Loading...
CC Resolution No. 9031 RESOLUTION NO. 9031 A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF CUPERTINO RESCINDING RESOLUTION NO, 8465 AND ESTABLISHING USER FEES WHEREAS, the State of California requires fees charged for service rendered not to exceed the cost of delivering said services; and WHEREAS, a public hearing has been held to review user fees; and WHEREAS, the City Council of the City of Cupertino has established guidelines for setting user fees; NOW, THEREFORE, BE IT RESOLVED that: 1, User fees are established per attachments A through G. 2. All user fees previously established by Council action or resolution are hereby superseded. PASSED AND ADOPTED at a regular meeting of the City Council of the City of Cupertino this ~ day of FebruAry , 1994, by the following vote. ~ Members of the Ci~ Council AYES: NOES: ABSENT: ABSTAIN: Bautista, Burnett, Dean, Sorensen, Koppel None None None APPROVED: Isl Barb Koppel Mayor, City of Cupertino ATTEST: Isl Kim Marie Smith City Clerk CITY OF CUPERTINO SUMMARY OF USER FEES DEPARTMENT SCHEDULE General A Engineering B Planning C Building D Water E Recreation F Miscellaneous G II-If SCHEDULE A GENERAL 11-2-1 Schedule A CITY OF CUPERTINO General Copying Service 1-20 copies 21 + Returned Check $0.55 .03 each additional 15.00 Late payment on 30 day delinquent city invoices Bicycle License 7% per annum Municipal Code Book Damage to city property (rate per hour) Grounds Streets Facilities Traffic - Engineering Traffic - Maintenance Plus materials and outside services 2.001 year 53.00 49.00 46.00 61.00 43.00 33.00 Cable T.V, Two persons minimum 2 hrs. 70.001 hour Tape Dubbing Full Tape Selective Dubbing Plus material cost 6.001 tape 14.001 tape Fingerprinting Processing Code Enforcement 42.00 Massage Establishment Administration Fee 34.001 hour 67.00 2 /1-2..3 SCHEDULE B ENGINEERING ,- I !~;z) Schedule B CITY OF CUPERTINO Engineering Street Cuts Permit to excavate in public right of way. Grading Permit To insure grading conforms to city ordinances and council approvals. Minimum Fee Or 6% oflmprovement Value Parcel Map I Tract Maps To insure maps conform to state map act and council approvals. Parcel Map Tract Map Plan Checking and Inspection Review only (no permit issued) Permit Fee or Residential 5% of Site Improvement Commercial 6% of Site Improvement Annexation (plus county filing fees) Certificates of Compliance To verify lots were not created in violation of local ordinances or state map act. 3 $168.00 142.00 381.00 1-4 lots 381.00 + 8.00 each lot over 4 266.00 1744.00 minimum 513.00 538.00 11~).1 Schedule B CITY OF CUPERTINO Engineering (continued) Encroachment permit To allow private facilities or improvements to be placed in public right of way. $125.00 residential 161.00 non-residential Lot line adjustment City must verify that lots after adjustment conform to zoning and setbacks. 280.00 Power cost Developer is responsible for one year power cost for street lights. The latest effective P,G. & E. rate schedule approved by the P.U.C. Plus any materialslservice fees. 24.00 short report 139,00 long report Soil and Geology report Engineering Copies Microfiche Engineering Copies Microfilm Blueline 6,001 copy 7.001 copy 8.001 copy 3.001 copy 220.00 Banners 4 /I~.;¡.J SCHEDULE C PLANNING 11- ~1 Schedule C CITY OF CUPERTINO DEFINITION OF PLANNING FEE SERVICES Full Application :\I1 al?plication w~ch. typicall>: involves, all steps of Û?-e development review process lllcludlllg Pre-apphcanon Revtew, Envuonmental Revtew Committee. the Planning Commission, and the City Council. The application requires an advertised public hearing before the Planning Commission and a public hearing or agendized review before the City Council. Applications requiring the preparation of an Environmental Impact Report (EIR) are included in this category, The application fee for particularly complicated applications and those requiring the preparation of an EIR will be based upon an hourly rate as described in the fee schedule. Limited Application An application