HomeMy WebLinkAboutAH Packet 5-23-2019CITY OF CUPERTINO
AGENDA
ADMINISTRATIVE HEARING
5:00 PM
10300 Torre Avenue, City Hall Conference Room C
Thursday, May 23, 2019
ROLL CALL
APPROVAL OF MINUTES
Subject: Draft Minutes of April 25, 2019
Recommended Action: approve or modify the Draft Minutes of April 25, 2019
Draft Minutes of Apri 25, 2019
ORAL COMMUNICATIONS
This portion of the meeting is reserved for persons wishing to address the members on
any matter not on the agenda. Speakers are limited to three (3) minutes. In most cases,
State law will prohibit the members from making any decisions with respect to a matter
not listed on the agenda
WRITTEN COMMUNICATIONS
PUBLIC HEARINGS
Subject: Amendment to an existing Use Permit (U-2013-07) to allow a childcare
facililty to increase the hours of operation to 7:00 a.m. to 6:00 p.m.; and a
Director's Minor Modification to legalize an existing deck. Application No (s).:
M-2019-02, DIR-2019-05; Applicant(s): Maria Tzankova (Burall USA, LLC);
Location: 21685 Granada Ave. APN# 357-17-139
Recommended Action: That the Hearing Officer:
1) Find that the proposed actions are exempt from CEQA; and
2) Approve the Use Permit Amendment (M-2019-02) and the Director's Minor
Modification (DIR-2019-05) in accordance with the draft resolutions
Hearing Officer's decision final unless appealed
Page 1
May 23, 2019Administrative Hearing AGENDA
Staff Report
1 - Draft Resolution for M-2019-02
2 - Draft Resolution for DIR-2019-05
3 - Plan Set
4 - Omei Preschool Business Plan
5 - Noise Study
6 - Trip Generation Study
OLD BUSINESS
NEW BUSINESS
ADJOURNMENT
Page 2
May 23, 2019Administrative Hearing AGENDA
In compliance with the Americans with Disabilities Act (ADA), anyone who is planning
to attend the next meeting who is visually or hearing impaired or has any disability
that needs special assistance should call the City Clerk's Office at 408-777-3223, 48
hours in advance of the meeting to arrange for assistance. Upon request, in advance,
by a person with a disability, meeting agendas and writings distributed for the meeting
that are public records will be made available in the appropriate alternative format.
Also upon request, in advance, an assistive listening device can be made available for
use during the meeting.
Any writings or documents provided to a majority of the members after publication of
the agenda will be made available for public inspection. Please contact the City
Clerk’s Office in City Hall located at 10300 Torre Avenue during normal business
hours.
IMPORTANT NOTICE: Please be advised that pursuant to Cupertino Municipal
Code 2.08.100 written communications sent to the Cupertino City Council,
Commissioners or City staff concerning a matter on the agenda are included as
supplemental material to the agendized item. These written communications are
accessible to the public through the City’s website and kept in packet archives. You are
hereby admonished not to include any personal or private information in written
communications to the City that you do not wish to make public; doing so shall
constitute a waiver of any privacy rights you may have on the information provided to
the City.
Members of the public are entitled to address the members concerning any item that is
described in the notice or agenda for this meeting, before or during consideration of
that item. If you wish to address the members on any other item not on the agenda, you
may do so during the public comment.
Page 3
Cupertino, CA 95014
(408) 777-3308
ACTION MINUTES OF THE REGULAR MEETING OF
THE ADMINISTRATIVE HEARING HELD ON April 25, 2019
ROLL CALL
Hearing Officer present: Piu Ghosh, Principal Planner
Staff present: Gian Martire, Associate Planner
Applicant(s) present: John Barton (project Architect)
APPROVAL OF MINUTES:
1.February 28, 2019
The minutes of February 28, 2019 were approved as written
POSTPONEMENTS/REMOVAL FROM CALENDAR:
None
ORAL COMMUNICATIONS:
None
WRITTEN COMMUNICATIONS:
None
PUBLIC MEETING ITEMS:
2. Application No.(s): INT-2019-01
Applicant:John Barton (Checker residence)
Location: 10376 Amistad Court APN#s: 342-45-014
Front Yard Interpretation to designate Amistad Court as the front lot line and Voss Avenue as the side
lot line to facilitate an 841 square foot, first floor addition to an existing single family residence
Administrative Hearing Officer’s decision final unless appealed.
Staff member Martire addressed the Hearing Officer. He explained that the property is on the
corner of Voss Avenue and Amistad Court. The sloped lot was originally developed in 1977. In
order for the applicant to be able to construct the proposed addition, they need to reorient the
front lot line to meet the setback requirements and to maintain the development pattern in the
neighborhood which is to have corner lots facing into the cul-de-sacs. This will also help to
ensure that future development projects in the neighborhood maintain this pattern.
Hearing Officer Ghosh clarified that this residence is the only residence to have a front yard on
Voss Avenue per the current corner lot interpretation as it is the shorter side. She reviewed the
2 Administrative Hearing
April 25, 2019
site plan. Staff member Martire reiterated that a small area of the garage wall would become
non-conforming with this interpretation, but no changes are proposed to this area. The
Hearing Officer noted that the new addition has a large bay window a small portion of which
will encroach into the front yard setback. Staff member Martire stated that the encroachment
of the walk in bay window is very minor so is not obtrusive.
The project Architect, John Barton, addressed the Hearing Officer. He said that the house was
built and operates such that Amistad Court is the front of the house. He has worked with Staff
to keep the house in conformance regarding the setbacks.
The Hearing Officer opened the public comment period.
There were no speakers.
The Hearing Officer closed the comment period.
The Hearing Officer confirmed that the deck proposed in the back meets all the setback and
height requirements per the accessory structure ordinance. The Hearing Officer concurs with
the findings for the designation of the front lot line along Amistad Court.
DECISION: The application was approved by the Hearing Officer per the draft resolution(s).
ADJOURNMENT
Respectfully submitted:
_____/s/Beth Ebben
Beth Ebben
Deputy Board Clerk
ADMINISTRATIVE HEARING STAFF REPORT
Agenda Date: May 23, 2019
SUBJECT
Amendment to an existing Use Permit (U-2013-07) to consider allowing a childcare
facility to increase the hours of operation to Monday through Friday, 7:00 a.m. to 6:00
p.m., and a Director's Minor Modification to legalize an existing deck. (Application
No(s).: M-2019-02 and DIR-2019-05; Applicant: Maria Tzankova (Omei Preschool);
Location: 21685 Granada Avenue; APN: 357-17-139)
RECOMMENDED ACTION
That the Hearing Officer:
1. Find that the proposed actions are exempt from CEQA; and
2. Approve the Use Permit Amendment (M-2019-02) and the Director’s Minor
Modification (DIR-2019-05) in accordance with the draft resolutions (Attachments 1
and 2).
DISCUSSION:
Project Data:
General Plan Designation Neighborhood Commercial/Residential
General Plan Special Area Monta Vista Village Special Area
Zoning Designation P (CN, ML, Res 4 - 12) – Planned Neighborhood
Commercial, Light Industrial, Residential
Specific Plan Monta Vista Design Guidelines
Lot Area 6,000 sq. ft. (0.14 acres)
Building Area Existing Proposed
2,091 sq. ft.No Change
Parking Required Proposed
Automobile 2 2
Project Consistency With:
General Plan Yes
Monta Vista Specific Plan Yes
M-2019-02 21685 Granada Avenue May 23, 2019
DIR-2019-05 Page 2
Zoning Yes
Environmental Assessment Categorically Exempt per Sections 15301 (Class 1) and
1504 (Class 4) of the California Environmental Quality
Act (CEQA)
Background:
Site Description
The project site is located within the
Monta Vista Village Special Area,
south of Stevens Creek Boulevard
and within the block bounded by
Pasadena Avenue, Imperial Avenue
and Granada Avenue (Figure 1).
Surrounding uses include mixed-
use office-residential to the north,
south, and west; and residential and
industrial uses to the east.
The site was originally developed as
a single-family residence under
Santa Clara County jurisdiction. In
1980, the site was annexed to the
City of Cupertino and rezoned to
P(CN, ML, Res 4-12), Planned
Neighborhood Commercial, Light Industrial, and Residential (Z-1980-40). In 1985, the
Planning Commission approved a Use Permit (U-1985-17) to convert the existing single-
family residence to a two-story office building. The site is subject to the Monta Vista
Design Guidelines.
