Loading...
Administrative Hearing Reso #114, TR-2019-032, 01-09-2020TR-2019-032 CITY OF CUPERTINO 10300 Torre Avenue Cupertino, California 95014 RESOLUTION NO. 114 OF THE ADMINISTRATIVE HEARING OFFICER OF THE CITY OF CUPERTINO APPROVING A TREE REMOVAL PERMIT TO ALLOW THE REMOVAL AND REPLACEMENT OF TWENTY-FIVE PROTECTED TREES LOCATED AT 19900 STEVENS CREEK BLVD. SECTION I: PROJECT DESCRIPTION Application No.: TR-2019-032 Applicant: Nathan Ung Location: 19900 Stevens Creek Blvd. (APN 369-05-038) SECTION II: FINDINGS TREE REMOVAL PERMIT: WHEREAS, the City of Cupertino received an application for a Tree Removal permit as described in Section I of this Resolution; and WHEREAS, the necessary public notices have been given as required by the Procedural Ordinance of the City of Cupertino, and the Administrative Hearing Officer has held at least one public meeting in regard to the application; and WHEREAS, pursuant to the provisions of the California Environmental Quality Act of 1970 (Public Resources Code section 21000 et seq.) (“CEQA”), together with the State CEQA Guidelines (California Code of Regulations, Title 14, Section 15000 et seq.) (hereinafter, "CEQA Guidelines"), the City staff has independently studied the proposed Project and has determined that the Project is exempt from environmental review pursuant to the categorical exemption in CEQA Guidelines section 15301 and 15332 for the reasons set forth in the staff report dated January 9, 2020 and incorporated herein; and WHEREAS, the applicant has met the burden of proof required to support said application; and WHEREAS, the Administrative Hearing Officer finds as follows with regard to this application: Resolution No. 114 TR-2019-032 January 9, 2020 Page 2 1. That the trees are irreversibly diseased, are in danger of falling, can cause potential damage to existing or proposed essential structures, or interferes with private on- site utility services and cannot be controlled or remedied through reasonable relocation or modification of the structure or utility services; The trees proposed for removal are either in conflict with the proposed site improvements, not suitable for preservation or relocation, or have an existing canopy form that would be hazardous under strong winds. These have been documented by an ISA certified arborist. NOW, THEREFORE, BE IT RESOLVED: That after careful consideration of the maps, facts, exhibits, testimony, staff’s report and presentation, and other evidence submitted in this matter, subject to the conditions which are enumerated in this Resolution beginning on PAGE 2 thereof: The application for a Tree Removal permit, Application no. TR-2019-032 is hereby approved and that the subconclusions upon which the findings and conditions specified in this resolution are based and contained in the Public Meeting record concerning Application no. TR-2019-032 as set forth in the Minutes of the Administrative Hearing Meeting of January 9, 2020 and are incorporated by reference as though fully set forth herein. SECTION III: CONDITIONS ADMINISTERED BY THE COMMUNITY DEVELOPMENT DEPT. 1. APPROVED EXHIBITS Approval is based on the arborist review dated November 4, 2019, consisting of 33 pages and the plan set drawn by M/A Design Group and HMH titled “Charles Dunn 19900 Stevens Creek Blvd. Building Remodel and Renovations” consisting of forty- five (45) sheets, except as may be amended by conditions in this resolution. 2. ACCURACY OF PROJECT PLANS The applicant/property owner is responsible to verify all pertinent property data including but not limited to property boundary locations, building setbacks, property size, building square footage, any relevant easements and/or construction records. Any misrepresentation of any property data may invalidate this approval and may require additional review. 3. CONCURRENT APPROVAL CONDITIONS The conditions of approval contained in file nos. DP-2019-001 and ASA-2019-006 shall be applicable to this approval. Resolution No. 114 TR-2019-032 January 9, 2020 Page 3 4. FINAL PLANTING PLAN The applicant shall plant replacement trees in accordance with the replacement requirements of the Protected Tree Ordinance. The trees shall be planted prior to final occupancy of site permits. The final planting plan shall be reviewed and approved by the Director of Community Development prior to issuance of building permits. The Director of Community Development shall have the discretion to require additional tree replacements as deemed necessary. An ISA Certified Arborist shall confirm that the replacement trees were planted properly and according to plan prior to final occupancy. 