which involves all steps of the development review process outlined in the Full Application description with the exception of the City Council. Minor Application An application which involves minimAl steps in the review process and is exempt from the California Environmental Act. The staff evaluation and report preparations are less extensive, The application requires Planning commission review. Miscellaneous Application An application which typically involves a non noticed review by the Planning Commission, The application does not typically require pre application m~ or Environmental Review and involves minimal staff preparation. Examples of this application are interpretation or clarification of conditions of approval or ordinance requirements, sign exceptions, fence exceptions, and tentative map and use permit extensions. Appeal. A request from the project applicant or interested party to reverse or amend a decision made by staff or an advisory body, An appointed public official serving on the board that made the decision subject to the appeal, an appointed public official serving on a board that is directly affected by the decision and the City Council members are exempted from the fee requirement, s /!~JI Schedule C CITY OF CUPERTINO DEFINITION OF PLANNING FEE SERVICES (continued) Directors Application An application which receives final approval by staff either via an advertised public hearing or non hearing format, The application may involve a pre application mccting and/or Environmental Review Committee review. Tempo~ SiiJI Pennit A staff review of a temporary sign application which includes an evaluation of the sign request, the entry into the temporary log and site review by Code Enforcement Officers. The permit fcc is in addition to the submittal of a deposit to guarantee removal of the sign upon expiration of the temporary permit. NOTES: Combined applications which are processed simultaneously (i.e., filed at the same time) will be classified based on highest rating. Mixed use applications will be classified based upon the highest intensity and review process. The Director of Community Development will have discretion to classify projects based upon the above criteria. 6 11- 3;2- Schedule C CITY OF CUPERTINO Planning Full Application Zoning Tentative Map Use Permit Application that requires staff time in excess of 48 hours will be charged an hourly rate of Limited Application Use Permit Tentative Map Amendment $1847.00 1847.00 1509.00 38.00 1061.00 1136.00 876.00 Minor Application Use Permit Tentative Map Hillside Exception Architectural and Site Approval Sign Exception Fence Exception Tentative Map and use Permit Extension 1018.00 1018.00 972.00 384.00 327.00 139.00 139.00 373.00 Miscellaneous Application, General Director Tentative Map - Lot Consolidation Variance . Minor Amendment Sign Permit Temporary Sign Permit Address Change Appeal 642.00 706.00 146.00 69.00 32.00 93.00 373.00 7 11-33 SCHEDULE D BUILDING -- ((-J) Schedule D CITY OF CUPERTINO Building Valuation Schedule OCCUPANCY AND TYPE I, APARTMENT HOUSES "Type I or II F.R. Type V - Masonry or Type III Type V - Wood Frame Type I - Basement Garage REMODEL COST PER SO. FT. COST PER NEW SO. FT. $33.00 27.00 25.00 15.00 $98.31 80,00 72.21 33.79 2. AUDITORWMS: Type I or II F.R. Type II - I-Hour Type 11 - N Type 111 - I-Hour Typel11-N Type V - I-Hour Type V - N 3. BANKS: " Type I or 11 F.R. Type 11 - I-Hour Type 11 - N Type III - I-Hour Type 111 - N Type V - I-Hour Type V - N 4. BOWLING ALLEYS: Type II - I-Hour Type 11 - N Type 111- I-Hour Type 111- N Type V - I-I Hour $34.00 25.00 25.00 25.00 25.00 25.00 25.00 $94.69 67.24 63.85 71.87 68,00 66.00 62.72 $43.00 43.00 43.00 44.00 44.00 )5,00 35.00 $135.60 97.41 92,77 11 0.40 105.43 97.41 92,66 $2\.00 2\.00 2\.00 2\.00 2\.00 $45.31 43.28 49,72 47.35 42.38 5. CHURCHES: Type I or 11 F,R. 531.00 Type 11 . I-Hour 25.00 Type 11 . N 25.00 Type 111 . I·Hour 25.00 Type III . N 25.00 Type V - I-Hour 25.00 Type V - N 25.00 Type 111 - I-Hour 3 \.00 Type V - I-Hour 3\.00 "Add 0.5 percent to total cost for each story over three .. Deduct II percent for mini-warehouses .. "Deduct 20 percent for "shell only· buildings 589.50 .. 