CC Resolution No. 05-072䕒体啌䥔乏丠㩏〠ⴵ㜰ലഊ䄊删卅䱏呕佉⁎䙏吠䥴⁅䥃奔䌠問䍎䱉传⁆䡔⁅䥃奔传⁆啃䕐呒义൏䄊䕍䑎义⁇䕒体啌䥔乏丠⹏〠ⴵ㔰‶佔删䙅剅久䕃吠䕈䌠协⁔䕆⁅但䌊乁䥄䅄䕔匠䅔䕔䕍呎ഊ圊䕈䕒十桴瑓瑡景䌠污晩牯楮敲畱物獥映敥档牡敧潦敳癲捩敲摮牥摥渠瑯琠硥散摥桴潣瑳漠敤楬敶楲杮猠楡敳癲捩獥※湡ഊ圊䕈䕒十異汢捩栠慥楲杮栠獡戠敥敨摬琠敲楶睥甠敳敦獥※湡ഊ圊䕈䕒十桴楃祴䌠畯据汩漠桴楃祴漠畃数瑲湩慨獥慴汢獩敨畧摩汥湩獥映牯猠瑥楴杮獵牥映敥㭳愠摮䡗剅䅅ⱓ漠灁楲ⰵ㈠〰ⰵ䌠瑩⁹潃湵楣摡灯整敒潳畬楴湯丠〠ⴵ㔰‶獥慴汢獩楨杮甠敳൲昊敥㭳愠摮䡗剅䅅ⱓ䌠畯据汩愠歳摥琠慨⁴桴潣瑳漠慣摮摩瑡瑳瑡浥湥⁴敢爠浥癯摥琠潲桴楬瑳湡潣瑮湩敵潴琠敨渠硥⁴敭瑥湩桷湥愠汬洠浥敢獲漠桴楃祴䌠畯据汩眠牥湩愠瑴湥慤据㭥愠摮䡗剅䅅ⱓ琠敨䌠瑩⁹潃湵楣敭扭牥楷桳琠浡湥桴敦捳敨畤敬爠獥汯瑵潩潴敲敦敲据桴慣摮摩瑡瑳瑡浥湥⁴潣瑳മഊ上坏䡔剅䙅剏ⱅ䈠⁅呉删卅䱏䕖⁄桴瑡ഺഊ䤊敒潳畬楴湯丠〠ⴵ㔰ⰶ匠档摥汵ⱁ椠敨敲祢愠敭摮摥琠湩楤慣整琠慨⁴桴牥獩愠映敥映牯愠慃摮摩瑡瑓瑡浥湥⸲唠敳敦獥愠敲攠晦捥楴敶䨠汵⁹ⱉ㈠〰⸵䅐卓䑅䄠䑎䄠佄呐䑅愠⁴敲畧慬敭瑥湩景琠敨䌠瑩⁹潃湵楣景琠敨䌠瑩⁹景䌠灵牥楴潮桴獩㌠摲搠祡漠慍⁹〲㔰祢琠敨映汯潬楷杮瘠瑯㩥潖整敍扭牥景琠敨䌠瑩⁹潃湵楣൬ഊ䄊䕙㩓低卅ഺ䄊卂久㩔䉁呓䥁㩎睋歯潌敷瑮慨ⱬ匠湡潤慶ⱬ圠湡Ⱨ䨠浡獥潎敮潎敮潎敮呁䕔呓ഺഊഊ縊是繓氻൪䌊瑩⁹汃牥띉慍潹Ⱳ䌠瑩⁹景䌠灵牥楴潮
CITY OF CUPERTINO
SUMMARY OF USER FEES
Resolution 05- 056 /April 5, 2005
Resolution 05- 072 /May 3, 2005
Fees Effective July 1, 2005
Department
General
Engineering
Planning
Building
Recreation
Schedule
A
B
C
D
E
CITY OF CUPERTINO
SUMMARY OF USER FEES
Resolution 05- 056 /April 5, 2005
Resolution 05- 072 /May 3, 2005
Fees Effective July 1, 2005
Schedule A - General
Photocopies - per sheet $0.20
Microfilm/Microfiche Printout $0.50 /frame
Budget Documents $50.00
Comprehensive Annual Financial Reports (CAFR) $30.00
Returned Check Charge $25.00
Late Payment on 30 Day Delinquent City Invoices 12% per annum
Property Liens Administrative Fee $30 per book/block/parcel
lien
Municipal Code Book $77.00
Williamson Act Filings $105.00
Candidate Statement Fee See Resolution No_ 04 -455
Tape Dubbing — Audio, Video, DVD, CD
VHS
$12.00 /tape
DVD
$20.00 /DVD
CD Webcast /CD Audio
$12.00 /CD
DV CAM /BETA CAM
$50.00 /tape
U -Matic
$25.00 /tape
Mini DV
$30.00 /DV
Audio Cassette
$1.00 /tape
Notary Fee $10.00 /signature
Fingerprinting Processing State Fee $32.00 Plus
$12.00 City Admin. Fee
Handbill Permit $93.00
Renewals $26.00
Solicitor Permit (Includes fingerprinting) $140.00
Renewals $26.00
Massage Establishment Fee (Includes fingerprinting /background check and $274.00
business start-up inspection)
Establishment with Therapist Permit $320.00
Renewals (Includes two inspections per year) $136.00
Massage Therapist Fee (Includes fingerprintingibackground check) $184.00
Therapist with Managing Employee $230.00
Renewals $46.00
CITY OF CUPERTINO
SUMMARY OF USER FEES
Resolution 05- 056 /April 5, 2005
Resolution 05- 072 /May 3, 2005
Fees Effective July 1, 2005
Schedule A - General (continued)
Massage Managing Employee (Includes fingerprinting/background check)
$184.00
Managing Employee with Therapist Permit
$230.00
Renewals
$46.00
Massage Permit Appeal (Denial /Revocation)
$145.00
Taxi Driver Permits (Includes fingerprinting and background check)
$184.00
Renewals
$46.00
All Municipal Code Parking Violations
$35.00
CVC Parking Citation Dismissals Administrative Fee
$25.00
Noise Variances
$140.00
Duplicate Business Licenses
$20.00
Business License Exemption Administrative Fee
$60.00
Business License Database
$100.00
New Business Monthly Reports
20.00 /month
Community Festivals
$8.00 /day /vendor
Fanners Market
$2.00 /week/vendor
Flea Markets
$8.50 /month/vendor
Sign Removal (Public Right -of -Way)
$15.00 /sign
Dangerous Dog Annual Registration Fee
$177.00
Internet Processing Fee
$2.00 /transaction
False Alarms
$130.00
Police Disturbances
Actual Cost *
Abatement Fee
Actual Cost *
Compilation of New Records (For information requests greater than 1/2 hour.) Actual Cost *
Graffiti Cleanup Actual Cost *
2
CITY OF CUPERTINO
SUMMARY OF USER FEES
Resolution 05- 056 /April 5, 2005
Resolution 05- 072 /May 3, 2005
Fees Effective July 1, 2005
Schedule A — General (Continued)
Damage to City Property Actual Cost
Grounds, Streets, Facilities
Traffic - Engineering
Traffic - Maintenance
Code Enforcement Actual Cost *
Public Requests for GIS Printed Maps
Standard pre - formatted maps
Plotted maps $25.00
Printed maps $2.00
Custom request maps Actual Cost*
For prints or plots of aerial photography, see Engineering fees
Public Requests for GIS Data
Digital data layers for GIS Data $25.00 /layer
$200.00 for all city layers
Custom request data layers on CDROM Actual Cost*
Ortho- rectified aerial photography $25.00 /tile
$300.00 full City of
Cupertino (153 tiles)
* Actual cost is: 1) Employee hourly rate plus 40% for benefits and overhead, and 2) cost of materials,
contractors and supplies.
