CC Resolution No. 9031
RESOLUTION NO. 9031
A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF CUPERTINO
RESCINDING RESOLUTION NO, 8465 AND ESTABLISHING USER FEES
WHEREAS, the State of California requires fees charged for service rendered not
to exceed the cost of delivering said services; and
WHEREAS, a public hearing has been held to review user fees; and
WHEREAS, the City Council of the City of Cupertino has established guidelines
for setting user fees;
NOW, THEREFORE, BE IT RESOLVED that:
1, User fees are established per attachments A through G.
2. All user fees previously established by Council action or resolution are
hereby superseded.
PASSED AND ADOPTED at a regular meeting of the City Council of the City of
Cupertino this ~ day of FebruAry , 1994, by the following vote.
~ Members of the Ci~ Council
AYES:
NOES:
ABSENT:
ABSTAIN:
Bautista, Burnett, Dean, Sorensen, Koppel
None
None
None
APPROVED:
Isl Barb Koppel
Mayor, City of Cupertino
ATTEST:
Isl Kim Marie Smith
City Clerk
CITY OF CUPERTINO
SUMMARY OF USER FEES
DEPARTMENT SCHEDULE
General A
Engineering B
Planning C
Building D
Water E
Recreation F
Miscellaneous G
II-If
SCHEDULE A
GENERAL
11-2-1
Schedule A
CITY OF CUPERTINO
General
Copying Service
1-20 copies
21 +
Returned Check
$0.55
.03 each additional
15.00
Late payment on 30 day
delinquent city invoices
Bicycle License
7% per annum
Municipal Code Book
Damage to city property
(rate per hour)
Grounds
Streets
Facilities
Traffic - Engineering
Traffic - Maintenance
Plus materials and outside services
2.001 year
53.00
49.00
46.00
61.00
43.00
33.00
Cable T.V,
Two persons minimum 2 hrs.
70.001 hour
Tape Dubbing
Full Tape
Selective Dubbing
Plus material cost
6.001 tape
14.001 tape
Fingerprinting Processing
Code Enforcement
42.00
Massage Establishment Administration Fee
34.001 hour
67.00
2
/1-2..3
SCHEDULE B
ENGINEERING
,-
I !~;z)
Schedule B
CITY OF CUPERTINO
Engineering
Street Cuts
Permit to excavate in public right of way.
Grading Permit
To insure grading conforms to city ordinances
and council approvals.
Minimum Fee
Or 6% oflmprovement Value
Parcel Map I Tract Maps
To insure maps conform to state map act and council approvals.
Parcel Map
Tract Map
Plan Checking and Inspection
Review only (no permit issued)
Permit Fee
or
Residential 5% of Site Improvement
Commercial 6% of Site Improvement
Annexation
(plus county filing fees)
Certificates of Compliance
To verify lots were not created in violation
of local ordinances or state map act.
3
$168.00
142.00
381.00 1-4 lots
381.00 + 8.00 each lot over 4
266.00
1744.00 minimum
513.00
538.00
11~).1
Schedule B
CITY OF CUPERTINO
Engineering
(continued)
Encroachment permit
To allow private facilities or improvements to be placed in public right of way.
$125.00 residential
161.00 non-residential
Lot line adjustment
City must verify that lots after adjustment conform to zoning and setbacks.
280.00
Power cost
Developer is responsible for one year power cost for street lights.
The latest effective P,G. & E. rate schedule approved by the P.U.C.
Plus any materialslservice fees.
24.00 short report
139,00 long report
Soil and Geology report
Engineering Copies
Microfiche
Engineering Copies
Microfilm
Blueline
6,001 copy
7.001 copy
8.001 copy
3.001 copy
220.00
Banners
4
/I~.;¡.J
SCHEDULE C
PLANNING
11- ~1
Schedule C
CITY OF CUPERTINO
DEFINITION OF PLANNING FEE SERVICES
Full Application
:\I1 al?plication w~ch. typicall>: involves, all steps of Û?-e development review process
lllcludlllg Pre-apphcanon Revtew, Envuonmental Revtew Committee. the Planning
Commission, and the City Council. The application requires an advertised public hearing
before the Planning Commission and a public hearing or agendized review before the City
Council.
Applications requiring the preparation of an Environmental Impact Report (EIR) are included
in this category, The application fee for particularly complicated applications and those
requiring the preparation of an EIR will be based upon an hourly rate as described in the fee
schedule.
Limited Application
An application which involves all steps of the development review process outlined in the
Full Application description with the exception of the City Council.