66.90 63.51 7\.76 68.37 65.31 62.15 90.51 8\.47 8 II~J 7 Schedule D CITY OF CUPERTINO Building Valuation Schedule OCCUPANCY AND TYPE 6. CONVALESCENT HOSPITALS: "Type 1 or II F.R. Type 11 I-Hour REMODEL COST PER SO. FT. COST PER NEW SO. FT. $44.00 32.00 $126.90 106.45 7. DWELLINGS: Type V - Masonry Type V - Wood Frame Basements Semi-Finished Unfinished $30.00 30.00 $88.14 83.62 13.00 13.00 20.91 16.16 8. FIRE STATIONS: Type I or 11 F.R. Type 11 - 1-Hour Type 11 - N Type 111 - 1-Hour Type 111 - N Týpe V - 1-Hour TypeV-N 9. HOMES FOR THE ELDERLY: Type I or 11 F.R. Type 11 - 1-Hour Type 11 - N Type 111 - I-Hour Type 111 - N Type V - I-Hour Type V - N 10. HOSPITALS: "Type 1 or 11 F.R. Type 111 - 1-Hour Type V - 1-Hour $36,00 26.00 26.00 26.00 26.00 26,00 26,00 $103.73 67.24 63,85 74.81 70.96 66,90 63,51 S33,OO 26.00 26.00 26.00 26.00 26.00 26.00 $93.56 75.03 71.42 78.20 74.81 74.58 70.85 S51.OO 43.00 40.00 S148.6O 123.62 114.70 11. HOTELS AND MOTElS: "Type 1 or 11 F.R. S33,oo Type 111 - 1-Hour 31.00 . Type III - N 26.00 . Type V - 1-Hour 26.00 Type V - N 26.00 . Add 0.5 percent to total cost for each story over three "" Deduct 11 percent for mini-warehouse """ Deduct 20 percent for "SheD only" buildings .... Add 25% for hazardous occupancy or high tech. S92,89 80.23 76.39 69.95 66.78 9 /I-}'f' Schedule D CITY OF CUPERTINO Building Valuation Schedule OCCUPANCY AND TYPE 12. INDUSTRIAL PLANTS: .... Type 1 or II F.R. Type II - I-Hour Type II - (Stcx:k) Type III - I-Hour Type III - N Tilt-Up Type V· I-Hour Type V - N 13. JAILS: Type I or 11 F.R. Type III - I-Hour Type V - I-Hour REMODEL COST PER SO. FT. COST PER NEW SO. FT. $20.00 20.00 20.00 20.00 20.00 20.00 20.00 20,00 $51.53 35.14 33.22 38.76 37.06 26.10 35.03 33.00 $50.00 47.00 38.00 $145.32 132.10 118.90 14. LIBRARIES: Type I or II F,R. Type 11 - I-Hour Type 11 - N Type III - I-I-Hour Type III - N Type V - I-Hour Type V - N $37.00 26.00 26,00 26.00 26.00 26.00 26.00 $106.45 74.47 70.63 81.02 77.07 72.55 69.16 IS. MEDICAL OFFICES: .... Type I or 11 F.R. Type 11 - I-Hour Type 11 - N Type III - I-Hour Typelll-N Type V - I-Hour Type V - N $44,00 33.00 33.00 33.00 33.00 33.00 33.00 $108,71 80.91 77.07 88.48 84.41 82.38 77.86 16. OFFICES: Type I or 11 F.R. $40.00 Type II . I-Hour 27.00 Type II . N 27.00 Type III - I-Hour 27.00 Type III - N 27.00 Type V - I-Hour 27.00 Type V - N 27.00 'Add 0.5 percent to total cost for each story over three, "Deduct II percent for mini-warehouse. "'Deduct 20 percent for "shell only" buildings "" Add 25% for hazardous or high tech cx:cupancies $95.15 63.05 60.12 69.38 66.22 64,18 61.25 10 //-ß'I Schedule D CITY OF CUPERTINO Building ValuatioD Schedule OCCUP~NCY AND TYPE REMODEL COST PER SO. FT, COST PER NEW SO. FT. 17, PRIVATE GARAGES: Wood Frame Masonry Open carports/covered decks/porches Uncovered decks 18. PUBLIC BUILDINGS: Type I or II F,R. Type 11 - I-Hour Type 11 - N Type III . I-Hour Type 111- N Type V - I·Hour Type V - N PUBLIC GARAGES: Type I or 11 F.R. Type I or II Open Pulåna Type 11 - N Type 111 . I-Hour Type 111- N Type V - I-Hour 20. RESTAURANTS: "Type III - I-Hour Type 111- N Type V - I-Hour Type V - N 21. SCHOOLS: Type I or 11 F.R. Type II - I-Hour Type 111- I-Hour Type 111 - N Type V - I·Hour TypeV-N · Add <LS percent 10 lOCal COlt for each story over tbree, ··Deduct II percent for mini-warehouse, "'Deduct 20 percent for "sheD only" buildinp. .... Add 2S% for hazardoUJ or high tech occuplllcies $13.00 $21.09 13.00 24.86 9.00 15.03 8.00 12.00 $46,00 5113.45 35.00 84.64 35.00 80.91 35.00 94.69 35.00 88.11 35.00 83,73 35.00 83,73 520,00 $44,75 20.00 35,03 20.00 26.22 20,00 31.53 20.00 30.17 20.00 26,10 $Sl.oo 584.52 Sl.oo 80,46 46,00 74.92 43.00 71.30 $Sl.oo $101.70 37.00 72,55 37,00 73,11 35.00 .' 