Loading...
ASA-2019-03 Stamped Plan Set.pdf P R O J E C T D I R E C T O R Y T A B L E O F C O N T E N T S S T E V E D A U B E R H O M E O W N E R 10367 Heney Creek Place Cupertino, California 95014 PH 408 472 0996 s t e v e @ d a u b e r.u s L E I T Z I N G E R & C O M P A N Y List of Drawings D E S I G N S T U D I O CS Cover Sheet, Project Sheet Index Richard Leitzinger, Principal ri c h a rd l e i t z i n g e r@ y a h o o .c o m A- 1.1 Site Plan, Parcel Map, Aerial Photograph of property A- 1.2 Site Plan, Site Data & Scope of Work 2040 Main Street, #124, Santa Clara, California 95050 A- 2.1 Existing Lower Level Floor Plan A- 2.2 Existing Main Level Floor Plan A- 2.3 Existing Upper Level Floor Plan PH 650 576 8445 A- 3.1 Proposed Lower Level Floor Plan A- 3.2 Proposed Main Level Floor Plan A- 3.3 Proposed Upper Level Floor Plan PH 650 576 8445 A- 4.1 Existing Roof Plan A- 4.2 Proposed Roof Plan A- 5.1 Proposed Building Sections A- 5.2 Proposed Building Section A- 6.1 Existing & Proposed Exterior Elevations A- 6.2 Existing & Proposed Exterior Elevations A- 6.3 Existing & Proposed Exterior Elevations A- 6.4 Existing & proposed Exterior Elevations A- 7.1 Area Calculation - Lower Level Floor Plan A- 7.2 Area Calculation - Main Level Floor Plan A- 7.3 Area Calculation - Upper Level Floor Plan R E S I D E N T I A L R E M O D E L & A D D I T I O N S T E V E D A U B E R R E S I D E N C E 1 0 3 6 7 H E N E Y C R E E K P L A C E , C U P E R T I N O , C A L I F O R N I A , 9 5 0 1 4 PROGRESS PRINTNOT FOR CONSTRUCTION PUBLISHED: 05.29.2019 ASA-2019-03 06/18/19 Ellen Yau DN 8 UP 7 UP 7 54'-9 3/4" 49'-2" 16'-2" 19'-6" 7'-7" 23'-3" 2'-6"53'-1"2'-0"1'-6" 33'-10" STAIR STORAGE ROOM CLG. HT. 8'-1" AFF 6'-0"6'-6" 1'-0" 2'-3 3/4" 12'-1 0" 10'-5" 8'-4" 2'-2"1'-3"5'-10" 3'-10" 12'-4" 5'-11" 3'-9"3'-11" 2'-3" 3 CAR GARAGE CLG. HT. '-1" AFF DN 1 DN 1 CRAWL SPACECRAWL SPACE CRAWL SPACE +/- EXISTING +/- (E)+/- (E) +/- (E)+/- (E) +/- (E)+/- (E) +/- (E) +/- (E)+/- (E)+/- (E)+/- (E)+/- (E)+/- (E)+/- (E) +/- (E)+/- (E)+/- (E)+/- (E) +/- (E) +/- (E) +/- (E) +/- (E) +/- (E) +/- (E) +/- (E) 54'-8" 29'-7" 26'-1" 1 5'-10" 9'-3" 16'-1"8'-2"1'-1 0" 2'-5" 10'-10" 2'-5" +/- (E) +/- (E) +/- (E) +/- (E) +/- (E) +/- (E) +/- (E) +/- (E) +/- (E) +/- (E) +/- (E) +/- (E) DN 8 I I I I I I SPECIFIC SHEET NOTES 1 PROPOSED SITE PLAN SCALE: 1/8” PROGRESS PRINTNOT FOR CONSTRUCTION PUBLISHED: 05.29.2019 RESIDENTIAL REMODEL & ADDITION SITE PLAN PROPOSED STEVE DAUBER RESIDENCE 10367 HENEY CREEK PLACE, CUPERTINO, CALIFORNIA A 1. 1 All drawing and written material appearing herein constitute the original and unpublished work of the designer and may not be duplicated, used or disclosed in whole or in part for design, fabrication or construction of any portion thereof other than the specific project to which it pertains without the written consent of the designer. 2 0 4 0 M A I N S T R E E T , # 1 2 4 SANTA CLARA, C ALI FO RN I A 9 5 0 5 0 6 5 0 5 7 6 8 4 4 5 r i c h a r d l e i t z i n g e r @ y a h o o .c o m D A T E P R O J E C T D R A W N R E V I E W S C A L E 01 .2 8 .2 01 8 2 01 8 .0 5 R A L R A L 1 /8 ” 4 23 2 20 25 2 3 4 27 11 20 23 23 2012 22 26 23 21 24 PROJ ECT LOC ATION MAP PROJECT LOCATION N EXISTING HOUSE SCOPE OF PROPOSED WORK The scope of proposed work includes, but not limited to the remodel of an existing residence, as follows: Additions are limited to the Living Room and Dining Room. These areas are under existing roof structures and within the building envelope. Windows and doors will be altered in order to optimize views to the open spaces and reduce sight lines to neighboring houses. New interior lighting will replace the some existing light xtures. The Master Bathroom will be remodeled. A second bathroom will involve replacement of xtures, cabinetry and nishes. The interior door of a bedroom will be relocated. Exterior work includes the removal of the existing wood siding and trim, which is currently in a degraded state and requires replacement. Removal of trellis type roof features. Removal of covered balcony located at the Living Room. Replacement of gutters and rain water leaders. Alterations to the existing roo ng will be kept to a minimum. New horizontal siding, natural stone, stucco veneer, and new trim will replace the existing wood siding. No landscaping or at work alterations proposed. No upgrade proposed for utility services.82.54’ PROPERTY LINE160.87’ PROPERTY LINE 65.00’ PROPERTY LINE 65.08’ PROPERTY LINE139.48’ PROPERTY LINE 137.00’ P R O P E R T Y LI NE 140.37’ PRO PERTY LINE 181 .28‘ PROPERTY LINE SANTA CLARA VALLEY WATER DISTRICT EASEMENT80.00’ PG&E TOWER EASEM E N T 72.03’ PROPERTY LINE20.00 FRONT SETBA C K 20.00 REAR SETBACK 15.00 SIDE SETBACK20.00 FRONT SETBACK 78.50’ PROPERTY LINEBuilding Structure 1. Line of existing Lower Level building structure. 2. Line of existing Main Level building structure. 3. Line of existing Upper Level building structure. 4. Shaded area indicates new area of addition/ Landscape 1 1 . Existing trees to remain. No trees are to be removed. 12. Existing landscaping to remain.. No proposed alterations to the landscape. 13. Existing fence to remain. Flatwork, Decks and Stairs 20. Existing agstone walkway to remain.. 21. Existing stair to remain. 22. Existing stairs to be removed. 23. Existing decking to remain. 24. Existing dry stack stone retaining wall to remain. 25. Existing driveway to remain. 26. Existing hot tub to remain. 27. New metal pipe and cable railing . 