Minor Application
An application which involves minimAl steps in the review process and is exempt from the
California Environmental Act. The staff evaluation and report preparations are less
extensive, The application requires Planning commission review.
Miscellaneous Application
An application which typically involves a non noticed review by the Planning Commission,
The application does not typically require pre application m~ or Environmental Review
and involves minimal staff preparation. Examples of this application are interpretation or
clarification of conditions of approval or ordinance requirements, sign exceptions, fence
exceptions, and tentative map and use permit extensions.
Appeal.
A request from the project applicant or interested party to reverse or amend a decision made
by staff or an advisory body, An appointed public official serving on the board that made
the decision subject to the appeal, an appointed public official serving on a board that is
directly affected by the decision and the City Council members are exempted from the fee
requirement,
s
/!~JI
Schedule C
CITY OF CUPERTINO
DEFINITION OF PLANNING FEE SERVICES
(continued)
Directors Application
An application which receives final approval by staff either via an advertised public hearing
or non hearing format, The application may involve a pre application mccting
and/or Environmental Review Committee review.
Tempo~ SiiJI Pennit
A staff review of a temporary sign application which includes an evaluation of the sign
request, the entry into the temporary log and site review by Code Enforcement Officers.
The permit fcc is in addition to the submittal of a deposit to guarantee removal of the sign
upon expiration of the temporary permit.
NOTES:
Combined applications which are processed simultaneously (i.e., filed at the same time)
will be classified based on highest rating.
Mixed use applications will be classified based upon the highest intensity and review
process.
The Director of Community Development will have discretion to classify projects based
upon the above criteria.
6
11- 3;2-
Schedule C
CITY OF CUPERTINO
Planning
Full Application
Zoning
Tentative Map
Use Permit
Application that requires staff time in excess
of 48 hours will be charged an hourly rate of
Limited Application
Use Permit
Tentative Map
Amendment
$1847.00
1847.00
1509.00
38.00
1061.00
1136.00
876.00
Minor Application
Use Permit
Tentative Map
Hillside Exception
Architectural and Site Approval
Sign Exception
Fence Exception
Tentative Map and use Permit Extension
1018.00
1018.00
972.00
384.00
327.00
139.00
139.00
373.00
Miscellaneous Application, General
Director
Tentative Map - Lot Consolidation
Variance .
Minor Amendment
Sign Permit
Temporary Sign Permit
Address Change
Appeal
642.00
706.00
146.00
69.00
32.00
93.00
373.00
7
11-33
SCHEDULE D
BUILDING
--
((-J)
Schedule D
CITY OF CUPERTINO
Building Valuation Schedule
OCCUPANCY AND TYPE
I, APARTMENT HOUSES
"Type I or II F.R.
Type V - Masonry or Type III
Type V - Wood Frame
Type I - Basement Garage
REMODEL COST PER SO. FT. COST PER NEW SO. FT.
$33.00
27.00
25.00
15.00
$98.31
80,00
72.21
33.79
2. AUDITORWMS:
Type I or II F.R.
Type II - I-Hour
Type 11 - N
Type 111 - I-Hour
Typel11-N
Type V - I-Hour
Type V - N
3. BANKS:
" Type I or 11 F.R.
Type 11 - I-Hour
Type 11 - N
Type III - I-Hour
Type 111 - N
Type V - I-Hour
Type V - N
4. BOWLING ALLEYS:
Type II - I-Hour
Type 11 - N
Type 111- I-Hour
Type 111- N
Type V - I-I Hour
$34.00
25.00
25.00
25.00
25.00
25.00
25.00
$94.69
67.24
63.85
71.87
68,00
66.00
62.72
$43.00
43.00
43.00
44.00
44.00
)5,00
35.00
$135.60
97.41
92,77
11 0.40
105.43
97.41
92,66
$2\.00
2\.00
2\.00
2\.00
2\.00
$45.31
43.28
49,72
47.35
42.38
5. CHURCHES:
Type I or 11 F,R. 531.00
Type 11 . I-Hour 25.00
Type 11 . N 25.00
Type 111 . I·Hour 25.00
Type III . N 25.00
Type V - I-Hour 25.00
Type V - N 25.00
Type 111 - I-Hour 3 \.00
Type V - I-Hour 3\.00
"Add 0.5 percent to total cost for each story over three
.. Deduct II percent for mini-warehouses
.. "Deduct 20 percent for "shell only· buildings
589.50
.. 66.90
63.51
7\.76
68.37
65.31
62.15
90.51
8\.47
8
II~J 7
Schedule D
CITY OF CUPERTINO
Building Valuation Schedule
OCCUPANCY AND TYPE
6. CONVALESCENT HOSPITALS:
"Type 1 or II F.R.
