Loading...
Reso 0891HC-51,410.5 RESOLUTION NO. 891 OF THE ARCHITECTURAL AND SITE APPROVAL COMMITTEE OF THE CITY OF CUPERTINO RECOMMENDING APPROVAL OF SITE AND LANDSCAPING FOR A LIGHT INDUSTRIAL BUILDING. PROPERTY OWNER: Joseph F. Brown APPLICANT: Carl Holvick Company (James Walker) ADDRESS: 845 Page Mill Road, Palo Alto, California LOCATION OF PROPERTY: Easterly of Bandley Drive approximately 200 ft. northerly of Lazaneo Drive ------------------------------------------------------------------------------------ FINDINGS : The Architectural and Site Approval Committee finds as follows with respect to this application: 1. The proposed site and architectural plans reflect substantial conformance with approvals granted by the Planning Commission under Resolutions..No. 1933 and 1934. CONDITIONS OF APPROVAL: 1-8. Architectural and Site Approval Standard Conditions to the extent that they do not conflict with the:,special conditions enumerated herein. In the event a conflict does exist, the special conditions as enumerated herein shall apply. ® 9. 'The recommendation of approval is based upon Exhibits A and B­ ' of this application except as may be amended by special conditions contained herein. E 10. The final site plan shall be modified to reflect the City Standard of 16 ft. parking stall length when utilized in conjunction with a 1.5 ft. overhang distance. 11. Subject to staff approval regarding design and location, one secured bicycle locking facility shall be provided for every 6,500 sq. ft. of building area, as per Planning Commission Resolution No. 1934, Condition 19. 12. Trash enclosure details shall be supplied at the building permit level, subject to staff approval. 13. Subject to staff approval, the site plan shall be modified at the building permit level to incorporate handicap stalls and ramps immediately adjacent to the westerly elevation of subject building. The applicant shall further ensure that sidewalks are situated in the vicinity of these handicap ramp facilities. 14. Signing, landscaping and light are not a part of this application and are continued to a date uncertain. -1- xC-51,-"410.5 RESOLUTION NO. 891 (.continued) PASSED AND ADOPTED this 21st day of June, 1979, at the regular meeting of the Architectural and Site Approval Committee of the City of Cupertino, State of California, by the following roll call vote: AYES: Committee Members: Johnson, Ripplinger, Sallan, Chairman Bond NAYS: " 1° None ABSTAIN: ifNone ABSENT: 11 " Irvine ATTEST: Ka ry McK nn Scott Senior Planning Technician 0 APPROVED: r / Elliott Bond, Chairman Architectural and Site Approval Committee -2-