1 ZONING SUMMARY SITE & FLOOR AREA SUMMARY Assessor’s Parcel Number: 342 48 027 Zoning: P (R1 0-2) Lot Gross Area: (1.44 acres) 62,726.00 sf. Lot Net Area: 1 5,396.50 sf. LOT COVERAGE Maximum Allowable Lot Coverage: 6,928.42 sf. 45% of the net area. Existing Lot Coverage: Existing Building Structure: 2,132.06 sf. Sub-total: 2,1 32.06 sf. Proposed Lot Coverage Additions: Proposed Building Structure Removed: (1 1 0.84) sf. Proposed Building Structure Addition: 22.98 sf. Subtotal: (87.86) sf. TOTAL LOT COVERAGE: 2,04 4.21 sf. FLOOR AREA RATIO: Maximum Allowable Floor Area: 6,928.42 sf. 45% of the net area. FLOOR AREA : Existing Floor Areas: Existing Lower Floor: 1 ,291 .49 sf. Existing Main Floor: 1,890.97 sf. Existing Upper Floor: 1,373.86 sf. Subtotal: 4,556.32 sf. Proposed Floor Areas Additions: Proposed Addition to Lower Floor: 0.00 sf. Proposed Addition to Main Floor: 76.60 sf. Proposed Addition to Upper Floor: 0.00 sf. Subtotal: 76.60 sf. TOTAL FLOOR AREA: 37.37% 4,632.92 sf. I I I I I I 13 This is a summary based upon conversations with Planning and Building of cials and review of the zoning ordinances and other governing agencies. County: Santa Clara City: Cupertino Zoning: P(R1 0-2) Planned Development Zone, Chapter 19.80 Very low density: (1/2 acre slope density formula) Average slo pe:28.53 ** Neighborhood : Oak Valley Assessors parcel number: 342 48 027 Street Address: 10367 Heney Creek Place, Cupertino, CA 95014 EXISTING CONDITIONS: Description of existing property: Lot size: 62,726.00 gross sf. or 1.44 acres Lot Type: Flag Lot - hillside. Utilities and services Overhead - none Underground - electrical/gas/water/waste Description of existing structures: Built: 1979 Renovation: 1980 Single Family Residence 2 stories 4 bedrooms 2.5 baths 3,424.00 sf. pool & spa - spa Parking: 3 car attached garage ZONING REQUIREMENTS; Lot coverage: 45% of net lot area. Refer to Title report for legal description or tentative map. FAR - Floor Area Ratio: 45% of net lot area. Refer to Title report for legal description or tentative map. Floors are counted once for each oor. No exception for stairs Interior stairs count at each oor. Basement stairs do not count. Interior ceiling exceeding 16’ above nish oor count twice towards FAR. Second story decks (balconies) with open railing and no roof above, do not count towards FAR. Accessory Buildings: All accessory buildings (non - ADU) on a lot where the cumulative area of structures exceed 500 sf. Setbacks: Front: First story: 20.00’ Second story:25.00’ Rear: First story: 20.00’ Second story: 25.00’ Interior Sides: First story: 5.00’ - 15.00’ sum total Second Story:1 5.00’ Covered porches may encroach into the front yard setback only: 6’ maximum distance and 96 sf. Maximum area. Building Height: 28.00’ maximum two stories height limit. Measured from grade directly below. height exceptions: chimneys and weather vanes and cupolas, not exceeding 24 sf. in area. Five additional feet maximum. Parking: 3 parking spaces actual. 2 uncovered space actual. 2 covered, 2 uncovered required. Solar Studies: Not required. Accessory Dwelling Unit: ADUs for lots of 20,000 or greater shall have a maximum oor area of 1,000 sf and must be a one story structure. Maximum height limit shall be 21.00’. See setback requirements above. OTHER NON-ZONING INFORMATION: Location: Latitude: 37.327424° 37° 19’ 38.7264” N Longitude: -1 22.070562° 122° 4’ 1 4.023 2” W Elevation: Above sea level 387.00 ft. Climate zone: 4 Rainfall: NOAA - Rain Intensity Data: Rainfall intensity (1 0yr.)2.7 in/hr Rainfall intensity (100yr.) 3.7 in/hr Drainage Area (10yr.) 450 sf. Drainage Area (1 00yr.)330 sf. Mean Annual Precipitation: 19 inches FEMA Flood zone: A WUI Urban Wildland Interface: Zone: 1 ASA-2019-03 06/18/19 Ellen Yau STAIR STORAGE ROOM 3 CAR GARAGE CRAWL SPACE CRAWL SPACE CRAWL SPACE I I I I I I 1 PROPOSED SITE PLAN SCALE: 1:30 RESIDENTIAL REMODEL & ADDITION SITE PLAN PROPOSED STEVE DAUBER RESIDENCE 10367 HENEY CREEK PLACE, CUPERTINO, CALIFORNIA A 1. 2 All drawing and written material appearing herein constitute the original and unpublished work of the designer and may not be duplicated, used or disclosed in whole or in part for design, fabrication or construction of any portion thereof other than the specific project to which it pertains without the written consent of the designer. 2 0 4 0 M A I N S T R E E T , # 1 2 4 SANTA CLARA, C ALI FO RNI A 9 5 0 5 0 6 5 0 5 7 6 8 4 4 5 r i c h a r d l e i t z i n g e r @ y a h o o .c o m D A T E P R O J E C T D R A W N R E V I E W S C A L E 01 .2 8 .2 01 8 2 01 8 .0 5 R A L R A L 1 :3 0 80’-0” PG&E TOWER EASEM E N T PG&E TOWER EASEMENT PG&E TOWER EASEMENT S.C.V.W.D. EASEMENTS.C.V.W.D. EASEMENT295.49’ 49 . 5 5 ’ 3 3 . 4 7 ’ 38 . 70 ’24.07’25 . 1 2 ’54.63’65.07’150.02’ 90.95’53.29’1 7 0 . 3 0 ’82.54’160.87’ 60.00’’78.50’1 3 9 .4 8 ’ 1 3 7 .0 0 ’ 1 36.00’ 140.37’ 181.28’ 65.08’72.03’ 65.15’63.42’58.86’20.00’ FRONT SETBA C K 20.00’ REAR SETBACK 20.00’ SIDE SETBACKHENEY CREEK PLACE 2 OFFICE OF COUNTRY ASSESSOR PARCEL MAP NTSPROGRESS PRINTNOT FOR CONSTRUCTION PUBLISHED: 04.10.2019 3 AERIAL PHOTOGRAPH OF SITE AND ADJACENT PROPERTIES NTS PROJECT LOCATION ASA-2019-03 06/18/19 Ellen Yau EXISTING WALL GRAPHIC LEGEND EXISTING WALL TO BE REMOVED. I I I I I I PROGRESS PRINTNOT FOR CONSTRUCTION PUBLISHED: 02.29.2019 1 EXI S TI N G LOWER FLOOR PLAN SCALE: 1/4” A A5.1 B A5.1 A A5.1 B A5.1 C A5.1 A 5.2 C A5.1 A A5.2 RESIDENTIAL REMODEL & ADDITION LOWER LEVEL FLOOR PLAN EXISTING & DEMOLITION STEVE DAUBER RESIDENCE 10367 HENEY CREEK PLACE, CUPERTINO, CALIFORNIA A 2.1 All drawing and written material appearing herein constitute the original and unpublished work of the designer and may not be duplicated, used or disclosed in whole or in part for design, fabrication or construction of any portion thereof other than the specific project to which it pertains without the written consent of the designer. 