Previous Approvals
In 2013, the Planning Commission approved a Use Permit (U-2013-07) to allow a non-
profit special needs childcare facility, Organization of Special Needs Families (OSF), to
operate Monday through Friday between 2:00 p.m. and 6:30 p.m. and Saturday from 1:00
p.m. to 4:00 p.m. with up to 13 students, ages five to 22. The existing Use Permit for the
special needs childcare facility remains active as OSF suspended operations at the project
site less than one year from the date of application for the Use Permit modification (M-
2019-02) and Director’s Minor Modification (DIR-2019-05).
Application Requests
The applicant, Maria Tzankova, representing Omei Preschool, is requesting an
Amendment to the existing Use Permit (U-2013-07) to consider allowing a childcare
Figure 1: Aerial Photo
M-2019-02 21685 Granada Avenue May 23, 2019
DIR-2019-05 Page 3
facility to increase the hours of operation to Monday through Friday, 7:00 a.m. to 6:00
p.m., and a Director's Minor Modification to legalize an existing deck constructed
without appropriate permits.
The Municipal Code grants the authority to review Amendments to Use Permits (Minor)
to the Administrative Hearing Officer. The Director’s Minor Modification Permit may be
approved administratively; however, since the permit is applied for concurrently with a
permit that needs a higher level of review, both permits must be reviewed by the
Administrative Hearing Officer at a public hearing.
Analysis:
Modification to Use:
The proposed childcare use is designed to provide care for preschool aged children
between the ages of three and five. The operating hours of the proposed preschool would
extend to 7:00 a.m. to 6:00 p.m. on weekdays, where the hours of operation previously
approved were from 2:00 p.m. to 6:00 p.m. In addition to the main preschool program
from 8:30 a.m. to 4:00 p.m., Omei Preschool will also offer the option of Before-School
Care starting at 7:00 a.m., and After-School Care until 6:00 p.m. on weekdays. No
operations are proposed on the weekend.
The existing Use Permit allows the site to operate with 13 students. No changes are
proposed to the maximum number of students at the site. Omei Preschool proposes
enrollment in two phases: phase one will be limited to nine children, and phase two will
increase enrollment to a maximum of 13 children. Preschool operations will be limited to
the first-floor, while the uses on the second-floor will be limited to storage and
administrative office space for the preschool, not to be accessed by students.
The proposed preschool will be subject to review by the California State Department of
Community Care Licensing, and shall comply with the requirements of the Building
Division, Public Works Department, and the Santa Clara County Fire Department prior
to final occupancy. The proposed use is consistent with the uses allowed with the existing
Use Permit (U-2013-07) for the site.
Site Improvements:
As part of this application, the applicant is requesting the following site improvements:
Legalization of the existing side-yard deck
Front-yard fence
Installation of additional landscaping
The applicant was issued a zoning code violation in October 2018 for illegally
constructing a six-foot front-yard fence, where a maximum three-foot high fence is
M-2019-02 21685 Granada Avenue May 23, 2019
DIR-2019-05 Page 4
allowedby the Monta Vista Design Guidelines. Code Enforcement also discoveredafront
and side-yard deck constructed on the property without a permit. In response to the
violation notice, the applicant: (1) removed the six-foot fence, (2) removed the front-yard
deck, and (3) applied for the Director’s Minor Modification (DIR-2019-05) to ensure
proper permits are in place for the conforming side-yard portion of the deck.
The applicant is proposing a new three-foot white picket fence along the front-property
line with landscaping consistent with the Monta Vista Design Guidelines. The side-yard
wood deck measures 304 sq. ft. with a deck-height of 16-inches above natural grade and
complies with the Accessory Buildings/Structures Ordinance, Chapter 19.100 of the
Cupertino Municipal Code. Therefore, no changes are necessary to the side-yard deck.
Finally, per the existing Use Permit (U-2013-07), the applicant is also required to plant a
landscape strip as a buffer between the parking area and the rear property line. The
applicant will comply with this provision at this time prior to obtaining final occupancy
of the site.
Outdoor Play Area:
State law requires childcare centers to provide 75 square-feet of outdoor play area per
child. The existing childcare facility provides approximately 810 square-feet of outdoor
play area. Omei Preschool could allow up to 10 children outside at any time based on the
state’s standards (See Table 1 below). However, at this time, the business program
anticipates seven children outside at any time.
Table 1: Outdoor Play Area calculations
Required by State Law 75 square feet per child
Outdoor play area – Provided 810 square feet
Potential number of children outside during
outdoor play time 10
The existing outdoor play area consists of turf and pavement in the rear northwest corner
of the property and a wood deck along the western side-yard. No outdoor play
equipment is proposed.
Noise:
A Noise Impact and Mitigation Study (Attachment 5) for Omei Preschool was prepared
by Environmental Consulting Services. The purpose of the study was to determine the
extent to which noise generated by the preschool could impact the closest adjacent
residences. The noise study indicated that the nearest sensitive receptors for noise
generated by the project are mixed-use, office and residential, buildings to the west,
northwest, and south of the property.
M-2019-02 21685 Granada Avenue May 23, 2019
DIR-2019-05 Page 5
Chapter 10.48: Community Noise Control of the Cupertino Municipal Code limits noise
during daytime hours (weekdays, 7:00 a.m. to 8:00 p.m.) on residential properties to 60
decibels (dBA) and allows for brief daytime noise incidents that last less than 15-minutes
during any two-hour period to be 65 dBA. Outdoor activities for the preschool are
scheduled in the morning from 10:30 a.m. to 11:30 a.m. and in the afternoon from 3:00
p.m. to 4:00 p.m. The preschool outdoor play area is located 45 feet from the nearest
residential use and is separated by a parking lot and a six-foot wood fence bordering the
outdoor play area on the west side and rear property lines. Due to the distance and the
existing wood fence barrier, the expected noise levels at the nearest residences range from
45 to 53 dBA.
The noise study concluded that the preschool activities would be within the City’s Noise
Ordinance limits, would not create any noticeable noise impacts, and would result in a
“less than significant” noise impact on nearby properties.
Parking and Traffic:
The project meets the parking requirement of two on-site parking spaces (1 space for
every 6.5 students per Municipal Code). The applicant has indicated that as part of their
traffic management strategy, parents will be instructed to park in the parking lot during
pick-up and drop-off. After parking, parents and guardians will be required to walk their
child to the preschool and sign in/out with a full signature. Omei Preschool will assign
families specific drop-off and pick-up time slots (Figure 2) to help reduce traffic impacts
to adjacent properties.
The applicant does not anticipate more than three families to arrive for Before-School
Care at this time. If more students enroll for the Before-School Care, Omei Preschool will
inform the families of their designated drop-off and pick-up times. The Preschool will
provide parents their designated drop-off and pick-up times with their enrolment
paperwork and retain a signed
acknowledgment for their
records. Drop-off for the main
preschool program will occur
between 8:30 a.m. and 9:00 a.m.,
with parents having the option
of early drop-off for Before-
School Care. The preschool will
inform parents and teachers to
not arrive on-site prior to 7:00
a.m. in an agreement.
Figure 2: Example Drop-Off Schedule for Omei Preschool
M-2019-02 21685 Granada Avenue May 23, 2019
DIR-2019-05 Page 6
The primary pick-up time is scheduled from 3:30 p.m. to 4:00 p.m., and from 5:45 p.m. to
6:00 p.m. for After-School Care pick-up. Late pick-up after 6:00 p.m. is not available.
A Trip Generation Study (Attachment 6) was prepared by Hexagon Transportation
Consultants, Inc. to determine the projected number of net new weekday AM and PM
peak hour trips generated by the proposed preschool. The trip generation study
concludedthat the proposed preschool would not result in any netnew vehicle trips since
the previous use operated with the same number of children. Therefore, the proposed
use would not create a significant impact on traffic requiring additional mitigation.
Environmental Review
This project is categorically exempt from the requirements of the California
Environmental Quality Act (CEQA) per Sections 15301: Existing Facilities and 15304:
Minor Alterations to Land.
Other Department/Agency Review
The City’s Public Works Department; Building Division; Environmental Programs
Division; and the Santa Clara County Fire Department have no objections to the project.
Their pre-hearing comments have been incorporated as conditions of approval in the
draft resolutions.