CITY OF CUPERTINO
SUMMARY OF USER FEES
Resolution 05- 056 /April 5, 2005
Resolution 05- 072 /May 3, 2005
Fees Effective July 1, 2005
Schedule B - Engineering
Street Cuts Miscellaneous
Cost of Improvements $10,000 or under $200.00
Cost of Improvements between $10,001 and $15,000 $300.00
Cost of Improvements $15,001 and over 5% of cost
Grading permit; greater of $2,000 minimum or 6% of cost of improvements $2,000.00 minimum
Pracel Map /Tract Map
Parcel Map (1 -4 lots) $3,250.00
Tract Map (> 4 lots) $6,750.00
Plan Check & Inspection
Review of Building Permit Only $500.00
Review of Public /Private Improvement Plans:
Residential; greater of $2,130 minimum or 5% of cost of improvements $2,130.00 minimum
Commercial; greater of $3,440 minimum or 6% of cost of improvements $3,440.00 minimum
Annexation (plus county filing fee) $1,400.00
Certificates of Compliance $1,200.00
Encroachment Permits
Residential
$200.00
Non - Residential
$200.00
Annual Utility Company
$350.00
Pool Perm t
$500.00
Lot Line Adjustment $2,300.00
Soil & Geo Reports (plus any material /service fees)
Short Report $600.00
Long Report $600.00
Geo Report Deposit $7,150.00
Engineering Copies
Micro fiche
$20.00 /sheet*
Improvement Plans
$20.00 /sheet*
Traffic Reports /Plans
$20.00 /sheet*
Microfilm
$0.50 /frame*
Transportation Permit (Per Department of Transportation)
Single $16.00
Annual Utility Company $90.00
Additional Engineering Investigation or Coordination $50.00 /hr
* Price is for first sheet only. Each additional sheet is $10.00.
CITY OF CUPERTINO
SUMMARY OF USER FEES
Resolution 05- 056 /April 5, 2005
Resolution 05- 072 /May 3, 2005
Fees Effective July 1, 2005
Schedule B - Engineering (continued)
Telecotmnunications Facility Fee (5% increase per year)
Installation Rate $1.75 /lineal ft. of conduit /yr
Occupancy Rate $0.90 /lineal ft. of leased
conduit /yr
Banners
Large Banners Across Stevens Creek Boulevard $320.00
Small Banner on Light Poles (for 20 poles) $630.00
Aerial Photo Custom Work
24" x 36" $50.00 /sheet
8 '' /" x 11" $10.00 /sheet
Soil /Geo Report Research $1,200.00
Special Events $1,090.00
Schools — Traffic Request $1,230.00
Insurance Review $315.00
Block Party /Parade ($950.00) No Charge
Vacation of Public Street ROW $460.00
Rural /Semi -Rural Classification Application
$600.00
Comprehensive Neighborhood Traffic Request
$1,720.00
Certificate of Correction
$130.00
Floodplain Evaluation $50.00
Permit Parking Study $880.00
Permit Parking Issuance (per household) $45.00
Research $170.00 /hr.
5
CITY OF CUPERTINO
SUMMARY OF USER FEES
Resolution 05- 056 /April 5, 2005
Resolution 05- 072 /May 3, 2005
Fees Effective July 1, 2005
Schedule C — Definition of Planning Fee Services
Major
Five thousand or more square feet commercial; 10,000 or more square feet office /industrial; eight or more
residential units.
Minor
Less than 5,000 square feet commercial; less than 10,000 square feet office /industrial; less than eight
residential units.
Appeal
A request from the project applicant or interested party to reverse or amend a decision made by staff or an
advisory body. An appointed public official serving on the board that made the decision subject to the
appeal, an appointed public official serving on a board that is directly affected by the decision and the City
Council members are exempted from the fee requirement.
Directors Application
An application that receives final approval by staff either via an advertised public hearing or non - hearing
format. The application may involve a pre - application meeting and /or Environmental Review committee
review.
Temporary Sign Permit
A staff review of a temporary sign application that includes an evaluation of the sign request, the entry into
the temporary log and site review by Code Enforcement Officers. The permit fee is in addition to the
submittal of a deposit to guarantee removal of the sign upon expiration of the temporary permit.
Tentative Man
Five or more parcels.
Parcel Map
Four or less parcels.
Housing Mitigation Fee
Fee collected is used to construct new affordable residential units for Cupertino residents and employees.
The fees mitigate the need for affordable units caused by expanding offices creating new jobs and new
residential development, office, R &D, industrial and residential development.
NOTES:
Mixed use applications will be classified based upon the highest intensity and review process.
The Director of Community Development will have discretion to classify projects based upon the above
criteria.
CITY OF CUPERTINO
SUMMARY OF USER FEES
Resolution 05- 056 /April 5, 2005
Resolution 05- 072 /May 3, 2005
Fees Effective July 1, 2005
Schedule C - Planning
General Plan Amendment Authorization - Major
$3,590.00
General Plan Amendment Authorization - Minor
$1,795.00
$3,590.00
Study Session
General Plan Amendment - Major
$11,185.00
General Plan Amendment - Minor
$5,593.00
$14,789.00
Development Agreement
$2,770.00
Zoning -Minor
$5,539.00
Zoning < one acre
Zoning one to five acres
$8,420.00
$11,473.00
Zoning > five acres
$12,206.00
Tentative Map
$12,206.00
Use Permit - Major
Exception (per exception)
$2,150.00
Amendment to Development Approval
$3,260.00
$5,407.00
Hillside Exception
$5,701.00
Parcel Map
$5,701.00
Use Permit - Minor
Planning Commission — Architectural and Site Approval
$5,701.00
Planning Commission Interpretation
$2,849.00
Planning Commission — Tree Removal
$2,462.00
Environmental Impact Report
$21,353.00
Negative Declaration - Major
$3,285.00
Negative Declaration - Minor
$1,643.00
For all projects requiring more than 48 hours of staff time,
applicants will be charged at the hourly rate of
$110.00 per hour, which includes staff time, overhead and
administrative oversight.
