Loading...
HomeMy WebLinkAboutAH Packet 5-23-2019CITY OF CUPERTINO AGENDA ADMINISTRATIVE HEARING 5:00 PM 10300 Torre Avenue, City Hall Conference Room C Thursday, May 23, 2019 ROLL CALL APPROVAL OF MINUTES Subject: Draft Minutes of April 25, 2019 Recommended Action: approve or modify the Draft Minutes of April 25, 2019 Draft Minutes of Apri 25, 2019 ORAL COMMUNICATIONS This portion of the meeting is reserved for persons wishing to address the members on any matter not on the agenda. Speakers are limited to three (3) minutes. In most cases, State law will prohibit the members from making any decisions with respect to a matter not listed on the agenda WRITTEN COMMUNICATIONS PUBLIC HEARINGS Subject: Amendment to an existing Use Permit (U-2013-07) to allow a childcare facililty to increase the hours of operation to 7:00 a.m. to 6:00 p.m.; and a Director's Minor Modification to legalize an existing deck. Application No (s).: M-2019-02, DIR-2019-05; Applicant(s): Maria Tzankova (Burall USA, LLC); Location: 21685 Granada Ave. APN# 357-17-139 Recommended Action: That the Hearing Officer: 1) Find that the proposed actions are exempt from CEQA; and 2) Approve the Use Permit Amendment (M-2019-02) and the Director's Minor Modification (DIR-2019-05) in accordance with the draft resolutions Hearing Officer's decision final unless appealed Page 1 May 23, 2019Administrative Hearing AGENDA Staff Report 1 - Draft Resolution for M-2019-02 2 - Draft Resolution for DIR-2019-05 3 - Plan Set 4 - Omei Preschool Business Plan 5 - Noise Study 6 - Trip Generation Study OLD BUSINESS NEW BUSINESS ADJOURNMENT Page 2 May 23, 2019Administrative Hearing AGENDA In compliance with the Americans with Disabilities Act (ADA), anyone who is planning to attend the next meeting who is visually or hearing impaired or has any disability that needs special assistance should call the City Clerk's Office at 408-777-3223, 48 hours in advance of the meeting to arrange for assistance. Upon request, in advance, by a person with a disability, meeting agendas and writings distributed for the meeting that are public records will be made available in the appropriate alternative format. Also upon request, in advance, an assistive listening device can be made available for use during the meeting. Any writings or documents provided to a majority of the members after publication of the agenda will be made available for public inspection. Please contact the City Clerk’s Office in City Hall located at 10300 Torre Avenue during normal business hours. IMPORTANT NOTICE: Please be advised that pursuant to Cupertino Municipal Code 2.08.100 written communications sent to the Cupertino City Council, Commissioners or City staff concerning a matter on the agenda are included as supplemental material to the agendized item. These written communications are accessible to the public through the City’s website and kept in packet archives. You are hereby admonished not to include any personal or private information in written communications to the City that you do not wish to make public; doing so shall constitute a waiver of any privacy rights you may have on the information provided to the City. Members of the public are entitled to address the members concerning any item that is described in the notice or agenda for this meeting, before or during consideration of that item. If you wish to address the members on any other item not on the agenda, you may do so during the public comment. Page 3 Cupertino, CA 95014 (408) 777-3308 ACTION MINUTES OF THE REGULAR MEETING OF THE ADMINISTRATIVE HEARING HELD ON April 25, 2019 ROLL CALL Hearing Officer present: Piu Ghosh, Principal Planner Staff present: Gian Martire, Associate Planner Applicant(s) present: John Barton (project Architect) APPROVAL OF MINUTES: 1.February 28, 2019 The minutes of February 28, 2019 were approved as written POSTPONEMENTS/REMOVAL FROM CALENDAR: None ORAL COMMUNICATIONS: None WRITTEN COMMUNICATIONS: None PUBLIC MEETING ITEMS: 2. Application No.(s): INT-2019-01 Applicant:John Barton (Checker residence) Location: 10376 Amistad Court APN#s: 342-45-014 Front Yard Interpretation to designate Amistad Court as the front lot line and Voss Avenue as the side lot line to facilitate an 841 square foot, first floor addition to an existing single family residence Administrative Hearing Officer’s decision final unless appealed. Staff member Martire addressed the Hearing Officer. He explained that the property is on the corner of Voss Avenue and Amistad Court. The sloped lot was originally developed in 1977. In order for the applicant to be able to construct the proposed addition, they need to reorient the front lot line to meet the setback requirements and to maintain the development pattern in the neighborhood which is to have corner lots facing into the cul-de-sacs. This will also help to ensure that future development projects in the neighborhood maintain this pattern. Hearing Officer Ghosh clarified that this residence is the only residence to have a front yard on Voss Avenue per the current corner lot interpretation as it is the shorter side. She reviewed the 2 Administrative Hearing April 25, 2019 site plan. Staff member Martire reiterated that a small area of the garage wall would become non-conforming with this interpretation, but no changes are proposed to this area. The Hearing Officer noted that the new addition has a large bay window a small portion of which will encroach into the front yard setback. Staff member Martire stated that the encroachment of the walk in bay window is very minor so is not obtrusive. The project Architect, John Barton, addressed the Hearing Officer. He said that the house was built and operates such that Amistad Court is the front of the house. He has worked with Staff to keep the house in conformance regarding the setbacks. The Hearing Officer opened the public comment period. There were no speakers. The Hearing Officer closed the comment period. The Hearing Officer confirmed that the deck proposed in the back meets all the setback and height requirements per the accessory structure ordinance. The Hearing Officer concurs with the findings for the designation of the front lot line along Amistad Court. DECISION: The application was approved by the Hearing Officer per the draft resolution(s). ADJOURNMENT Respectfully submitted: _____/s/Beth Ebben Beth Ebben Deputy Board Clerk ADMINISTRATIVE HEARING STAFF REPORT Agenda Date: May 23, 2019 SUBJECT Amendment to an existing Use Permit (U-2013-07) to consider allowing a childcare facility to increase the hours of operation to Monday through Friday, 7:00 a.m. to 6:00 p.m., and a Director's Minor Modification to legalize an existing deck. (Application No(s).: M-2019-02 and DIR-2019-05; Applicant: Maria Tzankova (Omei Preschool); Location: 21685 Granada Avenue; APN: 357-17-139) RECOMMENDED ACTION That the Hearing Officer: 1. Find that the proposed actions are exempt from CEQA; and 2. Approve the Use Permit Amendment (M-2019-02) and the Director’s Minor Modification (DIR-2019-05) in accordance with the draft resolutions (Attachments 1 and 2). DISCUSSION: Project Data: General Plan Designation Neighborhood Commercial/Residential General Plan Special Area Monta Vista Village Special Area Zoning Designation P (CN, ML, Res 4 - 12) – Planned Neighborhood Commercial, Light Industrial, Residential Specific Plan Monta Vista Design Guidelines Lot Area 6,000 sq. ft. (0.14 acres) Building Area Existing Proposed 2,091 sq. ft.No Change Parking Required Proposed Automobile 2 2 Project Consistency With: General Plan Yes Monta Vista Specific Plan Yes M-2019-02 21685 Granada Avenue May 23, 2019 DIR-2019-05 Page 2 Zoning Yes Environmental Assessment Categorically Exempt per Sections 15301 (Class 1) and 1504 (Class 4) of the California Environmental Quality Act (CEQA) Background: Site Description The project site is located within the Monta Vista Village Special Area, south of Stevens Creek Boulevard and within the block bounded by Pasadena Avenue, Imperial Avenue and Granada Avenue (Figure 1). Surrounding uses include mixed- use office-residential to the north, south, and west; and residential and industrial uses to the east. The site was originally developed as a single-family residence under Santa Clara County jurisdiction. In 1980, the site was annexed to the City of Cupertino and rezoned to P(CN, ML, Res 4-12), Planned Neighborhood Commercial, Light Industrial, and Residential (Z-1980-40). In 1985, the Planning Commission approved a Use Permit (U-1985-17) to convert the existing single- family residence to a two-story office building. The site is subject to the Monta Vista Design Guidelines. Previous Approvals In 2013, the Planning Commission approved a Use Permit (U-2013-07) to allow a non- profit special needs childcare facility, Organization of Special Needs Families (OSF), to operate Monday through Friday between 2:00 p.m. and 6:30 p.m. and Saturday from 1:00 p.m. to 4:00 p.m. with up to 13 students, ages five to 22. The