2 0 4 0 M A I N S T R E E T , # 1 2 4 SANTA CLARA, C ALI FORN I A 9 5 0 5 0 6 5 0 5 7 6 8 4 4 5 r i c h a r d l e i t z i n g e r @ y a h o o .c o m D A T E P R O J E C T D R A W N R E V I E W S C A L E 01 .2 8 .2 01 8 2 01 8 .0 5 R A L R A L 1 /4 ” 1 20 4 2121 SPECIFIC SHEET NOTES Floors 1. Existing stairs to remain. 2. Stair to be removed. 3. Existing step to remain. 4. Existing wood railing to be removed. Walls 20. Existing Horizontal siding and trim to be removed. 21. Existing front column and balcony to be removed. Windows and Doors 30. Existing windows and doors to be removed. Gutters & rain water leaders 40. Replace existing gutters and rain water leaders. 1 /4 ” I I I I I I 0 1 2 3 4 5 6 12 DN 8 UP 7 UP 7 54'-9 3/4" 49'-2" 16'-2" 19'-6" 7'-7" 23'-3" 2'-6"53'-1"2'-0"1'-6" 33'-10"STAIR MULTI-PURPOSE ROOM CLG. HT. 8'-1" AFF 6'-0"6'-6" 1'-0" 2'-3 3/4" 1 2'-1 0" 10'-5"8'-4" 2'-2"1'-3"5'-10" 3'-10" 12'-4" 5'-11" 3'-9"6'-2" 2'-3"3 CAR GARAGE CLG. HT. 9'-1 " AFF DN 1 DN 1 CRAWL SPACECRAWL SPACE CRAWL SPACE +/- EXISTING +/- (E)+/- (E)+/- (E) +/- (E)+/- (E)+/- (E)+/- (E) +/- (E)+/- (E)+/- (E)+/- (E)+/- (E)+/- (E)+/- (E) +/- (E) +/- (E)+/- (E)+/- (E) +/- (E) +/- (E) +/- (E) +/- (E) +/- (E) +/- (E) 54'-8" 29'-7" 26'-1" 9'-3" 16'-1"8'-2"1 '-1 0" 2'-5" 10'-10" 2'-5" +/- (E) +/- (E) +/- (E) +/- (E) +/- (E) +/- (E) +/- (E) +/- (E) +/- (E) +/- (E) +/- (E) +/- (E)16'-1" +/- (E)7'-7 1/2" 26'-2 1/2" 4'-1 1/2"8'-2"+/- (E)+/- (E)+/- (E) +/- (E) +/- (E)6'-3"+/- (E)+/- (E) 14'-9 1/4" 9'-7" 9'-8"6'-0" 11'-9" 4'-5"3'-5 1/2"11'-7 1/2" 5'-4"+/- (E)+/- (E)+/- (E)+/- (E) +/- (E) +/- (E) +/- (E) +/- (E) +/- (E)15'-8" 15'-3 3/4" ASA-2019-03 06/18/19 Ellen Yau I I I I I I A A5.1 B A5.1 A A5.1 B A5.1 C A5.1 A A5.2 C A5.1 A A5.2 RESIDENTIAL REMODEL & ADDITION MAIN LEVEL FLOOR PLAN EXISTING & DEMOLITION STEVE DAUBER RESIDENCE 10367 HENEY CREEK PLACE, CUPERTINO, CALIFORNIA A 2.2 All drawing and written material appearing herein constitute the original and unpublished work of the designer and may not be duplicated, used or disclosed in whole or in part for design, fabrication or construction of any portion thereof other than the specific project to which it pertains without the written consent of the designer. 2 0 4 0 M A I N S T R E E T , # 1 2 4 SANTA CLARA, C ALI FO RN I A 9 5 0 5 0 6 5 0 5 7 6 8 4 4 5 r i c h a r d l e i t z i n g e r @ y a h o o .c o m D A T E P R O J E C T D R A W N R E V I E W S C A L E 01 .2 8 .2 01 8 2 01 8 .0 5 R A L R A L 1 /4 ” 30 20 20 30 30 21 30 20 30 2 1 EXI S T I N G MAIN FLOOR PLAN SCALE: 1/4” PROGRESS PRINTNOT FOR CONSTRUCTION PUBLISHED: 05.29.2019 1 /4 ” I I I I I I 0 1 2 3 4 5 6 12 DINING ROOM CLG. HT. 8'-0"AFF FAMILY ROOM CLG. HT. 8'-0" AFF LIBRARY CLG. HT. 8'-" AFF HALLWAY CLG. HT. 8'-0" AFF REAR DECK NOOK CLG. HT. 8'-0" AFF PWDR CLG. HT. 8'-0"AFF HALLWAY CLG. HT. 8'-0" AFF LAUN. CLG. HT. 8'-0" AFF KITCHEN CLG. HT. 8'-0" AFF DN 3 DN 9 UP 7 DN 7UP 7 54'-9 3/4" 49'-2" 16'-2" 19'-6" 7'-7"23'-3" 2'-6"1'-10" 53'-1" 3'-5"DN 9 STAIRDN 3 LIVING ROOM CLG. HT. VAULTED 6'-0"6'-6"24'-9" 1'-0" 2'-3 3/4"1 2'-1 0" 10'-5"3'-10" 8'-4" 2'-2"1'-3" 3'-10" 12'-4"5'-11" 3'-9"54'-10" 14'-0" 15'-7" 9'-3" +/- (E) +/- (E)+/- (E)+/- (E) +/- (E) +/- (E) +/- (E) +/- (E) +/- (E)+/- (E) +/- (E) +/- (E)+/- (E)+/- (E) +/- (E)+/- (E)+/- (E)+/- (E) +/- (E)+/- (E) +/- (E) +/- (E)+/- (E) +/- (E)+/- (E)+/- (E) +/- (E)+/- (E) +/- (E)+/- (E) +/- (E) +/- (E)+/- (E)+/- (E)+/- (E)7'-5" 6'-3" 5'-10" +/- (E)8'-2"+/- (E)ENTRY CLG. HT. VAULTED 2'-3"3'-11" 2'-5" 1 0'-1 0" 2'-5"4'-5"+/- (E)+/- (E)5'-5"+/- (E)EXISTING WALL GRAPHIC LEGEND EXISTING WALL TO BE REMOVED. SPECIFIC SHEET NOTES Floors 1. Existing stairs to remain. 2. Stair to be removed. 3. Existing step to remain. 4. Existing wood railing to be removed. Walls 20. Existing Horizontal siding and trim to be removed. 21. Existing front column and balcony to be removed. Windows and Doors 30. Existing windows and doors to be removed. Gutters & rain water leaders 40. Replace existing gutters and rain water leaders. ASA-2019-03 06/18/19 Ellen Yau I I I I I I PROGRESS PRINTNOT FOR CONSTRUCTION PUBLISHED: 05.29.2019 1 EXI S TI N G UPPER FLOOR PLAN SCALE: 1/4” A A5.1 B A5.1 A A5.1 B A5.1 C A5.1 A A5.2 C A5.1 A A5.2 RESIDENTIAL REMODEL & ADDITION UPPER LEVEL FLOOR PLAN EXISTING & DEMOLITION STEVE DAUBER RESIDENCE 10367 HENEY CREEK PLACE, CUPERTINO, CALIFORNIA A 2.3 All drawing and written material appearing herein constitute the original and unpublished work of the designer and may not be duplicated, used or disclosed in whole or in part for design, fabrication or construction of any portion thereof other than the specific project to which it pertains without the written consent of the designer. 2 0 4 0 M A I N S T R E E T , # 1 2 4 SANTA CLARA, C ALI FORN I A 9 5 0 5 0 6 5 0 5 7 6 8 4 4 5 r i c h a r d l e i t z i n g e r @ y a h o o .c o m D A T E P R O J E C T D R A W N R E V I E W S C A L E 01 .2 8 .2 01 8 2 01 8 .0 5 R A L R A L 1 /4 ” 30 30 30 30 20 30 30 20 30 40 20 1 /4 ” I I I I I I 0 1 2 3 4 5 6 12 EXISTING WALL GRAPHIC LEGEND EXISTING WALL TO BE REMOVED. SPECIFIC SHEET NOTES Floors 1. Existing stairs to remain. 2. Stair to be removed. 3. Existing step to remain. 4. Existing wood railing to be removed. Walls 20. Existing Horizontal siding and trim to be removed. 21. Existing front column and balcony to be removed. Windows and Doors 30. Existing windows and doors to be removed. Gutters & rain water leaders 40. Replace existing gutters and rain water leaders. 