PUBLIC NOTICING AND COMMUNITY OUTREACH
The following table is a brief summary of the noticing for this project:
Notice of Public Hearing Agenda
Site Signage (at least 10 days prior to hearing)
Legal ad placed in newspaper
(at least 10 days prior to hearing)
51 notices mailed to property owners 300
feet from the project site (at least 10 days prior
to the hearing)
Posted on the City's official
notice bulletin board (five days
prior to hearing)
Posted on the City of
Cupertino’s Web site (five days
prior to hearing)
No comments have been received at the time of production of this staff report.
PERMIT STREAMLINING ACT
This project is subject to the Permit Streamlining Act (Government Code Section 65920 –
65964). The City has complied with the deadlines found in the Permit Streamlining Act.
Project Received: January 28, 2019; Deemed Incomplete: February 27, 2019
Revisions Received: February 27, 2019; Deemed Incomplete: March 28, 2019
Revisions Received: March 29, 2019; Deemed Incomplete: April 26, 2019
Revisions Received: April 30, 2019; Deemed Complete: May 2, 2019
M-2019-02 21685 Granada Avenue May 23, 2019
DIR-2019-05 Page 7
Since this project is Categorically Exempt, the City has 60 days (until July 2, 2019) to make
a decision on the project.
CONCLUSION
Staff recommends approval of the Use Permit Amendment and Director’s Minor
Modification, as the proposed preschool will not create adverse traffic, noise, or safety
impacts to the surrounding area and all of the findings for approval of the proposed
project, consistent with Chapter 19.156 of the Cupertino Municipal Code, may be made
as reflected in the draft resolutions.
With respect to the Use Permit Amendment, the following findings may be made:
1. The proposed development and/or use, at the proposed location, will not be
detrimental or injurious to property or improvements in the vicinity, and will not be
detrimental to the public health, safety, general welfare, or convenience.
The proposed childcare facility will not be detrimental or injurious to property or
improvements in the vicinity, and will not be detrimental to the public health, safety general
welfare, or convenience. The noise output from the proposed use complies with the Noise
Ordinance and would result in a less than significant impact to adjacent properties. Traffic
from the project would result in no net new PM peak hour trips. The traffic management
strategy strives to reduce traffic impacts on surrounding properties by utilizing the on-site
parking lot and assigning a drop-off and pick-up time slots for each family enrolled. The
proposed use provides a convenience to the community.
2. The proposed development and/or use will be located and conducted in a manner in
accord with the Cupertino Comprehensive General Plan, underlying zoning
regulations, and the purpose of this title and complies with the California
Environmental Quality Act (CEQA).
The proposed project is consistent with, and will be conducted in a manner in accordance with,
the General Plan, Zoning Ordinance, and the Monta Vista Specific Planand is consistent with
previous approvals. The proposed use will be reviewed further by the CA State Department of
Community Care Licensing, the Santa Clara County Fire Department, and the Cupertino
Building Division, and Public Works Department to ensure compliance with rules and
regulations for preschools. Furthermore, the use is categorically exempt under CEQA in that
the proposed project involves minor changes to an existing use.
With respect to the Director’s Minor Modification, the following findings may be made:
1. The application is a minor change to a plan, which has received site and design
approval.
M-2019-02 21685 Granada Avenue May 23, 2019
DIR-2019-05 Page 8
The site modifications including the legalization of an existing side-yard deck, the construction
of a front-yard fence, and the installation of landscaping are minor changes to an existing site.
No other exterior modifications are proposed as part of this project.
2. The proposed development and/or use will be located and conducted in a manner in
accord with the Cupertino Comprehensive General Plan, underlying zoning
regulations, and the purpose of this title and complies with the California
Environmental Quality Act (CEQA).
The proposed project is consistent with the General Plan and Zoning Ordinance. The side-
yard deck complies with the Accessory Buildings/Structures Ordinance and the proposed fence
complies with the requirements of the Monta Vista Design Guidelines. Furthermore, the
proposed modifications to the site are categorically exempt under CEQA in that involves
negligible change to an existing use or site.
NEXT STEPS
Should the project be approved, the Hearing Officer’s decision on this project is final
unless an appeal is filed within 14 calendar days of the date of the mailing of the decision.
All approvals granted by the Hearing Officer shall go into effect after 14 days.
Upon project approval, the applicant will be able to submit building permit drawings to
enable construction to commence. These approvals expire on May 23, 2021, at which time
the applicant may apply for a one-year extension.
Prepared by: Erika Poveda, Assistant Planner
Reviewed and Approved by:Piu Ghosh, Principal Planner
ATTACHMENTS
1. Draft Resolution for M-2019-02
2. Draft Resolution for DIR-2019-05
3. Plan Set
4. Omei Preschool Business Plan
5. Noise Study
6. Trip Generation Study
CITY OF CUPERTINO
10300 Torre Avenue
Cupertino, California 95014
DRAFT RESOLUTION
OF THE ADMINISTRATIVE HEARING OFFICER OF THE CITY OF
CUPERTINO AMENDING AN EXISTING USE PERMIT TO ALLOW A
CHILDCARE FACILITY TO INCREASE THE HOURS OF OPERATION TO
MONDAY THROUGH FRIDAY 7:00 A.M. TO 6:00 P.M. LOCATED AT 21685
GRANADA AVENUE
SECTION I: PROJECT DESCRIPTION
Application No.:M-2019-02
Applicant:Maria Tzankova (Omei Preschool)
Location:21685 Granada Avenue (APN: 357-17-139)
SECTION II: FINDINGS
WHEREAS, the Administrative Hearing Officer of the City of Cupertino received an
application for an amendment to an existing Use Permit (U-2013-07) to allow a childcare
facility to increase the hours of operation to Monday through Friday, 7:00 a.m. to 6:00
p.m.;
WHEREAS, the project is categorically exempt from the California Environmental
Quality Act (CEQA); and
WHEREAS, the necessary public hearing notices have been given as required by the
Procedural Ordinance of the City of Cupertino, and the Administrative Hearing Officer
has held at least one public hearing in regard to the application; and
WHEREAS, the applicant has met the burden of proof required to support said
application; and
WHEREAS, the Administrative Hearing Officer finds:
1. The proposed development and/or use, at the proposed location, will not be
detrimental or injurious to property or improvements in the vicinity, and will not be
detrimental to the public health, safety, general welfare, or convenience.
The proposed childcare facility will not be detrimental or injurious to property or
improvements in the vicinity, and will not be detrimental to the public health, safety general
welfare, or convenience. The noise output from the proposed use complies with the Noise
Draft Resolution M-2019-02 May 23, 2019
Page 2
Ordinance and would result in a less than significant impact to adjacent properties. Traffic
from the project would result in no net new PM peak hour trips. The traffic management
strategy strives to reduce traffic impacts on surrounding properties by utilizing the on-site
parking lot and assigning a drop-off and pick-up time slots for each family enrolled. The
proposed use provides a convenience to the community
2. The proposed development and/or use will be located and conducted in a manner in
accord with the Cupertino Comprehensive General Plan, underlying zoning
regulations, and the purpose of this title and complies with the California
Environmental Quality Act (CEQA).
The proposed project is consistent with, and will be conducted in a manner in accordance with,
the General Plan, Zoning Ordinance, and the Monta Vista Specific Plan and is consistent with
previous approvals. The proposed use will be reviewed further by the CA State Department of
Community Care Licensing, the Santa Clara County Fire Department, and the Cupertino
Building Division, and Public Works Department to ensure compliance with rules and
regulations for preschools. Furthermore, the use is categorically exempt under CEQA in that
the proposed project involves minor changes to an existing use.
NOW, THEREFORE, BE IT RESOLVED:
That after careful consideration of maps, facts, exhibits, testimony and other evidence
submitted in this matter, subject to the conditions, which are enumerated in Sections III,
IV, and V of this Resolution beginning on Page 2 thereof, the Administrative Hearing
Officer finds that the application is exempt from CEQA and Application No. M-2019-02 is
hereby approved; and that the sub-conclusions upon which the findings and conditions
specified in this Resolution are based and contained in the public hearing record
concerning Application U-2019-02 as set forth in the Minutes of the Administrative
Hearing Meeting of May 23, 2019, and are incorporated by reference as though fully set
forth herein.