5. TREE REPLACEMENTS The applicant is required to plant replacement trees in accordance with the Protected Tree Ordinance and per the approved replacement plan. 6. TREE PROTECTION As part of the demolition or building permit drawings, a tree protection plan shall be prepared by a certified arborist for the trees to be retained. In addition, the following measures shall be added to the protection plan: a. For trees to be retained, chain link fencing and other root protection shall be installed around the dripline of the tree prior to any project site work. b. Signs indicating the protected status of the tree shall be installed on the protective fencing. c. Tree protection conditions shall be posted on the tree protection fencing. d. No parking or vehicle traffic shall be allowed under root zones, unless using buffers approved by the Project Arborist. e. No trenching within the critical root zone area is allowed. If trenching is needed in the vicinity of trees to be retained, the City’s consulting arborist shall be consulted before any trenching or root cutting beneath the dripline of the tree. f. Wood chip mulch shall be evenly spread inside the tree projection fence to a four- inch depth. g. Retained trees shall continue to be irrigated or hand-watered to maintain them in good health. The tree protection measures shall be inspected and approved by the certified arborist prior to issuance of building permits. The City’s consulting arborist shall inspect the trees to be retained and shall provide reviews prior to issuance of demolition, grading or building permits. Additionally, a report ascertaining the good health of the trees mentioned above shall be provided prior to issuance of final occupancy. Any trees identified to be in poor health or Resolution No. 114 TR-2019-032 January 9, 2020 Page 4 incongruent with the site-wide tree replacement plan in the report shall be required to be removed and replaced. 7. TREE AND LANDSCAPE MAINTENANCE The property owner shall be responsible for ensuring that the existing trees and newly planted trees are properly maintained including but not limited to ensuring that there is adequate soil drainage, that the soil is well-aerated, and irrigation systems are thoroughly tested to provide sufficient water to landscaped areas while reducing water waste. 8. DISCLOSURE OF PROTECTED TREES AND COVENANT The property owner/applicant understands that the replacement trees may not be removed without a Tree Removal Permit and that they shall be responsible for ensuring the ongoing proper maintenance and care of the trees. The location and species of all replacements trees on site shall be disclosed upon sale of the property. In addition, a covenant shall be recorded on the property that identifies all the protected trees, prior to final occupancy. 9. CONSULTATION WITH OTHER DEPARTMENTS The applicant is responsible for consulting with other departments and/or agencies with regard to the proposed project for additional conditions and requirements. Any misrepresentation of any submitted data may invalidate an approval by the Community Development Department. 10. INDEMNIFICATION To the fullest extent permitted by law, the applicant shall indemnify, defend with the attorneys of the City’s choice, and hold harmless the City, its City Council, and its officers, employees, and agents (collectively, the “indemnified parties”) from and against any liability, claim, action, cause of action, suit, damages, judgment, lien, levy, or proceeding brought by a third party against one or more of the indemnified parties or one or more of the indemnified parties and the applicant related to this Resolution/Action Letter, the related entitlements, or any permit or approval authorized hereby for the project, including (without limitation) reimbursing the City its actual attorneys’ fees and costs incurred in defense of the litigation. The applicant shall pay such attorneys’ fees and costs within 30 (thirty) days following receipt of invoices from City. Such attorneys’ fees and costs shall include amounts paid to the City’s outside counsel and shall include City Attorney time and overhead costs and other City staff overhead costs and any costs directly related to the litigation reasonably incurred by City. The applicant shall likewise indemnify, defend, and hold harmless the indemnified parties from and against any damages, attorneys’ fees, or Resolution No. 114 TR-2019-032 January 9, 2020 Page 5 costs awards, including attorneys’ fees awarded under Code of Civil Procedure section 1021.5, assessed or awarded against the indemnified parties. 11. NOTICE OF FEES, DEDICATIONS, RESERVATIONS, OR OTHER EXACTIONS The Conditions of Project Approval set forth herein may include certain fees, dedication requirements, reservation requirements, and other exactions. Pursuant to Government Code Section 66020(d) (1), these Conditions constitute written notice of a statement of the amount of such fees, and a description of the dedications, reservations, and other exactions. You are hereby further notified that the 90-day approval period in which you may protest these fees, dedications, reservations, and other exactions, pursuant to Government Code Section 66020(a), has begun. If you fail to file a protest within this 90-day period complying with all of the requirements of Section 66020, you will be legally barred from later challenging such exactions. PASSED AND ADOPTED this 9th day of January 2020 at a noticed Public Meeting of the Administrative Hearing Officer of the City of Cupertino, State of California, held by the Director of Community Development, or his or her designee, pursuant to Cupertino Municipal Code Section 19.12.120. ATTEST: APPROVED: /s/Ellen Yau /s/Albert Salvador Ellen Yau Albert Salvador Associate Planner Assistant Director of Community Development