7
CITY OF CUPERTINO
SUMMARY OF USER FEES
Resolution 05- 056 /April 5, 2005
Resolution 05- 072 /May 3, 2005
Fees Effective July 1, 2005
Schedule C — Planning (Continued)
Categorical Exemption
$191.00
Design Review Conunittee — Architectural and Site Approval
$2,757.00
R -1 Design Review
$1,915.00
R -1 Exception
$2,150.00
Sign Exception
$1,612.00
Fence Exception
$549.00
Director- Variance
$1.377.00
Director— Minor Modification $963.00
Director — Tree Removal $795.00
Minor Residential Permit $963.00
Temporary Use Permit $1,100A0
Temporary Sign Permit $161.00
Sign Program $551.00
Appeal $145.00
Zoning, Planning, Municipal Code (Building Permit Fees)
Commercial /Multi - Family $0.21 /sq. ft.
Residential Single Family $0.11 /sq. ft.
Wireless Master Plan Fee: Equipment Mount on Existing Light Standard or
Utility Pole $5.00 /mount
Wireless Master Plan Fee: Other Personal Wireless Facility $1,000.00 /facility
Housing Mitigation In -Lieu Fees
Residential $1.15 /sq. ft.
Office /Industrial /R &D $2.25/sq. ft.
Stevens Creek Blvd. Specific Plan Fee $.044 /sq. ft.
For all projects requiring more than 48 hours of staff time, applicants will be charged at the hourly rate of
$110.00 per hour, which includes staff time, overhead and administrative oversight.
0
CITY OF CUPERTINO
SUMMARY OF USER FEES
Resolution 05- 056 /April 5, 2005
Resolution 05- 072 /May 3, 2005
Fees Effective July 1, 2005
Schedule D - Building Valuation Schedule
OCCUPANCY AND TYPE
REMODEL COST PER SO. FT.
COST PER NEW SO. FT.
1. APARTMENT HOUSES
Type II -
N
*Type I or H F.R.
$121.61
$253.34
Type V - Masonry or Type III
98.78
205.78
Type V - Wood Frame
91.32
190.24
Type 1 - Basement Garage
41.65
86.77
2. AUDITORIUM
86.77
Type I or II F.R.
$128.86
$243.14
Type II - 1 -Hour
93.33
176.09
Type II - N
88.29
166.58
Type III - 1 -Hour
98.12
185.14
Type III - N
93.08
175.62
Type V - 1 -Hour
93.82
177.02
Type V - N
87.55
165.18
3. BANKS
*Type I or II F.R.
$188.98
$343.59
Type H - I -Hour
139.21
253.11
Type II - N
134.75
244.99
Type III- 1 -Hour
153.63
279.33
Type III - N
148.14
269.35
Type V - 1 -Hour
139.21
253.11
Type V - N
133.34
242.44
4. BOWLING ALLEYS
Type II -
1 -Hour
$80.46
$118.32
Type II -
N
75.09
110.43
Type III
- I -Hour
87.56
128.76
Type III-
N
81.88
120.41
Type V -
1 -1 Hour
59.00
86.77
Type I or II F.R.
$105.87
$230.14
Type II - 1 -Hour
79.51
172.84
Type II - N
75.56
164.26
Type III - 1 -Hour
86.44
187.92
Type III - N
82.60
179.57
Type V - 1 -Hour
80.79
175.62
*Add 0.5 percent to total cost for each story over three
* *Deduct 11 percent for mini - warehouses
** *Deduct 20 percent for "shell only" buildings
N
CITY OF CUPERTINO
SUMMARY OF USER FEES "
Resolution 05- 056 /April 5, 2005
Resolution 05- 072 /May 3, 2005
Fees Effective July 1, 2005
Schedule D - Building Valuation Schedule
OCCUPANCY AND TYPE
REMODEL COST PER SO. FT.
COST PER NEW SO. FT.
6.
CONVALESCENT HOSPITALS
*Type I or II F.R.
$153.01
$322.94
Type 1 1 1 -Hour
107.57
224.11
Type III - I -Hour
110.25
229.68
Type V - 1 -Hour
103.90
216.46
7.
DWELLINGS
Type V - Masonry
$105.33
$224.11
Type V - Wood Frame
100.75
214.37
Basements
Semi- Finished
$25.30
$53.82
Unfinished
19.30
41.06
8.
FIRE STATIONS
Type I or It F.R.
$140.67
$265.41
Type II - 1 -Hour
92.59
174.70
Type 11 - N
8730
164.72
Type III- I -Hour
101.32
191.17
Type III - N
97.02
183.05
Type V - 1 -Hour
95.05
179.34
Type V - N
90.13
170.06
9.
HOMES FOR THE ELDERLY
Type I or II F.R.
$115.48
$240.58
Type II - I -Hour
93.77
195.34
Type 1I - N
89.76
186.99
Type III - 1 -Hour
97.66
203.46
Type III - N
93.65
195.11
Type V - 1 -Hour
94.32
196.50
Type V - N
91.09
189.78
10.
HOSPITALS
*Type I or II F.R.
$185.53
$378.62
Type III - 1 -Hour
153.58
313.43
Type V - I -Hour
146.53
299.05
* Add 0.5 percent to total cost for each story over three
* *Deduct 1 I percent for mini- warehouse
** *Deduct 20 percent for "shell only" buildings
* ** *Add 25% for hazardous occupancy or high tech
10
CITY OF CUPERTINO
SUMMARY OF USER FEES
Resolution 05- 056 /April 5, 2005
Resolution 05- 072 /May 3, 2005
Fees Effective July 1, 2005
Schedule D - Building Valuation Schedule
OCCUPANCY AND TYPE REMODEL COST PER SO. FT. COST PER NEW SO. FT.
11. HOTELS AND MOTELS
*Type I or II F.R.
$117.16
$234.32
Type III- 1 -Hour
101.50
20100
Type III - N
96.74
193.49
Type V - 1 -Hour
88.39
176.78
Type V - N
86.65
173.30
12. INDUSTRIAL PLANTS****
Type I or 11 F.R.
$93.73
$132.01
Type TI - 1 -Hour
65.23
91.87
Type II - (Stock)
59.96
84.45
Type III - 1 -Hour
71.82
101.15
Type III - N
67.70
95.35
Tilt -Up
49.42
69.60
Type V - 1 -Hour
67.70
95.35
Type V - N
61.93
87.23
13. JAILS
Type I or II F.R.
$210.39
$369.11
Type III - 1 -Hour
192.41
337.56
Type V - 1 -Hour
144.27
253.11
14. LIBRARIES
Type I or H F.R.
$137.72
$270.05
Type II - I -Hour
100.81
197.66
Type 11- N
95.84
187.92
Type III- 1 -1 -Hour
106.49
208.80
Type III - N
101.16
198.36
Type V - 1 -Hour
99.98
196.04
Type V -N
95.84
187.92
15. MEDICAL OFFICES * * **
Type I or II F.R.
