL SUBMIT DOCUMENTATION VERIFYING IMPLEMENTATION OF SOIL ANALYSIS REPORT RECOMMENDATIONS TO THE LOCAL AGENCY WITH CERTIFICATE OF COMPLETION. CONTRACTOR MUST PROVIDE AN IRRIGATION AUDIT IN ACCORDANCE WITH TITLE 23 BY THE STATE DEPARTMENT OF WATER RESOURCES SECTION 492.12, OR LOCAL AGENCY APPROVED ORDINANCE: IRRIGATION AUDIT, IRRIGATION SURVEY, AND IRRIGATION WATER USE ANALYSIS PRIOR TO PROJECT ACCEPTANCE. CONTRACTOR IS RESPONSIBLE FOR ENSURING THAT THE WORK IS COMPLETE AND IN COMPLIANCE WITH THE MOST CURRENT CODES, ORDINANCES AND REQUIREMENTS OF THE GOVERNING AGENCY. HMH IS NOT RESPONSIBLE FOR CHANGES WHICH OCCUR TO THE CODES, ORDINANCES OR REQUIREMENTS AFTER THE GOVERNING AGENCY'S APPROVAL OR DURING INSTALLATION. CONTRACTOR IS SOLELY RESPONSIBLE FOR CONSTRUCTION MEANS, METHODS, TECHNIQUES, SEQUENCES OR PROCEDURES, OR FOR SAFETY PRECAUTIONS AND PROGRAMS IN CONNECTION WITH THE WORK. HMH IS NOT RESPONSIBLE FOR THE CONTRACTOR'S FAILURE TO CARRY OUT THE WORK IN ACCORDANCE WITH THE CONSTRUCTION CONTRACT DOCUMENTS, NOR RESPONSIBLE FOR ACTS OR OMISSIONS OF THE CONTRACTOR, SUBCONTRACTORS, OR THEIR AGENTS OR EMPLOYEES, OR OF ANY OTHER PERSONS PERFORMING PORTIONS OF THE WORK. AS REQUESTED BY THE OWNER, HMH WILL VISIT THE SITE AT INTERVALS APPROPRIATE TO THE STAGE OF CONSTRUCTION TO REVIEW THE PROGRESS AND QUALITY OF WORK AND TO DETERMINE IN GENERAL IF THE WORK IS BEING PERFORMED IN A MANNER INDICATING THAT THE WORK, WHEN COMPLETED, WILL BE IN SUBSTANTIAL CONFORMANCE WITH THE CONSTRUCTION DOCUMENTS. HOWEVER, HMH WILL NOT MAKE EXHAUSTIVE OR CONTINUOUS ON-SITE OBS ERVATIONS TO CHECK QUALITY OF THE WORK. THERE IS NO WARRANTY OR GUARANTEE EITHER EXPRESSED OR IMPLIED BY HMH FOR THE COMPLETION OF THE WORK OR THE QUALITY OF PERFORMANCE OF THE CONSTRUCTION CONTRACTOR(S). CONTRACTOR SHALL SUPERVISE AND DIRECT THE WORK, USING THE CONTRACTOR'S BEST SKILL AND ATTENTION. CONTRACTOR SHALL BE SOLELY RESPONSIBLE FOR AND HAVE CONTROL OVER CONSTRUCTION MEANS, METHODS, TECHNIQUES, SEQUENCES, AND PROCEDURES AND FOR COORDINATING ALL PORTIONS OF THE WORK. CONTRACTOR SHALL BE RESPONSIBLE TO THE OWNER FOR ACTS AND OMISSIONS OF THE CONTRACTOR'S EMPLOYEES, SUBCONTRACTORS AND THEIR AGENTS AND EMPLOYEES, AND OTHER PERSONS PERFORMING PORTIONS OF THE WORK UNDER A CONTRACT WITH CONTRACTOR. IN THE EVENT OWNER CONSENTS TO, ALLOWS, AUTHORIZES OR APPROVES OF CHANGES TO ANY PLANS, SPECIFICATIONS, OR OTHER CONSTRUCTION DOCUMENTS, AND THESE ALTERATIONS ARE NOT APPROVED IN WRITING BY HMH, OWNER RECOGNIZES THAT SUCH ALTERATION AND THE RESULTS THEREOF ARE NOT THE RESPONSIBILITY OF HMH IN ADDITION, OWNER AGREES, TO THE FULLEST EXTENT PERMITTED BY LAW, TO INDEMNIFY AND HOLD HMH HARMLESS FROM ANY DAMAGE, LIABILITY OR COST (INCLUDING REASONABLE ATTORNEY'S FEES AND COSTS OF DEFENSE) ARISING FROM SUCH ALTERATIONS. THE EXISTENCE AND LOCATION OF ANY UNDERGROUND UTILITIES SHOWN ON THE PLANS WERE OBTAINED FROM AVAILABLE RECORDS AT THE TIME THE PLANS WERE DRAFTED AND DO NOT CONSTITUTE A REPRESENTATION AS TO THE ACCURACY OR COMPLETENESS OF THE LOCATION OR THE EXISTENCE OR NONEXISTENCE OF SUCH UTILITIES. IN NORTHERN CALIFORNIA, CONTRACTOR SHALL CONTACT UNDERGROUND SERVICES ALERT AT 1-800-642-2444 PRIOR TO PERFORMING ANY CONSTRUCTION WORK. IN OTHER AREAS, CONTRACTOR SHALL CONTACT A SIMILAR AGENCY/ORGANIZATION. CONTRACTOR SHALL PROVIDE PROPER PROJECT MAINTENANCE AFTER THE PROJECT IS COMPLETE. ANY LACK OF OR IMPROPER MAINTENANCE MAY RESULT IN DAMAGE TO PROPERTY OR PERSONS. CONTRACTOR SHALL BE RESPONSIBLE FOR THE RESULTS OF ANY LACK OF OR IMPROPER MAINTENANCE. GOVERNING AGENCY CITY OF CUPERTINO: PLANNING DEPARTMENT 10300 TORRE AVENUE CUPERTINO, CA 95014-3202 (408)777-3200 DESIGN TEA M CIVIL ENGINEER AND LANDSCAPE ARCHITECT: HMH 1570 OAKLAND RD. SAN JOSE, CA 95131 (408)487-2200 ARCHITECT: MA DESIGN GROUP 675 SOUTH ARROYO PARKWAY #500 PENTHOUSE SUITE PASADENA, CA 91105 (213)305-3583 OWNER 19900 STEVENS CREEK BLVD., LCC REPRESENTATIVE: NATHAN UNG 800 W. 6TH STREET, #600 LOS ANGELES, CA 90017 (213) 270-6221 SHEET TITLE TITLE SHEET C0.1 L1.01-L1.02 L2.01 L3.01-L3.02 L3.03 L3.04-L3.06 L4.01-L4.02 L4.03 L5.01-L5.05 LANDSCAPE SPECIFICATIONS PLANTING LEGEND, NOTES AND DETAILS PLANTING PLAN IRRIGATION DETAILS IRRIGATION LEGEND AND NOTES IRRIGATION PLAN CONSTRUCTION DETAILS, NOTES, AND MATERIALS LIST CONSTRUCTION PLAN COVER SHEET G0.01 TREE REMOVAL AND MITIGATION PLAN L0.01 TREE PROTECTION NOTES, DETAIL, AND DEMOLITION NOTES L0.02 SCOPE: THIS PROJECT INCLUDES ENHANCEMENTS TO THE PARKING LOT AND LANDSCAPE AT 19900 STEVENS CREEK BLVD. CUPERTINO, CA. LANDSCAPE UPGRADES INCLUDE UPDATED ACCESSIBLE PARKING, WALKWAYS, ENHANCED ENTRY PAVING, LANDSCAPE WALLS, DROUGHT TOLERANT PLANTING, A ND A RETROFIT DRIP IRRIGATION SYS TEM COMPLIANT WITH MWELO STANDARDS. TREES WILL BE REPLACED IN ACCORDANCE WITH THE CITY OF CUPERTINO'S TREE MITIGATION POLICY. TOTAL SITE AREA: 1.92 ACRES TOTAL LANDSCAPE AREA DISTURBED: 7,994 SF PERVIOUS SURFACE ADDED: 830 SF PERVIOUS SURFACE REMOVED: 4,669 SF IMPERVIOUS SURFACE ADDED: 4,669 SF IMPERVIOUS SURFACE REMOVED: 830 SF VICINITY MAP NOT TO SCALE SITE SHEET TITLE CIVIL DRAWINGS LA N DS C A PE D R A W IN G S SHEET TITLE L1.03 BIRD'S EYE VIEWS L3.07 WATER EFFICIENCY CALCULATIONS L4.04 PLANT IMAGES ADDITIONAL NOTES AND DETAILS C0.2 DEMOLITION PLAN C1.1-C1.2 GRADING AND DRAINAGE PLAN C2.1-2.2 BLUEPRINT FOR A CLEAN BAY C3.1 DP-2019-001, ASA-2019-006, TR-2019-032 01/10/20 Ellen Yau 7 9 10 12 16 18 19 20 21 23 24 28 29 30 31 32 33 34 35 27 26 25 37 38 40 39 4243 44 45 49 46 48 47 36 1 22 41 50 51 52 53 54 55 56 57 58 59 60 61 62 2 3 4 5 6 8 11 13 14 15 17 EX1 2 "SS EX1 2 "SS EX 6"W EX 6"W EX 6"W A B C D EF G H I JK LM N O P Q S T U R V W X Y DRAWN BY: PROJECT NO: CAD DWG FILE: CHECKED BY: DESIGNED BY: DATE: SCALE: HMHC DATE DESCRIPTIONNO 19900 STEVENS CREEKLANDSCAPE IMPROVEMENTSCUPERTINO, CAS:\PROJECTS\520200\LA\PRODUCTION\520201\520201VPC.DWG520201VPC.DWG L0.01 5202.00 LS BS 11/11/2019 PLOTTED: 11/14/2019 10:47 AMLand Use Entitlements Land Planning Landscape Architecture Civil Engineering Utility Design Land Surveying Stormwater Compliance 1570 Oakland Road (408) 487-2200 San Jose, CA 95131 HMHca.com NOT FOR CONSTRUCTION PLANNING COMMENTS11/14/19 1 TREE REMOVAL AND MITIGATION PLAN AMC 1" = 20' STEV ENS CREEK B LV D ( In Feet ) 1 inch = 20 feet GRAP HIC SCALE 80 40 20 10 020 19900 STEV ENS CREEK BL VD TREE TO BE REMOVED PROPOSED TREE # # TREE PROTECTION LEGEND DESCRIPTION SYMBOL TREE TO REMAIN/PROTECT 25TOTAL PROPOSED TREES (NOT INCLUDING STREET TREES) TOTAL TREES REQUIRED TO MEET MITIGATATION REQUIREMENTS +7 24" BOX T R EE M I T I G A T I O N SU M M A R Y T A B L E SIZE QUANTITY +- = 25 TREES REQUIRED REPLACEMENT RATIO-SIZE QTY*** QUANTITY REQUIRED 2:1 - 24" BOX OR 1:1 - 36" BOX 2:1 - 24" BOX OR 1:1 - 36" BOX 1:1 - 24" BOX TOTAL NUMBER OF NON-NA TIVE TREES TO BE REMOVED 7 6 12 7 10 2418"-36" DIA. ON-SITE TREE MITIGATION TABLE DBH** < 12" DIA. 12"-18" DIA. 6 +18 36" BOX 12 1 1 DP-2019-001, ASA-2019-006, TR-2019-032 01/10/20 Ellen Yau DRAWN BY: PROJECT NO: CAD DWG FILE: CHECKED BY: DESIGNED BY: DATE: SCALE: HMHC DATE DESCRIPTIONNO 19900 STEVENS CREEKLANDSCAPE IMPROVEMENTSCUPERTINO, CAS:\PROJECTS\520200\LA\PRODUCTION\520201\520201VPC.DWG520201VPC.DWG L0.02 5202.00 LS BS 11/11/2019 PLOTTED: 11/14/2019 10:48 AMLand Use Entitlements Land Planning Landscape Architecture Civil Engineering Utility Design Land Surveying Stormwater Compliance 1570 Oakland Road (408) 487-2200 San Jose, CA 95131 HMHca.com NOT FOR CONSTRUCTION PLANNING COMMENTS11/14/19 1 TREE PROTECTION NOTES, DETAIL, AND DEMOLITION NOTES AMC NOT TO SCALE DEMOLITION NOTES THE CONTRACTOR SHALL VISIT THE PROJECT SITE PRIOR TO B IDDING TO DETERMINE THE EXACT EXTE NT OF ALL SITE DEMOLITION ITEMS. THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE VERIFICATION OF ALL EXISTING UTILITIES IN THE FIELD PRIOR TO CONSTRUCTION. LOCATIONS SHOWN ON THE PLANS ARE APPROXIMATE AND ARE FOR GENE RAL INFORMATION ONLY. HE SHALL BE RESPONSIBLE FOR MAKING HIMSELF FAMILIAR WITH ALL UNDERGROUND CONDITIONS PRIOR TO COMMENCEMENT OF WORK. THESE PLANS MAY NOT SHOW ALL EXISTING CITY ELECTRICAL FACILITIES INCLUDING, BUT NOT LIMITED TO, TRAFFIC SIGNALS, STREETLIGHT AND TRAFFIC SIGNAL COMMUNICATION EQUIPMENT, CONDUIT, PULL BOXES, AND WIRING. THE CONTRACTOR SHALL BE RESPONSIBLE FOR LOCATING ALL SUCH FACILITIES AND FOR REPAIRING ANY SUCH FACILITIES THAT ARE DAMAGED DURING CONSTRUCTION. PAYMENT FOR LOCATING, COORDINATING, AND REPAIRING EXISTING CITY ELECTRICAL FACILITIES WILL BE DEEME D INCLUDED IN OTHER ITEMS OF WORK, AND NO ADDITIONAL COMPENSATION SHALL BE MADE THEREOF. ALL WORK SHALL BE DONE IN ACCORDANCE W ITH THE SPECIFICATIONS & DETAILS. THE CONTRACTOR SHALL PERFORM ALL CLEARING, DEMOLITION, REMOVAL OF OBSTRUCTIONS, AND SITE PREPARATIONS NECESSARY FOR THE PROPER EXECUTION OF ALL WORK SHOWN ON THESE PLAN AS DESCRIBED IN THE SPECIFICATIONS. THE CONTRACTOR SHALL NOTIFY UNDERGROUND SERVICE ALERT (U.S.A.) AT LEAST 48 HOURS PRIOR TO ANY EXCAVATION ON THIS PROJECT. CALL U.S.A. AT (800) 624-2444 THE CONTRACTOR SHALL BE RESPONSIBLE UNDER THIS CONTRACT FOR REPAIRING AND REPLACING, AT HIS OWN EXPENSE, ANY STRUCTURE S, FENCES , W ALLS, OR PLANT LIFE DAMAGED OR DESTROYED BY HIS OPERATION. LIKEWISE, HE SHALL BE RESPONSIBLE FOR REPAIRING OR REPLACING ANY AND ALL DAMAGES, OCCURRING BY HIS OPERATION, ON ADJACENT PROPERTIES AND ANYWHERE OUTSIDE THE CONTRACT LIMIT LINES. THE DA MAGED ITEMS SHALL BE RESTORED TO THERE ORIGINAL CONDITIONS AND TO THE SATISFACTION OF THE PROJECT SUPERINTENDENT. THE CONTRACTOR SHALL BE RESPONSIBLE TO KEEP ALL STREET RIGHT-OF-WAYS CLEAN TO THE SATISFACTION OF THE PROJECT SUPERINTENDENT ALL ITEMS INDICATED TO BE REMOVED SHALL BE DISPOSED OF FROM THE PROJECT S ITE, EXCEPT ITEMS INDICATED TO BE RE-INSTALLED. ALL TREES TO BE REMOVED SHALL HAVE THEIR STUMPS GROUND DOWN TO A MINIMUM DEPTH OF 24" REMOVE ALL LARGE ROOTS FROM PLANTING AREAS A MINIMUM DISTANCE OF 5' BEYOND THE DRIP LINE OF THE TREE. TRE E P ROTEC TION N OTES SECTION I SITE PREPARATION: ALL EXISTING TREES SHALL BE FENCED OFF WITHIN, AT OR OUTSIDE THE DRIP LINE (FOLIAR SPREAD) OF THE TREE USING THE FOLLOWING FORMULA: TWELVE INCHES IN DISTANCE FROM THE TRUNK FOR EVERY INCH IN TRUNK DIAMETER, MEASURED 2.0 FEET ABOVE THE AVERAGE GROUND LEV EL. EXAMPLE: A 24 INCH DIAMETER TREE WOULD HAVE A FENCE ERECTED 24 FEET FROM THE BASE OF THE TREE (24 X 12 = 288 / 12 = 24). THE FENCE SHOULD BE A MINIMUM OF SIX FEET HIGH, MADE OF W IRE WITH STEEL STAKES, SUCH AS CYCLONE FENCING. IF THE FENCE IS WITHIN THE DRIP LINE OF THE TREES, EVERY ATTEMPT SHOULD BE MADE TO RELOCATE THE FENCE OUTSIDE THE DRIPLINE OF THE TREE. IF NOT POSSIBLE, THE TREE SHALL BE PRUNED TO REDUCE THE CHANCE OF LIMB BREAKAGE FROM CONSTRUCTION EQUIPMENT ENCROACHING WITHIN THE DRIP LINE. ALL CONTRACTORS, SUBCONTRACTORS AND OTHER PERSONNEL SHALL BE WARNED THAT ENCROACHMENT WITHIN THE FENCED AREA IS FORBIDDEN WITHOUT THE CONSENT OF THE CERTIFIED ARBORIST ON THE JOB. THIS INCLUDES, BUT IS NOT LIMITED TO, STORAGE OF LUMBER AND OTHER MATERIALS, DISPOSAL OF PAINTS, SOLVENTS OR OTHER NOXIOUS MATERIALS, PARKED CARS, GRADING EQUIPMENT OR OTHER HEAVY EQUIPMENT. PENALTIES, BASED ON THE COST OF REMEDIAL REPAIRS AND THE EVALUATION GUIDE PUBLISHED BY THE INTERNATIONAL SOCIETY OF ARBORICULTURE, SHALL BE ASSESSED FOR DAMAGES TO THE TREES. SECTION II GRADING/EXCAVATING: ALL GRADING PLANS THAT SPECIFY GRADING WITHIN THE DRIP LINE OF ANY TREE, OR WITHIN THE DISTANCE FROM THE TRUNK AS OUTLINED IN SECTION I WHEN SAID DISTANCE IS OUTSIDE THE DRIP LINE, SHALL FIRST BE REVIEWED BY THE CERTIFIED ARBORIST. PROVISIONS FOR AERATION, DRAINAGE, PRUNING, TUNNELING BENEATH ROOTS, ROOT PRUNING OR OTHER NECESS ARY ACTIONS TO PROTECT THE TREES SHALL BE OUTLINED BY THE ARBORIST. IF TRENCHING IS NECESSARY WITHIN THE AREA AS DE SCRIBED ABOVE, SAID TRENCHING SHALL BE UNDERTAKEN BY HAND LABOR. ALL ROOTS 2 INCHES OR LARGER SHALL BE TUNNELED UNDER AND OTHER ROOTS SHA LL BE CUT SMOOTHLY TO THE TRUNK SIDE OF THE TRENCH. THE TRUNK SIDE SHOULD BE DRAPED IMMEDIATELY W ITH TWO LAYERS OF UNTREA TED BURLAP TO A DE PTH OF 3 FEET FROM THE SURFACE. THE BURLAP SHALL BE SOAKED NIGHTLY AND LEFT IN PLACE UNTIL THE TRENCH IS BACK FILLED TO THE ORIGINAL LEVEL. THE ARBORIST S HALL EXAMINE THE TRENCH PRIOR TO BACK FILLING TO ASCERTAIN THE NUMBER AND SIZE OF ROOTS CUT, SO AS TO SUGGEST THE NECESSARY REMEDIAL REPAIRS. SECTION III REMEDIAL REPAIRS: THE ARBORIST ON THE JOB SHALL HAVE THE RESPONSIBILITY OF OBSERVING ALL ONGOING ACTIVITIE S THAT MAY AFFECT THE TREES, AND PRESCRIBING NECESSARY REMEDIAL WORK TO INSURE THE HEALTH AND STABILITY OF SAID TREES. THIS INCLUDES, BUT IS NOT LIMITED TO, ALL ARBORIST A CTIVITIES BROUGHT OUT IN SECTIONS I AND II. IN ADDITION, PRUNING, AS OUTLINED IN THE "PRUNING STANDARDS" OF THE WESTERN CHAPTER OF THE INTERNATIONA L SOCIETY OF ARBORICULTURE, SHALL BE PRESCRIBED AS NECESSARY. FERTILIZING, AERATION, IRRIGATION, PEST CONTROL AND OTHER ACTIVITIES SHALL BE PRESCRIBED ACCORDING TO THE TREE NEEDS, LOCAL SITE REQUIREMENTS, AND STATE AGRICULTURAL PEST CONTROL LAWS. ALL SPECIFICATIONS SHALL BE IN WRITING. FOR PEST CONTROL OPERATIONS, CONSULT THE LOCA L COUNTY AGRICULTURAL COMMISSIONERS OFFICE FOR INDIVIDUALS LICENSED AS PEST CONTROL ADVISORS OR PEST CONTROL OPERATORS. SECTION IV FINAL INSPECTION: UPON COMPLETION OF THE PROJECT, THE ARBORIST SHALL RE VIEW ALL WORK UNDERTAKEN THAT MAY IMPACT THE EXISTING TREES. SPECIAL ATTENTION SHALL BE GIVEN TO CUTS AND FILLS, COMPACTING, DRAINAGE, PRUNING AND FUTURE REMEDIAL WORK . THE ARBORIST SHOULD SUBMIT A FINAL REPORT IN WRITING OUTLINING THE ONGOING REMEDIAL CARE FOLLOWING THE FINAL INSPECTION. A TR E E P R O TE C TI O N D ET A IL SCALE: NONE NOTES: 1. PROTECTION FOR TREES SHALL BE PROVIDED BEFORE GRADING OR OTHER EQUIPMENT IS ALLOWED ON THE PROPERTY. WHEN CONSTRUCTION IS TO TAKE PLACE BENEATH A TREE CANOPY FENCING SHALL BE LOCATED PER ARBORIST. IF CONSTRUCTION OR PAVING IS TO TAKE PLACE THROUGHOUT THE AREA BENEATH CANOPY, AND DRIP LINE FENCING IS NOT PRACTICAL, WATTLE AND SNOW FENCING SHOULD BE USED TO PROTECT THE TRUNKS FROM DAMAGE PER DE TAIL. 2. PRUNING MAY BE NECESSARY TO FACILITATE REMOVAL OF DEAD WOOD, CONFLICT WITH NEW STRUCTURE, OR REDUCE STRESS AND SHALL BE CARRIED OUT BY A QUALIFIED ARBORIST. 3. CONSULT WITH ARBORIST TO DETERMINE FERTILIZING AND WATERING SCHEDULE FOR EXISTING TREES PRIOR TO CONSTRUCTION TO REDUCE SHOCK AND STRESS. 4. ONLY TREES WITHIN THE LIMITS OF GRADING OR ADJACENT TO CONSTRUCTION STAGING AREAS AND CONSTRUCTION ACCESS AREAS SHALL RECEIVE TREE PROTECTION. CONTRACTOR SHALL CONSULT WITH ARBORIST FOR METHODS OF TRENCHING FOR INSTALLATION FOR UTILITIES WITHIN ROOTZONE.DRIP LINE FENCE THE PERIMETER OF DRIP LINE WITH 6' HIGH CHAIN LINK FENCE. SECURE ONE SIGN PER ZONE AS DETAILED BELOW OR APPROVED EQUAL TO FENCE WITH W IRE TIES. WHERE PROTECTIVE FENCING CAN NOT BE INSTALLED AT THE DRIPLINE OF THE TREE OR WHEN FENCING IS REMOVED FOR CONSTRUCTION, INSTALL LODGE POLE POSTS (4 PER TREE) AROUND TREE AND WRAP TRUNK IN STRAW WADDLE THEN ORANGE SNOW FENCING TO BRANCHING STRUCTURE. SECTION TRE E P ROTECTION ZONE DO NOT REMOVE EXCEPT FOR UNDER THE DIRECTION OF THE PROJECT ARBORIST SIGN 1 2 3 DRIP LINE 1 3 2 DP-2019-001, ASA-2019-006, TR-2019-032 01/10/20 Ellen Yau EX 6"W PA PA PA PA PA PA PA PA PA PA PA PA PA PA PA PA PA PA PA PA PA PA PA FOBFOB FOBDRAWN BY: PROJECT NO: CAD DWG FILE: CHECKED BY: DESIGNED BY: DATE: SCALE: HMHC DATE DESCRIPTIONNO 19900 STEVENS CREEKLANDSCAPE IMPROVEMENTSCUPERTINO, CAS:\PROJECTS\520200\LA\PRODUCTION\520201\520201LCC.DWG520201LCC.DWG L1.01 5202.00 LS BS 11/11/2019 PLOTTED: 11/15/2019 1:03 PMLand Use Entitlements Land Planning Landscape Architecture Civil Engineering Utility Design Land Surveying Stormwater Compliance 1570 Oakland Road (408) 487-2200 San Jose, CA 95131 HMHca.com NOT FOR CONSTRUCTION PLANNING COMMENTS11/14/19 1 CONSTRUCTION PLAN AMC 1" = 10' STEV ENS CREEK B LV D ( In Feet ) 1 inch = 10 feet GRAP HIC SCALE 4020 10 5 010 MATCHLINE, SEE SHEET L1.02 19900 S TEV ENS CREEK BL VD STEVENS CREEK BLVD. KEY MAP EXISTING TREE TO REMAIN, TYPICAL EXISTING TRANS FORMER TO REMAIN CURB RA MP, SEE CIVIL PLANS CONS TRUCTION LEGEND DESCRIPTION SYMBOLDETAIL CONCRETE PAVING NOTES: 1. SEE SHEET L2.01 FOR CONSTRUCTION DETAILS, MATERIALS LIST AND CONSTRUCTION NOTES. 2. LOCATE EXPANSION JOINTS ADJACENT TO ALL STRUCTURES (BUILDINGS, WALLS, AND STEPS) AND AT 10' MAXIMUM SPACING. COORDINATE WITH PROJECT LANDSCAPE ARCHITECT PRIOR TO LAYING OUT ALL EXPANSION JOINTS IN FIELD. CENTER LINE CONTROL JOINT CLALIGN EQ PAPLANTING AREA EQUAL TYPTYPICAL FOBFACE OF BUILDING L2.01 C EXPANSION JOINT CONCRETE PAVERS, TYPE A LANDSCAPE WALL WITH WOOD CAP LANDSCAPE WALL CONCRETE PAVERS, TYPE B L2.01 D L2.01 E L2.01 C L2.01 A L2.01 B L2.01 B EXISTING FENCE TO REMAIN BIKE PARKING FOR SIXTEEN (16) TRASH ENCLOSURE (SEE ARCHITECTURAL DRAWINGS) EXISTING SIDEWALK TO REMAIN 1 1 1 DP-2019-001, ASA-2019-006, TR-2019-032 01/10/20 Ellen Yau PA PA PA PA PA PA PA PA PA PA PA PA PA DRAWN BY: PROJECT NO: CAD DWG FILE: CHECKED BY: DESIGNED BY: DATE: SCALE: HMHC DATE DESCRIPTIONNO 19900 STEVENS CREEKLANDSCAPE IMPROVEMENTSCUPERTINO, CAS:\PROJECTS\520200\LA\PRODUCTION\520201\520201LCC.DWG520201LCC.DWG L1.02 5202.00 LS BS 11/11/2019 PLOTTED: 11/15/2019 1:05 PMLand Use Entitlements Land Planning Landscape Architecture Civil Engineering Utility Design Land Surveying Stormwater Compliance 1570 Oakland Road (408) 487-2200 San Jose, CA 95131 HMHca.com NOT FOR CONSTRUCTION PLANNING COMMENTS11/14/19 1 CONSTRUCTION PLAN AMC 1" = 10' MATCHLINE , SEE SHEE T L1.01 ( In Feet ) 1 inch = 10 feet GRA PHIC SCALE 4020 10 5 010 19900 STEVE NS C REE K BLVD STEVENS CREEK BLVD. KEY MAP CONSTRUCTION LEGEND DESCRIPTION SYMBOLDETAIL CONCRETE PAVING NOTES: 1. SEE SHEET L2.01 FOR CONSTRUCTION DETAILS, MATERIALS LIST AND CONSTRUCTION NOTES. 2. LOCATE EXPANSION JOINTS ADJACENT TO ALL STRUCTURES (BUILDINGS, WALLS, AND STEPS) AND AT 10' MAXIMUM S PACING. COORDINATE WITH PROJECT LANDSCAPE ARCHITECT PRIOR TO LAYING OUT ALL EXPANSION JOINTS IN FIELD. CENTER LINE CONTROL JOINT CLALIGN EQ PAPLANTING AREA EQUAL TYPTYPICAL FOBFACE OF BUILDING L2.01 C EXPANSION JOINT CONCRETE PAVERS, TYPE A LANDSCAPE WALL WITH WOOD CAP LANDSCAPE WALL CONCRETE PAVERS, TYPE B L2.01 D L2.01 E L2.01 C L2.01 A L2.01 B L2.01 B EXISTING TREE TO REMAIN, TYPICAL EXISTING PLANTING TO REMAIN EXISTING PLANTING TO REMAIN EXISTING FENCE TO REMAIN EXISTING FENCE TO REMAIN 1 1 1 DP-2019-001, ASA-2019-006, TR-2019-032 01/10/20 Ellen Yau DRAWN BY: PROJECT NO: CAD DWG FILE: CHECKED BY: DESIGNED BY: DATE: SCALE: HMHC DATE DESCRIPTIONNO 19900 STEVENS CREEKLANDSCAPE IMPROVEMENTSCUPERTINO, CAS:\PROJECTS\520200\LA\PRODUCTION\520201\520201LCC.DWG 520201LCC.DWG L1.03 5202.00 LS BS 1 1 /1 1 /201 9 PLOTTED: 11/19/2019 9:05 AMLand Use Entitlements Land Planning Landscape Architecture Civil Engineering Utility Design Land Surveying Stormwater Compliance 1570 Oakland Road (408) 487-2200 San Jose, CA 95131 HMHca.com NOT FOR CONSTRUCTION PLANNING COMMENTS11/1 4/1 9 1 BIRD'S EYE VIEWS AMC STEVENS CREEK BLVD. KEY MAP BIRD'S EYE VIEW 1 BIRD'S EYE VIEW 2 (PLANTING SHOWN IS DIAGRAMMATIC ONLY. SEE SHEETS L4.01 - L4.02 FOR PLANTING PLAN ) (PLANTING SHOWN IS DIAGRAMMATIC ONLY. SEE SHEETS L4.01 - L4.02 FOR PLANTING PLAN ) NONE 1 DP-2019-001, ASA-2019-006, TR-2019-032 01/10/20 Ellen Yau G A B C D E F AS NOTED CJT CONSTRUCTION DETAILS, NOTES, AND MATERIALS LIST DRAWN BY: PROJECT NO: CAD DWG FILE: CHECKED BY: DESIGNED BY: DATE: SCALE: HMHC DATE DESCRIPTIONNO 19900 STEVENS CREEKLANDSCAPE IMPROVEMENTSCUPERTINO, CAS:\PROJECTS\520200\LA\PRODUCTION\520201\520201DSC.DWG520201DSC.DWG L2.01 5202.00 LS BS 1 1 /1 1 /201 9 PLOTTED: 11/26/2019 10:06 AMLand Use Entitlements Land Planning Landscape Architecture Civil Engineering Utility Design Land Surveying Stormwater Compliance 1570 Oakland Road (408) 487-2200 San Jose, CA 95131 HMHca.com NOT FOR CONSTRUCTION PLANNING COMMENTS11/1 4/1 9 1 CONCRETE WALL WITH WOOD CAP SCALE: 1 "=1 '-0" NOTES: 1. REFER TO MATERIALS LIST FOR COLOR, TYPE AND FINISH. 1/2" RADIUS EDGE, TYPICAL 1'-0" MIN. 1'-6"12" 8" TYP. POURED IN PLACE CONCRETE WALL REBAR #4 @ 16" O.C. VERTICAL 3" CLEAR, ALTERNATE HOOKS INTO FOOTING AS SHOWN ADJACENT PAVING PER PLAN COMPACTED NON EXPANSIVE FILL, THICKNESS AND COMPACTION PER GEOTECHNICAL RECOMMENDATION NATIVE GRADE OR CERTIFIED COMPACTED SUBGRADE PER GEOTECHNICAL REPORT EXPANSION JOINT CONCRETE FOOTING REBAR #4 CONTINUOUS MAINTAIN 3" CLEAR, TYPICAL. 1 2 3 4 5 6 7 8 9 1 4 9 8 5 6 7 4 3 2 1'-6" 3" X 6" WOOD SLATS10 12 3/8" GALVANIZED STEEL C-CHANNEL @ 18" OC13 BLACK OXIDE SQUARE DRIVE SELF TAPPING SCREWS COUNTERSUNK SO THE SCREW HEAD IS FLUSH WITH THE FACE OF SURFACE. ALIGNED IN A STRAIGHT LINE AT THE SURFACE, SPACED EQUAL DISTANCE APART. 14 CONCRETE WEDGE ANCHOR 2 12 13 14 10 11 SLOPE CONCRETE @ 1 % KERF WOOD SO IT LIES FLUSH AGAINST SURFACE 11 SKATEBOARD DETERRENT, 4' O.C. MAX. SEE MATERIALS LIST 15 15 EXPANSION JOINTCONTROL JOINT 3/4" PAVING JOINTS (PEDESTRIAN) SCALE:1 "=1 '-0" NOTES: 1. SEE MATERIALS LIST FOR COLOR, TYPE AND FINISH. 2. CONTROL JOINTS SHALL BE PROVIDED AS SHOWN ON THE PLANS AND WITH A MAXIMUM SPACING OF 8' O.C. EXPANSION JOINTS SHALL BE AS SHOWN ON PLANS WITH A MAXIMUM SPACING OF 12' O.C. 1/2" RADIUS EDGE 1/2"X3" POLYFELT EXPANSION JOINT (TYPICAL). TOP WITH 2 PART SELF-LEVELING SEALER TO MATCH CONCRETE COLOR TOOLED OR SAW CUT CONTROL JOINT 3/4" DEEP REINFORCEMENT PER PAVING DETAIL 12" SMOOTH DOWEL. SLEEVE OR GREASE ONE END. FOR SIDEWALKS UP TO 8' WIDE USE 2 EQUALLY SPACED DOWELS PER EXPANSION JOINT. FOR FLAT WORK GREATER THAN 8' WIDE AND AT CURBS SPACE DOWELS AT 36" O.C. AT EXPANSION JOINT. CONCRETE PAVING, SEE CONCRETE PAVING DETAIL 1 2 3 4 5 6 4 3 6 1 2 5 46 CONCRETE PAVING (PEDESTRIAN) SCALE: 1 "=1 '-0" NOTES: 1. SEE MATERIALS LIST FOR COLOR TYPE AND FINISH. 4" THICK CONCRETE PAVING 4" CLASS 2 AGGREGATE BASE COMPACTED TO 90% FINISH GRADE TO BE 1" BELOW FOR TURF, 2" FOR SHRUB AREAS NATIVE GRADE OR CERTIFIED COMPACTED SUBGRADE #3 REBAR @ 18" O.C. EACH WAY, WITH 3" CLEAR 1/2" RADIUS EDGE 1 2 3 4 5 6 1 2 3 4 5 6 SECTION PAVERS OVER SAND SCALE: 1 "=1 '-0" NOTE: 1. SEE MATERIALS LIST FOR COLOR, TYPE AND FINISH. METAL HEADER, SEE DETAIL COMPACTED NON EXPANSIVE FILL PER GEOTECHNICAL REPORT FILTER FABRIC NATIVE GRADE OR CERTIFIED COMPACTED SUBGRADE FINISHED GRADE 2" BELOW FOR SHRUB AREAS CONCRETE PAVER, HOLD TIGHT 1-1/2" DEEP SAND LEVELING BED 1 2 3 4 5 6 7 6 8 5 4 ADJACENT PAVING OR BUILDING EDGE8 7 3 2 1 LANDSCAPE WALL SCALE: 1 "=1 '-0" NOTES: 1. REFER TO MATERIALS LIST FOR COLOR, TYPE AND FINISH. 1/2" RADIUS EDGE, TYPICAL 1'-0" MIN. 1'-6"12" 8" TYP. 1'-6" POURED IN PLACE CONCRETE WALL REBAR #4 @ 16" O.C. VERTICAL 3" CLEAR, ALTERNATE HOOKS INTO FOOTING AS SHOWN ADJACENT PLANTING OR PAVING PER PLAN COMPACTED NON EXPANSIVE FILL, THICKNESS AND COMPACTION PER GEOTECHNICAL RECOMMENDATION NATIVE GRADE OR CERTIFIED COMPACTED SUBGRADE PER GEOTECHNICAL REPORT EXPANSION JOINT CONCRETE FOOTING REBAR #4 CONTINUOUS MAINTAIN 3" CLEAR, TYPICAL. 1 2 3 4 5 6 7 8 9 1 4 9 8 5 6 7 4 3 2 SKATEBOARD DETERRENT, 4' O.C. MAX. SEE MATERIALS LIST 10 10 MATERIALS LIST CONCRETE PAVING: SHALL BE NATURAL GRAY WITH LIGHT BROOM FINISH PERPENDICULAR TO PATH OF TRAVEL, SCORED PER PLAN. CONCRETE PAVERS: TYPE A: SHALL BE 12X24 CALIFORNIA COLLECTION MANUFACTURED BY ACKERSTONE. COLOR: .STONE GREY F.M TYPE B: SHALL BE 3X18 CALIFORNIA COLLECTION MANUFACTURED BY ACKERSTONE. COLOR: .1/3 STONE GREY F.M., 1/3 CHARCOAL F.M., AND 1/3 AGAVE F.M., MIXED RANDOMLY. EXPANSION JOINT: ASPHALTIC FELT MATERIAL WITH MASTIC FILL. MASTIC COLOR TO MATCH CONCRETE. ALUMINUM HEADER: SHALL BE PERMALOC PERMASTRIP ALUMINUM EDGING, COLOR SHALL BE BLACK. LANDSCAPE WALL: SHALL BE PIP CONCRETE, DAVIS COLOR SILVER SMOKE, 4" HORIZONTAL BOARD FORM FINISH. LANDSCAPE WALL WITH WOOD CAP: SHALL BE PIP CONCRETE, DAVIS COLOR SILVER SMOKE, 4" HORIZONTAL BOARD FORM FINISH. WOOD CAP SHALL BE IPE WITH CLEAR SEALANT APPLIED TO ALL SIDES. BIKE RACK: SEE ARCHITECTURAL DRAWINGS FOR MAKE, MODEL AND COLOR. WASTE TRIOS AND ASH URNS: SEE ARCHITECTURAL DRAWINGS FOR MAKE, MODEL, COLOR AND LOCATION. SKATEBOARD DETERRENT: SHALL BE GRINDMINDER COLOR: SOLID STAINLESS STEEL WITH A BLACK OXIDE FINISH BY GRIND TO A HALT FOR SEAT WALL. CONCRETE WALL WITH WOOD CAP SHALL BE THREADED GRINDERMINDER COLOR: BLACK OXIDE BY GRIND TO HALT. CONSTRUCTION PLAN NOTES CONTRACTOR SHALL PROVIDE ALL LABOR, MATERIALS, AND EQUIPMENT FOR THE INSTALLATION OF ALL IMPROVEMENTS AS SHOWN ON THE DRAWINGS AND AS DESCRIBED IN THE SPECIFICATIONS. CONTRACTOR SHALL REVIEW ALL EXISTING SITE CONDITIONS PRIOR TO SUBMITTING BID AND PRIOR TO COMMENCING INSTALLATION. IF ANY DISCREPANCIES EXIST, THEY SHOULD BE BROUGHT TO THE IMMEDIATE ATTENTION OF THE OWNER'S AUTHORIZED REPRESENTATIVE. CONTRACTOR SHALL BE RESPONSIBLE FOR LOCATING AND STAKING ALL SEWER, WATER AND UTILITY LINES ABOVE OR BELOW GRADE THAT MIGHT BE DAMAGED AS A RESULT OF CONSTRUCTION OPERATIONS. CONTRACTOR SHALL ASSUME SOLE RESPONSIBILITY FOR ANY COST INCURRED FOR REPAIR, RESTORATION, OR REPLACEMENT OF AFOREMENTIONED UTILITIES DAMAGED AS A RESULT OF CONSTRUCTION OPERATIONS. DEVIATIONS BETWEEN THE DRAWINGS AND ACTUAL FIELD CONDITIONS SHALL BE BROUGHT TO THE IMMEDIATE ATTENTION OF THE OWNER'S AUTHORIZED REPRESENTATIVE. HARDSCAPE AND STRUCTURAL ELEMENTS SHALL BE PLACED PER GEOTECHNICAL SOILS REPORT. IF SUCH REPORT IS UNAVAILABLE, CONTRACTOR SHALL DISCUSS PLACEMENT ON SUITABLE GRADE WITH THE OWNER'S AUTHORIZED REPRESENTATIVE. UNLESS DESIGNATED ON THE DRAWINGS OTHERWISE, ALL MATERIALS DESIGNATED FOR REMOVAL SHALL BE DISPOSED OF OFF-SITE. COSTS INCURRED DUE TO REPAIR, RESTORATION, OR REPLACEMENT OF EXISTING IMPROVEMENTS WHICH ARE DESIGNATED "TO BE PROTECTED" OR "TO REMAIN" WHICH ARE DAMAGED AS A RESULT OF CONSTRUCTION OPERATIONS SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR. UNLESS DESIGNATED ON THE DRAWINGS OTHERWISE, MATERIALS TO BE PURCHASED AND FURNISHED BY THE CONTRACTOR SHALL BE NEW. CONCRETE INDICATED FOR SAWCUTTING AND REMOVAL SHALL BE CUT TO A TRUE LINE WITH NEATLY SAWED EDGES. IF A SAWCUT IS WITHIN THREE FEET (3') OF AN EXISTING EXPANSION OR CONTROL JOINT, CONCRETE SHALL BE REMOVED TO THAT NEAREST JOINT. CONTRACTOR SHALL SUBMIT SHOP DRAWINGS, MANUFACTURER'S CUT OR DATA SHEETS FOR APPROVAL PRIOR TO ORDERING MATERIALS. CONTRACTOR SHALL FURNISH TO THE OWNER'S AUTHORIZED REPRESENTATIVE A CERTIFICATE OF COMPLIANCE FOR SUCH FURNISHED MATERIALS. ABANDONED PIPES SHALL BE CAPPED OR PLUGGED IN A MANNER APPROVED BY THE OWNER'S AUTHORIZED REPRESENTATIVE. ALUMINUM HEADER SCALE: 1 "=1 '-0" TOP OF EDGING TO BE SET BENEATH PAVERS FINISHED GRADE 1" ABOVE ADJACENT PLANTING AREA 1 1/2" FOR TURF CERTIFIED COMPACTED SUBGRADE PER GEOTECH REPORT 12" ALUMINUM STAKES TO LOCK INTO PREFORMED LOOPS ON THE EDGING PERMALOC PERMASTRIP ALUMINUM EDGING PERMALOC PERMASTRIP NOTES: 1. INSTALL PER MANUFACTURER'S 'INSTALLATION GUIDELINES' 2. 16'-0" SECTIONS TO INCLUDE (8) 12" ALUMINUM STAKES. 3. CORNERS: NOTCH BASE ONLY AND FORM CONTINUOUS CORNER. 4. SEE MATERIALS LIST FOR COLOR. MANUFACTURED BY PERMALOC CORPORATION, HOLLAND MI. PHONE: (800) 356-9660 1 2 3 4 5 6 7 1 2 5 7 3 6 FILTER FABRIC CONCRETE PAVERS, SEE DETAIL 4 SECTION BIKE RACK IN INTERLOCKING PAVERS SCALE: 1 "=1 '-0" NOTES: 1. REFER TO MATERIALS LIST FOR COLOR, TYPE AND FINISH. ADJACENT INTERLOCKING PAVERS. SEE MATERIALS LIST BIKE RACK. IMBED MOUNT. SEE MATERIAL LIST FOR MAKE, MODEL & FINISH NATIVE GRADE OR CERTIFIED COMPACTED SUBGRADE DIRECT EMBEDMENT BIKE RACK PER MANUFACTURERS RECOMMENDATIONS CONCRETE FOOTING WITH REINFORCEMENT PER MANUFACTURERS RECOMMENDATIONS 1 2 3 4 5 6"1 4 2 3 5 1 DP-2019-001, ASA-2019-006, TR-2019-032 01/10/20 Ellen Yau EX 6"W DRAWN BY: PROJECT NO: CAD DWG FILE: CHECKED BY: DESIGNED BY: DATE: SCALE: HMHC DATE DESCRIPTIONNO19900 STEVENS CREEKLANDSCAPE IMPROVEMENTSCUPERTINO, CAS:\PROJECTS\520200\LA\PRODUCTION\520201\520201IRC.DWG520201IRC.DWG L3.01 5202.00 LS BS 11/11/2019 PLOTTED: 11/15/2019 1:07 PMLand Use Entitlements Land Planning Landscape Architecture Civil Engineering Utility Design Land Surveying Stormwater Compliance 1570 Oakland Road (408) 487-2200 San Jose, CA 95131 HMHca.com NOT FOR CONSTRUCTION PLANNING COMMENTS11/14/19 1 IRRIGATION PLAN AMC 1" = 10' S TEVENS CR EEK BLVD ( In Feet ) 1 inch = 10 feet GRA PHIC SCALE 4020 10 5 010 MATCHLINE, SEE SHEET L3.02 19900 S TEV ENS CREEK BL VD STEVENS CREEK BLVD. KEY MAP L3.02 L3.01 REMOTE CONTROL VALVE, PRESSURE REGULATOR & FILTER FOR DRIP SYSTEMS M 1. SEE SHEET L3.03 FOR IRRIGATION LEGEND AND NOTES. 2. SEE SHEETS L3.04 - L3.06 FOR IRRIGATION DETAILS. 3. SEE SHEET L3.07 FOR WATER USE CALCULATIONS AND IRRIGATION SCHEDULE. 4. IRRIGATION PLANS ARE DIAGRAMMATIC FOR GRAPHIC CLARITY. 5. I HAVE COMPLIED WITH THE CRITERIA OF THE WATER CONSERVATION IN LANDSCAPING ORDINANCE AND APPLIED THEM ACCORDINGLY FOR THE EFFICIENT USE OF WATER IN THE IRRIGATION DESIGN PLAN. IA STATION # GPM SIZE ZONE TYPE APPROX. LENGTH OF DRIP TUBING WATER METER REDUCED PRESSURE BACKFLOW DEVICE ELECTRIC IRRIGATION CONTROLLER WEATHER SENSOR PVC BALL VALVE QUICK COUPLER TREE BUBBLER NON PRESSURE LATERAL LINE DRIPZONE LATERAL LINE PRESSURIZED SUP PLY LINE (MAINLINE) SLEEVE (4" UNLESS OTHERWISE NOTED) DRIP IRRIGATION LINES VALVE TAG NOTES: IRRIGATION LEGEND DESCRIPTION SYMBOL # G P M X" XXXX' X" GPM # CENTER FEED W SHRUB BUBBLER 1 1 EXISTING TREE TO REMAIN, TYPICAL 1 DP-2019-001, ASA-2019-006, TR-2019-032 01/10/20 Ellen Yau DRAWN BY: PROJECT NO: CAD DWG FILE: CHECKED BY: DESIGNED BY: DATE: SCALE: HMHC DATE DESCRIPTIONNO19900 STEVENS CREEKLANDSCAPE IMPROVEMENTSCUPERTINO, CAS:\PROJECTS\520200\LA\PRODUCTION\520201\520201IRC.DWG520201IRC.DWG L3.02 5202.00 LS BS 11/11/2019 PLOTTED: 11/15/2019 1:07 PMLand Use Entitlements Land Planning Landscape Architecture Civil Engineering Utility Design Land Surveying Stormwater Compliance 1570 Oakland Road (408) 487-2200 San Jose, CA 95131 HMHca.com NOT FOR CONSTRUCTION PLANNING COMMENTS11/14/19 1 IRRIGATION PLAN AMC 1" = 10' MATCHLINE , SEE SHEE T L3.01 ( In Feet ) 1 inch = 10 feet GRA PHIC SCALE 4020 10 5 010 19900 STEVE NS C REE K BLVD STEVENS CREEK BLVD. KEY MAP L3.02 L3.01 REMOTE CONTROL VALVE, PRESSURE REGULATOR & FILTER FOR DRIP SYSTEMS M 1. SEE SHEET L3.03 FOR IRRIGATION LEGEND AND NOTES. 2. SEE SHEETS L3.04 - L3.06 FOR IRRIGATION DETAILS. 3. SEE SHEET L3.07 FOR WATER USE CALCULATIONS AND IRRIGATION SCHEDULE. 4. IRRIGATION PLANS ARE DIAGRAMMATIC FOR GRAPHIC CLARITY. 