Loading...
CC Resolution No. 9631 . . . - , . . 4Sf,. .,r..:.;q`< . . . . ~ • RESOLUTION NO. 9631 ' A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF CUPERTINO • APPROVING CONTRACT CHANGE ORDER NO. 1 FOR DE ANZA BOULEVARD OVERCROSSMG WIDENING, PROJECT 94-9429 RESOLVED by the City Council of the City of Cupertino, California, that Change Order No. 1 for changes to work which hus been approved by the Director of Public Works and this day presented to this Council, be, and it is hereby approved in conjunction with the project known as DE ANZA E30ULEVARD OVERCROSS[NG WIDENING, PROJECT 949429 BE IT FURTHER RESOLVED that funds are available and no further appropriation is necessary. PASSED AND ADOPTED at a regulaz meeting of the City Council of the City of Cupertino this 17th day of 1une,1996, by the following vote: YsI~ D~ml~srs Qf th~ ~iiX ~il AYES: Bautieta, Chang. Dean, Sorensen, Bumett NOES: None ABSENT: None ABSTAM: None ATTEST: . APPROVED: ~ _ ' City Clerk Mayor, City of Cupertino i I I i . . . . . . . . . . • • ti ~ ~ 10300 Torte Avenue Cupertino, CA 95014-3202 t i I~ ul' (408) 777-3354 ~_~L 1~) L 1 t121 FAX (408) 977-3333 Public Worla Depariment DE ANZA BOULEVARD OVERCROSSING WIDEMNG PROJECT 949429 CONTRACT CHANGE ORDER NO. i CONTRACTOR RGW Construction, Inc. i 43801 Osgood Road ! Fremont, CA 94539 The foilowing changes are hereby approved for this project: tA Additional Flagging S 1,248.11 18 TemporarySignatElectrical ~~4U8•~4 IC Additional Irrigation Backfow Preventor & Conduit 4,8T2.63 lD Additional MeWI Beam Guardtail 10,93838 1 E Additional Electrical Box & Conduit, Movc Ped Head 3,950.80 i F Pomeroy Girder Lcngth Changes 1,27339 IG Cupertino inn Driveway 2,213.79 ! H Remedial Deck Work 8c Sawcut Deck 2,751.95 il RewiningWall Hydrant&Handrait 3.644.87 1J Temporary Drop Inlet ~8•6~ 1K AC Overlay of De Anza 47,520.00 I L Cut Additional Loops 8,736.00 1M ConnectWaterMcter 452.00 tN Additional Striping, Signs & Marken 4,569.09 10 Sign Post Replacemrnt ~0.~ IP Insta1170'TypeCt-6Fencing 1.213.t1 1Q Modify Handicap Etamps 4,410.00 IR Quantiry Adjustrnrnu 4•g~~~ Total Chaage Ordtr Na i S 105,384.93 Total Projeet: Original Contract S 2,152,676.50 Change Orda No. 1 105_384.93 Revised Contract S 2,258,061.43 CONTRACTOR CiTY OF CUPERTINO Bert 1. Vukovich Director of Pubiic Work+ Title: Ciry Councii: lune 17, 1996 Datc: Resolution No. 9631 .