69.27 35,00 66,90 35.00 63.28 11 / (-<fo Schedule D CITY OF CUPERTINO Building Valuation Schedule OCCUPANCY AND TYPE 22. SERVICE STATIONS: Type II - N Type I II - I-Hour Type V - I-Hour Canopies REMODEL COST PER SO. IT. COST PER NEW SO. IT, 23. STORES: 'Type I or II F.R. Type II - I-Hour Type 11 - N Type III - I-Hour Typelll-N Type V - I Hour Type V - N 24. THEATERS: Type I or II F.R. Type 111 - I-Hour Type 111 - N Type V - I-Hour Type V - N $25.00 $60.34 25.00 60.57 25.00 53.22 13.00 23.28 $31.00 $76.16 28.00 45.88 28.00 44.97 28.00 56.05 28.00 52.88 28.00 44.75 28.00 41.92 $40,00 $99.21 29.00 71.87 28.00 68.48 27.00 64.86 26.00 61.92 25. WAREHOUSES:" Type lor II F.R. Type 11 or V-I-Hour Type 11 or V-N Type 111 - I-Hour Type 111 - N $28.00 14.00 14.00 14.00 14.00 $45.09 26.67 25,09 30.62 29.27 EOUIPMRNT AND AIR CONDmONlNG Commercial Residential Sprinkler Systems $3.90 3.23 1.86 RETAINING WALLS.. PRR SO. Fr. t'IIRlGHT X LRNGTH\ ...RV.... ARnVR GRADE Masomy Conc{ete $22.60 20.34 'Add 0.5 percent to total cost foe eacb story over three. .. Deduct II percent for mini-warebouse. "'Deduct 20 percent for "sbell only" buildings. "" Add 25% for hazardous or bigh tecb occupancies. The Buildlnl Official Is autborized to implemeDt Dew BuUdln1 ValuatioD Scbedules approved by tbe (,C,B.O, 12 ( /-0/1 Schedule D CITY OF CUPERTINO Building Permit Permit Valuation Sl . S3,000 S3,001 ·25,000 $69 00 $6900 for the first S3,000 plus S2.Wl for elU:h additional 51 000 or fraction thereof. to and including S25,OOO, , $270,00 for the first 525,000 plus S1.JHl for elU:h additional SI,ooo or fraction thereof, to and including 550,000. $450.00 for the first S50,000 plus aœ for elU:h additional 51,000 or fraction thereof, to and including 5100,000. $710 00 for the first 5100,000 plus ~ for each additional Sl,ooo or fraction thereof, to and includin¡ 5500,000. $2.350.00 for the first S5oo'~,Jlus SJ.œ for each additional Sl,ooo or fiaction thereof, to includin¡ SI,ooo,ooo 54 000.00 for the tint SI,ooo,ooo IDd up plus nœ for each additional S 1,000 or fiaction thereof. 525,001 - 50,000 S50,001 - 100,000 Sloo,ool ·500,000 5500,001·1,000,000 51,000,001· PLAN CHECKING Structural and Non Structural 85% of building ~t fee for each plan submitted. Each additional identical repeat plan for multi unit re5ulential developments will be ISsessed at 520.00 elU:h unit. Energy 30% ofbuildin¡ ~ fee for each plan submitted. Each additional identical repeat plan for multi unit resJdenti,1 developments will be assessed at S20.oo each unit. Repeat plan "......0 that exceecI2 reviews will be char¡ed an hourly rate at S50.00 per hour. 13 II-,/? Schedule D CITY OF CUPERTINO Building- Electrical Fees New Residential Buildings and Remodels that add additional square footage The following fees shall include all wiring and electrical equipment in or on each building, or other electrical equipment on the same premises constructed at the same time, Permit Fee $32.00 New multifamilv residential buiJdinl s (apartments and condominiums) having three or more living units not including the area of garages, carports and other noncommercial automobile storage areas constructed at the same time, per square foot New sin¡le and two-family residential buildings not including the area of garages, carports and other minor accessory buildings constructed at the same time, per square foot For other types of residential occupancies and alterations, additions and modifications to existing residential buildings, use the UNIT FEE SCHEDULE 0,05 0.055 14 II-fJ Schedule D CITY OF CUPERTINO Building- Electrical UNIT FEE SCHEDULE Remodel- No additional square footage Permit Fee $32,00 Residential Appliances For fixed residential appliances or receptacle outlets for same, including wall-mounted electric ovens; counter mounted cooking tops; electric ranges, self-contained room, console, or through-wall air conditioners; space heaters; food waste grinders; dishwashers washing machines; water heaters; clothes dryers; or other motor operated appliances not exceeding one horsepower (HP) in rating each NOTE: For other types of air conditioners and other motor-driven appliances having larger electrical ratings, see Power