Type 11 I-Hour
REMODEL COST PER SO. FT. COST PER NEW SO. FT.
$44.00
32.00
$126.90
106.45
7. DWELLINGS:
Type V - Masonry
Type V - Wood Frame
Basements
Semi-Finished
Unfinished
$30.00
30.00
$88.14
83.62
13.00
13.00
20.91
16.16
8. FIRE STATIONS:
Type I or 11 F.R.
Type 11 - 1-Hour
Type 11 - N
Type 111 - 1-Hour
Type 111 - N
Týpe V - 1-Hour
TypeV-N
9. HOMES FOR THE ELDERLY:
Type I or 11 F.R.
Type 11 - 1-Hour
Type 11 - N
Type 111 - I-Hour
Type 111 - N
Type V - I-Hour
Type V - N
10. HOSPITALS:
"Type 1 or 11 F.R.
Type 111 - 1-Hour
Type V - 1-Hour
$36,00
26.00
26.00
26.00
26.00
26,00
26,00
$103.73
67.24
63,85
74.81
70.96
66,90
63,51
S33,OO
26.00
26.00
26.00
26.00
26.00
26.00
$93.56
75.03
71.42
78.20
74.81
74.58
70.85
S51.OO
43.00
40.00
S148.6O
123.62
114.70
11. HOTELS AND MOTElS:
"Type 1 or 11 F.R. S33,oo
Type 111 - 1-Hour 31.00
. Type III - N 26.00
. Type V - 1-Hour 26.00
Type V - N 26.00
. Add 0.5 percent to total cost for each story over three
"" Deduct 11 percent for mini-warehouse
""" Deduct 20 percent for "SheD only" buildings
.... Add 25% for hazardous occupancy or high tech.
S92,89
80.23
76.39
69.95
66.78
9
/I-}'f'
Schedule D
CITY OF CUPERTINO
Building Valuation Schedule
OCCUPANCY AND TYPE
12. INDUSTRIAL PLANTS: ....
Type 1 or II F.R.
Type II - I-Hour
Type II - (Stcx:k)
Type III - I-Hour
Type III - N
Tilt-Up
Type V· I-Hour
Type V - N
13. JAILS:
Type I or 11 F.R.
Type III - I-Hour
Type V - I-Hour
REMODEL COST PER SO. FT. COST PER NEW SO. FT.
$20.00
20.00
20.00
20.00
20.00
20.00
20.00
20,00
$51.53
35.14
33.22
38.76
37.06
26.10
35.03
33.00
$50.00
47.00
38.00
$145.32
132.10
118.90
14. LIBRARIES:
Type I or II F,R.
Type 11 - I-Hour
Type 11 - N
Type III - I-I-Hour
Type III - N
Type V - I-Hour
Type V - N
$37.00
26.00
26,00
26.00
26.00
26.00
26.00
$106.45
74.47
70.63
81.02
77.07
72.55
69.16
IS. MEDICAL OFFICES: ....
Type I or 11 F.R.
Type 11 - I-Hour
Type 11 - N
Type III - I-Hour
Typelll-N
Type V - I-Hour
Type V - N
$44,00
33.00
33.00
33.00
33.00
33.00
33.00
$108,71
80.91
77.07
88.48
84.41
82.38
77.86
16. OFFICES:
Type I or 11 F.R. $40.00
Type II . I-Hour 27.00
Type II . N 27.00
Type III - I-Hour 27.00
Type III - N 27.00
Type V - I-Hour 27.00
Type V - N 27.00
'Add 0.5 percent to total cost for each story over three,
"Deduct II percent for mini-warehouse.
"'Deduct 20 percent for "shell only" buildings
"" Add 25% for hazardous or high tech cx:cupancies
$95.15
63.05
60.12
69.38
66.22
64,18
61.25
10
//-ß'I
Schedule D
CITY OF CUPERTINO
Building ValuatioD Schedule
OCCUP~NCY AND TYPE REMODEL COST PER SO. FT, COST PER NEW SO. FT.
17, PRIVATE GARAGES:
Wood Frame
Masonry
Open carports/covered decks/porches
Uncovered decks
18. PUBLIC BUILDINGS:
Type I or II F,R.
Type 11 - I-Hour
Type 11 - N
Type III . I-Hour
Type 111- N
Type V - I·Hour
Type V - N
PUBLIC GARAGES:
Type I or 11 F.R.