54'-9 3/4" 49'-2" 16'-2" 19'-6"7'-7"23'-3" 2'-6"53'-1" 14'-0" 15'-7"9'-3" STAIR DN 3 LIVING ROOM CLG. HT. VAULTED 6'-0"11'-9" 2'-3 3/4"1 2'-1 0" 10'-5"4'-8"9'-4" 3'-10" 12'-4"5'-11" BEDROOM 1 CLG. HT. 8'-0" AFFBEDROOM 2 CLG. HT. 8'-0" AFF BATHROOM CLG. HT. 8'-0" AFF HALLWAY CLG. HT. VAULT. M. BATH CLG. HT. 8'-0" AFF BEDROOM 3 CLG. HT. VAULT. HALLWAY CLG. HT. 8'-0" AFF TOILET/SHOWER CLG. HT. 8'-0" AFF DN 7 DN 7 MASTER BEDROOM CLG. HT. VAULT. M. W.I.C. CLG. HT. 8'-0" AFF (E) FAU 33'-4" +/- (E)+/- (E) +/- (E) +/- (E)+/- (E)+/- (E)+/- (E)+/- (E)+/- (E)+/- (E)+/- (E)+/- (E)+/- (E)+/- (E)+/- (E)+/- (E)+/- (E) +/- (E) +/- (E) +/- (E) +/- (E) +/- (E)5'-5"7'-5" +/- (E) +/- (E)1 5'-1 0" +/- (E) +/- (E)35'-8" +/- (E)7'-3 1/2"4'-9 1/2"+/- (E)+/- (E)ASA-2019-03 06/18/19 Ellen Yau I I I I I I SPECIFIC SHEET NOTES EXISTING WALL GRAPHIC LEGEND NEW WALL. PROGRESS PRINTNOT FOR CONSTRUCTION PUBLISHED: 05.29.2019 1 PROPOSED LOWER FLOOR PLAN SCALE: 1/4” A A5.1 B A5.1 A A5.1 B A5.1 C A5.1 A A5.2 C A5.1 A A5.2 RESIDENTIAL REMODEL & ADDITION LOWER LEVEL FLOOR PLAN PROPOSED STEVE DAUBER RESIDENCE 10367 HENEY CREEK PLACE, CUPERTINO, CALIFORNIA A 3.1 All drawing and written material appearing herein constitute the original and unpublished work of the designer and may not be duplicated, used or disclosed in whole or in part for design, fabrication or construction of any portion thereof other than the specific project to which it pertains without the written consent of the designer. 2 0 4 0 M A I N S T R E E T , # 1 2 4 SANTA CLARA, C ALI FORN I A 9 5 0 5 0 6 5 0 5 7 6 8 4 4 5 r i c h a r d l e i t z i n g e r @ y a h o o .c o m D A T E P R O J E C T D R A W N R E V I E W S C A L E 01 .2 8 .2 01 8 2 01 8 .0 5 R A L R A L 1 /4 ” 10 11 30 1 /4 ” I I I I I I 0 1 2 3 4 5 6 12 Floors 1. New addition. Landscape 10. Existing step to remain. 1 1 . New metal pipe and cable railing. Walls 20. New wall. 21 New post. Windows and Doors 30. New windows and doors. Gutters & rain water leaders 40. Replace existing gutters and rain water leaders. DN 8 UP 7 UP 7 54'-9 3/4" 48'-10"16'-2" 19'-6" 23'-3" 2'-6"53'-1"2'-0"1'-6" 33'-10" STAIR MULTI-PURPOSE ROOM CLG. HT. 8'-1 " AFF 6'-0"6'-6" 1'-0" 2'-3 3/4" 1 2'-1 0" 10'-5" 8'-4" 2'-2"1'-3"5'-10" 3'-10" 12'-4" 5'-11" 3'-9"3 CAR GARAGE CLG. HT. 9 '-1 " AFF DN 1 DN 1 CRAWL SPACECRAWL SPACE CRAWL SPACE +/- EXISTING +/- (E)+/- (E) +/- (E)+/- (E)+/- (E)+/- (E) +/- (E)+/- (E)+/- (E)+/- (E)+/- (E)+/- (E)+/- (E) +/- (E)+/- (E)+/- (E)+/- (E) +/- (E) +/- (E) +/- (E) +/- (E) +/- (E) +/- (E) +/- (E) 29'-7" 26'-1" 16'-1"8'-2"1 '-1 0" +/- (E) +/- (E) +/- (E) +/- (E) +/- (E) +/- (E) +/- (E) +/- (E) +/- (E)9'-3"3'-3"8'-2"+/- (E)4'-5"+/- (E)6'-3"+/- (E)4'-1 1/2"+/- (E)+/- (E)26'-2 1/2" +/- (E)14'-9 1/4" 9'-1 1 " 9'-8"6'-0" 15'-7 3/4"+/- (E)+/- (E) +/- (E) +/- (E) +/- (E)4'-9"3'-5 1/2"11'-3 1/2" +/- (E)+/- (E) +/- (E)7'-5"10'-6"1 5'-1 0 3/4"2'-7" 54'-8 3/4" ASA-2019-03 06/18/19 Ellen Yau DINING AREA CLG. HT. 8'-0"AFF FAMILY ROOM CLG. HT. 8'-0" AFF LIBRARY CLG. HT. 8'-0" AFF HALLWAY CLG. HT. 8'-0" AFF REAR DECK CLG. HT. 8'-1 " AFF NOOK CLG. HT. 8'-0" AFF PWDR CLG. HT. 8'-0"AFF HALLWAY CLG. HT. 8'-0" AFF LAUN. CLG. HT. 8'-0" AFF KITCHEN CLG. HT. 8'-0" AFF DN 3 DN 8 UP 7 DN 7UP 7 54'-9 3/4" 48'-8" 7'-1"23'-3" 2'-6"53'-1" 3'-5"DN 8 STAIR LIVING ROOM CLG. HT. VAULTED 6'-0"6'-6"24'-9" 1'-0" 2'-3 3/4"1 2'-1 0" 10'-5"8'-4" 2'-2"1'-3" 3'-10"5'-11" 3'-9"14'-0" 15'-7" 9'-3" +/- (E) +/- (E)+/- (E)+/- (E) +/- (E) +/- (E) +/- (E) +/- (E)+/- (E) +/- (E) +/- (E)+/- (E)+/- (E) +/- (E)+/- (E)+/- (E)+/- (E) +/- (E)+/- (E) +/- (E) +/- (E)+/- (E)+/- (E)+/- (E)+/- (E)+/- (E) +/- (E) +/- (E)+/- (E)+/- (E)+/- (E)7'-5"5'-10"4'-5"54'-9 3/4" 1 5'-1 1 3/4" 3'-10" 12'-4"+/- (E)18'-11" 4'-2" ENTRY CLG. HT. VAULTED+/- (E)+/- (E)4'-5"+/- (E)+/- (E)+/- (E)8'-2"+/- (E) +/- (E)1'-10" 22'-0" 6'-3" 5'-5" RESIDENTIAL REMODEL & ADDITION MAIN LEVEL FLOOR PLAN PROPOSED STEVE DAUBER RESIDENCE 10367 HENEY CREEK PLACE, CUPERTINO, CALIFORNIA I I I I I I SPECIFIC SHEET NOTES 1 PROPOSED MAIN FLOOR PLAN SCALE: 1/4” PROGRESS PRINTNOT FOR CONSTRUCTION PUBLISHED: 05.29.2019 A A5.1 B A5.1 A A5.1 B A5.1 C A5.1 A A5.2 C A5.1 A A5.2 A 3.2 All drawing and written material appearing herein constitute the original and unpublished work of the designer and may not be duplicated, used or disclosed in whole or in part for design, fabrication or construction of any portion thereof other than the specific project to which it pertains without the written consent of the designer. 2 0 4 0 M A I N S T R E E T , # 1 2 4 SANTA CLARA, C ALI FO RN I A 9 5 0 5 0 6 5 0 5 7 6 8 4 4 5 r i c h a r d l e i t z i n g e r @ y a h o o .c o m D A T E P R O J E C T D R A W N R E V I E W S C A L E 01 .2 8 .2 01 8 2 01 8 .0 5 R A L R A L 1 /4 ” 1 20 21 30 30 40 11 30 20 30 130 30 Floors 1. New addition. Landscape 10. Existing step to remain. 1 1 . New metal pipe and cable railing. Walls 20. New wall. 21 New post. Windows and Doors 30. New windows and doors. Gutters & rain water leaders 40. Replace existing gutters and rain water leaders. 1 /4 ” I I I I I I 0 1 2 3 4 5 6 12 EXISTING WALL GRAPHIC LEGEND NEW WALL. ASA-2019-03 06/18/19 Ellen Yau I I I I I I SPECIFIC SHEET NOTES PROGRESS PRINTNOT FOR CONSTRUCTION PUBLISHED: 05.29.2019 1 PROPOSED UPPER FLOOR PLAN SCALE: 1 1/4” A A5.1 B A5.1 A A5.1 B A5.1 C A5.1 A A5.2 C A5.1 A A5.2 RESIDENTIAL REMODEL & ADDITION UPPER LEVEL FLOOR PLAN PROPOSED STEVE DAUBER RESIDENCE 10367 HENEY CREEK PLACE, CUPERTINO, CALIFORNIA A 3.3 All drawing and written material appearing herein constitute the original and unpublished work of the designer and may not be duplicated, used or disclosed in whole or in part for design, fabrication or construction of any portion thereof other than the specific project to which it pertains without the written consent of the designer. 