5. I HAVE COMPLIED WITH THE CRITERIA OF THE WATER CONSERVATION IN LANDSCAPING ORDINANCE AND APPLIED THEM ACCORDINGLY FOR THE EFFICIENT USE OF WATER IN THE IRRIGATION DESIGN PLAN. IA STATION # GPM SIZE ZONE TYPE APPROX. LENGTH OF DRIP TUBING WATER METER REDUCED PRESSURE BACKFLOW DEVICE ELECTRIC IRRIGATION CONTROLLER WEATHER SENSOR PVC BALL VALVE QUICK COUPLER TREE BUBBLER NON PRESSURE LATERAL LINE DRIPZONE LATERAL LINE PRESSURIZED SUP PLY LINE (MAINLINE) SLEEVE (4" UNLESS OTHERWISE NOTED) DRIP IRRIGATION LINES VALVE TAG NOTES: IRRIGATION LEGEND DESCRIPTION SYMBOL # G P M X" XXXX' X" GPM # CENTER FEED W SHRUB BUBBLER 1 1 1 EXISTING TREE TO REMAIN, TYPICAL DP-2019-001, ASA-2019-006, TR-2019-032 01/10/20 Ellen Yau DRAWN BY: PROJECT NO: CAD DWG FILE: CHECKED BY: DESIGNED BY: DATE: SCALE: HMHC DATE DESCRIPTIONNO 19900 STEVENS CREEKLANDSCAPE IMPROVEMENTSCUPERTINO, CAS:\PROJECTS\520200\LA\PRODUCTION\520201\520201IDC.DWG520201IDC.DWG L3.03 5202.00 LS BS 11/11/2019 PLOTTED: 11/14/2019 1:17 PMLand Use Entitlements Land Planning Landscape Architecture Civil Engineering Utility Design Land Surveying Stormwater Compliance 1570 Oakland Road (408) 487-2200 San Jose, CA 95131 HMHca.com NOT FOR CONSTRUCTION PLANNING COMMENTS11/14/19 1 IRRIGATION LEGEND AND NOTES AMC AS SHOWN NOTE: INSTALL TORO DL2000 PER MANUFACTURER'S SPECIFICATIONS FOR GROUND COVER & SHRUB AREAS: DL2000 DRIPLINE SPACING = 12" EMITTER SPACING =12" DRIPPER FLOW =0.53 GPH BUBBLERS BACKFLOW PREV ENTION DEVICE AND SECURE ENCLOSURE MODEL M F V P DRIPZONE CONTROL KIT INCLUDES REMOTE CONTROL VALVE, PRESSURE REGULATOR & FILTER FOR DRIP AND TREE BUBBLER VALVES 1" QUICK COUPLER VALVE WITH YELLOW VINYL COVER TORO FCH-H-FIPT, MINIMUM ONE PER VALVE TORO DL-MP9 MINIMUM ONE PER VALVE TORO YD-500-34 MINIMUM ONE PER VALVE SPRAY, ROTOR, AND BUBBLER VALVES DRIP TUBING VALVES GALLONS PER MINUTE THROUGH VALVE CONTROL VALVE SIZE CONTROLLER STATION NUMBER ZONE TYPE, IF APPLICAPBLE LENGTH OF DRIP TUBING, IF APPLICABLE IRRIGATION LEGEND DESCRIPTION SYMBOL PVC BALL VALVE WATER METER FLUSH VALVE FOR DL2000 SYSTEM OPERATION INDICATOR FOR DRIP SYSTEM AIR VACUUM RELIE F VALVE FOR DRIP SYSTEM MASTER VALVE PRESSURE REGULATOR ON-GRADE TORO DRIP TUBING NONPRESSURE IRRIGATION SUPPLYLINE-3/4" MIN. PRESSURE SUPPLY MAINLINE SLEEVE: 2x ENCLOSED PIPE DIAMETER OR AS INDICATED CONTROLLER STATION NUMBER GALLONS PER MINUTE THROUGH VALVE CONTROL VALVE SIZE FLOW SENSOR FEBCO 825Y - OR EQUAL, LINE SIZE (BID ALTERNATE) MANUFACTURER/MODEL/SIZE NIBCO PVC BALL VALVE 4660-S OR EQUAL, LINE SIZE TORO 100-2SLVC (2 PIECE, 1" SINGLE LUG, WITH YELLOW VINYL COVER) 1-1/2" BF OR LINE SIZE WILKINS MODEL 500-HLR-P INCLUDE PRESSURE GAUGE, INSTALL IF PRESSURE AT P.O.C. EXCEEDS 90 PSI GRISWOLD 2160, NORMALLY OPEN, LINE SIZE TORO 1" SENSOR, TFS-100 (5-50 GPM) DRIP TUBING TORO DL-2000 SERIES (RGP-212-10) SCHEDULE 40 PVC PIPE NONPRESSURE DRIP IRRIGATION LATERAL, SIZED PER PIPE SIZING CHART 12" COVER 24" COVER 24" COVER CLASS 200 PVC PIPE 1120 SCHD. 40 PVC PIPE FOR SIZES 1-1/2" AND SMALLER 1120 CLASS 315 PVC PIPE FOR SIZES 2" AND LARGER 1120/SCHEDULE 40 PVC PIPE NOTES 12" COVER OPERATING PRESSURE MODEL NOZZLE GPM OPERATING PRESSURE NOTESMODEL 30 PSI # G P M X" XXXX' X" GPM # CENTER FEED REQUIRED EQUIPMENT NOT GRAPHICALLY DEPICTED ON PLANS: (INSTALL PER MANUFACTURER'S RECOMMENDATIONS.) ON GRADE TREE BUBBLER 0.25 GPM EACH 20-75 PSI TORO FB-25-PC MOUNTED ON TORO SHRUB ADAPTERS IN QUANTITIES AS FOLLOWS: 2 PER 15 GALLON OR 24" BOX TREE 4 PER 36" BOX AND LARGER TREE EXISTING DEDICATED IRRIGATION WATER METER DRIP TUBE FITTINGS TORO TRI-LOC FITTINGS WEATHER SENSOR INSTALLATION OPTIONS ARE AS FOLLOWS, SEE DETAILS FOR MOUNTING INSTRUCTIONS: 1. INSTALL ON ROOF EVE OR GUTTER (PREFERRED) 2. MOUNT TO 12' TALL PRESSURE TREATED POST WITH REINFORCED CONCRETE FOOTING IN OPEN LOCATION PER DIRECTION OF SITE SUPERINTENDENT IA IRRITROL MC-E BLUE SERIES, NUMBER OF STATIONS - WALL MOUNT CONTROLLER, MC-NUMBER OF STATIONS E. WALL MOUNT ET BASED ELECTRIC IRRIGATION CONTROLLER WIRELESS WEATHER SENSING KIT (CL-100-WIRELE SS). INSTALL CLIMA TE LOGIC MODULE IN ENCLOSURE CABINET PER DETAIL. W PIPE S IZING CHA RT FLOW RATE (GPM) PIPE SIZE (DIAMETER) 0 TO 9 .75" 9.1 TO 18 1" 18.1 TO 30 1.25" 30.1 TO 40 1.5" 40.1 TO 60 2" 60.1 TO 70 2.5" MAXIMUM NUMBER OF WIRES C OND UIT & SLEEVE SIZIN G GUIDE MINIMUM CONDUIT SIZE (SCH 40 PIPE) MAXIMUM LATERAL OR MAINLINE PIPE SIZE MINIMUM SLEEVE SIZE REQUIRED (SCH 40 PIPE) >50 50 35 25 6" 4" 4 "-6 " 8" 3" 3" 6" 2 -1 /2 " 2" TO 2-1/2" 4" 8 17 12 4 2"3 /4 " 1 -1 /4 " 2"1 -1 /2 " 3" 1 -1 /2 " 1" TO 1-1/4"2 -1 /2 " 1 -1 /2 " 1 /2 " 1" TORO DKZ-700 (0.1-35 GPM) 1. CONTRACTOR SHALL UTILIZE THE EXISTING MAINLINES AND IRRIGATION SLEEVES WHENEVER POSSIBLE IN ORDER TO COMPLETE THE ENTIRE SYSTEM AS SHOWN ON THE PLANS AND SPECIFICATIONS. 2. DRAWINGS ARE DIAGRAMMATIC AND DO NOT NECESSARILY INDICATE ALL THE OFFSETS AND FITTINGS REQUIRED FOR A COMPLETE IRRIGATION SYSTEM. THE IRRIGATION SYSTEM SHALL BE INSTALLED WITHIN A PLANTING AREA WHEREVER POSSIBLE. CONTRACTOR SHALL BE RESPONSIBLE FOR ADJUSTMENTS NECESSARY TO CONFORM TO ACTUAL FIELD CONDITIONS. 3. EQUIP MENT INCLUDING MAIN, LATERALS, AND VALVES SHOWN GRAPHICALLY IN HARDSCAPE AREAS ARE FOR DESIGN CLARIFICATION ONLY AND SHALL BE INSTALLED WITHIN PLANTED AREAS AT A REASONABLE, REACHABLE DISTANCE FROM HARDSCAPE OR TURF AREAS UNLESS OTHERWISE NOTED ON THE DRAWINGS. 4. CONTRACTOR SHALL INSTALL WIRE AND PIPE UNDER HARDSCAPE AREAS IN SEPERATE P.V.C. SCHEDULE 40 SLEEVES. CONTRACTOR SHALL COORDINATE PIPING AND SLEEVING LOCATION PRIOR TO HARDSCAPE INSTALLATION. SLEEVING SHALL BE INSTALLED IN ACCORDANCE WITH APPLICABLE CODES. WHEREVER POSSIBLE, CONTROL WIRES SHALL OCCUPY THE SAME TRENCH AS PIPES. EACH CONTROLLER SHALL HAVE AN INDEPENDENT GROUND WIRE. 5. "I HAVE COMPLIED WITH THE CRITERIA OF THE ORDINANCE AND APPLIED THEM ACCORDINGLY FOR THE EFFICIENT USE OF WATER IN THE IRRIGATION DESIGN PLAN." INSTALL IRRIGATION SYSTEM IN ACCORDANCE WITH ALL LOCAL AND STATE CODES AND ORDINANCES. 6. THE EXISTING WATER PRESSURE AT THE PROPOSED WATER METER LOCATION IS UNKNOW N. THE CONTRACTOR SHALL VERIFY WATER PRESSURE IS ADEQUATE FOR THE SYSTEM AS DESIGNED. IF ANY DISCREPANCY EXISTS BETWEEN DESIGN AND ACTUAL FIELD CONDITIONS NOTIFY THE LANDSCAPE ARCHITECT IMMEDIATELY IN WRITING FOR A DECISION BEFORE PROCEEDING WITH THE INSTALLATION. 9. CONTRACTOR SHALL BE RESPONSIBLE FOR COMPLETE AND EFFECTIVE COVERAGE OF ALL PLANTING AREAS. DURING THE MAINTENANCE PERIOD, IT IS THE RESPONSIBILITY OF THE LANDSCAPE MAINTENANCE CONTRACTOR TO ENSURE ALL PLANT MATERIAL RECE IVES AS MUCH WATER AS IS NECESSARY FOR ESTABLISHMENT AND TO SUSTAIN GOOD PLANT HEALTH. 10. CONTRACTOR SHALL FLUSH ALL LINES AND ADJUST IRRIGATION SYSTEM FOR OPTIMUM PERFORMANCE IN ACCORDANCE WITH THE SPECIFICATIONS. COSTS INCURRED DUE TO ANY ADJUSTMENTS FOR 100% COVE RAGE, INCLUDING THOSE REQUESTED BY THE OWNER'S AUTHORIZED REPRESENTATIVE SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR. 11. CONTRACTOR SHALL COORDINATE INSTALLATION OF THE IRRIGATION SYSTEM WITH THE LAYOUT AND INSTALLATION OF THE PLANT MATERIAL TO ENSURE THAT THERE WILL BE COMPLETE AND UNIFORM IRRIGATION COVERAGE OF PLANTING. THE IRRIGATION LAYOUT SHALL BE CHECKED BY THE CONTRACTOR AND OWNER'S AUTHORIZED REPRESENTATIVE PRIOR TO CONSTRUCTION TO DETERMINE IF ANY CHANGES, DELETIONS, OR ADDITIONS ARE REQUIRED. THE IRRIGATION SYSTEM SHALL BE INSTALLED AND TESTED PRIOR TO THE INSTALLATION OF ANY PLANT MATERIALS. 12. TRENCHING DEPTHS FOR IRRIGATION PIPES SHALL BE AS FOLLOWS: MAIN = 24", ALL LATERALS = 12". ALL DIMENS IONS ARE FROM THE TOP OF THE PIPE. PROVIDE A MINIMUM 3" SAND ENVELOPE AROUND ALL MAINLINE PIPE. 13. MINIMUM LATERAL SIZE SHALL BE 3/4". SEE PIPE SIZING CHART FOR SIZING. 14. IF SETTLEMENT OCCURS ALONG TRENCHES AND ADJUSTMENT(S) TO PIPES, VALVES, OR HEADS IS REQUIRED, THE CONTRACTOR, AS PART OF WORK UNDER THIS CONTRACT, SHALL MAKE ALL ADJUSTMENTS WITHOUT EXTRA COSTS TO THE OWNER. 15. IT IS THE RESPONSIBILITY OF THE CONTRACTOR TO FILL AND REPAIR ALL DEPRESSIONS AND REPLACE ALL NECESSARY LAWN AND/OR PLANTING DUE TO THE SETTLEMENT OF IRRIGATION FOR ONE YEAR FOLLOWING THE ACCEPTED COMPLETION OF MAINTENANCE. 16. CONTRACTOR SHALL GUARANTE E THAT ALL MATERIAL, EQUIPMENT, AND WORKMANSHIP FURNISHED BY HIM BE FREE OF DEFECTS FOR ONE YEAR FOLLOWING THE ACCEPTED COMPLETION OF MAINTENANCE. CONTRACTOR SHALL BE LIABLE FOR REPAIRS AND REPLACEMENT OF FAILED MATERIAL DURING THIS GUARANTEE PERIOD. 17. ALL PLASTIC FITTINGS SHALL BE A MINIMUM OF 18" APART TO FACILITATE REMOVAL AND REPLACEMENT OF INDIVIDUAL FITTINGS. 18. SPLICING OF 24 VOLT WIRES WILL NOT BE P ERMITTED EXCEPT IN VALVE BOXES. CONTRACTOR TO LEAVE A 24" COIL OF EXCESS WIRE AT EACH SPLICE AND EVERY 100' ON CENTER ALONG WIRE RUN. TAPE WIRE BUNDLES 10' ON CENTER. NO TAPING WILL BE PERMITTED INSIDE SLEEVES. WIRE CONNECTORS SHALL BE SCOTCH DBY OR APPROVED EQUAL, INSTALLED IN ACCORDANCE WITH MANUFACTURER'S INSTRUCTIONS. 19. CONTROL VALVES SHALL BE SIZED AS DESIGNATED ON THE DRAWINGS AND SHALL BE INSTALLED IN VALVE BOXES AS INDICATED IN THE DETAILS. BOXES SHALL BE SET FLUSH WITH THE FINISH GRADE OR SURFACE AND PERMANENTLY MARKED AS INDICATED IN THE DETAILS. 20. EXACT LOCATION OF CONTROLLERS TO BE DETERMINED AT JOB SITE BY PROJECT MANAGER. USE THIN WALL METAL CONDUIT ABOVE GRADE AND IN GARAGES. PAINT ALL CONDUIT TO MATCH BUILDING OR WALL COLOR. USE WATERPROOF CONNECTIONS FOR OUTDOOR INSTALLATION. INSTALL PER MANUFACTURERS SP ECIFICATIONS. SEAL ALL CONDUIT HOLES WITH SILICONE OR EQUAL. PROGRAM CONTROLLER TO IRRIGATE USING MULTIPLE REPEAT CYCLES OF SHORT DURATION. CARE SHALL BE TAKEN TO PREVENT RUNOFF OF WATER AND SLOPE/SOIL EROSION DUE TO PROLONGED APPLICATIONS OF WATER. 21. CONTROL WIRES SHALL BE 14 GAUGE (RED). SEPARATE WIRES SHALL RUN FROM THE CONTROLLE R TO EACH VALVE. COMMON GROUND WIRES SHALL BE 12 GAUGE (WHITE) ALL CONTROL WIRES LEADING FROM VALVES TO CONTROLLER SHALL BE LOOPED-UP A MINIMUM OF 30" INTO EVERY VALVE BOX INTERCEPTED ON THE WAY TO THE CONTROLLER. 22. CONTRACTOR TO COORDINATE CONTROLLER POWER HOOK-UP WITH PROJECT ELECTRICIAN. THE GENERAL CONTRACTOR SHALL COORDINATE HIS PORTION OF WORK WITH THE UNDERGROUND ELECTRICAL CONTRACTOR TO MINIMIZE CONFLICTS. 23. EXISTING BACKFLOW PREV ENTION DEVICES SHALL BE INSPECTED AND TESTING TO THE EXTENT MANDATED BY LOCAL BUILDING CODE. 24. BUBBLERS SHALL BE LOCATED ON THE UPHILL SIDE OF TREES. 25. ALL WATER TO DRAIN AWAY FROM BUILDING PER LOCAL BUILDING CODE. 26. DO NOT WILLFULLY INSTALL THE SPRINKLER SYSTEM AS SHOWN ON THE DRAWINGS WHEN IT IS OBVIOUS IN THE FIELD THAT OBSTRUCTIONS, GRADE DIFFERENCES OR DIFFERENCES IN THE AREA DIMENSIONS EXIST THAT MIGHT NOT HAV E BEEN CONSIDERED IN THE ENGINEERING. SUCH OBSTRUCTIONS OF DIFFERENCES SHOULD BE BROUGHT TO THE ATTENTION OF THE OWNER'S AUTHORIZED REPRESENTATIVE. IN THE EVENT THIS NOTIFICATION IS NOT PERFORMED, THE CONTRACTOR S HALL ASSUME FULL RESPONSIBILITY FOR ANY REVISIONS NECESSARY. 27. A LAMINATED, COLOR CODED, REDUCED SIZE IRRIGATION PLAN SHALL BE FURNISHED TO THE OWNER AFTER FINAL ACCEPTANCE. PLACE ANOTHER LAMINATED COPY INSIDE THE CONTROLLER CABINET DOOR. 28. LANDSCAPE CONTRACTOR TO COORDINATE WITH GENERAL CONTRACTOR PRIOR TO DEMOLITION OR PROTECTION OF EX ISTING MAINLINE AND CONTROLLER WIRE FOR FUTURE USE. 29. IF THE INTENT IS TO DEMO ANY IRRIGATION EQUIPMENT IN NEW CONSTRUCTION AREA, LANDSCAPE CONTRACTOR SHALL SUPPLY ALL NEW MAINLINE AND CONTROLLER WIRE TO NEW REMOTE CONTROL VALVE AS DESIGNED PER THIS PLAN, TYPICAL. 30. CONTRACTOR SHALL INSTALL DRIPLINE ON SLOPES PER MANUFACTURERS RECOMMENDATIONS WITH 25% INCREASED SPACING AT BOTTOM 1/3 OF SLOPE. 31. CONTRACTOR TO INSTALL LATERAL LINE CHECK VALVES WHERE NECESSARY TO PREVENT LOW HEAD DRAINAGE. MODEL SHALL BE NDS FLO CONTROL SPRING CHECK VALVE RATED TO 200PSI, MODEL 1790 (SLIPxSLIP CONNECTION WITH UNION), LINE SIZE OR APPROVED EQUAL. 32. CONTRACTOR MUST PROVIDE AN IRRIGATION AUDIT IN ACCORDANCE WITH LOCAL WELO AND TITLE 23 DEPARTMENT OF WATER RESOURCES SE CTION 492.12: IRRIGATION AUDIT, IRRIGATION SURVEY, AND IRRIGATION WATER USE ANALYSIS PRIOR TO PROJECT ACCEPTANCE. 33. CONTRACTOR SHALL PROVIDE A CERTIFICATE OF COMPLETION AS REQUIRED TO THE LOCAL REVIEWING AGENCY. SEE CALIFORNIA CODE OF REGULATIONS TITLE 23 WATERS DIVISION 2 DEPARTMENT OF WATE R RESOURCES CHAPTER 2.7 MODEL WATER EFFICIENT LANDSCAPE ORDINANCE APPENDIX C. 34. SOIL MANAGEMENT REPORT SHALL BE PROVIDED BY LANDSCAPE CONTRACTOR AND SOIL AMENDMENTS SHALL BE FOLLOWED PER THE REPORT. PHYSICAL COPIES OF THE SOIL MANAGEMENT REPORT SHALL BE PROV IDED TO CLIENT, PROJECT LANDSCAPE ARCHITECT AND LOCAL AGENCY AS REQUIRED. SOIL MANAGEMENT REPORT SHALL CONFORM TO STATE AB1881 WA TER EFFICIENT LANDSCAPE ORDINANCE OR AGE NCY ADOPTED WELO. 35. CONTRACTOR IS RESPONSIBLE FOR HAND WATERING INCLUDING BUT NOT LIMITED TO THE FOLLOWING AREAS DURING PLANT ESTABLISHMENT: BIO-CELL AREAS, SODDED AREAS. THESE AREAS WILL NEED SUPPLEMENTAL HAND WATERING IF THEY ARE IRRIGATED BY DRIP UNTIL ROOTS ARE ESTABLISHED AS DRIP IRRIGATION MAY NOT PROVIDE SUFFICIENT WATER TO THESE AREAS FOR HEALTHY PLANT ESTABLISHMENT. 36. ALL EXISTING IRRIGATION SYSTEMS SHALL REMAIN OPERATIONAL DURING CONSTRUCTION WHERE PRACTICAL. IF THE IRRIGATION SYSTEM IS TO BE SHUT OFF FOR PERIODS OF TIME LONGER THAN THREE DAYS A HAND WATERING MAINTENANCE PROGRAM SHALL BE ESTABLISHED TO MAINTAIN CURRENT PLANT HEALTH. CONTRACTOR WILL BE RESPONSIBLE FOR REPLACING ANY DEAD OR DECLINING PLANT MATERIAL DUE TO LACK OF WATERING. ALL EXISTING MAINLINE, CONTROL WIRES, LATERAL LINES, SPRAY HEADS, DRIP TUBING OR OTHER IRRIGATION EQUIPMENT SHALL REMAIN IN PLACE AND UNDAMAGED. IF MODIFICATIONS TO THE EXISTING SYSTEM NEED TO TAKE PLACE, THE CONTRACTOR SHALL REPAIR, REPLACE OR ADD NEW EQUIPMENT AS NEEDED TO MAINTAIN PROPER COVERAGE AND WATER DISTRIBUTION FOR ALL PLANTING AREAS. ANY UNUSED CONTROL WIRES RESULTING IN THE RETROFIT SHALL BE PUT IN A NEW VALVE BOX AND LABELED. UPDATE THE CONTROLLER SCHEDULE TO INDICATE THAT THESE VALVE STATIONS ARE NO LONGER IN USE. IR RIGATION NOTE S SHRUB BUBBLER (0.25 GPM ) 20 PSI TORO 570Z-COM FB-25-PC DP-2019-001, ASA-2019-006, TR-2019-032 01/10/20 Ellen Yau DRAWN BY: PROJECT NO: CAD DWG FILE: CHECKED BY: DESIGNED BY: DATE: SCALE: HMHC DATE DESCRIPTIONNO 19900 STEVENS CREEKLANDSCAPE IMPROVEMENTSCUPERTINO, CAS:\PROJECTS\520200\LA\PRODUCTION\520201\520201IDC.DWG520201IDC.DWG L3.04 5202.00 LS BS 11/11/2019 PLOTTED: 11/14/2019 1:17 PMLand Use Entitlements Land Planning Landscape Architecture Civil Engineering Utility Design Land Surveying Stormwater Compliance 1570 Oakland Road (408) 487-2200 San Jose, CA 95131 HMHca.com NOT FOR CONSTRUCTION PLANNING COMMENTS11/14/19 1 IRRIGATION DETAILS AMC AS SHOWN EXTERIOR SURFACE FOR MOUNTING OF SPRINKLER CONTROLLER CONTROL WIRES TO CONTROL VALVES PVC SWEEP ELL (DEPTH AS REQUIRED) 1/2" UL APPROVED ELECTRICAL CONDUIT, RING NUT AND JUNCTION BOX FOR 120V AC ELECTRICAL POWER FINISHED GRADE EXTERIOR WALL MOUNT IRRIGATION CONTROLLER, SEE IRRIGATION LEGEND FOR SPECIFICATION N.T.S. W A L L M OUN T C ON TR O L L E R GALVANIZED ELEC. WIRE CONDUIT (SIZE AS REQUIRED) PAINT TO MATCH BLDG. AS REQUIRED NOTES: 1. VERIFY LOCATION WITH PROJECT ELECTRICIAN. 2. ALL ELECTRICAL WORK MUST CONFORM TO LOCAL CODES. REFER TO PRODUCT LITERATURE FOR ADDITIONAL INSTALLATION REQUIREMENTS. THIS DRAWING IS PROV IDED FOR REFERENCE ONLY. INDIVIDUAL PROJECT REQUIREMENTS AND LOCAL CODES MAY DICTATE DIFFERENCES IN INSTALLATION PROCEDURES THAT ARE NOT IDENTIFIED ON THIS DETAIL. 1 2 3 4 5 6 7 1 7 4 2 5 6 3 C L IM A TE LOGI C SCALE: N.T.S. NOTES: 1. ALL ELECTRICAL WORK MUST CONFORM TO LOCAL CODES. 2. REFER TO PRODUCT LITERATURE FOR ADDITIONAL INSTALLATION REQUIREMENTS. 1 2 3 4 5 6 7 8 9 10 CLIMATE LOGIC™ WEATHER SENSOR MOUNTED OUTDOORS ON FLAT SURFACE USING SCRE WS. CLIMATE LOGIC™ WEATHER SENSOR MOUNTED ON A DRAIN GUTTER USING QUICKCLIP™ GUTTERMOUNT. CLIMATE LOGIC™ RECEIVER MODULE MOUNTED INDOORS NEAR THE COMPATIBLE CONTROLLER. MOUNT WITH SCREWS AT EYE LEVEL OR IF IN A SECURE AREA, MOUNT ON HOOK & LOOP TYPE STRIPS FOR DISMOUNTING AND HANDHELD PROGRAMMING UTILIZING THE SLACK IN THE CORD. SINGLE CONNECTION CORD PLUGGED INTO CONTROLLERS REMOTE PORT. AUTOMATIC IRRIGATION CONTROLLER FINISH SURFACE OF SPACE WHERE CONTROLLER IS LOCATED. POWER SOURCE, LOCATE IN CONDUIT PVC SCHEDULE 40 CONTROL WIRE CONDUIT (SIZE AS REQUIRED). PVC SWEEP ELL (PROTECTING LOW VOLTAGE CONTROL WIRES TO THE ELECTRIC VALVES). OPTIONAL JUNCTION BOX TO ROUTE CONTROL WIRES TO THE ELECTRIC VALVES. Irritrol CLIMATE LOGIC 69F 40% 1:15a MENU No Rain-Irrigation 11/16 CL-M1 SMART RXENABLED % 1 2 3 4 7 8 9 6 5 AS REQUIRED N.T.S. M A S TE R VA L V E NOTES : 1. DO NOT LOCATE REMOTE VALVE IN TURF 2. COMPA CT SOIL AROUND BOX TO SAME DENSITY AS ADJACENT UNDISTURBED SOIL BUNDLE AND TAPE CONTROL WIRE TO MAINLINE EVERY 10' 3. SPLICES IN CONTROL WIRE ARE NOT ALLOWED BETWEEN CONTROLLER AND VALVE 4. SEE IRRIGATION LEGEND FOR EQUIPMENT SPECIFICATION 5. INSTALL ALL IN ACCORDANCE WITH MANUFA CTURER'S RECOMMENDATIONS 1 MASTER VALVE-SEE LEGEND 1 CARSON #1324 RECTANGULAR VALVE BOX WITH BLACK BOLT DOWN COVER, OR A PPROVED EQUAL. HEAT BRAND "MV" ON LID IN 2" HIGH LETTERS 2 FINISHED GRADE 3 FROM POINT OF CONNECTION- ADAPT AS REQUIRED 4 SCH. 80 TOE NIPPLE- LENGTH AS REQUIRED 5 PEA GRAVEL SUMP, MIN 6" DEEP 6 3M DBY WIRE CONNECTOR 7 CONTROL AND COMMON WIRE TO DESIGNATED AUTOMATIC CONTROLLER 8 FLOW SENSOR CABLE WITHIN CONDUIT9 BRICK SUPPORT, 1 PER CORNER106"6"2 3 4 5 6 7 8 9 10 TO FLOW SENSOR N.T.S. FL OW S E N S OR NOTES : 1. SEE IRRIGATION LEGEND FOR EQUIPMENT SPECIFICATION 2. INSTALL ALL IN ACCORDANCE WITH MANUFACTURER'S RECOMMENDATIONS FLOW SENSOR 1 RECTANGULAR VALVE BOX W/ BLACK BOLT DOWN COVER. HEAT BRAND VALVE "FS" ON LID IN 2" HIGH CHARACTERS 2 CONDUIT BACK TO DECODER AT CONTROLLER 3 4 TO IRRIGATION POINT OF CONNECTION 5 FINISH GRADE 6 10 5 PER MANUFACTURER PER MANUFACTURER NO PIPE RESTRICTIONS, FITTINGS, COUPLINGS OR OTHER SPLICES TO OCCUR IN THE PIPE RUNS OF LENGTHS GIVEN PEA GRAVEL SUMP, MIN. 6" DEEP 7 1 6"6"2 6 7 4 8 9 1 CONTROL AND COMMON WIRE TO DESIGNATED AUTOMATIC CONTROLLER 8 9 BRICK SUPPORT, 1 PER CORNER 3 3M DBY WIRE CONNECTOR 10 MASTER VALVE N.T.S. V A L V E L A Y OU T VALVE BOX , TYPICAL. CONTRACTOR SHALL GROUP VALVES IN A MANIFOLD WHENEVER POSSIBLE. GATE VALVE: SEE DETAIL. PROVIDE 1 GATE VALVE PER GROUP OF CONTROL VALVES. PROVIDE 1 GATE VALVE PER CONTROL VALVE WHEN NOT GROUPED TOGETHER. NOTES: 1. SEE IRRIGATION LEGEND FOR MODELS. 2. SEE IRRIGATION PLAN(S) FOR ADDITIONAL GATE VALVE LOCATIONS. 3. SEE INSTALLATION DIAGRAMS DETA IL FOR ADDITIONAL INFORMATION REGARDING ACCEPTABLE VALVE BOX LOCATIONS. 1 2 3 TOP VIEW 1 MAINLINE 3 4 CONTROL VALVE 4 2 5 5 QUICK COUPLING VALVE N.T.S. B A L L V A L V E BRICK SUPPORT, 2 TOTAL FINISHED GRADE/ BEFORE PLANTING BALL VALVE: SEE LEGEND FOR MAKE AND MODEL - LINE SIZE PVC SCH 40 MIN 8" LONG PVC SCH 40 PVC MAINLINE PIPE PEA GRAVEL SUMP, MIN. 6" DEEP NOTES: 1. PLACE AGGREGATE PRIOR TO INSTALLATION OF VALVE BOX 2. INSTALL VALVE BOX SO TOP OF BOX IS FLUSH WITH ADJACENT HARDSCAPE PVC 45 FITTING SCH 40 (TYP.) 18" MIN. 10" MIN. 1 2 3 4 5 6 7 8 9 1 2 9 8 7 6 5 4 3 6"6" ROUND PLASTIC VALVE BOX WITH BOLT DOWN LID N.T.S. Q UIC K C OUP L I NG V A LV E 10" ROUND PLASTIC VALVE BOX WITH BOLT DOWN LID 1 1/4" x 1 1/4" x 3/16" ANGLE IRON 30" LONG, 2 STAINLESS STEEL STRAPS 3" LONG SCHEDULE 80 PVC THREADED NIPPLE NOTE: 1. NIPPLES AND FITTINGS TO BE SAME SIZE AS VALVE IPT INLET THREAD SIZE 2. SEE IRRIGATION LEGEND FOR SPECIFICATION 3. INSTALL ALL IN ACCORDANCE WITH MANUFACTURER'S RECOMMENDATIONS 10" LONG SCH 80 PVC THREADED NIPPLE SCH 80 PVC THREADED 90 DEGREE ELL PVC MAINLINE QUICK COUPLING VALVE FINISHED GRADE SEEIRRIGATIONLEGENDSIDE VIEW TOP VIEW 1 11 6 4 10 2 9 5 1 2 3 PEA GRAVEL SUMP, MIN. 6" DEPTH 3 4 5 6 MAINLINE FITTING 7 7 9 10 11 2" MAX. 5 11 12 BRICK SUPPORTS, 2 TOTAL 12 SECTION/ELEVATION MINIMUM 4 '' CLEAR N.T.S. D RIP L IN E R E M OTE CON TROL V ALV E , P RE S S UR E R EGU L A TOR A ND FI L TER PVC MAINLINE VALVE BOX FINISHED GRADE VALVE, SEE LEGEND SERVICE EXPANSION COIL PRESSURE REGULATOR, SEE LEGEND SCH. 80 UNION PVC LATERAL FILTER, SEE LEGEND 1 CU. FT. PEA GRAVEL SUMP VALVE BOX EXTENSION BRICK SUPPORTS 1 2 3 4 5 6 7 8 9 10 11 12 3 2 1 8 11 12 10 9 76 5 4 NOTES: 1. SEE IRRIGATION LEGEND FOR EQUIPMENT SPECIFICATION. 2. INSTALL ALL IN ACCORDANCE WITH MANUFACTURER'S RECOMMENDATIONS. A B C D E F G H DP-2019-001, ASA-2019-006, TR-2019-032 01/10/20 Ellen Yau DRAWN BY: PROJECT NO: CAD DWG FILE: CHECKED BY: DESIGNED BY: DATE: SCALE: HMHC DATE DESCRIPTIONNO 19900 STEVENS CREEKLANDSCAPE IMPROVEMENTSCUPERTINO, CAS:\PROJECTS\520200\LA\PRODUCTION\520201\520201IDC.DWG520201IDC.DWG L3.05 5202.00 LS BS 11/11/2019 PLOTTED: 11/14/2019 1:16 PMLand Use Entitlements Land Planning Landscape Architecture Civil Engineering Utility Design Land Surveying Stormwater Compliance 1570 Oakland Road (408) 487-2200 San Jose, CA 95131 HMHca.com NOT FOR CONSTRUCTION PLANNING COMMENTS11/14/19 1 IRRIGATION DETAILS AMC AS SHOWN NOTES: 1. BUBBLER DISTANCE TO ROOT BALL WILL VARY DEPENDING ON THE CONTAINER SIZE OF THE PLANT. ALLOW 6" BETWEEN TRUNK AND BUBBLER. 2. PLACE ALL BUBBLERS ON UPHILL SIDE OF SLOPE IF APPLICABLE CONCEAL ALL EQUIPMENT UNDER MULCH. 3. SEE IRRIGATION LEGEND FOR SPECIFICATION. 4. INSTALL ALL IN ACCORDANCE WITH MANUFACTURER'S RECOMMENDATIONS. FINISHED GRADE TUBING STAKES PVC COATED 12 GAUGE WIRE U STAKES QUANTITY AS NEEDED TO SECURE TUBING (2 MIN.) SALCO OR EQUAL MULCH PER SPECIFICATIONS POSITION BUBBLER OVER ROOT BALL PRESSURE COMPENSATING DRIP BUBBLER (SEE LEGEND FOR MODEL) UV RESISTANT 1/2" PVC SCHD 40 ADAPTER PVC LATERAL PIPE PVC SCH 40 TEE OR ELL 1/2" (SLIP XSLIP X FIPT) 1/2" PV C SCH 40 (MIPT X SLIP) MALE ADAPTER UV RADIATION RESISTANT ROOT BALL PLANT CROWN 1/2" UV RESISITANT FLEXIBLE SCH 40 PVC HOSE (BLACK) SOIL RING (SEE PLANTING DETAILS) ON G RA DE TRE E B UB BLE R N.T.S. 1 2 3 4 5 6 7 8 9 10 11 12 13 1 2 3 4 5 6 7 8 9 10 13 12 11 14 INSTALL CHECK VALVE WHERE ELEVATION OF HIGHEST BUBBLER ON THE VALVE IS 4' OR MORE A BOVE THE LOWEST BUBBLER ON THE VALVE. 14 D RIP L IN E FLU S H VA L VE O N P V C TE E SCALE: N.T.S. 1 1 1" ABOVE FINISH GRADE NATIVE SOIL PER SPECIFICATIONS 2 FINISH GRADE 3 DRIPLINE FLUSH VALVE 4 6" ROUND PLASTIC VALVE BOX. HEAT BRAND "FV" ON LID IN 1" HIGH CHARACTERS 5 3/4" SCH 80 PVC NIPPLE 6 BRICK SUPPORTS 7 PEA GRAVEL SUMP (6" X 18") 8 PVC TEE (S X S X T) WITH 3/4" THREADED OUTLET 9 PVC PIPING 10 18"6" 2 3 4 5 6 7 8 9 10 NOTES: 1. SEE IRRIGATION LEGEND FOR EQUIPMENT SPECIFICATION. 2. INSTALL ALL IN ACCORDANCE WITH MANUFACTURER'S RECOMMENDATIONS. 3. LOCATE AND USE ONE FLUSH VALVE FOR EVERY 7PM PER ZONE AT LOW POINTS. N.T.S. NOTES: 1. AIR/VACUUM RELIEF VALVE CANNOT BE CONNECTED LOWER THAN DRIPLINE LATERALS. 2. USE ONE FOR EACH INCREMENT OF 7 GPM. 3. SEE IRRIGATION LEGEND FOR EQUIPMENT SPECIFICATION. 4. INSTALL ALL IN ACCORDANCE WITH MANUFACTURER'S RECOMMENDATIONS. FINISHED GRADE 6" ROUND VALVE BOX DRIPLINE AIR/VACUUM RELIEF VALVE 1/2" PVC COUPLING (TxT) 1/2" SCH. 80 NIPPLE (LENGTH AS REQUIRED) PEA GRAVEL SUMP (6'') BRICK SUPPORTS PVC PIPING AND FITTING D RIP L IN E 1/2" A IR /V ACU UM R E LIE F VA L V E (PLUMBED TO PV C TE E) 1 2 3 4 5 6 7 8 1 2 3 4 5 6 7 8 SECTION/ELEVATION H I J SEE SPECIFICATIONS FOR DEPTH FINISHED GRADE N.T.S. D R IP L IN E A I R/V A C UU M RE L IE F L A TE RA L NOTES: 1. SEE IRRIGATION LEGEND FOR EQUIPMENT SPECIFICATION. 2. INSTALL ALL IN ACCORDANCE WITH MANUFACTURER'S RECOMMENDATIONS. DRIPLINE AIR/V ACUUM RELIEF VALVE IN VALVE BOX AT HIGHEST POINTS PLUMBED TO TUBING PVC CROSS TO DRIPLINE COMPRESSION ADAPTERS (TYP) DRIPLINE (TYP) DRIPLINE BLANK TUBING (TYP) ISOMETRIC VIEW 1 2 3 4 5 6 1 2 1 3 4 5 6 SECTION/ELEVATION FINISHED GRADE N.T.S. D RIPLINE O P E R AT I O N IN DIC ATOR NOTES: 1. USE ONE OPERATION INDICATOR PER ZONE. 2. PLACE AT FLUSH END OF ZONE. 3. SEE IRRIGATION LEGEND FOR PIPE SCHEDULE AND EQUIPMENT SPECIFICATION. 4. INSTALL ALL IN ACCORDANCE WITH MANUFA CTURER'S RECOMMENDATIONS. DRIPLINE OPERATION INDICATOR. USE ONE PER ZONE AND LOCATED AT FLUSH END OF ZONE DRIPLINE. USE ONE PER ZONE AND LOCATED AT FLUSH END OF ZONE 3"1 2 3 4 1 2 3 4 NATIVE SOIL BACKFILL PER SPECIFICATIONS DEPTH PER SPECIFICATIONS D RIPLINE S TE E L S O I L S TA P L E - ON GR A D E SCALE: N.T.S. 1 FINISH GRADE OF MULCH LAYER1 MULCH TOP DRESSING PER SPECIFICATIONS2 DRIPLINE3 FINISH GRADE 4 DRIPLINE STEEL SOIL STAPLE5 NATIVE SOIL PER SPECIFICATIONS6 DEPTH OF MULCH PER SPECIFICATIONS AND PLANTING PLAN 7 SECTIONELEVATION 2 3 4 5 6 7 7 NOTES: 1. SEE IRRIGATION LEGEND FOR EQUIPMENT SPECIFICATION. 2. INSTALL ALL IN ACCORDANCE WITH MANUFA CTURER'S RECOMMENDATIONS. 3. LOCATE STAPLES ALONG TUBING PER MANUFA CTURER'S RECOMMENDATIONS. ISOMETRIC N.T.S. NOTES: 1. SEE IRRIGATION LEGEND FOR EQUIPMENT SPECIFICATION. 2. INSTALL ALL IN ACCORDANCE WITH MANUFACTURER'S RECOMMENDATIONS. DEPTH PER SPECIFICATIONS FINISHED GRADE DRIPLINE TEE (TYP.) DRIPLINE (TYP.) SUB-MANIFOLD PVC CROSS TO DRIPLINE COMPRESSION ADAPTERS (TYP.) PVC SUPPLY MANIFOLD PVC TEE TO DRIP LINE COMPRESSION ADAPTERS (TYP.) FLOW FROM VALVE DRIP LINE CE NTE R-FE E D S UP P LY SUB-MANIFOLD 1 2 3 4 5 6 7 8 9 1 2 3 4 5 7 6 8 9 FV AV FV N.T.S. D RIPLINE CE NTE R-FEE D LA Y OU T DRIPLINE AUTOMATIC FLUSH VALVE PLUMBED TO FLUSH MANIFOLD AT LOW POINT PVC FLUSH MANIFOLD DRIPLINE MANIFOLD-TO-ELBOW CONNECTION REMOTE CONTROL VALVE WITH FILTER AND PRESSURE REGULATOR PVC SUPPLY MANIFOLD DRIPLINE MANIFOLD-TO-TEE CONNECTION DRIPLINE LATERAL AIR/VACUUM RELIEF LATERAL DRIPLINE BLANK TUBING CENTERED ON MOUND OR BERM DRIPLINE AIR/VACUUM RELIEF VALVE PLUMBED TO DRIPLINE BLANK TUBING AT EACH HIGH POINT PERIMETER LATERALS 2" TO 4" FROM EDGE ZONE PERIMETER DRIPLINE OPERATION INDICATOR NOTE: 1. SEE IRRIGATION LEGEND FOR EQUIPMENT SPECIFICATION 2. INSTALL ALL IN ACCORDANCE WITH MANUFA CTURER'S RECOMMENDATIONS 3. THE TOTAL LENGTH OF ALL INTERCONNECTED DRIP LINE SHALL NOT EXCEED THE MAXIMUM RUN LENGTH PLAN 1 2 3 4 5 6 7 8 9 10 11 12 1 2 3 7 4 9 10 11 12 8 5 6 AV FV N.T.S. D RIPLINE O DD CU RV ES L A Y O UT NOTE: 1. SEE IRRIGATION LEGEND FOR EQUIPMENT SPECIFICATION 2. INSTALL ALL IN ACCORDANCE WITH MANUFA CTURER'S RECOMMENDATIONS 3. TOTAL LENGTH OF ALL INTERCONNECTED DRIPLINE SHALL NOT EXCEED MAXIMUM RUN LENGTH DRIPLINE AIR/VACUUM RELIEF VALVE PLUMBED TO SUPPLY MANIFOLD AT HIGH POINT DRIPLINE TEE PERIMETER LATERALS 2'' TO 4'' FROM EDGE DRIPLINE PVC FLUSH MANIFOLD DRIPLINE MANIFOLD-TO-ELBOW CONNECTION (TYP.) DRIPLINE OPERATION INDICATOR DRIPLINE AUTOMATIC FLUSH VALVE PLUMBED TO FLUSH MANIFOLD AT LOW POINT REMOTE CONTROL VALVE WITH FILTER AND PRESSURE REGULATOR AREA PERIMETER PVC SUPPLY MANIFOLD PLAN 1 2 3 4 5 6 7 10 11 9 8 4 11 10 9 7 8 3 5 1 2 7 6 A B C D E F DP-2019-001, ASA-2019-006, TR-2019-032 01/10/20 Ellen Yau DRAWN BY: PROJECT NO: CAD DWG FILE: CHECKED BY: DESIGNED BY: DATE: SCALE: HMHC DATE DESCRIPTIONNO 19900 STEVENS CREEKLANDSCAPE IMPROVEMENTSCUPERTINO, CAS:\PROJECTS\520200\LA\PRODUCTION\520201\520201IDC.DWG520201IDC.DWG L3.06 5202.00 LS BS 11/11/2019 PLOTTED: 11/14/2019 1:15 PMLand Use Entitlements Land Planning Landscape Architecture Civil Engineering Utility Design Land Surveying Stormwater Compliance 1570 Oakland Road (408) 487-2200 San Jose, CA 95131 HMHca.com NOT FOR CONSTRUCTION PLANNING COMMENTS11/14/19 1 IRRIGATION DETAILS AMC AS SHOWN N.T.S. W E A TH E RPROO F S P L ICE A S S E M B L Y INSTRUCTIONS: 1. STRIP WIRES APPROXIMATELY 1/2" (12.7 MM) TO EXPOSE WIRE. 2. TWIST CONNECTOR AROUND WIRES CLOCKWISE UNTIL HAND TIGHT, DO NOT OVERTIGHTEN. 3. INSERT WIRE ASSEMBLY INTO PLASTIC TUBE UNTIL WIRE CONNECTOR SNAPS PAST LIP IN BOTTOM OF TUBE. 4. PLACE WIRES WHICH EXIT TUBE IN WIRE EXIT HOLES AND CLOSE CAP UNTIL IT SNAPS. 5. INSPECT FINAL SPLICE ASSEMBLY TO BE SECURE A ND FINISHED. 1 2 3 4 5 INSTRUCTIONS: 1. CENTER VALVE BOX OVER REMOTE CONTROL VALVE TO FACILITATE SERVICING VALVE. 2. SET BOXES 1" ABOVE FINISH GRADE OR MULCH COVER IN GROUND COVER/SHRUB AREA AND FLUSH WITH FINISH GRADE IN TURF AREA. 3. SET RCV AND VALVE BOX ASSEMBLY IN GROUND COVER/SHRUB AREA WHERE POSSIBLE. INSTALL IN LAWN ONLY IF GROUND COVER DOES NOT EXIST ADJACENT TO LAWN. 4. SET BOXES PARALLEL TO EACH OTHER AND PERPENDICULAR TO EDGE OF LAWN, WALK, FENCE, CURB, ETC. 5. AVOID HEAVILY COMPACTING SOIL AROUND VALVE BOXES TO PREVENT COLLAPSE AND DEFORMATION OF VALVE BOX SIDES. 6. INSTALL EXTENSION BY VALVE BOX MANUFACTURER AS REQUIRED TO COMPLETELY ENCLOSE ASSEMBLY FOR EASY ACCESS. 7. NEVER INSTALL VALVE BOX IN HARDSCAPE FINISHED GRADE PROV IDE A MIN. OF 2" CLEAR BETWEEN PIPES PROVIDE A 3" MINIMUM SAND ENVELOPE AROUND ALL MAINLINE SNAKE SOLVENT WELD P LASTIC PIPING IN TRENCH AS SHOWN TIE A 24" LOOP IN WIRING AT CHANGES OF DIRECTION 30 DEGREES OR GREATER. UNTIE AFTER ALL CONNECTIONS HAVE BEEN MADE INSTALL WIRING BENEATH AND BESIDE MAINLINE. TAPE AND BUNDLE AT 10 FOOT INTERVALS NOTE : SLEEVE BE LOW ALL HARDSCAPE ELEMENTS WITH THE SLEEVING TWICE THE DIAMETER OF WIRE BUNDLE CONTAINED IN IT. SEE IRRIGATION LEGEND FOR MINIMUM COVER. MAINLINE, LATERAL SAME TRENCH & WIRING IN THE MAINLINE PIPE LATERAL PIPE N.T.S. INSTALLATION DIAGRAMS 16" x 25" RECTANGULAR VALVE BOX FOR EMITTER MANIFOLD ASSEMBLY. 14" x 19" RECTANGULAR VALVE BOX. QUICK COUPLING VALVE EDGE OF LAWN, WALK, FENCE, CURB, ETC. 12" 12" 12" 12"12"TYP1"SECTION PLAN VIEW TOP VIEW 1 2 3 4 5 6 7 8 9 10 1 2 3 4 1 5 78 9 10 WIRING IN CONDUIT (SLEEVE AT ALL HARDSCAPE CROSSINGS) AV FV N.T.S. D RIPLINE TRIA NGU L A R L AY OUT NOTE: 1. SEE IRRIGATION LEGEND FOR EQUIPMENT SPECIFICATION. 2. INSTALL ALL IN ACCORDANCE WITH MANUFACTURER'S RECOMMENDATIONS REMOTE CONTROL VALVE WITH FILTER AND PRESSURE REGULATOR DRIPLINE AREA PERIMETER PVC FLUSH MANIFOLD DRIPLINE AUTOMA TIC FLUSH VALVE PLUMBED TO FLUSH MANIFOLD AT LOW POINT DRIPLINE MANIFOLD-TO- ELBOW CONNECTION (TYP.) PVC SUPPLY MANIFOLD DRIPLINE TEE (TYP.) PERIMETER LATE RALS 2'' TO 4'' FROM EDGE DRIPLINE AIR/V ACUUM RELIEF VALVE PLUMBED TO SUPPLY MANIFOLD AT HIGH POINT DRIPLINE OPERATION INDICATOR. PLUMBED TO TUBING PLAN 1 2 3 4 5 6 7 8 9 10 11 6 4 5 7 9 10 11 2 1 8 3 A B C DP-2019-001, ASA-2019-006, TR-2019-032 01/10/20 Ellen Yau DRAWN BY: PROJECT NO: CAD DWG FILE: CHECKED BY: DESIGNED BY: DATE: SCALE: HMHC DATE DESCRIPTIONNO 19900 STEVENS CREEKLANDSCAPE IMPROVEMENTSCUPERTINO, CAS:\PROJECTS\520200\LA\PRODUCTION\520201\520201IDC.DWG520201IDC.DWG L3.07 5202.00 LS BS 11/11/2019 PLOTTED: 11/14/2019 1:15 PMLand Use Entitlements Land Planning Landscape Architecture Civil Engineering Utility Design Land Surveying Stormwater Compliance 1570 Oakland Road (408) 487-2200 San Jose, CA 95131 HMHca.com NOT FOR CONSTRUCTION PLANNING COMMENTS11/14/19 1 WATER EFFICIENCY CALCULATIONS AMC AS SHOWN IRRIGATION AUDIT SCHEDULE 1. A UDITS S H A LL BE IN A CCO RDA N CE W ITH TH E S TA TE O F CA LIFO RN IA LA N DS CA PE A UDITO R H A N DBO O K. 2. A UDITS S H A LL BE CO N DUCTED BY A S TA TE CERTIFIED LA N DS CA PE IRRIGA TIO N A UDITO R A T LEA S T O N CE EVERY FIVE YEA RS A N D S UBMITTED TO TH E LO CA L W A TER PURVEYO R A T TH E CO S T O F T H E LA N D O W N ER. 3. A UDITS S H A LL IN CLUDE IN S PECTIO N , S YS TEM TUN E-UP, S YS TEM TES T W ITH DIS TRIBUTIO N UN IFO RMITY, REPO RTIN G O VERS PRA Y O R RUN O FF TH A T CA US ES O VERLA N D FLO W , A N D PREPA RA TIO N O F A N IRRIGA TIO N S CH EDULE IN CLUDIN G CO N FIGURIN G IRRIGA TIO N CO N TRO LLERS W ITH A PPLICA TIO N RA TE, S O IL TYPES , PLA N T FA CTO RS , S LO PE, EXPO S URE A N D A N Y O TH ER FA CTO RS N ECES S A RY FO R A CCURA TE PRO GRA MMIN G. 4. A UDITS W ILL N O T BE CO N DUCTED BY TH E PERS O N W H O DES IGN ED O R IN S TA LLED TH E LA N DS CA PE. 5. IN LA RGE PRO JECTS O R PRO JECTS W ITH MULTIPLE LA N DS CA PE IN S TA LLA TIO N S (I.E. PRO DUCTIO N H O ME DEVELO PMEN TS ) A N A UDITIN G RA TE O F 1 IN 7 LO TS O R A PPRO XIMA TELY 15% W ILL S A TIS FY REQUIREMEN T. MO N TH LY MA IN TEN A N CE S CH EDU LE REMA RKS JAN FEB MAR APRIL MAY JUNE JULY AUG SEPT OCT NOV DEC IRRIGA TIO N W A TERIN G CHECK COVERAGE WEEKLY X X X X X X X X X IRRIGA TIO N MA IN TEN A N CE FLUS H FILTERS A N D REPLA CE DEFECTIVE EQUIPMENT X X FERTILIZA TIO N 10 LBS . 16-6-8 PER 1000 S F X X X W EEDIN G BY H A N D A S REQUIRED EA CH WEEK X X X X X X X CLEA N -UP WEEKLY TRASH AND GENERAL SITE CLEAN-UP X X X X X X X X X X X MULCH IN G MULCH H EA VILY IN EA RLY S PRIN G, MA IN TA IN 3" MULCH LAYER ANNUALY X PRUN IN G PRUN E PER IS A S TA N DA RDS X X X X IRRIGATION MAINTENANCE SCHEDULE 1. TH E LA N DS CA PE S H A LL BE MA IN TA IN ED TO EN S URE W A TER EFFICIEN CY. A REGULA R MA IN TEN A N CE S CH EDULE S H A LL IN CLUDE, BUT N O T BE LIMITED TO , RO UTIN E IN S PECTIO N , CH ECKIN G, A UDITIN G, A DJUS TIN G, A N D REPA IRIN G IRRIG A TIO N EQUIPMEN T; RES ETTIN G TH E A UTO MA TIC IRRIGA TIO N CO N TRO LLER; A ERA TIN G A N D DETH A TCH IN G TURF A REA S ; REPLEN IS H IN G MULCH ; FERTILIZIN G; PRUN IN G , W EEDIN G IN A LL LA N DS CA PE A REA S ; TO PDRES S IN G W ITH CO MPO S T; A N D REMO VIN G O BS TRUCTIO N S TO EMIS S IO N DEVICES . 