Reso 0870HC-51,088.41
RESOLUTION NO. 870
OF THE ARCHITECTURAL AND SITE APPROVAL COMMITTEE
OF THE CITY OF CUPERTINO APPROVING' -DESIGN CRITERIA
FOR A FREE-STANDING SIGN FOR A LIGHT INDUSTRIAL
SITE.
PROPERTY OWNER: Sierra Land Company c/o Ford Land Company
APPLICANT: Pizza Time Theatre Inc.
ADDRESS: 10060 Bubb Road, Cupertino, California 95014
LOCATION OF PROPERTY: East side of Bubb Road in the West Valley Industrial Park
----------------------------------------------------------------------------------------
FINDINGS:
The Architectural and Site Approval Committee finds as follows with respect to this
application:
1. That the proposed sign design concept, as amended by conditions contained
herein, is consistent with provisions contained in Section 1.03.3 a, b,
and c of Ordinance No. 746.
CONDITIONS OF APPROVAL:
1-8. Architectural and Site Approval Standard Conditions to the extent that they
do not conflict with the special conditions enumerated herein. In the event
a conflict does exist, the special conditions as enumerated herein shall
® apply.
9. The recommendation.of approval is based upon Exhibit F-1 1st Revision
of this application except as may be amended by special conditions
contained herein.
10. Precise sign design criteria shall be subject to staff review and approval
prior to release of building permits. The final design shall reflect an
increase in depth of wooden material, as well as the incorporation of a
substantial base for the sign.
ll. A site plan specifying the location of subject free-standing sign shall
be submitted for staff approval at the building permit level.
-----------------------------------------------------------------------------------
PASSED AND ADOPTED this 21st day of February, 1979, at a regular meeting of the
Architectural and Site approval Committee of the City of'Cupertino, State of
California, by the following roll call vote:
AYES: Committee Members: Johnson,
NAYS: if if None
ABSTAINING: If
if None
ABSENT: " " Irvine
ATTEST:
r Wrl ,, J y, r
Ka rf
McKenn Scott
Planning Intern
Sallan, Ripplinger, Chairman Bond
APPROVED
Elliott Bond, Chairman
Architectural and Site Approval Committee