Type I or II Open Pulåna
Type 11 - N
Type 111 . I-Hour
Type 111- N
Type V - I-Hour
20. RESTAURANTS:
"Type III - I-Hour
Type 111- N
Type V - I-Hour
Type V - N
21. SCHOOLS:
Type I or 11 F.R.
Type II - I-Hour
Type 111- I-Hour
Type 111 - N
Type V - I·Hour
TypeV-N
· Add <LS percent 10 lOCal COlt for each story over tbree,
··Deduct II percent for mini-warehouse,
"'Deduct 20 percent for "sheD only" buildinp.
.... Add 2S% for hazardoUJ or high tech occuplllcies
$13.00 $21.09
13.00 24.86
9.00 15.03
8.00 12.00
$46,00 5113.45
35.00 84.64
35.00 80.91
35.00 94.69
35.00 88.11
35.00 83,73
35.00 83,73
520,00 $44,75
20.00 35,03
20.00 26.22
20,00 31.53
20.00 30.17
20.00 26,10
$Sl.oo 584.52
Sl.oo 80,46
46,00 74.92
43.00 71.30
$Sl.oo $101.70
37.00 72,55
37,00 73,11
35.00 .' 69.27
35,00 66,90
35.00 63.28
11
/ (-<fo
Schedule D
CITY OF CUPERTINO
Building Valuation Schedule
OCCUPANCY AND TYPE
22. SERVICE STATIONS:
Type II - N
Type I II - I-Hour
Type V - I-Hour
Canopies
REMODEL COST PER SO. IT. COST PER NEW SO. IT,
23. STORES:
'Type I or II F.R.
Type II - I-Hour
Type 11 - N
Type III - I-Hour
Typelll-N
Type V - I Hour
Type V - N
24. THEATERS:
Type I or II F.R.
Type 111 - I-Hour
Type 111 - N
Type V - I-Hour
Type V - N
$25.00 $60.34
25.00 60.57
25.00 53.22
13.00 23.28
$31.00 $76.16
28.00 45.88
28.00 44.97
28.00 56.05
28.00 52.88
28.00 44.75
28.00 41.92
$40,00 $99.21
29.00 71.87
28.00 68.48
27.00 64.86
26.00 61.92
25. WAREHOUSES:"
Type lor II F.R.
Type 11 or V-I-Hour
Type 11 or V-N
Type 111 - I-Hour
Type 111 - N
$28.00
14.00
14.00
14.00
14.00
$45.09
26.67
25,09
30.62
29.27
EOUIPMRNT AND AIR CONDmONlNG
Commercial
Residential
Sprinkler Systems
$3.90
3.23
1.86
RETAINING WALLS.. PRR SO. Fr. t'IIRlGHT X LRNGTH\ ...RV.... ARnVR GRADE
Masomy
Conc{ete
$22.60
20.34
'Add 0.5 percent to total cost foe eacb story over three.
.. Deduct II percent for mini-warebouse.
"'Deduct 20 percent for "sbell only" buildings.
"" Add 25% for hazardous or bigh tecb occupancies.
The Buildlnl Official Is autborized to implemeDt Dew BuUdln1 ValuatioD Scbedules approved by tbe (,C,B.O,
12
( /-0/1
Schedule D
CITY OF CUPERTINO
Building Permit
Permit Valuation
Sl . S3,000
S3,001 ·25,000
$69 00
$6900 for the first S3,000 plus S2.Wl for elU:h additional 51 000
or fraction thereof. to and including S25,OOO, ,
$270,00 for the first 525,000 plus S1.JHl for elU:h additional
SI,ooo or fraction thereof, to and including 550,000.
$450.00 for the first S50,000 plus aœ for elU:h additional
51,000 or fraction thereof, to and including 5100,000.
$710 00 for the first 5100,000 plus ~ for each additional
Sl,ooo or fraction thereof, to and includin¡ 5500,000.
$2.350.00 for the first S5oo'~,Jlus SJ.œ for each additional
Sl,ooo or fiaction thereof, to includin¡ SI,ooo,ooo
54 000.00 for the tint SI,ooo,ooo IDd up plus nœ for each
additional S 1,000 or fiaction thereof.
525,001 - 50,000
S50,001 - 100,000
Sloo,ool ·500,000
5500,001·1,000,000
51,000,001·
PLAN CHECKING
Structural and Non Structural
85% of building ~t fee for each plan submitted. Each additional identical repeat plan
for multi unit re5ulential developments will be ISsessed at 520.00 elU:h unit.
