Loading...
Apple Park 2019 Annual Renewable Electricity Use Report Apple Park 2019 Annual Renewable Electricity Use Report Prepared for the Director of Community Development Background Section 3.b of Exhibit DP-2 to the "Conditions of Approval-AB 900 Compliance for the Apple Campus 2 Project" requires Apple to supply 100 percent renewable energy to Apple Campus 2 Project, Phase 1 ("Apple Park") from any combination of:onsite generation; purchase through California's Direct Access program and delivered to Apple Park through the utility's transmission system and measured by the the utility's meter;or market purchase of renewable energy credits that are Green-e Energy certified. Exhibit DP-2 is attached to this report. In support of this requirement,Apple prepared this renewable electricity use report for calendar year 2019. 100 Percent Renewable Electricity Use Table 1 shows total electricity use at Apple Park from all sources of electricity supply,and it shows the percent renewable of that electricity. The table shows Apple Park operated on 100 percent renewable electricity for the reporting year. A summary table showing monthly values for each electricity source is attached to this report. Table 1 —Total Annual Renewable Electricity Use Total Percent of Total Apple Park 2019 Electricity Electricity Renewable Renewable Use that is Electricity Percent (kwh) Renewable (kwh) Onsite Generation-Rooftop PV 17031,448 100% 17,031,448 Onsite Generation-Fuel Cells 19,626,589 100% 19,626,589 Direct Access Electricity Supplied 29,998,256 100% 29,998,256 via the Utility Meter Green-e Energy REC Purchase 0 0 Total: 66,656,293 66,656,293 100% Total electricity use at Apple Park is the sum of: • electricity generated onsite and connected directly to Apple Park without being measured by a utility meter and Annual Renewable Electricity Use Report—2019 2 • electricity supplied by California's Direct Access program connecting to Apple Park through the utility meter. Total renewable electricity use at Apple Park is the sum of: • electricity generated onsite and connected directly to Apple Park without being measured by a utility meter multiplied by the percent renewable of that generation; • Direct Access electricity supplied to Apple Park multiplied by the percent renewable of that supply; and • purchase of Green-e Energy certified renewable energy certificates (RECs). Documentation of Direct Access supplied renewables is shown in the WREGIS REC tracking system summary table,which is attached to this report. The RECs shown in the WREGIS table were generated from the 130-megawatt California Flats solar PV project. • Apple owns these RECs through a 25-year power purchase agreement for all electricity and RECs generated by that project. The WREGIS table only includes REC generated during the first eight months of 2019;the WREGIS system takes four months or longer to verify and create RECs. However,the REC quantity in the WREGIS table exceeds the Direct Access electricity quantity shown in Table 1 because the WREGIS table includes RECs for Apple Park and for other Apple buildings in the Cupertino area. Attachments Attachment 1 Exhibit DP-2 of the AB900 Conditions of Approval Attachment 2 Summary table of monthly electricity use supplied from onsite generation and via Direct Access Attachment 3 WREGIS tracking system summary table for 2019 RECs generated from the California Flats solar PV project and delivered to Apple via Direct Access I. Annual Renewable Electricity Use Report—2019 3 Attachment 1 Exhibit DP-2 of the AB900 Conditions of Approval EXHIBIT DP-2 CONDITIONS OF APPROVAL-AB 900 COMPLIANCE APPLE CAMPUS 2 PROTECT J. NO NET ADDITIONAL GREENHOUSE GAS EMISSIONS For the AB 900 Compliance Conditions of Approval that ensure that the project meets the no net additional greenhouse gas emissions standard, the Community Development Director may allow deviations and alterations, provided that the applicant/property owner establishes to the satisfaction of the Community Development Director that,based on substantial evidence, the project continues to meet the no net additional greenhouse gas emission standard. 