existing Use Permit for the special needs childcare facility remains active as OSF suspended operations at the project site less than one year from the date of application for the Use Permit modification (M- 2019-02) and Director’s Minor Modification (DIR-2019-05). Application Requests The applicant, Maria Tzankova, representing Omei Preschool, is requesting an Amendment to the existing Use Permit (U-2013-07) to consider allowing a childcare Figure 1: Aerial Photo M-2019-02 21685 Granada Avenue May 23, 2019 DIR-2019-05 Page 3 facility to increase the hours of operation to Monday through Friday, 7:00 a.m. to 6:00 p.m., and a Director's Minor Modification to legalize an existing deck constructed without appropriate permits. The Municipal Code grants the authority to review Amendments to Use Permits (Minor) to the Administrative Hearing Officer. The Director’s Minor Modification Permit may be approved administratively; however, since the permit is applied for concurrently with a permit that needs a higher level of review, both permits must be reviewed by the Administrative Hearing Officer at a public hearing. Analysis: Modification to Use: The proposed childcare use is designed to provide care for preschool aged children between the ages of three and five. The operating hours of the proposed preschool would extend to 7:00 a.m. to 6:00 p.m. on weekdays, where the hours of operation previously approved were from 2:00 p.m. to 6:00 p.m. In addition to the main preschool program from 8:30 a.m. to 4:00 p.m., Omei Preschool will also offer the option of Before-School Care starting at 7:00 a.m., and After-School Care until 6:00 p.m. on weekdays. No operations are proposed on the weekend. The existing Use Permit allows the site to operate with 13 students. No changes are proposed to the maximum number of students at the site. Omei Preschool proposes enrollment in two phases: phase one will be limited to nine children, and phase two will increase enrollment to a maximum of 13 children. Preschool operations will be limited to the first-floor, while the uses on the second-floor will be limited to storage and administrative office space for the preschool, not to be accessed by students. The proposed preschool will be subject to review by the California State Department of Community Care Licensing, and shall comply with the requirements of the Building Division, Public Works Department, and the Santa Clara County Fire Department prior to final occupancy. The proposed use is consistent with the uses allowed with the existing Use Permit (U-2013-07) for the site. Site Improvements: As part of this application, the applicant is requesting the following site improvements: Legalization of the existing side-yard deck Front-yard fence Installation of additional landscaping The applicant was issued a zoning code violation in October 2018 for illegally constructing a six-foot front-yard fence, where a maximum three-foot high fence is M-2019-02 21685 Granada Avenue May 23, 2019 DIR-2019-05 Page 4 allowedby the Monta Vista Design Guidelines. Code Enforcement also discoveredafront and side-yard deck constructed on the property without a permit. In response to the violation notice, the applicant: (1) removed the six-foot fence, (2) removed the front-yard deck, and (3) applied for the Director’s Minor Modification (DIR-2019-05) to ensure proper permits are in place for the conforming side-yard portion of the deck. The applicant is proposing a new three-foot white picket fence along the front-property line with landscaping consistent with the Monta Vista Design Guidelines. The side-yard wood deck measures 304 sq. ft. with a deck-height of 16-inches above natural grade and complies with the Accessory Buildings/Structures Ordinance, Chapter 19.100 of the Cupertino Municipal Code. Therefore, no changes are necessary to the side-yard deck. Finally, per the existing Use Permit (U-2013-07), the applicant is also required to plant a landscape strip as a buffer between the parking area and the rear property line. The applicant will comply with this provision at this time prior to obtaining final occupancy of the site. Outdoor Play Area: State law requires childcare centers to provide 75 square-feet of outdoor play area per child. The existing childcare facility provides approximately 810 square-feet of outdoor play area. Omei Preschool could allow up to 10 children outside at any time based on the state’s standards (See Table 1 below). However, at this time, the business program anticipates seven children outside at any time. Table 1: Outdoor Play Area calculations Required by State Law 75 square feet per child Outdoor play area – Provided 810 square feet Potential number of children outside during outdoor play time 10 The existing outdoor play area consists of turf and pavement in the rear northwest corner of the property and a wood deck along the western side-yard. No outdoor play equipment is proposed. Noise: A Noise Impact and Mitigation Study (Attachment 5) for Omei Preschool was prepared by Environmental Consulting Services. The purpose of the study was to determine the extent to which noise generated by the preschool could impact the closest adjacent residences. The noise study indicated that the nearest sensitive receptors for noise generated by the project are mixed-use, office and residential, buildings to the west, northwest, and south of the property. M-2019-02 21685 Granada Avenue May 23, 2019 DIR-2019-05 Page 5 Chapter 10.48: Community Noise Control of the Cupertino Municipal Code limits noise during daytime hours (weekdays, 7:00 a.m. to 8:00 p.m.) on residential properties to 60 decibels (dBA) and allows for brief daytime noise incidents that last less than 15-minutes during any two-hour period to be 65 dBA. Outdoor activities for the preschool are scheduled in the morning from 10:30 a.m. to 11:30 a.m. and in the afternoon from 3:00 p.m. to 4:00 p.m. The preschool outdoor play area is located 45 feet from the nearest residential use and is separated by a parking lot and a six-foot wood fence bordering the outdoor play area on the west side and rear property lines. Due to the distance and the existing wood fence barrier, the expected noise levels at the nearest residences range from 45 to 53 dBA. The noise study concluded that the preschool activities would be within the City’s Noise Ordinance limits, would not create any noticeable noise impacts, and would result in a “less than significant” noise impact on nearby properties. Parking and Traffic: The project meets the parking requirement of two on-site parking spaces (1 space for every 6.5 students per Municipal Code). The applicant has indicated that as part of their traffic management strategy, parents will be instructed to park in the parking lot during pick-up and drop-off. After parking, parents and guardians will be required to walk their child to the preschool and sign in/out with a full signature. Omei Preschool will assign families specific drop-off and pick-up time slots (Figure 2) to help reduce traffic impacts to adjacent properties. The applicant does not anticipate more than three families to arrive for Before-School Care at this time. If more students enroll for the Before-School Care, Omei Preschool will inform the families of their designated drop-off and pick-up times. The Preschool will provide parents their designated drop-off and pick-up times with their enrolment paperwork and retain a signed acknowledgment for their records. Drop-off for the main preschool program will occur between 8:30 a.m. and 9:00 a.m., with parents having the option of early drop-off for Before- School Care. The preschool will inform parents and teachers to not arrive on-site prior to 7:00 a.m. in an agreement. Figure 2: Example Drop-Off Schedule for Omei Preschool M-2019-02 21685 Granada Avenue May 23, 2019 DIR-2019-05 Page 6 The primary pick-up time is scheduled from 3:30 p.m. to 4:00 p.m., and from 5:45 p.m. to 6:00 p.m. for After-School Care pick-up. Late pick-up after 6:00 p.m. is not available. A Trip Generation Study (Attachment 6) was prepared by Hexagon Transportation Consultants, Inc. to determine the projected number of net new weekday AM and PM peak hour trips generated by the proposed preschool. The trip generation study concludedthat the proposed preschool would not result in any netnew vehicle trips since the previous use operated with the same number of children. Therefore, the proposed use would not create a significant impact on traffic requiring additional mitigation. Environmental Review This project is categorically exempt from the requirements of the California Environmental Quality Act (CEQA) per Sections 15301: Existing Facilities and 15304: Minor Alterations to Land. Other Department/Agency Review The City’s Public Works Department; Building Division; Environmental Programs Division; and the Santa Clara County Fire Department have no objections to the project. Their pre-hearing comments have been incorporated as conditions of