2. W H EN EVER PO S S IBLE, REPA IR O F IRRIGA TIO N EQUIPMEN T S H A LL BE DO N E W ITH TH E O RIGIN A LLY S PECIFIED MA TERIA LS O R TH EIR EQUIVA LEN TS O R W ITH CO MPO N EN TS W ITH GREATER EFFICIENCY. SOIL MANAGEMENT REPORT S O IL MA N A GEMEN T REPO RT S H A LL BE PRO VIDED BY LA N DS CA PE CO N TRA CTO R A N D S O IL A MEN DMEN TS S H A LL BE FO LLO W ED PER TH E REPO RT. PH YS ICA L CO PIES O F TH E S O IL MA N A GEMEN T REPO RT S H A LL BE PRO VIDED TO CLIEN T, PRO JECT LA N DS CA PE A RCH ITECT, A N D LO CA L A GEN CY REQUIRED. S O IL MA N A GEMEN T REPO RT S H A LL CO N FO RM TO S TA TE A B1881 W A TER EFFICIEN T LA N DS CA PE O RDIN A N CE O R A GEN CY A DO PTED W ELO A S FO LLO W S : 1. S UBMIT S O IL S A MPLES TO A LA BO RA TO RY FO R A N A LYS IS A N D RECO MMEN DA TIO N S . (A ) S O IL S A MPLIN G S H A LL BE CO N DUCTED IN A CCO RDA N CE W ITH LA BO RA TO RY PRO TO CO L, IN CLUDIN G PRO TO CO LS REGA RDIN G A DEQUA TE S A MPLIN G DEPTH FO R TH E IN TEN DED PLA N TS . (B) TH E S O IL A N A LYS IS S H A LL IN CLUDE S O IL S TRUCTURE, IN FILTRA TIO N RA TE DETERMIN ED BY LA BO RA TO RY TES T O R S O IL TEXTURE IN FILTRA TIO N RA TE TA BLE, PH , TO TA L S O LUBLE S A LTS , S O DIUM , PERCEN T O RGA N IC MA TTER, A N D RECO MMEN DA TIO N S . (C) PRO JECTS W ITH MULTIPLE LA N DS CA PE IN S TA LLA TIO N S (I.E. PRO DUCTIO N H O ME DEVELO PMEN TS ) A S O IL S A MPLIN G RA TE O F 1 IN 7 LO TS O R A PPRO XIMA TELY 15% W ILL S A TIS FY TH IS REQUIREMEN T. LA RGE LA N DS CA PE PRO JECTS S H A LL S A MPLE A T A RA TE EQUIVA LEN T TO 1 IN 7 LO TS . 2. TH E PRO JECT A PPLICA N T, O R H IS /H ER DES IGN EE, S H A LL CO MPLY W ITH O N E O F TH E FO LLO W IN G: (A ) IF S IGN IFICA N T MA S S GRA DIN G IS N O T PLA N N ED, TH E S O IL A N A LYS IS REPO RT S H A LL BE S UBMITTED TO TH E LO CA L A GEN CY A S PA RT O F TH E LA N DS CA PE DO CUMEN TA TIO N PA CKA GE: O R (B) IF S IGN IFICA N T MA S S GRA DIN G IS PLA N N ED, TH E S O IL A N A LYS IS REPO RT S H A LL BE S UBMITTED TO TH E LO CA L A G EN CY A S PA RT O F TH E CERTIFICA TE O F CO MPLETIO N . 3. TH E S O IL A N A LYS IS REPO RT S H A LL BE MA DE A VA ILA BLE, IN A TIMELY MA N N ER, TO TH E PRO FES S IO N A LS PREPA RIN G TH E LA N DS CA PE DES IGN PLA N S A N D IRRIGA TIO N DES IGN PLA N S TO MA KE A N Y N ECES S A RY A DJUS TMEN TS TO TH E DES IGN PLA N S . 4. TH E PRO JECT A PPLICA N T, O R H IS /H ER DES IGN EE, S H A LL S UBMIT DO CUMEN TA TIO N VERIFYIN G IMPLEMEN TA TIO N O F S O IL A N A LYS IS REPO RT RECO MMEN DA TIO N S TO TH E LO CA L A GEN CY W ITH CERTIFICA TE O F CO MPLETIO N . DP-2019-001, ASA-2019-006, TR-2019-032 01/10/20 Ellen Yau I I I I I I I I I I I I I I I I I I I I B BD B D D B D B DD D D D D H H H H H H H H I I I I I C C C C C C C C C C C C A A A C C C C C C C C C C C F E E E E E I I I I I I I F F F F F F F F F F F FF F F F F F F F F F F F F F F F F F F D D D D D D D D D F F F F F F F F F F F F F F F F F DRAWN BY: PROJECT NO: CAD DWG FILE: CHECKED BY: DESIGNED BY: DATE: SCALE: HMHC DATE DESCRIPTIONNO 19900 STEVENS CREEKLANDSCAPE IMPROVEMENTSCUPERTINO, CAS:\PROJECTS\520200\LA\PRODUCTION\520201\520201PAC.DWG520201PAC.DWG L4.01 5202.00 LS BS 11/11/2019 PLOTTED: 11/15/2019 1:09 PMLand Use Entitlements Land Planning Landscape Architecture Civil Engineering Utility Design Land Surveying Stormwater Compliance 1570 Oakland Road (408) 487-2200 San Jose, CA 95131 HMHca.com NOT FOR CONSTRUCTION PLANNING COMMENTS11/14/19 1 PLANTING PLAN AMC 1" = 10' S TEVENS CR EEK BLVD ( In Feet ) 1 inch = 10 feet GRA PHIC SCALE 4020 10 5 010 MATCHLINE , SEE SHEE T L4.02 19900 S TE V ENS CREEK BL VD STEVENS CREEK BLVD. KEY MAP L4.02 L4.01 SHRUB LE GEND BOTANICAL NAME SYMBOL NOTES: 1. SEE SHEET L4.03 FOR PLANTING LEGEND, NOTES, AND DETAILS. BACCHARIS PILULARIS 'TWIN PEAKS' CAREX TUMULICOLA HEUCHERA MAXIMA GROUNDCOVER AGAVE WEBERI ANIGOZANTHOS 'HARMONY' HETEROMELES ARBUTIFOLIA 'DAVIS GOLD' CHONDROPETALUM ELEPHANTINUM PHLOMIS FRUTICOSA PITTOSPORUM TENUIFOLIUM ANIGOZANTHOS 'TEQUILA SUNRISE' B C F D A E H LEYMUS CONDENSATUS 'CANYON PRINCE' SESLERIA AUTUMNALIS ACER RUBRUM 'ARMSTRONG' ACE ARM CERCIS OCCIDENTALIS 'ALBA' CER OCC FRAXINUS UHDEI FRA UHD TREES PROPOSE D PLANT P ALETTE IPOLYSTICHUM MUNITUM ADIANTUM ALEUTICUM LOMANDRA 'BREEZE' PYRUS CALLERYANA 'CHANTICLEER' PYR CHA EXISTING TREE TO REMAIN, TYPICAL 6 ACE ARM 36" BOX 1 FRA UHD 36" BOX 2 ACE ARM 24" BOX 8 PYR CHA 24" BOX 1 1 1 1 DP-2019-001, ASA-2019-006, TR-2019-032 01/10/20 Ellen Yau H H H H H H H H I I D D B B B D D D B B B B B B C C C C C C C I I I I B B B I E E EE D D D DD DRAWN BY: PROJECT NO: CAD DWG FILE: CHECKED BY: DESIGNED BY: DATE: SCALE: HMHC DATE DESCRIPTIONNO 19900 STEVENS CREEKLANDSCAPE IMPROVEMENTSCUPERTINO, CAS:\PROJECTS\520200\LA\PRODUCTION\520201\520201PAC.DWG520201PAC.DWG L4.02 5202.00 LS BS 11/11/2019 PLOTTED: 11/15/2019 1:09 PMLand Use Entitlements Land Planning Landscape Architecture Civil Engineering Utility Design Land Surveying Stormwater Compliance 1570 Oakland Road (408) 487-2200 San Jose, CA 95131 HMHca.com NOT FOR CONSTRUCTION PLANNING COMMENTS11/14/19 1 PLANTING PLAN AMC 1" = 10' MATCHLINE , SEE SHEE T L4.01 ( In Feet ) 1 inch = 10 feet GRA PHIC SCALE 4020 10 5 010 19900 STEVE NS C REE K BLVD STEVENS CREEK BLVD. KEY MAP L4.02 L4.01 SHRUB LE GEND BOTANICAL NAME SYMBOL NOTES: 1. SEE SHEET L4.03 FOR PLANTING LEGEND, NOTES, AND DETAILS. BACCHARIS PILULARIS 'TWIN PEAKS' CAREX TUMULICOLA HEUCHERA MAXIMA GROUNDCOVER AGAVE WEBERI ANIGOZANTHOS 'HARMONY' HETEROMELES ARBUTIFOLIA 'DAVIS GOLD' CHONDROPETALUM ELEPHANTINUM PHLOMIS FRUTICOSA PITTOSPORUM TENUIFOLIUM ANIGOZANTHOS 'TEQUILA SUNRISE' B C F D A E H LEYMUS CONDENSATUS 'CANYON PRINCE' SESLERIA AUTUMNALIS ACER RUBRUM 'ARMSTRONG' ACE ARM CERCIS OCCIDENTALIS 'ALBA' CER OCC FRAXINUS UHDEI FRA UHD TREES PROPOSE D PLANT P ALETTE IPOLYSTICHUM MUNITUM ADIANTUM ALEUTICUM LOMANDRA 'BREEZE' PYRUS CALLERYANA 'CHANTICLEER' PYR CHA EXISTING TREE TO REMAIN, TYPICAL 2 ACE ARM 24" BOX EXISTING PLANTING TO REMAIN, TYPICAL EXISTING PLANTING TO REMAIN, TYPICAL REMOVE ANY INVASIVE PLANTS SUCH AS IVY. 2 ACE ARM 36" BOX 7 CER OCC 36" BOX 2 ACE ARM 36" BOX 3 ACE ARM 24" BOX 1 1 1 1 1 DP-2019-001, ASA-2019-006, TR-2019-032 01/10/20 Ellen Yau C A AS NOTED CJT PLANTING LEGEND, NOTES AND DETAILS DRAWN BY: PROJECT NO: CAD DWG FILE: CHECKED BY: DESIGNED BY: DATE: SCALE: HMHC DATE DESCRIPTIONNO 19900 STEVENS CREEKLANDSCAPE IMPROVEMENTSCUPERTINO, CAS:\PROJECTS\520200\LA\PRODUCTION\520201\520201LDC.DWG520201LDC.DWG L4.03 5202.00 LS BS 11/11/2019 Land Use Entitlements Land Planning Landscape Architecture Civil Engineering Utility Design Land Surveying Stormwater Compliance 1570 Oakland Road (408) 487-2200 San Jose, CA 95131 HMHca.com NOT FOR CONSTRUCTION PLANNING COMMENTS11/14/19 1 CONTRACTOR SHALL PROVIDE ALL LABOR, MATERIALS, AND EQUIPMENT NECESSARY TO FURNISH AND INSTALL PLANT MATERIAL AS SHOWN ON THE DRAWING S AND AS DESCRIBED IN THE SPECIFICATIONS. UNLESS DESIGNATED ON THE DRAWINGS OTHERWISE, STRUCTURAL IMPROVEMENTS AND HARDSCAPE SHALL BE INSTALLED PRIOR TO PLANTING OPERATIONS. PLANT LIST ON THE DRAWINGS SHALL BE USED AS A GUIDE ONLY. CONTRACTOR SHALL TAKEOFF AND VERIFY SIZES AND Q UANTITIES BY PLAN CHECK. A SO IL MANAGEMENT REPORT SHALL BE PROVIDED BY LANDSCAPE CONTRACTOR AND SO IL AMENDMENTS SHALL BE FOLLOWED PER THE REPORT. PHYSICAL COPIES OF THE SOIL MANAGEMENT REPORT SHALL BE PROVIDED TO THE CLIENT, PROJECT LANDSCAPE ARCHITECT AND LOCAL AGENCY AS REQUIRED. THE SOIL MANAGEMENT REPORT SHALL CO NFORM TO STATE AB1881 WATER EFFICIENT LANDSCAPE ORDINANCE (WELO) OR LOCAL AGENCY ADOPTED WELO. CONTRACTOR SHALL OBTAIN A SOILS MANAGEMENT REPORT AFTER GRADING OPERATIONS AND PRIOR TO PLANT INSTALLATION. SAMPLES OF FERTILIZERS, ORGANIC AMENDMENT, SOIL CONDIT IONERS, AND SEED SHALL BE SUBMITTED PRIOR TO INCORPORATION. CONTRACTOR SHALL FURNISH TO THE OWNER'S AUTHORIZED REPRESENTATIVE A CERTIFICATE OF COMPLIANCE FOR SUCH FURNISHED MATERIALS. ALL WORK ON THE IRRIGATION SYSTEM, INCLUDING HYDROSTATIC, COVERAGE, AND OPERATIONAL TESTS AND THE BACKFILLING AND COMPACTION OF TRENCHES SHALL BE PERFORMED PRIOR TO PLANTING OPERATIONS. LOCATIONS OF PLANT MATERIAL SHALL BE REVIEWED O N SITE BY THE OWNER'S AUTHORIZED REPRESENTATIVE PRIOR TO INSTALLATION. TREES SHALL BE PLANTED NO CLOSER THAN TEN FEET (10') FRO M UTILITIES. TREES PLANTED WITHIN FIVE FEET (5') OF HARDSCAPE OR STRUCTURES SHALL BE INSTALLED WITH A ROOT BARRIER AS APPROVED BY THE OWNER'S AUTHORIZED REPRESENTATIVE. *CONTRACTOR SHALL SUBMIT PHOTOS OF ALL PLANT MATERIAL, TREES AND GROUND COVERS. PHOTOS SHALL BE OF THE SPECIFIED CONTAINER SIZE . THESE PHOTOS SHALL BE SUBMITTED AS A COMPLETE SUBMITTAL PACKAGE FOR APPROVAL BY LANDSCAPE ARCHITECT. NOTES: 1. SEE PLANTING SPECIFCATIONS PRIOR TO INSTALLATION OF PLANT MATERIALS. 2. ROOTBALL CROWN TO BE 1" ABOVE FINISH GRADE. A SHALLOW BASIN 2" DEEP SHALL BE FORMED AROUND ROOTBALL BELOW FINISH GRADE FINISH GRADE NATIVE GRADE OR CERTIFIED COMPACTED SUBGRADE APPROVED BACKFILL, THOROUGHLY MIXED PRIOR TO INSTALLATION AGRIFORM PLANT TABLETS 2 PER 1 GALLON, 3 PER 5 AND 15 GALLON 2X DIAMETER OF ROOTBALL DEPTH OF ROOTBALL SHRUB-SEE PLAN AND LEGEND FOR SIZE AND TYPE 6"FOOT TAMP BASE SHRUB PLANTING SCALE: N.T.S. CL 1 2 3 4 5 6 7 1 2 5 3 6 4 7 NOTES: 1. ALL PLANTS TO BE PLANTED AT EQUAL SPACING "TRIANGULATED" UNLESS OTHERWISE INDICATED ON PLANS. 2. INFILL PLANTS AS REQUIRED TO MAINTAIN SPACING AT IRREGULAR EDGES. EQUAL EQUAL EQUALEQUAL1/2 PLANT SPACING PLUS 6" GROUNDCOVER SPACING SCALE: N.T.S. EDGE OF PLANTING AREA TYPICAL PLANT SPACING VARIES SEE PLANTING LEGEND AND PLANS. 2 1 1 2 NOTES: 1. SEE PLANTING SPECIFICATIONS PRIOR TO INSTALLATION OF PLANT MATERIALS. 2. THIS DETAIL APPLIES TO 15 GALLON AND 24" BOX TREES. 3. ROOTBALL CROWN TO EXTEND 1" ABOVE FINISH GRADE. 4. TREES INSTALLED WITHIN TURF AREAS SHALL BE INSTALLED WITH 'ARBOR-GARD' AT BASE OF TRUNK. 2" DIAMETER TREATED LODGE POLE PINE STAKE PLACED ON WINDWARD SIDES OF TREE, AND OUTSIDE OF ROOTBALL A SHALLOW BASIN 2" DEEP SHALL BE FORMED AROUND ROOTBALL BELOW FINISH GRADE. TREES PLANTED IN TURF SHALL NOT HAVE BASINS. FINISH GRADE NATIVE GRADE APPROVED BACKFILL, THOROUGHLY MIXED PRIOR TO INSTALLATION. PUDDLE AND SETTLE PRIOR TO PLANTING TREE. ROOTBALL AGRIFORM PLANT TABLETS 3 PER 15 GALLON, 6 PER 24" BOX AND 8 FOR 36" BOX CINCH TIE OR APPROVED EQUAL TREE-SEE PLAN FOR SIZE AND TYPE PLAN PREVAILING WINDS 2X DIAMETER OF ROOTBALL DEPTH OF ROOTBALL 6"FOOT TAMP BASE TREE STAKING (DOUBLE) SCALE: N.T.S. 10 1 3 2 3 1 6 5 7 8 10 3 3 2 1 2 3 4 9 9 8 7 6 5 4 3 2 1 CONTRACTOR MUST CONTACT THE CITY OF CUPERTINO ARBORIST TO VERIFY SPECIES (EVEN IF SHOWN ON THE PLANS), LOCATIONS, AND QUANTITIES OF ALL STREET TREES PRIOR TO ORDERING MATERIAL. IF STREET TREES ARE TO BE PLANTED IN TREE WELLS, FINAL LOCATION OF TREE WELLS SHALL BE DETERMINED BY THE ARBORIST PRIOR TO INSTALLATION OF SIDEWALK. ALL PLANTING AREAS TO RECEIVE 3 " THICK BARK MULCH LAYER. IN THE EVENT THAT BARK MULCH EX ISTS ON SITE, CONTRACTOR SHALL PROVIDE SAMPLE OF EX ISTING AND PROPOSED MATCHING BARK MULCH FOR APPROVAL. OTHERWISE, BARK MULCH SHALL BE LYNGSO SMALL FIR BARK (3 /4 " TO 1-1/2 ") OR APPROVED EQUAL. ALL PLANT MATERIAL SHALL BE SELECTED IN ACCORDANCE WITH THE AMERICAN STANDARD FOR NURSERY STOCK (ANSI Z6 0.1) FOR STANDARD FORM TREES, CALIPER SIZE SHALL BE MEASURED 6 " ABOVE THE SOIL LINE FOR CALIPERS EQUAL TO OR LESS THAN 4" FOR CALIPERS GREATER THAN 4", CALIPER SHALL BE MEASURES 12" ABOVE THE SOIL LINE. FOR MULTI-TRUNK TREES THE CALIPER SHALL BE ESTABLISHED BY TAKING THE AVERAGE OF THE CALIPER OF THE TWO LARGEST TRUNKS. CALIPER IS MEASURED 6” ABOVE ORIGINATION POINT OF THE SECOND LARGEST TRUNK OR 6” ABOVE GROUND IF ALL TRUNKS ORIGINATE FROM THE SOIL. CALIPER SIZES STANDARDS: 15 GALLON: 0.7 5-1.2 5" 24" BOX: 1.25-2" 36" BOX: 2-3.5" 4 8" BOX : 3 .5-5" 60" BOX: 4-6" WATER NEEDS CATEGORY BASED ON WUCOLS IV (JANUARY 2 014 ) LANDSCAPE COEFFICIENT METHOD: CATEGORY PERCENTAGE OF ETo (H) HIGH: 0.7 -0.9 (M) MEDIUM: 0.4 -0.6 (L) LOW: 0.1-0.3 (VL) VERY LOW: <0.1 B P RO POSED PLANT PAL ET T E SYMBOL BOTANICAL NAME COMMON NAME MINIMUM CONTAINER SIZE / SPACING O.C. HxW WUCOLS TREES SHRUBS 5 GALLON 3'X3' L 5 GALLON WEBER'S AGAVE AGAVE WEBERI 6'X6' 1 GALLON @ 30" O.C. TWIN PEAKS DWARF COYOTE BRUSH BACCHARIS PILULARIS 'TWIN PEAKS' 2'x5' L ANIGOZANTHOS 'HARMONY' HARMONY KANGARO O PAW 3'X3' GROUNDCOVER CAREX TUMULICOLA FOOTHILL SEDGE 2'X2' 1 GALLON @ 18" O.C. HETEROMELES ARBUTIFOLIA 'DAVIS GOLD' DAVIS GOLD TOYON 8'X6' L LEYMUS CONDENSATUS 'CANYON PRINCE' CANYON PRINCE WILD RYE 3'X4' 1 GALLON @ 24" O.C. CHONDROPETALUM ELEPHANTINUM LARGE CAPE RUSH 5'X4' 5 GALLON 24" BOX ARMSTRO NG RED MAPLE 50'X15' ACER RUBRUM 'ARMSTRONG' M 7 ACE ARM L L L L L M SESLERIA AUTUMNALIS AUTUMN MOOR GRASS 1'X2' 1 GALLON @ 18" O.C. HEUCHERA MAXIMA ISLAND ALUM ROOT 2'X2' 1 GALLON @ 18" O.C. M 1 GALLON JERUSALEM SAGE 3'X3' PHLOMIS FRUTICOSA L PITTOSPORUM TENUIFOLIUM KOHUHU 20'X12' 1 GALLON M 3 17 30 29 9 49 16 ANIGOZANTHOS 'TEQUILA SUNRISE' TEQUILA SUNRISE KANGAROO PAW 5 GALLON 5 GALLON B C F D A E H WHITE-FLOWERING WESTERN REDBUD 15'X10' CERCIS OCCIDENTALIS 'ALBA' VL 7 CER OCC EVERGREEN ASH 50'X30' FRAXINUS UHDEI M 1 FRA UHD 36" BOX 36" BOX I POLYSTICHUM MUNITUM WESTERN SWORD FERN 3'X3' 1 GALLON M38 1 GALLON WESTERN MAIDENHAIR FERN ADIANTUM ALEUTICUM 3'X3' H 20 TYPE NATIVE? SHRUB GRASS TREE SUCCULENT PERENNIAL GRASS-LIKE SHRUB GRASS-LIKE GRASS PERENNIAL SHRUB SHRUB FERN FERN TREE TREE PERENNIAL N N N N N N N N Y N N Y Y Y Y Y N L LOMANDRA 'BREEZE' DWARF MAT RUSH 3'X3' 1 GALLON @ 24" O.C. GRASS-LIKE N 36" BOX ARMSTRO NG RED MAPLE 50'X15' ACER RUBRUM 'ARMSTRONG' M 10 ACE ARM TREE N CHANTICLEER FLOWERING PEAR 30' X 20' PYRUS CALLERYANA 'CHANTICLEER' M 8 PYR CHA 24" BOX TREE N 1 1 1 DP-2019-001, ASA-2019-006, TR-2019-032 01/10/20 Ellen Yau NONE CJT PLANT IMAGES DRAWN BY: PROJECT NO: CAD DWG FILE: CHECKED BY: DESIGNED BY: DATE: SCALE: HMHC DATE DESCRIPTIONNO 19900 STEVENS CREEKLANDSCAPE IMPROVEMENTSCUPERTINO, CAS:\PROJECTS\520200\LA\PRODUCTION\520201\520201LDC.DWG520201LDC.DWG L4.04 5202.00 LS BS 11/11/2019 Land Use Entitlements Land Planning Landscape Architecture Civil Engineering Utility Design Land Surveying Stormwater Compliance 1570 Oakland Road (408) 487-2200 San Jose, CA 95131 HMHca.com NOT FOR CONSTRUCTION PLANNING COMMENTS11/14/19 1 ADIANTUM ALEUTICUM AGAVE WEBER I ANGIOZANTHOS 'HARMONY' ANGIOZANTHOS 'T EQUILA SUNRISE' CHONDROPETALUM ELEPHANTINUM HETERO MELES ARBUTIF OLIA 'DAVIS GOL D' PHLOMIS FRUTICOSA PH ORMIUM T EN AX 'BRO NZ E BABY' PITTOSPORUM TENUIFOLIUM POLYSTICHUM MUNITUM ACER RUBRUM 'AR MSTRONG' CERCIS OCCIDENTALIS 'ALBA' FRAXINUS UHDEI BACCHARIS PILLULARIS 'TWIN PEAKS' CAREX TUMULICOLA HEUCHERA MAXIMA LEYMUS COND ENSATUS 'CANYO N PRICE' LOMANDRA 'BREEZE' SESLERIA AUTUMNALIS DP-2019-001, ASA-2019-006, TR-2019-032 01/10/20 Ellen Yau For convenience in designation on the drawings or in the specifications, certain articles or materials to be incorporated in the work may be designated under a trade name or the name of a manufacturer and catalogue number. Subject to approval by the Owner or Landscape Architect, an alternative article or material may be utilized. When requested, Contractor shall furnish the Owner with a Certificate of Compliance stating that the material substantially meets the specifications The obligations of the Contractor under this section shall not extend to the liability of the Landscape Architect, the Landscape Architect's consultants, and agents and employees of any of them arising out of (1) the preparation or approval of maps, drawings, opinions, reports, surveys, change orders, designs or specifications, or (2) the giving of or the failure to give directions or instructions by the Landscape Architect, the Landscape Architect's consultants, and agents and employees of any of them provided such giving or failure to give is the primary cause of the injury or damage. The burden of proof as to the quality and suitability of alternatives shall be upon the Contractor. Landscape Architect shall review and approve or take other appropriate action on the contractor submittals, such as shop drawings, product data, samples and other date, which the contractor is required to submit, but only for the limited purpose of checking for conformance with the design concept and the information shown in the construction documents. This review shall not include review of the accuracy or completeness of details, such as quantities, dimensions, weights or gauges, fabrication processes, construction means or methods, coordination of the work with other trades or construction safety precautions, all of which are the sole responsibility of the contractor. review of a specific item shall not indicate that the landscape architect has reviewed the entire assemble of which the item is a component. Landscape Architect shall not be responsible for any deviations from the construction documents not brought to the attention of the Landscape Architect in writing by the contractor. - Represents the entire and integrated agreement between the Owner and the Contractor. The contract documents form the Contract for construction. - The person or entity whose bid is accepted and to whom the Contract is awarded. - These specifications, the drawings, addenda issued prior to execution of the Contract, and the Contract between the Owner and the Contractor. - Is the person or entity identified as such in the Contract. - The term "work" or "project" means the construction and services required by the Contract Documents and includes providing all labor, materials, equipment, transportation, tools, and incidentals necessary to complete the work in a satisfactory manner by licensed contractor and experienced workers. Contractor shall not be relieved of obligations to perform the work in accordance with the Contract Documents either by activities or duties of the Owner, Landscape Architect, or by tests, inspections or approvals required or performed by persons other than the Contractor. Contractor must have the written consent of the Owner to substitute a subcontractor other than that designated in the bid. Contractor shall set forth in the bid the name and the location of each subcontractor who will perform work or labor or render service to the Contractor in or about the construction of the work. - The professional services firm who prepared the project drawings and specifications for the Owner. SUBCONTRACTS CONSTRUCTION PROCEDURE All materials shall be subject to rigid inspection and if, in the opinion of the Owner the same do not comply with the contract documents, said materials shall be rejected and immediately removed from the premises at the expense of the Contractor. The Contractor shall furnish such samples of all materials as requested by the Owner without charge. Labor and equipment necessary for the furnishing of such samples shall be the responsibility of the Contractor. Manufacturers warranties, guaranties, instructions sheets and parts lists, which are furnished with certain articles or materials incorporated in the work, shall be delivered to the Owner prior to acceptance of the work. Materials, parts and equipment to be furnished by the Contractor shall be new, unless otherwise specified in these specifications or noted on the drawings. The materials shall be manufactured, handled, and used in a workmanlike manner. The Owner may at any time prior to acceptance of the work, by written order to Contractor and without notice to sureties, increase or decrease the estimated quantity of work or material, make alterations, deviations, additions to or omissions from the drawings and specifications, and make changes in the project as may be deemed necessary or advisable, within the general scope thereof. N o claim for additional work or material will be allowed unless supported by a written Change Order signed by the Owner and the Contractor stating their agreement upon all of the following: - Change in the work. - Amount of the adjustment in the Contract sum, and - E xtent of the adjustment in the Contract time, if any. U nless otherwise specifically defined herein, or unless the context requires a different meaning, all words, abbreviations, symbols, terms and phrases having a well known or technical meaning shall be so construed. Whenever in these specifications, or in any documents or instruments where these specifications govern, the following terms are used, the intent and meaning thereof shall be as follows: B ids shall be submitted in sealed envelopes bearing on the outside the name of the bidder, the bidder's address and the name of the project for which the bid is being submitted. B ids shall be delivered to Owner or general contractor responsible for reviewing and processing bids. Any discrepancies shall be brought to the immediate attention of the Owner. Contractor shall assume all necessary revisions due to failure to give such notification. E ach bidder shall inspect the construction documents (drawings and specifications) and site of the proposed project. The submission of a bid shall constitute and acknowledge that the bidder is familiar with all conditions which might affect the contemplated project. The Owner reserves the right to any time prior to the award, to reject all bids. The Owner also reserves the right to accept other than the lowest bidder, to accept one (1) part of a proposal and to waive any technical informalities in any proposal. A bidder may withdraw the bid without prejudice, provided a written request for such withdrawal is delivered to the Owner prior to the commencement of the opening of bids. The contractor shall keep at the project site a copy of the drawings and specifications. In the event a discrepancy exists between figures and/or drawings, the discrepancy shall be immediately submitted to the Owner for clarification. Any adjustment made by the Contractor without obtaining such clarification from the Owner shall be at the Contractor's risk and expense and be subject to removal if said adjustment does not meet the approval of the Owner. The Contractor shall review, approve, and submit such submittals required by the contract documents with reasonable promptness and in such sequence or to cause no delay in the work. Shop drawings, product data, samples, and similar submittals are not contract documents. The purpose of their submittals is to demonstrate for those portions of the work for which submittals are required the way the Contractor proposes to conform to the information given and the design concept expressed in the drawings. The Contract documents, as defined herein, are intended to be read together to describe a complete and finished piece of work, including all labor, materials and equipment necessary for the proper execution of the project. Anything in the specifications and not on the drawings, or on the drawings and not in the specifications, shall be as though shown or mentioned in both. Contractor shall comply with all rules and regulations of the Department of Food and Agriculture, the Department of Health, the Department of Industrial Relations and all other agencies which govern the use of pesticides/herbicides required in the performance of the work. P roject maintenance is required after the project is complete. A lack of maintenance in area such as, but not limited to irrigation and planting operations may result in damage to property and/or persons. Contractor acknowledges and agrees that, as between parties to the contract, the contractor is solely responsible for the results of any lack of or improper maintenance. Costs incurred due to repair or replacement of defective or damaged work shall be the responsibility of the contractor. The Contractor shall abate dust nuisance by cleaning, sweeping and sprinkling with water, or other means as necessary, and shall save the Owner free and harmless from any claim for loss or damage sustained by others and resulting from operations on the project site. When placing concrete around or contiguous to any utility, the Contractor shall assume responsibility for costs to furnish and install a cushion of expansion joint material, clear opening or sleeve, or by other suitable means shall prevent embedment in or bonding with the concrete. The Contractor shall absorb in its bid, the patent fees or royalties on any patented article or process which may be furnished or used in the work. The Contractor shall indemnify and hold the Owner harmless from any legal actions that may be brought from infringement of patents. Throughout all phases of construction, and until acceptance of the work, the Contractor shall keep the project site clean and free from rubbish and debris. Costs incurred due to cleanup operations shall be as included in the prices bid for the various items of work and no separate payment will be made therefor. Contractor shall comply with all local sound control and noise level regulations and ordinances which apply to any work performed pursuant to the Contract, and shall make every effort to control an undue noise resulting from the construction operation. Contractor shall comply with all air pollution control rules, regulations, ordinances and statutes which apply to any work performed pursuant to the Contract and shall not discharge smoke, dust or any other air contaminants into the atmosphere in such quantity as will violate the regulations of any legally constituted authority. The Contractor shall be responsible for initiating, maintaining and supervising all safety precautions and programs in connection with the performance of the Contract. The Contractor shall give notices and comply with applicable laws, ordinances, rules, regulations and lawful orders of public authorities bearing on safety of persons or property or their protection from damage, injury or loss. The Contractor shall take reasonable precautions for safety of, and shall provide reasonable protection to prevent damage, injury or loss to: employees on the work and other persons who may be affected thereby, the work and materials and equipment to be incorporated therein, whether in storage on or off the site, under care, custody or control of the Contractor or the Contractor's subcontractors, and other property at the site or adjacent thereto, such as trees, shrubs, lawns, walks, pavements, roadways, structures and utilities not designated for removal, relocation or replacement in the course of construction. The Contractor shall so conduct operations as to offer the least possible obstruction and inconvenience to the public. The Contractor shall have under construction no greater amount of work than can be performed properly with due regard to the rights of the public. DRAWN BY: PROJECT NO: CAD DWG FILE: CHECKED BY: DESIGNED BY: DATE: SCALE: HMHC DATE DESCRIPTIONNO 19900 STEVENS CREEKLANDSCAPE IMPROVEMENTSCUPERTINO, CAS:\PROJECTS\520200\LA\PRODUCTION\520201\520201SPC.DWG520201SPC.DWG L5.01 5202.00 LS BS 11/11/2019 Land Use Entitlements Land Planning Landscape Architecture Civil Engineering Utility Design Land Surveying Stormwater Compliance 1570 Oakland Road (408) 487-2200 San Jose, CA 95131 HMHca.com NOT FOR CONSTRUCTION PLANNING COMMENTS11/14/19 1 NONE HMH LANDSCAPE SPECIFICATIONS INSTRUCTIONS TO BIDDERS A. SU B MITTALS B. E XAMIN ATION OF CON STRU CTION DOCU ME N TS AN D SITE RE JE CTION OF ALL B IDS C. WITHDRAWAL OF B ID D. GE N E RAL CON DITION S DE FIN ITION S A. CON TRACT CON TRACT DOCU ME N TS CONTRACTOR LAN DSCAP E ARCHITE CT OWNER WORK DRAWINGS AND SPECIFICATIONS SHOP DRAWIN GS OR P RODU CT DATA AN D SAMP LE S E. CHANGE ORDERS F. CON TROL OF MATE RIALS G. SAMP LE S AN D TE STS H. SUBSTITUTION OR EQUIVALENTSI. CERTIFICATES OF COMPLIANCEJ. IN DE MN IFICATION K. L. SAFE TY OF P E RSON S AN D P ROP E RTY M. PROJECT SITE MAINTENANCE N. AIR POLLUTION O. NOISE CONTROL P E STICIDE S/HE RB ICIDE S P. Q. DUST CONTROL R. U TILITIE S S. PATENTS AND ROYALTIES T. REPAIRS AND REPLACEMENT U. P ROJE CT MAIN TE N AN CE B. C. D. Concrete for footings shall be placed against native grade or certified compacted subgrade prepared per geotechnical report. Grading excavations shall be level, free from loose material, and free from standing water. N o grading shall be done when the moisture content of the soil is so great that excessive compaction will occur, nor when it is so dry that dust will form in the air or that clods will not break readily. Grading shall be to the dimensions and elevations indicated on the drawings, of sufficient width to provide clearances for setting of forms and inspection of the various classifications of work. Grading shall be completed prior to weed abatement operations and soil preparation. C. Abandoned pipes shall be capped or plugged in a manner suitable to site supervisor or agency inspector. All materials removed shall be disposed of off-site. B urning shall not be permitted. N o accumulation of flammable material shall remain on or adjacent to the project site. Finish grades shall be well compacted, reasonably smooth, ensuring positive drainage, free of abrupt grade changes, irregularities, water pockets or discontinuities in surface level. Grades shall flow away from structures and in accordance with local jurisdictional requirements. Finish grade adjacent to paved areas, curbs, valve boxes and similar features shall be one inch (1") below the finished surface for turf areas, and two to three inches (2" - 3") below the finished surface for ground cover areas. Areas adjacent to hardscape should be graded so 3" layer of mulch does not over spill onto adjacent surface. Finished surfaces in all cases shall conform to the lines, grades, cross sections and dimensions indicated on the drawings. Depressions caused by the removal of objectionable materials shall be backfilled and compacted with materials equal to the surrounding soil. The Contractor shall provide all lines and grades necessary to properly carry on the work. Any work which is not found to comply with the lines and grades shown on the drawings shall be altered or removed and replaced by, and at the expense of, the Contractor. Costs incurred due to repair of replacement of existing improvements which are not designated for removal and which are damaged as a result of construction operations shall be the responsibility of the Contractor. Replacements shall be at least equal to the conditions when Contractor entered upon the work, and shall match them in finish and dimension. P lant material shall be replaced with the same species, size, and in the original location (unless otherwise designated). GRADING OPERATIONS All bench marks, monuments and other reference points shall remain undisturbed. Contractor shall provide all labor, materials, and equipment for clearing and grubbing operations performed in advance of grading operations. Clearing and grubbing shall consist of removing all natural and artificial objectionable materials within the limits of construction. E xcept as indicated on the drawings, materials removed shall not be incorporated in the project. Contractor shall provide all labor, materials and equipment to perform all fine grading operations as indicated on the drawings and specified herein. See geotechnical, civil, and structural drawings for other earthwork specifications/recommendations. A. FINE GRADING PRESERVATION OF PROPERTY REMOVAL and DISPOSAL OF MATERIAL GENERAL B. C. CLEARING and GRUBBING GE N E RAL A. B. Trenches that settle below grade shall be reopened to a depth required for proper compaction, refilled and compacted to indicated surface elevation. U nsuitable materials as determined by the Owner shall be removed from the project site. Arrangements for disposal of the material at off-site locations shall be made with the City's/Owner's written consent of the property upon which such material will be disposed. E. Compaction of backfill by ponding and jetting will not be permitted. D. E xcavated material, approved for backfilling by geotechnical engineer, shall be free from large clods, stones and other objectionable materials, exceeding three inches (3") in diameter; and deposited in accordance with the requirements for compacted fill as specified herein. Fill material shall be composed of satisfactory excavated material or approved imported soil and shall be evenly spread in uniform continuous horizontal layers per geotechnical