2 0 4 0 M A I N S T R E E T , # 1 2 4 SANTA CLARA, C ALI FORN I A 9 5 0 5 0 6 5 0 5 7 6 8 4 4 5 r i c h a r d l e i t z i n g e r @ y a h o o .c o m D A T E P R O J E C T D R A W N R E V I E W S C A L E 01 .2 8 .2 01 8 2 01 8 .0 5 R A L R A L 1 /4 ” 30 20 30 21 30 40 20 30 20 21 30 40 20 1 /4 ” I I I I I I 0 1 2 3 4 5 6 12 EXISTING WALL GRAPHIC LEGEND NEW WALL. Floors 1. New addition. Landscape 10. Existing step to remain. 1 1 . New metal pipe and cable railing. Walls 20. New wall. 21 New post. Windows and Doors 30. New windows and doors. Gutters & rain water leaders 40. Replace existing gutters and rain water leaders. 54'-9 3/4" 52'-1"22'-10" 12'-10" 10'-6"23'-3" 2'-6"53'-1"14'-0" 15'-7"9'-3" STAIR LIVING ROOM CLG. HT. VAULTED 6'-0"1'-0"2'-3 3/4"1 2'-1 0" 10'-5"4'-8"10'-6" 12'-4"5'-11" BEDROOM 2 CLG. HT. 8'-0" AFF BATHROOM CLG. HT. 8'-0" AFF HALLWAY CLG. HT. VAULTED BEDROOM 3 CLG . HT. VAULTED HALLWAY CLG. HT. 8'-0" AFF BEDROOM 1 CLG. HT. 8'-0" AFF DN 7 DN 7 MASTER BEDROOM CLG. HT. VAULTED M. W.I.C. CLG. HT. 8'-0" AFF (E) FAU+/- (E)+/- (E) +/- (E)+/- (E)+/- (E) +/- (E)+/- (E)+/- (E) +/- (E)+/- (E) +/- (E) +/- (E)+/- (E) +/- (E)+/- (E)+/- (E)+/- (E) +/- (E) +/- (E) +/- (E) +/- (E) +/- (E) M. BATH CLG. HT. 8'-0" AFF TOILET CLG. HT. 8'-0" AFF 33'-4" 4'-9 1/2"7'-6 1/2" SHOWER CLG. HT. 8'-0" AFF 5'-5"+/- (E)+/- (E)+/- (E) +/- (E)+/- (E)ASA-2019-03 06/18/19 Ellen Yau SPECIFIC SHEET NOTES Roof Features 1. Dashed lines indicates building structure below.. 2. Existing asphalt shingle roof to remain.. 3. Existing solar panels to remain. 4. Existing skylight to remain. 5. Existing trellis and extended eaves to be removed. 6. Existing metal gutters and rain water leaders to be replaced. 7. Existing rain water diverter to be removed. 8. New rain water d iverter. EXISTING WALL GRAPHIC LEGEND EXISTING WALL TO BE REMOVED. I I I I I I PROGRESS PRINTNOT FOR CONSTRUCTION PUBLISHED: 05.29.2019 1 EXI S TI N G LOWER & UPPER ROOF PLAN SCALE: 1/4” A A5.1 B A5.1 A A5.1 B A5.1 C A5.1 A A5.2 C A5.1 A A5.2 RESIDENTIAL REMODEL & ADDITION ROOF PLAN EXISTING & DEMOLITION STEVE DAUBER RESIDENCE 10367 HENEY CREEK PLACE, CUPERTINO, CALIFORNIA A 4. 1 All drawing and written material appearing herein constitute the original and unpublished work of the designer and may not be duplicated, used or disclosed in whole or in part for design, fabrication or construction of any portion thereof other than the specific project to which it pertains without the written consent of the designer. 2 0 4 0 M A I N S T R E E T , # 1 2 4 SANTA CLARA, C ALI FORN I A 9 5 0 5 0 6 5 0 5 7 6 8 4 4 5 r i c h a r d l e i t z i n g e r @ y a h o o .c o m D A T E P R O J E C T D R A W N R E V I E W S C A L E 01 .2 8 .2 01 8 2 01 8 .0 5 R A L R A L 1 /4 ” 7 6 6 1 5 6 6 5 2 5 1 6 3 5 7 6 5 6 4 7 1 /4 ” I I I I I I 0 1 2 3 4 5 6 12 RWL RWL RWL RWL RWL RWL RWL RWL RWL RWL RWL RWL EXISTING ROOF PITCH: 5:12 +/-, TYPICAL ASA-2019-03 06/18/19 Ellen Yau I I I I I I SPECIFIC SHEET NOTES EXISTING WALL GRAPHIC LEGEND EXISTING WALL TO BE REMOVED.PROGRESS PRINTNOT FOR CONSTRUCTION PUBLISHED: 05.29.2019 1 PROPOSED LOWER & UPPER ROOF PLAN SCALE: 1/4” A A5.1 B A5.1 A A5.1 B A5.1 C A5.1 A A5.2 C A5.1 A A5.2 RESIDENTIAL REMODEL & ADDITION ROOF PLAN PROPOSED STEVE DAUBER RESIDENCE 10367 HENEY CREEK PLACE, CUPERTINO, CALIFORNIA A 4. 2 All drawing and written material appearing herein constitute the original and unpublished work of the designer and may not be duplicated, used or disclosed in whole or in part for design, fabrication or construction of any portion thereof other than the specific project to which it pertains without the written consent of the designer. 2 0 4 0 M A I N S T R E E T , # 1 2 4 SANTA CLARA, C ALI FORN I A 9 5 0 5 0 6 5 0 5 7 6 8 4 4 5 r i c h a r d l e i t z i n g e r @ y a h o o .c o m D A T E P R O J E C T D R A W N R E V I E W S C A L E 01 .2 8 .2 01 8 2 01 8 .0 5 R A L R A L 1 /4 ” 2 8 1 6 61 4 3 Roof Features 1. Dashed lines indicates building structure below.. 2. Existing asphalt shingle roof to remain.. 3. Existing solar panels to remain. 4. Existing skylight to remain. 5. Existing trellis and extended eaves to be removed. 6. Existing metal gutters and rain water leaders to be replaced. 7. Existing rain water diverter to be removed. 8. New rain water diverter. 1 /4 ” I I I I I I 0 1 2 3 4 5 6 12 RWL RWL RWL RWL RWL RWL RWL RWL RWL RWL RWL RWL EXISTING ROOF PITCH: 5:12 +/1 TYPICAL ASA-2019-03 06/18/19 Ellen Yau TOP OF PLATE HALL CLG. HT. 8'-1 " AFF LANDING CLG. HT. VAULTED LIVING ROOM CLG. HT. VAULTED LIBRARY CLG. HT. 8'-1 " AFF CRAWLSPACE LIVING ROOM CLG. HT. VAULTED LIVING ROOM CLG. HT. VAULTED MULTI-PURPOSE ROOM CLG. HT. 8'-1 " AFF MULTI-PURPOSE ROOM CLG. HT. 8'-1 " AFF MULTI-PURPOSE ROOM CLG. HT. 8'-1 " AFF BEDROOM CLG. HT. VAULTED TOP OF SUBFLOOR TOP OF PLATE TOP OF SUBFLOOR TOP OF SUBFLOOR 9'-10 5/8"8'-1 3/4" 22'-4 1/8" 10'-1 1/2" 8'-2 5/8" TOP OF PLATE TOP OF SUBFLOOR TOP OF PLATE 12 +/- (E) 5 +/- (E) 12 +/- (E) 5 +/- (E) 12 +/- (E) 5 +/- (E) 12 +/- (E) 5 +/- (E)TOP OF PLATE TOP OF SUBFLOOR TOP OF SUBFLOOR TOP OF SUBFLOOR TOP OF PLATE TOP OF PLATE TOP OF SUBFLOOR TOP OF SUBFLOOR TOP OF PLATE TOP OF PLATE+/- (E)+/- (E)+/- (E) +/- (E)+/- (E) +/- (E)+/- (E)+/- (E)+/- (E)+/- (E) +/- (E)+/- (E) +/- (E)+/- (E)+/- (E)+/- (E) +/- (E)26'-4 1/2"+/- (E)27'-3 7/8"29'-3 1/4"8'-1" 8'-1" 21'-3 7/8"9'-6" 8'-2 5/8" 12'-10 1/2" 17'-1 1/8" 8'-2 5/8" 23'-9 7/8" 9'-1 1/2" SPECIFIC SHEET NOTES Structures 1. New wood framing. 2. New exterior wall 3. New interior wall. Flashing, Sheet Metal Trim and Accessories 10. New metal gutters and down spout. Painted Windows and Doors 20. Replace existing window and doors. 21. New windows and doors. Cabinetry and Trim 40. Replace existing exterior trim and fascia boards. 