approval in the draft resolutions. PUBLIC NOTICING AND COMMUNITY OUTREACH The following table is a brief summary of the noticing for this project: Notice of Public Hearing Agenda Site Signage (at least 10 days prior to hearing) Legal ad placed in newspaper (at least 10 days prior to hearing) 51 notices mailed to property owners 300 feet from the project site (at least 10 days prior to the hearing) Posted on the City's official notice bulletin board (five days prior to hearing) Posted on the City of Cupertino’s Web site (five days prior to hearing) No comments have been received at the time of production of this staff report. PERMIT STREAMLINING ACT This project is subject to the Permit Streamlining Act (Government Code Section 65920 – 65964). The City has complied with the deadlines found in the Permit Streamlining Act. Project Received: January 28, 2019; Deemed Incomplete: February 27, 2019 Revisions Received: February 27, 2019; Deemed Incomplete: March 28, 2019 Revisions Received: March 29, 2019; Deemed Incomplete: April 26, 2019 Revisions Received: April 30, 2019; Deemed Complete: May 2, 2019 M-2019-02 21685 Granada Avenue May 23, 2019 DIR-2019-05 Page 7 Since this project is Categorically Exempt, the City has 60 days (until July 2, 2019) to make a decision on the project. CONCLUSION Staff recommends approval of the Use Permit Amendment and Director’s Minor Modification, as the proposed preschool will not create adverse traffic, noise, or safety impacts to the surrounding area and all of the findings for approval of the proposed project, consistent with Chapter 19.156 of the Cupertino Municipal Code, may be made as reflected in the draft resolutions. With respect to the Use Permit Amendment, the following findings may be made: 1. The proposed development and/or use, at the proposed location, will not be detrimental or injurious to property or improvements in the vicinity, and will not be detrimental to the public health, safety, general welfare, or convenience. The proposed childcare facility will not be detrimental or injurious to property or improvements in the vicinity, and will not be detrimental to the public health, safety general welfare, or convenience. The noise output from the proposed use complies with the Noise Ordinance and would result in a less than significant impact to adjacent properties. Traffic from the project would result in no net new PM peak hour trips. The traffic management strategy strives to reduce traffic impacts on surrounding properties by utilizing the on-site parking lot and assigning a drop-off and pick-up time slots for each family enrolled. The proposed use provides a convenience to the community. 2. The proposed development and/or use will be located and conducted in a manner in accord with the Cupertino Comprehensive General Plan, underlying zoning regulations, and the purpose of this title and complies with the California Environmental Quality Act (CEQA). The proposed project is consistent with, and will be conducted in a manner in accordance with, the General Plan, Zoning Ordinance, and the Monta Vista Specific Planand is consistent with previous approvals. The proposed use will be reviewed further by the CA State Department of Community Care Licensing, the Santa Clara County Fire Department, and the Cupertino Building Division, and Public Works Department to ensure compliance with rules and regulations for preschools. Furthermore, the use is categorically exempt under CEQA in that the proposed project involves minor changes to an existing use. With respect to the Director’s Minor Modification, the following findings may be made: 1. The application is a minor change to a plan, which has received site and design approval. M-2019-02 21685 Granada Avenue May 23, 2019 DIR-2019-05 Page 8 The site modifications including the legalization of an existing side-yard deck, the construction of a front-yard fence, and the installation of landscaping are minor changes to an existing site. No other exterior modifications are proposed as part of this project. 2. The proposed development and/or use will be located and conducted in a manner in accord with the Cupertino Comprehensive General Plan, underlying zoning regulations, and the purpose of this title and complies with the California Environmental Quality Act (CEQA). The proposed project is consistent with the General Plan and Zoning Ordinance. The side- yard deck complies with the Accessory Buildings/Structures Ordinance and the proposed fence complies with the requirements of the Monta Vista Design Guidelines. Furthermore, the proposed modifications to the site are categorically exempt under CEQA in that involves negligible change to an existing use or site. NEXT STEPS Should the project be approved, the Hearing Officer’s decision on this project is final unless an appeal is filed within 14 calendar days of the date of the mailing of the decision. All approvals granted by the Hearing Officer shall go into effect after 14 days. Upon project approval, the applicant will be able to submit building permit drawings to enable construction to commence. These approvals expire on May 23, 2021, at which time the applicant may apply for a one-year extension. Prepared by: Erika Poveda, Assistant Planner Reviewed and Approved by:Piu Ghosh, Principal Planner ATTACHMENTS 1. Draft Resolution for M-2019-02 2. Draft Resolution for DIR-2019-05 3. Plan Set 4. Omei Preschool Business Plan 5. Noise Study 6. Trip Generation Study CITY OF CUPERTINO 10300 Torre Avenue Cupertino, California 95014 DRAFT RESOLUTION OF THE ADMINISTRATIVE HEARING OFFICER OF THE CITY OF CUPERTINO AMENDING AN EXISTING USE PERMIT TO ALLOW A CHILDCARE FACILITY TO INCREASE THE HOURS OF OPERATION TO MONDAY THROUGH FRIDAY 7:00 A.M. TO 6:00 P.M. LOCATED AT 21685 GRANADA AVENUE SECTION I: PROJECT DESCRIPTION Application No.:M-2019-02 Applicant:Maria Tzankova (Omei Preschool) Location:21685 Granada Avenue (APN: 357-17-139) SECTION II: FINDINGS WHEREAS, the Administrative Hearing Officer of the City of Cupertino received an application for an amendment to an existing Use Permit (U-2013-07) to allow a childcare facility to increase the hours of operation to Monday through Friday, 7:00 a.m. to 6:00 p.m.; WHEREAS, the project is categorically exempt from the California Environmental Quality Act (CEQA); and WHEREAS, the necessary public hearing notices have been given as required by the Procedural Ordinance of the City of Cupertino, and the Administrative Hearing Officer has held at least one public hearing in regard to the application; and WHEREAS, the applicant has met the burden of proof required to support said application; and WHEREAS, the Administrative Hearing Officer finds: 1. The proposed development and/or use, at the proposed location, will not be detrimental or injurious to property or improvements in the vicinity, and will not be detrimental to the public health, safety, general welfare, or convenience. The proposed childcare facility will not be detrimental or injurious to property or improvements in the vicinity, and will not be detrimental to the public health, safety general welfare, or convenience. The noise output from the proposed use complies with the Noise Draft Resolution M-2019-02 May 23, 2019 Page 2 Ordinance and would result in a less than significant impact to adjacent properties. Traffic from the project would result in no net new PM peak hour trips. The traffic management strategy strives to reduce traffic impacts on surrounding properties by utilizing the on-site parking lot and assigning a drop-off and pick-up time slots for each family enrolled. The proposed use provides a convenience to the community 2. The proposed development and/or use will be located and conducted in a manner in accord with the Cupertino Comprehensive General Plan, underlying zoning regulations, and the purpose of this title and complies with the California Environmental Quality Act (CEQA). The proposed project is consistent with, and will be conducted in a manner in accordance with, the General Plan, Zoning Ordinance, and the Monta Vista Specific Plan and is consistent with previous approvals. The proposed use will be reviewed further by the CA State Department of Community Care Licensing, the Santa Clara County Fire Department, and the Cupertino Building Division, and Public Works Department to ensure compliance with rules and regulations for preschools. Furthermore, the use is categorically exempt under CEQA in that the proposed project involves minor changes to an existing use. NOW, THEREFORE, BE IT RESOLVED: That after careful consideration of maps, facts, exhibits, testimony and other evidence submitted in this matter, subject to the conditions, which are enumerated in Sections III, IV, and V of this Resolution beginning on Page 2 thereof, the Administrative Hearing Officer finds that the application is exempt from CEQA and Application No. M-2019-02 is hereby approved; and that the sub-conclusions upon which the findings and conditions specified in this Resolution are based and contained in the public hearing record concerning Application U-2019-02 as set forth in the Minutes of the Administrative Hearing Meeting of May 23, 2019, and are incorporated by reference as though fully set forth herein. SECTION III: CONDITIONS ADMINISTERED BY THE COMMUNITY DEVELOPMENT DEPARTMENT 1. APPROVED EXHIBITS Approval is based on the plan set entitled “Omei Preschool, 21685 Granada Ave., Cupertino, CA” consisting of three sheets labeled as A0.1, A.02, and A.03, and a Business Planconsisting of five sheets, prepared by Omei Preschool, except as may be amended by conditions in this resolution. 