report. COMPACTED FILL BACKFILL UNSUITABLE MATERIALS Interior of pipe shall be thoroughly cleaned of all foreign matter prior to, during, and after installation in the trench. In order to make any necessary adjustments, connections that are to be made to an existing pipe, catch basin or other appurtenances shall be exposed and inspected before laying new pipe. Drainage systems shall be as indicated and installed as detailed on the drawings. P ipe shall be as indicated on the drawings and laid and jointed in accordance with generally accepted practice and to line and grade as designated on the drawings. B. Contractor shall provide all labor, materials, and equipment to furnish and install drainage systems as indicated on the drawings and as specified herein. Cross reference civil engineering drawings for connections and coordinated drainage systems. Contractor shall maintain the project site throughout the progress of the work in a reasonable, dry, workable condition, free of surface water. Contractor shall be responsible for all cutting and patching of new or existing walks, curbs and pavements required for proper installation of drainage systems. A. DRAINAGE GENERAL HORIZONTAL SUBDRAINS DP-2019-001, ASA-2019-006, TR-2019-032 01/10/20 Ellen Yau Contractor shall apply, in areas to be installed with subbase materials, a selective pre-emergent, surface-applied herbicide. Rates and application method shall be as recommended by manufacturer. Visible weeds shall be sprayed with a non-selective, post-emergent herbicide. Application method shall be as recommended by manufacturer. NON-VEGETATIVE SITE MATERIALS A. WEED ABATEMENT AND SOIL TREATMENT Contractor shall apply spray chemicals when air currents are still; preventing drifting onto adjoining property and preventing any toxic exposure to persons whether or not they are in, or near, the project. Decomposed granite shall be the product of crushing rock or gravel; clean, hard, sound, durable, uniform in quality, and free of any detrimental quantity of soft, friable, thin, elongated or laminated pieces, disintegrated material, organic matter, oil, or other deleterious substances. Color shall be as indicated on the drawings or selected by Landscape Architect. B. D. C. E. Material shall be of such nature that it can be compacted readily under watering and rolling to form a firm, stable base that is spread in one (1) operation, free from pockets of large fine material. Aggregate subbase material shall be as specified in the project geotechnical report. Sand utilized for subbase material shall be as specified in the project geotechnical report OR consist of natural or manufactured granular material free of clay, deleterious amounts of organic material broken glass, cans or other substances not suitable for the purposes intended. Samples should be submitted prior to project order for approval. Sand for surface areas shall consist of natural or manufactured granular material free of clay, deleterious amounts of organic material, broken glass, cans or other substances not suitable for the purposes intended. Washed concrete sand shall be thoroughly and uniformly washed. Plaster sand is unacceptable for play areas. Samples should be submitted prior to project order for approval. AGGREGATE SUBBASE MATERIAL Contractor shall apply an approved selective pre-emergent, surface-applied herbicide. Rates and application method shall be as recommended by the manufacturer. Costs incurred due to repair or replacement of defective or damaged work shall be the responsibility of the Contractor. Visible weeds shall be sprayed with an approved non-selective, post-emergent herbicide. Rates and application method shall be as recommended by the manufacturer. Contractor shall apply spray chemicals when air currents are still; preventing drifting onto adjoining property and preventing any toxic exposure to persons whether or not they are in, or near, the project. Asphaltic concrete shall be the product of mixing coarse and fine aggregate with paving asphalt at a central mixing plant until all aggregate particles are uniformly coated. Paving asphalt shall be steam-refined, produced from crude asphaltic petroleum or a mixture of refined liquid asphalt and refined solid asphalt. Paving asphalt shall be homogeneous and free from water and residues obtained by the artificial distillation of coal, coal tar or paraffin oil. Aggregates shall be clean and free from decomposed or organic materials, and other deleterious substances. D. C. Contractor shall provide all labor, materials and equipment for furnishing, spreading, compacting and finishing asphaltic concrete paving as indicated on the drawings and specified herein. Prior to placement of asphaltic concrete, Contractor shall be responsible for establishing subgrade and providing drainage in accordance with the Fine Grading Section, and performing weed abatement operations as specified herein. B. TEMPORARY ASPHALTIC CONCRETE PAVING A. SAND SUBBASE MATERIAL SAND FOR SURFACE AREAS DECOMPOSED GRANITE GENERAL WEED ABATEMENT AND SOIL TREATMENT MATERIALS REPAIR AND REPLACEMENT DRAWN BY: PROJECT NO: CAD DWG FILE: CHECKED BY: DESIGNED BY: DATE: SCALE: HMHC DATE DESCRIPTIONNO 19900 STEVENS CREEKLANDSCAPE IMPROVEMENTSCUPERTINO, CAS:\PROJECTS\520200\LA\PRODUCTION\520201\520201SPC.DWG520201SPC.DWG L5.02 5202.00 LS BS 1 1 /1 1 /201 9 PLOTTED: 11/14/2019 1:36 PMLand Use Entitlements Land Planning Landscape Architecture Civil Engineering Utility Design Land Surveying Stormwater Compliance 1570 Oakland Road (408) 487-2200 San Jose, CA 95131 HMHca.com NOT FOR CONSTRUCTION PLANNING COMMENTS11/1 4/1 9 1 NONE HMH LANDSCAPE SPECIFICATIONS Geotextile fabric, if applicable, shall be TenCrate Mirifi Type N-Series, nonwoven polypropylene geotextile fabric or equal, unless otherwise noted in detail or materials list. Coarse aggregate shall be composed of gravel or a blended mixture of crushed rock and gravel containing no more than fifty (50) percent of crushed rock particles having all faces fractured and not less than twenty-five percent (25%) of gravel. Aggregates shall not exceed a diameter of one and one-half inches (1 1/2"). Blending shall produce a uniform, consistent percentage of each. Rock products shall be clean, hard, sound, durable, uniform in quality and free of any detrimental quantity of soft, friable, thin, elongated or laminated pieces, disintegrated material, organic matter, oil, alkali, or other deleterious substances. Wooden forms shall have a net thickness of at least one and one-half inches (1 1/2") and shall be free of imperfections which would impair the strength for the use intended. Forms shall be secured by nailing to side stakes of sufficient length and cross-sectional area to adequately resist lateral displacement during placement of concrete. Forms shall be clean and shall receive a coat of light oil immediately prior to placing concrete. Benders or thin plank forms may be used on curves. Reinforcement shall conform to the dimensions and details shown on the drawings and shall be cleaned thoroughly of all rust, mill scale, mortar, oil, dirt, or coating of any character which would be likely to destroy or impair its proper bonding with the concrete. Reinforcing steel, where indicated on the drawings, shall be Grade 40 or Grade 60 billet steel, conforming to ASTM A-615. Wire mesh reinforcement, where indicated on the drawings, shall conform to ASTM A-185. Metal forms shall have sufficient rigidity to resist springing during placement of concrete. Forms shall be secured by means of metal stakes designed so as to be driven below the top of the forms through openings, locking them into position. D. E. Forms shall be free of warp, set plumb and true to line and grade with upper edges flush with specified grade or finished surface of the constructed improvement, and not more than one-half inch (1/2") less in depth than the specified thickness of the edge of the concrete to be placed. Water shall not contain deleterious substances or any amount of impurities that will cause a change in the time of setting. The amount of water used in the mixture shall not exceed the amount necessary to permit material placement and consolidation. C. Cement shall be Type II low alkali portland cement conforming to ASTM C-150. Cement shall be of the same brand and type used throughout the project. Sand shall consist of natural or manufactured granular material, free of deleterious amounts of organic material, mica, loam, clay, and other substances not suitable for portland cement concrete. Sand shall be thoroughly and uniformly washed. In addition to complying with all pertinent codes and regulations of local governing agencies, Contractor shall comply with all pertinent recommendations contained in "Recommended Practice for Concrete Formwork", publication #347-78 of the American Concrete Institute. Concrete shall consist of portland cement, fine aggregate (sand), coarse aggregate and water, proportioned and mixed to attain a twenty-eight (28) day compressive strength of at least 2,500 pounds per square inch with a slump not to exceed three inches (3"). Concrete shall not contain reactive aggregate or calcium chloride. Contractor shall provide all labor, materials and equipment to construct concrete items as indicated on the drawings and specified herein. B. MATERIALS FORMS REINFORCEMENT CONCRETE GENERALA. Install embedded items accurately in their proper locations, secured against displacement, prior to placing concrete. Concrete shall be placed on native grade, certified compacted subgrade, or subbase material, free of all loose and extraneous material, sufficiently dampened to ensure that no moisture will be absorbed from the fresh concrete. Equipment used shall not have any aluminum components coming into direct contact with the concrete. Concrete shall be distributed uniformly and thoroughly vibrated in a manner that will encase the reinforcement, fill the forms and bring the surface true to grade and cross-section. PLACING CONCRETE Scored control joints shall be tooled to a minimum depth of three-quarters inch (3/4") and a radius of one-eighths inch (1/8") at five foot (5') intervals or per plan. Spraying of curing compound shall commence as soon as free water leaves the surface but no later than three (3) hours following placement of concrete. Saw cut joints, where specified shall be as indicated on the drawings or at intervals not to exceed twelve feet (12') on center, and shall be cut to a minimum depth of three-quarters inch (3/4") and a width not to exceed one-quarter inch (1/4"). Curing compound shall form an impervious membrane and shall be a blend of pure waxes and alkali-resistant pigments in a solvent emulsion and installed per manufacturer recommendation. H. Stamped concrete , where indicated on the drawings, shall be performed by applying special forming tools while concrete is still in the plastic stage of set. Desired pattern shall be as indicated on the drawings. Contractor shall be licensed, tooled, and trained for stamping product being used. Expansion joints shall be as indicated on the drawings and at corners, radius points and at regular intervals not to exceed twelve feet (12') on center. Set premolded expansion joint strip below finished surface, temporarily secured to top of expansion strip or use a removable plastic filler strip. Expansion joints shall be sealed per detail callout. G. Colored concrete , where indicated on the drawings and per materials list and installed per manufacturer recommendations. Broom finish , where indicated on the drawings, shall be performed after finish troweling by drawing the following broom types across the narrowest width of the concrete or in the direction as indicated on the drawings. Heavy Broom - Push with coarse or stiff bristles. Rock salt finish , where indicated on the drawings, shall be performed by applying rock salt evenly over entire surface just prior to the finish troweling. Press salt crystals into the surface with sufficient trowel pressure so that salt is embedded just barely below surface leaving the tops of the crystals exposed. Cure finished surface in accordance with generally accepted practice. Medium Broom - Push with medium or medium stiff bristles. Fine Broom - Push with fine or soft textured bristles. Concrete finishes shall be as indicated on the drawings and specified herein. No advertising impressions, stamp or mark of any description will be permitted on surface of concrete. Concrete shall not be covered with plastic sheeting. Concrete surfaces shall be floated prior to steel troweling. Formed edges shall be rounded to a radius of one-half inch (1/2"). Edges at expansion joints shall be rounded to a radius of one-half inch (1/2"). F. FINISHING JOINTS CURING Sandblasted Finish , where indicated on the drawings, shall be performed after finish troweling by blowing the surface granules with an air-pressure hose and fine grain silicon sand. Contractor shall do a test sample for approval prior to completing entire area to be sandblasted. Water shall be free of any amount of impurities that will cause change in the time of setting of portland cement. Quantity of water shall be the minimum required to produce a mixture sufficiently workable for the purpose intended. Contractor shall provide weep holes in first or second layer of brick as indicated in details on drawings or as required. Concrete block which becomes wet shall be permitted to dry before commencing work. Mortar joints for stone shall be tooled to produce a slightly concave surface, and well-bonded to stone at edges. Contractor shall provide expansion joints at corners and at thirty feet (30') on center or as required by local code. All bolts and anchors to be inserted in the wall shall be solidly grouted in place. Mortar joints for brick and concrete block shall be straight, clean, uniform in thickness of not less than three-eighths of an inch (3/8"), tooled to produce a slightly concave surface, and well bonded at edges. All walls shall be laid true, level, and plumb, and unless otherwise indicated on the drawings. Brick and concrete block shall be laid in a running bond pattern. Brick and stone shall be clean, wetted immediately before laying and shall be laid on a full mortar bed with "push joints". All work shall be performed in compliance with applicable local building ordinances and Uniform Building Code and Masonry Design Manual. Coarse aggregate shall be composed of gravel or a blended mixture of crushed rock and gravel. Rock products shall be clean, hard, sound, durable, uniform in quality and free of any detrimental quantity of soft, friable, thin, elongated or laminated pieces, disintegrated material, organic matter, oil, alkali or other deleterious substance. Reinforcing steel shall be Grade 40 or Grade 60 billet steel conforming to ASTM A-615. Varying grades shall not be used interchangeably in any one wall. C. Sand shall consist of natural or manufactured granular material, free of deleterious amounts of organic material, mica, loam or clay, conforming to ASTM G-404 for grout and ASTM C-144 for mortar. Sand shall be thoroughly and uniformly washed. Cement shall be Type II low alkali portland cement conforming to ASTM C-150. Cement shall be of the same brand and type used throughout the project. Mortar used in masonry construction shall be one (1) part portland cement to two and one-half (2 1/2) parts of sand, to which one-quarter (1/4) to one-half (1/2) part hydrated lime or lime putty has been added. Color shall be as indicated on the drawings or as selected by Landscape Architect. Grout for use in spaces less than two inches (2") clear in dimension shall be one (1) part portland cement and two and one-quarter (2 1/4) to three (3) parts sand. For spaces four inches (4") or larger add one and one-quarter (1 1/4) to two (2) parts of aggregate. Stone shall be uniform in quality; clean and free of dust or other foreign materials. Hollow load bearing (CMU) masonry units shall be made with sand-gravel aggregate and shall conform to ASTM C-90 for Grade N-1 units, free of cracks or defects. Net size of units shall be shown on the drawings. Contractor shall provide all labor, materials and equipment to construct masonry structures conforming to the dimensions and details indicated on the drawings and specified herein. B. Brick shall be whole, sound, hard burned, give a clear ringing sound when struck together, and be uniform in quality. Brick shall be clean and free of dust or other foreign materials. Net size, color and texture of units shall be as shown on the drawings. MATERIALS INSTALLATION MASONRY A. GENERAL E. Spread and screed setting bed to a uniform thickness, except for minor variations required to produce a true surface, level in plane or uniformly spread for drainage as shown on drawings. Setting bed shall be three-quarter inch (3/4") minimum and one and one-quarter inch (1 1/4") maximum. Horizontal steel for concrete block walls shall be laid in a course of bond beam block filled with grout. For concrete block walls, a vertical dowel shall be provided in the foundation for each vertical bar. Vertical cores containing steel shall be filled solid with grout. Reinforcement shall be placed as indicated on the drawings and as required by building codes. D. REINFORCEMENT LAYING PAVERS Apply a thin layer of cement paste (1/32" to 1/16") by brushing or troweling over setting bed or to bottom of brick. Set and level each brick. Rates and application method shall be as recommended by the manufacturer. Deliver materials in manufacturer's original unopened containers. Product shall be Graffiti Control as manufactured by Sure Klean or an approved equal. F. GRAFFITI CONTROL Where practical, treated wood shall be cut to final size and trimmed prior to treatment. If site sawing or drilling is necessary, cut surfaces shall be thoroughly brushed with two (2) coats of the same kind of preservative in conformance with AWPA Specification M-4. Portions of posts which are to be embedded in earth or concrete shall be brushed before installation with two (2) coats of coal tar bitumen, or approved equal. Applications shall extend a minimum of one inch (1") above finish grade or surface. Spraying will not be permitted. Contractor shall provide all labor, materials and equipment to construct wooden structures conforming to the dimensions and details indicated on the drawings and as specified herein. Douglas fir, where indicated on the drawings, shall conform in all particulars to the Standard Grading Rules for Western Lumber published by the Western Wood Products Association. Redwood, where indicated on the drawings, shall conform in all particulars to the Standard Specifications for Grades of California Redwood of the Redwood Inspection Service. Cedar, where indicated on the drawings, shall conform in all particulars to the Standard Grading Rules for West Coast Lumber. Lumber shall be straight; free from large, loose or unsound knots or knot clusters, scars, decay, holes, insect damage, and other defects or imperfections that would materially impair the strength or durability. Splits shall be no longer than the butt dimension. No cracks will be permitted. No nails, spikes, or other metal shall be present. Poles, where indicated on the drawings, shall be cut from sound, live, close-grained trees, machine peeled with all branch stubs and overgrown knots trimmed flush with the surface. Type of pressure treatment or preservative shall be as indicated on the drawings and shall conform with the applicable standards contained in the Manual of Recommended Practice of the American Wood Preservers Association. Contractor shall furnish a Certificate of Compliance for each load of pressure treated lumber to Owner. Where a particular method of pressure treatment is not indicated on the drawings, the lumber shall be conditioned, seasoned, prepared and treated by the empty cell pressure process with pentachlorophenol with six-tenths (0.60) pounds per cubic foot retention. Penetration shall be determined by the pentor check method. Plywood, where indicated on the drawings, shall be manufactured and graded in accordance with the rules of the American Plywood Association and the latest Product Standard for Softwood Plywood, Construction and Industrial, of the National Bureau of Standards. Each sheet of plywood shall bear the official stamp of a quality control agency stating the grade of the sheet. C. B. A. ROUGH CARPENTRY GENERAL MATERIALS TREATMENTS AND PRESERVATIVES DP-2019-001, ASA-2019-006, TR-2019-032 01/10/20 Ellen Yau DRAWN BY: PROJECT NO: CAD DWG FILE: CHECKED BY: DESIGNED BY: DATE: SCALE: HMHC DATE DESCRIPTIONNO 19900 STEVENS CREEKLANDSCAPE IMPROVEMENTSCUPERTINO, CAS:\PROJECTS\520200\LA\PRODUCTION\520201\520201SPC.DWG520201SPC.DWG L5.03 5202.00 LS BS 11/11/2019 Land Use Entitlements Land Planning Landscape Architecture Civil Engineering Utility Design Land Surveying Stormwater Compliance 1570 Oakland Road (408) 487-2200 San Jose, CA 95131 HMHca.com NOT FOR CONSTRUCTION PLANNING COMMENTS11/14/19 1 NONE HMH LANDSCAPE SPECIFICATIONS Lumber shall be well nailed or bolted together as indicated on the drawings. Nails shall not be driven closer together than one-half (1/2) their length. Care shall be taken to avoid hammer marks, moons, or saw cuts. Lumber shall be stored neatly in piles on skids in such manner that they may be readily inspected, and shall be handled in a manner that will avoid injury or breakage. Framing shall be true and exact. All lumber shall be cut and framed to a close fit and shall have even bearing over the entire contact surface. Shimming will not be permitted. D. WORKMANSHIP Galvanized surfaces which are to be painted shall be prepared by hand-scraping, brushing with stiff fiber or wire brushes or cleaning with alkaline solution followed by a fresh water rinse. After washing, surfaces shall be roughened by abrasive blasting. Galvanizing shall not be removed during preparation operations. F. After preparation, apply one (1) coat of zinc dust-zinc oxide primer followed by a vinyl wash pre-treatment and two (2) finish enamel paint coats. P rior to painting concrete surfaces, a brush coat or surface film of thin cement mortar shall be applied. W hen the film has set sufficiently the surface shall be rubbed by hand or mechanical means necessary to remove excess mortar and produce a smooth surface of even texture. Finished surfaces shall be washed with water and then with a ten percent (10%) to fifteen percent (15%) muriatic acid wash. Concrete surfaces shall be thoroughly dry and free of dust at time of painting. P aint for concrete surfaces shall be of either epoxy enamel type or acrylic emulsion type applied in not less than two (2) applications producing a uniform appearance. P aints, stains, or sealers shall be applied prior to assembling. W ood surfaces shall be prepared for painting by removing any foreign matter by wire brushing, scraping or sanding. All surfaces shall be wiped or dry brushed to remove any dust or chalky residue resulting from preparation operations. E. P aints and stains shall be of colors and tints as indicated on the drawings, and shall be applied in accordance with the manufacturer's recommendations and these specifications. Contractor shall submit color samples to the City for approval before applying any paint materials. C. D. P aint shall be delivered to the project site in new, unopened, round, airtight containers, appropriately identified with the manufacturer's name, date of manufacture, type of material and lot or batch number. P aint shall be applied on thoroughly dry surfaces and during periods of favorable weather. Surfaces being covered shall be free from moisture, dust, grease or other deleterious substance which would prevent bonding. P ainting shall be done in a neat and workmanlike manner, applied by brush, roller or spray methods. Finished surfaces shall be uniform, free of brush marks, roller stipple texture, runs or skips. E ach application of paint shall be thoroughly cured and any skips, holidays, thin areas or other deficiencies corrected before the succeeding application. Contractor shall protect all adjacent improvements against disfigurement as a result of painting operations. P aint shall be homogeneous, free of contaminants and of a consistency suitable for use in the capacity for which it is specified. Finished paint shall be well ground and the pigment shall be properly dispersed in the vehicle according to the requirements of the paint. The dispersion shall be of such nature that the pigment does not settle appreciably, does not cake or thicken in the container or become granular or curdled. P aints shall possess properties which in all respects effect satisfactory application, adhesion and curing. Thinning will not be permitted. PAINTING and STAINING Contractor shall provide all labor, material, tools, equipment and incidentals for sanding, priming, painting and staining of improvements as indicated on the drawings and specified herein. Contractor shall be responsible for the location, alignment, layout, dimensions and application of paint and stains. Costs incurred for repair or replacement of defective or damaged work, rejected materials or workmanship shall be the responsibility of the Contractor. A. B. GENERAL A. B. This section does not include reinforcing steel for concrete and masonry or items required in connection with irrigation or electrical work. Contractor shall provide all labor, materials, and equipment to furnish and install miscellaneous metal items as indicated on the drawings and as specified herein. P ortions of work exposed to view shall be finished neatly. All sharp corners and edges that are marred, cut or roughened during erection shall be slightly rounded. C. W orkmanship and finish shall be equal to the best general practice in steel fabricating shops. All materials, prior to fabrications, shall be thoroughly wire brushed and cleaned of all scale and rust. Finished members shall be free from twists, bends or open joints. D. Unless specified otherwise in the details on the drawings, nails and spikes shall be galvanized flat common. M iscellaneous metal items shall conform to the dimensions and details as indicated on the drawings. Steel bars, plates and shapes shall conform to ASTM A-36. E. Framing anchors, where applicable, shall be sixteen (16) gauge, zinc-coated, corrosion resistant sheet steel. Anchor bolts, where applicable, shall be carefully installed to permit true positioning of the bearing assemblies. B olts shall be long enough to extend entirely through the nut but not more than one-quarter inch (1/4") beyond. Unless otherwise specified on the drawings, bolts, nuts and lag screws shall be galvanized square head. Carriage bolts shall have truss heads with square shoulder. W ashers shall be over-sized of "cut" type. H oles shall be either punched full size, drilled full size, or sub-punched and reamed. Zinc used for galvanizing shall be grade P rime W estern conforming to ASTM B -6. M aterials shall be galvanized by the hot-dip method or electrodepositing process. F. Galvanized surfaces that are abraded or damaged after zinc coating application shall be thoroughly stripped and cleaned and repaired by a coating of "galvalloy", or approved equal. Finish coat to match existing finish. Contractor shall submit detail shop drawings indicating material thickness, type grade, and class; dimension; construction details; and other pertinent data for review and approval by engineer prior to fabrication. drawings shall include catalog cuts, erection details, manufacturer's descriptive data and installation instructions and templates. Contractor shall verify al measurements and shall take all field measurements necessary before fabrication. E xposed fastenings shall be compatible materials, shall generally batch in color and finish, and shall harmonize with the material to which fastenings are applied. M aterials and parts necessary to complete each item, even though such work is not definitely shown or specified, shall be included. P oor matching of holes for fasteners shall be cause for rejection. Fastenings shall be concealed where practical. Thickness of metal and details of assembley and supports shall provide strength and stiffness. Joints exposed to weather shall be formed to exclude water. M aterial shall be manufactured from coil steel having a minimum yield strength of 50,000 psi. Steel shall be galvanized to meet the requirements of ASTM A-526 with a minimum zinc coating weight of nine-tenths (.90) ounces per square foot hot-dit process. Galvanizing shall be performed after fabrication and prior to assembling component parts. MISCELLANEOUS METAL GENERAL MATERIALS WORKMANSHIP AND PROTECTION PAINTING GALVANIZED SURFACES PAINTING CONCRETE PAINTING WOOD SURFACES WORKMANSHIP MATERIALS BOLTS, NUTS AND FASTENERS GALVANIZING WROUGHT IRON OR TUBULAR STEEL FENCING Anchorage shall be provided where necessary for fastening miscellaneous metal items securely in place. Anchorage not otherwise specified or indicated shall include slotted inserts made to engage with the anchor, expansion shields, and power-driven fasteners when approved for concrete; toggle bolts and through bolts for masonry; machine and carriage bolts for steel; and lag bolts and screws for wood. D rawings are diagrammatic and shall be adjusted as necessary to conform to actual field conditions. Costs incurred due to any adjustment for coverage, including those requested by the O wner relative to the location of irrigation heads as shown on the drawings shall be the responsibility of the Contractor. P oint of connection (P .O .C.) and operating pressure (P .S.I .) shall be as indicated on the drawings. Contractor shall verify the location and size of water source, P SI , and electrical supply prior to commencing installation. I n case of discrepancy, Contractor shall immediately notify the O wner. Contractor shall provide all labor, materials, and equipment necessary to furnish and install the irrigation system as indicated on the drawings and as specified herein. Coordinate the installation of all irrigation materials with the construction of site amenities and planting. All work on the irrigation system, including hydrostatic, coverage, and operational tests and the backfilling and compaction of trenches shall be performed before planting operations. I n the event any equipment or methods indicated on the drawings or specified herein conflict with applicable regulations, Contractor shall immediately notify the O wner or Landscape Architect in writing prior to installation. I n case of discrepancy, Contractor shall immediately notify the O wner. D ue to the scale of the drawings, it is not possible to indicate all offsets, fittings, sleeves, and related other equipment, which may be required. Contractor shall carefully investigate the structural and finished conditions affecting the work and install a complete irrigation system within the intent of the drawings and specifications. M anufacturer's warranties shall not relieve the Contractor of liability under the provisions for guarantees. All local and state laws, rules and regulations governing or relating to any portion of the irrigation system are hereby incorporated into and made a part of these specifications. H owever, if these specifications call for or describe materials, workmanship or construction of a better quality, higher standard or larger size than is required by the above rules, regulations or requirements, these specifications and the drawings shall take precedence. QUALITY ASSURANCE B. I R R I GATI O N SY STE M A. GE NE R AL PRODUCT DELIVERY, STORAGE AND HANDLING D. Galvanized steel pipe, where indicated on