Reso 120840
•
I•
RESOIZJ'TION NO. 1208
OF TIE ARCEIITECI'URAL AND SITE APPROVAL CCMMPITEE
OF THE CITY OF CUPERTINO RECONMMING APPROVAL A FENCING
AND SITE ENTRY ARCHITECTURE FOR AN EXISTING INDUSTRIAL COMPLEX
PROPERTY OWNER: Measurex Corporation
APPLICANT: Peter Duxberry Associates
ADDRESS: One Results Way
Cupertino, CA. 95014
LOCATION: Bubb Road at McClellan Road
The Architectural and Site Approval C=nttee finds as follows with regard
to this application:
1) That the proposed entry concept for the existing industrial site is
consistent with the colors and materials established for the
MeaSUreX Employee Center building which constitutes a principal
design focus of the complex.
2) That the proposed wood fence adjacent to the Imperial Avenue
frontage is consistent with the intent of the Monta Vista Design
Guidelines.
CONDITIONS:
1-8) Standard Architectural and Site Approval Conditions to the extent
that they do not conflict with the special conditions listed herein.
In the event of conflict, the specific conditions listed herein
shall prevail.
9) The recommendation of approval is based on Exhibits A-1 lst Rev.,
A-2, B, B-1 and B-2 of Application ASAC 51,638.1, except as may be
amended by conditions contained herein.
PASSED AND ADOPTED this 28th day of April, 1986, at a Regular Meeting of
the Architectural and Site Approval Committee of the City of Cupertino,
State of California, by the following roll -call vote:
AYES: MEMBERS: Mann, Jackson, Miller, Chr. Nobel
NAYS: MEMBERS: None
ABSTAIN: MEMBERS: None
ATTEST:
Robert Cowan
Planning Director
APPROVED:
L 144 & C,
Deborah Nobel, Chairwoman
Arch. and Site Apprvl. Committee
- 1 -