Apparatus. Nonresidential Appliances For residential appliances and self-contained factory- wired, nonresidential appliances not exceeding one horsepower (HP), kilowatt (KW), or kilovotampere(KV A) in rating including medical and dental devices; food, beverage, and ice cream cabinets; illuminated show cases; drinking fountains; vending machines; laundry machines; or other similar types of equipment, each NOTE: For other types of air conditioners and other motor-driven appliances having larger electrical ratings, see Power Apparatus. Services 4.00 4.00 For services of 600 volts or less and not over 200 amperes in rating, each 20,00 For services of 600 volts or less and over 200 amperes to 1000 amperes in rating, each For services over 600 volts over 1000 amperes in rating each 40.00 80,00 IS 1/-<1'1' Schedule D CITY OF CUPERTINO Building - Electrical USER FEE SCHEDULE (continued) Remòdel - No additional square footage Signs, Outline Lighting and Marquees For signs, outline lighting systems or marquees supplied from one branch circuit, each For additional branch circuits within the same sign, outline lighting system or marquee each Miscellaneous Apparatus, Conduits, Conductors, and Special Circuits For electrical apparatus, conduits and conductors for which a permit is required but for which no fee is herein set forth Power Device I Apparatus For motors, generators, transformers, rectifiers, synchronous converters, capacitors, industrial heating, air conditioners and heat pumps, cooking or baking equipment and other apparatuses, as follows: Rating in horsepower (HP), kilowatts (KW), kilovolt-amperes (KV A), or kilovolt-amperes-reactive (KV AR): 1 unit 2 through S units, each additional 6 and over, each additional NOTE: 1, For equipment or appliances having more than one motor, transformer, heater, etc" the sum of the combined ratings may be used. 2. These fees include all switches, circuit breakers, contractors, thermostats, relays and other directly related control equipment. 16 $20.00 4,00 23.00 40,00 15.00 10,00 If -t/s- Schedule D CITY OF CUPERTINO Building· Electrical UNIT FEE SCHEDULE (continued) Remodel - No additional square footage Busways For trolley and plug-in-type busways, each 100 feet or fraction thereof $5.50 NOTE: An additional fee will be required for lighting fixtures, motors and other appliances that are connected to trolley and plug-in-type busways. No fee is required for portable tools. Receptacle, Switch and Lighting Outlets For receptacle, switch. lighting or other outlets at which current is used or controlled, except services, feeders and meters. First 20 each Additional outlets, each NOTE: For multi-outlet assemblies, each 5 feet or traction thereof may be considered as one outlet. 1.00 0.60 Lighting Fixtures For lighting fixtures, sockets or other lamp holding devices First 20 each Additional fixtures, each For pole or platform-mounted lighting fixtures each For theatrical-type ligÞring fixtures or assemblies each 1.00 0,60 1.00 1.00 17 1/-fC Schedule D CITY OF CUPERTINO Building· Mechanical Fees New Residential Buildings and Remodels that add additional square Cootage. The following fees shall include all mechanical equipment in or on each building, or other mechanical equipment on the same premised constructed at the same time, New multifamily residential buildin¡,~ (apartments and condominiums) having three or more living units not including the area of garages, carports and other noncommercial automobile storage areas con- structed at the same time, per square foot $0,05 New and sinllle and two-family residential buildinis not including the area of garages, carports and other minor accessory buildings constructed at the same time, per square foot 0,055 18 11-'/7 Schedule D CITY OF CUPERTINO Building - Mechanical Fees UNIT FEE SCHEDULE Remodels - No additional Square Footage Permit Fee For the repair of alteration of, or additiòn to each heating appliance, refrigeration unit, cooling unit, V A V boxes, absorption unit, or each heating, cooling, absorption, or