the drawings, shall be ASA Schedule 40 mild steel screwed pipe. Fittings shall be medium galvanized screwed beaded malleable iron. B rass pipe, where indicated on the drawings, shall be 86% red brass, American National Standards I nstitute, Schedule 40 screwed pipe, conforming to Federal Specifications WW-P-351. Fittings shall be medium brass, screwed 125 pound class, conforming to Federal Specifications WW-P-460. P lastic pipe, where indicated on the drawings, shall be injection molded, rigid, unplasticized polyvinyl chloride (P V C), NSF approved, of high tensile strength, chemical resistant and impact strength, and depending on class and grade, conform to ASTM 2241 or ASTM D -1785. Fittings and couplings shall be threaded P V C Schedule 80 conforming to ASTM D -2464, or slip-fitting, tapered socket, solvent-weld type, P V C Schedule 40 conforming to ASTM D -2466 or P V C Schedule 80 conforming to ASTM D -2467. Solvent cement and primer for rigid P V C solvent-weld pipe and fittings shall be of commercial quality, I AP M O approved, conforming to ASTM D -2564. Contractor shall exercise care in handling, loading, unloading and storing of irrigation materials and equipment. Gate valves and remote control valves, except for anti-siphon valves, shall be installed below grade as indicated in the details on the drawings, in lockable valve boxes manufactured by Carson, B rooks, Fraser, Ametek, or approved equal. V alve box lids shall be per I rrigation Legend. Gate valves shall be identified by stamping "CV " on the valve box cover. R emote control valves shall be identified by stamping "R CV " and station number on the valve box cover. V alve boxes shall be set one inch (1") above finish grade, with valves set at sufficient depth to provide appropriate clearance between the cover and valve. B ackflow prevention unit shall be factory assembled and shall be as indicated in the I rrigation Legend on the drawings, or approved equal. Contractor shall install backflow prevention unit as indicated in the details on the drawings and in accordance with manufacturer's recommendation. UV R -P V C pipe, where indicated on the drawings, shall be ultra-violet resistant, Schedule 40 P V C pipe. Fittings shall be UV R -P V C fittings. All galvanized pipe and fittings installed below grade shall be painted with two (2) coats of K oppers #50 B itumastic, or approved equal. P ipes may be wrapped with an approved asphaltic tape. BACKFLOW PREVENTION UNIT VALVE BOXES J. I. BRASS PIPE F. GALVANIZED PIPE UVR-PVC PIPE H. G. PLASTIC PIPE E. W ithin fifteen (15) calendar days after award of Contract and prior to installation, the Contractor shall submit to the O wner a list of materials including the manufacturer, description, model number and installation data. E quipment or materials installed or furnished without prior written acceptance may be rejected and such materials removed from the site at the Contractor's expense. MATERIALS LIST C. Q uick coupling valves shall be as indicated in the I rrigation Legend on the drawings. REMOTE CONTROL VALVES W here indicated on the drawings, and as needed for field conditions, anti-drain valves shall be as indicated in the I rrigation Legend on the drawings. R emote control valves shall be solenoid activated, of the type, manufacturer and size as indicated in the I rrigation Legend on the drawings. N. M. ANTI-DRAIN VALVES QUICK COUPLING VALVES I solation valves (ball) shall be as indicated in the I rrigation Legend on the drawings, or approved equal. Contractor shall install isolation valves as indicated in the details on the drawings and in accordance with manufacturer's recommendation. ISOLATION VALVES K. L. P V C pipe shall be protected from tool damage during assembly. P lastic pipe which has been nicked, scarred or damaged shall be removed and replaced at the Contractor's expense. An expansion curl shall be provided within three feet (3') of each wire connection and change of direction, and at least every 100 feet of wire length on longer runs. P rovide a separate ground wire for each controller. Field splices between the controller and remote control valves will not be permitted. For traditional wire systems, install a spare control wire of a different color along entire mainline. Loop thirty-six inches (36") excess wire into each single box and into one valve box in each group of valves. R iser units shall be oriented perpendicular to the finish grade with nipples of the same size as the riser opening in the irrigation head. P ipe shall be cut square and the ends reamed out to the full inside diameter of the pipe and thoroughly cleaned of dirt, dust and moisture before installation. Spacing of heads and drip irrigation tubing shall not exceed the maximum shown on the drawings and in no case exceed the maximum spacing recommended by the manufacturer. Contractor responsible to insure complete coverage. I rrigation heads shall be of the manufacturer, size, type, and rate of precipitation with the diameter (or radius) of throw, pressure, and discharge as specified in the I rrigation Legend. For traditional wire systems, all splices shall be made with Scotch-Lok #3576 Connector Sealing P acks, R ain B ird P en-Tite, Sears D S-400 wire connectors, 3M D B Y wire sealing packs, or approved equal. Use one (1) splice per connector sealing pack. W ire splices shall be located in pull boxes set one inch (1") above finish grade. Q. INSTALLATION P. IRRIGATION HEADS CONTROLLERS AND WIRING Controller shall be of the type and manufacturer as indicated in the I rrigation Legend on the drawings, or approved equal. Contractor shall install controller as indicated in the details on the drawings and in accordance with manufacturer's recommendations. For traditional wire systems connections between the controller and the remote control valves shall be made with direct burial solid copper wire. Control wire shall be #14 AW G, Type U.F., 600 volt. Common wire shall be #12 AW G. W ire shall be P V C insulated of single conductor type, underground feeder cable, U.L. approved. W ire shall be buried a minimum of eighteen inches (18") in depth and whenever possible shall occupy the same trench as the mainline, bundled and secured to irrigation pipelines at ten foot (10') intervals with plastic electrical tape, providing sufficient slack for expansion and contraction. W ire for slope systems shall be installed in a UV R P V C sleeve laid adjacent to the on-grade pipes. For traditional wire systems, as practical, pilot wires shall be a different color for each valve. Common wires shall be white with a different color stripe for each automatic controller. For 2wire systems, each controller shall have a different wire color. O. All controller wires installed within the garage shall be run in corrosion resistant thin metal wall electrical conduit and labeled as "I rrigation Control W ires." For two wire systems, all splices shall be made with 3M D B Y -6 direct bury splice kits or approved equal. Use one (1) splice per connector sealing pack. W ire splices shall be located in pull boxes set one inch (1") above finish grade. For two wire systems, surge protection against surge damage due to lightening or other electrical surge events is required. All installations shall conform to manufacturer's instructions, and must meet or exceed the American Society of I rrigation Consultants (ASI C) E arth Grounding Guideline 100-2002. I n all cases where it does not conflict with appropriate grounding grid design for the project, Ground R ods or P lates as referred to in this specification shall conform to the following standards: 1. All grounding rods shall be bare copper of 5/8” diameter or greater, and 8’ length or greater. 2. All grounding plates shall be 5 square feet, typically 4” by 96”, as outlined in ASIC Earth Grounding Guideline 100-2002. 3. A measured resistance reading of no more than 25 ohms is necessary at each TW-LA-1 (Lightning Arrestor). ASIC Spec: Section 7.0 – Measuring resistance, item A. Ground rods and plates shall be located at a minimum distance to assure that the two-wire path is outside of the electrode sphere of influence for the grounding rod. For an 8’ grounding rod, this means that the grounding rod must be connected at least 8’ away from the two-wire path, at a right angle to the two-wire path. See the section below for details on connecting the grounding rod or plate to the device or lightning arrestor. (Under no circumstance should a ground rod or ground plate be installed in or under a valve box, meter box or electrical box.) Trenches shall be of open vertical construction to appropriate depths as indicated on the drawings and specified herein. P V C pipe shall be laid on native grade or certified compacted subgrade, free of rocks or sharp-edged objects and snaked from side to side in the trench to allow for expansion and contraction. P V C solvent-weld joints shall be made in accordance with ASTM D -2855. P ipe shall not be exposed to water for twenty-four (24) hours after solvent-weld joints are completed. Galvanized pipe threads shall be cut with clean, sharp dies, conforming to American Standards Association Specification. M ale pipe threads shall be coated with a non-toxic, non-hardening, non-corrosive joint compound. B rass pipe and fittings shall be assembled using Teflon dope, applied to the male threads only. Teflon tape shall be used on all threaded P V C to P V C and on all threaded P V C to metal joints. DP-2019-001, ASA-2019-006, TR-2019-032 01/10/20 Ellen Yau DRAWN BY: PROJECT NO: CAD DWG FILE: CHECKED BY: DESIGNED BY: DATE: SCALE: HMHC DATE DESCRIPTIONNO 19900 STEVENS CREEKLANDSCAPE IMPROVEMENTSCUPERTINO, CAS:\PROJECTS\520200\LA\PRODUCTION\520201\520201SPC.DWG520201SPC.DWG L5.04 5202.00 LS BS 1 1 /1 1 /201 9 PLOTTED: 11/14/2019 1:37 PMLand Use Entitlements Land Planning Landscape Architecture Civil Engineering Utility Design Land Surveying Stormwater Compliance 1570 Oakland Road (408) 487-2200 San Jose, CA 95131 HMHca.com NOT FOR CONSTRUCTION PLANNING COMMENTS11/1 4/1 9 1 NONE HMH LANDSCAPE SPECIFICATIONS AS-BUILT AND RECORD DRAWINGS MATERIALS TO BE FURNISHED ADJUSTING AND TESTING THE SYSTEM Lubricate male end according to manufacturers recommendations and insert male end to specified depth. Use hands only when inserting PVC pipe. Form thrust blocks in such a manner that concrete comes in contact only with the fittings. Thrust blocks shall be between solid soil and the fitting. Thrust blocks shall be provided where necessary to resist system pressure on ring-tite pipe and fittings. Blocks shall be concrete and the size shall be based on an average soil safe bearing load of 1000 pounds per square foot. All lines shall have a minimum horizontal clearance of six inches (6") from each other and from lines of other trades. Parallel lines shall not be installed directly over one another. Piping under existing pavement may be installed by jacking, boring or hydraulic driving, except that no hydraulic driving will be permitted under asphaltic concrete pavement. Where cutting or breaking of existing pavement is necessary, obtain permission from the Owner before cutting or breaking pavement and then make all necessary repairs and replacements to the satisfaction of the Owner, and at no additional cost to the Owner. Irrigation lines and control wiring shall be installed under paving in separate PVC Schedule 40 sleeves. Sleeves shall be installed with the coverage depths as specified herein. Non-pressure lateral lines Pressure mainline Control wiring Contractor shall furnish all equipment, materials and labor to conduct pipeline pressure tests, coverage tests and operational tests. All tests shall be made in the presence of the Owner prior to planting operations. Trenches shall not be backfilled until the pipeline pressure tests have been performed to the satisfaction of the Owner. With open ends capped, prior to installing valves, test pressure supply lines for six (6) hours at 125 PSI. Center load PVC pipe with a small amount of backfill to prevent arching and whipping under pressure. - system layout - pressure pipeline tests - coverage tests - operational tests (prior to commencing planting operations) Contractor shall be responsible for correcting any portions of the work twenty (24) hours in advance for the following inspections, After completion of pipeline assembly, prior to installation of terminal fittings, including but not limited to remote control valves and quick coupler valves, entire system shall be thoroughly flushed to remove dirt, scale or other deleterious material. Operational test shall demonstrate the performance and operation of all components of the controller system. Remote control valves shall be properly balanced, heads adjusted for coverage and system shall be workable, clean and efficient. Contractor shall be responsible for correcting any portions of the work that are not properly installed and retesting until installation has been accepted by the Owner. Contractor shall furnish the Owner the following materials at the end of construction, prior to the Post-Installation Maintenance Period: Two (2) five foot (5') valve keys for operating isolation valves. Two (2) keys for each controller. Two (2) sets of special tools required for removing, disassembling and adjusting each type of sprinkler and valve supplied on the project. Coverage test shall demonstrate that each station area is balanced to provide uniform and adequate coverage. One (1) set each approved as-built and record drawings. Two (2) sets each approved controller charts. Contractor shall maintain and keep up to date one (1) set of bluelines showing the "as-built" location of major features of the project and indicating changes that may occur during installation. Use factory-made male end or prepare field-cut male end to exact specifications of factory-made end. Prior to acceptance of the work, Contractor shall furnish the Owner with one (1) set of reproducible transparencies as the Record Set showing the as-built data, of a quality satisfactory to the Owner. Transfer as-built data in ink (no ball point pen) and eradicate outdated items. Carefully clean bell or coupling and insert rubber ring without lubricant. Position ring carefully according to manufacturers recommendations. One (1) quick coupler key and matching hose swivels for each quick coupler valve installed. Provide the following minimum coverage (where lines occur under paved areas, these coverage depths shall be considered below subgrade): T. S. R. Complete operating and maintenance instructions. Prepare and deliver four (4) individually bound copies of the Operation and Maintenance Manual to the Owner at least ten (10) calendar days prior to acceptance of the work. The Manual shall include descriptive material of equipment installed and shall be in sufficient detail for maintenance personnel to understand,operate and maintain all equipment. Each complete, bound manual shall include the following: Contractor shall provide two (2) controller charts for each controller supplied. The controller charts shall show the area controlled and shall be the maximum size which the controller door will allow. The controller charts shall be a photographic print with a different color indicating the area of coverage for each station. When completed and approved, the controller charts shall be hermetically sealed between two (2) pieces of transparent plastic, each being a minimum of twenty (20) mils thick. Index sheets stating Contractor's address and telephone number, list of equipment with names and addresses of local manufacturers representatives. Catalog and parts sheets on all material and equipment installed. Dimension from two (2) permanent points of reference (buildings, monuments, sidewalks, curbs, pavement) the location of the following items: Contractor shall submit As-built/Record Drawings to Owner for review prior to completing Controller Charts. Contractor shall guarantee all materials and equipment for one (1) year from the date of acceptance of the work. Should any trouble develop within the time specified due to inferior or faulty materials or workmanship, the Contractor shall be responsible for costs incurred due to repair and replacement. 12" 18" 18" Guarantee statement. GUARANTEEW. OPERATION AND MAINTENANCE MANUALSV. CONTROLLER CHARTS U. Rubber Ring Seal Joint: Point of connection to existing water lines. Point of connection to existing electrical power. Irrigation valves. Routing of irrigation pressure lines (dimensions, maximum 100' along route). Remote control valves. Routing of control valves. Quick coupling valves. Other related equipment as requested by the Owner. The Owner reserves the right to refuse or reject any unsuitable plant material. Unsuitable plants shall be removed from the project site and replaced at the Contractor's expense. Replacement plants shall be the same species, variety, size and conditions as specified. Pruning of plant materials shall not be done prior to delivery. After planting, pruning shall be limited to the minimum necessary to remove injured twigs and branches, dead wood and suckers. Plant material is subject to substitution based upon availability. Substituted material shall be approved in advance by the Owner. Contractor shall provide all labor, materials and equipment for the installation of plant material as indicated on the drawings and as specified herein. Contractor shall coordinate planting with other site improvements. Unless otherwise specified, structural improvements shall be installed prior to planting operations. All work on the irrigation system, including hydrostatic, coverage, and operational tests, and the backfilling and compaction of trenches shall be performed prior to planting operations. An agricultural suitability and fertility analysis soils report shall take precedence over these specifications. Samples of fertilizers, soil conditioners, seed, or other materials shall be submitted to Owner forty-eight (48) hours prior to incorporation in the work. Contractor shall be responsible for locating and staking existing sewer, water and utility lines above or below grade that might be damaged as a result of planting operations. Contractor shall assume sole responsibility for any cost incurred due to damage and for replacement of aforementioned utilities. Nursery growth stock shall be selected from high quality, well-shaped stock, grown under climatic conditions similar to those in the project locale. Minimum acceptable size of plants as indicated in the drawings shall correspond with that normally expected for the species and variety of commercially available nursery stock. Oversize plants may be used if not root bound, but shall not increase the Contract price. Up to ten percent (10%) of undersized plants in any one (1)variety and grade may be used, provided they are larger than the average size of the next smallest grade. Scientific and common names conform to customary nursery usage. Types and sizes of plant materials shall be as indicated on the drawings. Quantities shown are a guide only, Contractor shall verify quantities by plan check. Where applicable, caliper shall be the diameter of the trunk one foot (1') above the ground surface. Plant material shall be in accordance with the State Department of Agriculture's regulations for nursery inspections, rules and grading. All plants shall be of No. 1 Grade and have a normal habit of growth, and shall be sound, healthy, vigorous and free of insect infestations, plant diseases,sun scalds,fresh bark abrasions or other objectionable disfigurements.All plants shall have a normal,well-developed branch system and vigorous and fibrous root system which is not root bound and is free of kinked or girdling roots. PLANT MATERIAL QUALITY B. GENERAL PLANTING GENERALA. Commercial fertilizer shall be a pelleted, beaded, or granular product having the chemical analysis specified herein and shall be free-flowing material delivered in original unopened containers. Use of material which becomes caked or otherwise damaged shall not be permitted. Fertilizers shall comply with applicable requirements of the State Agricultural Code and shall be packaged, first grade, commercial quality products identified as to source, type of material, weight and manufacturer's guaranteed analysis. Fertilizers shall not contain toxic ingredients in quantities harmful to human, animal, or plant life. When requested, Contractor shall furnish the Owner with Certificate of Compliance stating that the material substantially meets the specifications. Organic base fertilizer shall be comprised of decomposed animal, fish and vegetable matter with humic acids and a bacterial stimulant,manufactured as Gro-Power by Southern California Organic Fertilizer Co., Glendale, California, or approved equal. FERTILIZERSC. When requested, Contractor shall furnish the Owner with a delivery receipt and Certificate of Compliance stating that the material substantially meets the specifications. Nitrogen stabilized organic amendment shall be a ground or processed wood product derived from wood of redwood, fir or cedar, treated with a non-toxic agent to absorb water quickly. Nitrogen content, based on dry weight, shall be 0.5% for redwood and 0.7% for fir and cedar. Iron content, based on dry weight, shall be 0.1%. Pine sawdust is not acceptable. AMENDMENTS D. Topsoil shall consist of fertile, friable soil of loamy character, and shall contain an amount of organic matter normal to the area. It shall be reasonably free from weeds, refuse, roots, heavy or stiff clay, stones larger than one inch (1") in diameter, sticks, brush, litter and other deleterious substances. Topsoil may be obtained from the site if approved by the Owner. When required, imported topsoil shall be subject to inspection and testing at the source of supply prior to delivery to the project. E.TOPSOIL The irrigation system and finish grade shall be completed prior to weed abatement operations. Stake plant locations and secure approval from the Owner before excavating pits. Excavated pits shall be as indicated in the details on the drawings. Dust sides of pits with gypsum before backfilling. All nursery stakes shall be removed after tree has been planted and staked according to construction details. Trees shall be staked at time of planting as indicated in the details on the drawings. Containers shall be opened and removed such that the rootball is not injured. Water all planting areas thoroughly after installation of plant materials. Additional backfill shall be added to fill voids caused by water settlement. INSTALLATION -SHRUBS, VINES, AND TREES Backfill shall be as specified in the project agricultural suitability report, machine-mixed and approved by the Owner prior to incorporation in planting pits. If a agricultural suitability report is not available, the following amendments or approved equal, shall be incorporated: Contractor shall operate the irrigation system to keep planting areas uniformly moist for a period of three (3) weeks (21 consecutive calendar days). At the end of the three (3) week period, Contractor shall spray all visible weeds with a contact herbicide. Application method shall be as recommended by manufacturer. After spraying, planting areas shall remain unwatered for a minimum of forty-eight (48) hours. Remove weeds from site. Water seven (7) additional consecutive calendar days from the first application, and apply a contact herbicide as may be necessary. After second spraying, water shall not be applied for an additional forty-eight (48) hour period. Applications shall continue at seven (7) day intervals as determined by the Owner. Contractor shall apply spray chemicals when air currents are still, preventing drifting onto adjoining property and preventing any toxic exposure to persons whether or not they are in or near the project. Weeds and debris shall be disposed of off-site. J. I. BACKFILL Areas to receive "soil preparation" include turf, groundcover from rooted cuttings and non-slope hydroseeded areas. WEED ABATEMENT OPERATIONS MATERIAL DELIVERY AND INSPECTION Resulting soil shall be clean, in a friable condition and suitable for planting. 3 CY Nitrogen stabilized organic amendment 125 LBS Gro-Power Plus soil conditioner/fertilizer 30 LBS Agricultural gypsum If an agricultural suitability report is not available, the following amendments, or approved equal, shall be mechanically spread and uniformly cultivated into the upper six inches (6") per 1,000 square feet of soil by suitable equipment operated at approximately right angles in at least two (2) directions: Fertilizing and conditioning materials shall be as specified in the project agricultural suitability report. Wash off fertilizer from plant. Inspection of plant materials required by Owner, County, State or Federal authorities shall be the responsibility of the Contractor. When requested, Contractor shall furnish copies of such permits or certificates to Owner. Plant material shall be delivered with legible identification labels, handled and stored adequately to maintain a healthy condition, protecting them from drying out, windburn or any other injury. H. G. F. SOIL PREPARATION 2 LBS per CY of mix Agricultural gypsum 1 LB per CY of mix Iron sulfate 16 LBS per CY of mix Gro-Power Plus soil conditioner/fertilizer 3 parts by volume Nitrogen stabilized organic amendment 7 parts by volume On-site soil Biotreatment soil shall conform to the most current regional permit based on project location. Biotreament soil for projects located within the MRP (Municipal Regional Permit) boundary including but not limited to portions of Contra Costa County, Alameda County, San Mateo County and Santa Clara County shall conform to California Regional Water Quality Control Board San Francisco Bay Region Municipal Stormwater NPDES Permit No. CAS6120058 Attachment L "Specification of Soils for Biotreament or Bioretention Facilities." Biotreament soil for projects located within the Small MS4s (Municipal Separate Storm Sewer System) General Permit Boundary including but not limited to portions of Santa Clara County (southern), Santa Cruz County, San Benito County and Monterey County shall conform to the provisions in the permit. If none exists, soil shall conform to California Regional Water Quality Control Board San Francisco Bay Region Municipal Stormwater NPDES Permit No. CAS6120058 Attachment L "Specification of Soils for Biotreament or Bioretention Facilities." BIOTREAMENT SOIL INSTALLATION - SOD INSTALLATION - HYDROSEEDING GUARANTEE An agricultural suitability report that has been prepared for the specific site shall take precedent over the following materials. If such report is not available, the following materials shall be of such a character that when dispersed in a uniform slurry shall form an absorbent porous mat: Seed mixture shall be as indicated on the drawings. Fiber shall be clean, weed-free mulch of wood cellulose containing no germination or growth-inhibiting factors. Fiber shall contain a harmless, temporary green dye. Water shall be fresh, free of impurities, excess chlorine and salts. Mixing shall be performed in a tank, with a built-in continuous agitation and recirculation system, of sufficient operating capacity to produce a homogeneous slurry and a discharge system which will apply the slurry to the designated areas at a continuous and uniform rate. The slurry preparation shall take place at the project site and shall begin by adding water to the tank when the engine is at halt throttle. When the water level has reached the height of the agitator shaft, good recirculation shall be established, and at this time the seed shall be added. Fertilization shall then be added followed by the wood cellulose fiber, when the tank is at least one-third (1/3) filled with water. Spraying shall commence immediately when the tank is full. A slurry mixture which has not been applied within four (4) hours after mixing shall be rejected and replaced at the Contractor's expense. Slopes shall be hydroseeded after weed abatement operations and planting of trees and shrubs. Costs incurred for repair or replacement of bare, sparse or damaged areas shall be the responsibility of the Contractor. Contractor shall spray designated areas with the slurry in a sweeping motion, in an arched stream, until a uniform coat is achieved and the material is spread at the required rate per acre. Prepare soil and provide weed abatement operations in accordance with the General Planting Section. Rake, cultivate, float and roll until areas to receive turf are in a smooth and uniform condition. Prior to sodding, soil shall be moist to a minimum depth of one inch (1"). Prior to installation, area to be sodded shall receive sulphate of ammonia at the rate of one (1) pound per 200 square feet. Sod shall be laid and tamped with butt joint in a staggered "running bond" pattern. Sod shall be as indicated on the drawings. After installation, sod shall be rolled with a 200-pound water-filled lawn roller. Finish grade for turf areas shall be one inch (1") below the finish surface of walks, curbs, or related hardscape. Contractor shall guarantee plant material through one (1) full year after the date of acceptance of the work. Replacement plant material shall be of the same species, variety, & size as originally planted and shall be guaranteed for one (1) full year from the date of re-planting. Cost incurred due to replacement of dead or dying plant material shall be the responsibility of the Contractor. N. M. L. 1500 to 3000 pounds per acre, depending on slope 3000 gallons per acre 1000 pounds per acre Fresh water Wood cellulose fiber, Conwed 2000 or approved equal Grow-Power Plus, or approved equal 5 to 15 pounds per acre, depending on slope Organic stabilizer, ECO E-Tac or approved equal Galvanized pipe or ultra-violet resistant (UVR) PVC installed on grade shall be anchored at intervals not to exceed ten feet (10'), with #4 rebar, with a "J" hooked radius. K. DP-2019-001, ASA-2019-006, TR-2019-032 01/10/20 Ellen Yau DRAWN BY: PROJECT NO: CAD DWG FILE: CHECKED BY: DESIGNED BY: DATE: SCALE: HMHC DATE DESCRIPTIONNO 19900 STEVENS CREEKLANDSCAPE IMPROVEMENTSCUPERTINO, CAS:\PROJECTS\520200\LA\PRODUCTION\520201\520201SPC.DWG520201SPC.DWG L5.05 5202.00 LS BS 1 1 /1 1 /201 9 PLOTTED: 11/14/2019 1:37 PMLand Use Entitlements Land Planning Landscape Architecture Civil Engineering Utility Design Land Surveying Stormwater Compliance 1570 Oakland Road (408) 487-2200 San Jose, CA 95131 HMHca.com NOT FOR CONSTRUCTION PLANNING COMMENTS11/1 4/1 9 1 NONE HMH LANDSCAPE SPECIFICATIONS TREES GROUND COVER AREAS IRRIGATION SYSTEM EXECUTION Costs incurred due to damage or replacement during Post-Installation Maintenance Period shall be the responsibility of the Contractor. Contractor shall maintain the project on a continuous basis from the first day after planting is completed, until acceptance of the work. Contractor shall provide all labor, materials and equipment to perform work during the Post-Installation Maintenance Period, as specified herein, including but not limited to, adequate watering of plant material, replacing unsuitable plant material and controlling weeds, rodents and other pests. Post-Installation Maintenance Period may be extended by the Owner if the project is improperly maintained, appreciable replacement is required, or other corrective work becomes necessary. All areas including, but not limited to, turf, ground cover, and concrete flatwork, shall be kept clean and free of weeds, litter and debris. Unless stipulated otherwise by the Owner, the Post-Installation Maintenance Period shall consist of a minimum of ninety (90) consecutive calendar days, once all parties agree the Maintenance Period