2. ACCURACY OF PROJECT PLANS The applicant/property owner is responsible to verify all pertinent property data including but not limited to property boundary locations, building setbacks, Draft Resolution M-2019-02 May 23, 2019 Page 3 property size, building square footage, any relevant easements and/or construction records. Any misrepresentation of any property data may invalidate this approval and may require additional review. 3. ANNOTATION OF THE CONDITIONS OF APPROVAL The conditions of approval set forth shall be incorporated into and annotated on the first page of the building plans. 4. CONCURRENT APPROVAL CONDITIONS The conditions of approval contained in file no. DIR-2019-05 shall be applicable to this approval. 5. PREVIOUS CONDITIONS OF APPROVAL All previous conditions of approval, in accordance with U-2013-07 shall remain in effect except as may be amended by conditions contained in this resolution. 6. ALLOWED USES Approval is granted for a preschool/childcare facility use to operate Monday through Friday, between the hours of 7:00 a.m. and 6:00 p.m. with a maximum of 13 enrolled students on site at any given time. Preschool/childcare operations shall be limited to the first-floor, while the second-floor will be limited to storage and administrative office space for the preschool and shall not be accessed by students. Any changes in the operational parameters outside of this approval must be reviewed and approved by the City. Planning Staff has the ability to approve minor modifications to the business plan as long as the changes are consistent with any applicable Building and/or Fire Codes and City parking requirements. 7. FUTURE REVIEW OF USE PERMIT In the event of any documented substantial problems and/or violations, the City reserves the right to review this use permit at any time for imposing additional conditions of approval or revocation of the use permit. 8. EXPIRATION If the use for which this permit is granted and utilized has ceased or has been suspended for one year or more, this use permit amendment (M-2019-02) and the existing use permit (U-2013-07) shall be deemed expired and a new use permit application must be applied for and obtained. 9. BUSINESS LICENSE Prior to final occupancy, the business owner shall obtain a City of Cupertino business license. Draft Resolution M-2019-02 May 23, 2019 Page 4 10. TRAFFIC MANAGEMENT PLAN The preschool operator will inform parents/guardians of enrolled students that in the interest of being good neighbors drop-off and pick-up must occur on-site and during scheduled drop-off and pick-up times. Parents and teachers shall not arrive on-site prior to 7:00 a.m. Late pick-up after 6:00 p.m. is not available. These requirements shall be provided in the form of acknowledgments with the student enrollment documentation. The acknowledgments shall be signed by the responsible parents/guardians concurrent with student enrollment, and shall be retained by the applicant/operator. The City may request proof that the acknowledgements have been received and signed by parents/guardians of enrolled students at any time. 11. PARKING Per the Parking Regulations Ordinance, Cupertino Municipal Code Chapter 19.124, there shall be a minimum of two available parking stalls on-site (1 space for every 6.5 students). On-street parking shall not be designated for student drop- off or pick-up. 12. NOISE CONTROL The outdoor play area schedule shall be limited as indicated in the Business Plan. Noise levels shall not exceed those as listed in the Community Nosie Control Ordinance, Cupertino Municipal Code Chapter 10.48. If there are documented violations of the Community Noise Control Ordinance, the Director of Community Development has the discretion to require noise attenuation measures to comply with the ordinance. 13. CITY STREET TREE A City street tree may be required to be planted prior to final occupancy upon further review by the Public Works Department. Should the Director of Public Works require a City street tree, a tree grate will be required pursuant to the Monta Vista Design Guidelines. 14. SIGNAGE Signage is not approved with this use permit application. The applicant shall be required to submit an application for signage prior to installation of any signage on site. Signage shall conform to the City’s Sign Ordinance. 15. CONSULTATION WITH OTHER DEPARTMENTS The applicant is responsible to consult with other departments and/or agencies with regard to the proposed project for additional conditions and requirements. Draft Resolution M-2019-02 May 23, 2019 Page 5 Any misrepresentation of any submitted data may invalidate an approval by the Community Development Department. 16. INDEMNIFICATION Except as otherwise prohibited by law, the applicant shall indemnify and hold harmless the City, its City Council, and its officers, employees and agents (collectively, the “indemnified parties”) from and against any claim, action, or proceeding brought by a third party against one or more of the indemnified parties or one or more of the indemnified parties and the applicant to attack, set aside, or void this Resolution or any permit or approval authorized hereby for the project, including (without limitation) reimbursing the City its actual attorneys’ fees and costs incurred in defense of the litigation. The applicant shall pay such attorneys’ fees and costs within 30 days following receipt of invoices from City. Such attorneys’ fees and costs shall include amounts paid to counsel not otherwise employed as City staff and shall include City Attorney time and overhead costs and other City staff overhead costs and any costs directly related to the litigation reasonably incurred by City. 17. NOTICE OF FEES, DEDICATIONS, RESERVATIONS OR OTHER EXACTIONS The Conditions of Project Approval set forth herein may include certain fees, dedication requirements, reservation requirements, and other exactions. Pursuant to Government Code Section 66020(d) (1), these Conditions constitute written notice of a statement of the amount of such fees, and a description of the dedications, reservations, and other exactions. You are hereby further notified that the 90-day approval period in which you may protest these fees, dedications, reservations, and other exactions, pursuant to Government Code Section 66020(a), has begun. If you fail to file a protest within this 90-day period complying with all of the requirements of Section 66020, you will be legally barred from later challenging such exactions. SECTION IV: CONDITIONS ADMINSTERED BY THE PUBLIC WORKS DEPARTMENT 18. REVOCABLE ENCROACHMENT PERMIT Developer shall apply a revocable encroachment permit for the proposed landscaping within the public right of way. 19. CURB AND GUTTER IMPROVEMENTS Curbs and gutters, sidewalk, and driveway repairs may be required in accordance with grades and standards as specified by the Director of Public Works. Draft Resolution M-2019-02 May 23, 2019 Page 6 20. DRAINAGE Grading and drainage shall be provided to the satisfaction of the Director of Public Works. Show all existing and proposed downspouts from the roof. Install splash blocks at all downspouts to ensure roof water is directed away from the foundation. 