Loading...
approved plans DP-2017-02.pdf76 Gas Stations CUPERTINO, CA OWNER:Liaoning Benefit Petroleum (US) Corporation ARCHITECT: Amir Khojasteh Campbell, CA 95008 Tel.: (408) 316-6168 PROJECT BUILDING DATA PROJECT LOCATION 3. CALIFORNIA FIRE CODE, 2016 SCOPE OF WORK SHEET INDEX COVER SHEET ARCHITECTURAL A.0.0 VICINITY MAP N.T.S. 4. CALIFORNIA ELECTRICAL CODE, 2016 5. CALIFORNIA MECHANICAL CODE, 2016 6. CALIFORNIA ENERGY CODE, 2016 8. CITY OF CUPERTINO CODES AND ORDINANCES, INCLUDING, BUT NOT LIMITED TO, FIRE AND ZONING. GENERAL NOTES SHEET WHERE SECTION 1. CALIFORNIA BUILDING CODE, 2016 2. CALIFORNIA PLUMBING CODE, 2016 APPLICABLE CODES: BUILDING DATA: IS DRAWN DETAIL IDENTIFICATION IS DRAWN SHEET WHERE DETAIL TYPE WALL DETAIL SECTION IDENTIFICATION SYMBOLS BUILDING SECTION RADIUSRAD SCHED ST.STL.or SS TRUE CW DIM DIA DET ELEC ELEV DWG EXH EXT EXP FLR GALV GA FIX FIN GYP FT GL (E) EQ EA FEET GAUGE GALVANIZED GLASS GYPSUM FIXTURE WD VOL W/ V.I.F. ELECTRICAL EQUAL EXTERIOR EXISTING EXHAUST EXPANSION FINISH FLOOR DETAIL DIAMETER DIMENSION DRAWING COLD WATER EACH ELEVATION SPECS SUSP THK TYP T.O.S. STD STL SQ REQ SHT SIM SC REF REINF REC RECT VERIFY IN FIELD WOOD VOLUME WITH SPECIFICATIONS STANDARD SUSPENDED TOP OF SLAB STAINLESS STEEL THICK TYPICAL SQUARE STEEL REQUIRED RECESSED RECTANGLE REFERENCE REINFORCED/ING SOLID CORE SCHEDULE SHEET SIMILAR O.F.C.I. ALUM ADJ APPROX A.F.F. ABBREVIATIONS BLDG CAB. CLR COL CONT CONST CONC CLG CSK PROJECT NAME CL BD L ELEVATION COLUMN POINT LINE GRID ROOM NUMBER ABOVE FINISHED FLOOR COUNTERSINK CONTINUOUS CONCRETE COLUMN CLEAR CEILING CENTER LINE CABINET CONSTRUCTION APROXIMATE ANGLE ALUMINUM ADJUSTABLE BUILDING BOARD O.C. O.D. NO./# NTS NIC (N) MECH MIN MTD MET MFR I.D. INSUL WALL SECTION CONTRACTOR INSTALLED NOT IN CONTRACT ON CENTER OUTSIDE DIAMETER OWNER FURNISHED, NOT TO SCALE NUMBER NEW INSIDE DIAMETER INSULATION MECHANICAL MANUFACTURER MOUNTED METAL MINIMUM NORTH CONSULTANTS Mike Foresee A.G.P. Design Group The project consists of a demolition of existing building, and build a new 2,487 sq. ft. of metal stud construction with 10490 S. De Anza Blvd. 10490 S. De Anza Blvd. Cupertino, CA 95014 Landscaping consists of turf and ground covers of varying heights with medium height shrubs, Trees, in clusters of 3 or 4, supply visual vertical screening at wood fence corners per landscaping drawings. Colored river rock is placed in certain areas to introduce a low maintenance item, providing a variety in materials at selected accent areas. FIRE SPRINKLERS NOTES: B) THE AUTOMATIC SPRINKLER SYSTEM SHALL BE INSTALLED IN ACCORDANCE WITH CFC, CMC. C) FAST RESPONSE FIRE SPRINKLER HEADS SHALL BE INSTALLED IN GARAGE AND WORKSHOP AREAS. D) THE SUPPRESSION CONTRACTOR SHALL PROVIDE TWO COPIES OF THE DRAWINGS AND CALCULATIONS E) THE DISTRICT SHALL ISSUE A PERMIT PRIOR TO INSTALLATION OF THE AUTOMATIC SPRINKLER SYSTEM. TO THE FIRE DISTRICT. PLANTING AND IRRIGATION SYSTEMS: BUBBLER IRRIGATION WILL BE USED FOR TREES AND SHRUBS POP-UP SPRINKLER HEADS WILL BE USED TO IRRIGATE THE TURF AREAS. CONCEALED QUICK COUPLER VALVES AND BACK FLOW PREVENTERS COMPLETE THE SYSTEM. LANDSCAPING WILL BE PRIVATELY MAINTAINED. ALL IRRIGATION PIPING SHALL BE PVC SCHEDULE 40, INSTALLED AT A DEPTH OF 18" BELOW GRADE. PROPOSED SITE PLAN EXISTING USE:Gas Station A.P.N.: EXISTING ZONING: ADDRESS: P (CG) LOT SIZE: GROSS Sq. ft.16,097 Sq.ft. LANDSCAPE COVERAGE 2,963 Sq. ft. BUILDING COVERAGE 18 % PAVING COVERAGE: 22 % 2,487 Sq. ft. 7,489 Sq. ft.58% EXISTING/ DEMO. SITE PLANA.1.0 1296 Virginia Ave. A) THE CITY OF CUPERTINO REQUIRES FIRE SPRINKLERS THROUGHOUT ALL NEW AND EXISTING BUILDINGS AND STRUCTURES SHALL BE PROVIDED IN THE LOCATIONS DESCRIBED IN THIS SECTION OR IN SECTION 903.2.1THE OWNER(S), OCCUPANT(S) AND ANY CONTRACTOR(S) OR SUBCONTRACTOR(S) ARE RESPONSIBLE FOR CONSULTING WITH THE WATER PURVEYOR OF RECORD IN ORDER TO DETERMINE IF ANY MODIFICATION OR UPGRADE OF THE EXISTING WATER SERVICE IS REQUIRED. BY CMC. FIRE WALLS AND FIRE BARRIERS USED TO SEPARATE BUILDING AREAS SHALL BE WATER SUPPLY REQUIREMENT: POTABLE WATER SUPPLIES SHALL BE PROTECTED FROM CONTAMINATION CAUSED BY FIRE PROTECTION WATER SUPPLIES. 