Loading...
July 9, 1984ASAC-352 SUMMARY MINUTES OF THE REGULAR MEETING OF THE ARCHITECTURAL AND SITE APPROVAL COMMITTEE OF JULY 9, 1984. MEETING HELD IN THE CONFERENCE ROOM 106 OF CITY HALL, CUPERTINO, CALIFORNIA 95014. The Meeting_ was called to order at 7:00 p.m. by Vice -Chairman Martin Miller who led the Pledge of Allegiance. ROLL CALL: Present: Committee Members Morrison (arrived at 7:05 p.m.), Nobel Rooker and Vice -Chairman Miller Absent: Chairman Roger Higdon Staff Present: Steve Piasecki, Associate Planner APPROVAL OF MINUTES: Minutes of the regular meeting of June 25, 1984 were approved as published. CONSENT CALENDAR: Note: Item Number 5 was moved onto the Consent Calendar. Item 1) Application _HC=511415_21_- Mervyn_s__Cupertino_ Crossroads__ ---------- (Gene Barbour/Ad-Art Inc.) - Request approval of minor --------------------- changes in the Sign Program previously approved by ASAC. • The property is located at the southwest corner of Stevens Creek Boulevard and De Anza Boulevard. Item 5) Application _HC_�Im929_1=BAS Homess,__Inc_ - Site and architecture for single-family homes located on Avenida Lane approximately 400 ft. west of Alcalde Avenue. Consent Calendar was approved unanimously by those present, Committee Members Nobel, Rooker and Vice -Chairman Miller. INFORMAL REVIEW OF USE PERMIT APPLICATIONS: Item 2) Application 12-U-84 -_HW & Associates Investment Company - ---------- ------------------------------ Use Permit to construct 16 townhouses. The property is located on the south side of Olive Avenue, 150 ft. west of Imperial AVenue in the Monta Vista neighborhood. Presentation: Bruce G. Johnson, representing applicant After some discussion relating to adequacy of the parking, the Committee made the following comments: Project should provide permanent landscaping in the private yard areas to buffer the site from the adjoining industrial areas and provide privacy • screening from the neighboring residential areas. 1 A. S. A. C. Minutes of July 9, I ------------------------------ ASAC-35.22- „ - Good quality roof ma - The Committee favo requests the applica issuance of -building rial is important. a consistent building color and to return informally prior to I; ermi ts. ; Item 3) ARplication 13-_U_-_S_4- _DonL_ Deck Associates Inc. - Use , Permit. to construct a professional office building to be located on the southeast corner of Cupertino Road and Foothill Boulevard. (Moved to the end of thb Agenda as the applicant was not !': present.) it NEW,BUSINESS: �r Item 4) Agclication HC-51.339_3_ - De Anza Centre (Gene ----------------------Anza------------Gene Rarb_ourlAd__ArtInc_) - Revised Sign Program and informal review of landscaping and ;trash enclosures for the De Anza Centre. The property is located on the east side of De Anza I�IIY Boulevard, approximately 400 f t . north of Ballinger Road. ("Coco's Center") The Committee determined t'he following: - Location and design of trash enclosures to be approve$;,I! by staff at the building permit level. - Landscaping to re details of the plant - Revised Sign Progr following conditions to the Committee with more eri al type and location. was approved subject to the - A. The ground sign is to be reduced in height such that the soffit of the roof element on the sign ii '� aligns with the height -of the soffit on the ilj adjacent "Coco's" Restaurant building. '! +jl - B. The sign width is to be reduced to reflect the appropriate i proportions subject to staff approval at the building permit level. Vote: Ayes - Committee Member Nobel, Rooker and Vice-ChairmanMiller Nays - Committee Member Morrison Item 5) A €scation Hr-1�99.1 $AS Homes - Site and architecture for single--f ami 1 y homes located on Avenida Lar? ' )I�: approximately 400 f t. west of Al cal de Avenue. (Moved under Consent Calendar) 2 A. S. , A. C. Mi nutes of Jul y 9, 1984 qr ----------------------------------- ASAC-352 Item b) ApplicationHC-51.598_1= Nick __Papaggorgiou - Site, architecture, landscaping, lighting and signing for an office building located on the south side of Homestead Road approximately 450 ft. west of Stel 1 i ng Road. Presentation: Tom Dowdakin, representing the applicant The Committee expressed concern about the compatibility of the building with surrounding office buildings and shopping center The applicant illustrated a revised elevation sketch illustrating a mansard roof on the proposed structure. The applicant was asked to return with modified architectural drawings illustrating a more interesting building morphology which is compatible with surrounding structures. Item 3) Application 13-U-84 - Don L. Beck Associates _Inc_ Use --------------------------------------- Permit to construct a professional office building to be located on the southeast corner of Cupertino Load and Foothill Boulevard. (Moved to the end of the Agenda) The Committee had no special concerns or comments. The is Committee requested the applicant return with building colors and final landscaping prior to issuance of building permits for informal review. Mr. Byer, applicant for item #4 indicated he will redesign sign and return to Committee for change of approval. ADJOURNMENT: Having concluded its business, the Committee adjourned at 8:50 p.m to the next regular meeting of July 23, 1984. ATTEST: /s/ Dorothy Cornelius City Clerk APPROVED: sl Martin Miller