can start. If the Owner notifies the Contractor of failure to control weeds as specified herein, the Contractor shall kill all weeds within ten (10) calendar days of such notification. The Post-Installation Maintenance Period will be extended for every day after the ten (10) calendar days until such weeds have been killed. Before weeds exceed two inches (2") in height, they shall be removed and disposed of off-site. All weeds shall be spot sprayed and left in place for seven (7) calendar days. Areas sprayed shall remain unwatered for a minimum of forty-eight (48) hours. Dead weeds shall be removed seven (7) calendar days after application and disposed of off-site. Contractor shall operate the irrigation system automatically and shall properly and completely maintain all parts of the irrigation system. Contractor shall take appropriate steps to eliminate rodents. Costs incurred due to repair or replacement of equipment shall be the responsibility of the Contractor. Replacement parts shall be identical to the material and as indicated on the drawings and specified herein. Contractor shall provide for delivery of water in sufficient quantities and adjust water application to compensate for seasonal conditions and shall ensure full and complete coverage. Prior to acceptance of the project and maintenance period, turf areas shall be established with a uniform 80% coverage, healthy vigorous growth and to a minimum of two inches (2") in height. Costs incurred for repair or replacement of bare, sparse or damaged areas shall be the responsibility of the Contractor. If an agricultural suitability soils report is not available, turf areas shall be fertilized with Gro Power Plus or approved equal every seventy (70) calendar days, at a rate recommended by the manufacturer. Contractor shall trim around irrigation heads to allow for unimpeded spray, at the base of trees, and at borders along walks, mowstrips and curbs. Contractor shall remove all grass clippings from project site. If an agricultural suitability soils report is not available, ground cover areas shall be fertilized with Gro Power Plus or approved equal every seventy (70) calendar days, at a rate recommended by the manufacturer. First mowing of turf shall be performed when the grass is two and one-half inches (2-1/2") in height. After initial mowing, turf shall be cut as often as necessary to maintain the turf at a height of two inches (2") for bluegrass and fescues and one inch (1") for bermuda. If required, or at the direction of the Owner, trees planted as part of the Contract shall be pruned or headed back, to eliminate diseased or damaged growth, reduce toppling or wind damage, maintain growth within space limitations, maintain natural appearance, due to vandalism, and to balance the crown with the root structure. At the request of the Owner, wounds over one and one-half inch (1-1/2") in diameter may be sealed with an approved tree seal. Staking of trees shall be checked frequently for damage, and to prevent chaffing or girdling. Costs incurred due to damage or replacement due to improper staking materials shall be the responsibility of the Contractor. Contractor shall exercise preventive measures when using stringline trimmers near tree trunks. Costs incurred due to damage or replacement of trees due to improper measures shall be the responsibility of the Contractor. Dead or dying trees shall be immediately replaced at the Contractor's expense with material of the same species and size and guaranteed as described in these specifications. Subsurface drains and catch basin grates shall be kept clear of leaves, litter and debris to ensure unimpeded passage of water. Drainlines shall be periodically flushed with clear water to avoid build-up of silt and debris. G. F. D. TURF C. B. If a soils report is not available, slopes shall be fertilized with Gro Power Plus or approved equal every seventy (70) calendar days, at a rate recommended by the manufacturer. Seed for replacement shall be of the same type and quantity ratio as specified in the Plant List on the drawings. Prior to acceptance of the project and maintenance period, slopes shall be established with a uniform 80% coverage, healthy vigorous growth. Costs incurred for repair or replacement of bare, sparse or damaged areas shall be the responsibility of the Contractor. Upon completion of the Post-Installation Maintenance Period, Contractor shall request a final observation and letter of acceptance of the work performed in accordance with the Contract Documents. The request shall be made to the Owner, a minimum of seven (7) calendar days prior to the date for inspection. INSPECTIONJ. H. SLOPES POST-INSTALLATION MAINTENANCE PERIOD GENERAL A. Prior to acceptance of the project and maintenance period, turf areas shall be established with a uniform 80% coverage, healthy vigorous growth and to a minimum of four inches (4") in height. Costs incurred for repair or replacement of bare, sparse or damaged areas shall be the responsibility of the Contractor. If an agricultural suitability soils report is not available, specialty sod areas shall be fertilized with Gro Power Plus or approved equal two or three times per year in early spring, late spring, or fall depending on grower reccomendations and sod type and sod health. Specialty sods do not require as much fertilization as tradional fescue sod. Contractor shall trim around irrigation heads to allow for unimpeded spray, at the base of trees, and at borders along walks, mowstrips and curbs. Contractor shall remove all grass clippings from project site. Mow free and specialty sods shall be allowed to grow without regular mowing or line trimming. No more than 1/3 of the leaf blade shall be removed, mowed or trimmed in any trim or mow cycle. Specialty sod shall never be mowed or trimmed to a height less than 4". Mowing or trimming shall be done once a year in the late spring to remove florets or seed heads. E. SPECIALTY SODS INCLUDING NATIVE, MOW FREE, AND BIOFILTRATION SOD Biotreatment areas and facilities including but not limited to planting, irrigation, soils, impermeable liner, drain rock, mulch, underground storm drain piping, and tree filter boxes shall be monitored and maintained throughout the life of the project in accordance with local regulations and requirements. I. BIOTREAMENT AREAS DP-2019-001, ASA-2019-006, TR-2019-032 01/10/20 Ellen Yau ADMINISTRATIVE HEARING STAFF REPORT Meeting Date: January 9, 2020 Subject Architectural and Site Approval Permit to allow for architectural and site improvements to an existing 13,250 square foot industrial building; (Application No(s).: ASA-2019-005; Applicant: Scott Stotler; Location: 10100 Bubb Road.; APN(s): 357-20-024) Recommended Action That the Hearing Officer adopt the draft resolution (Attachment 1) to: 1. Find that the proposed actions are exempt from CEQA; and 2. Approve the Architectural and Site Approval Permit. Discussion Project Data: General Plan Designation Industrial/Residential/Commercial General Plan Special Area Bubb Road Special Area Zoning Designation ML-rc (Light Industrial) Lot Size 38,052 sq. ft. (no change) Existing Proposed Floor Area 13,250 sq. ft. 12,850 sq. ft. Lot Coverage 37% 34% Project Consistency With: General Plan Yes Zoning Yes Environmental Assessment Categorically Exempt per Section 15301 (Class 1) and 15332 (Class 32) of the California Environmental Quality Act (CEQA) ASA-2019-005 10100 Bubb Road January 9, 2020 Page 2 Background: The property is located within the Bubb Road Special Area which is bounded by Stevens Creek Blvd to the north, 85 Highway to the east, McClellan Road to the south, and Southern Pacific railroad tracks to the west. The Bubb Road Special Area is comprised primarily of one-story industrial and research and development buildings, with some two-story buildings. The site was previously occupied by an auto maintenance and repair shop. The property is located adjacent to other administrative and professional offices to the north and west (marketing office, administrative office for an import/export company, and Apple Inc. offices) and a Caltrans Maintenance Station to the south. Analysis: As part of their tenant improvements, the applicant is requesting for architectural and material changes to the existing building to accommodate primarily administrative offices for a real estate development firm. The proposed use is permitted in the ML-rc zoning district and therefore, a change in the zoning or a Conditional Use Permit is not required for the proposed use. The footprint of the existing building will largely be retained except for a minor reduction in square footage where a new building entrance (along the northern wall) and exterior courtyard is proposed. The application also proposes the replacement of the existing mansard roof with a contemporary parapet and flat roof form, installation of a new glass window and door system, and styling of the building with a contemporary industrial aesthetic with gray-tone paint on fiber-cement panels and stucco. There is a minor reduction in lot coverage due to the conversion of the mansard roof to a vertical parapet resulting in removal of existing roof eaves, and a reduction in roof coverage where the new north-facing entrance is proposed. STEVENS CREEK BLVD Figure 1 Site aerial ASA-2019-005 10100 Bubb Road January 9, 2020 Page 3 Overall the architectural modifications are minor in scope and include the following (see Figure s 2 and 3): • Addition of a new building entrance and courtyard area to a north-facing main entrance by reducing the building’s square footage and installing a wood trellis cover over the area; • Removal of the existing mansard roof and replacement with Hardie “Reveal” fiber- cement cladded panel system for the façade and new parapet; • Installation of a new ground-to-ceiling storefront glazing system with a new front door facing directly to Bubb Road; • Provide a front entry patio area along the Bubb frontage; and • Addition of an attached architectural metal trellis along the Bubb frontage. Figure 2 Existing and proposed east elevation (Bubb Road) ASA-2019-005 10100 Bubb Road January 9, 2020 Page 4 In addition to the building and façade changes the applicant will provide site improvements consistent with the vision of the Bubb Road Special area and the Cupertino Municipal Code as follows: • Provide pedestrian access to buildings from parking areas and the public right-of- way; • Propose new low-water use plantings in new landscape planting strips and in the front area along Bubb Road; • Provide landscape screening along the shared property line with Highway 85 ; and • Plant new parking lot trees. Bicycle and Vehicular Parking The new building square footage of 12,850 sq. ft. would require a total of 45 off-street vehicular parking stalls and 11 Class 1 bicycle parking spots. The proposed plan will maintain the existing 35 vehicular parking stalls that are located along the northern and eastern property lines and add an additional 11 stalls along the rear of the building. The refore, the proposal will provide 46 vehicular stalls and an additional stall in the enclosed garage for a total of 47 off-street parking stalls. The Figure 3 Existing and proposed north elevation ASA-2019-005 10100 Bubb Road January 9, 2020 Page 5 required bicycle parking will be provided within the secured enclosed garage with two additional Class 3 bicycle parking at the Bubb Road entrance. Landscaping & Trees No trees are proposed to be removed as the four existing trees on the property (two redwoods in the southwest corner and two redwoods in the southeast corner) will be protected during construction and retained. The applicant is required to meet the City’s Landscape Ordinance and all proposed landscaping has low to moderate watering needs. Consistent with the tree-lined vision of the Bubb Road Special Area, the applicant is proposing to plant four new trees within the front setback area - two Cathedral live oaks (Quercus virginiana ‘Cathedral’) and two Swan Hill olives (Olea europaes ‘Swan Hill’). These trees will supplement the two existing redwood trees at the southwest corner of the property. In addition, the applicant will install parking lot trees in compliance with the Parking Ordinance by constructing two landscape islands between the parking stalls on the north side , and planting trees along the eastern property line (closest to Highway 85). Since the ML -rc ordinance requires rear yards facing Highway 85 to be screened, the property owner has selected to install sweet bay shrubs (Laurus nobilis ‘Monrik’). Sidewalk In coordination with the Planning Division and the Public Works Department, the applicant is proposing to construct a 5’-0” monolithic sidewalk to match the western side of Bubb Road. Furthermore, the construction of the sidewalk aligns with the vision of Bubb Road - to be a tree-lined avenue that is more bike and pedestrian friendly. Environmental Review This project is categorically exempt from the requirements of the California Environmental Quality Act (CEQA) per Section 15301 – Existing Facilities and 15332 - In- Fill Development Projects. Other Department/Agency Review The City’s Building Division, Environmental Programs Division, Public Works Department, Cupertino Sanitary District, and the Santa Clara County Fire Department have no objections to the project. ASA-2019-005 10100 Bubb Road January 9, 2020 Page 6 Public Noticing And Community Outreach The following table is a brief summary of the noticing for this project: Notice of Public Hearing Agenda  Site Signage (at least 10 days prior to hearing)  6 notices mailed to property owners adjacent to the project site (at least 10 days prior to the hearing)  Posted on the City's official notice bulletin board (five days prior to hearing)  Posted on the City of Cupertino’s Web site (five days prior to hearing) No comments have been received at the time of production of this staff report. Permit Streamlining Act This project is subject to the Permit Streamlining Act (Government Code Section 65920 – 65964). The City has complied with the deadlines found in the Permit Streamlining Act. Project Received: September 3, 2019; Deemed Incomplete: October 3, 2019 Revisions Received: October 28, 2019; Deemed Incomplete: November 27, 2019 Revisions Received: December 11, 2019; Deemed Complete: December 17, 2019 Since this project is Categorically Exempt, the City has 60 days (until February 17, 2020) to make a decision on the project. Conclusion Staff recommends approval of the Architectural and Site Approval permit, since the plans and conditions of approval address all concerns related to the proposed project. Additionally, all the findings for approval of the proposed project, consistent with chapter 19.168 of the Cupertino Municipal Code, may be made as follows: 1. The proposal, at the proposed location, will not be detrimental or injurious to property or improvements in the vicinity, and will not be detrimental to the public health, safety, general welfare, or convenience; The applicant proposes a façade modification that utilizes minor exterior changes to modernize the style. The changes include material changes from concrete wall surfaces to painted stucco, from brick accents to painted fiber-cement panels, and from a wood-tiled mansard roof to a painted fiber-cement façade and parapet wall. The building will include a new front patio that fronts the building and an exterior courtyard entrance along the north-side of the building. The courtyard is created by reducing the interior building square footage. All the proposed changes are minor improvements to the existing building and site and will not be detrimental or injurious to property or improvements in the vicinity ASA-2019-005 10100 Bubb Road January 9, 2020 Page 7 2. The proposal is consistent with the purposes of Chapter 19.168, the General Plan any specific plan, zoning ordinances, applicable planned development permit, conditional use permits, variances, subdivision maps or other entitlements to use which regulate the subject property including, but not limited to, adherence to the following specific criteria: a) Abrupt changes in building scale should be avoided. A gradual transition related to height and bulk should be achieved between new and existing buildings. There are no changes in building scale except for a minor reduction in bulk where the mansard roof is proposed to be removed on the one-story building. b) In order to preserve design harmony between new and existing buildings and in order to preserve and enhance property values, the materials, textures and colors of new building should harmonize with adjacent development by being consistent or compatible with design and color schemes with the future character of the neighborhoods and purposes of the zone in which they are situated. The location, height and materials of walls, fencing, hedges and screen planting should harmonize with adjacent development. Unsightly storage areas, utility installations and unsightly elements of parking lots should be concealed. The planting of ground cover or various types of pavements should be used to prevent dust and erosion, and the unnecessary destruction of existing healthy trees should be avoided. Lighting for development should be adequate to meet safety requirements as specified by the engineering and building departments and provide shielding to prevent spill-over light to adjoining property owners. The planning area was designed to preserve light industrial uses and the proposed materials contribute to the industrial aesthetic. The façade changes include stucco wall textures, fiber- cement accent paneling, and metal trellis architectural features painted in shades of gray and black. The project will include new trees to line the newly proposed sidewalk and shade parking lot areas. All utilities are located at the rear of the property, and landscape hedging is proposed along the eastern property line. Therefore, unsightly elements are not proposed for the site and will not be visible from the public right-of-way. c) The number, location, color, size, height, lighting and landscaping of outdoor advertising signs and structures have been designed to minimize traffic hazard, positively affect the general appearance of the neighborhood and harmonize with adjacent development. No signs are proposed as part of this project. d) With respect to new projects within existing residential neighborhoods, new development should be designed to protect residents from noise, traffic, light and ASA-2019-005 10100 Bubb Road January 9, 2020 Page 8 visually intrusive effects by use of buffering, setbacks, landscaping, walls and other appropriate design measures. This application is not a new project and is not located near residential neighborhoods. Next Steps The permit will be effective 14 calendar days from the date of the hearing. The decision of the Administrative Hearing Officer is final, unless appealed within 14 calendar days from the date of the hearing. The applicant team may apply for building and/or other permits with the City at the end of the appeal period. This approval is valid until January 9, 2022. The applicant team may apply for a one-time two -year extension before the approval expires. Prepared by: Ellen Yau, Associate Planner Reviewed and Approved for submission by: Piu Ghosh, Planning Manager ATTACHMENTS 1. Draft Resolution for ASA-2019-005 2. Plan Set ASA-2019-005 CITY OF CUPERTINO 10300 Torre Avenue Cupertino, California 95014 RESOLUTION NO. 111 OF THE ADMINISTRATIVE HEARING MEETING OF THE CITY OF CUPERTINO TO ALLOW FOR ARCHITECTURAL AND SITE IMPROVEMENTS TO AN EXISTING 13,250 SQUARE FOOT INDUSTRIAL BUILDING AT 10100 BUBB ROAD SECTION I: PROJECT DESCRIPTION Application No.: ASA-2019-005 Applicant: Scott Stotler Location: 10100 Bubb Road (APN 357-20-024) SECTION II: FINDINGS WHEREAS, the City of Cupertino received an application for an Architectural and Site Approval to consider allowing modifications to the exterior building materials and landscaping for an existing industrial building, as described in Section I. of this Resolution; and WHEREAS, the necessary public notices have been given as required by the Procedural Ordinance of the City of Cupertino, and the Administrative Hearing Officer has held at least one public meeting in regard to the application; and WHEREAS, pursuant to the provisions of the California Environmental Quality Act of 1970 (Public Resources Code section 21000 et seq.) (“CEQA”), together with the State CEQA Guidelines (California Code of Regulations, Title 14, Section 15000 et seq.) (hereinafter, "CEQA Guidelines"), the City staff has independently studied the proposed Project and has determined that the Project is exempt from environmental review pursuant to the categorical exemption in CEQA Guidelines section 15301 and 15332 for the reasons set forth in the staff report dated January 9, 2020 and incorporated herein; and WHEREAS, the applicant has met the burden of proof required to support said application; and Resolution No. 111 ASA-2019-005 January 9, 2020 Page 2 WHEREAS, the Administrative Hearing Officer finds as follows with regard to this application: 1. The proposal, at the proposed location, will not be detrimental or injurious to property or improvements in the vicinity, and will not be detrimental to the public health, safety, general welfare, or convenience; The applicant proposes a façade modification that utilizes minor exterior changes to modernize the style. The changes include material changes from concrete wall surfaces to painted stucco, from brick accents to painted fiber-cement panels, and from a wood-tiled mansard roof to a painted fiber-cement façade and parapet wall. The building will include a new front patio that fronts the building and an exterior courtyard entrance along the north-side of the building. The courtyard is created by reducing the interior building square footage. All the proposed changes are minor improvements to the existing building and site and will not be detrimental or injurious to property or improvements in the vicinity. 2. The proposal is consistent with the purposes of Chapter 19.168, the General Plan any specific plan, zoning ordinances, applicable planned development permit, conditional use permits, variances, subdivision maps or other entitlements to use which regulate the subject property including, but not limited to, adherence to the following specific criteria: a) Abrupt changes in building scale should be avoided. A gradual transition related to height and bulk should be achieved between new and existing buildings. There are no changes in building scale except for a minor reduction in bulk where the mansard roof is proposed to be removed on the one-story building. b) In order to preserve design harmony between new and existing buildings and in order to preserve and enhance property values, the materials, textures and colors of new building should harmonize with adjacent development by being consistent or compatible with design and color schemes with the future character of the neighborhoods and purposes of the zone in which they are situated. The location, height and materials of walls, fencing, hedges and screen planting should harmonize with adjacent development. Unsightly storage areas, utility installations and unsightly elements of parking lots should be concealed. The planting of ground cover or various types of pavements should be used to prevent dust and erosion, and the unnecessary destruction of existing healthy trees should be avoided. Lighting for development should be adequate to meet safety requirements as specified by the engineering and building departments and provide shielding to prevent spill-over light to adjoining property owners. Resolution No. 111 ASA-2019-005 January 9, 2020 Page 3 The planning area was designed to preserve light industrial uses and the proposed materials contribute to the industrial aesthetic. The façade changes include stucco wall textures, fiber- cement accent paneling, and metal trellis architectural features painted in shades of gray and black. The project will include new trees to line the newly proposed sidewalk and shade the parking lot areas. All utilities are located at the rear of the property, and landscape hedging is proposed along the eastern property line. Therefore, unsightly elements are not proposed for the site and will not be visible from the public right-of-way. c) The number, location, color, size, height, lighting and landscaping of outdoor advertising signs and structures have been designed to minimize traffic hazard, positively affect the general appearance of the neighborhood and harmonize with adjacent development. No signs are proposed as part of this project. d) With respect to new projects within existing residential neighborhoods, new development should be designed to protect residents from noise, traffic, light and visually intrusive effects by use of buffering, setbacks, landscaping, walls and other appropriate design measures. This application is not a new project and is not located near residential neighborhoods. NOW, THEREFORE, BE IT RESOLVED: That after careful consideration of the maps, facts, exhibits, testimony, staff’s report and presentation, and other evidence submitted in this matter, subject to the conditions which are enumerated in this Resolution beginning on PAGE 4 thereof, The application for an Architectural and Site Approval, Application no. ASA-2019-005 is hereby approved and that the subconclusions upon which the findings and conditions specified in this resolution are based and contained in the Public Meeting record concerning Application no. ASA-2019-005 as set forth in the Minutes of the Administrative Hearing Meeting of January 9, 2020 and are incorporated by reference as though fully set forth herein. SECTION III: CONDITIONS ADMINISTERED BY THE COMMUNITY DEVELOPMENT DEPARTMENT 1. APPROVED EXHIBITS Approval is based on the plan set drawn by Platform titled “10100-10120 Bubb Road” consisting of twenty-two (22) sheets labeled A0.0, A0.1, 1 Boundary Survey, Resolution No. 111 ASA-2019-005 January 9, 2020 Page 4 A1.0, L1.0, L2.0, IR1.1, IR1.2, IR1.3, IR1.4, A1.1, A1.1alt, A1.2, A2.0, A2.1, A2.2, A3.0, A3.1, A3.2, A3.4, A3.5, and A3.6, except as may be amended by conditions in this resolution. 2. ACCURACY OF PROJECT PLANS The applicant/property owner is responsible to verify all pertinent property data including but not limited to property boundary locations, building setbacks, property size, building square footage, any relevant easements and/or construction records. Any misrepresentation of any property data may invalidate this approval and may require additional review. 3. ANNOTATION OF THE CONDITIONS OF APPROVAL The conditions of approval set forth shall be incorporated into and annotated on the first page of the building plans. 4. INGRESS/EGRESS EASEMENT Prior to final occupancy, the property owner shall record an appropriate deed restriction and covenant running with the land subject to the approval of the City Attorney, to provide the necessary reciprocal ingress and egress easements to and from the adjoining properties for purposes of pedestrian and vehicular access and cross circulation. The easement language shall provide that construction of any driveways shall be completed to the City’s satisfaction at such time as the city can require the adjacent property owners to agree to construct driveway(s) and provide reciprocal ingress/egress easements through a planning permit. The agreement language including the driveway(s) and easement layout shall be reviewed and approved by the City prior to recordation with the County Recorder’s Office. The easement shall contain a provision that it may not be modified or removed without express written approval from the City. 5. EXTERIOR BUILDING MATERIALS/TREATMENTS a. The final building exterior plan shall closely resemble the details shown on the original approved plans. b. No fencing is approved within the front setback area. c. All final building exterior treatment plan (including but not limited to details on exterior color, materials, architectural treatments, doors, windows, lighting fixtures, and/or embellishments) shall be reviewed and approved by the Director of Community Development prior to issuance of building permits to ensure quality and consistency. Resolution No. 111 ASA-2019-005 January 9, 2020 Page 5 d. Any exterior changes determined to be substantial by the Director of Community Development shall either require a modification to this permit or a new permit based on the extent of the change. 6. WINDOW DETAILS The frontage windows shall be kept open and transparent to the greatest extent possible. The final storefront design and window display shall be reviewed and approved by the Director of Community Development prior to issuance of building permits for tenant improvements. No changes shall be made to the transparency of the windows without the express approval of the Director of Community Development. 7. LANDSCAPE PROJECT SUBMITTAL Prior to issuance of building permits, the applicant shall submit a full Landscape Documentation Package, per sections 14.15.050 A, B, C, and D of the Landscape Ordinance, for projects with landscape area 500 square feet or more or elect to submit a Prescriptive Compliance Application per sections 14.15.040 A, B, and C for projects with landscape area between 500 square feet and 2,500 square feet. The Landscape Documentation Package or Prescriptive Compliance Application shall be reviewed and approved to the satisfaction of the Director of Community Development prior to issuance of building permits, and additional requirements per sections 14.15.040 D, E, F, and G or 14.15.050 E, F, G, H, and I will be required to be reviewed and approved prior to final inspections. 8. LANDSCAPE INSTALLATION REPORT The project is subject to all provisions delineated in the Landscape Ordinance (CMC, Chapter 14.15). A landscape installation audit shall be conducted by a certified landscape professional after the landscaping and irrigation system have been installed. The findings of the assessment shall be consolidated into a landscape installation report. The landscape installation report shall include but is not limited to: inspection to confirm that the landscaping and irrigation system are installed as specified in the landscape and irrigation design plan, system tune-up, system test with distribution uniformity, reporting overspray or run-off that causes overland flow, and preparation of an irrigation schedule. The landscape installation report shall include the following statement: “The landscape and irrigation system have been installed as specified in the landscape and irrigation design plan and complies with the criteria of the ordinance and the permit.” Resolution No. 111 ASA-2019-005 January 9, 2020 Page 6 9. LANDSCAPE AND IRRIGATION MAINTENANCE Per the Landscape Ordinance (CMC, Chapter 14.15), a maintenance schedule shall be established and submitted to the Director of Community Development or his/her designee, either with the landscape application package, with the landscape installation report, or any time before the landscape installation report is submitted. a) Schedules should take into account water requirements for the plant establishment period and water requirements for established landscapes. b) Maintenance shall include, but not be limited to the following: routine inspection; pressure testing, adjustment and repair of the irrigation system; aerating and de- thatching turf areas; replenishing mulch; fertilizing; pruning; replanting of failed plants; weeding; pest control; and removing obstructions to emission devices. c) Failed plants shall be replaced with the same or functionally equivalent plants that may be size-adjusted as appropriate for the stage of growth of the overall installation. Failing plants shall either be replaced or be revived through appropriate adjustments in water, nutrients, pest control or other factors as recommended by a landscaping professional. 