$144.16
$27724
Type II - 1 -Hour
111.23
213.90
Type TI - N
105.68
203.23
Type III- I -Hour
120.64
232.00
Type III - N
112.32
215.99
Type V - I -Hour
108.82
209.26
Type V -N
104.96
201.84
*Add 0.5 percent to total cost for each story over three
* *Deduct 11 percent for mini- warehouse
** *Deduct 20 percent for "shell only" buildings
* ** *Add 25% for hazardous or high tech occupancies
I1
CITY OF CUPERTINO
SUMMARY OF USER FEES
Resolution 05- 056 /April 5, 2005
Resolution 05- 072 /May 3, 2005
Fees Effective July 1, 2005
Schedule D - Building Valuation Schedule
OCCUPANCY AND TYPE REMODEL COST PER SO FT. COST PER NEW SO. FT.
16. OFFICES
Type I or II F.R.
$148.67
$247.78
Type II - 1 -Hour
99.53
165.88
Type II - N
94.80
157.99
Type III - 1 -Hour
107.46
179.10
Type III - N
102.73
171.22
Type V - 1 -Hour
100.64
167.74
Type V -N
94.80
157.99
17. PRIVATE GARAGES
Wood Frame
$37.21
$56.38
Masonry
41.95
63.57
Open carports /covered decks /patios
25.42
38.51
Uncovered decks
25.22
32.37
18. PUBLIC BUILDINGS
Type I or II F.R.
$143.14
$28629
Type 1I - 1 -Hour
116.00
232.00
Type II - N
110.90
221.79
Type III - 1 -Hour
120.41
240.82
Type III - N
116.23
232.46
Type V - 1 -Hour
110.20
220.40
Type V - N
106.26
212.51
19. PUBLIC GARAGES
Type I or II F.R.
$80.55
$113.45
Type I or II Open Parking
60.45
85.14
Type II - N
46.12
64.96
Type III - 1 -Hour
60.95
85.84
Type III - N
54.19
76.33
Type V - 1 -Hour
55.51
78.18
20. RESTAURANTS
*Type III - 1 -Hour
$167.22
$225.97
Type III - N
161.55
218.31
Type V - I -Hour
153.14
206.94
Type V -N
147.13
198.82
*Add 0.5 percent to total cost for each story over three
* *Deduct 11 percent for mini- warehouse
** *Deduct 20 percent for "shell only" buildings
* ** *Add 25% for hazardous or high tech occupancies
12
CITY OF CUPERTINO
SUMMARY OF USER FEES
Resolution 05- 056 /April 5, 2005
Resolution 05- 072 /May 3, 2005
Fees Effective July 1, 2005
Schedule D - Building Valuation Schedule
OCCUPANCY AND TYPE REMODEL COST PER SO. FT. COST PER NEW SQ. FT.
21. SCHOOLS
Type I or II F.R.
$162.53
$257.98
Type If - 1 -Hour
110.94
176.09
Type III- I -Hour
118.68
188.38
Type III - N
114.15
181.19
Type V - 1 -Hour
111.23
176.55
Type V - N
106.11
168.43
22. SERVICE STATIONS
Type II - N
$87.31
$155.90
Type III- I -Hour
91.07
162.63
Type V - 1 -Hour
77.56
138.50
Canopies
36.38
64.96
23. STORES
94.15
165.18
*Type I or II F.R.
$145.29
$191.17
Type II - 1 -Hour
88.87
116.93
Type II - N
86.93
114.38
Type III- 1 -Hour
108.08
142.22
Type III - N
101.38
133.40
Type V - 1 -Hour
90.98
119.71
Type V - N
84.10
110.66
24. THEATERS
Type I or II F.R.
$145.20
$254.74
Type III - 1 -Hour
105.79
185.60
Type III -N
100.77
176.78
Type V - 1 -Hour
99.58
174.70
Type V - N
94.15
165.18
25. WAREHOUSES **
Type I or II F.R.
$72.20
$114.61
Type II or V -1 -Hour
42.82
67.98
Type II or V -N
40.19
63.80
Type III - I -Hour
48.53
77.02
Type III - N
46.19
73.31
*Add 0.5 percent to total cost for each story over three
* *Deduct 11 percent for mini- warehouse
** *Deduct 20 percent for "shell only" buildings
* ** *Add 25% for hazardous or high tech occupancies
13
CITY OF CUPERTINO
SUMMARY OF USER FEES
Resolution 05- 056 /April 5, 2005
Resolution 05- 072 /May 3, 2005
Fees Effective July 1, 2005
Schedule D - Building Valuation Schedule
EQUIPMENT AND AIR CONDITIONING
Commercial $ 5.26
Residential $ 4.39
Sprinkler Systems $ 3.25
RETAINING WALLS, PER SO. FT. (HEIGHT X LENGTH) AREA ABOVE GRADE
Masonry $ 30.07
Concrete $ 26.46
................................................ ...............................
Address Changes
14
$268.92
Permit Valuation
$1 -$3,000
$3,001 - 25,000
$25,001 - 50,000
$50,001 - 100,000
$100,001 - 500,000
$500,001 - 1,000,000
$1,000,001 -
PLAN CHECKING
Structural and Non - Structural
CITY OF CUPERTINO
SUMMARY OF USER FEES
Resolution 05- 056 /April 5,200S
Resolution 05- 072 /May 3, 2005
Fees Effective July 1, 2005
Schedule D - Building Permit
$83.16
$93.96 for the first $3,000 plus $10.80 for each additional
$1,000 or fraction thereof, to and including $25,000.
$324.00 for the first $25,000 plus $8.64 for each additional
$1,000 or fraction thereof, to and including $50,000.
$540.00 for the first $50,000 plus $6.48 for each additional
$1,000 or fraction thereof, to and including $100,000.
$851.04 for the first $100,000 plus $4_32 for each additional
$1,000 or fraction thereof, to and including $500,000.
$2,817.72 for the first $500,000 plus $3_24 for each additional
$1,000 or fraction thereof, to and including $1,000,000.
$4.795.20 for the first $1,000,000 and up plus $2.16 for each
additional $1,000 or fraction thereof.
1.3345% of building permit fee for each plan submitted. Each additional identical repeat plan for
multi -unit residential developments will be assessed at $34.86 each unit.
Energy
48% of building permit fee for each plan submitted. Each additional identical repeat plan for
multi -unit residential developments will be assessed at $34.86 each unit.
Repeat plan checks that exceed 2 reviews will be charged an hourly rate at $87.14 per hour.
15
CITY OF CUPERTINO
SUMMARY OF USER FEES
Resolution 05 -056 /April 5, 2005
Resolution 05- 072 /May 3, 2005
Fees Effective July 1, 2005
Schedule D - Building - Electrical Fees
New Residential Buildings and Remodels that add additional square footage
The following fees shall include all wiring and electrical equipment in or on each building, or
other electrical equipment on the same premises constructed at the same time.
