Loading...
Reso 1530 ASAC 10-U-89 RESOLUTION No. 1530 • OF THE PLANNING COMMISSION OF THE CITY OF CUPERTINO RECOMMENDING APPROVAL OF PRECISE LANDSCAPING, LIGHTING, FENCING, SIDEWALK, AND SIGNAGE PLAN FORA 147 UNIT 'IOWNHOME DEVELOPMENT APPLICANT: Mariani Development Corp. PROPERTY OWNER: Mariani Group of Companies APPLICANT'S ADDRESS: Four Main Street, Los Altos 94022 PROJECT lOCATION: 10930 North DeAnza Boulevard FINDINGS 1) This approval meets the requirements of Condition 38 of 10-U-89 for Phase I. 2) The landscaping is in general conformance with the proposed xeriscape guidelines. 3) The sidewalks, lighting, and fencing is in conformance with applicable city standards. 4) The signage is in conformance with Title 17 of the Cupertino Municipal Code. CONDITIONS: 1-8) Standard Architectural and Site Approval Committee conditions to the extent that they do not conflict with the special conditions list' herein. In the event of conflict, the specific conditions listPd herein shall prevail. 9) The approval is based on Exhibits L1 through L6 dated November 7, 1989, L1 through 15, L10 through 114, 117 through 119, and L26 dated March 30, 1990, 115, 116, 120, L21, and 128, dated April 23, 1990, street lighting detail dated April 23, 1990, and material and color board dated April 17, 1989, except as may be amended by the conditions contained herein. 10) Prior to issuance of building permits, the landscape plans shall be certified by a registered landscapearchitect for conformance to the eg xeriscape guidelines. 11) The location of the sidewalk and landscaping along North DeAnza Boulevard shall be modified to make a smoother transition where the sidewalk meets the curb while attempting to maintain a 10 ft. sidewalk setback as far as possible. • Resolution No. 1530 (10-U-89) April 23, 1990 Page -2- 0111 12) The soundwalls and project walls will be painted a cream color to match that of the overall development. The privacy fences shall be painted to match the individual units. The fences adjacent to the recreation and lawn area shall be constructed of wood and painted white. 13) The street lighting shall be located as indicated on Sheet L1 dated march 30, 1990 and shall be 70 watt, dome style lighting fixture as indicated on the street lighting detail. 14) The signage shall consist of two signs, one monument sign located on the southwest corner of Homestead Road and Blue Jay Drive, and the other an entry sign located in the landscape median at the entry off Blue Jay Drive (Sheet S1) . The lettering shall be 12 inches high, bronze letters with script typography. 15) The colors for the monument sign shall be desert sand framing, aquamarine tile work, and terra cotta wall fountain. The entry sign shall be painted a light and dark beige as indicated on Sheet S1. PASSED AND ADOPrrU this 23rd day of April, 1990 at a regular meeting of the Architectural and Site Approval Committee of the City of Cupertino, 4111 State of California, by the following roll call vote: AYES: Gong, Hoxie, Lim NAYS: ABSTAIN: ABSENT: Jackson ATPEST• APPROVED: PP:4W sis4115g• Thomas Robillard -2VR1 - •, •, Chairman Planner I Ar and Site Apprvl. Comm. asac/rsolou89