2013 CFC AND HEALTH AND SAFETY CODE . TIMING OF INSTALLATION: WHEN FIRE APPARATUS ACCESS ROAD OR WATER SUPPLY FOR FIRE PROTECTION IS REQUIRED TO BE INSTALLED, SUCH PROTECTION SHALL BE INSTALLED AND MADE SERVICEABLE PRIOR TO AND DURING THE TIME OF CONSTRUCTION. TEMPORARY STREET SIGN SHALL BE INSTALLED AT EACH STREET INTERSECTION WHEN CONSTRUCTION OF NEW ROADWAYS ALLOWS PASSAGE BY VEHICLES, CFC. PREMISES IDENTIFICATION: APPROVED NUMBERS OR ADDRESSES SHALL BE PLACED ON ALL NEW BUILDING IN SUCH POSITION AS TO BE PLAINLY VISIBLE AND LEGIBLE FROM STREET OR ROAD FRONTING THE PROPERTY. NUMBERS SHALL CONTRAST WITH THEIR BACKGROUND. CFC. CONSTRUCTION SITE FIRE SAFETY: ALL CONSTRUCTION SITES MUST COMPLY WITH CFC. CHAPTER 33 AND STANDARD DETAIL AND SPECIFICATION SI-7. SITE Los Altos, CA 94024 Tel.: (650) 941-8055 E-mail: smpengineers@yahoo.com SMP ENGINEERS 1534 Carob Lane E-mail: agp@pacbell.net SPRINKLER Full 7. CALIFORNIA GREEN BUILDING CODES GREEN BUILDING CODE: CONTRACTOR TO COMPLY WITH CALIFORNIA BUILDING CODE AND REGULATIONS. SURVEY: FLOOR AREA RATIO 2,487 Sq.ft./ 16,097 Sq. ft. = 15% < 25% Max. EXISTING FOOT PRINT 1,221 Sq. ft. LAND USE:Commercial FENCE New wood fence Saied Razavi 10490 S. De Anza Blvd. Cupertino, CA 95014 FUTURE CONCEPTUAL INTERSECTION LAYOUTA.2.0 cement plaster finish convenience store. The new construction and new trash enclosure are fully sprinkered according to This building will construct based on the California Green Building code. The hours of operation for this location will 24 hours and the number of occupancy will be 10. PARKING Required : 7 Provided per City site study report 369-39-041 SURVEYT.1 CIVIL BUILDING ELEVATIONS, DOOR & WINDOW ELEVATIONSA.7.0 BUILDING SECTIONS, TRASH ENCLOSURE SECTIONA.8.0 LINE OF SITEA.9.0 TRASH ENCLOSURE, CANOPY ELEVATIONSA.4.0 FLOOR AREA DIAGRAMA.5.0 ROOF PLAN, DETAILSA.6.0 COVER SHEETC-1 GRADING & DRAINAGE PLANC-2 DETAILSC-3 STORM WATER CONTROL PLAN/ MEASURESC-4 STORM WATER CONTROL MEASURES/ DETAILSC-5 TRASH ENCLOSURE 235 Sq.ft./ 13,174 Sq. ft. = 2% (Sprinklered) Provided: 7 + 1 H.C. OCCUPANCY GROUP M TYPE OF CONSTRUCTION V-B STORIES 1 Type I Construction TRASH ENCLOSURE 235 Sq.ft.2 % The existing gas pumps will be slightly moved from west to the east in order to create more space for cars. to the California Fire code (CFC) and Building code (CBC). CONSTRUCTED IN ACCORDANCE WITH THE CALIFORNIA BUILDING CODE AND SHALL BE WITHOUT OPENING OR PENETRATIONS. ADDRESS IDENTIFICATION: NEW AND EXISTING BUILDING SHALL HAVE APPROVED ADDRESS NUMBERS, BUILDING NUMBERS OR BUILDING IDENTIFICATION PLACED IN , A POSITION THAT IS PLAINLY LEGIBLE AND VISIBLE FROM THE STREET OR ROAD FRONTING THE PROPERTY. THESE NUMBERS SHALL CONTRAST WITH THEIR BACKGROUND. WHERE REQUIRED BY THE FIRE CODE OFFICIAL, ADDRESS NUMBERS SHALL BE PROVIDED IN ADDITIONAL APPROVED LOCATION TO FACILITATE EMERGENCY RESPONSE. NUMBERS SHALL BE A MINIMUM OF 4 INCHES HIGH WITH A MINIMUM STROKE WIDTH OF 0.5 INCH. ADDRESS NUMBERS SHALL BE MAINTAINED . CFC SEC. 505.1. PROPOSED FLOOR PLAN, ENLARGED TOILET PLAN, DETAILSA.3.0 HAZMAT REVIEW: A SEPARATE REVIEW BY HAZMAT DIVISION IS REQUIRED. DETAILED PLANS FOR THE PROPOSED SYSTEM MUST BE SUBMITTED SEPARATELY AND DIRECTLY TO THE OFFICE LOCATED AT 14700 WINCHESTER BLVD. LOS GATOS, CA. ALL PERMITS REQUIRED BY HAZMAT DIVISION MU ST BE OBTAINED PRIOR TO COMMENCING WORK, OR AS INDICATED BY THE HAZMAT REVIEW. LANDSCAPING LANDSCAPE PLANL-1.0 FUTURE CONCEPTUAL SITE PLANL-2.0 EROSION CONTROL PLANC-6 COLOR AND MATERIAL A.10.0 RESTRICTIONS FOR SALES OF ALCOHOL: ( BEFORE LAND DEDICATION) 16,097 Sq. ft. FLOOR AREA RATIO 2,487 Sq.ft./ 14,103 Sq. ft. = 18% < 25% Max. ( AFTER LAND DEDICATION) RENDERING- 3DA.11.0 16,097 Sq. ft. - 14103 Sq.ft. = 1994 Sq.ft. ACTUAL LAND :BEFORE LAND DEDICATION 14,103 Sq. ft. ACTUAL LAND :AFTER LAND DEDICATION TOTAL LAND DEDICATION A.0.0COVER SHEETor reproduced