Permit Fee
$38.37
New multi - family residential buildings (apartments and condominiums) having
three or more living units not including the area of garages, carports and other
non - commercial automobile storage areas constructed at the same time, per
square foot $'07
New single and two - family residential buildings not including the area of
garages, carports and other minor accessory buildings constructed at the
same time, per square foot $.08
For other types of residential occupancies and alterations, additions and
modifications to existing residential buildings, use the UNIT FEE SCHEDULE
New commercial buildings and completely remodeled spaces not including the
Area of garages, per square foot $.13
Corrunercial alterations and modifications to existing buildings, use the
Unit fee schedule
77
CITY OF CUPERTINO
SUMMARY OF USER FEES
Resolution 05- 056IApril 5, 2005
Resolution 05- 072/May 3, 2005
Fees Effective July 1, 2005
UNIT FEE SCHEDULE
Remodel - No additional square footage
Permit Fee
Residential Appliances
$ 38.37
For fixed residential appliances or receptacle outlets for same, including
wall- mounted electric ovens; counter mounted cooking tops; electric
ranges, self - contained room console, or through -wall air conditioners;
space heaters; food waste grinders; dishwashers washing machines;
water heaters; clothes dryers; or other motor operated appliances not
exceeding one horsepower (HP) in rating each $ 4.80
NOTE: For other types of air conditioners and other motor- driven
appliances having larger electrical ratings, see Power Apparatus.
Non - Residential Appliances
For residential appliances and self- contained factory- wired, non - residential
appliances non exceeding one horsepower (HP), kilowatt (KW), or
kilovotampere (KVA) in rating including medical and dental devices; food,
beverage, and ice cream cabinets; illuminated show cases; drinking fountains;
vending machines; laundry machines; or other similar types of equipment,
each $ 4.80
NOTE: For other types of air conditioners and other motor -driven appliances
having larger electrical ratings, see Power Apparatus.
Services
For services of 600 volts or less and not over 200 amperes in rating, each $ 29.43
For services of 600 volts or less and over 200 amperes to 1,000 amperes in
rating, each $ 59.94
For services over 600 volts over 1,000 amperes in rating, each $119.88
17
CITY OF CUPERTINO
SUMMARY OF USER FEES
Resolution 05- 0561April 5, 2005
Resolution 05- 072 /May 3, 2005
Fees Effective July 1, 2005
Schedule D - Building - Electrical
USER FEE SCHEDULE
(continued)
Remodel - No additional square footage
Signs, Outline Lighting and Marquees
For signs, outline lighting systems or marquees supplied from one
branch circuit, each $23.98
For additional branch circuits within the same sign, outline lighting
system or marquee, each $ 4.80
Miscellaneous Apparatus, Conduits, Conductors, and Special Circuits
For electrical apparatus, conduits and conductors for which a permit is
required but for which no fee is herein set forth $27.58
Power Device /Apparatus
For motors, generators, transformers, rectifiers, synchronous converters,
capacitors, industrial heating, air conditioners and heat pumps, cooking
or baking equipment and other apparatuses, as follows:
Rating in horsepower (HP), kilowatts (KW), kilovolt- amperes (KVA),
or kilovolt- amperes- reactive (KVAR):
1 unit
2 through 5 units, each additional
6 and over, each additional
NOTE:
$47.96
$17.99
$11.99
1. For equipment or appliances having more than one motor, transformer,
heater, etc., the sum of the combined ratings may be used.
2. These fees include all switches, circuit breakers, contractors, thermostats,
relays and other directly related control equipment.
18
CITY OF CUPERTINO
SUMMARY OF USER FEES
Resolution 05 -056 /April 5, 2005
Resolution 05- 072 /May 3, 2005
Fees Effective July 1, 2005
Schedule D - Building - Electrical
UNIT FEE SCHEDULE
(continued)
Remodel - No additional square footage
Busways
For trolley and plug -in -type busways, each 100 feet or fraction thereof $7.02
Note: An additional fee will be required for lighting fixtures, motors
and other appliances that are connected to trolley and plug -in -type
busways. No fee is required for portable tools.
Receptacle, Switch and Lighting Outlets
For receptacle, switch, lighting or other outlets at which current is
used or controlled, except services, feeders and meters.
First 20 each $1.20
Additional outlets, each $0.73
NOTE: For multi - outlet assemblies, each 5 feet or
fraction thereof may be considered as one outlet.
Lighting Fixtures
For lighting fixtures, sockets or other lamp holding devices
First 20 each
Additional fixtures, each
$1.20
$0.73
For pole or platform- mounted lighting fixtures each $1.20
For theatrical -type lighting fixtures or assemblies each $1.20
19
CITY OF CUPERTINO
SUMMARY OF USER FEES
Resolution 05- 056 /April 5, 2005
Resolution 05- 072 /May 3, 2005
Fees Effective July 1, 2005
Schedule D - Building - Mechanical Fees
New Residential Buildings and Remodels that add additional square footage.
The following fees shall include all mechanical equipment in or on each building, or
other mechanical equipment on the same premised constructed at the same time.
New multi - family residential buildings (apartments and condominiums)
having three or more living units not including the area of garages, carports
and other non - commercial automobile storage areas constructed at the same
time, per square foot $0.07
New and single and two - family residential buildings not including the area
of garages, carports and other minor accessory buildings constructed at the
same time, per square foot $0.08
For other types of residential occupancies and alterations and modifications
To existing building, use the unit fee schedule
New commercial buildings and completely remodeled spaces not including
The area of garages, per square foot $0.13
Commercial alterations and modifications to existing buildings, use the unit
Fee schedule
20
CITY OF CUPERTINO
SUMMARY OF USER FEES
Resolution 05- 0561April 5, 2005
Resolution 05- 072 /May 3, 2005
Fees Effective July 1, 2005
Schedule D - Building - Mechanical Fees
UNIT FEE SCHEDULE
Remodels - No additional Square Footage
Permit Fee $ 38.37
For the repair of alteration of, or addition to each heating appliance,
refrigeration unit, cooling unit, VAV boxes, absorption unit, or each
heating, cooling, absorption, or evaporative cooling system, including
installation of controls regulated by this Code. $ 13.19
For each air - handling unit, A/C units, heat pumps to and including
10,000 cubic feet per minute, including ducts attached thereto. Does
not apply to central type. $ 10.26
NOTE: This fee shall not apply to an air - handling unit that is a
portion of a factory- assembled appliance, cooling unit, evaporative
cooler or absorption unit for which a permit is required elsewhere
in this Code.