SECTION III: CONDITIONS ADMINISTERED BY THE COMMUNITY
DEVELOPMENT DEPARTMENT
1. APPROVED EXHIBITS
Approval is based on the plan set entitled “Omei Preschool, 21685 Granada Ave.,
Cupertino, CA” consisting of three sheets labeled as A0.1, A.02, and A.03, and a
Business Planconsisting of five sheets, prepared by Omei Preschool, except as may
be amended by conditions in this resolution.
2. ACCURACY OF PROJECT PLANS
The applicant/property owner is responsible to verify all pertinent property data
including but not limited to property boundary locations, building setbacks,
Draft Resolution M-2019-02 May 23, 2019
Page 3
property size, building square footage, any relevant easements and/or
construction records. Any misrepresentation of any property data may invalidate
this approval and may require additional review.
3. ANNOTATION OF THE CONDITIONS OF APPROVAL
The conditions of approval set forth shall be incorporated into and annotated on
the first page of the building plans.
4. CONCURRENT APPROVAL CONDITIONS
The conditions of approval contained in file no. DIR-2019-05 shall be applicable to
this approval.
5. PREVIOUS CONDITIONS OF APPROVAL
All previous conditions of approval, in accordance with U-2013-07 shall remain in
effect except as may be amended by conditions contained in this resolution.
6. ALLOWED USES
Approval is granted for a preschool/childcare facility use to operate Monday
through Friday, between the hours of 7:00 a.m. and 6:00 p.m. with a maximum of
13 enrolled students on site at any given time. Preschool/childcare operations shall
be limited to the first-floor, while the second-floor will be limited to storage and
administrative office space for the preschool and shall not be accessed by students.
Any changes in the operational parameters outside of this approval must be
reviewed and approved by the City. Planning Staff has the ability to approve
minor modifications to the business plan as long as the changes are consistent with
any applicable Building and/or Fire Codes and City parking requirements.
7. FUTURE REVIEW OF USE PERMIT
In the event of any documented substantial problems and/or violations, the City
reserves the right to review this use permit at any time for imposing additional
conditions of approval or revocation of the use permit.
8. EXPIRATION
If the use for which this permit is granted and utilized has ceased or has been
suspended for one year or more, this use permit amendment (M-2019-02) and the
existing use permit (U-2013-07) shall be deemed expired and a new use permit
application must be applied for and obtained.
9. BUSINESS LICENSE
Prior to final occupancy, the business owner shall obtain a City of Cupertino
business license.
Draft Resolution M-2019-02 May 23, 2019
Page 4
10. TRAFFIC MANAGEMENT PLAN
The preschool operator will inform parents/guardians of enrolled students that in
the interest of being good neighbors drop-off and pick-up must occur on-site and
during scheduled drop-off and pick-up times. Parents and teachers shall not arrive
on-site prior to 7:00 a.m. Late pick-up after 6:00 p.m. is not available.
These requirements shall be provided in the form of acknowledgments with the
student enrollment documentation. The acknowledgments shall be signed by the
responsible parents/guardians concurrent with student enrollment, and shall be
retained by the applicant/operator. The City may request proof that the
acknowledgements have been received and signed by parents/guardians of
enrolled students at any time.
11. PARKING
Per the Parking Regulations Ordinance, Cupertino Municipal Code Chapter
19.124, there shall be a minimum of two available parking stalls on-site (1 space
for every 6.5 students). On-street parking shall not be designated for student drop-
off or pick-up.
12. NOISE CONTROL
The outdoor play area schedule shall be limited as indicated in the Business Plan.
Noise levels shall not exceed those as listed in the Community Nosie Control
Ordinance, Cupertino Municipal Code Chapter 10.48. If there are documented
violations of the Community Noise Control Ordinance, the Director of
Community Development has the discretion to require noise attenuation measures
to comply with the ordinance.
13. CITY STREET TREE
A City street tree may be required to be planted prior to final occupancy upon
further review by the Public Works Department. Should the Director of Public
Works require a City street tree, a tree grate will be required pursuant to the Monta
Vista Design Guidelines.
14. SIGNAGE
Signage is not approved with this use permit application. The applicant shall be
required to submit an application for signage prior to installation of any signage
on site. Signage shall conform to the City’s Sign Ordinance.
15. CONSULTATION WITH OTHER DEPARTMENTS
The applicant is responsible to consult with other departments and/or agencies
with regard to the proposed project for additional conditions and requirements.
Draft Resolution M-2019-02 May 23, 2019
Page 5
Any misrepresentation of any submitted data may invalidate an approval by the
Community Development Department.
16. INDEMNIFICATION
Except as otherwise prohibited by law, the applicant shall indemnify and hold
harmless the City, its City Council, and its officers, employees and agents
(collectively, the “indemnified parties”) from and against any claim, action, or
proceeding brought by a third party against one or more of the indemnified
parties or one or more of the indemnified parties and the applicant to attack, set
aside, or void this Resolution or any permit or approval authorized hereby for the
project, including (without limitation) reimbursing the City its actual attorneys’
fees and costs incurred in defense of the litigation. The applicant shall pay such
attorneys’ fees and costs within 30 days following receipt of invoices from City.
Such attorneys’ fees and costs shall include amounts paid to counsel not otherwise
employed as City staff and shall include City Attorney time and overhead costs
and other City staff overhead costs and any costs directly related to the litigation
reasonably incurred by City.
17. NOTICE OF FEES, DEDICATIONS, RESERVATIONS OR OTHER EXACTIONS
The Conditions of Project Approval set forth herein may include certain fees,
dedication requirements, reservation requirements, and other exactions. Pursuant
to Government Code Section 66020(d) (1), these Conditions constitute written
notice of a statement of the amount of such fees, and a description of the
dedications, reservations, and other exactions. You are hereby further notified that
the 90-day approval period in which you may protest these fees, dedications,
reservations, and other exactions, pursuant to Government Code Section 66020(a),
has begun. If you fail to file a protest within this 90-day period complying with
all of the requirements of Section 66020, you will be legally barred from later
challenging such exactions.
SECTION IV: CONDITIONS ADMINSTERED BY THE PUBLIC WORKS
DEPARTMENT
18. REVOCABLE ENCROACHMENT PERMIT
Developer shall apply a revocable encroachment permit for the proposed
landscaping within the public right of way.
19. CURB AND GUTTER IMPROVEMENTS
Curbs and gutters, sidewalk, and driveway repairs may be required in accordance
with grades and standards as specified by the Director of Public Works.
Draft Resolution M-2019-02 May 23, 2019
Page 6
20. DRAINAGE
Grading and drainage shall be provided to the satisfaction of the Director of Public
Works. Show all existing and proposed downspouts from the roof. Install splash
blocks at all downspouts to ensure roof water is directed away from the
foundation.
21. IMPROVEMENT AGREEMENT
The project developer shall enter into a development agreement, if applicable,
with the City of Cupertino providing for payment of fees, including but not limited
to checking and inspection fees, storm drain fees, park dedication fees and fees for
under grounding of utilities. Said agreement shall be executed prior to issuance of
construction permits (or prior to Final/Parcel map approval).
a. Checking & Inspection Fees Per current fee schedule ($857)
b. Storm Drainage Fee Per current fee schedule ($9,471 per AC)
c. Traffic Impact Fee Per current fee schedule ($6,236 per new peak-
hour trip). Due only if project generates new PM
peak-hour trips.
d. Encroachment Permit Fee To be determined
e. Bond: Encroachment Bond 115% of off-site improvements, if applicable
The fees described above are imposed based upon the current fee schedule
adopted by the City Council. However, the fees imposed herein may be modified
at the time of recordation of a final map or issuance of a building permit in the
event of said change or changes, the fees changed at that time will reflect the then
current fee schedule.
SECTION V: CONDITIONS ADMINSTERED BY THE BUILDING DIVISION
22. BUILDING PERMIT ISSUANCE
The applicant shall consult with the City Building Division to obtain the necessary
building permits for the on-site alterations. The use permit amendment shall be
considered null and void and of no effect if a building permit is not filed and
accepted by the City within the expiration date specified in the municipal code. In
the event that a building permit expires for any reason, the use permit shall be null
and void.
PASSED AND ADOPTED this 23rd day of May, 2019 at a noticed Public Hearing of the
Administrative Hearing Officer of the City of Cupertino, State of California, held by the
Director of Community Development, or his or her designee, pursuant to Cupertino
Municipal Code Section 19.12.120.