21. IMPROVEMENT AGREEMENT The project developer shall enter into a development agreement, if applicable, with the City of Cupertino providing for payment of fees, including but not limited to checking and inspection fees, storm drain fees, park dedication fees and fees for under grounding of utilities. Said agreement shall be executed prior to issuance of construction permits (or prior to Final/Parcel map approval). a. Checking & Inspection Fees Per current fee schedule ($857) b. Storm Drainage Fee Per current fee schedule ($9,471 per AC) c. Traffic Impact Fee Per current fee schedule ($6,236 per new peak- hour trip). Due only if project generates new PM peak-hour trips. d. Encroachment Permit Fee To be determined e. Bond: Encroachment Bond 115% of off-site improvements, if applicable The fees described above are imposed based upon the current fee schedule adopted by the City Council. However, the fees imposed herein may be modified at the time of recordation of a final map or issuance of a building permit in the event of said change or changes, the fees changed at that time will reflect the then current fee schedule. SECTION V: CONDITIONS ADMINSTERED BY THE BUILDING DIVISION 22. BUILDING PERMIT ISSUANCE The applicant shall consult with the City Building Division to obtain the necessary building permits for the on-site alterations. The use permit amendment shall be considered null and void and of no effect if a building permit is not filed and accepted by the City within the expiration date specified in the municipal code. In the event that a building permit expires for any reason, the use permit shall be null and void. PASSED AND ADOPTED this 23rd day of May, 2019 at a noticed Public Hearing of the Administrative Hearing Officer of the City of Cupertino, State of California, held by the Director of Community Development, or his or her designee, pursuant to Cupertino Municipal Code Section 19.12.120. Draft Resolution M-2019-02 May 23, 2019 Page 7 ATTEST:APPROVED: ________________________ Erika Poveda Benjamin Fu Assistant Planner Acting Community Development Director CITY OF CUPERTINO 10300 Torre Avenue Cupertino, California 95014 DRAFT RESOLUTION OF THE ADMINISTRATIVE HEARING OFFICER OF THE CITY OF CUPERTINO ALLOWING SITE MODIFICATIONS AT AN EXISTING CHILDCARE FACILITY, INCLUDING THE LEGALIZATION OF AN EXISTING DECK, THE CONSTRUCTION OF A FRONT-YARD FENCE, AND THE INSTALLATION OF LANDSCAPING LOCATED AT 21685 GRANADA AVENUE. SECTION I: PROJECT DESCRIPTION Application No.:DIR-2019-05 Applicant:Maria Tzankova (Omei Preschool) Location:21685 Granada Avenue (APN: 357-17-139) SECTION II: FINDINGS WHEREAS, the Administrative Hearing Officer of the City of Cupertino received an application to allow for site modifications at an existing childcare facility, including the including the legalization of an existing side-yard deck, the construction of a front-yard fence, and the installation of landscaping; WHEREAS, the project is categorically exempt from the California Environmental Quality Act (CEQA); and WHEREAS, the necessary public hearing notices have been given as required by the Procedural Ordinance of the City of Cupertino, and the Administrative Hearing Officer has held at least one public hearing in regard to the application; and WHEREAS, the applicant has met the burden of proof required to support said application; and WHEREAS, the Administrative Hearing Officer finds: 1. The application is a minor change to a plan which has received site and designs approval; The site modifications including the legalization of an existing side-yard deck, the construction of a front-yard fence, and the installation of landscaping are minor changes to an existing site. No other exterior modifications are proposed as part of this project. Draft Resolution DIR-2019-05 May 23, 2019 Page 2 2. The proposed development and/or use will be located and conducted in a manner in accord with the Cupertino Comprehensive General Plan, underlying zoning regulations, and the purpose of this title and complies with the California Environmental Quality Act (CEQA). The proposed project is consistent with the General Plan and Zoning Ordinance. The side- yard deck complies with the Accessory Buildings/Structures Ordinance and the proposed fence complies with the requirements of the Monta Vista Design Guidelines. Furthermore, the proposed modifications to the site are categorically exempt under CEQA in that involves negligible change to an existing use or site. NOW, THEREFORE, BE IT RESOLVED: That after careful consideration of maps, facts, exhibits, testimony and other evidence submitted in this matter, subject to the conditions, which are enumerated in Section III and IV ofthis Resolution beginning on Page 2thereof, the Administrative Hearing Officer finds that the project is exempt from CEQA and Application No. DIR-2019-05 is hereby approved; and that the sub-conclusions upon which the findings and conditions specified in this Resolution are based and contained in the public hearing record concerning Application DIR-2019-05 as set forth in the Minutes of the Administrative HearingMeeting of May 23, 2019, and are incorporated by reference as though fully set forth herein. SECTION III: CONDITIONS ADMINISTERED BY THE COMMUNITY DEVELOPMENT DEPARTMENT 1. APPROVED EXHIBITS Approval is based on the plan set entitled “Omei Preschool, 21685 Granada Ave., Cupertino CA” consisting of three (3) sheets labeled as A0.1, A.02, and A.03, and a Business Plan consisting of five (5) sheets, prepared by Omei Preschool, except as may be amended by conditions in this resolution. 2. ACCURACY OF PROJECT PLANS The applicant/property owner is responsible to verify all pertinent property data including but not limited to property boundary locations, building setbacks, property size, building square footage, any relevant easements and/or construction records. Any misrepresentation of any property data may invalidate this approval and may require additional review. 3. ANNOTATION OF THE CONDITIONS OF APPROVAL The conditions of approval set forth shall be incorporated into and annotated on the first page of the building plans. Draft Resolution DIR-2019-05 May 23, 2019 Page 3 4. FENCING The proposed front-yard fence shall meet the fence standards of the Monta Vista Design Guidelines. 5. CONCURRENT APPROVAL CONDITIONS The conditions of approval contained in file no. M-2019-02 shall be applicable to this approval. 6. PREVIOUS CONDITIONS OF APPROVAL All previous conditions of approval, in accordance with U-2013-07, Resolution No.6721 as approved by the Planning Commission on August 13, 2013, shall remain in effect except as may be amended by conditions contained in this resolution. 7. CITY STREET TREE A City street tree may be required to be planted prior to final occupancy upon further review by the Public Works Department. Should the Director of Public Works require a City street tree, a tree grate will be required pursuant to the Monta Vista Design Guidelines. 8. CONSULTATION WITH OTHER DEPARTMENTS The applicant is responsible to consult with other departments and/or agencies with regard to the proposed project for additional conditions and requirements. Any misrepresentation of any submitted data may invalidate an approval by the Community Development Department. 9. INDEMNIFICATION Except as otherwise prohibited by law, the applicant shall indemnify and hold harmless the City, its City Council, and its officers, employees and agents (collectively, the “indemnified parties”) from and against any claim, action, or proceeding brought by a third party against one or more of the indemnified parties or one or more of the indemnified parties and the applicant to attack, set aside, or void this Resolution or any permit or approval authorized hereby for the project, including (without limitation) reimbursing the City its actual attorneys’ fees and costs incurred in defense of the litigation. The applicant shall pay such attorneys’ fees and costs within 30 days following receipt of invoices from City. Such attorneys’ fees and costs shall include amounts paid to counsel not otherwise employed as City staff and shall include City Attorney time and overhead costs and other City staff overhead costs and any costs directly related to the litigation reasonably incurred by City. Draft Resolution DIR-2019-05 May 23, 2019 Page 4 10. NOTICE OF FEES, DEDICATIONS, RESERVATIONS OR OTHER EXACTIONS The Conditions of Project Approval set forth herein may include certain fees, dedication requirements, reservation requirements, and other exactions. Pursuant to Government Code Section 66020(d) (1), these Conditions constitute written notice of a statement of the amount of such fees, and a description of the dedications, reservations, and other exactions. You are hereby further notified that the 90-day approval period in which you may protest these fees, dedications, reservations, and other exactions, pursuant to Government Code Section 66020(a), has begun. If you fail to file a protest within this 90-day period complying with all of the requirements of Section 66020, you will be legally barred from later challenging such exactions. SECTION IV: CONDITIONS ADMINSTERED BY THE BUILDING DEPARTMENT 11. BUILDING PERMIT ISSUANCE The applicant shall consult with the City Building Division to obtain the necessary building permits for the on-site alterations. The use permit amendment shall be considered null and void and of no effect if a building permit is not filed and accepted by the City within the expiration date specified in the municipal code. In the event that a building permit expires for any reason, the use permit shall be null and void. PASSED AND ADOPTED this 23rd day of May, 2019 at a noticed Public Hearing of the Administrative Hearing Officer of the City of Cupertino, State of California, held by the Director of Community Development, or his or her designee, pursuant to Cupertino Municipal Code Section 19.12.120. ATTEST:APPROVED: ________________________ Erika Poveda Benjamin Fu Assistant Planner Acting Community Development Director NO.DESCRIPTION DATE 01 - WIP Work in Progress JOB NO. : SHEET NO. DATE: SCALE: DRAWN BY: BUZZ BRYAN, ARCHITECT C20561 REVISIONS A.014/29/2019Plotted On:4/29/2019 AS NOTED SITE / ROOF PLAN IF THE ABOVE DIMENSION DOES NOT MEASURE ONE INCH (1") EXACTLY, THIS DRAWING WILL HAVE BEEN ENLARGED OR REDUCED, AFFECTING ALL LABELED SCALES. 