10. SIGNAGE Signage is not approved with this application. Signage shall conform to the City Sign Code. 11. LIGHTING On-site lighting must be in conformance with Cupertino Municipal Code Chapter 19.60 and 19.124 and automatic teller machine lighting, specifically, shall meet minimum standards required by the State of California Business and Professions Code. 12. DEMOLITION REQUIREMENTS All demolished building and site materials shall be recycled to the maximum extent feasible subject to the Building Official. The applicant shall provide evidence that materials were recycled prior to occupancy. 13. GRADING AND CONSTRUCTION HOURS AND NOISE LIMITS The applicant shall indicate compliance with the following grading and construction hours and noise limit requirements on all demolition, construction and grading permits, and in the construction management plan(s), unless otherwise indicated. a. All grading activities shall be limited to the dry season (April 15 to October 1), unless permitted otherwise by the Director of Public works. Resolution No. 111 ASA-2019-005 January 9, 2020 Page 7 b. Construction hours and noise limits shall be compliant with all requirements of Chapter 10.48 of the Cupertino Municipal Code. c. Grading, street construction, underground utility and demolition hours for work done more than 750 feet away from residential areas shall be limited to Monday through Friday, 7 a.m. to 8 p.m. and Saturday and Sunday, 9 a.m. to 6 p.m. Grading, street construction, demolition or underground utility work within 750 feet of residential areas shall not occur on Saturdays, Sundays, holidays, and during nighttime period as defined in Section 10.48.053(b) of the Municipal Code. d. Construction activities shall be limited to Monday through Friday, 7 a.m. to 8 p.m. and Saturday and Sunday, 9 a.m. to 6 p.m. Construction activities are not allowed on holidays as defined in Chapter 10.48 of the Municipal Code. Night time construction is allowed if compliant with nighttime standards of Section 10.48 of the Cupertino Municipal Code. e. Rules and regulations pertaining to all construction activities and limitations identified in this permit, along with the name and telephone number of an applicant appointed disturbance coordinator, shall be posted in a prominent location at the entrance to the job site. f. The applicant shall be responsible for educating all contractors and subcontractors of said construction restrictions. 14. BAAQMD BASIC CONTROL MEASURES (DUST CONTROL) Project shall comply with the Bay Area Quality Management District’s Basic Construction Mitigation Measures to reduce construction fugitive dust impacts as follows: a. All exposed surfaces (e.g., parking areas, staging areas, soil piles, graded areas, and unpaved access roads) shall be watered two times per day. b. All haul trucks transporting soil, sand, or other loose material off-site shall be covered. c. All visible mud or dirt tracked-out onto adjacent public roads shall be removed using wet power vacuum street sweepers at least once per day. The use of dry power sweeping is prohibited. d. All vehicle speeds on unpaved roads shall be limited to 15 mph. e. All roadways, driveways, and sidewalks to be paved shall be completed as soon as possible. Building pads shall be laid as soon as possible after grading unless seeding or soil binders are used. f. Idling times shall be minimized either by shutting equipment off when not in use or reducing the maximum idling time to 5 minutes (as required by the California airborne toxics control measure Title 13, Section 2485 of California Resolution No. 111 ASA-2019-005 January 9, 2020 Page 8 Code of Regulations [CCR]). Clear signage shall be provided for construction workers at all access points. g. All construction equipment shall be maintained and properly tuned in accordance with manufacturer’s specifications. All equipment shall be checked by a certified mechanic and determined to be running in proper condition prior to operation. h. A publicly visible sign shall be posted with the telephone number and person to contact at the City of Cupertino regarding dust complaints. This person shall respond and take corrective action within 48 hours. The BAAQMD phone number shall also be visible to ensure compliance with applicable regulations. Applicant shall indicate compliance with BAAQMD’s basic control measures on all demolition, construction and grading permits and construction management plan(s). 15. CONSULTATION WITH OTHER DEPARTMENTS The applicant is responsible to consult with other departments and/or agencies with regard to the proposed project for additional conditions and requirements. Any misrepresentation of any submitted data may invalidate an approval by the Community Development Department. 16. INDEMNIFICATION To the fullest extent permitted by law, the applicant shall indemnify, defend with the attorneys of the City’s choice, and hold harmless the City, its City Council, and its officers, employees, and agents (collectively, the “indemnified parties”) from and against any liability, claim, action, cause of action, suit, damages, judgment, lien, levy, or proceeding brought by a third party against one or more of the indemnified parties or one or more of the indemnified parties and the applicant related to this Resolution/Action Letter, the related entitlements, or any permit or approval authorized hereby for the project, including (without limitation) reimbursing the City its actual attorneys’ fees and costs incurred in defense of the litigation. The applicant shall pay such attorneys’ fees and costs within 30 (thirty) days following receipt of invoices from City. Such attorneys’ fees and costs shall include amounts paid to the City’s outside counsel and shall include City Attorney time and overhead costs and other City staff overhead costs and any costs directly related to the litigation reasonably incurred by City. The applicant shall likewise indemnify, defend, and hold harmless the indemnified parties from and against any damages, attorneys’ fees, or costs awards, including attorneys’ fees awarded under Code of Civil Procedure section 1021.5, assessed or awarded against the indemnified parties. Resolution No. 111 ASA-2019-005 January 9, 2020 Page 9 17. NOTICE OF FEES, DEDICATIONS, RESERVATIONS, OR OTHER EXACTIONS The Conditions of Project Approval set forth herein may include certain fees, dedication requirements, reservation requirements, and other exactions. Pursuant to Government Code Section 66020(d) (1), these Conditions constitute written notice of a statement of the amount of such fees, and a description of the dedications, reservations, and other exactions. You are hereby further notified that the 90-day approval period in which you may protest these fees, dedications, reservations, and other exactions, pursuant to Government Code Section 66020(a), has begun. If you fail to file a protest within this 90-day period complying with all of the requirements of Section 66020, you will be legally barred from later challenging such exactions. SECTION IV: CONDITIONS ADMINISTERED BY THE PUBLIC WORKS DEPARTMENT 18. STREET IMPROVEMENTS & DEDICATION Provide frontage improvements along the project to the satisfaction of the Director of Public Works. Street improvement plan design must be completed and approved prior to issuance of Building Permit. Street improvements may include, but not be limited to, new monolithic sidewalk, new driveway approach, new storm lateral, curb and gutter, and necessary AC conform and adjustment to utility boxes. All improvements must be completed and accepted by the City prior to Building Final Occupancy or Street Improvement Encroachment Permit acceptance whichever comes first. 17. ACCEPTANCE OF PROPERTY RIGHTS The Public Works Director, or his/her designee, shall have the authority to accept all offers of dedications, easements, quitclaims and other property rights and interests on behalf of the City. 18. PEDESTRIAN AND BICYCLE IMPROVEMENTS Developer shall provide pedestrian and bicycle related improvements (eg. Walkway and bicycle racks, etc.) consistent with the Cupertino Bicycle Transportation Plan and the Pedestrian Transportation Guidelines, and as approved by the Director of Public Works. All improvements must be completed and accepted by the City prior to Building Final Occupancy or Street Improvement Encroachment Permit acceptance whichever comes first. Resolution No. 111 ASA-2019-005 January 9, 2020 Page 10 19. DRAINAGE Drainage shall be provided to the satisfaction of the Director of Public Works. Any storm water overflows or surface sheeting should be directed away from neighboring private properties and to the public right of way as much as reasonably possible. At Building Permit stage, evaluate and address on-site drainage, no storm drain line(s) under sidewalk through the curb will be allowed. A storm lateral connection to City’s storm drain system may be required. 20. C.3 REQUIREMENTS C.3 regulated improvements are required for all projects creating and/or replacing 10,000 S.F. or more of impervious surface (collectively over the entire project site). The developer shall reserve a minimum of 4% of developable surface area for the placement of low impact development measures, for storm water treatment, unless an alternative storm water treatment plan, that satisfies C.3 requirements, is approved by the Director of Public Works. The developer must include the use and maintenance of site design, source control and storm water treatment Best Management Practices (BMPs), which must be designed per approved numeric sizing criteria. A Storm Water Management Plan, Storm Water Facilities Easement Agreement, Storm Water Facilities Operation and Maintenance Agreement, and certification of ongoing operation and maintenance of treatment BMPs are each required. 21. IMPROVEMENT AGREEMENT The project developer shall enter into a development agreement with the City of Cupertino providing for payment of fees, including but not limited to checking and inspection fees, storm drain fees, park dedication fees and fees for under grounding of utilities. Said agreement and fees shall be executed and paid prior to issuance of Building. Fees: a. Checking & Inspection Fees: Per current fee schedule ($891) b. Storm Drainage Fee: Per current fee schedule ($9,566 per AC) c. Traffic Impact Fee: Per current fee schedule: $6,298 (based on one new peak-hour trip) d. Encroachment Permit Fee: Per current fee schedule ($816) Bonds: Resolution No. 111 ASA-2019-005 January 9, 2020 Page 11 Faithful Performance Bond: 100% of Off-site and On-site Improvements Labor & Material Bond: 100% of Off-site and On-site Improvement -The fees described above are imposed based upon the current fee schedule adopted by the City Council. However, the fees imposed herein may be modified at the time of recordation of a final map or issuance of a building permit in the event of said change or changes, the fees changed at that time will reflect the then current fee schedule. 22. TRANSPORTATION IMPACT FEES The Project may be subject to the payment of Transportation Impact Fees under City’s Transportation Impact Fee Program (Chapter 14.02 of the Cupertino Municipal Code). 23. TRASH, RECYCLING AND COMPOST ENCLOSURES Trash enclosure plans must be designed in accordance with the City’s “Public Works Guidelines posted at www.cupertino.org/nowaste, and to the satisfaction of the Environmental Programs Manager. Clearance by the Public Works Department is required prior to obtaining a building permit. (CMC 9.18.210 H & K) 24. UNDERGROUND UTILITIES Developer shall comply with the requirements of the Underground Utilities Ordinance No. 331 and other related Ordinances and regulations of the City of Cupertino and shall coordinate with affected utility providers for installation of underground utility devices. Developer shall submit detailed plans showing utility underground provisions. Said plans shall be subject to prior approval of the affected Utility provider and the Director of Public Works. 25. TRANSFORMERS & CABINETS Electrical transformers, telephone cabinets and similar equipment shall be placed in underground vaults. The developer must receive written approval from both the Public Works Department and the Community Development Department prior to installation of any above ground equipment. Should above ground equipment be permitted by the City, equipment and enclosures shall be screened with fencing and landscaping such that said equipment is not visible from public street areas, as determined by the Community Development Department. Transformers shall not be located in the front or side building setback area. Resolution No. 111 ASA-2019-005 January 9, 2020 Page 12 26. WATER BACKFLOW PREVENTERS Domestic and Fire Water Backflow preventers and similar above ground equipment shall be placed away from the public right of way and site driveways to a location approved by the Cupertino Planning Department, Santa Clara County Fire Department and the water company. 27. BEST MANAGEMENT PRACTICES Utilize Best Management Practices (BMPs), as required by the State Water Resources Control Board, for construction activity, which disturbs soil. BMP plans shall be included in grading and street improvement plans. 28. TRAFFIC CONTROL PLAN The developer must submit a traffic control plan by a Registered Traffic Engineer to be approved by the City. The plan shall include a temporary traffic control plan for work in the right of way as well as a routing plan for all vehicles used during construction. All traffic control signs must be reviewed and approved by the City prior to commencement of work. The City has adopted Manual on Uniform Traffic Control Devices (MUTCD) standards for all signage and striping work throughout the City. 29. FIRE PROTECTION Fire sprinklers shall be installed in any new construction to the approval of the City. 30. SANTA CLARA COUNTY FIRE DEPARTMENT A letter of clearance for the project shall be obtained from the Santa Clara County Fire Department prior to issuance of building permits. Clearance should include written approval of the location of any proposed Fire Backflow Preventers, Fire Department Connections and Fire Hydrants (typically Backflow Preventers should be located on private property adjacent to the public right of way, and fire department connections must be located within 100’ of a Fire Hydrant). 31. FIRE HYDRANT Fire hydrants shall be located as required by the City and Santa Clara County Fire Department as needed. 32. SAN JOSE WATER SERVICE COMPANY CLEARANCE Provide San Jose Water Service Company approval for water connection, service capability and location and layout of water lines and backflow preventers before issuance of a building permit approval. Resolution No. 111 ASA-2019-005 January 9, 2020 Page 13 33. DEDICATION OF UNDERGROUND WATER RIGHTS Developer shall “quit claim” to the City all rights to pump, take or otherwise extract water from the underground basin or any underground strata in the Santa Clara Valley. 34. SANITARY DISTRICT A letter of clearance for the project shall be obtained from the Cupertino Sanitary District prior to issuance of building permits. 35. UTILITY EASEMENTS Clearance approvals from the agencies with easements on the property (including PG&E, AT&T, and California Water Company, and/or equivalent agencies) will be required prior to issuance of building permits. SECTION V: CONDITIONS ADMINISTERED BY THE FIRE DEPARTMENT 36. FIRE SPRINKLERS REQUIRED (As noted on Sheet A0.0) Approved automatic sprinkler systems in new and existing buildings and structures shall be provided in the locations described in this Section or in Sections 903.2.1 through 903.2.19 whichever is the more restrictive. For the purposes of this section, firewalls and fire barriers used to separate building areas shall be constructed in accordance with the California Building Code and shall be without openings or penetrations. 1. In other than residential buildings which require the installation of fire sprinklers for all new buildings according to the California Residential Code, an automatic sprinkler system shall be provided throughout all new buildings and structures. Exceptions: a. Buildings and structures that do not exceed 1,000 square feet of building area and that are not located in the Wildland-Urban Interface Fire Area. b. Buildings and structures that are located in the Wildland-Urban Interface Fire Area and do not exceed 500 square feet of building area. c. Group S-2 or U occupancies that are not located in the Wildland-Urban Interface and used exclusively for vehicle parking and meeting all of the following conditions: i. Noncombustible construction, ii. Maximum building area not to exceed 5,000 square feet, iii. Structure is open on three (3) or more sides, Resolution No. 111 ASA-2019-005 January 9, 2020 Page 14 iv. Minimum of 10 feet separation from existing buildings unless area is separated by fire walls complying with CBC 706. 2. An automatic sprinkler system shall be provided throughout existing buildings and structures when alterations or additions are made that create conditions described in Sections 903.2.1 through 903.2.19. 3. An automatic sprinkler system shall be provided throughout existing buildings and structures, when additions are made that increase the building area to more than 3,600 square feet. 37. FIRE APPARATUS ACCESS ROADS REQUIRED FOR BUILDINGS AND FACILITIES (As noted on Sheet A1.1) Approved fire apparatus access roads shall be provided for every facility, building or portion of a building hereafter constructed or moved into or with the jurisdiction. The fire apparatus access road shall comply with the requirements of this section and shall extend to within 150 feet of all portions of the facility and all portions of the exterior walls of the first story of the building as measured by an approved route around the exterior of the building or facility. [CFC, Section 503.1.1]. A 20' wide clear path shall be designated as fire lane back to the NE corner of the building, to comply with this section as noted on Sheet A1.1. 38. FIRE LANES REQUIRED (As noted on Sheet A1.1) The minimum clear width of fire department access roads shall be 20 feet. The minimum outside turning radius is 42 feet for required circulating access roadways. Fire apparatus access roads shall be designated and marked as a fire lane as set forth in Section 22500.1 of the California Vehicle Code. Fire Lane (as outlined in Comment 2) will be marked for fire lane use only as noted on Sheet A1.1. 39. WATER SUPPLY REQUIREMENTS Potable water supplies shall be protected from contamination caused by fire protection water supplies. It is the responsibility of the applicant and any contractors and subcontractors to contact the water purveyor supplying the site of such project, and to comply with the requirements of that purveyor. Such requirements shall be incorporated into the design of any water-based fire protection systems, and/or fire suppression water supply systems or storage containers that may be physically connected in any manner to an appliance capable of causing contamination of the potable water supply of the purveyor of record. Final approval of the system(s) under consideration will not be granted by this office until compliance with the requirements of the water purveyor of record are documented by that purveyor as Resolution No. 111 ASA-2019-005 January 9, 2020 Page 15 having been met by the applicant(s). 2016 CFC Sec. 903.3.5 and Health and Safety Code 13114.7. 40. ADDRESS IDENTIFICATION New and existing buildings shall have approved address numbers, building numbers or approved building identification placed in a position that is plainly legible and visible from the street or road fronting the property. These numbers shall contrast with their background. Where required by the fire code official, address numbers shall be provided in additional approved locations to facilitate emergency response. Address numbers shall be Arabic numbers or alphabetical letters. Numbers shall be a minimum of 4 inches (101.6 mm) high with a minimum stroke width of 0.5 inch (12.7 mm). Where access is by means of a private road and the building cannot be viewed from the public way, a monument, pole or other sign or means shall be used to identify the structure. Address numbers shall be maintained. CFC Sec. 505.1. 41. CONSTRUCTION SITE FIRE SAFETY All construction sites must comply with applicable provisions of the CFC Chapter 33 and our Standard Detail and Specification SI-7. Provide appropriate notations on subsequent plan submittals, as appropriate to the project. CFC Chp. 33. PASSED AND ADOPTED this 9th day of January 2020 at a noticed Public Meeting of the Administrative Hearing Officer of the City of Cupertino, State of California, held by the Director of Community Development, or his or her designee, pursuant to Cupertino Municipal Code Section 19.12.120. ATTEST: APPROVED: /s/Ellen Yau /s/Albert Salvador Ellen Yau Albert Salvador Associate Planner Assistant Director of Community Development 1 0 1 0 0 - 1 0 1 2 0 B U B B R D.cupertino, ca 95014COMMERCIAL T.I.OWNERS: Dutchints Development LLC 5150 El Camino Real STE E20 Los Altos, CA 94022 P:650-397-5297 TITLE SHEET GENERAL INFO A 0.0 All drawings and written material herein constitute original original and unpublished work of the Architect and may not be duplicated, used or disclosed without the written consent of Architect DATE ISSUE/REVISION 1431 MLK Jr Way Oakland, CA 94612 510-823-9046 06/14/19 PLANNING APP 10/21/19 T.I. PREP ASA RESUBMIT 210/23/19 A.S.A. RESUBMIT 11/05/19 PRICING SET 12/06/19 A.S.A. RESUBMIT 2 BUILDING AREA INFORMATION: ALL WORK DONE IN THIS PROJECT SHALL COMPLY WITH THE 2016 CBC, CMC, CPC, CPC, CEC, CFC, CALGREEN MANDATORY MEASURES, AND ENERGY CODE, INCLUDING AMENDMENTS BY THE CITY OF CUPERTINO 1.THE PERMIT SET IS INCLUSIVE OF THE DRAWING SHEETS LISTED IN THE DRAWING INDEX (A0.0). 2. THE CONTRACTOR SHALL CHECK AND FIELD VERIFY ALL DIMENSIONS AND CONDITIONS PRIOR TO PROCEEDING WITH THE WORK . 3. CONFLICTS FOUND IN THE CONSTRUCTION DOCUMENTS SHALL BE BROUGHT TO THE ATTENTION OF THE ARCHITECT AND/OR OWNER . 4. WRITTEN DIMENSIONS TAKE PRECEDENCE OVER SCALED DIMENSIONS . DO NOT SCALE THE DRAWINGS . 5. ALL DIMENSIONS , WHEN SHOWN IN THE ARCHITECTURAL PLANS , ARE TO GRID, FACE OF STUD , FACE OF MASONRY, AND FACE OF CONCRETE , UNLESS OTHERWISE NOTED . 6. ALL CHANGES IN FLOOR MATERIAL OCCUR AT CENTERLINE OF DOOR OR FRAMED OPENING UNLESS OTHERWISE INDICATED ON THE DRAWINGS 7. FIRE SPRINKLERS , WHERE REQUIRED SHALL BE INSTALLED IN ACCORDANCE WITH NFPA , C.B.C. & CITY REQUIREMENTS AND SPECIFICATIONS . IF FIRE SPRINKLERS ARE REQUIRED , FIRE PROTECTION DRAWINGS ARE TO BE COMPLETED BY THE PLUMBER AND SUBMITTED FOR PERMIT SEPARATELY . 8. WHEELCHAIR ACCESS RAMPS AT CURBS SHALL BE CONSTRUCTED PER LOCAL JURISDICTION SPECIFICATIONS . REFER TO CITY REQUIREMENTS AND CIVIL DRAWINGS FOR ADDITIONAL INFORMATION . 9. GLASS SUBJECT TO HUMAN IMPACT SHALL BE OF SAFETY GLAZING MATERIAL (LAMINATED OR TEMPERED ) WHERE REQUIRED AND SHALL MEET LOCAL , STATE , AND FEDERAL REQUIREMENTS . 10 . ANY SURVEY MONUMENTS WITHIN THE AREA OF CONSTRUCTION SHALL BE PRESERVED OR RESET BY A REGISTERED CIVIL ENGINEER OR A LICENSED LAND SURVEYOR . 11. PRIOR TO BIDDING , THE GENERAL CONTRACTOR AND ALL SUB-CONTRACTORS SHALL VISIT THE SITE AND BECOME ACQUAINTED WITH ALL CONDITIONS RELATING TO THE CONSTRUCTION AND COMPLETION OF THE PROJECT AND THE EMPLOYMENT OF LABOR THEREON . BIDDERS AND THEIR SUBCONTRACTORS SHALL REPORT ANY DISCREPANCIES TO THE ARCHITECT AND/OR OWNER . 12. IN THE EVENT HAZARDOUS MATERIALS ARE ENCOUNTERED IN THE PREMISES DURING THE EXECUTION OF THE WORK , NOTIFY THE OWNER IMMEDIATELY AND DO NOT PROCEED UNTIL DIRECTED . FOLLOW ALL CAL OSHA REQUIREMENTS . 13 . NOTES ARE AN AID TO THE CONTRACTOR IN UNDERSTANDING THE WORK AND SHOULD NOT BE CONSTRUED AS BEING COMPLETE IN EVERY DETAIL . IT IS THE RESPONSIBILITY OF THE CONTRACTOR TO BECOME THOROUGHLY FAMILIAR WITH THE WORK , AND REPORT ALL DISCREPANCIES BETWEEN THE DRAWINGS AND THE ACTUAL CONDITIONS TO THE ARCHITECT AND/OR OWNER . 14 . DO NOT SUBSTITUTE , REVISE , OR CHANGE THE WORK WITHOUT THE WRITTEN CONSENT OF THE ARCHITECT AND/OR OWNER . 15. INSTALL ALL WORK PLUMB , LEVEL , SQUARE , TRUE , AND IN PROPER ALIGNMENT. 16 . COORDINATE ALL WORK AS REQUIRED BY THE CONTRACT DOCUMENTS WITH THE OWNER INCLUDING TEMPORARY STORAGE , LOADING , BUILDING KEYING SYSTEMS , ETC. AND PROVIDE NECESSARY BARRICADES , SIGNS, BARRIERS , AND PROTECTION 17. CONTRACTOR SHALL PAY SPECIFIC ATTENTION TO DIMENSIONS OR IMPLIED PLAN AND SECTIONAL SPATIAL RELATIONSHIPS , AND VERIFY ALL AXES AND IMPLIED SYMMETRIES BEFORE BEGINNING WORK . DOORS ARE TYPICALLY CENTERED IN RELATION TO ADJACENT WALLS , UNLESS OTHERWISE NOTED . 18. PROVIDE AND COORDINATE LOCATION AND TYPE OF BLOCKING/BACKING IN PARTITIONS BEHIND ALL WALL MOUNTED ITEMS , INCLUDING ALL ADA ACCESSIBILITY BUILDING ELEMENTS . 19. THE DRAWINGS INDICATE LOCATION , DIMENSION , REFERENCE , AND SOME DETAIL OF CONSTRUCTION . THE DRAWINGS DO NOT ILLUSTRATE EVERY CONDITION . THE OWNER UNDERSTANDS AND ACKNOWLEDGES THAT THIS IS A “BUILDER'S SET OF DOCUMENTS” AND DOES NOT CONTAIN THE LEVEL OF DETAILS FOUND IN A COMPLETE SET OF CONSTRUCTION DOCUMENTS , AND WILL REQUIRE EXPERIENCED AND QUALIFIED CONTRACTORS , SUBCONTRACTORS AND OTHERS TO PROVIDE , AMONG OTHER THINGS , DETAILS , SUPPLEMENTAL DETAILS AND PRODUCTION SPECIFICATIONS , AND TO ELABORATE AND INTERPRET THE BUILDER'S SET OF DOCUMENTS . PER OWNER/ARCHITECT AGREEMENT , ARCHITECT IS NOT RESPONSIBLE FOR WATERPROOFING MATERIALS AND DETAILING . 20. DETAILED AND LARGER SCALE DRAWINGS TAKE PRECEDENCE OVER SMALLER SCALE DRAWINGS . 21 . DIMENSIONS ARE NOT ADJUSTABLE WITHOUT APPROVAL OF THE ARCHITECT, UNLESS NOTED AS +/-. 22. VERTICAL DIMENSIONS ARE FROM THE TOP OF SUB FLOOR , UNLESS OTHERWISE NOTED . SUB FLOOR SHALL MEAN EITHER TOP OF PLYWOOD OR TOP OF GYPCRETE , UNLESS OTHERWISE NOTED . 23. DIMENSIONS MARKED V.I.F. SHALL BE "VERIFIED" IN THE FIELD BY THE GENERAL CONTRACTOR . 24. ANY WASTE AND REFUSE CAUSED BY THE CONTRACTOR SHALL BE REMOVED FROM THE PREMISES AND DISPOSED OF IN ACCORDANCE WITH ALL LOCAL REGULATIONS . 25. DEFINITIONS USED ON DRAWINGS: A. AS REQUIRED : AS REQUIRED BY REGULATORY REQUIREMENTS BY REFERENCED STANDARDS , BY EXISTING CONDITIONS , BY GENERALLY ACCEPTED CONSTRUCTION PRACTICE , OR BY THE CONTRACT DOCUMENTS . B. TYPICAL : IDENTICAL FOR ALL SUCH CONDITIONS , UNLESS OTHERWISE NOTED . C. SIMILAR : COMPARABLE CHARACTERISTICS FOR THE CONDITION NOTED . DIFFERENCES CAN BE INFERRED FROM OTHER INFORMATION INDICATED . VERIFY DIMENSIONS AND ORIENTATIONS . D. FURNISH : SUPPLY ONLY, OTHERS TO INSTALL E. INSTALL : INSTALL ITEMS FURNISHED BY OTHERS F. PROVIDE : FURNISH AND INSTALL G. REMOVE : ELIMINATE AND DISPOSE OF PROPERLY. H. CONTRACTOR : THE GENERAL CONTRACTOR OR ANY SUB-CONTRACTORS HIRED INDIVIDUALLY OR INDEPENDENTLY BY THE OWNER . 26. CONTRACTOR IS RESPONSIBLE FOR PROVIDING AND INSTALLING ALL UNIT ENTRY SIGNAGE AND DOOR NUMBERS . GENERAL CONTRACTOR TO COORDINATE WITH OWNER AND PROVIDE ANY NECESSARY BLOCKING/BACKING . 27. CONTRACTOR TO COORDINATE DOORS , ROLL-UP DOOR AND/OR ENTRY GATE OPERATION AND SECURITY WITH OWNER . 28. AREA CALCULATIONS IN THIS SET OF DRAWINGS SHOULD NOT BE USED BY THE GENERAL CONTRACTOR FOR PURPOSES OF AREA TAKE OFFS FOR BIDDING PURPOSES . 29. PROVIDE WATER RESISTANT GYPSUM BOARD TO RESIST MILDEW AT ALL WET LOCATIONS , INCLUDING BATHROOMS AND KITCHENS . GENERAL NOTES: ARCHITECT: PLATFORM lead: Ben Anderson 1431 Martin Luther King Jr Way Oakland, CA 94612 P:510-823-9046 PROJECT DIRECTORY (N)NEW (E)EXISTING A.F.F.ABOVE FINISHED FLOOR TYP.TYPICAL G.S.M.GALVANIZED SHEET METAL R.W.L.RAIN WATER LEADER SHT'G SHEETING N.I.C.NOT IN CONTRACT CLR.CLEAR (SPACE) MAX.MAXIMUM MIN.MINIMUM COORD.COORDINATE V.I.F.VERIFY IN FIELD U.O.N.UNLESS OTHERWISE NOTED W.R.B.WATER RESISTANT GYPSUM BOARD ABBREVIATIONS S.S.D. S.E.D. S.P.D. S.M.D. S.A.S.M S.A.S.M.F. SEE STRUCTURAL DRAWINGS SEE ELECTRICAL DRAWINGS SEE PLUMBING DRAWINGS SEE MECHANICAL DRAWINGS A0 GENERAL INFO TITLE SHEET A0.1 SITE PHOTOS 1 TOPOGRAPHIC BOUNDARY SURVEY A1.0 EXISTING SITEPLAN AND ROOFPLAN L1.0 PROPOSED PLANTING AND HARDSCAPE PLAN L2.0 PROPOSED PLANT SCHEDULE IR1.1 IRRIGATION PLAN IR1.2 IRRIGATION LEGEND AND NOTES IR1.3 IRRIGATION DETAILS IR1.4 IRRIGATION DETAILS A1.1 PROPOSED SITEPLAN AND ROOFPLAN A1.1alt FUTURE SITEPLAN COVENANT AT PARKING LOT A1.2 SITE DETAILS A2.0 EXISTING FLOORPLAN A2.1 PROPOSED FLOORPLAN A2.2 PROPOSED REFLECTED CEILING PLAN A3.0 EXISTING AND PROPOSED BUBB RD. (WEST) ELEVATION A3.1 EXISTING AND PROPOSED NORTH ELEVATION A3.2 EXISTING AND PROPOSED EAST ELEVATION A3.4 EXISTING AND PROPOSED BUILDING SECTIONS A3.5 EXISTING AND PROPOSED BULDING SECTIONS A3.6 MATERIALS AND COLOR BOARDSELF ADHERED SHEET MEMBRANE SELF ADHERED SHEET MEMBRANE FLASHING BUILDING TYPE BUILDING CODE INFORMATION: TYPE III B NON-RATED EXISTING PROPOSED TYPE V B NON-RATED OCCUPANCY TYPE F-1 & B B CONDITIONED FLOOR AREA 13,250 S.F. 12,850 S.F. INDUSTRIAL USE 8,249 S.F. OFFICE USE 5,001 SF ALLOWABLE AREA B OCCUPANCY WITH TYPE III B CONSTRUCTION PER TABLE 506.2 19,000 S.F. PER STORY OCCUPANCY SEPARATION NONE REQUIRED OCCUPANT LOAD (EGRESS)12,850 S.F. AT 100 S.F. PER PERSON = 129 OCCUPANTS PLUMBING FIXTURES OCCUPANT LOAD FOR PLUMBING FIXTURE CALC GROUP B, 200 S.F. PER OCCUPANT = 60 3O MALE 30 FEMALE 1 MALE AND 2 FEMALE WATER CLOSETS REQUIRED, & 1 URINAL AT MALE RESTROOM 1 SERVICE SINK REQUIRED. 1 HIGH-LOW DRINKING FOUNTAIN REQUIRED FIRE SPRINKLERS FULLY SPRINKLERED FULLY SPRINKLERED OWNERS: Dutchints Development LLC 5150 El Camino Real STE E20 Los Altos, CA 94022 P:650-397-5297 0 S.F. 12,850 S.F. EXISTING PROPOSED STRUCTURAL ENGINEER: XL Engineering lead: Brian Coats 11846 Dublin Blvd. Dublin, CA 94568 P: 925-803-9756 M.E.P. ENGINEERING: GMEP Engineers lead: David Davenport 26439 Rancho Pkwy S #120 Lake Forest, CA 92630 P:949-267-9095 SURVEYOR: GRANT LINE LAND SURVEYING lead: Kevin Nickolas 2278 Carol Ann Drive Tracy, CA 95377 P:925-457-1734 DRAWING INDEX: ASSESSORS PARCEL NUMBER LOT AREA: RECORDED SIZE (ASSESSOR): EXISTING BUILDING AREA (PER SURVEY) LOT WIDTH: LOT DEPTH: SCOPE OF PROPOSAL: LOT INFORMATION ZONING INFORMATION ZONING: LAND USE: SETBACK REQ. SETBACK - FRONT SETBACK - SIDE SETBACK - REAR EXISTING BUILDING HEIGHT PROPOSED BUILDING HEIGHT EXISTING USE PROPOSED USE EXISTING LOT COVERAGE 13,250 + MANSARD 965 = 14,215 PROPOSED LOT COVERAGE 14,215 - TRELLIS 1,298 =12,917 EXISTING PARKING PROPOSED BUILDING AREA PARKING CALCULATION FOR PROPOSED OFFICE USE: 12,850 S.F. AT 285 S.F. PER SPACE = TOTAL REQUIRED = 45 PARKING SPACES TOTAL PROPOSED = 46 PARKING SPACES INCLUDING 2 ADA SPACES BICYCLE PARKING 12,850 S.F. PROPOSED FLOOR AREA AT 1,250 S.F. PER SPOT = 11 11 CLASS 1 BIKE PARKING SPOTS PROPOSED TO BE PROVIDED IN (N) LOCKABLE GARAGE AREA AND 2 CLASS II SPACES AT FRONT PATIO IF COVENANT TO CONNECT PARKING LOT IS UTILIZED, TOTAL REQUIRED = 45 PARKING SPACES TOTAL PROPOSED = 44 PARKING SPACES IN PARKING LOT + 1 PARKING SPACE IN GARAGE 357-20-024 38,052 S.F. 0.87 ACRES 13,250 (VARIES) 174'-186' (VARIES) 220'-229' ML-rc INDUSTRIAL/RESIDENTIAL/COMMERCIAL 25' none b/c adjacent to MXL none b/c adjacent to CA R.O.W. 17' 17' MIXED - AUTO REPAIR & OFFICE OFFICE 37% 34% 44 SPACES 12,850 S.F. BUILDING SCOPE: CHANGE OF USE AND TENANT IMPROVEMENT TO CREATE NEW OFFICE SPACE IN AN EXISTING LIGHT INDUSTRIAL AUTO REPAIR WAREHOUSE. THE REMOVAL OF 400 S.F. OF EXISTING INTERIOR FLOOR AREA, TO ALLOW FOR AN OPEN TO SKY SIDE ENTRY COURT SPACE. THE REPAIR OF EXISTING MEN'S AND WOMEN'S RESTROOMS, AND THE INSTALLATION OF 2 NEW POWDER ROOMS WITHIN 2 OF THE EXECUTIVE OFFICES THE INSTALLATION OF A NEW BREAK ROOM KITCHEN (NO RANGE) LOT SCOPE: REPAIR (E) ASPHALT PAVING AS REQUIRED, PROVIDE (N) PARKING LOT STRIPING TO CURRENT STANDARDS, INCLUDING (2) (N) ADA PARKING SPACES ADJACENT TO (N) ENTRY COURT PROVIDE (N) PARKING LOT LIGHTING PROVIDE (N) PERMEABLE SURFACE AND PLANTING IN AREAS OF PARKING LOT NO LONGER REQUIRED TO BE DEDICATED TO VEHICULAR CIRCULATION AND PARKING PROVIDE (N) DEDICATED PEDESTRIAN WALKWAY AT PERIMITER OF BUILDING WHERE EXTERIOR DOORS OCCUR EXPAND (E) PATIO AT BUBB RD. SIDE OF THE BUILDING BY 5 FEET PROVIDE (N) PLANTING IN FRONT YARD SETBACK LANDSCAPE: STOEV DESIGN GROUP 