in whole or part without the DESIGN GROUP,and may not be duplicated, usedThis drawing is the exclusive property of A.G.P.written permission of A.G.P.D.G.12"=1'-0" DRAWN BY: AS SHOWN PROJECT NO: CHECKED BY: SCALE: PLOT SCALE: AK DATE: AK ITEM REVISIONS NO.DATE Tel:(408) 316.6168 E-Mail:agp@pacbell.net Campbell, CA 95008 1296 Virgina, Ave. 08-18-2016 2016.01 10490 S. DE ANZA BLVD.CUPERTINO, CAPlanning Submittal 9/6/16 SITE Planning Submittal 12/11/17 Planning Comments 1/18/18 Planning Submittal 3/7/18 a. NO BEER OR WINE SHALL BE DISPLAYED WITHIN FIVE FEET OF THE CASH REGISTER OR THE FRONT DOOR UNLESS IT IS IN A PERMANENTLY AFFIXED COOLER. b. NO ADVERTISEMENT OF ALCOHOLIC BEVERAGES SHALL BE DISPLAYED AT MOTOR FUEL ISLANDS. c. NO SALE OF ALCOHOLIC BEVERAGES SHALL BE MADE FROM A DRIVE-IN WINDOW. d. NO DISPLAY OR SALE OF BEER OR WINE SHALL BE MADE FROM AN ICE TUB. e. NO BEER OR WINE ADVERTISING SHALL BE LOCATED ON MOTOR FUEL ISLANDS AND NO SELF- ILLUMINATED FOR BEER OR WINE SHALL BE LOCATED ON BUILDINGS OR WINDOWS. f. EMPLOYEES ON DUTY BETWEEN THE HOURS OF TEN P.M. AND TWO A.M. WHO SELL BEER OR WINE SHALL BE AT LEAST TWENTY-ONE YEARS OF AGE. PACIFICA DRIVE (68')S. DE ANZA BLVD.S00° 53' 50"W155.00S89° 00' 00"E 42.06 N00° 53' 50"E109.38N89° 00' 00"W 110.00 L=65.42. R=122.06' L=17.10' R=20.00' N49°53'19"E 3.69' 1221 sq.ft EXISTING KFC 2080 PACIFIC OFFICE CENTEREXISTING PARKING760 sq.ft (E) GARAGE 417 sq.ft (E) STORE PACIFICA DRIVE (68') PACIFICA DRIVE (68')S00° 53' 50"W155.00S89° 00' 00"E 42.06 N00° 53' 50"E109.38N89° 00' 00"W 110.00 KFC 2080 PACIFIC OFFICE CENTERH.C. 42.06 S89° 00' 00"E 2487 sq.ft16,097 sq.ft A.1.0 or reproduced in whole or part without the DESIGN GROUP,and may not be duplicated, usedThis drawing is the exclusive property of A.G.P.written permission of A.G.P.D.G.12"=1'-0" DRAWN BY: AS SHOWN PROJECT NO: CHECKED BY: SCALE: PLOT SCALE: AK DATE: 07-6-16 MF ITEM REVISIONS NO.DATE Tel:(408) 316.6168 E-Mail:agp@pacbell.net Campbell, CA 95008 NORTH1296 Virginia Ave.10490 S. DE ANZA BLVD.CUPERTINO, CAPLANNORTHPLANEXISTING SITE PLAN/ DEMO. PLAN PROPOSED SITE PLAN 1"=20'-0"SITE PLANSPlanning Submittal 9/6/16 1"=20'-0" CONDITION OF THE SPACE BEFORE CONSTRUCTION COMMENCES. FIELD VERIFY ALL DIMENSIONS AND EXISTING EQUIPMENT, EXISTING NOTIFY ARCHITECT OF ANY CONFLICTS BETWEEN CONSTRUCTION DOCUMENTS DOCUMENTS WHICH ARE REQUIRED BY AGENCIES FOR PLAN CHECK AND CONTRACTOR IS RESPONSIBLE FOR ALL MECHANICAL, HVAC WORK, AND ALL ELECTRICAL & MECHANICAL UTILITIES, ROOF ELEMENTS, PIPING, CONDUIT AND CONTRACTOR IS RESPONSIBLE FOR ALL ELECTRICAL WORK, SUCH AS OUTLETS, SWITCHES, WIRING AND ALL DOCUMENTS WHICH ARE REQUIRED BY ALL KEY NOTES GENERAL NOTES BUILDING PERMIT PROCESS. AND EXISTING CONDITIONS. AGENCIES FOR PLAN CHECK AND BUILDING PERMIT PROCESS. 4. 3. 2. 1. NEW 4" CONC. SEE CIVIL DWGS. 4 2 3 1 EXISTING DRIVE WAY TO BE CLOSED PATH OF TRAVEL EXISTING GAS PUMP TO BE RELOCATED 1 2 3 3 4 5 NEW 6" STEEL POST 6 NEW METAL ROOF , SEE SHEET A.6.0 6 DIAGRAM 5 6 7 (E) METAL ROOF TO BE REMOVED 8 (E) POST TO BE REMOVED 7 8 9 (E) AIR & WATER PUMP TO BE RELOCATED 10 (N) LOCATION OF AIR & WATER PUMP 10 9 11 (N) LOCATION OF (E) GAS PUMP 11 11 12 GATES 12 13 (N) EV 14 (N) CONC. CURB, SEE CIVIL DWGS. 14 Planning Review 2/21/17 NEW PLANTING AREA15 LAWN AREA 1616 16 BUILDING SIGN LOCATION 17 17 Planning Submittal 10/04/17 1515 NEW LOCATION OF EXISTING SIGN 18 18 LINE OF FUTURE CITY STREET ALIGNMENT19 19 20 21 LINE OF EXISTING PROPERTY LINE20 LINE OF EXISTING EASEMENT21 ONE HOUR FIRE RESISTANCE RATING WALL22 22 22 BOLLARD, PAINTED23 23 EXISTING DRIVE WAY TO REMAIN, SEE CIVIL DWGS.24 24 Planning Submittal 12/11/17 CLIMBING VINE PLANT25 25 25 STREET TREE, SEE SHEET L.128 TREE, SEE SHEET L.129 NEW FENCE26 WHEEL STOP, TYP.27 1315 26 27 28 29 29 LANDSCAPE AREA AREA 1: 140.87 SQ. FT. AREA 2: 490.10 SQ. FT. AREA 3: 87.30 SQ. FT. AREA 4: 557.68 SQ. FT. AREA 5: 1687.10 SQ. FT. TOTAL LANDSCAPE AREA: 2963.05 SQ. FT. 29 Planning Submittal 3/7/18 PACIFICA DRIVE (68')S. DE ANZA BLVD.S00° 53' 50"W155.00S89° 