Loading...
BLD-2019-0686InspectionRecord.pdfINSPECTION RECORD CUPERTINO CITY HALL 10300 Torre Avenue • Cupertino, CA 95014-3255 PHONE 408-777-3228 WWW.CUPERTINO.ORG BUILDING ADDRESS: 7724 HUNTRIDGE LN Cupertino APN: 359 06 045 PERMIT NO: BLD-2019-0686 OWNER'S NAME: CHU KEVIN L AND ROCHELLE F TRUSTEE OWNER'S PHONE: Not Provided CONTRACTOR: LAR CONSTRUCTION AND REMODELING INC, 1900 CAMDEN AVENUE #211 SAN JOSE CONTRACTOR PHONE: 8885277545 DATE ISSUED 12/5/2019 1:51:17 PM ISSUED BY: VALUATION: $30000 JOB DESCRIPTION REMODEL (2) BATHROOMS (92 SF) REV# 1 - PARTIAL RE -PIPE - COPPER FROM MAIN TO (2) BATHROOMS INSPECTION TYPE DATE STATUS INSPECTOR ROUGH ELECTRICAL 2019-09-05 CONDITIONAL James Lee ROUGH PLUMBING 2019-08-29 CONDITIONAL James Lee ROUGH MECHANICAL 2019-09-05 CONDITIONAL James Lee ROUGH PLUMBING 2019-09-05 CONDITIONAL James Lee SHOWER PAN 2019-09-10 CONDITIONAL James Lee INTERIOR LATH 2019-09-10 CONDITIONAL James Lee ROUGH ELECTRICAL 2019-10-07 Cancelled James Lee ROUGH PLUMBING 2019-10-07 Cancelled James Lee ROUGH MECHANICAL 2019-10-07 Cancelled James Lee SHOWER PAN 2019-10-07 Cancelled James Lee ROUGH ELECTRICAL 2019-11-18 Passed Antonio Torrez ROUGH MECHANICAL 2019-11-18 Passed Antonio Torrez ROUGH PLUMBING 2019-11-18 Passed Antonio Torrez INTERIOR LATH 2019-11-20 Passed Antonio Torrez FINAL MECHANICAL 2019-12-05 Scheduled Bob Sabich FINAL ELECTRICAL 2019-12-05 Scheduled Bob Sabich FINAL PLUMBING 2019-12-05 Scheduled Bob Sabich FINAL BUILDING 2019-12-05 Passed Bob Sabich FINAL ELECTRICAL 2019-12-12 Rescheduled FINAL MECHANICAL 2019-12-12 Rescheduled FINAL PLUMBING 2019-12-12 Rescheduled FINAL BUILDING 2019-12-12 Rescheduled EVERY PERMIT ISSUED SHALL BECOME INVALID UNLESS THE WORK ON THE SITE AUTHORIZED BY SUCH PERMIT IS COMMENCED WITHIN 12 MONTHS AFTER ITS ISSUANCE, OR IF THE WORK AUTHORIZED ON THE SITE BY SUCH PERMIT IS SUSPENDED OR ABANDONED FOR A PERIOD OF 12 MONTHS AFTER THE TIME THE WORK IS COMMENCED.