BLD-2019-0686InspectionRecord.pdfINSPECTION RECORD
CUPERTINO
CITY HALL
10300 Torre Avenue • Cupertino, CA 95014-3255
PHONE 408-777-3228
WWW.CUPERTINO.ORG
BUILDING ADDRESS: 7724 HUNTRIDGE LN Cupertino
APN: 359 06 045
PERMIT NO: BLD-2019-0686
OWNER'S NAME: CHU KEVIN L AND ROCHELLE F TRUSTEE
OWNER'S PHONE: Not Provided
CONTRACTOR: LAR CONSTRUCTION AND REMODELING INC, 1900 CAMDEN AVENUE #211 SAN JOSE
CONTRACTOR PHONE: 8885277545
DATE ISSUED 12/5/2019 1:51:17 PM
ISSUED BY:
VALUATION: $30000
JOB DESCRIPTION
REMODEL (2) BATHROOMS (92 SF) REV# 1 - PARTIAL RE -PIPE - COPPER FROM MAIN TO (2) BATHROOMS
INSPECTION TYPE
DATE
STATUS
INSPECTOR
ROUGH ELECTRICAL
2019-09-05
CONDITIONAL
James Lee
ROUGH PLUMBING
2019-08-29
CONDITIONAL
James Lee
ROUGH MECHANICAL
2019-09-05
CONDITIONAL
James Lee
ROUGH PLUMBING
2019-09-05
CONDITIONAL
James Lee
SHOWER PAN
2019-09-10
CONDITIONAL
James Lee
INTERIOR LATH
2019-09-10
CONDITIONAL
James Lee
ROUGH ELECTRICAL
2019-10-07
Cancelled
James Lee
ROUGH PLUMBING
2019-10-07
Cancelled
James Lee
ROUGH MECHANICAL
2019-10-07
Cancelled
James Lee
SHOWER PAN
2019-10-07
Cancelled
James Lee
ROUGH ELECTRICAL
2019-11-18
Passed
Antonio Torrez
ROUGH MECHANICAL
2019-11-18
Passed
Antonio Torrez
ROUGH PLUMBING
2019-11-18
Passed
Antonio Torrez
INTERIOR LATH
2019-11-20
Passed
Antonio Torrez
FINAL MECHANICAL
2019-12-05
Scheduled
Bob Sabich
FINAL ELECTRICAL
2019-12-05
Scheduled
Bob Sabich
FINAL PLUMBING
2019-12-05
Scheduled
Bob Sabich
FINAL BUILDING
2019-12-05
Passed
Bob Sabich
FINAL ELECTRICAL
2019-12-12
Rescheduled
FINAL MECHANICAL
2019-12-12
Rescheduled
FINAL PLUMBING
2019-12-12
Rescheduled
FINAL BUILDING
2019-12-12
Rescheduled
EVERY PERMIT ISSUED SHALL BECOME INVALID UNLESS THE WORK ON THE SITE AUTHORIZED BY SUCH PERMIT IS COMMENCED WITHIN 12 MONTHS AFTER ITS ISSUANCE, OR IF THE WORK
AUTHORIZED ON THE SITE BY SUCH PERMIT IS SUSPENDED OR ABANDONED FOR A PERIOD OF 12 MONTHS AFTER THE TIME THE WORK IS COMMENCED.