00' 00"E 42.06 N00° 53' 50"E109.38N89° 00' 00"W 110.00 L=65.42. R=122.06' L=17.10' R=20.00' N49°53'19"E 3.69' 1177 sq.ft EXISTING KFC 2080 PACIFIC OFFICE CENTEREXISTING PARKING760 sq.ft (E) GARAGE 417 sq.ft (E) STORE PACIFICA DRIVE (68')S00° 53' 50"W155.00S89° 00' 00"E 42.06 N00° 53' 50"E109.38N89° 00' 00"W 110.00 KFC 2080 PACIFIC OFFICE CENTERH.C. 42.06 S89° 00' 00"E 2494 sq.ft16,097 sq.ft A.2.0 or reproduced in whole or part without the DESIGN GROUP,and may not be duplicated, usedThis drawing is the exclusive property of A.G.P.written permission of A.G.P.D.G.12"=1'-0" DRAWN BY: AS SHOWN PROJECT NO: CHECKED BY: SCALE: PLOT SCALE: AK DATE: 07-6-16 MF ITEM REVISIONS NO.DATE Tel:(408) 316.6168 E-Mail:agp@pacbell.net Campbell, CA 95008 NORTH1296 Virginia Ave.10490 S. DE ANZA BLVD.CUPERTINO, CAPLANNORTHPLANEXISTING SITE PLAN/ DEMO. PLAN PROPOSED FUTURE SITE PLAN 1"=20'-0"FUTURE CONCEPTUALINTERSECTION LAYOUTPlanning Submittal 9/6/16 1"=20'-0" CONDITION OF THE SPACE BEFORE CONSTRUCTION COMMENCES. FIELD VERIFY ALL DIMENSIONS AND EXISTING EQUIPMENT, EXISTING NOTIFY ARCHITECT OF ANY CONFLICTS BETWEEN CONSTRUCTION DOCUMENTS DOCUMENTS WHICH ARE REQUIRED BY AGENCIES FOR PLAN CHECK AND CONTRACTOR IS RESPONSIBLE FOR ALL MECHANICAL, HVAC WORK, AND ALL ELECTRICAL & MECHANICAL UTILITIES, ROOF ELEMENTS, PIPING, CONDUIT AND CONTRACTOR IS RESPONSIBLE FOR ALL ELECTRICAL WORK, SUCH AS OUTLETS, SWITCHES, WIRING AND ALL DOCUMENTS WHICH ARE REQUIRED BY ALL KEY NOTES GENERAL NOTES BUILDING PERMIT PROCESS. AND EXISTING CONDITIONS. AGENCIES FOR PLAN CHECK AND BUILDING PERMIT PROCESS. 4. 3. 2. 1. NEW 4" CONC. SEE CIVIL DWGS. 4 2 3 1 EXISTING PROPERTY LINE PATH OF TRAVEL EXISTING GAS PUMP TO BE RELOCATED 1 2 3 3 4 5 NEW 10" STEEL POST 6 NEW METAL ROOF , SEE SHEET A2.1 6 DIAGRAM 5 6 7 (E) METAL ROOF TO BE REMOVED 8 (E) POST TO BE REMOVED 7 8 9 (E) AIR & WATER PUMP TO BE RELOCATED 10 (N) LOCATION OF AIR & WATER PUMP 10 9 11 (N) LOCATION OF (E) GAS PUMP 11 11 12 GATES 12 13 (N) EV 13 14 (N) CONC. CURB 14 Planning Review 2/21/17 NEW PLANTING AREA15 15 LAWN AREA 16 16 16 BUILDING SIGN LOCATION 17 17 Planning Submittal 10/04/17 15 15 17 NEW LOCATION OF EXISTING SIGN 18 LINE OF FUTURE CITY STREET ALIGNMENT 19 20 LINE OF EXISTING EASEMENT 21 ONE HOUR FIRE RESISTANCE RATING WALL22BOLLARD, PAINTED 23 CLIMBING VINE PLANT 19 20 21 22 23 Planning Comments 1/18/18 24 WHEEL STOP 24 Planning Submittal 3/7/18 25 STREET TREE, SEE SHEET L.1 26 TREE, SEE SHEET L.1 24 25 25 B C E F A 1 2 A 2487 sq.ft B B A G D 21.1 A.3.0 or reproduced in whole or part without the DESIGN GROUP,and may not be duplicated, usedThis drawing is the exclusive property of A.G.P.written permission of A.G.P.D.G.12"=1'-0" DRAWN BY: AS SHOWN PROJECT NO: CHECKED BY: SCALE: PLOT SCALE: AK DATE: 07-6-16 MF ITEM REVISIONS NO.DATE Tel:(408) 316.6168 E-Mail:agp@pacbell.net Campbell, CA 95008 1296 Virginia Ave.10490 S. DE ANZA BLVD.CUPERTINO, CANORTHPLANFLOOR PLAN 1/4"=1'-0"PROPOSED FLOOR PLANPlanning Submittal 9/6/16 CONDITION OF THE SPACE BEFORE CONSTRUCTION COMMENCES. FIELD VERIFY ALL DIMENSIONS AND EXISTING EQUIPMENT, EXISTING NOTIFY ARCHITECT OF ANY CONFLICTS BETWEEN CONSTRUCTION DOCUMENTS DOCUMENTS WHICH ARE REQUIRED BY AGENCIES FOR PLAN CHECK AND CONTRACTOR IS RESPONSIBLE FOR ALL MECHANICAL, HVAC WORK, AND ALL ELECTRICAL & MECHANICAL UTILITIES, ROOF ELEMENTS, PIPING, CONDUIT AND CONTRACTOR IS RESPONSIBLE FOR ALL ELECTRICAL WORK, SUCH AS OUTLETS, SWITCHES, WIRING AND ALL DOCUMENTS WHICH ARE REQUIRED BY ALL KEY NOTES GENERAL NOTES BUILDING PERMIT PROCESS. AND EXISTING CONDITIONS. AGENCIES FOR PLAN CHECK AND BUILDING PERMIT PROCESS. 4. 3. 2. 1. 2 x 3'-0"w TEMP. GLASS STORE FRONT ENTRY DOOR W/ PANIC HARDWARE 2 3 1 COUNTER STORE FRONT 4 METAL CANOPY ABOVE ALL MECHANICAL EQUIPMENT WIL BE ON THE ROOF.5. 