CC Resolution No. 9631 . . . - , . . 4Sf,. .,r..:.;q`< . . .
. ~ •
RESOLUTION NO. 9631 '
A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF CUPERTINO •
APPROVING CONTRACT CHANGE ORDER NO. 1 FOR DE ANZA
BOULEVARD OVERCROSSMG WIDENING, PROJECT 94-9429
RESOLVED by the City Council of the City of Cupertino, California, that
Change Order No. 1 for changes to work which hus been approved by the Director of
Public Works and this day presented to this Council, be, and it is hereby approved in
conjunction with the project known as
DE ANZA E30ULEVARD OVERCROSS[NG WIDENING,
PROJECT 949429
BE IT FURTHER RESOLVED that funds are available and no further
appropriation is necessary.
PASSED AND ADOPTED at a regulaz meeting of the City Council of the City of
Cupertino this 17th day of 1une,1996, by the following vote:
YsI~ D~ml~srs Qf th~ ~iiX ~il
AYES: Bautieta, Chang. Dean, Sorensen, Bumett
NOES: None
ABSENT: None
ABSTAM: None
ATTEST: . APPROVED:
~ _
' City Clerk Mayor, City of Cupertino
i
I
I
i . . . . . . . . .
. • •
ti
~ ~ 10300 Torte Avenue
Cupertino, CA 95014-3202
t i I~ ul' (408) 777-3354
~_~L 1~) L 1 t121 FAX (408) 977-3333
Public Worla Depariment
DE ANZA BOULEVARD OVERCROSSING WIDEMNG
PROJECT 949429
CONTRACT CHANGE ORDER NO. i
CONTRACTOR
RGW Construction, Inc.
i 43801 Osgood Road
! Fremont, CA 94539
The foilowing changes are hereby approved for this project:
tA Additional Flagging S 1,248.11
18 TemporarySignatElectrical ~~4U8•~4
IC Additional Irrigation Backfow Preventor & Conduit 4,8T2.63
lD Additional MeWI Beam Guardtail 10,93838
1 E Additional Electrical Box & Conduit, Movc Ped Head 3,950.80
i F Pomeroy Girder Lcngth Changes 1,27339
IG Cupertino inn Driveway 2,213.79
! H Remedial Deck Work 8c Sawcut Deck 2,751.95
il RewiningWall Hydrant&Handrait 3.644.87
1J Temporary Drop Inlet ~8•6~
1K AC Overlay of De Anza 47,520.00
I L Cut Additional Loops 8,736.00
1M ConnectWaterMcter 452.00
tN Additional Striping, Signs & Marken 4,569.09
10 Sign Post Replacemrnt ~0.~
IP Insta1170'TypeCt-6Fencing 1.213.t1
1Q Modify Handicap Etamps 4,410.00
IR Quantiry Adjustrnrnu 4•g~~~
Total Chaage Ordtr Na i S 105,384.93
Total Projeet:
Original Contract S 2,152,676.50
Change Orda No. 1 105_384.93
Revised Contract S 2,258,061.43
CONTRACTOR CiTY OF CUPERTINO
Bert 1. Vukovich
Director of Pubiic Work+
Title:
Ciry Councii: lune 17, 1996
Datc: Resolution No. 9631
.