2. LEED—SILVER OR EOUIVALENT Pursuant to Chapter 16.58, Green Building Standards Code Adopted, of the Cupertino Municipal Code, the project shall meet the requirements for Leadership in Energy and Environmental Design (LEED) Silver certification or an equivalent, at a minimum, as identified in the Ordinance.Apple shall develop a LEED Silver certification program plan which shall be subject to review and approval by the Director of Community Development prior to issuance of building permits.Prior to occupancy,the City will hire a third-party independent consultant, at Apple's expense, to make a finding that Apple's LEED program plan meets the requirements of LEED Silver and any then applicable requirement of the Governor's Guidelines for Streamlining Judicial Review Under the California Environmental Quality Act("Guidelines"). 3. ENERGY a. ENERGY EFFICIENCY Apple shall reduce energy use through energy-efficient green building design of lighting,heating, cooling and ventilation systems to reduce building system energy use by at least 30 percent compared to typical commercial development. Energy- efficient building systems, such as the following; shall be incorporated into the project design: high-efficiency radiant conditioning systems, light-emitting diode (LED) electric lighting, and natural ventilation. Apple shall submit an energy efficiency plan for review and approval to the Director of Community Development prior to issuance of the first building permit. Apple shall fund the cost of an independent consultant selected by the City to review and report on the energy efficiency plan so that the Director of Community Development may verify that the building design will reduce building systems energy use by at least 30 percent compared to typical commercial development. b. RENEWABLE ENERGY 100 percent of the project's overall energy needs shall be provided by renewable energy. Based on Apple's current proposal, Apple shall: (a) install at least 650,000 square feet of photovoltaics on building roofs and the parking garage canopy that will have a capacity of at least 12 megawatts;(b)construct at least a 6-megawatt fuel cell installation on-site that will be powered by 100-percent directed biogas; and (c) AB 900 CONDITIONS • Page DP-2-2 obtain the remainder of the project's energy needs from the State of California Direct • Access Program,off-site Apple-owned renewable energy projects or grid-purchased renewable energy. For the on-site energy production, the amount of renewable energy may be scaled to the phase of development. Apple shall acquire grid- purchased renewable energy from the following sources: (1) participation in California's regulated Direct Access program;and(2)market purchase of renewable energy credits that are Green-e Energy certified. The specific Energy Service Providers and sources used to supply renewable energy for the project may be determined closer to the time of project completion. Apple shall submit specifications for the energy systems for review and approval to the Director of Community Development prior to issuance of building permits. The Director of Community Development may approve deviations in the design of the energy systems from those specified above provided that the applicant/property owner establishes to the satisfaction of the Community Development Director that, based on substantial evidence, the project's overall energy needs axe provided by renewable energy. Apple shall submit an annual report to the Director of Community Development by February 15th of each year documenting compliance with this renewable energy condition for the prior calendar year, including total energy use and total energy credits for the reporting period supported by documentation from Direct Access and Green-e Energy certified sources sufficient to allow the Director of Community Development to make the determination that 100 percent of the project's overall energy needs are being provided by renewable energy. Due to the timing of the Green-e Energy certification process, which may take up to six months after the end of the calendar year, the Green-e Energy certification documentation may be provided in a supplemental filing to occur within 30 days of completion of the Green-e Energy certification process.The annual report shall indicate an approximate date of submittal for the Green-e Energy certification documentation,which shall be no later than August lei of each year. 4. PARKING AND TRANSPORTATION In order to reduce peak hour trips, Apple shall implement an enhanced Transportation Demand Management(TDM)program as required by Mitigation Measure TRANS 9b and the details of Mitigation Measure TRANS-9b set forth in the TDM Program Expansion on pages 441-447 and Figure VI-11 of the Draft EIR, all of which are incorporated into these Conditions of Approval (see Condition 3 - MITIGATION MONITORING AM) REPORTING PROGRAM in Development Permit(DP-2011-04)Resolution). 