For each air - handling unit A/C unit, heat pump over 10,000 cfm $ 17.82
For the installation or relocation of each commercial or industrial -type
Hood $137.87
For the installation of each residential hood that is served by a mechanical
exhaust, including the ducts for such hood $ 10.26
For the installation or relocation of each forced -air or gravity -type furnace
or burner, including ducts and vents attached to such appliance, up to and
including 100,000 Btu/h $ 14.31
For each ventilation system which is not a portion of any heating or
air conditioning system authorized by a permit $ 10.26
For each ventilation fan connected to a single duct $ 7.02
For the installation or relocation of each forced air or gravity type
furnace or burner, including ducts and vents attached to such appliance
over 100,000 Btu /h $ 17.55
21
CITY OF CUPERTINO
SUMMARY OF USER FEES
Resolution 05- 0561April 5, 2005
Resolution 05- 072 /May 3, 2005
Fees Effective July 1, 2005
Schedule D - Building - Mechanical Fees
UNIT FEE SCHEDULE
(continued)
Remodels - No additional Square Footage
For the installation or relocation of each floor furnace, including vent $ 14.31
For the installation or relocation of each suspended heater, recessed
wall heater or floor - mounted unit heater $ 14.31
For the installation, relocation or replacement of each appliance vent
installed and not included in an appliance permit $ 7.02
For the installation or relocation of each boiler or compressor to and
including three horsepower, or each absorption system to and including
100,000 Btu /h (29.3 kw)
$ 14.31
For the installation or relocation of each boiler or compressor over three
horsepower to and including 15 horsepower, or each absorption system
over 100,000 Btu/h and including 500,000 Btu/h
$ 26.19
For the installation or relocation of each boiler or compressor over 15
horsepower to and including 30 horsepower, or each absorption system
over 500,000 Btu /h to and including 1,000,000 Btu/h
$ 35.91
For the installation or relocation of each boiler or compressor over 30
horsepower to and including 50 horsepower, or for each absorption system
over 1,000,000 Btu/h to and including 1,750,000 Btu/h
$ 53.46
For the installation or relocation of each boiler or refrigeration compressor
over 50 horsepower, or each absorption system over 1,750,000 Btu/h
$89.37
For each appliance or piece of equipment regulated by this Code but not
classed in other appliance categories, or for which no other fee is listed
in this Code
$ 10.26
22
CITY OF CUPERTINO
SUMMARY OF USER FEES
Resolution 05- 056 /April 5, 2005
Resolution 05- 072 /May 3, 2005
Fees Effective July 1, 2005
Schedule D - Building - Plumbing Fees
New Residential Buildings and Remodels that add additional square footage
The following fees shall include all plumbing equipment in or on each building, or other
plumbing equipment on the same premises constructed at the same time.
New multi - family residential buildings (apartments and condominiums) having
three or more living units not including the area of garages, carports and other
non - commercial automobile storage areas constructed at the same, per square
foot $0.07
New single and two - family residential buildings not including the area of
garages, carports and other minor accessory buildings constructed at the same
time, per square foot $0.08
For other types of residential occupancies and alterations and modifications
To existing building, use the unit fee schedule
New commercial buildings and completely remodeled spaces not including
The area of garages, per square foot $0.13
Commercial alterations and modifications to existing buildings, use the
unit fee schedule
23
CITY OF CUPERTINO
SUMMARY OF USER FEES
Resolution 05- 056 /April 5, 2005
Resolution 05- 072 /May 3, 2005
Fees Effective July 1, 2005
Schedule D - Building - Plumbing Fees
UNIT FEE SCHEDULE
Remodel - No additional Square Footage
Permit Fee $38.37
For installation, alteration or repair of water piping water treating
equipment $ 9.00
For repair or alteration of drainage or vent piping, floor, area,
condensate piping $ 9.00
For each plumbing fixture or trap or set of fixtures on one trap
(including water, drainage piping and backflow protection therefor) $ 9.00
For each gas piping system of one (1) to four (4) outlets $ 5.40
For each gas piping system of five (5) or more, per outlet $ 1.20
For each industrial waste pre- treatment interceptor, including its trap
and vent, excepting kitchen type grease traps functioning as fixture
traps $17.99
Kitchen type trap and/or system $ 9.00
For each building sewer, sanitary sewer, and each trailer park sewer $21.58
Storm/rainwater systems per drain $ 9.00
For each water heater and/or vent $10.79
Water service $ 9.00
Re -pipe per fixture $ 9.00
24
CITY OF CUPERTINO
SUMMARY OF USER FEES
Resolution 05- 056 /April 5, 2005
Resolution 05- 072 /May 3, 2005
Fees Effective July 1, 2005
Schedule D - Building - Plumbing Fees
UNITS FEE SCHEDULE
Remodel - No additional Square Footage
(continued)
For each lawn sprinkler system on any one meter, including backflow $13.19
protection devices therefor
Five (5) or more, each
For atmospheric type vacuum breakers /backflow not included in item 1
1 to 5
over 5 each additional
For each private sewage disposal system
For each cesspool
25
$ 1.08
$10.79
$ 2.16
$67.14
$33.57
CITY OF CUPERTINO
SUMMARY OF USER FEES
Resolution 05- 056 /April 5, 2005
Resolution 05- 072 /May 3, 2005
Fees Effective July 1, 2005
Schedule D
OTHER BUILDING INSPECTION FEES
Private Swimming Pools
For new private, residential, in- ground, swimming pools for
single - family and multi - family occupancies including a complete
system of necessary branch circuit wiring, bonding, grounding,
underwater lighting, water pumping and other similar electrical
equipment directly related to the operation of a swimming pool,
each including plan check and energy. $540.00
For other types of swimming pools, therapeutic whirlpools,
spas and alterations to existing swimming pools, use the
UNIT FEE SCHEDULE
Temporary Power Service
For a temporary service power pole or pedestal including all
pole or pedestal- mounted receptacle outlets and appurtenances,
each. $62.10
For a temporary distribution system and temporary lighting
and receptacle outlets for construction sites, decorative light,
Christmas tree sales lots, fireworks stands, etc. each. $11.88
Inspection outside of the normal business hours $90.72/hr.
(minimum charge two hours)
Inspection for which no fee is specifically established $68.04/hr.
(minimum charge one hour)
Re- inspection - A fee may be assessed for each inspection or re- inspection
when such portion of work for which inspection is called is not complete
or when corrections called for are not made. $176.18
26
CITY OF CUPERTINO
SUMMARY OF USER FEES
Resolution 05- 056 /April 5, 2005
Resolution 05 -072 /May 3, 2005
Fees Effective July 1, 2005
Schedule E - Recreation
Recreation classes and excursion fees shall be determined as follows:
Classes
1. Determine the maximum hourly rate paid to instructor.
2. Multiply the instructor's hourly rate by the number of class meetings.
3. Determine the minimum number of participants and divide into the instructor's cost.
4. Add indirect overhead percent - 32 %.
5. Add 20% to establish non - resident fee.
6. Add cost for specialized equipment or supplies.
Special conditions: For classes taught by contract instructors, the indirect overhead is only
added to the City's percentage.
Excursions
1. Transportation cost divided by the number of participants plus overhead transfer.
2. Add 20% to establish non - resident fee.
3. Add any admission cost, supplies or leadership cost.
Additional factors that may be used to determine the class or excursion user fee:
The total number of participants in a given activity may generate additional revenue whereby
the total program cost may be reduced.
Classes that traditionally have waiting lists may have the user fee increased.
Programs in competition with adjacent cities or the private sector may require fees to be
increased or decreased to remain competitive.
27
CITY OF CUPERTINO
SUMMARY OF USER FEES
Resolution 05- 056 /April 5, 2005
Resolution 05 -072 /May 3, 2005
Fees Effective July 1, 2005
Scbedule E - Recreation
Facility Use Fee Schedule (Staff Use Only)
CLASSIFICATIONS:
Group I: City of Cupertino activities that are open to the public. Official city sponsored
programs.
Group II: Clubs with 51 % resident membership, recreation programs and events with full or
affiliated city co- sponsorship and open to the public.
Group III: Programs and events sponsored by Cupertino based non - profit recreation,
education or community service organization with 51% resident participation.