41. New cabinet. S C ALE : 1 /4 ” I I I I I I 0 1 2 3 4 5 6 12 PROGRESS PRINTNOT FOR CONSTRUCTION PUBLISHED: 05.01.2019 I I I I I I B.B BU I LDI N G S EC TI O N SCALE: 1/4”A.A BU I LDI N G S EC TI O N SCALE: 1/4” C.C BU I LDI N G S EC TI O N SCALE: 1/4” RESIDENTIAL REMODEL & ADDITION BUILDING SECTIONS PROPOSED STEVE DAUBER RESIDENCE 10367 HENEY CREEK PLACE, CUPERTINO, CALIFORNIA A 5. 1 All drawing and written material appearing herein constitute the original and unpublished work of the designer and may not be duplicated, used or disclosed in whole or in part for design, fabrication or construction of any portion thereof other than the specific project to which it pertains without the written consent of the designer. 2 0 4 0 M A I N S T R E E T , # 1 2 4 SANTA CLARA, C ALI FO RN I A 9 5 0 5 0 6 5 0 5 7 6 8 4 4 5 r i c h a r d l e i t z i n g e r @ y a h o o .c o m D A T E P R O J E C T D R A W N R E V I E W S C A L E 01 .2 8 .2 01 8 2 01 8 .0 5 R A L R A L 1 /4 ” 20 21 21 21 221 2 1 21 3 3 2121 41 2120 20 ASA-2019-03 06/18/19 Ellen Yau SPECIFIC SHEET NOTES Structures 1. New wood framing. 2. New exterior wall 3. New interior wall. Flashing, Sheet Metal Trim and Accessories 10. New metal gutters and down spout. Painted Windows and Doors 20. Replace existing window and doors. 21. New windows and doors. Cabinetry and Trim 40. Replace existing exterior trim and fascia boards. 41. New cabinet. S C ALE : 1 /4 ” I I I I I I 0 1 2 3 4 5 6 12 PROGRESS PRINTNOT FOR CONSTRUCTION PUBLISHED: 05.29.2019 I I I I I I A.A BU I LDI N G S EC TI O N SCALE: 1/4” RESIDENTIAL REMODEL & ADDITION BUILDING SECTIONS PROPOSED STEVE DAUBER RESIDENCE 10367 HENEY CREEK PLACE, CUPERTINO, CALIFORNIA A 5. 2 All drawing and written material appearing herein constitute the original and unpublished work of the designer and may not be duplicated, used or disclosed in whole or in part for design, fabrication or construction of any portion thereof other than the specific project to which it pertains without the written consent of the designer. 2 0 4 0 M A I N S T R E E T , # 1 2 4 SANTA CLARA, C ALI FO RN I A 9 5 0 5 0 6 5 0 5 7 6 8 4 4 5 r i c h a r d l e i t z i n g e r @ y a h o o .c o m D A T E P R O J E C T D R A W N R E V I E W S C A L E 01 .2 8 .2 01 8 2 01 8 .0 5 R A L R A L 1 /4 ” 40 21 10 21 2121 41 21 FAMILY ROOM CLG. HT. 8'-1 " AFF37'-1 5/8" DINING ROOM CLG. HT. 8'-1" AFF MASTER BEDROOM CLG. HT. VAULTED POWDER ROOM CLG. HT. 8'-1 " AFF HALL CLG. HT. 8'-1 " AFF GARAGE CLG. HT. VARIES BATHROOM CLG. HT. 8'-1 " AFF BEDROOM CLG. HT. 8'-1" AFF HALL CLG. HT. 8'-1 " AFF CRAWLSPACE 8'-1" 9'-11 5/8" TOP OF PLATE8'-1" 12 +/- (E) 5 +/- (E) 12 +/- (E) 5 +/- (E) 12 +/- (E) 5 +/- (E)+/- (E)+/- (E)+/- (E) +/- (E) TOP OF SUBFLOOR 9'-1" 8'-1" 22'-3 7/8"TOP OF SUBFLOOR +/- (E) +/- (E)+/- (E)TOP OF PLATE ASA-2019-03 06/18/19 Ellen Yau 27'-5 1/4"29'-11" 29'-10 3/4" 27'-5 1/4" 29'-11" 27'-0 1/4" 19'-5" 29'-10 3/4"27'-0 1/4"19'-5"PROGRESS PRINTNOT FOR CONSTRUCTION PUBLISHED: 05.29.2019 1 EXI S TI N G EXTERIOR ELEVATION - FRONT (Faces n e i gh b o r at 1 0 3 5 9 Heney Creek) SCALE: 1/4” 2 PROPOSED EXTERIOR ELEVATION - FRONT (Faces n e i gh b o r at 1 0 3 5 9 Heney Creek) SCALE: 1/4” RESIDENTIAL REMODEL & ADDITION EXTERIOR ELEVATIONS EXISTING & PROPOSED STEVE DAUBER RESIDENCE 10367 HENEY CREEK PLACE, CUPERTINO, CALIFORNIA A 6. 1 All drawing and written material appearing herein constitute the original and unpublished work of the designer and may not be duplicated, used or disclosed in whole or in part for design, fabrication or construction of any portion thereof other than the specific project to which it pertains without the written consent of the designer. 2 0 4 0 M A I N S T R E E T , # 1 2 4 SANTA CLARA, C ALI FORN I A 9 5 0 5 0 6 5 0 5 7 6 8 4 4 5 r i c h a r d l e i t z i n g e r @ y a h o o .c o m D A T E P R O J E C T D R A W N R E V I E W S C A L E 01 .2 8 .2 01 8 2 01 8 .0 5 R A L R A L 1 /4 ” NEW EXTERIOR FINISHES Roo ng System and Material 1. Existing Laminated asphalt berglass roof shingles. Flashing, Sheet Metal Trim and Accessories 20. New metal gutters and down spout. Painted Walls 30. Hardie horizontal siding. 31. Conventional three coat stucco exterior wall system. Windows and Doors 40. Metal or composite windows and doors. Lighting 50. Existing wall mounted lighting. Decorative Entry Door 60. Existing custom wood door and stain glass to remain. Masonry 70. Natural stone veneer. 71 Cast stone chimney cap and skirt. Trim 80. Hardie Trim. 81. Sof t. Metal 90. Existing composite steps to remain. 91. Steel cable railing to match existing. 1 /4 ” I I I I I I 0 1 2 3 4 5 6 12 20 31 40 70 30 1 30 31 70 90 91 8060 1 31 ASA-2019-03 06/18/19 Ellen Yau 29'-10 3/4"27'-0 1/2"19'-5"36'-1 3/8"33'-3"25'-7 3/4"27'-3 7/8"29'-0"8'-0 5/8"21'-6 7/8" 9'-6"8'-2 5/8" 22'-3 1/2"PROGRESS PRINTNOT FOR CONSTRUCTION PUBLISHED: 05.29.2019 1 EXI S TI N G EXTERIOR ELEVATION - LEFT SIDE (Faces open space) SCALE: 1/4” 2 PROPOSED EXTERIOR ELEVATION - LEFT SIDE (Faces open space) SCALE: 1/4” RESIDENTIAL REMODEL & ADDITION EXTERIOR ELEVATIONS EXISTING & PROPOSED STEVE DAUBER RESIDENCE 10367 HENEY CREEK PLACE, CUPERTINO, CALIFORNIA A 6. 2 All drawing and written material appearing herein constitute the original and unpublished work of the designer and may not be duplicated, used or disclosed in whole or in part for design, fabrication or construction of any portion thereof other than the specific project to which it pertains without the written consent of the designer. 