5. CONSTRUCTION a. DIRECT ACCESS For each year during the construction period, Apple shall demonstrate to the Community Development Director that it has fully offset the project construction emissions by participation in California's Direct Access program for supplying renewable power to Apple-owned buildings located in the City. 2 AB 900 CONDITIONS Page DP-2-3 - b. PHASE 1 PROTECT GHG EMISSIONS Mitigation of all Phase 1 project GHG emissions from construction shall occur contemporaneously with construction of the project. 6. ENVIRONMENTAL SUSTAINABILITY MEASURES The project shall install 300 electric vehicle charging stations on the project site. The parking lot shall also be configured to allow for up to 1,000 electric vehicle charging stations to be installed. 7. WATER SUPPLY The project shall reduce water use by 30 percent compared to typical commercial development through use of low-flow fixtures and drought-tolerant landscaping. Apple shall submit a water supply plan for review and approval by the Director of Community Development prior to building permit issuance. 8. WASTE MANAGEMENT a. OPERATIONAL WASTE DIVERSION RATE The project shall achieve and maintain a diversion rate of at least 50 percent. b. CONSTRUCTION AND DEMOLITION WASTE DIVERSION RATE A minimum of 75 percent of construction and demolition waste shall be diverted from landfills,to the satisfaction of the City. 9. BINDING AND ENFORCEABLE AGREEMENT As required by Public Resources Code Section 21182(d), the April 12, 2012 agreement between Apple, Inc,, signed by SVP and Chief Financial Officer Peter Oppenheimer, and the City of Cupertino, acknowledged and agreed to by Aarti Shrivastava, Community Development Director, constitutes a binding and enforceable agreement by Apple that all mitigation measures required pursuant to the California Environmental Quality Act to certify the project under the Jobs and Economic Improvement Through Environmental Leadership Act of 2011 shall be conditions of approval of the project, and shall be fully enforceable by the City of Cupertino or its designees; and that all adopted mitigation measures shall be monitored and enforced by the City of Cupertino on an ongoing basis for the life of theobligation to implement or com 1 with the mitigation perform, comply measures. As required by Public Resources Code Section 21183(e), the binding and enforceable agreement furtherprovides that Apple agrees to paythe costs of the Court of � PP �' Appeal in hearing and deciding any case, including payment of court costs for the appointment of a special master if deemed appropriate by the court,in a form and manner specified by the Judicial Council,as provided in the Rules of Court adopted by the Judicial Council pursuant to subdivision (f) of Section 21185 of the Public Resources Code. As required by Public Resources Code Section 21182(f), the binding and enforceable agreement also provides that Apple agrees to pay the costs of preparing the administrative record for the project concurrent with review and consideration of the project puxsuant to CEQA, in a form and manner specified by the City of Cupertino for 3 AB 900 CONDITIONS Page DP-2-4 the project. Apple shall perform all obligations set forth in the April 12,2012 binding and enforceable agreement. 