Draft Resolution M-2019-02 May 23, 2019
Page 7
ATTEST:APPROVED:
________________________
Erika Poveda Benjamin Fu
Assistant Planner Acting Community Development Director
CITY OF CUPERTINO
10300 Torre Avenue
Cupertino, California 95014
DRAFT RESOLUTION
OF THE ADMINISTRATIVE HEARING OFFICER OF THE CITY OF CUPERTINO
ALLOWING SITE MODIFICATIONS AT AN EXISTING CHILDCARE FACILITY,
INCLUDING THE LEGALIZATION OF AN EXISTING DECK, THE CONSTRUCTION
OF A FRONT-YARD FENCE, AND THE INSTALLATION OF LANDSCAPING
LOCATED AT 21685 GRANADA AVENUE.
SECTION I: PROJECT DESCRIPTION
Application No.:DIR-2019-05
Applicant:Maria Tzankova (Omei Preschool)
Location:21685 Granada Avenue (APN: 357-17-139)
SECTION II: FINDINGS
WHEREAS, the Administrative Hearing Officer of the City of Cupertino received an
application to allow for site modifications at an existing childcare facility, including the
including the legalization of an existing side-yard deck, the construction of a front-yard
fence, and the installation of landscaping;
WHEREAS, the project is categorically exempt from the California Environmental
Quality Act (CEQA); and
WHEREAS, the necessary public hearing notices have been given as required by the
Procedural Ordinance of the City of Cupertino, and the Administrative Hearing Officer
has held at least one public hearing in regard to the application; and
WHEREAS, the applicant has met the burden of proof required to support said
application; and
WHEREAS, the Administrative Hearing Officer finds:
1. The application is a minor change to a plan which has received site and designs
approval;
The site modifications including the legalization of an existing side-yard deck, the construction
of a front-yard fence, and the installation of landscaping are minor changes to an existing site.
No other exterior modifications are proposed as part of this project.
Draft Resolution DIR-2019-05 May 23, 2019
Page 2
2. The proposed development and/or use will be located and conducted in a manner in
accord with the Cupertino Comprehensive General Plan, underlying zoning
regulations, and the purpose of this title and complies with the California
Environmental Quality Act (CEQA).
The proposed project is consistent with the General Plan and Zoning Ordinance. The side-
yard deck complies with the Accessory Buildings/Structures Ordinance and the proposed fence
complies with the requirements of the Monta Vista Design Guidelines. Furthermore, the
proposed modifications to the site are categorically exempt under CEQA in that involves
negligible change to an existing use or site.
NOW, THEREFORE, BE IT RESOLVED:
That after careful consideration of maps, facts, exhibits, testimony and other evidence
submitted in this matter, subject to the conditions, which are enumerated in Section III and
IV ofthis Resolution beginning on Page 2thereof, the Administrative Hearing Officer finds
that the project is exempt from CEQA and Application No. DIR-2019-05 is hereby
approved; and that the sub-conclusions upon which the findings and conditions specified
in this Resolution are based and contained in the public hearing record concerning
Application DIR-2019-05 as set forth in the Minutes of the Administrative HearingMeeting
of May 23, 2019, and are incorporated by reference as though fully set forth herein.
SECTION III: CONDITIONS ADMINISTERED BY THE COMMUNITY
DEVELOPMENT DEPARTMENT
1. APPROVED EXHIBITS
Approval is based on the plan set entitled “Omei Preschool, 21685 Granada Ave.,
Cupertino CA” consisting of three (3) sheets labeled as A0.1, A.02, and A.03, and
a Business Plan consisting of five (5) sheets, prepared by Omei Preschool, except
as may be amended by conditions in this resolution.
2. ACCURACY OF PROJECT PLANS
The applicant/property owner is responsible to verify all pertinent property data
including but not limited to property boundary locations, building setbacks,
property size, building square footage, any relevant easements and/or
construction records. Any misrepresentation of any property data may invalidate
this approval and may require additional review.
3. ANNOTATION OF THE CONDITIONS OF APPROVAL
The conditions of approval set forth shall be incorporated into and annotated on
the first page of the building plans.
Draft Resolution DIR-2019-05 May 23, 2019
Page 3
4. FENCING
The proposed front-yard fence shall meet the fence standards of the Monta Vista
Design Guidelines.
5. CONCURRENT APPROVAL CONDITIONS
The conditions of approval contained in file no. M-2019-02 shall be applicable to
this approval.
6. PREVIOUS CONDITIONS OF APPROVAL
All previous conditions of approval, in accordance with U-2013-07, Resolution
No.6721 as approved by the Planning Commission on August 13, 2013, shall
remain in effect except as may be amended by conditions contained in this
resolution.
7. CITY STREET TREE
A City street tree may be required to be planted prior to final occupancy upon
further review by the Public Works Department. Should the Director of Public
Works require a City street tree, a tree grate will be required pursuant to the Monta
Vista Design Guidelines.
8. CONSULTATION WITH OTHER DEPARTMENTS
The applicant is responsible to consult with other departments and/or agencies
with regard to the proposed project for additional conditions and requirements.
Any misrepresentation of any submitted data may invalidate an approval by the
Community Development Department.
9. INDEMNIFICATION
Except as otherwise prohibited by law, the applicant shall indemnify and hold
harmless the City, its City Council, and its officers, employees and agents
(collectively, the “indemnified parties”) from and against any claim, action, or
proceeding brought by a third party against one or more of the indemnified
parties or one or more of the indemnified parties and the applicant to attack, set
aside, or void this Resolution or any permit or approval authorized hereby for the
project, including (without limitation) reimbursing the City its actual attorneys’
fees and costs incurred in defense of the litigation. The applicant shall pay such
attorneys’ fees and costs within 30 days following receipt of invoices from City.
Such attorneys’ fees and costs shall include amounts paid to counsel not otherwise
employed as City staff and shall include City Attorney time and overhead costs
and other City staff overhead costs and any costs directly related to the litigation
reasonably incurred by City.
Draft Resolution DIR-2019-05 May 23, 2019
Page 4
10. NOTICE OF FEES, DEDICATIONS, RESERVATIONS OR OTHER EXACTIONS
The Conditions of Project Approval set forth herein may include certain fees,
dedication requirements, reservation requirements, and other exactions. Pursuant
to Government Code Section 66020(d) (1), these Conditions constitute written
notice of a statement of the amount of such fees, and a description of the
dedications, reservations, and other exactions. You are hereby further notified that
the 90-day approval period in which you may protest these fees, dedications,
reservations, and other exactions, pursuant to Government Code Section 66020(a),
has begun. If you fail to file a protest within this 90-day period complying with
all of the requirements of Section 66020, you will be legally barred from later
challenging such exactions.
SECTION IV: CONDITIONS ADMINSTERED BY THE BUILDING DEPARTMENT
11. BUILDING PERMIT ISSUANCE
The applicant shall consult with the City Building Division to obtain the necessary
building permits for the on-site alterations. The use permit amendment shall be
considered null and void and of no effect if a building permit is not filed and
accepted by the City within the expiration date specified in the municipal code. In
the event that a building permit expires for any reason, the use permit shall be null
and void.
PASSED AND ADOPTED this 23rd day of May, 2019 at a noticed Public Hearing of the
Administrative Hearing Officer of the City of Cupertino, State of California, held by the
Director of Community Development, or his or her designee, pursuant to Cupertino
Municipal Code Section 19.12.120.
ATTEST:APPROVED:
________________________
Erika Poveda Benjamin Fu
Assistant Planner Acting Community Development Director
NO.DESCRIPTION DATE
01 - WIP Work in Progress
JOB NO. :
SHEET NO.
DATE:
SCALE:
DRAWN BY:
BUZZ BRYAN, ARCHITECT C20561
REVISIONS
A.014/29/2019Plotted On:4/29/2019
AS NOTED
SITE / ROOF PLAN
IF THE ABOVE DIMENSION DOES
NOT MEASURE ONE INCH (1")
EXACTLY, THIS DRAWING WILL HAVE
BEEN ENLARGED OR REDUCED,
AFFECTING ALL LABELED SCALES.