evaporative cooling system, including installation of controls regulated by this Code, For each air-handling unit, AlC units, heat pumps to and including 10,000 cubic feet per minute, including ducts attached thereto, Does not apply to central type. NOTE: This fee shall not apply to an air-handling unit that is a portion of a factory-assembled appliance, cooling unit, evaporative cooler or absorption unit for which a permit is required elsewhere in this Code. For each air-handling unit AlC unit, heat pump over 10,000 cfm For the installation or relocation of each commercial or industrial-type hood For the installation of each residential hood that is served by a mechanical exhaust, including the ducts for such hood For the installation or relocation of each forced-air or gravity-type funw:e or burner, including ducts and vents attached to such app1iance, up to and including 100,000 BtuIh For each evaporative cooler other than portable type For each ventilation system which is not a portion of any heating or air-conditioning system authorized by a permit " For each ventilation fan connected to a single duct For the installation or relocation of each forced-air or gravity-type furnace or burner, including ducts and vents attached to such appliance over 100,000 BtuIh $32,00 11.00 7,50 13.00 115.00 7.50 11.00 7.50 7.50 5,50 13,00 19 1/-(/ Schedule D CITY OF CUPERTINO Building- Mechanical Fees UNIT FEE SCHEDULE (continued) Remodels· No additional Square Footage For the installation or relocation of eaéh floor furnace, including vent For the installation or relocation of each suspended heater, recessed wall heater or floor-mounted unit heater For the installation. or relocation or replacement of each appliance vent installed and not included in an appliance permit For the installation or relocation of each boiler or compressor to and including three horsepower, or each absorption system to and including 100,000 BtuIh For the installation or relocation of each boiler or compressor over three horsepower to and including 15 horsepower, or each absorption system over 100,000 BtuIh and including 500,000 BtuIh For the installation or relocation of each boiler or compressor over 15 horsepower to and including 30 horsepower, or each absorption system over 500,000 Btu/h to and including 1,000,000 Btu/h For the installation or relocation of each boiler or compressor over 30 horsepower to and including 50 horsepower, or for each absolJ'Ûon system over 1,000,000 Btu/h to and including 1,750,000 Btu/h For the installation or relocation of each boiler or refrigeration compressor over 50 horsepower, or each absorption system over 1,750,000 BtuIh. For each appliance or piece of equipment regulated by this Code but not classed in other appliance categories. or for which no other fee is listed in this Code. 20 $11.00 11.00 5.50 11.00 20,00 28.00 41.00 70,00 7,50 //-1'9' Schedule D CITY OF CUPERTINO Building - Plumbing Fees New Residential Buildinp and Remodels that add additional square footage. The following fees shall include all plumbing equipment in or on each building, or other plumbing equipment on the same premises constructed at the same time, New multifamily residential buildin¡s (apartments and condominiums) having three or more living units not including the area of garages, carports and other non-commercial automobile storage areas constructed at the same time, per square fool New sin¡le and two-family residential buildin¡," not including the area of garages, carports and other minor accessory buildings constructed at the same time, per square fOOl SO,05 0.055 21 11-5~Q Schedule D CITY OF CUPERTINO Building- Plumbing Fees UNIT FEE SCHEDULE Remodel- No additional Square Footage Permit Fee For installation, alteration or repair of water piping water treating equipment For repair or alteration of drainage or vent piping, floor, area, condensate piping For each plumbing fixture or trap or set of fixtures on one trap (including water, drainage piping and bacld10w protection therefor) For each gas piping