These organizations must show an official structure and status.
Group IV: Private, special interest or business groups for functions not open to the public.
These functions would include parties, banquets, receptions, industrial
conferences, seminars, trade shows, etc.
Group V: Programs and events sponsored by non - resident non - profit recreation, education
or community service organization. These organizations must show official
structure and status.
Group VI: Cupertino Businesses using the Cupertino Room of the Quinlan Community
Center for promotional and business related purposes other than negotiation or
direct sale.
W
CITY OF CUPERTINO
SUMMARY OF USER FEES
Resolution 05- 0561April 5, 2005
Resolution 05- 072 /May 3, 2005
Fees Effective July 1, 2005
Schedule E - Recreation
Quinlan Community Center
ROOM RENTAL SCHEDULE PER HOUR
Cupertino Room
Monday — Thursday
Friday - Sunday
Group 11
N/A
$17
Group III
$30
$80
Group IV
$140
$230
Group V
$50
$140
Group VI
$265
$265
Classroom
Group II
N/A
$12
Group III
$20
$60
Group IV
$45
$90
Group V
$25
$75
Conference Room
Group lI
N/A
$12
Group III
$10
$25
Group N
$40
$60
Group V
$25
$50
Security Staff
Security staff is required when alcohol is served at any City facility: $25.00 per hour.
Overtime Fee
Functions exceeding the permitted reservation time shall be charged $150.00 for any time up to the first
half hour, and $150.00 for every half hour thereafter. This charge will be deducted from the security
deposit. This applies to all City facilities.
Security Deposit
A security deposit shall be required for Groups III, IV, V, and VI. Security deposit is due at time of
reservation. The Department Director may also require a deposit based on the nature of an event. The
security deposit will be refunded if no damage occurs, rooms are left in clean condition, and permits
conclude on time.
Quinlan Community Center
Cupertino Room — Groups IV, VI $750
All Other Rooms — Group IV $300
Group II, II, V — All Rooms $300
29
CITY OF CUPERTINO
SUMMARY OF USER FEES
Resolution 05- 056 /April 5, 2005
Resolution 05- 072 /May 3, 2005
Fees Effective July 1, 2005
Schedule E — Recreation
Monta Vista Recreation Center
Creekside Park Building
Room Rental Schedule Per Hour
Monta Vista Recreation Center
Multi- Pumose
Creekside Park Building
Group III
N/A
N/A
Group N
N/A
N/A
Group V
N/A
N/A
Classroom
$20
N/A
Group II
$15
$15
Group III
$15
$15
Group IV
$30
$30
Group V
$20
$20
Conference Room/Kitchen
Group II
$15
N/A
Group III
$15
N/A
Group N
$25
N/A
Group V
$20
N/A
Security Staff
Security staff is required when alcohol is served at any City facility: $25.00 per hour.
Overtime Fee
Functions exceeding the permitted reservation time shall be charged $150.00 for any time up to the first
half hour, and $150.00 for every half hour thereafter. This charge will be deducted from the security
deposit. This applies to all City facilities.
Security Deposit
A security deposit shall be required for Groups III, IV, V, and VI. Security deposit is due at time of
reservation. The Department Director may also require a deposit based on the nature of an event. The
security deposit will be refunded if no damage occurs, rooms are left in clean condition, and permits
conclude on time,
30
Annual Membership
Newsletter - Mailed
Room Rental Schedule Per Hour
Reception Room
Group H
Group III
Group IV
Group V
CITY OF CUPERTINO
SUMMARY OF USER FEES
Resolution 05- 056 /April 5, 2005
Resolution 05- 072 /May 3, 2005
Fees Effective July 1, 2005
Schedule E — Recreation
Senior Center
Resident
$22
$5.00
Classroom Conference Room, Arts & Crafts Room,
Bay Room
Group II
Group III
Group W
Group V
Non - Resident
$27
$5.00
Evenings and Weekends *
$12
$80
$230
$140
$12
$60
$90
$75
* Senior Center rooms are not available for rental Monday through Thursday 8:00 a.m. to 10:00 p.m. and
Friday, 8:00 a.m. to 5:00 p.m.
Security Staff
Security staff is required when alcohol is served at any City facility: $25.00 per hour.
Overtime Fee
Functions exceeding the permitted reservation time shall be charged $150.00 for any time up to the first
half hour, and $150.00 for every half hour thereafter. This charge will be deducted from the security
deposit. This applies to all City facilities.
Security Deposit
A security deposit shall be required for Groups III, IV, V, and VI. Security deposit is due at time of
reservation. The Department Director may also require a deposit based on the nature of an event. The
security deposit will be refunded if no damage occurs, rooms are left in clean condition, and permits
conclude on time.
Cupertino Senior Center
Reception Hall — Group IV $750
All Other Rooms — Group N $300
Group II, III, V — All Rooms $300
31
Field preparation $36.50
(includes dragging, watering, chalking, and bases)
Field Attendant (2 hour minimum) $ 825/hr.
Field Attendant is required any time lights or field preparation
is requested.
Lights (in the evening) $ 5.00 /hr.
Memorial Park Amphitheater
Cupertino resident/Resident business $55.00
Non- resident/Non- resident business $75.00
Memorial Park Gazebo
Cupertino resident /Resident business $55.00
Non- resident/Non- resident business $75.00
Picnic Areas (Daily Rate)
Cupertino residents
CITY OF CUPERTINO
Cupertino business
a
SUMMARY OF USER FEES
Non - residents
Resolution 05- 056 /April 5, 2005
Non - resident business
Resolution 05- 072 /May 3, 2005
Electricity at Memorial or Linda Vista Park
Fees Effective July 1, 2005
Schedule E - Recreation
OUTDOOR FACILITIES
Memorial Softball Field
Cupertino residents /businesses only
$25.00
Non - Residents
$40.00
Field can be reserved for a maximum
of 2 hours
THERE IS NO FEE FOR CURRENT SOFTBALL TEAMS PLAYING
IN CUPERTINO LEAGUES
Field preparation $36.50
(includes dragging, watering, chalking, and bases)
Field Attendant (2 hour minimum) $ 825/hr.
Field Attendant is required any time lights or field preparation
is requested.
Lights (in the evening) $ 5.00 /hr.
