July 9, 1984ASAC-352
SUMMARY MINUTES OF THE REGULAR MEETING OF THE ARCHITECTURAL AND SITE
APPROVAL COMMITTEE OF JULY 9, 1984. MEETING HELD IN THE CONFERENCE
ROOM 106 OF CITY HALL, CUPERTINO, CALIFORNIA 95014.
The Meeting_ was called to order at 7:00 p.m. by Vice -Chairman Martin
Miller who led the Pledge of Allegiance.
ROLL CALL:
Present: Committee Members Morrison (arrived at 7:05 p.m.), Nobel
Rooker and Vice -Chairman Miller
Absent: Chairman Roger Higdon
Staff Present: Steve Piasecki, Associate Planner
APPROVAL OF MINUTES: Minutes of the regular meeting of June 25, 1984
were approved as published.
CONSENT CALENDAR:
Note: Item Number 5 was moved onto the Consent Calendar.
Item 1) Application _HC=511415_21_- Mervyn_s__Cupertino_ Crossroads__
----------
(Gene Barbour/Ad-Art Inc.) - Request approval of minor
---------------------
changes in the Sign Program previously approved by ASAC.
• The property is located at the southwest corner of Stevens
Creek Boulevard and De Anza Boulevard.
Item 5) Application _HC_�Im929_1=BAS Homess,__Inc_ - Site and
architecture for single-family homes located on Avenida Lane
approximately 400 ft. west of Alcalde Avenue.
Consent Calendar was approved unanimously by those present,
Committee Members Nobel, Rooker and Vice -Chairman Miller.
INFORMAL REVIEW OF USE PERMIT APPLICATIONS:
Item 2) Application 12-U-84 -_HW & Associates Investment Company -
---------- ------------------------------
Use Permit to construct 16 townhouses. The property is
located on the south side of Olive Avenue, 150 ft. west of
Imperial AVenue in the Monta Vista neighborhood.
Presentation: Bruce G. Johnson, representing applicant
After some discussion relating to adequacy of the parking,
the Committee made the following comments:
Project should provide permanent landscaping in the
private yard areas to buffer the site from the
adjoining industrial areas and provide privacy
• screening from the neighboring residential areas.
1
A. S. A. C. Minutes of July 9, I
------------------------------
ASAC-35.22- „
- Good quality roof ma
- The Committee favo
requests the applica
issuance of -building
rial is important.
a consistent building color and
to return informally prior to I;
ermi ts. ;
Item 3) ARplication 13-_U_-_S_4- _DonL_ Deck Associates Inc. - Use ,
Permit. to construct a professional office building to be
located on the southeast corner of Cupertino Road and
Foothill Boulevard.
(Moved to the end of thb Agenda as the applicant was not !':
present.)
it
NEW,BUSINESS:
�r
Item 4) Agclication HC-51.339_3_ - De Anza Centre (Gene
----------------------Anza------------Gene
Rarb_ourlAd__ArtInc_) - Revised Sign Program and informal
review of landscaping and ;trash enclosures for the De Anza
Centre. The property is located on the east side of De Anza I�IIY
Boulevard, approximately 400 f t . north of Ballinger Road.
("Coco's Center")
The Committee determined t'he following:
- Location and design of trash enclosures to be approve$;,I!
by staff at the building permit level.
- Landscaping to re
details of the plant
- Revised Sign Progr
following conditions
to the Committee with more
eri al type and location.
was approved subject to the
- A. The ground sign is to be reduced in height such
that the soffit of the roof element on the sign ii '�
aligns with the height -of the soffit on the ilj
adjacent "Coco's" Restaurant building. '!
+jl
- B. The sign width is to be reduced to reflect the
appropriate i proportions subject to staff
approval at the building permit level.
Vote: Ayes - Committee Member Nobel, Rooker and
Vice-ChairmanMiller
Nays - Committee Member Morrison
Item 5) A €scation Hr-1�99.1 $AS Homes - Site and architecture for single--f ami 1 y homes located on Avenida Lar? ' )I�:
approximately 400 f t. west of Al cal de Avenue.
(Moved under Consent Calendar)
2
A. S. , A. C. Mi nutes of Jul y 9, 1984
qr
-----------------------------------
ASAC-352
Item b) ApplicationHC-51.598_1= Nick __Papaggorgiou - Site,
architecture, landscaping, lighting and signing for an
office building located on the south side of Homestead Road
approximately 450 ft. west of Stel 1 i ng Road.
Presentation: Tom Dowdakin, representing the applicant
The Committee expressed concern about the compatibility of
the building with surrounding office buildings and shopping
center
The applicant illustrated a revised elevation sketch
illustrating a mansard roof on the proposed structure. The
applicant was asked to return with modified architectural
drawings illustrating a more interesting building morphology
which is compatible with surrounding structures.
Item 3) Application 13-U-84 - Don L. Beck Associates _Inc_ Use
---------------------------------------
Permit to construct a professional office building to be
located on the southeast corner of Cupertino Load and
Foothill Boulevard.
(Moved to the end of the Agenda)
The Committee had no special concerns or comments. The
is Committee requested the applicant return with building
colors and final landscaping prior to issuance of building
permits for informal review.
Mr. Byer, applicant for item #4 indicated he will redesign
sign and return to Committee for change of approval.
ADJOURNMENT:
Having concluded its business, the Committee adjourned at 8:50 p.m to
the next regular meeting of July 23, 1984.
ATTEST:
/s/ Dorothy Cornelius
City Clerk
APPROVED:
sl Martin Miller