system of one (1) to four (4) outlets For each gas piping system of five (5) or more, per outlet For each industrial waste pre treatment interceptor, including its trap and vent, excepting kitchen type grease traps functioning as fixture traps Kitchen type trap, and or system For each building sewer, sanitary sewer, and each trailer park sewer Storm I rainwater systems-per drain For each water heater and/or vent Water Service Re pipe - per fixture 22 $32.00 7.50 7,50 7.50 4,00 1.00 15,00 7.50 18,00 7.50 9.00 7,50 7.50 / /-s/ Schedule D CITY OF CUPERTINO Building - Plumbing Fees UNIT FEE SCHEDULE Remodel- No additional Square Footage (continued) For each lawn sprinkler system on anyone meter, including bacldlow protecûon devices therefor Five (5) or more, each For atmospheric type vacuum breakers/back flow not included in item I $11.00 0.60 lto5 over 5 each addiûonal 9.00 1.80 56,00 28,00 For each private sewage disposal system For each cesspool 23 /1- 5-2- CITY OF CUPERTINO OTHER BUILDING INSPECTION FEES Private Swímrning Pools For new private, residential, in-ground, swimming pools for single-family and multifamily occupancies including a complete system of necessary branch circuit wiring, bonding, grounding, underwater lighting, water pumping and other similar electrical equipment directly related to the operation of a swimming pool, each For other types of swímrning pools, therapeutic whirlpools, spas and alterations to existing swimming pools, use the UNIT FEE SCHEDULE Temporary Power Service For a temporary service power pole or pedestal including all pole or pedestal-mounted receptacle outlets and appurtenances, each For a temporary distribuûon system and temporary lighting and receptacle outlets for construction sites, decorative light, Christmas tree sales lots, fireworks stands, etc, each Inspection outside of the normal business hours (minimum charge two hours) Inspection for which no fee is specifically established (minimum charge one hour) Reinspection - A fee may be assessed for each inspection or reinspection when such portion of work for which inspection is called is not complete or when comctions called for are not made 24 $75.00 30,00 7.75 69.001 hr, 47,001 hr. 47.oolhr, /1-5"'.$ SCHEDULE E WATER //-55' Schedule E CITY OF CUPERTINO Water Reconnection I Non-payment of service Normal working hours After working hours $21.00 43.00 Meter installation or Special Services (minimum 1 hour) 43.00/hour 25 /I-J-l .. SCHEDULE F RECREA TION , /1-.>7 Schedule F CITY OF CUPERTINO Recreation Recreation classes and excursion fees shall be determined as follows: C1a..~§es 1, Determine the maximum hourly rate paid to instructor, 2. Multiply the instructor's hourly rate by the number of class meetings, 3. Determine the minimum number of participants and divide into the instructors cost. 4. Add indirect overhead percent - 59"10. 5. Add 20"10 to establish non-resident fee. 6, Add cost for specialized equipment or supplies, Special condition ¡: If participation does not meet minimum enrollment requirements and the class continues, the instructor may receive 80% of the registration fee. )::ycurs10M 1, Transpiration cost divided by the number of participants plus overhead transfer. 2, Add 20"10 to establish non-resident fee. 3, Add any admission cost, supplies or leadership cost. Additional factors that may be n...d to dMf!m1in~ the clR.fl.C or eyrnmainn 11GM' fee~ The total number of participants in a given activity may generate additional revenue whereby the total program cost may be reduced. Classes that traditionally have waiting lists may have the user fee increased. Programs in competition with adjacent cities or the private sector may require fees to be increased or decreased to remain competitive. 