2 0 4 0 M A I N S T R E E T , # 1 2 4 SANTA CLARA, C ALI FORN I A 9 5 0 5 0 6 5 0 5 7 6 8 4 4 5 r i c h a r d l e i t z i n g e r @ y a h o o .c o m D A T E P R O J E C T D R A W N R E V I E W S C A L E 01 .2 8 .2 01 8 2 01 8 .0 5 R A L R A L 1 /4 ” NEW EXTERIOR FINISHES 1 /4 ” I I I I I I 0 1 2 3 4 5 6 12 80 1 31 31 70 20 80 90 40 31 91 71 80 70 Roo ng System and Material 1. Existing Laminated asphalt berglass roof shingles. Flashing, Sheet Metal Trim and Accessories 20. New metal gutters and down spout. Painted Walls 30. Hardie horizontal siding. 31. Conventional three coat stucco exterior wall system. Windows and Doors 40. Metal or composite windows and doors. Lighting 50. Existing wall mounted lighting. Decorative Entry Door 60. Existing custom wood door and stain glass to remain. Masonry 70. Natural stone veneer. 71 Cast stone chimney cap and skirt. Trim 80. Hardie Trim. 81. Sof t Metal 90. Existing composite steps to remain. 91. Steel cable railing to match existing. ASA-2019-03 06/18/19 Ellen Yau I I I I I I PROGRESS PRINTNOT FOR CONSTRUCTION PUBLISHED: 05.29.2019 1 EXI S TI N G EXTERIOR ELEVATION - REAR ELEVATION (Faces open space) SCALE: 1/4” 2 PROPOSED EXTERIOR ELEVATION - REAR ELEVATION (Faces open space) SCALE: 1/4” RESIDENTIAL REMODEL & ADDITION EXTERIOR ELEVATIONS EXISTING & PROPOSED STEVE DAUBER RESIDENCE 10367 HENEY CREEK PLACE, CUPERTINO, CALIFORNIA A 6. 3 All drawing and written material appearing herein constitute the original and unpublished work of the designer and may not be duplicated, used or disclosed in whole or in part for design, fabrication or construction of any portion thereof other than the specific project to which it pertains without the written consent of the designer. 2 0 4 0 M A I N S T R E E T , # 1 2 4 SANTA CLARA, C ALI FORN I A 9 5 0 5 0 6 5 0 5 7 6 8 4 4 5 r i c h a r d l e i t z i n g e r @ y a h o o .c o m D A T E P R O J E C T D R A W N R E V I E W S C A L E 01 .2 8 .2 01 8 2 01 8 .0 5 R A L R A L 1 /4 ” NEW EXTERIOR FINISHES 1 /4 ” I I I I I I 0 1 2 3 4 5 6 12 40 1 20 31 31 1 31 31 40 40 90 31 70 Roo ng System and Material 1. Existing Laminated asphalt berglass roof shingles. Flashing, Sheet Metal Trim and Accessories 20. New metal gutters and down spout. Painted Walls 30. Hardie horizontal siding. 31. Conventional three coat stucco exterior wall system. Windows and Doors 40. Metal or composite windows and doors. Lighting 50. Existing wall mounted lighting. Decorative Entry Door 60. Existing custom wood door and stain glass to remain. Masonry 70. Natural stone veneer. 71 Cast stone chimney cap and skirt. Trim. 80. Hardie Trim. 81. Sof t. Ornamental Metal Work 90. Existing composite steps to remain. 91. Steel cable railing to match existing.29'-8"27'-5 1/4"29'-11" 26'-9 1/2"19'-2 3/8"29'-8"27'-5 1/4"29'-11" 26'-9 1/2"19'-2 3/8" ASA-2019-03 06/18/19 Ellen Yau I I I I I I PROGRESS PRINTNOT FOR CONSTRUCTION PUBLISHED: 05.29.2019 1 EXI S TI N G EXTERIOR ELEVATION - RIGHT SIDE (Faces n e i gh b o rs at 10391 and 1 0 3 9 9 Heney Creek) SCALE: 1/4” 2 PROPOSED EXTERIOR ELEVATION - RIGHT SIDE (Faces n e i gh bo rs at 10391 and 1 0 3 9 9 Heney Creek) SCALE: 1/4” RESIDENTIAL REMODEL & ADDITION EXTERIOR ELEVATIONS EXISTING & PROPOSED STEVE DAUBER RESIDENCE 10367 HENEY CREEK PLACE, CUPERTINO, CALIFORNIA A 6. 4 All drawing and written material appearing herein constitute the original and unpublished work of the designer and may not be duplicated, used or disclosed in whole or in part for design, fabrication or construction of any portion thereof other than the specific project to which it pertains without the written consent of the designer. 2 0 4 0 M A I N S T R E E T , # 1 2 4 SANTA CLARA, C ALI FO RNI A 9 5 0 5 0 6 5 0 5 7 6 8 4 4 5 r i c h a r d l e i t z i n g e r @ y a h o o .c o m D A T E P R O J E C T D R A W N R E V I E W S C A L E 01 .2 8 .2 01 8 2 01 8 .0 5 R A L R A L 1 /4 ” NEW EXTERIOR FINISHES 1 /4 ” I I I I I I 0 1 2 3 4 5 6 12 71 70 31 30 31 71 80 31 40 20 81 80 Roo ng System and Material 1. Existing Laminated asphalt berglass roof shingles. Flashing, Sheet Metal Trim and Accessories 20. New metal gutters and down spout. Painted Walls 30. Hardie horizontal siding. 31. Conventional three coat stucco exterior wall system. Windows and Doors 40. Metal or composite windows and doors. Lighting 50. Existing wall mounted lighting. Decorative Entry Door 60. Existing custom wood door and stain glass to remain. Masonry 70. Natural stone veneer. 71 Cast stone chimney cap and skirt. Trim. 80. Hardie Trim. 81. Sof t. Ornamental Metal Work 90. Existing composite steps to remain. 91. Steel cable railing to match existing. 91 31 36'-0 5/8"33'-7 1/4"29'-10 7/8"27'-5"33'-11 5/8"32'-5 1/2"8'-1"8'-1" 25'-8 5/8"9'-1"8'-1" 30'-4 1/4"4'-5"7'-0"30 ASA-2019-03 06/18/19 Ellen Yau DN 8 UP 7 UP 7 54'-9 3/4" 48'-10"16'-2" 19'-6" 23'-3" 2'-6"53'-1"2'-0"1'-6" 33'-10" STAIR MULTI-PURPOSE ROOM CLG. HT. 8'-1 " AFF 6'-0"6'-6"1'-0" 2'-3 3/4" 1 2 '-1 0" 10'-5"8'-4" 2'-2"1'-3"5'-10" 3'-10" 12'-4" 5'-11" 3'-9"3 CAR GARAGE CLG. HT. 9 '-1 " AFF DN 1 DN 1 CRAWL SPACECRAWL SPACE CRAWL SPACE +/- EXISTING +/- (E)+/- (E) +/- (E)+/- (E)+/- (E)+/- (E) +/- (E)+/- (E)+/- (E)+/- (E)+/- (E)+/- (E)+/- (E)+/- (E)+/- (E)+/- (E)+/- (E) +/- (E) +/- (E) +/- (E) +/- (E)+/- (E) +/- (E) +/- (E) 29'-7" 26'-1" 16'-1"8'-2"1 '-1 0" +/- (E)+/- (E) +/- (E) +/- (E) +/- (E) +/- (E) +/- (E) +/- (E) +/- (E)9'-3"3'-3"8'-2"+/- (E)4'-5"+/- (E)6'-3"+/- (E)4'-1 1/2"+/- (E)+/- (E)26'-2 1/2" +/- (E)14'-9 1/4" 9'-1 1 " 9'-8"6'-0" 15'-7 3/4"+/- (E)+/- (E)+/- (E) +/- (E)+/- (E)4'-9"3'-5 1/2"11'-3 1/2" +/- (E)+/- (E) +/- (E)7'-5"10'-6"1 5'-1 1 3/4"2'-6" 54'-9 3/4" I I I I I I A 7. 1 All drawing and written material appearing herein constitute the original and unpublished work of the designer and may not be duplicated, used or disclosed in whole or in part for design, fabrication or construction of any portion thereof other than the specific project to which it pertains without the written consent of the designer. 