1" ACTUAL
OMEI
PRESCHOOL
21685 GRANADA AVE
CUPERTINO,CA
12/31/19
2'-2"7'-2"6'-8"12'-2"3'-1"5'-3"
10'-7"8'-8"10'-5"15'-8"25'-10"13'-2"41'-6"5'9'-3"4'8'-6"9'-1"8'2'-7 1/2"
13'-4"4'-8"18'24'9'-3"36' -2"2'-2"
23'-2"
3'-2"20'
10'-7"8'-8"15'-8"25'-10"13'-2"9'-3"4'3 X 6 R.W. JST @ 16" O.C.2'6'-6"4'4 X 6 R.W.4 X 6 R.W.4 X 6 R.W.NN
0 4'8'16'SCALE: 1/8" = 1'-0"1 SITE PLAN
SCALE: 1/4" = 1'-0"2 DECK FRAMING PLAN
PROPOSED WD. DECK
LEVEL LANDING PLAY AREA
DECK HEIGHT 16" - 304 S.F.
(E) 6' WD. FENCE
(E) 6 ' WD. FENCE
(E) 6' WD.
FENCE
PROPERTY
LINE
(N) 6' WD. FENCE
W/ 3' X 6' GATE
(E) INTERLOCKING
PAVERS (PERVIOUS)
EXIST'G R.W.RAMP
MAX 1 : 12
HANDRAIL BOTH
SIDES
EXIST'G RW. DECK
LEVEL LANDING. HGT. 16"
LEVEL
LANDING
8.5 X 22' STD. PARKING
STALL
(E) ACCESSIBLE PATH
(E) ACCESSIBLE PATH
(N) 3' FENCE /GATE W /
PICKETS COLOR : WHITE
(E) 6' WD. FENCE + GATE
TYP. 10 X 10 PRECAST CONC .
BEARING BLOCK - WET SET IN
16" X 16" X 10" CONC. PAD.
SIMPSON CB46 AT EA . BM.
CONNECTION
TYP 4 X 6 RW WALL LEDGER
SECURE TO SOLID BLOCKING
W/ 5/8" X 6" LAG BOLT W/
WASHER 32" O.C.
(E) SYNTHETIC TURF AREA
TYPICAL 1" X 5 1/2" EXT.
WD. DECK - TREX OR EQ.
(E) SHRUB -
PHOTINA TO REMAIN
(N) L/S PLANTING -
AGAPANTHUS /24" O.C.
/ 1 GAL / BLUE
(E) GAS MTR
(E) ELEC.MTR
NEW L/S AREA 50 S.F. -
(N) SHRUBS - COREOPSIS MARITIMA
/SEA DAHLIA/ 18" O,C, / 1 GALLON
(N) RIVER ROCK GROUND
COVER - RIVER ROCK
COBBLE DRAINAGE
DISSIPATOR
70% - 2" - 4" /30"%- 4" - 8"
PROPERTY
LINE
(N) L/S PLANTER EDGING -
VIGORO HEAVY DUTY
PROFESSIONAL 5" HGT.
STAKE 36" O.C. (BLACK)
(E) DRAIN SWALE.
NO DRAINAGE ONTO
NEIGHBORING PROPERTIES
(E) DRAIN SWALE
(E) 4' FENCE BARRIER
NO CONCENTRATED
FLOW ACROSS R.O.W.
NO DRAINAGE ONTO
NEIGHBOR PROPERTIES
(E) 6' WD. FENCE
(E) MAX. 3' TALL SIDEYARD
FENCE WITHIN FRONT YARD
SETBACK
(E) 6' WD. FENCE
& GATE
(E) STUDENT VEGGIE
GARDEN AREA
DIRECT ALL DOWN SPOUTS
/ SPLASHBLOCKS AWAY
FROM FOUNDATION
(E) CONC. SLAB
LEVEL LANDING
DASHED ROOF LINE
GRANADA AVENUE
60.00
100.00'EXISTING BUILDING
(E) SYNTHETIC
TURF L/S
60.00 L/S
(E)
L/S
LEVEL
LEVELLEVEL PROJECT DATA:
ARCHITECT : B. BRYAN, ARCHITECT C20561 / EMAIL: cyberbuz@sbcglobal.net / 408 -257 -7500
OWNER: M. TZANKOVA / EMAIL: maria_tzankova@yahoo.de / 408 -444 -0635
SCOPE OF WORK: NEW WD. DECK 304 S.F.
NEW 6' WD. FENCE 13 L.F.
NEW 3' WD. FENCE 32 L.F.
L/S PLANTING 278 S.F
TOTAL OUTDOOR AREA : 3,909 S.F.
HOURS OF OPERATION: 7 A.M. - 6 P.M.
APN : 357 -17 -139
ADDRESS: 21685 GRANADA AVENUE
ZONE: P (CN, ML, RES. 4 -12 )
OCCUPANCY E/ S-2
TYPE OF CONST: VB, NO SPRINKLER
LOT SIZE: 6,000 S.F.
BUILDING AREA: 2,091 S.F.
FLOOR AREA RATIO: 34.85 %
PARKING PROVIDED : 1 (H/C) + 1 = 2
PARKING REQUIRED : 1 (H/C) + 1 = 2 MIN. 1 PARKING STALL PER 6.5 CHILDREN PER CMC SECT.19124.040A
PROPOSED USE: 1ST FLR : EDUCATIONAL ( 13 PRESCHOOL STUDENTS) GROUP E
2ND FLR: LOW HAZARD STORAGE GROUP S-2
NUMBER OF STORIES: 2 STORY
BUILDING HEIGHT: 24' -2"
OUTDOOR AREA: CALIF. DEPT. OF SOCIAL SERVICES - 810 S.F.
ALLOWABLE BLDG . AREA: 1,272/9,500 (E) + 819/(13,500) = > 0.19 < 1 PER SECT. 58.4.2
WM
COTG
SBL SBL SBL
(E)
6" LOC
(E)
6" LOC
(E)
6" LOC
(E)
6" LOC
(E)
6" LOC
(E)
6" LOC
(E)
6" LOC
(E)
6" LOC
(E)
6" LOC
(E)
6" LOC
(E)
6" LOC
(E)
6" LOC
(E)
6" LOC
SBL (E) (E) (E) (E) (E) (E) L/S
PLAY AREA
506 S.F.
(E) FRONT L/S AREA 228 S.F. -
PROPOSED NEW WOOD DECK
1 FRONTAGE VIEW OF DECK 2 CLOSE UP VIEW OF DECK 3 REAR VIEW OF DECK
4' CLR
(E)
L/S
(E)
L/S
(E)
L/S
(E)
L/S
(E)
L/S
NO.DESCRIPTION DATE
01 - WIP Work in Progress
JOB NO. :
SHEET NO.
DATE:
SCALE:
DRAWN BY:
BUZZ BRYAN, ARCHITECT C20561
REVISIONS
A.024/18/2019Plotted On:4/18/2019
AS NOTED
SITE CONTEXT
IF THE ABOVE DIMENSION DOES
NOT MEASURE ONE INCH (1")
EXACTLY, THIS DRAWING WILL HAVE
BEEN ENLARGED OR REDUCED,
AFFECTING ALL LABELED SCALES.
1" ACTUAL
OMEI
PRESCHOOL
21685 GRANADA AVE
CUPERTINO,CA
12/31/19
100'60'100'
N05'10'20'SCALE: 1" = 10'1 SITE CONTEXT PLAN
0 5'10'20'SCALE: 1" = 10'2 SITE CONTEXT SOUTH ELEVATION
AUTOMOTIVE BUILDING BEYOND
TYP. PROPERTY LINE
TYP. PROPERTY LINE
TYP. PROPERTY LINE
TYP. ON-STREET
PARKING
10070 PASADENA AVE
MIXED USE :
OFFICE/ RETAIL / RESIDENTIAL
21865 GRANADA AVE.
EDUCATIONAL /
LIGHT STORAGE AUTOMOTIVE REPAIR
DETACHED GARAGE
10075 IMPERIAL AVE
RESIDENTIAL
DRIVEWAY /
PARKING
DRIVEWAY /
PARKING
REAR YARD
MIXED USE
DRIVEWAY /
PARKING
DRIVEWAY /
PARKING REAR YARD
10070 PASADENA AVE.21685 GRANADA AVE.10075 IMPERIAL AVE.
PASADENA AVE.IMPERIAL AVE
MIXED USE :
OFFICE/ RETAIL / RESIDENTIAL
PASADENA AVENUEIMPERIAL AVENUEGRANADA AVENUE
70 '28 '
75 '
52 '
30 '
60 '100 '100 '50 '50 '100 '25 '25 '45 '
NO.DESCRIPTION DATE
01 - WIP Work in Progress
JOB NO. :
SHEET NO.