1" ACTUAL OMEI PRESCHOOL 21685 GRANADA AVE CUPERTINO,CA 12/31/19 2'-2"7'-2"6'-8"12'-2"3'-1"5'-3" 10'-7"8'-8"10'-5"15'-8"25'-10"13'-2"41'-6"5'9'-3"4'8'-6"9'-1"8'2'-7 1/2" 13'-4"4'-8"18'24'9'-3"36' -2"2'-2" 23'-2" 3'-2"20' 10'-7"8'-8"15'-8"25'-10"13'-2"9'-3"4'3 X 6 R.W. JST @ 16" O.C.2'6'-6"4'4 X 6 R.W.4 X 6 R.W.4 X 6 R.W.NN 0 4'8'16'SCALE: 1/8" = 1'-0"1 SITE PLAN SCALE: 1/4" = 1'-0"2 DECK FRAMING PLAN PROPOSED WD. DECK LEVEL LANDING PLAY AREA DECK HEIGHT 16" - 304 S.F. (E) 6' WD. FENCE (E) 6 ' WD. FENCE (E) 6' WD. FENCE PROPERTY LINE (N) 6' WD. FENCE W/ 3' X 6' GATE (E) INTERLOCKING PAVERS (PERVIOUS) EXIST'G R.W.RAMP MAX 1 : 12 HANDRAIL BOTH SIDES EXIST'G RW. DECK LEVEL LANDING. HGT. 16" LEVEL LANDING 8.5 X 22' STD. PARKING STALL (E) ACCESSIBLE PATH (E) ACCESSIBLE PATH (N) 3' FENCE /GATE W / PICKETS COLOR : WHITE (E) 6' WD. FENCE + GATE TYP. 10 X 10 PRECAST CONC . BEARING BLOCK - WET SET IN 16" X 16" X 10" CONC. PAD. SIMPSON CB46 AT EA . BM. CONNECTION TYP 4 X 6 RW WALL LEDGER SECURE TO SOLID BLOCKING W/ 5/8" X 6" LAG BOLT W/ WASHER 32" O.C. (E) SYNTHETIC TURF AREA TYPICAL 1" X 5 1/2" EXT. WD. DECK - TREX OR EQ. (E) SHRUB - PHOTINA TO REMAIN (N) L/S PLANTING - AGAPANTHUS /24" O.C. / 1 GAL / BLUE (E) GAS MTR (E) ELEC.MTR NEW L/S AREA 50 S.F. - (N) SHRUBS - COREOPSIS MARITIMA /SEA DAHLIA/ 18" O,C, / 1 GALLON (N) RIVER ROCK GROUND COVER - RIVER ROCK COBBLE DRAINAGE DISSIPATOR 70% - 2" - 4" /30"%- 4" - 8" PROPERTY LINE (N) L/S PLANTER EDGING - VIGORO HEAVY DUTY PROFESSIONAL 5" HGT. STAKE 36" O.C. (BLACK) (E) DRAIN SWALE. NO DRAINAGE ONTO NEIGHBORING PROPERTIES (E) DRAIN SWALE (E) 4' FENCE BARRIER NO CONCENTRATED FLOW ACROSS R.O.W. NO DRAINAGE ONTO NEIGHBOR PROPERTIES (E) 6' WD. FENCE (E) MAX. 3' TALL SIDEYARD FENCE WITHIN FRONT YARD SETBACK (E) 6' WD. FENCE & GATE (E) STUDENT VEGGIE GARDEN AREA DIRECT ALL DOWN SPOUTS / SPLASHBLOCKS AWAY FROM FOUNDATION (E) CONC. SLAB LEVEL LANDING DASHED ROOF LINE GRANADA AVENUE 60.00 100.00'EXISTING BUILDING (E) SYNTHETIC TURF L/S 60.00 L/S (E) L/S LEVEL LEVELLEVEL PROJECT DATA: ARCHITECT : B. BRYAN, ARCHITECT C20561 / EMAIL: cyberbuz@sbcglobal.net / 408 -257 -7500 OWNER: M. TZANKOVA / EMAIL: maria_tzankova@yahoo.de / 408 -444 -0635 SCOPE OF WORK: NEW WD. DECK 304 S.F. NEW 6' WD. FENCE 13 L.F. NEW 3' WD. FENCE 32 L.F. L/S PLANTING 278 S.F TOTAL OUTDOOR AREA : 3,909 S.F. HOURS OF OPERATION: 7 A.M. - 6 P.M. APN : 357 -17 -139 ADDRESS: 21685 GRANADA AVENUE ZONE: P (CN, ML, RES. 4 -12 ) OCCUPANCY E/ S-2 TYPE OF CONST: VB, NO SPRINKLER LOT SIZE: 6,000 S.F. BUILDING AREA: 2,091 S.F. FLOOR AREA RATIO: 34.85 % PARKING PROVIDED : 1 (H/C) + 1 = 2 PARKING REQUIRED : 1 (H/C) + 1 = 2 MIN. 1 PARKING STALL PER 6.5 CHILDREN PER CMC SECT.19124.040A PROPOSED USE: 1ST FLR : EDUCATIONAL ( 13 PRESCHOOL STUDENTS) GROUP E 2ND FLR: LOW HAZARD STORAGE GROUP S-2 NUMBER OF STORIES: 2 STORY BUILDING HEIGHT: 24' -2" OUTDOOR AREA: CALIF. DEPT. OF SOCIAL SERVICES - 810 S.F. ALLOWABLE BLDG . AREA: 1,272/9,500 (E) + 819/(13,500) = > 0.19 < 1 PER SECT. 58.4.2 WM COTG SBL SBL SBL (E) 6" LOC (E) 6" LOC (E) 6" LOC (E) 6" LOC (E) 6" LOC (E) 6" LOC (E) 6" LOC (E) 6" LOC (E) 6" LOC (E) 6" LOC (E) 6" LOC (E) 6" LOC (E) 6" LOC SBL (E) (E) (E) (E) (E) (E) L/S PLAY AREA 506 S.F. (E) FRONT L/S AREA 228 S.F. - PROPOSED NEW WOOD DECK 1 FRONTAGE VIEW OF DECK 2 CLOSE UP VIEW OF DECK 3 REAR VIEW OF DECK 4' CLR (E) L/S (E) L/S (E) L/S (E) L/S (E) L/S NO.DESCRIPTION DATE 01 - WIP Work in Progress JOB NO. : SHEET NO. DATE: SCALE: DRAWN BY: BUZZ BRYAN, ARCHITECT C20561 REVISIONS A.024/18/2019Plotted On:4/18/2019 AS NOTED SITE CONTEXT IF THE ABOVE DIMENSION DOES NOT MEASURE ONE INCH (1") EXACTLY, THIS DRAWING WILL HAVE BEEN ENLARGED OR REDUCED, AFFECTING ALL LABELED SCALES. 1" ACTUAL OMEI PRESCHOOL 21685 GRANADA AVE CUPERTINO,CA 12/31/19 100'60'100' N05'10'20'SCALE: 1" = 10'1 SITE CONTEXT PLAN 0 5'10'20'SCALE: 1" = 10'2 SITE CONTEXT SOUTH ELEVATION AUTOMOTIVE BUILDING BEYOND TYP. PROPERTY LINE TYP. PROPERTY LINE TYP. PROPERTY LINE TYP. ON-STREET PARKING 10070 PASADENA AVE MIXED USE : OFFICE/ RETAIL / RESIDENTIAL 21865 GRANADA AVE. EDUCATIONAL / LIGHT STORAGE AUTOMOTIVE REPAIR DETACHED GARAGE 10075 IMPERIAL AVE RESIDENTIAL DRIVEWAY / PARKING DRIVEWAY / PARKING REAR YARD MIXED USE DRIVEWAY / PARKING DRIVEWAY / PARKING REAR YARD 10070 PASADENA AVE.21685 GRANADA AVE.10075 IMPERIAL AVE. PASADENA AVE.IMPERIAL AVE MIXED USE : OFFICE/ RETAIL / RESIDENTIAL PASADENA AVENUEIMPERIAL AVENUEGRANADA AVENUE 70 '28 ' 75 ' 52 ' 30 ' 60 '100 '100 '50 '50 '100 '25 '25 '45 ' NO.DESCRIPTION DATE 01 - WIP Work in Progress JOB NO. : SHEET NO. DATE: SCALE: DRAWN BY: BUZZ BRYAN, ARCHITECT C20561 REVISIONS A.035/15/2019Plotted On:5/15/2019 AS NOTED FLOOR PLANS IF THE ABOVE DIMENSION DOES NOT MEASURE ONE INCH (1") EXACTLY, THIS DRAWING WILL HAVE BEEN ENLARGED OR REDUCED, AFFECTING ALL LABELED SCALES. 1" ACTUAL OMEI PRESCHOOL 21685 GRANADA AVE CUPERTINO,CA 12/31/19 2'-2"7'-2"6'-8"12'-2"3'-1"5'-3" 10'-7"8'-8"10'-5"15'-8"25'-10"13'-2"N 0 2'4'8'SCALE: 1/4" = 1'-0"1 FIRST FLOOR PLAN 0 2'4'8'SCALE: 1/4" = 1'-0"2 SECOND FLOOR CLASS ROOM 2 CLASS ROOM 1 CLASS ROOM 1 RESTROOM FOYER STAFF R 00M STORAGE RM . OPEN TO BELOWCLASS ROOM 3 SNACK BAR UP CLO DN EXT. WD. DECK LEVEL LANDING 304 S.F. EXT. WD. DECK LEVEL LANDING EXT. RDWD. DECK LEVEL LANDING RAMP 1 : 12 SLOPE RESTROOM RESTROOM STORAGE RM . NO INTERIOR WORK PROPOSED FOR THIS APPROVAL OMEI Preschool, 21685 Granada Ave., Cupertino, CA 95014 BUSINESS PLAN Submitted by Omei Preschool November 2018 OMEI Preschool, 21685 Granada Ave., Cupertino, CA 95014 Summary Since its opening in 2008 Omei Academy has served the community of Cupertino by providing excellent Chinese Cultural Classes. The courses provided meet the needs of students of various ethnic backgrounds whose interest and desire is to learn Chinese Language, Folk Dance and Martial Arts and many other forms of Chinese Arts and culture. Omei Academy has successfully developed over the years tutoring and after school programs, where students have achieved great academic results and won many awards in martial arts competitions. With its diverse population Cupertino is one of the most progressive and technologically fast developing residence in Northern California. The families of Cupertino are also known to place a high value on education, reflected by the city’s award winning school system. Education, innovation and collaboration are the hallmarks nourished by the city government, the community, and local industry and commerce. As the demand in the community for bilingual activities is very strong, Omei Academy plans to expand by operating a preschool “Omei Preschool” for children years 3-5 before entering Kindergarten in the building at 21685 Granada Ave., Cupertino. Its location is situated in a Neighborhood/Commercial Zone. The building is strategically located near the city center and is easily assessable. Given that the majority of the area’s commercial buildings are occupied by tech – companies, whose employees are mostly family oriented, preschool programs such as those available at Omei Preschool are in demand. Description of Operation Activities: Phase I Omei Academy proposes the use of the location at 21685 Granada Ave., Cupertino as Omei Preschool. At the moment the facility can be licensed for 9 children, according to the state licensing requirements. One qualified teacher will be employed. Main hours of operation will be 8:30am – 4:00pm with the option of before school care 7:00am – 8:30am and after school care 4:00-6:00pm, Monday to Friday. If summer program is available hours of operation and number of children/teachers will remain the same as during the regular time. OMEI Preschool, 21685 Granada Ave., Cupertino, CA 95014 Daily activities will include: 7:00-8:30am Before School Care _____________________________________________________________________ 8:30-9:00am Arrival. Morning Routine 9:00-9:20am Morning Circle Time: Calendar, Message of the Day, Group Activity. Music and Movement 9:20-9:40am Transition Time/Snack Time 9:40-10:10am Foreign Language Activities (Mandarin) 10:10-10:40am STEM Program 10:40-11 :20am Outside Play Time 11 :20-11 :30am Handwashing. Bathroom Routine 11 :30am-11 :40pm Transition Time 11:40am-12:30pm Lunch /does not include play time outside/ 12:30-2:00pm Nap 2:00-2:15pm Recreational Activities 2:15-2:30pm Snack 2:30-3:00pm Math Games 3:00-3:40pm Outside Play Time 3:40-4:00pm Learning Centers 4:00-6:00pm After School Care 4:00-4:45pm Special Program 4:45-5:00pm Transition Time/Bathroom Routine 5:00-5:30pm Small Motor Skills Development 5:30-6:00pm Learning Centers 6:00pm Pick Up Time The maximum number of children being outside at the same time will be 7. Special Program: Monday: Cooking Tuesday: Performing Arts Wednesday: Experiments