2 0 4 0 M A I N S T R E E T , # 1 2 4 SANTA CLARA, C ALI FO RN I A 9 5 0 5 0 6 5 0 5 7 6 8 4 4 5 r i c h a r d l e i t z i n g e r @ y a h o o .c o m D A T E P R O J E C T D R A W N R E V I E W S C A L E 01 .2 8 .2 01 8 2 01 8 .0 5 R A L R A L 1 /4 ” RESIDENTIAL REMODEL & ADDITION FAR AREA CALCULATION LOWER LEVEL FLOOR PLAN STEVE DAUBER RESIDENCE 10367 HENEY CREEK PLACE, CUPERTINO, CALIFORNIA B A Flooor Area RRationn Summmary Existiting Lowerr Level FFloor Areaa A 14.77 x 4.13 = 61.00 sf. B 29.58 x 26.21 = 775.29 sf. C 9.67 x 3.83 = 37.04 sf. D 15.67 x 3.45 = 54.06 sf. E 25.56 x 1 1 .29 = 288.57 F 15.90 x 4.75 = 75.53 sf. Subtotaotal - Existing FFloor Areaa: 1 ,291 .49 sf. Propoposed Loweer Levelel Floor Arerea I 0.00 x 0.00 = 0.00 sf. Subtotaotal - Proposedd Floor Arerea: 0.00 sf. Total LLower Level Floor Arerea: 1 ,291 .49 sf. C F D E S C ALE : 1 /4 ” I I I I I I 0 1 2 3 4 5 6 12 1 PROPOSED LOWER FLOOR PLAN SCALE: 1/4” EXISTING WALL GRAPHIC LEGEND NEW WALL. PROGRESS PRINTNOT FOR CONSTRUCTION PUBLISHED: 05.29.2019 ASA-2019-03 06/18/19 Ellen Yau DINING AREA CLG. HT. 8'-0"AFF FAMILY ROOM CLG. HT. 8'-0" AFF LIBRARY CLG. HT. 8'-0" AFF HALLWAY CLG. HT. 8'-0" AFF REAR DECK CLG. HT. 8'-1 " AFF NOOK CLG. HT. 8'-0" AFF PWDR CLG. HT. 8'-0"AFF HALLWAY CLG. HT. 8'-0" AFF LAUN. CLG. HT. 8'-0" AFF KITCHEN CLG. HT. 8'-0" AFF DN 3 DN 8 UP 7 DN 7UP 7 54'-9 3/4" 48'-8" 7'-1"23'-3" 2'-6"53'-1" 3'-5"DN 8 STAIR LIVING ROOM CLG. HT. VAULTED 6'-0"6'-6"24'-9" 1'-0" 2'-3 3/4"1 2'-1 0" 10'-5"8'-4" 2'-2"1'-3"3'-10"5'-11" 3'-9"14'-0" 15'-7" 9'-3" +/- (E) +/- (E)+/- (E)+/- (E) +/- (E) +/- (E) +/- (E) +/- (E)+/- (E) +/- (E) +/- (E)+/- (E)+/- (E)+/- (E)+/- (E)+/- (E)+/- (E) +/- (E)+/- (E) +/- (E)+/- (E)+/- (E)+/- (E)+/- (E)+/- (E)+/- (E) +/- (E)+/- (E)+/- (E)+/- (E)+/- (E)7'-5"5'-10"4'-5"54'-9 3/4" 1 5'-1 1 3/4" 3'-10"12'-4"+/- (E)18'-11" 4'-2"ENTRY CLG. HT. VAULTED+/- (E)+/- (E)4'-5"+/- (E)+/- (E)+/- (E)8'-2"+/- (E)+/- (E)1'-10" 22'-0" 6'-3" 5'-5"I I I I I I S C ALE : 1 /4 ” I I I I I I 0 1 2 3 4 5 6 12 1 PROPOSED MAIN FLOOR PLAN SCALE: 1/4” PROGRESS PRINTNOT FOR CONSTRUCTION PUBLISHED: 04.10.2019 A 7. 2 All drawing and written material appearing herein constitute the original and unpublished work of the designer and may not be duplicated, used or disclosed in whole or in part for design, fabrication or construction of any portion thereof other than the specific project to which it pertains without the written consent of the designer. 2 0 4 0 M A I N S T R E E T , # 1 2 4 SANTA CLARA, C ALI FO RN I A 9 5 0 5 0 6 5 0 5 7 6 8 4 4 5 r i c h a r d l e i t z i n g e r @ y a h o o .c o m D A T E P R O J E C T D R A W N R E V I E W S C A L E 01 .2 8 .2 01 8 2 01 8 .0 5 R A L R A L 1 /4 ” RESIDENTIAL REMODEL & ADDITION FAR AREA CALCULATION MAIN LEVEL FLOOR PLAN STEVE DAUBER RESIDENCE 10367 HENEY CREEK PLACE, CUPERTINO, CALIFORNIA A G E K C H J D I B F L Flooor Area RRationn Summmary Existiting Main LeLevel Floloor Area A 12.83 x 12.33 = 1 58 .1 9 sf. B 10.42 x 4.17 = 43.45 sf. C 23.25 x 1 6.1 0 = 374.33 sf. D 2.31 x 8.33 = 19.24 sf. E 5.41 x 2.42 = 13.09 sf. F 6.00 x 15.08 = 90.48 sf. G 19.23 x 18.92 = 363.83 sf. H 29.58 x 24.75 = 732.11 sf. I 15.98 x 4.42 = 70.63 sf. J 14.00 x 1.83 = 25.62 sf. Subtotaotal - Existing FFloor Areaa: 1 ,890.97 sf. Propoposed Mainn Level FFloor Areaa K 6.00 x 3.83 = 22.98 sf. L 14.00 x 3.83 = 53.62 sf. Subtotaotal - Proposedd Floor Arerea: 76.60 sf. Total MMain Level FlFloor Areaa: 1,967.57 sf. EXISTING WALL GRAPHIC LEGEND NEW WALL. ASA-2019-03 06/18/19 Ellen Yau 54'-9 3/4" 52'-1"22'-10" 12'-10" 10'-6"23'-3" 2'-6"53'-1"14'-0" 15'-7"9'-3" STAIR LIVING ROOM CLG. HT. VAULTED 6'-0"1'-0"2'-3 3/4"1 2'-1 0" 10'-5"4'-8"10'-6" 12'-4"5'-11" BEDROOM 2 CLG. HT. 8'-0" AFF BATHROOM CLG. HT. 8'-0" AFF HALLWAY CLG. HT. VAULTED BEDROOM 3 CLG. HT. VAULTED HALLWAY CLG. HT. 8'-0" AFF BEDROOM 1 CLG. HT. 8'-0" AFF DN 7 DN 7 MASTER BEDROOM CLG. HT. VAULTED M. W.I.C. CLG. HT. 8'-0" AFF (E) FAU+/- (E)+/- (E) +/- (E)+/- (E)+/- (E) +/- (E)+/- (E)+/- (E) +/- (E)+/- (E) +/- (E)+/- (E)+/- (E) +/- (E)+/- (E)+/- (E)+/- (E) +/- (E) +/- (E) +/- (E)+/- (E) +/- (E) M. BATH CLG. HT. 8'-0" AFF TOILET CLG. HT. 8'-0" AFF 33'-4"4'-9 1/2"7'-6 1/2"SHOWER CLG. HT. 8'-0" AFF 5'-5"+/- (E)+/- (E)+/- (E)+/- (E)+/- (E)I I I I I I S C ALE : 1 /4 ” I I I I I I 0 1 2 3 4 5 6 12 PROGRESS PRINTNOT FOR CONSTRUCTION PUBLISHED: 04.10.2019 1 PROPOSED UPPER FLOOR PLAN SCALE: 1/4” A 7. 3 All drawing and written material appearing herein constitute the original and unpublished work of the designer and may not be duplicated, used or disclosed in whole or in part for design, fabrication or construction of any portion thereof other than the specific project to which it pertains without the written consent of the designer. 2 0 4 0 M A I N S T R E E T , # 1 2 4 SANTA CLARA, C ALI FORN I A 9 5 0 5 0 6 5 0 5 7 6 8 4 4 5 r i c h a r d l e i t z i n g e r @ y a h o o .c o m D A T E P R O J E C T D R A W N R E V I E W S C A L E 01 .2 8 .2 01 8 2 01 8 .0 5 R A L R A L 1 /4 ” RESIDENTIAL REMODEL & ADDITION FAR AREA CALCULATION UPPER LEVEL FLOOR PLAN STEVE DAUBER RESIDENCE 10367 HENEY CREEK PLACE, CUPERTINO, CALIFORNIA D C E B A F Flooor Area RRationn Summmary Existiting Upper Level FFloor Areaa A 12.83 x 12.33 = 1 58 .1 9 sf. B 10.42 x 7.54 = 78.57 sf. C 23.25 x 4.67 = 108.58 sf. D 25.56 x 13.70 = 350.17 sf. E 29.58 x 21.83 = 645.73 sf. F 14.00 x 2.33 = 32.62 sf. Subtotaotal - Existing FFloor Areaa: 1 ,373.8 6 sf. Propoposed Uppeer Levell Floor Areea 0.00 x 0.00 = 0.00 sf. Subtotaotal - Proposedd Floor Arerea: 0.00 sf. Total UUpper Level Floor Arerea: 1 ,373.86 sf. EXISTING WALL GRAPHIC LEGEND NEW WALL. ASA-2019-03 06/18/19 Ellen Yau