Energy
30% ofbuildin¡ ~ fee for each plan submitted. Each additional identical repeat plan
for multi unit resJdenti,1 developments will be assessed at S20.oo each unit.
Repeat plan "......0 that exceecI2 reviews will be char¡ed an hourly rate at S50.00 per hour.
13
II-,/?
Schedule D
CITY OF CUPERTINO
Building- Electrical Fees
New Residential Buildings and Remodels that add additional square footage
The following fees shall include all wiring and electrical equipment in or on each
building, or other electrical equipment on the same premises constructed at the same
time,
Permit Fee
$32.00
New multifamilv residential buiJdinls (apartments and condominiums)
having three or more living units not including the area of garages,
carports and other noncommercial automobile storage areas
constructed at the same time, per square foot
New sin¡le and two-family residential buildings not including
the area of garages, carports and other minor accessory buildings
constructed at the same time, per square foot
For other types of residential occupancies and
alterations, additions and modifications to existing
residential buildings, use the UNIT FEE SCHEDULE
0,05
0.055
14
II-fJ
Schedule D
CITY OF CUPERTINO
Building- Electrical
UNIT FEE SCHEDULE
Remodel- No additional square footage
Permit Fee
$32,00
Residential Appliances
For fixed residential appliances or receptacle outlets for
same, including wall-mounted electric ovens; counter
mounted cooking tops; electric ranges, self-contained
room, console, or through-wall air conditioners; space
heaters; food waste grinders; dishwashers washing
machines; water heaters; clothes dryers; or other motor
operated appliances not exceeding one horsepower
(HP) in rating each
NOTE: For other types of air conditioners and other
motor-driven appliances having larger electrical
ratings, see Power Apparatus.
Nonresidential Appliances
For residential appliances and self-contained factory-
wired, nonresidential appliances not exceeding one
horsepower (HP), kilowatt (KW), or kilovotampere(KV A)
in rating including medical and dental devices; food,
beverage, and ice cream cabinets; illuminated show cases;
drinking fountains; vending machines; laundry machines;
or other similar types of equipment, each
NOTE: For other types of air conditioners and other
motor-driven appliances having larger electrical ratings,
see Power Apparatus.
Services
4.00
4.00
For services of 600 volts or less and not over 200
amperes in rating, each
20,00
For services of 600 volts or less and over 200 amperes
to 1000 amperes in rating, each
For services over 600 volts over 1000 amperes in
rating each
40.00
80,00
IS
1/-<1'1'
Schedule D
CITY OF CUPERTINO
Building - Electrical
USER FEE SCHEDULE
(continued)
Remòdel - No additional square footage
Signs, Outline Lighting and Marquees
For signs, outline lighting systems or marquees
supplied from one branch circuit, each
For additional branch circuits within the same sign,
outline lighting system or marquee each
Miscellaneous Apparatus, Conduits, Conductors, and Special Circuits
For electrical apparatus, conduits and conductors for
which a permit is required but for which no fee is
herein set forth
Power Device I Apparatus
For motors, generators, transformers, rectifiers,
synchronous converters, capacitors, industrial heating,
air conditioners and heat pumps, cooking or baking
equipment and other apparatuses, as follows:
Rating in horsepower (HP), kilowatts (KW), kilovolt-amperes
(KV A), or kilovolt-amperes-reactive (KV AR):
1 unit
2 through S units, each additional
6 and over, each additional
NOTE:
1, For equipment or appliances having more than one motor,
transformer, heater, etc" the sum of the combined ratings
may be used.
2. These fees include all switches, circuit breakers, contractors,
thermostats, relays and other directly related control equipment.
16
$20.00
4,00
23.00
40,00
15.00
10,00
If -t/s-
Schedule D
CITY OF CUPERTINO
Building· Electrical
UNIT FEE SCHEDULE
(continued)
Remodel - No additional square footage
Busways
For trolley and plug-in-type busways, each 100 feet or
fraction thereof
$5.50
NOTE: An additional fee will be required for lighting fixtures,
motors and other appliances that are connected to trolley and
plug-in-type busways. No fee is required for portable tools.
Receptacle, Switch and Lighting Outlets
For receptacle, switch. lighting or other outlets at
which current is used or controlled, except services,
feeders and meters.
First 20 each
Additional outlets, each
NOTE: For multi-outlet assemblies, each 5 feet or
traction thereof may be considered as one
outlet.