DATE:
SCALE:
DRAWN BY:
BUZZ BRYAN, ARCHITECT C20561
REVISIONS
A.035/15/2019Plotted On:5/15/2019
AS NOTED
FLOOR PLANS
IF THE ABOVE DIMENSION DOES
NOT MEASURE ONE INCH (1")
EXACTLY, THIS DRAWING WILL HAVE
BEEN ENLARGED OR REDUCED,
AFFECTING ALL LABELED SCALES.
1" ACTUAL
OMEI
PRESCHOOL
21685 GRANADA AVE
CUPERTINO,CA
12/31/19
2'-2"7'-2"6'-8"12'-2"3'-1"5'-3"
10'-7"8'-8"10'-5"15'-8"25'-10"13'-2"N
0 2'4'8'SCALE: 1/4" = 1'-0"1 FIRST FLOOR PLAN
0 2'4'8'SCALE: 1/4" = 1'-0"2 SECOND FLOOR
CLASS ROOM 2
CLASS ROOM 1
CLASS ROOM 1
RESTROOM
FOYER
STAFF R 00M
STORAGE RM .
OPEN TO BELOWCLASS ROOM 3
SNACK
BAR
UP
CLO
DN
EXT. WD.
DECK LEVEL
LANDING
304 S.F.
EXT. WD.
DECK LEVEL
LANDING
EXT. RDWD.
DECK LEVEL
LANDING
RAMP
1 : 12
SLOPE
RESTROOM
RESTROOM
STORAGE RM .
NO INTERIOR WORK PROPOSED FOR THIS APPROVAL
OMEI Preschool, 21685 Granada Ave., Cupertino, CA 95014
BUSINESS PLAN
Submitted by
Omei Preschool
November 2018
OMEI Preschool, 21685 Granada Ave., Cupertino, CA 95014
Summary
Since its opening in 2008 Omei Academy has served the community of Cupertino by
providing excellent Chinese Cultural Classes. The courses provided meet the needs of
students of various ethnic backgrounds whose interest and desire is to learn Chinese
Language, Folk Dance and Martial Arts and many other forms of Chinese Arts and
culture. Omei Academy has successfully developed over the years tutoring and after
school programs, where students have achieved great academic results and won many
awards in martial arts competitions.
With its diverse population Cupertino is one of the most progressive and
technologically fast developing residence in Northern California. The families of
Cupertino are also known to place a high value on education, reflected by the city’s
award winning school system. Education, innovation and collaboration are the
hallmarks nourished by the city government, the community, and local industry and
commerce.
As the demand in the community for bilingual activities is very strong, Omei
Academy plans to expand by operating a preschool “Omei Preschool” for children
years 3-5 before entering Kindergarten in the building at 21685 Granada Ave.,
Cupertino. Its location is situated in a Neighborhood/Commercial Zone. The building
is strategically located near the city center and is easily assessable. Given that the
majority of the area’s commercial buildings are occupied by tech – companies, whose
employees are mostly family oriented, preschool programs such as those available at
Omei Preschool are in demand.
Description of Operation Activities:
Phase I
Omei Academy proposes the use of the location at 21685 Granada Ave., Cupertino as
Omei Preschool. At the moment the facility can be licensed for 9 children, according
to the state licensing requirements. One qualified teacher will be employed. Main
hours of operation will be 8:30am – 4:00pm with the option of before school care
7:00am – 8:30am and after school care 4:00-6:00pm, Monday to Friday. If summer
program is available hours of operation and number of children/teachers will remain
the same as during the regular time.
OMEI Preschool, 21685 Granada Ave., Cupertino, CA 95014
Daily activities will include:
7:00-8:30am Before School Care
_____________________________________________________________________
8:30-9:00am Arrival. Morning Routine
9:00-9:20am Morning Circle Time: Calendar, Message of the Day,
Group Activity. Music and Movement
9:20-9:40am Transition Time/Snack Time
9:40-10:10am Foreign Language Activities (Mandarin)
10:10-10:40am STEM Program
10:40-11 :20am Outside Play Time
11 :20-11 :30am Handwashing. Bathroom Routine
11 :30am-11 :40pm Transition Time
11:40am-12:30pm Lunch /does not include play time outside/
12:30-2:00pm Nap
2:00-2:15pm Recreational Activities
2:15-2:30pm Snack
2:30-3:00pm Math Games
3:00-3:40pm Outside Play Time
3:40-4:00pm Learning Centers
4:00-6:00pm After School Care
4:00-4:45pm Special Program
4:45-5:00pm Transition Time/Bathroom Routine
5:00-5:30pm Small Motor Skills Development
5:30-6:00pm Learning Centers
6:00pm Pick Up Time
The maximum number of children being outside at the same time will be 7.
Special Program:
Monday: Cooking
Tuesday: Performing Arts
Wednesday: Experiments
Thursday: Entertainment ( Magic)
Friday: Sports
Before School Care Daily Activities:
Monday: My family
Tuesday: Our Community
Wednesday: Arts and Crafts
Thursday: Work and Occupation
Friday: Awesome Animals
OMEI Preschool, 21685 Granada Ave., Cupertino, CA 95014
Courses of emphasis during the school year are:
Chinese Language – Teaching children to speak and listen. Introduction to reading
and writing
STEM – As a part of our daily life we set as a priority childrens’ exposure to science
and capturing their interest. Exploring together STEM related activities in a fun way
improves childrens’ social skills; designing and creating improves their fine motor
skills and develops their process of thinking, which will lead to innovation later.
Math – Daily activities teaching numbers concepts
Sports – Omei Academy Cupertino is known all over the world for its Chinese Martial
Arts Champions. Starting martial arts classes at early age brings the benefit of better
concentration, discipline and higher achievements. The Friday Sports activities at
Omei Preschool will be age and developmentally appropriate and concentrated
indoors.
Phase II
Omei Academy hopes to increase the number of children to 13 in near future. From
these 13 children we expect to have about 3 children attending the Before school care
( 7-8.30am), and 3-4 children attending the After school care (4-6pm).
There will be one teacher on site. Both owners Maria Tzankova and Yunjian Zou are
finger printed and will be helping the main teacher with supervising the children in
and outdoor whenever necessary. Maria Tzankova is enrolled at De Anza College,
Child Development Department, she has the units to be teacher ’s aide and is expected
to finish her Director Permit by the end of the year.
Drop off and Pick up:
Before School Care Drop Off: Parents can drop off between 7-7.15am for Before
School Care. Teachers will arrive no earlier than 7am.
Main Drop Off: Parents will drop off between 8.30-9:00am for the main hours of
operation
Main pick up time: Main pick up time will be between 3:30-4pm.
After School Care Pick up: After School Care pick up will be between 5.45-6pm.
Late pick up: Late pick up is not available for the parents.
Traffic Management:
The parking in the back will be used for drop off and pick up. The car will then back
up and leave the property. All parents will be provided information and acknowledge
OMEI Preschool, 21685 Granada Ave., Cupertino, CA 95014
the drop off/pick up plan.
Our facility will accommodate a maximum of 13 children. Since we ex pect some of
the kids to be dropped off in the Before School Care between 7 and 7:15am, and in
addition to this we give the parents a 30 min range to drop off in the main time
between 8:30 and 9am, we don’t expect a vehicle overflow. Pick up will follow a
similar procedure. The drop off and pick up time is spread out and will be arranged
for a specific time with every family at enrollment, so we can create a schedule with
the exact time every child will come in.
Parents need to bring their children in and sign them in with a full signature. We will
follow the same procedure at pick up.
Parents can drop off their children the earliest 7am and should pick up the latest at
6pm.
Conclusion
The owner of Omei Academy has confidence in the program provided and believes
that it can grow serving the community in a friendly and professional way.
Environmental Consulting Services * * * Saratoga
______________________________________________________________________________________
Environmental Consulting Services 18488 Prospect Road – Suite 1, Saratoga, CA 95070
Phone: (408) 257-1045 stanshell99@toast.net
______________________________________________________________________________________
March 29, 2019
Ms. Erika Poveda
Assistant Planner
Planning Division - City of Cupertino
10300 Torre Avenue
Cupertino, CA 95014
RE: Noise Impact and Mitigation Study for Omei Preschool,
21685 Granada Avenue, Cupertino
Dear Ms. Poveda,
In response to your request I have evaluated the potential noise impacts that could be produced at
nearby residential receptor locations by the proposed new preschool activities at the planned Omei
Preschool in Cupertino. The report discusses the present environment, the proposed project and its
associated noise-related aspects, the potential new activities and operational noise impacts at the nearest
receptors in the area, and compliance with Cupertino noise guidelines.