Thursday: Entertainment ( Magic) Friday: Sports Before School Care Daily Activities: Monday: My family Tuesday: Our Community Wednesday: Arts and Crafts Thursday: Work and Occupation Friday: Awesome Animals OMEI Preschool, 21685 Granada Ave., Cupertino, CA 95014 Courses of emphasis during the school year are: Chinese Language – Teaching children to speak and listen. Introduction to reading and writing STEM – As a part of our daily life we set as a priority childrens’ exposure to science and capturing their interest. Exploring together STEM related activities in a fun way improves childrens’ social skills; designing and creating improves their fine motor skills and develops their process of thinking, which will lead to innovation later. Math – Daily activities teaching numbers concepts Sports – Omei Academy Cupertino is known all over the world for its Chinese Martial Arts Champions. Starting martial arts classes at early age brings the benefit of better concentration, discipline and higher achievements. The Friday Sports activities at Omei Preschool will be age and developmentally appropriate and concentrated indoors. Phase II Omei Academy hopes to increase the number of children to 13 in near future. From these 13 children we expect to have about 3 children attending the Before school care ( 7-8.30am), and 3-4 children attending the After school care (4-6pm). There will be one teacher on site. Both owners Maria Tzankova and Yunjian Zou are finger printed and will be helping the main teacher with supervising the children in and outdoor whenever necessary. Maria Tzankova is enrolled at De Anza College, Child Development Department, she has the units to be teacher ’s aide and is expected to finish her Director Permit by the end of the year. Drop off and Pick up: Before School Care Drop Off: Parents can drop off between 7-7.15am for Before School Care. Teachers will arrive no earlier than 7am. Main Drop Off: Parents will drop off between 8.30-9:00am for the main hours of operation Main pick up time: Main pick up time will be between 3:30-4pm. After School Care Pick up: After School Care pick up will be between 5.45-6pm. Late pick up: Late pick up is not available for the parents. Traffic Management: The parking in the back will be used for drop off and pick up. The car will then back up and leave the property. All parents will be provided information and acknowledge OMEI Preschool, 21685 Granada Ave., Cupertino, CA 95014 the drop off/pick up plan. Our facility will accommodate a maximum of 13 children. Since we ex pect some of the kids to be dropped off in the Before School Care between 7 and 7:15am, and in addition to this we give the parents a 30 min range to drop off in the main time between 8:30 and 9am, we don’t expect a vehicle overflow. Pick up will follow a similar procedure. The drop off and pick up time is spread out and will be arranged for a specific time with every family at enrollment, so we can create a schedule with the exact time every child will come in. Parents need to bring their children in and sign them in with a full signature. We will follow the same procedure at pick up. Parents can drop off their children the earliest 7am and should pick up the latest at 6pm. Conclusion The owner of Omei Academy has confidence in the program provided and believes that it can grow serving the community in a friendly and professional way. Environmental Consulting Services * * * Saratoga ______________________________________________________________________________________ Environmental Consulting Services 18488 Prospect Road – Suite 1, Saratoga, CA 95070 Phone: (408) 257-1045 stanshell99@toast.net ______________________________________________________________________________________ March 29, 2019 Ms. Erika Poveda Assistant Planner Planning Division - City of Cupertino 10300 Torre Avenue Cupertino, CA 95014 RE: Noise Impact and Mitigation Study for Omei Preschool, 21685 Granada Avenue, Cupertino Dear Ms. Poveda, In response to your request I have evaluated the potential noise impacts that could be produced at nearby residential receptor locations by the proposed new preschool activities at the planned Omei Preschool in Cupertino. The report discusses the present environment, the proposed project and its associated noise-related aspects, the potential new activities and operational noise impacts at the nearest receptors in the area, and compliance with Cupertino noise guidelines. To summarize the conclusions of the report, the proposed changes to the on-site activities would meet the City noise ordinance limitations and would not produce any significant noise disturbance in the vicinity of the site. Project Description [1] [2] The proposed new preschool activity would provide weekday daytime care for toddler and preschool- age kids on the subject site. Its purpose is to provide Chinese culture classes to meet the needs of students of various ethnic backgrounds, who desire to learn Chinese language, folk dance, martial arts and many other forms of Chinese arts and culture. The preschool proposes to use the several rooms of the building and outdoor play yard as they exist at present without modification. The property is in a Neighborhood/ Commercial zone. The site and its immediate neighbors are shown in Exhibit 1. There is a six-foot wood fence bordering the outdoor play area on the west and a four-foot fence on the north property line shared with the adjacent residential areas. Temporary parking for drop-off and pickup of children can use the two spaces on the property and several street parking spaces near the site. One of the spaces on site is a handicapped space. School Program [2] [3] The preschool program would serve up to 9 kids initially (13 kids in the future as permitting is available), ages 3 through 5, with a staff of 1+, on a normal workday schedule of 7:00 am to 6:00 pm, Monday through Friday year-round. The primary hours of school operation will be 8:30am – 4:00pm, with the option of before-school care 7:00am – 8:30am and after- school care 4:00-6:00pm, Monday through Friday. If a summer program is available, hours of operation and the number of children/teachers would remain the same as during the regular school year. There would be no evening or holiday activities held on site. Inside activities would include normal school educational, creative, and play activities. Drop off and Pick up Before-School Care: Parents can drop off between 7-7:15 am. Main Drop Off: Parents will drop off between 8.30-9:00am for the main hours of operation. Main pick up time: Main pick up time will be between Omei Preschool Noise Study, Granada Avenue – Cupertino Page 2 of 5 Environmental Consulting Services * * * Saratoga 3:30-4 pm. After-School Care Pick up: After-School Care pick up will be between 5.45-6 pm. Late pick up: Late pick up is not available for the parents. Sensitive Receptor Locations The project area is a mixed residential and commercial neighborhood on the south side of Stevens Creek Boulevard in Cupertino, several blocks west of Highway 85. The nearest sensitive receptor locations for noise generated by the project includes two-story condos adjacent to the property on the west and northwest, and also across Granada Street to the south. Parking lots and driveways separate the school site from the adjacent condos. The properties on the east side are commercial businesses, so they are not considered significant receptors for preschool noise. There is a six-foot wood fence on the west property line and a four-foot fence on the north side of the site. Other residential receptors in the area would have less preschool noise due to increased distance and building obstruction. Exhibit 1 - Omei Preschool and Nearby Areas This study investigates the extent to which the closest adjacent residences could be impacted by noise from preschool activities. The existing ambient noise environment and potential noise impacts are discussed in the following sections. Preschool site Noise measurement location Omei Preschool Noise Study, Granada Avenue – Cupertino Page 3 of 5 Environmental Consulting Services * * * Saratoga Ambient Noise Levels and Noise Sources in the Area Field noise measurements were made during the midmorning and midafternoon periods of March 21, 2019, with a CEL-440 Precision Noise Meter and Analyzer, calibrated with a B & K Model 4230 Sound Level Calibrator. The measurement location was chosen to represent ambient noise levels at the site and in adjacent key receptor locations, which have very similar noise because of the lack of nearby traffic. The measurement location is shown in Exhibit 1. Noise levels were measured and are reported using percentile noise descriptors, as follows: L90 (the background noise level exceeded 90 % of the time), L50 (the median noise level exceeded 50% of the time), L1 (the peak level exceeded 1% of the time), and Leq (the average energy-equivalent noise level). Measured noise levels are presented in Exhibit 2 below. The Ldn