5 SHELVES 6 EXISTING ELECTRICAL TO STAY 7 10" DIA. ALUMINUM COVER COLUMNNORTHPLANTOILET ENLARGED PLAN 1/2"=1'-0" H.C.PARKING N.T.S ADA FIXTURE HIGHTS N.T.S 8 3'-0"w - 1/4" TEMP. GLASS DOOR W/ PANIC HARDWARE 9 3'-0"w x 7'-0" h- H.M. DOOR 10 3'-0"w x 7'-0"h-WOOD DOOR 1 2 3 4 5 5 6 7 9 8 10 10 10 10 10 10 Planning Submittal 12/11/17ENLARGED TOILET PLAN, DETAILS11 EXTERIOR STUCCO FINISH OVER PLYWOOD SHEATG . FIRE RESISTANT 11 11 11 12 WASTE TRIO/ CIGARETTE UM 12 13 RECYCLE BIN 14 TRASH BIN 13 14 4 4 Planning Comments 1/18/18 6. 15 PROHIBITED AREA FOR DISPLAYING ANY KIND OF ALCOHOL BEVERAGES, MIN. OF 5 FEET. 15 a. NO BEER OR WINE SHALL BE DISPLAYED WITHIN FIVE FEET OF THE CASH REGISTER OR THE FRONT DOOR UNLESS IT IS IN A PERMANENTLY AFFIXED COOLER. b. NO ADVERTISEMENT OF ALCOHOLIC BEVERAGES SHALL BE DISPLAYED AT MOTOR FUEL ISLANDS. c. NO SALE OF ALCOHOLIC BEVERAGES SHALL BE MADE FROM A DRIVE-IN WINDOW. d. NO DISPLAY OR SALE OF BEER OR WINE SHALL BE MADE FROM AN ICE TUB. e. NO BEER OR WINE ADVERTISING SHALL BE LOCATED ON MOTOR FUEL ISLANDS AND NO SELF- ILLUMINATED FOR BEER OR WINE SHALL BE LOCATED ON BUILDINGS OR WINDOWS. f. EMPLOYEES ON DUTY BETWEEN THE HOURS OF TEN P.M. AND TWO A.M. WHO SELL BEER OR WINE SHALL BE AT LEAST TWENTY-ONE YEARS OF AGE. Planning Submittal 3/7/18 C C A.4.0 or reproduced in whole or part without the DESIGN GROUP,and may not be duplicated, usedThis drawing is the exclusive property of A.G.P.written permission of A.G.P.D.G.12"=1'-0" DRAWN BY: AS SHOWN PROJECT NO: CHECKED BY: SCALE: PLOT SCALE: AK DATE: 07-6-16 MF ITEM REVISIONS NO.DATE Tel:(408) 316.6168 E-Mail:agp@pacbell.net Campbell, CA 95008 1296 Virginia Ave.10490 S. DE ANZA BLVD.CUPERTINO, CACANOPY FRONT ELEVATION 1/4"=1'-0"TRASH ENCLOSURE & CANOPYCONDITION OF THE SPACE BEFORE CONSTRUCTION COMMENCES. FIELD VERIFY ALL DIMENSIONS AND EXISTING EQUIPMENT, EXISTING NOTIFY ARCHITECT OF ANY CONFLICTS BETWEEN CONSTRUCTION DOCUMENTS DOCUMENTS WHICH ARE REQUIRED BY AGENCIES FOR PLAN CHECK AND CONTRACTOR IS RESPONSIBLE FOR ALL MECHANICAL, HVAC WORK, AND ALL ELECTRICAL & MECHANICAL UTILITIES, ROOF ELEMENTS, PIPING, CONDUIT AND CONTRACTOR IS RESPONSIBLE FOR ALL ELECTRICAL WORK, SUCH AS OUTLETS, SWITCHES, WIRING AND ALL DOCUMENTS WHICH ARE REQUIRED BY ALL KEY NOTES GENERAL NOTES BUILDING PERMIT PROCESS. AND EXISTING CONDITIONS. AGENCIES FOR PLAN CHECK AND BUILDING PERMIT PROCESS. 4. 3. 2. 1. 8" CMU WALL WITH PLASTER CEMENT FINISH, COLOR TO MATCH BUILDING 2 3 1 METAL GATES, CORRUGATED METAL PANEL, SILVER SMITH SR1: 51 BY ATAS BRUSHED ALUM. COVERED OVER 10" DIA. STEEL COL. (COLOR BD. # 10) 4 ALUM. CANOPY FASCIA, DESIGN PER PETROLEUM'S COOPERATE SPEC. (BY OTHERS) ALL MECHANICAL EQUIPMENT WIL BE ON THE ROOF.5. 5 4" DIA. METAL POST WARPED WITH BRUSHED ALUM TO MATCH BUILDING COL. 6 7 NORTHPLANTRASH ENCLOSURE FLOOR PLAN 1/2"=1'-0" FRONT ELEVATION 1/2"=1'-0"ELEVATIONSCANOPY SIDE ELEVATION 1/4"=1'-0" 3 2 4 4 2 3 8 METAL ROOF, GALVANIZED SILVER, BY AEP SPAN 8 8 1 2 3 1 1 5 7 7 8 6" CONC. CURB 6 6 6 5 9 5 x 8 x 3/8" BASE PLATE 9 TRASH ENCLOSURE IS TYPE I CONSTRUCTION AND FULLY FIRE SPRINKLERED.6. 4 A-6 5 A-6 10 BOLLARD 10 Planing Submittal 12/11/17 CORRUGATED METAL PANEL, SILVER SMITH SR1: 51 BY ATAS (COLOR BD. # 1) 11 76 SIGN BY OTHERS 11 11 6 (COLOR BD. # 1) Planning Comments 1/18/18 Planing Submittal 3/7/18 A A-1 A-2A-3 A-4 A-5 A-6 A-7 B C D E F G H J 2487 sq.ft16,097 sq.ft A.5.0 or reproduced in whole or part without the DESIGN GROUP,and may not be duplicated, usedThis drawing is the exclusive property of A.G.P.written permission of A.G.P.D.G.12"=1'-0" DRAWN BY: AS SHOWN PROJECT NO: CHECKED BY: SCALE: PLOT SCALE: AK DATE: 07-6-16 MF ITEM REVISIONS NO.DATE Tel:(408) 316.6168 E-Mail:agp@pacbell.net Campbell, CA 95008 1296 Virginia Ave.10490 S. DE ANZA BLVD.CUPERTINO, CANORTHPLANFLOOR AREA DIAGRAM 1 4"=1'-0"FLOOR AREA DIAGRAMPlanning Submittal 9/6/16 CONDITION OF THE SPACE BEFORE CONSTRUCTION COMMENCES. FIELD VERIFY ALL DIMENSIONS AND EXISTING EQUIPMENT, EXISTING NOTIFY ARCHITECT OF ANY CONFLICTS BETWEEN CONSTRUCTION DOCUMENTS DOCUMENTS WHICH ARE REQUIRED BY AGENCIES FOR PLAN CHECK AND CONTRACTOR IS RESPONSIBLE FOR ALL MECHANICAL, HVAC WORK, AND ALL ELECTRICAL & MECHANICAL UTILITIES, ROOF ELEMENTS, PIPING, CONDUIT AND CONTRACTOR IS RESPONSIBLE FOR ALL ELECTRICAL WORK, SUCH AS OUTLETS, SWITCHES, WIRING AND ALL DOCUMENTS WHICH ARE REQUIRED BY ALL KEY NOTES GENERAL NOTES BUILDING PERMIT PROCESS. AND EXISTING CONDITIONS. AGENCIES FOR PLAN CHECK AND BUILDING PERMIT PROCESS. 