4 Annual Renewable Electricity Use Report—2019 4 Attachment 2 Summary table of monthly electricity use supplied from onsite generation and via Direct Access • Building Electricity Generation Source Calendar 2019 Use 2019-01 2019-02 2019-03 2019-04 - 2019-05 2019-06 2019-07 2019-08 2019-09 2019-10 2019-11 2019-12 Total kWh kWh kWh kWh kWh kWh kWh kWh kWh kWh kWh kWh kWh Apple Park Direct Access Electricity 2,714,515 2,952,723 2,424,497 2,485,205 2,188,139 2,483,618 2,003,512 2,125,273 2,611,061 2,809,713 2,600,000 2,600,000 29,998,256 Apple Park Fuel Cell 1,544,000 1,208,000 1,508,000 1,169,482 1,189,316 1,201,400 1,350,600 2,068,995 2,595,896 2,451,794 1,523,487 1,815,619 19,626,589 Apple Park Rooftop PV 712,766 933,042 1,366,487 1,693,008 1,482,856 1,681,512 2,371,909 2,389,718 1,693,671 1,229,350 752,775 724,352 17,031,448 66,656,293 Annual Renewable Electricity Use Report—2019 5 Attachment 3 WREGIS tracking system summary table for 2019 RECs generated from the California Flats solar PV project and delivered to Apple via Direct Access : 'l�■ E Certificates in Active Subaccount Printed Date: 2/13/2020 12:05:03 PM Generator Certificate Green-a SubAccount WREGIS Fiant-Unit County State Fuel Vintage Vintage Serial Quantity AZ BC CA CO MT NV NM TX WA OR AB UT Energy Ecologo Hydro SMUD eTag eTag GU ID Name TYFr Month Year Numbers Eligible Certified Certification Eligible Matched CA Flats I F 5594•CA- I i § California § i ` .1 Not Not Contact I Not r Not j Not —�_—�`No[ Not ' W5594 130-CA Monterey1 CA Solar 1 2019 327139-1 15,533 1 No I( No No i No No No No ; No No Flats ! !--- i Declared Declared 'CK I Declared ' Declared , Declared § Declared : Declared _ t i Flats 1 A # CA Solar [0 15533 I „- -I, �7I I �_._�— _,_. # . California i CA Flats { 5594-CA- 1 § i ! 1 ._e W5594 Monterey 2 1 2019 331517-1 17,737 Not ! Not Contact No f No Not j Not ' No No[ No No[ N0 i Not No € No No No Flats0 I [0 17737 Declared Declared CK I Declared I Declared Declared I Declared Declared 1 , CA Flats 5594-CA- 1(California ! Not 1 Not I Contact § Nat Not No[ No[ Not W5594 § 130-CA 1 Monterey CA Solar 3 i 2019 334674-1 26,812 1 No No No ` No No I No No No No Flats Declared Declared CK I Declared Declared § Declared Declared Declared __.__... I Flats 130 I I to 26812 j ___I--___I _._! I + _§ I ._ I—CA Flats t I 5594-CA- § i __�_.� { _ i �_� _..___ § California f § Not Not Contact No[ i Not Not Not Not i t Flats W5594 130-CA Monterey I CA 1 Solar}4 2019 338438-1 33,875# Declared Declared CEC No No Declared i Declared No Declared '' No I No No I No + No + Declared t Declared§ tt I E Flats 130 I—_ l— t to 33875 1 I I �- __§— I I _ i —�__ _--_I i i t 11I CA Flats I 5594-CA- I ° I i i ! Califomla W5594 ; 130-CA t Monterey CA Solar 15 2019 342516-1 32,998 Not NotDec Contact No No Not 1 NotDec No Dec I No Not No I Not ! No j Ne I No No j Flats tt Declared Declared CEC 1 Declared Declared Declared 1 Declared Declared @ 1 I Flats 130 9 1 i to 32998 � — • i 1 I - California CA Flats { 1 5594-CA- § Not t§ Not Contact § 1 Not ` Not I No[ I No[ No[ t ( j I t W5594 1130-CA ; Monterey {CA Solar 1 6 2019 346661-1 42,120 Declared i Declared CK No Na! No No No 1 Na 1 No No I No Flats Flats 130 i ` § t°42120 i 111 Declared I Declared § Declared Declared Declared I — ' CA Flats 1 5594-CA- ; § i Not 1 Not Not I 'Not i i I I California ( No[ No[ Contact 1 No[Flats W5594 130-CA Monterey CA Solari 7 2019 '.350936-1 43,989 Declared ( Declared CK No No Declared Declared I — ! Declared — Declared 1 — Declared I No — i No No Flats 130 i ( f Ito 43989 § 3 _i__ I 1 CA Flats gg 5594-CA- I I , 1 California W5594 130-CA I Monterey§CA 1 Solar!8 { 2019 355259-1 1 40,818§ Not I Not Contact No No Not I Not No I Not No Not No Not No i No I No j No Flats Y Declared Declared CK Declared Declared ! Declared Declared Declared I 1 Flats 130 ' 1 to 40818 !( CA Flats - 5594-CA- 1 Contact i 1 Not Not f Not Not I } —r California 1 i Not 4 Not 111 W5594 , 130-CA MontereyCA 1 Solar 9 2019 359747-1 32,963 � No 1 No{ cl _ — Declared !Declared N° 1 No ! No No --`—'_ Flats 130 5594 CA- ---- r— § ! of to 32963 ! 1 Not ( Not 1 II Flats t Not Not I Contact No[ • N Not I No , 1 No! N Declared Declared I DC-C Declared Declared Declared CA Flats i ( t 1 1 t California I W5594 1130-CA 1 Monterey i CA ' Solar 10 2019 366776-1 27,711 1 No No 1 I No No i No °t I No ; No ! No , No Flats Declared §Declared CEC , Declared Declared Declared Declared Declared f Flats 130 1 c°vn1 1 I I 1 i _.._-._ _ __ .. a—.._ ,._�..—_. _-L. I § 1314556 (._.._ _..... . i i i —.;t...— i I _._ . 1..._ �_..�. § _.tom_.,_. Page 1 of 1