noise levels were computed as the long- term average of the Leq using the daily traffic distribution in the area, with standard weighted penalties for the nighttime hours, and modeled with an enhanced version of the National Cooperative Highway Research Board traffic noise model [5]. EXHIBIT 2 AMBIENT NOISE LEVELS (dBA) Omei Preschool area Location and condition L90 L50 Leq L1 Ldn 1. Northwest corner of play area, midmorning 43 45 48.4 58 50 2. Northwest corner of play area, midafternoon 46 48 48.8 56 50 The primary source of ambient noise in the project area is traffic on Stevens Creek Boulevard, a major arterial one block north of the preschool site, and the Highway 85 freeway, several blocks east of the site. Granada Avenue and its intersecting streets are low-speed two-lane streets carrying only a few vehicles per minute, so they do not represent a significant source of local noise. Typical vehicle passby noise levels are in the 50-60 dBA range at 25 feet. Trucks, buses, motorcycles, and poorly-muffled vehicles produce peak levels 5 to 15 dBA higher on passby. Large and small aircraft and helicopter overflights create infrequent noise incidents of 50 to 60 dBA. The low noise measurements reflect the fact that near the site traffic volumes and speeds are both low. Typical sporadic neighborhood activities are garbage pickup and also residential yard maintenance. There are no other significant noise sources in the project area. Relevant Cupertino Noise Ordinance Limits [4] Section 10.48.040 of the Cupertino Noise Ordinance is applicable to this project, which limits noise during daytime hours (7 am to 8 pm) on residential property to 55 dBA, and 50 dBA during evening hours (8pm to 7am). In addition, brief daytime noise incidents are allowed with somewhat higher noise levels by Ordinance section 10.48.050. For example, noise incidents that last less than 15 minutes during any two hour period are allowed to be 5 dB higher than the long-term general limits. Omei Preschool Noise Study, Granada Avenue – Cupertino Page 4 of 5 Environmental Consulting Services * * * Saratoga Potential Omei Preschool Noise Impacts Outdoor playground activities Outdoor activities would occur in the existing play area in the northwest corner of the site, as shown in Exhibit 1. This fenced area has a concrete sidewalk, with some grass, foliage and trees. Several types of play activities would be included in the back yard area for the post-toddler kids, including sand toys, hula hoops, group games, and other appropriate outdoor play activities. Outdoor play times are scheduled between 10:30 and 11:30 am, and from 3 to 4 pm, with kids having appropriate amounts of time during each period. All of the project noise would be from sporadic voices of the young kids during outdoor play periods. Activities of this type can create intermittent brief noise from voices of 50 to 60 dBA at a distance of 25-35 feet within the play yard. The two closest adjacent residences are approximately 40-45 feet from the play yard, with wood fences intervening. Distance and the property line wood fences reduce the play yard noise at each the nearest residences by 8-10 dBA. Hence the expected worst-case noise levels from kids voices at the nearest residences are 45 to 53 dBA, which is less than the 55 dBA Cupertino daytime noise limit, and this would only occur for short periods during the morning and afternoon play periods. Project Traffic Noise Because of the relatively small number of kids at the school and the associated small number of drop- off and pick-up trips generated (less than 15 during each period), no noticeable increase in traffic noise would be generated by the preschool operation. Temporary Construction Noise There is no new construction associated with the Omei Preschool project. Conclusions and Summary Overall ambient noise levels in the project area now depend primarily on Stevens Creek Boulevard and Highway 85 traffic noise, and these will continue to be the dominant noise sources in the area in the foreseeable future. The primary noticeable noise would be intermittent and brief voice incidents from young children in the play area adjacent to the preschool building. With the informal type of play activities, the age of the kids, and the distances and/or fence protection involved, these activities would be within City noise ordinance limits, and would not create any noise impacts in the adjacent residential areas. Thus, the new preschool use would not create any noticeable noise impact and would result in a “Less than Significant” noise impact on any nearby properties If I may be of further assistance on this project, please do not hesitate to contact me. Respectfully submitted, Stan Shelly H. Stanton Shelly Acoustical Consultant Board Certified Member (1982) Institute of Noise Control Engineering Omei Preschool Noise Study, Granada Avenue – Cupertino Page 5 of 5 Environmental Consulting Services * * * Saratoga REFERENCES 1. Project drawings A.01, A.02 and A.03 - Omei Preschool, Bryan Architects & Assoc, Cupertino, CA; Jan 2019, 2. Business Plan - Omei Preschool; November 2018. 3. Discussion with Maria Tzankova, project owner, about planned preschool operations; March 2019. 4. Noise Ordinance, Municipal Code Section 10.48, Noise levels for residential and commercial zones; City of Cupertino. 5. Highway Noise - A Design Guide for Highway Engineers, National Cooperative Highway Research Program Report 117, Highway Research Board, National Academy of Sciences, Washington, D.C., 1971 (model enhanced and field validated by ECS). Memorandum Date: April 4, 2019 To: Ms. Erika Poveda, City of Cupertino From: Brian Jackson Subject: Trip Generation Study for Omei Preschool at 21685 Granada Avenue in Cupertino, CA Hexagon Transportation Consultants, Inc. has completed a trip generation study for a proposed preschool at 21685 Granada Avenue in Cupertino, California. The existing building on the site previously housed a special needs child care center, which had an enrollment of 13 children and one teacher. The proposed Omei Preschool also would accommodate an enrollment of up to 13 children and one teacher. The preschool’s main hours of operation would be from 8:30 AM to 4:00 PM on weekdays (Monday – Friday) and would serve children 3 to 5 years of age. Optional student care would be provided before school from 7:00 to 8:30 AM, and after school from 4:00 to 6:00 PM. The purpose of this trip generation study is to document the projected number of net new AM and PM peak hour vehicle trips generated by the proposed preschool. The City of Cupertino typically does not require preparation of a comprehensive transportation impact analysis, including an evaluation of intersection level of service, for projects deemed “small”. For small projects, a trip generation analysis usually is sufficient. The reason the City typically does not require more extensive traffic analysis for small projects is because once the project-generated AM and/or PM peak hour trips are assigned to the roadway network based on the inbound/outbound splits, the trips disperse, and the number of new trips added to any one intersection is effectively negligible. Accordingly, City of Cupertino staff have indicated that a trip generation study will suffice for the proposed project. Project Trip Generation Hexagon prepared trip estimates based on trip generation rates obtained from the ITE Trip Generation Manual, 10th Edition (2017). The average AM and PM peak hour trip generation rates for Day Care Center (Land Use Category 565) were applied to both the proposed project and the previous special needs child care center that operated on the site. The ITE defines a day care center as a facility where care for preschool age children is provided during the daytime hours. Day care facilities generally include classrooms, offices, eating areas and playgrounds. This definition applies to both the previous use and the proposed use. Based on the ITE rates for Day Care Center, the proposed preschool would be expected to generate 53 gross daily vehicle trips, with 10 gross trips occurring during the weekday AM peak hour of traffic (one-hour period between 7:00 AM and 9:00 AM) and 10 gross trips occurring during the weekday PM peak hour of traffic (one-hour period between 4:00 PM and 6:00 PM). Since the previous use had the same number of children as the proposed use would ultimately accommodate (13 students), the project would result in no new vehicle trips (see Table 1). Trip Generation Study for Omei Preschool in Cupertino April 4, 2019 P a g e | 2 Table 1 Project Trip Generation Estimates AM Peak Hour PM Peak Hour Daily Daily Land Use Rate Trips Rate In Out Total Rate In Out Total Proposed Use Omei School 1 13 Children 4.09 53 0.78 5 5 10 0.79 5 5 10 Previous Use Child Care 1 13 Children 4.09 (53) 0.78 (5) (5) (10) 0.79 (5) (5) (10) Net New Trips:0 0 0 0 0 0 0 Size 1 Day Care Center (Land Use 565) average rates from ITE Trip Generation, 10th Edition (2017) were used.