4. 3. 2. 1. (4' x 9'-6") = 38 Sq. Ft.A: DIAGRAM Planning Review 2/21/17 Planning Submittal 10/04/17 (4' x 9'-8") = 38.66 Sq. Ft.A-1: (4'-4" x 4'-0") =17.33 Sq. Ft.A-2: (8'-10" x 8'-4") = 73.61 Sq. Ft.A-3: (13'-2 "x 14'-8") = 193.11 Sq. Ft.A-4: (17'-10" x 29'-4") = 523.11 Sq. Ft.A-5: (20'-6" x 28'-10") = 591.08 Sq. Ft.A-6: (11'-8" x 8'-0") = 93.33 Sq. Ft.A-7: (8'-6" x 9'-8") = 82.16Sq. Ft.B: (16''-4" x 8'-6") = 138.83 Sq. Ft.C: (13'-2" x 14'-8") = 193.11 Sq. Ft.D: (36'-10" x 10'-6") = 386.75 Sq. Ft.E: (8'-10" x 8'-0") = 70.66 Sq. Ft. ( OPEN SPACE)F: (8'-10" x 8'-0") = 70.66 Sq. Ft. (OPEN SPACE)G: (3' -6" x 4'-0") = 14 Sq. Ft.H: (4'-0" x 9'-0") = 36 Sq. Ft.J: TOTAL FLOOR AREA SQ. FT.: 2419.08 Planning Submittal 12/11/17 Planning Comments 2/21/18 TOTAL BUILDING SQ. FT.: 2487.00 Planning Submittal 3/7/18 PACIFICA DRIVE S00° 53' 50"W155.00S89° 00' 00"E 42.06 N00° 53' 50"E109.38N89° 00' 00"W 110.00 H.C.S. DE ANZA BLVD.S89° 00' 00"E 42.06 A.6.0 or reproduced in whole or part without the DESIGN GROUP,and may not be duplicated, usedThis drawing is the exclusive property of A.G.P.written permission of A.G.P.D.G.12"=1'-0" DRAWN BY: AS SHOWN PROJECT NO: CHECKED BY: SCALE: PLOT SCALE: AK DATE: 07-6-16 MF ITEM REVISIONS NO.DATE Tel:(408) 316.6168 E-Mail:agp@pacbell.net Campbell, CA 95008 1296 Virginia Ave.10490 S. DE ANZA BLVD.CUPERTINO, CANORTHPLAN ROOF PLAN 1/8"=1'-0"ROOF PLAN, DETAILSPlanning Submittal 9/6/16 CONDITION OF THE SPACE BEFORE CONSTRUCTION COMMENCES. FIELD VERIFY ALL DIMENSIONS AND EXISTING EQUIPMENT, EXISTING NOTIFY ARCHITECT OF ANY CONFLICTS BETWEEN CONSTRUCTION DOCUMENTS DOCUMENTS WHICH ARE REQUIRED BY AGENCIES FOR PLAN CHECK AND CONTRACTOR IS RESPONSIBLE FOR ALL MECHANICAL, HVAC WORK, AND ALL ELECTRICAL & MECHANICAL UTILITIES, ROOF ELEMENTS, PIPING, CONDUIT AND CONTRACTOR IS RESPONSIBLE FOR ALL ELECTRICAL WORK, SUCH AS OUTLETS, SWITCHES, WIRING AND ALL DOCUMENTS WHICH ARE REQUIRED BY ALL KEY NOTES GENERAL NOTES BUILDING PERMIT PROCESS. AND EXISTING CONDITIONS. AGENCIES FOR PLAN CHECK AND BUILDING PERMIT PROCESS. 4. 3. 2. 1. FLAT ROOF 4 2 3 1 METAL PANEL SCREEN MECHANICAL EQUIPMENT LOCATION FLAT OVERHANG BELOW, SEE ELEVATION FOR LOCATION 3 5 Planning Reviewl 2/21/17 NEW LOCATION OF (E) SIGN 1 3 1 1 4 2 5 TRASH ENCLOSURE ROOF PLAN 1/4"=1'-0" ENLARGED SECTION SECTION @ BEAM METAL ROOF DECKING N.T.S. 1 N.T.S. 2 N.T.S. 3 ROOF SUPPORT DETAIL N.T.S. 4 CMU DOWELS DETAIL N.T.S. 5 2 1 Planning Submittal 12/11/17NORTHPLAN Planning Comments 1/18/18SLOPE Planning Submittal 3/7/18 FOOD MART new NEW A.7.0 or reproduced in whole or part without the DESIGN GROUP,and may not be duplicated, usedThis drawing is the exclusive property of A.G.P.written permission of A.G.P.D.G.12"=1'-0" DRAWN BY: AS SHOWN PROJECT NO: CHECKED BY: SCALE: PLOT SCALE: AK DATE: 07-6-16 MF ITEM REVISIONS NO.DATE Tel:(408) 316.6168 E-Mail:agp@pacbell.net Campbell, CA 95008 1296 Virginia Ave.10490 S. DE ANZA BLVD.CUPERTINO, CAEAST ELEVATION 1/8"=1'-0"ELEVATIONSPlanning Submittal 9/6/16 WEST ELEVATION 1/8"=1'-0" NORTH ELEVATION 1/8"=1'-0" SOUTH ELEVATION 1/8"=1'-0" PLANNING REVIEW 6/20/17 KEY NOTES CORRUGATED METAL PANEL, SILVER SMITH SR1:51 (COLOR BD. #1)1 EXTERIOR BUILDING LIGHT, TEX 30"L x 12"W x 4"D (COLOR BD. #3)2 EXTERIOR CEMENT PLASTER- SMOOTH FINISH, KELLY MOORE -KM 237-L BLUE HARMONY"3 ALUMINUM STOREFRONT DOOR & FRAME, LT601-70 BLACK 3P (COLOR BD. #7)4 STOREFRONT WINDOWS, AA 250/ 425 THERMAL WINDOWS ENTRANCED & STOREFRONTS5 ALUMINUM METAL COMPOSITE PANELS, BTR-RED - ALPOLIC MFG. OR EQUAL (COLOR BD. # 9) 6 ALUMINUM METAL COMPOSITE PANELS, BPS-PEARL - ALPOLIC MFG. OR EQUAL7 ALUMINUM METAL COMPOSITE PANELS, BSM SLATE BLACK MATTE - ALPOLIC MFG. OR EQUAL8 1 1 3 4 5 7 6 6 8 10" DIA. METAL COLUMN WARPED WITH BRUSHED ALUMINUM 9 NEW LOCATION OF EXISTING AIR AND WATER PUMP101091 