1.00
0.60
Lighting Fixtures
For lighting fixtures, sockets or other lamp holding
devices
First 20 each
Additional fixtures, each
For pole or platform-mounted lighting fixtures each
For theatrical-type ligÞring fixtures or assemblies each
1.00
0,60
1.00
1.00
17
1/-fC
Schedule D
CITY OF CUPERTINO
Building· Mechanical Fees
New Residential Buildings and Remodels that add additional square Cootage.
The following fees shall include all mechanical equipment in or on each building, or
other mechanical equipment on the same premised constructed at the same time,
New multifamily residential buildin¡,~ (apartments and condominiums)
having three or more living units not including the area of garages,
carports and other noncommercial automobile storage areas con-
structed at the same time, per square foot
$0,05
New and sinllle and two-family residential buildinis not including
the area of garages, carports and other minor accessory buildings
constructed at the same time, per square foot
0,055
18
11-'/7
Schedule D
CITY OF CUPERTINO
Building - Mechanical Fees
UNIT FEE SCHEDULE
Remodels - No additional Square Footage
Permit Fee
For the repair of alteration of, or additiòn to each
heating appliance, refrigeration unit, cooling unit, V A V
boxes, absorption unit, or each heating, cooling, absorption,
or evaporative cooling system, including installation
of controls regulated by this Code,
For each air-handling unit, AlC units, heat pumps to and
including 10,000 cubic feet per minute, including ducts
attached thereto, Does not apply to central type.
NOTE: This fee shall not apply to an air-handling unit that is a
portion of a factory-assembled appliance, cooling unit, evaporative
cooler or absorption unit for which a permit is required elsewhere
in this Code.
For each air-handling unit AlC unit, heat pump over 10,000 cfm
For the installation or relocation of each commercial
or industrial-type hood
For the installation of each residential hood that is served
by a mechanical exhaust, including the ducts for such hood
For the installation or relocation of each forced-air
or gravity-type funw:e or burner, including ducts and
vents attached to such app1iance, up to and including
100,000 BtuIh
For each evaporative cooler other than portable type
For each ventilation system which is not a portion of any
heating or air-conditioning system authorized by a permit
" For each ventilation fan connected to a single duct
For the installation or relocation of each forced-air or
gravity-type furnace or burner, including ducts and vents
attached to such appliance over 100,000 BtuIh
$32,00
11.00
7,50
13.00
115.00
7.50
11.00
7.50
7.50
5,50
13,00
19
1/-(/
Schedule D
CITY OF CUPERTINO
Building- Mechanical Fees
UNIT FEE SCHEDULE
(continued)
Remodels· No additional Square Footage
For the installation or relocation of eaéh floor furnace,
including vent
For the installation or relocation of each suspended heater,
recessed wall heater or floor-mounted unit heater
For the installation. or relocation or replacement of each
appliance vent installed and not included in an appliance
permit
For the installation or relocation of each boiler or
compressor to and including three horsepower, or each
absorption system to and including 100,000 BtuIh
For the installation or relocation of each boiler or
compressor over three horsepower to and including 15
horsepower, or each absorption system over 100,000
BtuIh and including 500,000 BtuIh
For the installation or relocation of each boiler or
compressor over 15 horsepower to and including 30
horsepower, or each absorption system over 500,000
Btu/h to and including 1,000,000 Btu/h
For the installation or relocation of each boiler or
compressor over 30 horsepower to and including 50
horsepower, or for each absolJ'Ûon system over
1,000,000 Btu/h to and including 1,750,000 Btu/h
For the installation or relocation of each boiler or
refrigeration compressor over 50 horsepower, or each
absorption system over 1,750,000 BtuIh.
For each appliance or piece of equipment regulated by
this Code but not classed in other appliance categories.
or for which no other fee is listed in this Code.
20
$11.00
11.00
5.50
11.00
20,00
28.00
41.00
70,00
7,50
//-1'9'
Schedule D
CITY OF CUPERTINO
Building - Plumbing Fees
New Residential Buildinp and Remodels that add additional square footage.