30 Caledonia St, #4
 Sausalito, CA 94965
 Office: 415-944-1475 1 0 1 0 0 - 1 0 1 2 0 B U B B R D.cupertino, ca 95014COMMERCIAL T.I.OWNERS: Dutchints Development LLC 5150 El Camino Real STE E20 Los Altos, CA 94022 P:650-397-5297 SITE PHOTOS A 0.1 All drawings and written material herein constitute original original and unpublished work of the Architect and may not be duplicated, used or disclosed without the written consent of Architect CHANGE OF USE PERMITDATE ISSUE/REVISION 1431 MLK Jr Way Oakland, CA 94612 510-823-9046 06/14/19 PLANNING APP 9'-2"N 71°01'51" E 219.04'BUBB ROAD(74' WIDE)WGFLAG POLE ROOF CANOPY OVERHANGHIGH VOLTAGE TRANS. 98.93 PADMONUMENT SIGN CURB LINE BROKEN HEAVINGPOOR CONDITION ELECT. MARKOUT HAZARDOUSMATERIALSSTORAGEN GL PAC-BELL PG&E 42" TREE 24" TREE 30" TREE 24" TREE 24" TREE 30" TREE CONC. DRAINAGE DITCHEXCEPTIONA C A C A C A C CONC.D/WAPRONCOVERED TRASH AREA 6'CHAIN LINK8' CHAIN LINK W/WOOD SLATSMON. WELL 6'CHAIN LINKMON. WELL 6'CHAIN LINK SD CONCRETEELECTROLIERSSMH BASIS OF BEARINGSN18°58'09"WP.S.E.S 23°18'58" E 184.97'N 68°08'46" E 205 .91'N 18°58'09" E 148.91' R=500' L=25.17'SS SS SS E E E32'-0" 37'-0"10'-0" NORTH 1 0 1 0 0 - 1 0 1 2 0 B U B B R D.cupertino, ca 95014COMMERCIAL T.I.OWNERS: Dutchints Development LLC 5150 El Camino Real STE E20 Los Altos, CA 94022 P:650-397-5297 EXISTING SITEPLAN & ROOFPLAN A 1.0 All drawings and written material herein constitute original original and unpublished work of the Architect and may not be duplicated, used or disclosed without the written consent of Architect DATE ISSUE/REVISION 1431 MLK Jr Way Oakland, CA 94612 510-823-9046 06/14/19 PLANNING APP 10/21/19 T.I. PREP ASA RESUBMIT 210/23/19 A.S.A. RESUBMIT 11/05/19 PRICING SET 12/06/19 A.S.A. RESUBMIT 2 EXISTING SITEPLAN AND ROOFPLAN 1" = 10'-0"1 CUT (N) OPENINGS IN ROOF (SHOWN HATCHED) REMOVE (E) MANSARD ROOF PARAPET RIDGE TO BE REMOVED REMOVE ALL HAZMAT MITIGATION SYSTEMS, ONCE CLEANUP DEEMED COMPLETE REMOVE (E) CURB REMOVE (E) CURB (E) SKYLIGHTS TO BE REMOVED (E) SKYLIGHT TO BE REMOVED (E) CURB CUT CONNECTING TO NEIGHBORING PARKING LOT TO REMAIN MAINTAIN COVENANT/EASEMENT FOR CONNECTION TO NEIGHBORING PARKING LOT AT REAR 16171819201213141511 10 123452829303132333435363738394041424344454622'-0"5'-0" 10'-8"130'-0"25'-0"21222324252627105'-0" 18'-0" 22'-0" 18'-0"8'-6"HAZARDOUSMATERIALSSTORAGE678922'-0" MIN.26'-6"38'-11" 18'-7"17'-10"86'-0"MIN. 33' BACK FROM PARAPET PROVIDE TRUNCATED DOME WARNING WHERE PEDESTRIAN TRAFFIC CROSSES VEHICULAR TRAFFIC, TYP. NORTH 1 0 1 0 0 - 1 0 1 2 0 B U B B R D.cupertino, ca 95014COMMERCIAL T.I.OWNERS: Dutchints Development LLC 5150 El Camino Real STE E20 Los Altos, CA 94022 P:650-397-5297 PROPOSED SITEPLAN & ROOFPLAN A 1.1 All drawings and written material herein constitute original original and unpublished work of the Architect and may not be duplicated, used or disclosed without the written consent of Architect DATE ISSUE/REVISION 1431 MLK Jr Way Oakland, CA 94612 510-823-9046 06/14/19 PLANNING APP 10/21/19 T.I. PREP ASA RESUBMIT 210/23/19 A.S.A. RESUBMIT 11/05/19 PRICING SET 12/06/19 A.S.A. RESUBMIT 2 RIDGE PROVIDE (N) PEDESTRIAN ROUTE (SIDEWALK) TO CONNECT EXTERIOR DOORSPROVIDE (N) TRELLIS COVER AT NEW SIDE ENTRY COURT AREA WITH (N) PLANTING EXPAND (E) PATIO AREA 5' CLOSER TO BUBB RD.10100 BUBB RD.PROPOSED SITEPLAN AND ROOFPLAN 1" = 10'-0"1 PROVIDE (N) 5' WIDE MONOLITHIC SIDWALK 2% MAX. CROSS-SLOPE SEE FIGURE 1-19 SHEET A1.2 PROVIDE (N) SIDEWALK TO CONNECT (E) FRONT PATIO AREA TO (N) SIDWALK AT BUBB RD. PROVIDE (N) CURB/RETAINING AROUND PATIO AT INSIDE OF FRONT YARD, LEVEL TO SIDEWALK MAINTAIN VEHICULAR ACCESS TO ONE OF THE EXISTING GARAGE DOORS EXISTING TRANSFORMER TO REMAIN PG&E / HIGH VOLTAGE UNDERGROUND PROVIDE DROUGHT TOLERANT PLANTING S.L.D. MAINTAIN ACCESS TO (E) MONITORING WELL (E) HAZARDOUS TANKS FOR REMEDIATION TO REMAIN AS NEEDED (N) LARGE TREE (E) REDWOODS TO REMAIN, TYP. PROVIDE (N) PLANTING S.L.D. REPAIR (E) TRASH ENCLOSURE (E) CURB CUT CONNECTING TO NEIGHBORING PARKING LOT TO REMAIN (N) CURB OR CORTEN PLATE, TYPICAL AT (N) PLANTING AREAS APPLY LOW IMPACT DEVELOPMENT STANDARDS TO SITE DESIGN WHERE POSSIBLE, ROOF TO DRAIN TO (N) PLANTING BEDS, TYP. ROOF DRAIN AND OVERFLOW SCUPPER, TYP. (E) LOW SLOPE ROOFING TO BE REMOVED AND REPLACED, VERIFY CONDITION OF SHEATHING, AND REPLACE AS REQUIRED ROOF DRAIN AND OVERFLOW SCUPPER, TYP. ROOF DRAIN AND OVERFLOW SCUPPER, TYP. ROOF DRAIN AND OVERFLOW SCUPPER, TYP.SLOPE DNSLOPE DN4'-0" TYP. SLOPE DN (E) VALLEY GUTTER DRAINS TO HIGHWAY R .O .W. TYP. (N) CLIMBER VINE AT (E) CHAIN LINK FENCE BOARDRING CAL TRANS PARKING LOT, STEPPED DOWN (E) UTILITY CONNECTIONS MAINTAIN COVENANT/EASEMENT FOR CONNECTION TO NEIGHBORING PARKING LOT AT REAR WOULD REQUIRE THE REMOVAL OF PARKING SPACES #1 & 2 SEE SHEET A1.1alt 11 CLASS 1 BIKE SPACES INSIDE LOCKABLE GARAGE SPACE EXISTING MONITORING WELL (E) ELECTROLIER PROVIDE (N) CEDAR TRELLIS IN PLACE OF (E) MANSARD ROOF PROVIDE METAL SCREENINGELEMENTS FOR ROOFTOPEQUIPMENTPROVIDE METAL SCREENINGELEMENTS FOR ROOFTOPEQUIPMENT2% SLOPE 2% SLOPE 2% SLOPE ADJUST UTILITY BOXES TO GRADE 6' @ 8.3% SLOPE6' @ 8.3% SLOPEADJUST UTILITY BOXES TO GRADE 2% SLOPE 2% SLOPE PROVIDE (N) 5' WIDE MONOLITHIC SIDWALK 2% MAX. CROSS-SLOPE SEE FIGURE 1-21 SHEET A1.2 2% SLOPEPROVIDE (N) PARAPET WHERE (E) MANSARD ROOF IS REMOVED EV CHARGING STATION FIRE LANE , PROVIDE RED CURB WITH THE WORDS "FIRE LANE" WITH 3" LETTERS IN WHITE AT A MAX INTERVAL OF 50', FROM SIDWALK TO END OF TURN IN DRIVE AISLE PROVIDE (N) LIGHT POLE, S.L.D. PROVIDE (N) LIGHT POLE, S.L.D. PROVIDE INVERTED "U" BIKE RACK FOR 2 CLASS II BIKE SPACES 1415161718101112139 8 1232627282930313233343536373839404142434422'-0"5'-0" 10'-8"130'-0"25'-0"19202122232425105'-0" 18'-0" 22'-0" 18'-0"HAZARDOUSMATERIALSSTORAGE456722'-0" MIN.8'-6"22'-0"4526'-6"38'-11" 18'-7"17'-10"86'-0"MIN. 33' BACK FROM PARAPET MAINTAIN COVENANT/EASEMENT FOR CONNECTION TO NEIGHBORING PARKING LOT AT REAR WOULD REQUIRE THE REMOVAL OF PARKING SPACE #1 CUTTING IN A NEW 22' CURB CUT WOULD REMOVE 2 PARKING SPACES 1 0 1 0 0 - 1 0 1 2 0 B U B B R D.cupertino, ca 95014COMMERCIAL T.I.OWNERS: Dutchints Development LLC 5150 El Camino Real STE E20 Los Altos, CA 94022 P:650-397-5297 PROPOSED SITEPLAN & ROOFPLAN A 1.1alt All drawings and written material herein constitute original original and unpublished work of the Architect and may not be duplicated, used or disclosed without the written consent of Architect DATE ISSUE/REVISION 1431 MLK Jr Way Oakland, CA 94612 510-823-9046 06/14/19 PLANNING APP 10/21/19 T.I. PREP ASA RESUBMIT 210/23/19 A.S.A. RESUBMIT 11/05/19 PRICING SET 12/06/19 A.S.A. RESUBMIT 2 POSSIBLE FUTURE SITEPLAN AND ROOFPLAN 1" = 10'-0"1 TURNING RADIUS = 30' TURNING RADIUS = 15' GARAGE SHOWN DASHED 1 0 1 0 0 - 1 0 1 2 0 B U B B R D.cupertino, ca 95014COMMERCIAL T.I.OWNERS: Dutchints Development LLC 5150 El Camino Real STE E20 Los Altos, CA 94022 P:650-397-5297 SITEWORK DETAILS A 1.2 All drawings and written material herein constitute original original and unpublished work of the Architect and may not be duplicated, used or disclosed without the written consent of Architect DATE ISSUE/REVISION 1431 MLK Jr Way Oakland, CA 94612 510-823-9046 06/14/19 PLANNING APP 10/21/19 T.I. PREP ASA RESUBMIT 210/23/19 A.S.A. RESUBMIT 11/05/19 PRICING SET 12/06/19 A.S.A. RESUBMIT 2 43'-4"43'-4"43'-4"20'-1"20'-1"20'-1"20'-1"20'-1"4'-7"21'-4"21'-8"21'-4"21'-8" 1 2 4 5 A B C E G H I D F 3 22'-0" 21'-8"21'-8" NORTH 1 0 1 0 0 - 1 0 1 2 0 B U B B R D.cupertino, ca 95014COMMERCIAL T.I.OWNERS: Dutchints Development LLC 5150 El Camino Real STE E20 Los Altos, CA 94022 P:650-397-5297 EXISTING FLOORPLAN & DEMOLITION PLAN A 2.0 All drawings and written material herein constitute original original and unpublished work of the Architect and may not be duplicated, used or disclosed without the written consent of Architect DATE ISSUE/REVISION 1431 MLK Jr Way Oakland, CA 94612 510-823-9046 06/14/19 PLANNING APP 10/21/19 T.I. PREP ASA RESUBMIT 210/23/19 A.S.A. RESUBMIT 11/05/19 PRICING SET 12/06/19 A.S.A. RESUBMIT 2 EXISTING AUTO REPAIR SHOP EXISTING OFFICE SPACE EXISTING AUTO REPAIR SHOP CUT (N) OPENINGS IN EXTERIOR WALL AND SLAB ON GRADE (SHOWN HATCHED) REMOVE (E) OVERHEAD DOORS REMOVE (E) NON STRUCTURAL PARITIONS , TYP. EXISTING & DEMOLITION FLOORPLAN 1/8" = 1'-0"1 EXISTING BATHROOMS TO BE REMODELED REMOVE (E) OVERHEAD DOORS RETAIN 1 OVERHEAD DOOR AT TRANSFORMER AND SWITCHGEAR TRANSFORMER ANDSWTICHGEAR TO REMAINNOTES ON SELECTIVE DEMOLITION: GENERAL REMOVE MATERIALS , SYSTEMS , COMPONENTS , FIXTURES AND EQUIPMENT AS DESIGNATED AND AS REQUIRED FOR COMPLETION OF REMODELING WORK INDICATED . COORDINATE SELECTIVE DEMOLITION FOR REMODELING WITH MECHANICAL CIVIL, STRUCTURAL AND ELECTRICAL WORK; CAP AND IDENTIFY ACTIVE UTILITIES AS REQUIRED . CONTRACTOR SHALL MAKE EFFORTS TO RECYCLE DEMOLISHED MATERIALS RATHER THAN LANDFILL MATERIALS . ARCHITECT WILL PROVIDE A LIST OF RECYCLING COMPANIES AND LOCATIONS UPON REQUEST. QUALITY ASSURANCE A. REGULATORY REQUIREMENTS - COMPLY WITH GOVERNING EPA NOTIFICATION REGULATIONS BEFORE STARTING SELECTIVE DEMOLITION . CALL (800) 822-1974 . COMPLY WITH HAULING AND DISPOSAL REGULATIONS OF AUTHORITIES HAVING JURISDICTION . B. STATE AND LOCAL CODE REQUIREMENTS SHALL CONTROL DISPOSAL OF DEBRIS , WHICH SHALL BE AT OFF SITE LOCATION . EXISTING CONDITIONS A. SITE SURVEYS - FOLLOWING PERFORMANCE OF DEMOLITION , INSPECT AND REPORT DEFECTS AND STRUCTURAL WEAKNESSES OF CONSTRUCTION AND IMPROVEMENTS PARTIALLY DEMOLISHED , CUT, AND REMOVED; OF CONSTRUCTION AND IMPROVEMENTS REMAINING; AND OF ADJACENT CONSTRUCTION AND IMPROVEMENTS . B. PROTECTION: PROTECT THE STRUCTURAL INTEGRITY OF EXISTING CONSTRUCTION AND IMPROVEMENTS TO REMAIN . C. ASBESTOS: IT IS NOT EXPECTED THAT ASBESTOS WILL BE ENCOUNTERED IN THE WORK . IF ANY MATERIALS SUSPECTED OF CONTAINING ASBESTOS ARE ENCOUNTERED , DO NOT DISTURB THE MATERIALS . IMMEDIATELY NOTIFY THE ARCHITECT AND THE OWNER . PROTECTION A. DO NOT INTERFERE WITH USE OF ADJACENT BUILDING SPACES; MAINTAIN FREE AND SAFE PASSAGE TO AND FROM . COVER AND PROTECT EXISTING MATERIALS WHEN DEMOLITION WORK IS PERFORMED IN AREAS WHERE EXISTING MATERIALS HAVE NOT BEEN REMOVED . B. PREVENT MOVEMENT OF ADJACENT CONSTRUCTION , PROVIDE AND PLACE BRACING AND BE RESPONSIBLE FOR SAFETY AND SUPPORT OF ADJACENT CONSTRUCTION . C. CEASE OPERATION AND NOTIFY ARCHITECT IMMEDIATELY IF SAFETY OF STRUCTURE APPEARS TO BE ENDANGERED; TAKE PRECAUTIONS TO PROPERLY SUPPORT STRUCTURE . DO NOT RESUME OPERATION UNTIL SAFETY IS RESTORED . EXISTING SERVICES A. DISCONNECT OR REMOVE UTILITY SERVICES AS REQUIRED FOR COMPLETION OF PROJECT; DISCONNECT, STUB OFF, AND CAP UTILITY SERVICE LINES NOT REQUIRED FOR NEW CONSTRUCTION . DO NOT REMOVE UTILITIES DISCOVERED DURING DEMOLITION BUT NOT INDICATED WITHOUT FIRST DETERMINING PURPOSE FOR UTILITY. B. DO NOT DISRUPT SERVICES TO ADJACENT BUILDING AREAS NOT IN PROJECT. C. PLACE MARKERS TO INDICATE LOCATION OF DISCONNECTED SERVICES; IDENTIFY SERVICE LINES AND CAPPING LOCATIONS ON PROJECT RECORD DOCUMENTS . DEFINITIONS A. DEMOLISH: REMOVE AND LEGALLY DISPOSE OF ITEMS EXCEPT THOSE INDICATED TO BE REINSTALLED , SALVAGED , OR TO REMAIN THE OWNER'S PROPERTY. B. REMOVE: REMOVE IN GOOD CONDITION FOR RE-USE OR STORAGE AT THE OWNER'S DISCRETION , UNLESS OTHERWISE NOTED . C. REMOVE AND REINSTALL: REMOVE ITEMS INDICATED; CLEAN , SERVICE , AND OTHERWISE PREPARE THEM FOR REUSE; STORE AND PROTECT AGAINST DAMAGE . REINSTALL ITEMS IN THE SAME LOCATIONS OR IN LOCATIONS INDICATED . D. EXISTING TO REMAIN: PROTECT CONSTRUCTION INDICATED TO REMAIN AGAINST DAMAGE AND SOILING DURING SELECTIVE DEMOLITION . WHEN NECESSARY, ITEMS MAY BE REMOVED TO A SUITABLE , PROTECTED STORAGE LOCATION DURING SELECTIVE DEMOLITION AND THEN CLEANED AND REINSTALLED IN THEIR ORIGINAL LOCATIONS . PRODUCTS MATERIALS A. GENERAL: 1. REMOVE AND RECYCLE OR DISPOSE OF ITEMS AND MATERIALS NOT DESIGNATED TO BE SALVAGED . DISPOSAL SHALL BE AT THE LEGAL DUMP SITE FOR THE MATERIAL TO BE DISPOSED . 2. IF, IN THE COURSE OF REMOVING DESIGNATED ITEMS AND MATERIALS , THE CONDITION OF OTHER MATERIALS OR THE STRUCTURE SO EXPOSED APPEARS TO BE DAMAGED OR OF OTHERWISE QUESTIONABLE CONDITION , IMMEDIATELY NOTIFY THE ARCHITECT AND/OR STRUCTURAL ENGINEER , WHO WILL DETERMINE IF THE OTHER MATERIALS OR STRUCTURE SHALL BE REMOVED , AND IF SO TO WHAT EXTENT. B. ITEMS TO BE SALVAGED: 1. CAREFULLY REMOVE MATERIALS INDICATED TO BE RETAINED BY OWNER; DELIVER AND STORE WHERE DIRECTED . A. COORDINATE EXTENT OF EXISTING MATERIALS TO BE RETAINED BY OWNER WITH OWNER'S REPRESENTATIVE PRIOR TO BEGINNING SELECTIVE DEMOLITION . 2. CAREFULLY DISCONNECT, REMOVE , AND PROTECT ITEMS INDICATED AND DESIGNATED TO BE SALVAGED , AS WELL AS ANY ADDITIONAL ITEMS SO DIRECTED BY THE ARCHITECT. 3. PACKAGE SALVAGED ITEMS THAT ARE IN SATISFACTORY CONDITION FOR REINSTALLATION IN CARDBOARD AND LABEL AS TO CONTENTS . SHOULD A QUESTION ARISE AS TO WHETHER OR NOT CERTAIN ITEMS ARE OF SUITABLE CONDITION FOR REINSTALLATION , CONSULT THE ARCHITECT FOR DETERMINATION . 4. DELIVER SALVAGED ITEMS AT TIME AND TO LOCATION DIRECTED BY THE OWNER . 5. REINSTALL SALVAGED ITEMS IN LOCATIONS INDICATED , OR AS DESIGNATED BY THE ARCHITECT. 6. SALVAGED ITEMS NOT INDICATED OR DESIGNATED FOR REINSTALLATION IN THE WORK SHALL BE DELIVERED TO OWNER . EXECUTION EXAMINATION A. VERIFY THAT UTILITIES HAVE BEEN DISCONNECTED AND CAPPED . B. SURVEY EXISTING CONDITIONS AND CORRELATE WITH REQUIREMENTS INDICATED TO DETERMINE EXTENT OF SELECTIVE DEMOLITION REQUIRED . C. PERFORM SURVEYS AS THE WORK PROGRESSES TO DETECT HAZARDS RESULTING FROM SELECTIVE DEMOLITION ACTIVITIES . PREPARATION A. CONDUCT DEMOLITION OPERATIONS AND REMOVE DEBRIS TO ENSURE MINIMUM INTERFERENCE WITH ROADS , STREETS , WALKS AND OTHER ADJACENT OCCUPIED AND USED FACILITIES . B. DO NOT CLOSE OR OBSTRUCT STREETS , WALKS OR OTHER ADJACENT OCCUPIED OR USED FACILITIES WITHOUT PERMISSION FROM THE OWNER AND AUTHORITIES HAVING JURISDICTION . PROVIDE ALTERNATE ROUTES AROUND CLOSED OR OBSTRUCTED TRAFFIC WAYS. C. CONDUCT DEMOLITION OPERATIONS TO PREVENT INJURY TO PEOPLE AND DAMAGE TO ADJACENT BUILDINGS AND FACILITIES TO REMAIN . ENSURE SAFE PASSAGE OF PEOPLE AROUND SELECTIVE DEMOLITION AREA - PROVIDE TEMPORARY WEATHER PROTECTION , DURING INTERVAL BETWEEN DEMOLITION AND REMOVAL OF EXISTING CONSTRUCTION , ON EXTERIOR SURFACES AND NEW CONSTRUCTION TO ENSURE THAT NO WATER LEAKAGE OR DAMAGE OCCURS TO STRUCTURE OR INTERIOR AREAS . E. PROVIDE AND MAINTAIN INTERIOR AND EXTERIOR BRACING OR STRUCTURAL SUPPORT TO PRESERVE STABILITY AND PREVENT MOVEMENT, SETTLEMENT OR COLLAPSE OF BUILDING TO BE SELECTIVELY DEMOLISHED - STRENGTHEN OR ADD NEW SUPPORTS WHEN REQUIRED DURING PROGRESS OF SELECTIVE DEMOLITION . UTILITY SERVICES A. MAINTAIN EXISTING UTILITIES INDICATED TO REMAIN IN SERVICE AND PROTECT THEM AGAINST DAMAGE DURING SELECTIVE DEMOLITION OPERATIONS . B. UTILITY REQUIREMENTS: LOCATE , IDENTIFY, DISCONNECT, AND SEAL OR CAP OFF INDICATED UTILITY SERVICES SERVING BUILDING TO BE SELECTIVELY DEMOLISHED . 1. ARRANGE TO SHUT OFF INDICATED UTILITIES WITH UTILITY COMPANIES . 2. WHERE UTILITY SERVICES ARE REQUIRED TO BE REMOVED , RELOCATED OR ABANDONED , PROVIDE BYPASS CONNECTIONS TO MAINTAIN CONTINUITY OF SERVICE TO OTHER PARTS OF THE BUILDING BEFORE PROCEEDING WITH SELECTIVE DEMOLITION . 3. CUT OFF PIPE OR CONDUIT IN WALLS OR PARTITIONS TO BE REMOVED . CAP, VALVE OR PLUG AND SEAL THE REMAINING PORTION OF PIPE OR CONDUIT AFTER BYPASSING . C. DO NOT START SELECTIVE DEMOLITION WORK UNTIL UTILITY DISCONNECTING AND SEALING HAVE BEEN COMPLETED AND VERIFIED IN WRITING . SHORING A. CAREFULLY SHORE AND PRESERVE EXISTING MATERIALS TO REMAIN WHERE SUPPORTING FRAMING IS DEMOLISHED . GENERAL A. REMOVE ITEMS DESIGNATED FOR DEMOLITION , AND AS REQUIRED FOR THE PERFORMANCE OF THE WORK . IF IN DOUBT AS TO WHETHER AN ITEM IS TO BE DEMOLISHED , CONTACT THE ARCHITECT FOR A DECISION PRIOR TO PROCEEDING WITH ITS DEMOLITION . B. REMOVE ITEMS CAREFULLY; PROVIDE FOR NEAT AND STRUCTURALLY SOUND JUNCTIONS BETWEEN EXISTING AND NEW MATERIALS . 1 A3.0 1 A3.2 1 A3.1 1 A3.4 1 A3.4 INTERIOR FINISH SCHEDULE Room #Room Name Area (S.F. net)Flooring Base Wall 1 Walls 2 Ceiling Notes #01 Realtor Pool 1,454 S.F.W-1 B-1 W-G G-1 EC-1 #02 Small Conference Room 186 S.F.C-1 B-1 W-G G-1 DC-1 #03 Reception 627 S.F W-1 B-1 G-1 EC-1 #04 Kitchen 904 S.F.W-1/T-1 B-1/B-2 W-G G-1 EC-1 See enlarged plans for quartz countertops #05 Lounge Area 1,069 S.F.W-1 B-1 W-G G-1 EC-1 #06 Large Conference Room 324 S.F.C-1 B-1 W-G G-1 DC-1 #07 Office 110 S.F.C-1 B-1 W-G G-1 DC-1 #08 Office 131 S.F.C-1 B-1 G-1 DC-1 #09 Office 130 S.F.C-1 B-1 G-1 DC-1 Sand Blasted brick #10 Office 106 S.F.C-1 B-1 W-G G-1 DC-1 #11 Executive Office 209 S.F.C-1 B-1 W-G G-1 DC-2 #12 AM Bar 129 S.F.W-1/T-1 B-1/B-2 G-1 DC-2 #13 Executive Office 263 S.F.C-1 B-1 W-G G-1 DC-2 #14 Water Closet 31 S.F.T-1 W-2 G-1 DC-2 Sand Blasted Brick #15 Water Closet 42 S.F.T-1 W-2 G-1 DC-2 #16 Large Conference Room 428 S.F.C-1 B-1 W-G G-1 DC-2 #17 Executive Assistant 285 S.F.C-1 B-1 W-G G-1 DC-1 #18 Office 120 S.F.C-1 B-1 W-G G-1 DC-1 #19 Office 120 S.F.C-1 B-1 W-G G-1 DC-1 #20 Office 112 S.F.C-1 B-1 W-G G-1 DC-1 #21 Common Work Area 1,625 S.F.W-1 B-1 W-G G-1 EC-1 #22 Men's Restroom 143 S.F.T-1 W-2 G-1 DC-1 #23 Women's Restroom 173 S.F.T-2 W-2 G-1 DC-1 #24 Pantry/ Storage 106 S.F.W-1 B-1 G-1 DC-1 #25 Garage/Storage 985 S.F.CO-1 N/A G-1 EC-1 #26 Office 132 S.F.C-1 B-1 W-G G-1 DC-1 #27 Office 123 S.F.C-1 B-1 W-G G-1 DC-1 #28 Office 123 S.F.C-1 B-1 W-G G-1 DC-1 #29 Office 123 S.F.C-1 B-1 W-G G-1 DC-1 #30 Design/Build Pool 1,739 S.F.W-1 B-1 W-G G-1 EC-1 DOOR SCHEDULE Door Tag Width Height Thickness Material Frame Fire Hardware Remarks D1 36"80"Hollow Metal Hollow Metal with Lite D2 72"80"Hollow Metal Hollow Metal D3 36"80"Solid Core Veneer Slab Pre - hung D4 Not Used Not Used D5 48"80"Hollow Core Wood Closet Door Pre - hung Bi-Part D6 36"80"Hollow Core Wood Closet Door Pre - hung Bi-Part INTERIOR FINISH KEY Finish Tag Finish Material Specification Color B-1 WOOD BASE MOLDING 6" MDF PAINTED B-2 TILE BASE MOLDING C-1 CARPET TILE CO-1 EPOXY SEALED CONCRETE RUST-OLEUM EPOXY SHIELD 2 PART GREY EC EXPOSED CEILING / PAINTED BLACK DC-1 DROPPED GYP CEILING 9'-0"LEVEL 4 SMOOTH WHITE DC-2 DROPPED GYP CEILING 11'-0"LEVEL 4 SMOOTH WHITE G-1 GYP BD WHITE T-1 12" X 24" TILE W-1 PRE-FINISHED ENGINEERED FLOORING W-T 48" WALL TILE W-G 1/2" TEMPERED GLASS WALL ROOM # 30 ROOM # 25 SMALL CONF. RM. ROOM # 02 EXISTING ELECTRICAL PANELSAND SWITCHGEAR TO REMAIN43'-4"43'-4"43'-4"20'-1"20'-1"20'-1"20'-1"20'-1"4'-7"21'-4"21'-8"21'-4"21'-8" 1 2 4 5 A B C E G H I D F 3 22'-0" 21'-8"21'-8" NORTH 1 0 1 0 0 - 1 0 1 2 0 B U B B R D.cupertino, ca 95014COMMERCIAL T.I.OWNERS: Dutchints Development LLC 5150 El Camino Real STE E20 Los Altos, CA 94022 P:650-397-5297 PROPOSED FLOORPLAN A 2.1 All drawings and written material herein constitute original original and unpublished work of the Architect and may not be duplicated, used or disclosed without the written consent of Architect DATE ISSUE/REVISION 1431 MLK Jr Way Oakland, CA 94612 510-823-9046 06/14/19 PLANNING APP 10/21/19 T.I. PREP ASA RESUBMIT 210/23/19 A.S.A. RESUBMIT 11/05/19 PRICING SET 12/06/19 A.S.A. RESUBMIT 2 PROPOSED FLOORPLAN 1/8" = 1'-0"1 15' INSPECTION WELL EXTRACTION WELL 15' INSPECTION WELL EXTRACTION WELL EXTRACTION WELL COAT CLOSET REALTOR POOL (E) SKYLIGHT ABOVE (SHOWN DASHED) (E) SKYLIGHT ABOVE (SHOWN DASHED) FLOOR RECEPTACLE TYP. ROOM # 01 ROOM # 03 RECEPTION ROOM # 05 LOUNGE AREA ROOM # 06 LARGE CONF. RM. ROOM # 07 OFFICE ROOM # 08 OFFICE ROOM # 09 OFFICE ROOM # 10 OFFICE ROOM # 11 EXEC. OFFICE ROOM # 12 AM BAR ROOM # 13 EXEC. OFFICERM # 15 W.C. RM # 14 W.C. ROOM # 16 LARGE CONF. RM. ROOM # 18 OFFICE ROOM # 17 EXEC. ASSIST. ROOM # 19 OFFICE ROOM # 20 OFFICEROOM # 04KITCHENROOM # 21 COMMON WORK AREA ROOM # 22 MEN'S ROOM # 23 WOMEN'SROOM # 24 PANTRY / STORAGE GARAGE / STORAGE ROOM # 26 OFFICE ROOM # 27 OFFICE ROOM # 28 OFFICE ROOM # 29 OFFICE DESIGN / BUILD POOL (11) CLASS 1 BIKE PARKING SPOTS1 X SEE A6.0 FOR ASSEMBLIES 2 A3.0 2 A3.2 2 A3.1 A SEE A5.0 FOR WINDOW SCHEDULE A B C B D E E E E F G H I J K L M N O O O OOOS Q EXISTING VIMS RISER LOCATION EXISTING VIMS RISER LOCATION RELOCATE (E) SVETS RISER PROVIDE TEMP. BRACING UNTIL WALL IS FRAMED EXISTING VIMS RISER LOCATION 2 A3.4 2 A3.4 2 A3.4 2 A3.4 T T D1 D1 D2 D1 D1 D5 D3 D3 D3 D6 D6 D6 D3 D3 D4 D2 ROOM # 31 GYM ROOM # 32LOCKER RMEXISTING VIMS RISER LOCATION EXISTING ELECTRICAL PANELSAND SWITCHGEAR TO REMAINR R S8 S8 S8 S8 S8 S8 S8 S8 S8 S8 S8 HB4 HB4 HB4 HB4 HB4 O O O D D D D D D D D DD S8S8S8S8S8S8S8S8S8S8S12S12S12S12S12S12S12S12LED TAPELED TAPE COVEC2 C2 C2 C2 LED TAPE P P P P V O O O O O O O V W W V V VV V C2 C2 C2 C2 C2 C2 C2C220'-1"20'-1"20'-1"20'-1"20'-1"4'-7"21'-4"21'-8"21'-4"21'-8" A B C E G H I D F 22'-0"1 0 1 0 0 - 1 0 1 2 0 B U B B R D.cupertino, ca 95014COMMERCIAL T.I.OWNERS: Dutchints Development LLC 5150 El Camino Real STE E20 Los Altos, CA 94022 P:650-397-5297 PROPOSED REFLECTED CEILING PLAN A 2.2 All drawings and written material herein constitute original original and unpublished work of the Architect and may not be duplicated, used or disclosed without the written consent of Architect DATE ISSUE/REVISION 1431 MLK Jr Way Oakland, CA 94612 510-823-9046 06/14/19 PLANNING APP 10/21/19 T.I. PREP ASA RESUBMIT 210/23/19 A.S.A. RESUBMIT 11/05/19 PRICING SET 12/06/19 A.S.A. RESUBMIT 2 (E) SKYLIGHT (E) SKYLIGHT RECEPTION OPEN AREA PANTRY / STORAGE COAT CLOSET SMALL CONF. RM. LARGE CONF. RM. OFFICES EXECUTIVE ASSITANT OFFICES EXEC. OFFICE EXEC. OFFICE OFFICES REALTOR POOL DESIGN / BUILD POOL GARAGE / STORAGE COMMON WORK AREA LARGE CONF. RM. WOMEN'S MEN'S LOUNGE AREA KITCHENOFFICES ELECTRICAL NOTES: 1. PROVIDE DEDICATED 20AMP CIRCUIT TO SPECIFICALLY SERVE ALL BATHROOM OUTLETS 2. THIS PLAN IS FOR LIGHT FIXTURE LOCATION ONLY. ELECTRICAL , LIGHTING , AND HEATING DESIGN BY OTHERS 4. ALL LIGHTING TO BE HIGH EFFICIENCY AND HIGH EFFICACY AND SHALL MEET THE REQUIREMENTS OF CAL ENERGY CODE S12 S8 S4 SUSPENDED 4' LED LINEAR LIGHT PEERLESS BRUNO LED SOFTSHINE BRM9L 4FT 80CRI 35K ID1500LMF 0/100 SUSPENDED 8' LED LINEAR LIGHT PEERLESS BRUNO LED SOFTSHINE BRM9L 8FT 80CRI 35K ID1500LMF 0/100 SUSPENDED 12' LED LINEAR LIGHT PEERLESS BRUNO LED SOFTSHINE BRM9L 12FT 80CRI 35K ID1500LMF 0/100 D SUSPENDED 24" LED DRUM LIGHT SLV MEDO PRO 60 7133814U R SUSPENDED 32" LED RING LIGHT SCOTT ARCHITECTURAL LIGHTING S2720-2L46 35K PT BL HB4 HIGH BAY 4' LED INDUSTRIAL LIGHT - SPEC PENDING WALL SCONCE SCOTT ARCHITECTURAL LIGHTING S3125-L14-35K-PT-BL 36" VERTICAL WALL MOUNTED LIGHT SCOTT ARCHITECTURAL LIGHTING S3A42-L24-35K-NT-SECV 24" HORIZONTAL WALL MOUNTED LIGHT SCOTT ARCHITECTURAL LIGHTING S3A43-L16-35K-NT-SEC C2 4" SQUARE RECESSED LED WALL WASH CAN LIGHT ELEMENT BY TECH LIGHTING E4S-L-W-LXWD-I-120 4" ROUND RECESSED LED CAN LIGHT HALO OR SIMLAR - SPEC PENDING W EXTERIOR LED WALL LIGHT PARKING LOT LIGHTING BEGA 44419 K4 60" O EXTERIOR LED RECESSED LIGHT EXTERIOR SOFFIT CONDITIONS - SPEC PENDING EMERGENCY "BUG-EYE" FIXTURE HARDWIRED WITH 90 MIN. BATTERY BACKUP ILLUMINATED COMBO EMERGENCY / EXIT SIGN HARDWIRED WITH 90 MIN. BATTERY BACKUP 1 0 1 0 0 - 1 0 1 2 0 B U B B R D.cupertino, ca 95014COMMERCIAL T.I.OWNERS: Dutchints Development LLC 5150 El Camino Real STE E20 Los Altos, CA 94022 P:650-397-5297 STREET FACING ELEVATIONS A 3.0 All drawings and written material herein constitute original original and unpublished work of the Architect and may not be duplicated, used or disclosed without the written consent of Architect DATE ISSUE/REVISION 1431 MLK Jr Way Oakland, CA 94612 510-823-9046 06/14/19 PLANNING APP 10/21/19 T.I. PREP ASA RESUBMIT 210/23/19 A.S.A. RESUBMIT 11/05/19 PRICING SET 12/06/19 A.S.A. RESUBMIT 221'-0"17'-0"20'-0"17'-0"EXISTING BUBB RD. ELEVATION 1/8" = 1'-0"1 PROPOSED BUBB RD. ELEVATION 1/8" = 1'-0"2 PL PL PL PL REMOVE (E) MANSARD ROOF (N) CEDAR TRELLIS AT BUBB ENTRY PROVIDE (N) MECHANICAL EQUIPMENT SCREENS AS REQUIRED , MIN. 33' BACK FROM PARAPET PROVIDE (N) STOREFRONT GLAZING REMOVE (E) MONUMENT SIGN REMOVE (E) STOREFRONT GLAZING AND TRIM PROVIDE (N) SIDEWALK AT BUBB , CONNECTED TO FRONT ENTRY 10100 FUTURE SIGNAGE , BACK-LIT, PERMITTED SEPARATELY HARDIE "REVEAL" FACADE PANEL SYSTEM OVER (E) BRICK (E) SLAB ON GRADE 0" (E) TOP OF PARAPET 17'-0" (E) SLAB ON GRADE 0" (E) TOP OF PARAPET 17'-0" HARDIE "REVEAL" FACADE PANEL SYSTEM OVER (N) PARAPET 1 0 1 0 0 - 1 0 1 2 0 B U B B R D.cupertino, ca 95014COMMERCIAL T.I.OWNERS: Dutchints Development LLC 5150 El Camino Real STE E20 Los Altos, CA 94022 P:650-397-5297 NORTH FACING ELEVATIONS A 3.1 All drawings and written material herein constitute original original and unpublished work of the Architect and may not be duplicated, used or disclosed without the written consent of Architect DATE ISSUE/REVISION 1431 MLK Jr Way Oakland, CA 94612 510-823-9046 06/14/19 PLANNING APP 10/21/19 T.I. PREP ASA RESUBMIT 210/23/19 A.S.A. RESUBMIT 11/05/19 PRICING SET 12/06/19 A.S.A. RESUBMIT 2 EXISTING NORTH ELEVATION 1/8" = 1'-0"1 PROPOSED NORTH ELEVATION 1/8" = 1'-0"2 (N) STOREFRONT GLAZING AT (E) OPENING BUBB RD. EXISTING CURB PL PL PL PL BUBB RD. EXISTING CURB CUT (N) RAIN WATER LEADERS (E) PIPES FOR SOIL VAPOR EXTRACTION SYSTEM TO REMAIN UNTIL "NO FUTHER ACTION" (NFA) DERTERMINATION FROM SDD DEH CUT (N) OPENING INTO (E) TILT UP CONCRETE WALL TO ALLOW FOR (N) SIDE ENTRY COURT WALL LUMINAIREWALL LUMINAIRE (N) 2 COAT STUCCO OVER (E) PAINTED TILT-UP CONCRETE EXTERIOR WALLS (E) SLAB ON GRADE 0" (E) TOP OF PARAPET 17'-0" (E) SLAB ON GRADE 0" (E) TOP OF PARAPET 17'-0" REMOVE (E) RAIN WATER LEADER REMOVE (E) STOREFRONT GLAZING (N) STEEL OUTRIGGERS FOR NOW WOOD TRELLIS AT SIDE ENTRY (N) TUBE STEEL TRELLIS AT BUBB ENTRYHARDIE "REVEAL" FACADE PANEL SYSTEM OVER (E) BRICK 1 0 1 0 0 - 1 0 1 2 0 B U B B R D.cupertino, ca 95014COMMERCIAL T.I.OWNERS: Dutchints Development LLC 5150 El Camino Real STE E20 Los Altos, CA 94022 P:650-397-5297 EAST FACING ELEVATIONS A 3.2 All drawings and written material herein constitute original original and unpublished work of the Architect and may not be duplicated, used or disclosed without the written consent of Architect DATE ISSUE/REVISION 1431 MLK Jr Way Oakland, CA 94612 510-823-9046 06/14/19 PLANNING APP 10/21/19 T.I. PREP ASA RESUBMIT 210/23/19 A.S.A. RESUBMIT 11/05/19 PRICING SET 12/06/19 A.S.A. RESUBMIT 2 EXISTING EAST ELEVATION 1/8" = 1'-0"1 PROPOSED EAST ELEVATION 1/8" = 1'-0"2 INFILL (E) OVERHEAD DOOR OPENINGS WITH (N) GLAZING AND CEMENTITIOUS PANELING FOR SILL , TYP. PL PL PL PL (E) PIPES FOR SOIL VAPOR EXTRACTION SYSTEM TO REMAIN UNTIL "NO FUTHER ACTION" (NFA) DERTERMINATION FROM SDD DEH FUTURE SIGNAGE , BACK-LIT, PERMITTED SEPARATELY (N) 2 COAT STUCCO OVER (E) PAINTED TILT-UP CONCRETE EXTERIOR WALLS (E) SLAB ON GRADE 0" (E) TOP OF PARAPET 17'-0" (E) SLAB ON GRADE 0" (E) TOP OF PARAPET 17'-0" REMOVE (E) GARAGE DOORS TYP. U.N.O. (N) SLATS AT (E) FENCE FOR SCREENING 1 0 1 0 0 - 1 0 1 2 0 B U B B R D.cupertino, ca 95014COMMERCIAL T.I.OWNERS: Dutchints Development LLC 5150 El Camino Real STE E20 Los Altos, CA 94022 P:650-397-5297 BUILDING SECTIONS A 3.4 All drawings and written material herein constitute original original and unpublished work of the Architect and may not be duplicated, used or disclosed without the written consent of Architect DATE ISSUE/REVISION 1431 MLK Jr Way Oakland, CA 94612 510-823-9046 06/14/19 PLANNING APP 10/21/19 T.I. PREP ASA RESUBMIT 210/23/19 A.S.A. RESUBMIT 11/05/19 PRICING SET 12/06/19 A.S.A. RESUBMIT 214'-2 3/8"EXISTING BUILDING SECTION 3/16" = 1'-0"1 PROPOSED BUILDING SECTION 3/16" = 1'-0"2 PL PL CUT OPENING IN ROOF FOR (N) SIDE ENTRY COURT, INFILL WITH WOOD TRELLIS REMOVE (E) SKYLIGHTS WOMEN'SPANTRY / STORAGE COMMON WORK AREA W/ PRIVATE OFFICES BEYOND RECEPTION W/ SMALL CONF. RM. BEYOND MECH / SOFFIT SPACE (N) STOREFRONT GLAZING AT ENTRY COURT CORRIDOR RETAIN (E) SKYLIGHT (N) TUBE STEEL HEADER , S.S.D. OUTDOOR ENTRY LIGHTS AT SOFFIT CUT (N) OPENINGS IN ROOF, EXTERIOR WALL AND SLAB ON GRADE (SHOWN HATCHED) 1 A6.1 (E) SLAB ON GRADE 0" (E) TOP OF PARAPET 17'-0" (E) SLAB ON GRADE 0" (E) TOP OF PARAPET 17'-0" 1 0 1 0 0 - 1 0 1 2 0 B U B B R D.cupertino, ca 95014COMMERCIAL T.I.OWNERS: Dutchints Development LLC 5150 El Camino Real STE E20 Los Altos, CA 94022 P:650-397-5297 BUILDING SECTIONS A 3.5 All drawings and written material herein constitute original original and unpublished work of the Architect and may not be duplicated, used or disclosed without the written consent of Architect DATE ISSUE/REVISION 1431 MLK Jr Way Oakland, CA 94612 510-823-9046 06/14/19 PLANNING APP 10/21/19 T.I. PREP ASA RESUBMIT 210/23/19 A.S.A. RESUBMIT 11/05/19 PRICING SET 12/06/19 A.S.A. RESUBMIT 236WEIGHTS & DIMENSIONS (cont.)C10589Fig. 9 − Dimensions 50HCQ 09 (Sheet 2 of 2)3'-6"EXISTING BUILDING SECTION 3/16" = 1'-0"3 PROPOSED BUILDING SECTION 3/16" = 1'-0"4 REMOVE (E) MANSARD ROOF PROVIDE (N) WOOD TRELLIS AND BEAM OVER (E) STEEL POSTS AT FRONT PATIO, S.S.D. PROVIDE (N) HARDIE "REVEAL" PANEL SYSTEM OVER (E) BRICK WALL PROVIDE (N) TEMPERED GLASS STOREFRONT LINE OF SIGHT FROM SIDEWALK ACROSS BUBB RD. PROVIDE MECHANICAL EQUIPMENT SCREEN 17'-0"24'-8"17'-0"REMOVE (E) SKYKLIGHTS (N) ENTRY AT BUBB RD.PROVIDE (N) SIDEWALK AT BUBB RD. (E) SLAB ON GRADE 0" (E) TOP OF PARAPET 17'-0" (E) SLAB ON GRADE 0" (E) TOP OF PARAPET 17'-0" PROVIDE (N) PARAPET OVER (N) STOREFRONT GLAZING FENCE EXISTING ELECTRICAL PANELS AND SWITCHGEAR TO REMAIN EXISTING ELECTRICAL PANELS AND SWITCHGEAR TO REMAIN 1 0 1 0 0 - 1 0 1 2 0 B U B B R D.cupertino, ca 95014COMMERCIAL T.I.All drawings and written material herein constitute original original and unpublished work of the Architect and may not be duplicated, used or disclosed without the written consent of Architect A.S.A. SETDATE ISSUE/REVISION 30 Caledonia Street Sausalito CA 94965 415-944-1475 1 0 1 0 0 - 1 0 1 2 0 B U B B R D.cupertino, ca 95014COMMERCIAL T.I.All drawings and written material herein constitute original original and unpublished work of the Architect and may not be duplicated, used or disclosed without the written consent of Architect A.S.A. SETDATE ISSUE/REVISION 30 Caledonia Street Sausalito CA 94965 415-944-1475 1 0 1 0 0 - 1 0 1 2 0 B U B B R D.cupertino, ca 95014COMMERCIAL T.I.All drawings and written material herein constitute original original and unpublished work of the Architect and may not be duplicated, used or disclosed without the written consent of Architect A.S.A. SETDATE ISSUE/REVISION 30 Caledonia Street Sausalito CA 94965 415-944-1475 1 0 1 0 0 - 1 0 1 2 0 B U B B R D.cupertino, ca 95014COMMERCIAL T.I.All drawings and written material herein constitute original original and unpublished work of the Architect and may not be duplicated, used or disclosed without the written consent of Architect A.S.A. SETDATE ISSUE/REVISION 30 Caledonia Street Sausalito CA 94965 415-944-1475 AV FV SECTIONELEVATION NOT TO SCALE NOT TO SCALE AV FV SECTION NOT TO SCALE AV FV FV AV FV AV FV AV FV AV FV