26 II-/. / Schedule F CITY OF CUPERTINO Recreation (continued) Facility Use Fee Schedule (Staff Use Only) CLASSIFICATIONS: Priori\}' of Use Group I: Group II: Group III: Group IV: Group V: Group VI: City of Cupertino activities that are open to the public, Official city sponsored programs, Clubs with S 1 % resident membership, recreation programs and events with full or affiliated city co-sponsorship and open to the public. Programs and events sponsored by Cupertino based non-profit recreation, education or community service org lni7JIûon with S 1 % resident participation, These organizations must show an official structure and status. Private, special interest or business groups for functions not open to the public, These functions would include parties, banquets, receptions, industtial conferences, seminars, trade shows, etc. Programs and events sponsored by non-resident non- profit recreation, education or community service orgAni7J1riQD. These org lni7JItions must show official structure. and status. Cupertino Businesses using the Cupertino Room of the Quinlan Community Center for promotional and business related purposes other than negotiation or direct sale, 27 11-6 .?- Schedule F CITY OF CUPERTINO Recnation (continued) ROOM RENTAL SCHEDULE. PER HOUR Quinlan Community Center Multi-Purpose (Nonnal oper. hours) (After hours) Group ill $15 $40 Group IV 50 75 Group V 25 50 Senior Center (After hours only) $35 50 40 Classroom Group ill 10 35 Group IV 25 SO Group V IS 40 Conference Room Group ill 5 15 Group IV 20 20 Group V IS 15 IS 25 IS 15 20 IS Groups serving alcohol, add $15,oo/hour for security per5OlII1Cl A security deposit of$loo.oo may be required based on the nature of tile event Groups I &: U pay only staffing cost of S8.25/hour if needed 28 Monta Vista! Fremont Older NIA N/A N/A 15 25 15 N/A N/A N/A II-t J Schedule F CITY OF CUPERTINO Recreation (continued) oumOOR FACILITIES Memorial Softball Field Cupertino residentslbusiness only Field can be reserved for a maximum of2 hours THERE IS NO FEE FOR CURRENT SOFTBALL TEAMS PLAYING IN CUPERTINO LEAGUES, $25.00 Field preparation (includes dragging, watering, chalking, and bases) 20.00 Field Attendant (2 hour minimum) Field Attendant is required any time lights or a field preparation is requested. Lights (in the evening) 8,251 hr. 5.001 hr. Memorial Park Amphitheater Cupertino Resident Non-resident Electricity Memorial Park Gazebo Cupertino Resident Non-resident 25.00 40.00 16,50 25,00 40.00 Picnic Areas Residents Non-residents If electricity is required 25,00 40,00 16,50 29 11-,: fÍ Schedule F CITY OF CUPERTINO Rec:reatioD ( CODtiaued) BLACKBERRY FARM PICNIC GROUNDS General Admission: Weekends & Holidays $6.00 4,00 Weekdays $3.50 2.50 ADULT (13 years and over) CHILD (6 thru 12) Children under 6 are ftee when accompanied by their parents. Group Rates: 100 - 500 persons 501·1000 persons 1001 or more persons Adult Child (13 and over) (6 thru 12) 5,50 3.50 5,00 3,00 4,50 2,50 Adult 3,25 3,00 2,75 Child 2,25 2.00 1.75 BI.ACKBRRRY FARM GOLF COIJRSE 9-Holes Junior & Seniors (under 16 and over 62) Second Nine (all players) Weekends 9.25 NIA 7,25 Weekdays 7.50 6,50 6,50 All green fee prices; deduct $1.00 when you present a Cupertino J.D. All groups and tournaments pay the full rate (Cupertino resident still applies) Staff is authorized to set meJ'(:hAlVli~ fees according to current cost. 30 I/-t ,; SCHEDULE G MISCELLANEOUS 110 Sehedule G CITY OF CUPERTINO MlseeUaaeous Overhead Pereeat Fee Sehedule The City Manager may authorize service fees to be invoiced for services rendered by the city that are not specified on schedule A through F. .' To arrive at the appropriate service fee, the employees' hourly rate for each employee directly involved in the service delivered is multiplied by the cost center overhead percentage, The sum of employee services plus any direct material cost becomes the invoice amount. Cost Ceater Pereeat City Manager City Attorney City Clerk Government Channel Accounting General Services Personnel Code Enforcement Planning Building Public Works Administratioa Engineering Design Inspection Service Public Works Supervision Grounds Streets Facilities Traffic Fngi.-rin¡ Traffic Fngi.-rin¡ Maintenance Water 670~ 37% 120% 108% 108% 55% 143% 80% 60% 87% 100% 125% 70% 123% 180% 164% 249% 78% 91% 130% , 31 (1-0