TRASH ENCLOSURE11 11 67 31 6 6 6 11 METAL DOWNSPOUT12 12 2 1 9 9 GAS PUMP13 13 1 14 BICYCLE RACK14 6 1 6 8 2 12 5 4 9 17 6 73 1 21 6 3 8 6 1 9 13 9 5 4 8 5 BUILDING SIGNS15 15 (OPTION- SMOOTH CEMENT PLASTER FINISH COLOR- KELLY MOORE #45 WHITE SHADOW) BOLLARD, PAINTED16 16 16 16 1/4"=1'-0" EXTERIOR DOOR AND WINDOW ELEVATION 1/4"=1'-0" EXTERIOR DOOR AND WINDOW ELEVATION Planning Submittal 12/11/17DOOR & WINDOW ELEVATION17 4" DIA. METAL COLUMN WARPED WITH BRUSHED ALUMINUM (COLOR BD. # 10) 17 (COLOR BD. # B) (COLOR BD. #8) (COLOR BD. # A OR # 9) (COLOR BD. # 9) (COLOR BD. # 10) 18 METAL ROOF (COLOR BD. # 2) 18 18 18 18 18 18 18 18 Planning Comments 1/18/18 Planning Comments 2/21/18 Planning Submittal 3/7/18 4 4 5 5 444 5 5 5 B C E FA GD 1 2 A.8.0 or reproduced in whole or part without the DESIGN GROUP,and may not be duplicated, usedThis drawing is the exclusive property of A.G.P.written permission of A.G.P.D.G.12"=1'-0" DRAWN BY: AS SHOWN PROJECT NO: CHECKED BY: SCALE: PLOT SCALE: AK DATE: 07-6-16 MF ITEM REVISIONS NO.DATE Tel:(408) 316.6168 E-Mail:agp@pacbell.net Campbell, CA 95008 1296 Virginia Ave.10490 S. DE ANZA BLVD.CUPERTINO, CABUILDING SECTION A-A 1/4"=1'-0"BUILDING SECTIONSPlanning Submittal 9/6/16 CONDITION OF THE SPACE BEFORE CONSTRUCTION COMMENCES. FIELD VERIFY ALL DIMENSIONS AND EXISTING EQUIPMENT, EXISTING NOTIFY ARCHITECT OF ANY CONFLICTS BETWEEN CONSTRUCTION DOCUMENTS DOCUMENTS WHICH ARE REQUIRED BY AGENCIES FOR PLAN CHECK AND CONTRACTOR IS RESPONSIBLE FOR ALL MECHANICAL, HVAC WORK, AND ALL ELECTRICAL & MECHANICAL UTILITIES, ROOF ELEMENTS, PIPING, CONDUIT AND CONTRACTOR IS RESPONSIBLE FOR ALL ELECTRICAL WORK, SUCH AS OUTLETS, SWITCHES, WIRING AND ALL DOCUMENTS WHICH ARE REQUIRED BY ALL KEY NOTES GENERAL NOTES BUILDING PERMIT PROCESS. AND EXISTING CONDITIONS. AGENCIES FOR PLAN CHECK AND BUILDING PERMIT PROCESS. 4. 3. 2. 1. FLAT ROOF (COLOR BD. # 2) 4 2 3 1 METAL PANEL SCREEN (COLOR BD. # 1) FLAT OVERHANG BELOW, SEE ELEVATION FOR LOCATION 3 5 STRUCTURAL JOIST 1 2 METAL FASCIA (COLOR BD. # 9) 3 4 5 6 SUSPENDED CEILING 6 7 CORR. METAL ROOFING, COATED WITH RUST INHIBITED PAINT BUILDING SECTION B-B 1/4"=1'-0" 6 3 2 1 4 TRASH ENCLOSURE SECTION A-A 1/4"=1'-0" 8 WELD ANGLE STL. 1 1/2" x 6"x 3/8" PLATE TO STL JOIST, USE #8 SCREWS TO FASCIA BD. 9 GA 20,G.I EDGE FLASHING 10 4 x 4 x 1/4" HSS PERPEN. TO BEAM 11 12" ROOF OVERHANG TYP. 12 8" CMU WALL 13 GA 20, G.I. GUTTER 14 GATE HINGES INTO MTL. BOLLARD 15 MTL. GATE 16 DRIVEWAY LEVEL (CONC. APRON) 78 9 10 11 12 13 1516 Planning Submittal 12/11/17TRASH ENCLOSURE SECTIONS4 17 CEMENT PLASTER FINISH "KELLY MORE 237-L BLUE HARMONY" 17 17 18 CEMENT PLASTER FINISH "KELLY MORE 45 WHITE SHADOW" 18 (COLOR BD. # B) (COLOR BD. # A OR # 9)) (COLOR BD. # 6) (COLOR BD. # 2) Planning Submittal 3/7/18 new A.9.0 or reproduced in whole or part without the DESIGN GROUP,and may not be duplicated, usedThis drawing is the exclusive property of A.G.P.written permission of A.G.P.D.G.12"=1'-0" DRAWN BY: AS SHOWN PROJECT NO: CHECKED BY: SCALE: PLOT SCALE: AK DATE: 07-6-16 MF ITEM REVISIONS NO.DATE Tel:(408) 316.6168 E-Mail:agp@pacbell.net Campbell, CA 95008 1296 Virginia Ave.10490 S. DE ANZA BLVD.CUPERTINO, CALINE OF SIGHTPlanning Submittal 12/11/17 PACIFICA STRET - PROPOSED SOUTH VIEW N.T.S DE ANZA BLVD. - EXISTING EAST VIEW N.T.S DE ANZA BLVD. - PROPOSED EAST VIEW N.T.S PACIFICA STRET - EXISTING SOUTH VIEW N.T.S Planning Comments 2/21/18 3/7/18Planning Submittal A.10.0 or reproduced in whole or part without the DESIGN GROUP,and may not be duplicated, usedThis drawing is the exclusive property of A.G.P.written permission of A.G.P.D.G.12"=1'-0" DRAWN BY: AS SHOWN PROJECT NO: CHECKED BY: SCALE: PLOT SCALE: AK DATE: 07-6-16 MF ITEM REVISIONS NO.DATE Tel:(408) 316.6168 E-Mail:agp@pacbell.net Campbell, CA 95008 1296 Virginia Ave.10490 S. DE ANZA BLVD.CUPERTINO, CACOLOR AND MATERIALPlanning Submittal 12/11/17 Planning Comments 2/21/18 3/7/18Planning Submittal A.11.0 or reproduced in whole or part without the DESIGN GROUP,and may not be