The following fees shall include all plumbing equipment in or on each building, or other
plumbing equipment on the same premises constructed at the same time,
New multifamily residential buildin¡s (apartments and condominiums)
having three or more living units not including the area of garages,
carports and other non-commercial automobile storage areas
constructed at the same time, per square fool
New sin¡le and two-family residential buildin¡," not including the area
of garages, carports and other minor accessory buildings constructed
at the same time, per square fOOl
SO,05
0.055
21
11-5~Q
Schedule D
CITY OF CUPERTINO
Building- Plumbing Fees
UNIT FEE SCHEDULE
Remodel- No additional Square Footage
Permit Fee
For installation, alteration or repair of water piping
water treating equipment
For repair or alteration of drainage or vent piping, floor, area,
condensate piping
For each plumbing fixture or trap or set of fixtures on one
trap (including water, drainage piping and bacld10w protection
therefor)
For each gas piping system of one (1) to four (4) outlets
For each gas piping system of five (5) or more, per outlet
For each industrial waste pre treatment interceptor, including
its trap and vent, excepting kitchen type grease traps
functioning as fixture traps
Kitchen type trap, and or system
For each building sewer, sanitary sewer, and each trailer park sewer
Storm I rainwater systems-per drain
For each water heater and/or vent
Water Service
Re pipe - per fixture
22
$32.00
7.50
7,50
7.50
4,00
1.00
15,00
7.50
18,00
7.50
9.00
7,50
7.50
/ /-s/
Schedule D
CITY OF CUPERTINO
Building - Plumbing Fees
UNIT FEE SCHEDULE
Remodel- No additional Square Footage
(continued)
For each lawn sprinkler system on anyone meter, including
bacldlow protecûon devices therefor
Five (5) or more, each
For atmospheric type vacuum breakers/back flow not
included in item I
$11.00
0.60
lto5
over 5 each addiûonal
9.00
1.80
56,00
28,00
For each private sewage disposal system
For each cesspool
23
/1- 5-2-
CITY OF CUPERTINO
OTHER BUILDING INSPECTION FEES
Private Swímrning Pools
For new private, residential, in-ground, swimming pools for
single-family and multifamily occupancies including a complete
system of necessary branch circuit wiring, bonding, grounding,
underwater lighting, water pumping and other similar electrical
equipment directly related to the operation of a swimming pool,
each
For other types of swímrning pools, therapeutic
whirlpools, spas and alterations to existing
swimming pools, use the UNIT FEE SCHEDULE
Temporary Power Service
For a temporary service power pole or pedestal
including all pole or pedestal-mounted receptacle
outlets and appurtenances, each
For a temporary distribuûon system and temporary
lighting and receptacle outlets for construction
sites, decorative light, Christmas tree sales lots,
fireworks stands, etc, each
Inspection outside of the normal business hours
(minimum charge two hours)
Inspection for which no fee is specifically established
(minimum charge one hour)
Reinspection - A fee may be assessed for each inspection
or reinspection when such portion of work for which inspection
is called is not complete or when comctions called for are not made
24
$75.00
30,00
7.75
69.001 hr,
47,001 hr.
47.oolhr,
/1-5"'.$
SCHEDULE E
WATER
//-55'
Schedule E
CITY OF CUPERTINO
Water
Reconnection I Non-payment of service
Normal working hours
After working hours
$21.00
43.00
Meter installation or Special Services
(minimum 1 hour)
43.00/hour
25
/I-J-l
..
SCHEDULE F
RECREA TION
,
/1-.>7
Schedule F
CITY OF CUPERTINO
Recreation
Recreation classes and excursion fees shall be determined as follows:
C1a..~§es
1, Determine the maximum hourly rate paid to instructor,
2. Multiply the instructor's hourly rate by the number of class meetings,
3. Determine the minimum number of participants and divide into the instructors cost.
4. Add indirect overhead percent - 59"10.
5. Add 20"10 to establish non-resident fee.
6, Add cost for specialized equipment or supplies,
Special condition¡: If participation does not meet minimum enrollment requirements
and the class continues, the instructor may receive 80% of the registration fee.
)::ycurs10M
1, Transpiration cost divided by the number of participants plus overhead transfer.
2, Add 20"10 to establish non-resident fee.
3, Add any admission cost, supplies or leadership cost.
Additional factors that may be n...d to dMf!m1in~ the clR.fl.C or eyrnmainn 11GM' fee~
The total number of participants in a given activity may generate additional revenue
whereby the total program cost may be reduced.
Classes that traditionally have waiting lists may have the user fee increased.
Programs in competition with adjacent cities or the private sector may require fees to be
increased or decreased to remain competitive.
26
II-/. /
Schedule F
CITY OF CUPERTINO
Recreation
(continued)
Facility Use Fee Schedule (Staff Use Only)
CLASSIFICATIONS: Priori\}' of Use
Group I:
Group II:
Group III:
Group IV:
Group V:
Group VI:
City of Cupertino activities that are open to the public, Official city sponsored
programs,
Clubs with S 1 % resident membership, recreation programs and events with full or
affiliated city co-sponsorship and open to the public.