Memorial Park Amphitheater
Cupertino resident/Resident business $55.00
Non- resident/Non- resident business $75.00
Memorial Park Gazebo
Cupertino resident /Resident business $55.00
Non- resident/Non- resident business $75.00
Picnic Areas (Daily Rate)
Cupertino residents
$ 55.00
Cupertino business
$ 75.00
Non - residents
$ 80.00
Non - resident business
$100.00
Electricity at Memorial or Linda Vista Park
$ 25.00
Sports Field Fees
Adult Leagues (two hour minimum) $50.00 /hr
Deposit $600.00
Youth Leagues (Participant /Season) $11.00 R
$22.00NR
32
CITY OF CUPERTINO
SUMMARY OF USER FEES
Resolution 05-056/April 5, 2005
Resolution 05- 072 /May 3, 2005
Fees Effective July 1, 2005
Schedule E - Recreation
BLACKBERRY FARM PICNIC GROUNDS
General Admission:
ADULT (13 years and over)
CHILD (6 through 12)
Group Rates:
Weekends & Holidays
Resident Non - Resident
$8.00 $9.00
$5.00 $6.00
Weekdays
Resident Non - Resident
$5.00 $6.00
$4.00 $5.00
33
Weekends & Holidays
Weekdays
Adult
Child
Adult
Child
(13 & Older)
(6-12)
(13 & Older) 6 -12
100 -500 persons
$8.50
$6.50
$5.75
$4.75
501 -1,000
$8.00
$6.00
$5.50
$4.50
1,001 or more
$7.50
$5.50
$5.25
$4.25
Full Summer Pass
Available any day the park
is open:
Resident
Non - Resident
Adult (13 & Up)
$85.00
$110.00
Child (6 to 12 years old)
$60.00
$70.00
Family Pass (2 people)
$140.00
$170.00
Family Pass (3 people)
$150.00
$180.00
Family Pass (4 people)
$160.00
$190.00
Family Pass (5 people)
$170.00
$200.00
Family Pass (6 people)
$180.00
$210.00
33
CITY OF CUPERTINO
SUMMARY OF USER FEES
Resolution 05- 056 /April 5, 2005
Resolution 05- 072 /May 3, 2005
Fees Effective July 1, 2005
Schedule E - Recreation
10 -Day Pass
Available any 10 days the park is open:
Resident
Adult (13 and older) $40.00
Child (6 to 12 years old) $32.50
Children under 6 are free when accompanied by their parents
BLACKBERRY FARM GOLF COURSE
9 -Holes
Junior & Senior
Second 9 Holes (all
players)
Weekends
Resident Non - Resident
$14.00 $16.00
$14.00 $16.00
$12.00 $14.00
Non - Resident
$45.00
$36.00
Weekdays
Resident Non - Resident
$12.00 $14.00
$11.00 $13.00
$11.00 $13.00
All groups and tournaments pay the full rate (Cupertino resident still applies).
Staff is authorized to set merchandise fees according to current cost.
BLACKBERRY FARM RETREAT CENTER
Conference Room (9:00 a.m. to 5:00 p.m., with meals) $69.95 /person
34
CITY OF CUPERTINO
SUMMARY OF USER FEES
Resolution 05- 056 /April 5, 2005
Resolution 05- 072 /May 3, 2005
Fees Effective July 1, 2005
Schedule E - Recreation
BLACKBERRY FARM GOLF COURSE
Annual Rate (Weekdays Only)
Adults (17 -61)
Jr /Sr
Cupertino Residents
$850
$775
Non - Residents
$1,000
$925
Semi - Annual Rate (Weekdays Only)
Cupertino Residents
$455
$415
Non - Residents
$540
$495
Super - Annual Rates (Good on Weekends &
Holidays)
Cupertino Residents
$1,000
$1,000
Non - Residents
$1,125
$1,125
Super -Semi Annual Rates (Good on Weekends &
Holidays)
Cupertino Residents
$500
$500
Non - Residents
$600
$600
Quick Passes (Ten -play card for the price of nine)
Cupertino Resident Weekday
$99
$90
Cupertino Resident Weekend
$117
$117
Non - Resident Weekday
$117
$108
Non - Resident Weekend
$135
$135
Green Fees
Cupertino Resident Weekday
$12
$11
Cupertino Resident Weekend
$14
$14
Non - Resident Weekday
$14
$13
Non - Resident Weekend
$16
$16
35
CITY OF CUPERTINO
SUMMARY OF USER.FEES
Resolution 05- 056 /April 5, 2005
Resolution 05- 072 /May 3, 2005
Fees Effective July 1, 2005
Schedule E - Recreation
Sports Center
Day Passes
Type
Resident
Non- Resident
One Year
Single
$7.00
$10.00
Monthly Passes
Couple
$810.00
$880.00
One Month
Single
$55.00
$65.00
One Month
Couple
$75.00
$90.00
One Month
Family
$95.00
$115.00
Annual Passes
One Year
Juniors ( <17)
$,300.00
$330.00
One Year
Single
$425.00
$455.00
One Year
Couple
$810.00
$880.00
One Year
Family
$905.00
$980.00
One Year
Senior
$380.00
$405.00
Enrollment Fee
All
$50.00
$50.00
ADDITIONAL CONDITIONS
1. The Cupertino Tennis Club will be charged $10.00 /hour during primetime and $6.00 /hour per court
during non - primetime for all C.T.C. sponsored activities other than U.S.T.A. leagues and practices.
2. All competitors in C.T.C. /U.S.T.A. leagues participating at the Sports Center must purchase an
annual pass.
3. Individuals may purchase a ten pack of day passes, $60.00 Resident, $90.00 Non - Resident.
4. Specials will be offered on an on -going basis.
Child Watch Fees
One visit: $5.00
Ten visits: $45.00
One Month Pass: $100.00
Teen Center
Rental Rate $150.00
Deposit $750.00
Overtime Rate $200.00 first hour; $100.00 each half hour after
Residents
Daily Pass $.00
Annual Pass $.00
Non - Residents:
Daily Pass $5.00
36
CITY OF CUPERTINO
SUMMARY OF USER FEES
Resolution 05- 056 /April 5, 2005
Resolution 05- 072 /May 3, 2005
Fees Effective July 1, 2005
Schedule E — Recreation
Community Hall
ROOM RENTAL SCHEDULE PER HOUR
Fridav - Sundav
Security Staff
Security staff is required when alcohol is served at any City facility: $25.00 per hour.
$90
$90
$240
$150
$275
Overtime Fee
Functions exceeding the permitted reservation time shall be charged $150.00 for any time up to the first half
hour, and $150.00 for every half hour thereafter. This charge will be deducted from the security deposit.
This applies to all City facilities.
Securitv Deposit
A security deposit shall be required for Groups III, IV, V, and VI. Security deposit is due at time of
reservation. The Department Director may also require a deposit based on the nature of an event. The
security deposit will be refunded if no damage occurs, rooms are left in clean condition, and permits
conclude on time.
Community Hall
Groups IV, VI $750
Groups II, III, V $300
37
Monday — Thursday
Group II
$40
Group I1I
$40
Group IV
$150
Group V
$60
Group VI
$275
Fridav - Sundav
Security Staff
Security staff is required when alcohol is served at any City facility: $25.00 per hour.
$90
$90
$240
$150
$275
Overtime Fee
Functions exceeding the permitted reservation time shall be charged $150.00 for any time up to the first half
hour, and $150.00 for every half hour thereafter. This charge will be deducted from the security deposit.
This applies to all City facilities.
Securitv Deposit
A security deposit shall be required for Groups III, IV, V, and VI. Security deposit is due at time of
reservation. The Department Director may also require a deposit based on the nature of an event. The
security deposit will be refunded if no damage occurs, rooms are left in clean condition, and permits
conclude on time.
Community Hall
Groups IV, VI $750
Groups II, III, V $300
37