duplicated, usedThis drawing is the exclusive property of A.G.P.written permission of A.G.P.D.G.12"=1'-0" DRAWN BY: AS SHOWN PROJECT NO: CHECKED BY: SCALE: PLOT SCALE: AK DATE: 07-6-16 MF ITEM REVISIONS NO.DATE Tel:(408) 316.6168 E-Mail:agp@pacbell.net Campbell, CA 95008 1296 Virginia Ave.10490 S. DE ANZA BLVD.CUPERTINO, CARENDERING- 3DPlanning Submittal 12/11/17 Planning Comments 2/21/18 3/7/18Planning Submittal SMP ENGINEERS “ ” CITY ENGINEER'S SIGNATURE FOR LOCATION OF GAS PUMPS SEE ARCHITECTURAL PLANS.USE NDS 900FFRTL CATCH BASIN FILTER. CITY WILL NEED A CONSTRUCTION EASEMENT ON THE PROPERTY IN ORDER TO CONFORM FUTURE STREET PAVEMENT TO THE PROJECT SITE WHEN THE ROAD IS WIDENED. ADA ACCESSIBLE PATH TO BE CROSS-STRIPED. SMP ENGINEERS X PLAN Y X Y SECTION Y-YSECTION X-X ELEVATION VIEW SMP ENGINEERS PACIFIC DRIVE (68')S. DE ANZA BLVD.(VARIES)S00° 53' 50"W155.00S89° 00' 00"E 42.06 N00° 53' 50"E 109.38 N89° 00' 00"W 110.00 L=65.42. R=122.06' L=17.10' R=20.00' N49°53'19"E 3.69' H.C. CITY WILL NEED A CONSTRUCTION EASEMENT ON THE PROPERTY IN ORDER TO CONFORM FUTURE STREET PAVEMENT TO THE PROJECT SITE WHEN THE ROAD IS WIDENED. ADA ACCESSIBLE PATH TO BE CROSS-STRIPED. Pervious Material Design Criteria: 1 3 2 S. DE ANZA BLVD.(VARIES)S00° 53' 50"W155.00N00° 53' 50"E 109.38 N89° 00' 00"W 110.00 L=65.42. R=122.06' L=17.10' R=20.00' N49°53'19"E 3.69' PLAN VIEW SECTION A - A STORM INLET SEDIMENT TRAP-FIBER ROLLS CONCRETE WASHOUT AREA EROSION AND SEDIMENT CONTROL NOTES AND MEASURES EXISTING DRAINAGE INLET PROTECTION PLAN FIBER ROLL NOTES FIBER ROLL SECTION B-B TEMPORARY COVER ON STOCK PILE PERSPECTIVE STABILIZED CONSTRUCTION ENTRANCE (TO BE MAINTAINED) Maintenance PLAN PROFILE SMP ENGINEERS PACIFICA DRIVES. DE ANZA BLVD.S00° 53' 50"W155.00 S89° 00' 00"E42.06N00° 53' 50"E109.38N89° 00' 00"W110.00H.C.42.06S89° 00' 00"EFueling StationConvenience Store L.1.012"=1'-0"DRAWN BY:AS SHOWNPROJECT NO:CHECKED BY:SCALE:PLOT SCALE:RCDATE:11-15-17RCITEMREVISIONSNO.DATETel:(408) 316.6168E-Mail:agp@pacbell.netCampbell, CA 950081296 Virginia Ave.10490 S. DE ANZA BLVD. CUPERTINO, CA NORTH PLANLANDSCAPE PLAN - PHASE I1"=20'-0"LANDSCAPE PLAN**Landscape ArchitectureUrban DesignMenlo Park, CA 94025640 Menlo Ave, Suite 10Tel 650 326 6100a s s o c i a t e sca@ciardella-assoc.comF 650 285 4537CiardellaPLANTING LEGENDPLANTING NOTESPLANT IMAGES PACIFICA DRIVES. DE ANZA BLVD.S00° 53' 50"W 155.00 S89° 00' 00"E42.06N00° 53' 50"E109.38N89° 00' 00"W110.00H.C.42.06S89° 00' 00"EFueling StationConvenience Store L.2.012"=1'-0"DRAWN BY:AS SHOWNPROJECT NO:CHECKED BY:SCALE:PLOT SCALE:RCDATE:11-15-17RCITEMREVISIONSNO.DATETel:(408) 316.6168E-Mail:agp@pacbell.netCampbell, CA 950081296 Virginia Ave.10490 S. DE ANZA BLVD. CUPERTINO, CA**Landscape ArchitectureUrban DesignMenlo Park, CA 94025640 Menlo Ave, Suite 10Tel 650 326 6100a s s o c i a t e sca@ciardella-assoc.comF 650 285 4537CiardellaPLANTING LEGENDPLANTING NOTESNORTH PLANLANDSCAPE PLAN - PHASE II1"=20'-0"PLANT IMAGESLANDSCAPE PLAN - PHASE II PH.0 12"=1'-0" DRAWN BY: AS SHOWN PROJECT NO: CHECKED BY: SCALE: PLOT SCALE: AK DATE: 07-6-16 MF ITEM REVISIONS NO.DATE10490 S. DE ANZA BLVD.CUPERTINO, CAPHOTOSSOUTH SOUTH WEST EAST EAST SCALE: PROJECT NAME: DATE: PROJECT NO.:SHEETNO.:PROJECT TITLE:PH.1 N.T.S 8/28/2016 PHOTO PACIFIC ST./ DE ANZA BLVD.- NORTH PACIFIC ST.- SOUTH 76 Gas Stations10490 S. De Anza Blvd. CUPERTINO, CA SCALE: PROJECT NAME: DATE: PROJECT NO.:SHEETNO.:PROJECT TITLE:PH.2 N.T.S 8/28/2016 PHOTO PACIFIC ST.- EAST PACIFIC ST.- WEST 76 Gas Stations10490 S. De Anza Blvd. CUPERTINO, CA SCALE: PROJECT NAME: DATE: PROJECT NO.:SHEETNO.:PROJECT TITLE:PH.3 N.T.S 8/28/2016 PHOTO DE ANZA BLVD.- NORTH DE ANZA BLVD.- SOUTH 76 Gas Stations10490 S. De Anza Blvd. CUPERTINO, CA SCALE: PROJECT NAME: DATE: PROJECT NO.:SHEETNO.:PROJECT TITLE:PH.4 N.T.S 8/28/2016 PHOTO DE ANZA BLVD.- EAST DE ANZA BLVD.- WEST 76 Gas Stations10490 S. De Anza Blvd. CUPERTINO, CA T-1 APN: 369-39-041 CITY OF CUPERTINO 10490 S. DE ANZA BLVD. CUPERTINO, CA TOPOGRAPHIC SURVEY MAP .')'0&#$$4'8+#6+105