Programs and events sponsored by Cupertino based non-profit recreation,
education or community service orglni7JIûon with S 1 % resident participation,
These organizations must show an official structure and status.
Private, special interest or business groups for functions not open to the public,
These functions would include parties, banquets, receptions, industtial
conferences, seminars, trade shows, etc.
Programs and events sponsored by non-resident non- profit recreation, education
or community service orgAni7J1riQD. These orglni7JItions must show official
structure. and status.
Cupertino Businesses using the Cupertino Room of the Quinlan Community
Center for promotional and business related purposes other than negotiation or
direct sale,
27
11-6 .?-
Schedule F
CITY OF CUPERTINO
Recnation
(continued)
ROOM RENTAL SCHEDULE. PER HOUR
Quinlan
Community
Center
Multi-Purpose (Nonnal oper. hours) (After hours)
Group ill $15 $40
Group IV 50 75
Group V 25 50
Senior
Center
(After hours only)
$35
50
40
Classroom
Group ill 10 35
Group IV 25 SO
Group V IS 40
Conference Room
Group ill 5 15
Group IV 20 20
Group V IS 15
IS
25
IS
15
20
IS
Groups serving alcohol, add $15,oo/hour for security per5OlII1Cl
A security deposit of$loo.oo may be required based on the nature of tile event
Groups I &: U pay only staffing cost of S8.25/hour if needed
28
Monta Vista!
Fremont Older
NIA
N/A
N/A
15
25
15
N/A
N/A
N/A
II-t J
Schedule F
CITY OF CUPERTINO
Recreation
(continued)
oumOOR FACILITIES
Memorial Softball Field
Cupertino residentslbusiness only
Field can be reserved for a maximum of2 hours
THERE IS NO FEE FOR CURRENT SOFTBALL
TEAMS PLAYING IN CUPERTINO LEAGUES,
$25.00
Field preparation
(includes dragging, watering, chalking, and bases)
20.00
Field Attendant (2 hour minimum)
Field Attendant is required any time lights or a
field preparation is requested.
Lights (in the evening)
8,251 hr.
5.001 hr.
Memorial Park Amphitheater
Cupertino Resident
Non-resident
Electricity
Memorial Park Gazebo
Cupertino Resident
Non-resident
25.00
40.00
16,50
25,00
40.00
Picnic Areas
Residents
Non-residents
If electricity is required
25,00
40,00
16,50
29
11-,: fÍ
Schedule F
CITY OF CUPERTINO
Rec:reatioD
( CODtiaued)
BLACKBERRY FARM PICNIC GROUNDS
General Admission:
Weekends & Holidays
$6.00
4,00
Weekdays
$3.50
2.50
ADULT (13 years and over)
CHILD (6 thru 12)
Children under 6 are ftee when
accompanied by their parents.
Group Rates:
100 - 500 persons
501·1000 persons
1001 or more persons
Adult Child
(13 and over) (6 thru 12)
5,50 3.50
5,00 3,00
4,50 2,50
Adult
3,25
3,00
2,75
Child
2,25
2.00
1.75
BI.ACKBRRRY FARM GOLF COIJRSE
9-Holes
Junior & Seniors (under 16 and over 62)
Second Nine (all players)
Weekends
9.25
NIA
7,25
Weekdays
7.50
6,50
6,50
All green fee prices; deduct $1.00 when you present a Cupertino J.D.
All groups and tournaments pay the full rate (Cupertino resident still applies)
Staff is authorized to set meJ'(:hAlVli~ fees according to current cost.
30
I/-t ,;
SCHEDULE G
MISCELLANEOUS
110
Sehedule G
CITY OF CUPERTINO
MlseeUaaeous
Overhead Pereeat Fee Sehedule
The City Manager may authorize service fees to be invoiced for services rendered by the city that
are not specified on schedule A through F. .'
To arrive at the appropriate service fee, the employees' hourly rate for each employee directly
involved in the service delivered is multiplied by the cost center overhead percentage, The sum
of employee services plus any direct material cost becomes the invoice amount.
Cost Ceater
Pereeat
City Manager
City Attorney
City Clerk
Government Channel
Accounting
General Services
Personnel
Code Enforcement
Planning
Building
Public Works Administratioa
Engineering Design
Inspection Service
Public Works Supervision
Grounds
Streets
Facilities
Traffic Fngi.-rin¡
Traffic Fngi.-rin¡ Maintenance
Water
670~
37%
120%
108%
108%
55%
143%
80%
60%
87%
100%
125%
70%
123%
180%
164%
249%
78%
91%
130%
,
31
(1-0