To summarize the conclusions of the report, the proposed changes to the on-site activities would
meet the City noise ordinance limitations and would not produce any significant noise disturbance in the
vicinity of the site.
Project Description [1] [2]
The proposed new preschool activity would provide weekday daytime care for toddler and preschool-
age kids on the subject site. Its purpose is to provide Chinese culture classes to meet the needs of students
of various ethnic backgrounds, who desire to learn Chinese language, folk dance, martial arts and many
other forms of Chinese arts and culture. The preschool proposes to use the several rooms of the building
and outdoor play yard as they exist at present without modification. The property is in a Neighborhood/
Commercial zone. The site and its immediate neighbors are shown in Exhibit 1. There is a six-foot wood
fence bordering the outdoor play area on the west and a four-foot fence on the north property line shared
with the adjacent residential areas. Temporary parking for drop-off and pickup of children can use the two
spaces on the property and several street parking spaces near the site. One of the spaces on site is a
handicapped space.
School Program [2] [3]
The preschool program would serve up to 9 kids initially (13 kids in the future as permitting is
available), ages 3 through 5, with a staff of 1+, on a normal workday schedule of 7:00 am to 6:00 pm,
Monday through Friday year-round. The primary hours of school operation will be 8:30am – 4:00pm, with
the option of before-school care 7:00am – 8:30am and after- school care 4:00-6:00pm, Monday through
Friday. If a summer program is available, hours of operation and the number of children/teachers would
remain the same as during the regular school year. There would be no evening or holiday activities held on
site. Inside activities would include normal school educational, creative, and play activities.
Drop off and Pick up
Before-School Care: Parents can drop off between 7-7:15 am. Main Drop Off: Parents will drop off
between 8.30-9:00am for the main hours of operation. Main pick up time: Main pick up time will be between
Omei Preschool Noise Study, Granada Avenue – Cupertino Page 2 of 5
Environmental Consulting Services * * * Saratoga
3:30-4 pm. After-School Care Pick up: After-School Care pick up will be between 5.45-6 pm. Late pick up:
Late pick up is not available for the parents.
Sensitive Receptor Locations
The project area is a mixed residential and commercial neighborhood on the south side of Stevens
Creek Boulevard in Cupertino, several blocks west of Highway 85. The nearest sensitive receptor locations
for noise generated by the project includes two-story condos adjacent to the property on the west and
northwest, and also across Granada Street to the south. Parking lots and driveways separate the school
site from the adjacent condos. The properties on the east side are commercial businesses, so they are not
considered significant receptors for preschool noise. There is a six-foot wood fence on the west property
line and a four-foot fence on the north side of the site. Other residential receptors in the area would have
less preschool noise due to increased distance and building obstruction.
Exhibit 1 - Omei Preschool and Nearby Areas
This study investigates the extent to which the closest adjacent residences could be impacted by
noise from preschool activities. The existing ambient noise environment and potential noise impacts are
discussed in the following sections.
Preschool site
Noise measurement location
Omei Preschool Noise Study, Granada Avenue – Cupertino Page 3 of 5
Environmental Consulting Services * * * Saratoga
Ambient Noise Levels and Noise Sources in the Area
Field noise measurements were made during the midmorning and midafternoon periods of March 21,
2019, with a CEL-440 Precision Noise Meter and Analyzer, calibrated with a B & K Model 4230 Sound Level
Calibrator. The measurement location was chosen to represent ambient noise levels at the site and in
adjacent key receptor locations, which have very similar noise because of the lack of nearby traffic. The
measurement location is shown in Exhibit 1.
Noise levels were measured and are reported using percentile noise descriptors, as follows: L90
(the background noise level exceeded 90 % of the time), L50 (the median noise level exceeded 50% of the
time), L1 (the peak level exceeded 1% of the time), and Leq (the average energy-equivalent noise level).
Measured noise levels are presented in Exhibit 2 below. The Ldn noise levels were computed as the long-
term average of the Leq using the daily traffic distribution in the area, with standard weighted penalties for
the nighttime hours, and modeled with an enhanced version of the National Cooperative Highway Research
Board traffic noise model [5].
EXHIBIT 2
AMBIENT NOISE LEVELS (dBA)
Omei Preschool area
Location and condition L90 L50 Leq L1 Ldn
1. Northwest corner of play area,
midmorning
43 45 48.4 58 50
2. Northwest corner of play area,
midafternoon
46 48 48.8 56 50
The primary source of ambient noise in the project area is traffic on Stevens Creek Boulevard, a
major arterial one block north of the preschool site, and the Highway 85 freeway, several blocks east of the
site. Granada Avenue and its intersecting streets are low-speed two-lane streets carrying only a few
vehicles per minute, so they do not represent a significant source of local noise. Typical vehicle passby
noise levels are in the 50-60 dBA range at 25 feet. Trucks, buses, motorcycles, and poorly-muffled vehicles
produce peak levels 5 to 15 dBA higher on passby. Large and small aircraft and helicopter overflights
create infrequent noise incidents of 50 to 60 dBA. The low noise measurements reflect the fact that near
the site traffic volumes and speeds are both low. Typical sporadic neighborhood activities are garbage
pickup and also residential yard maintenance. There are no other significant noise sources in the project
area.
Relevant Cupertino Noise Ordinance Limits [4]
Section 10.48.040 of the Cupertino Noise Ordinance is applicable to this project, which limits noise
during daytime hours (7 am to 8 pm) on residential property to 55 dBA, and 50 dBA during evening hours
(8pm to 7am). In addition, brief daytime noise incidents are allowed with somewhat higher noise levels by
Ordinance section 10.48.050. For example, noise incidents that last less than 15 minutes during any two
hour period are allowed to be 5 dB higher than the long-term general limits.
Omei Preschool Noise Study, Granada Avenue – Cupertino Page 4 of 5
Environmental Consulting Services * * * Saratoga
Potential Omei Preschool Noise Impacts
Outdoor playground activities
Outdoor activities would occur in the existing play area in the northwest corner of the site, as shown
in Exhibit 1. This fenced area has a concrete sidewalk, with some grass, foliage and trees. Several types of
play activities would be included in the back yard area for the post-toddler kids, including sand toys, hula
hoops, group games, and other appropriate outdoor play activities. Outdoor play times are scheduled
between 10:30 and 11:30 am, and from 3 to 4 pm, with kids having appropriate amounts of time during each
period.
All of the project noise would be from sporadic voices of the young kids during outdoor play periods.
Activities of this type can create intermittent brief noise from voices of 50 to 60 dBA at a distance of 25-35
feet within the play yard. The two closest adjacent residences are approximately 40-45 feet from the play
yard, with wood fences intervening. Distance and the property line wood fences reduce the play yard noise
at each the nearest residences by 8-10 dBA. Hence the expected worst-case noise levels from kids voices
at the nearest residences are 45 to 53 dBA, which is less than the 55 dBA Cupertino daytime noise limit,
and this would only occur for short periods during the morning and afternoon play periods.
Project Traffic Noise
Because of the relatively small number of kids at the school and the associated small number of drop-
off and pick-up trips generated (less than 15 during each period), no noticeable increase in traffic noise
would be generated by the preschool operation.
Temporary Construction Noise
There is no new construction associated with the Omei Preschool project.
Conclusions and Summary
Overall ambient noise levels in the project area now depend primarily on Stevens Creek Boulevard
and Highway 85 traffic noise, and these will continue to be the dominant noise sources in the area in the
foreseeable future. The primary noticeable noise would be intermittent and brief voice incidents from young
children in the play area adjacent to the preschool building. With the informal type of play activities, the age
of the kids, and the distances and/or fence protection involved, these activities would be within City noise
ordinance limits, and would not create any noise impacts in the adjacent residential areas. Thus, the new
preschool use would not create any noticeable noise impact and would result in a “Less than Significant”
noise impact on any nearby properties
If I may be of further assistance on this project, please do not hesitate to contact me.
Respectfully submitted,
Stan Shelly
H. Stanton Shelly
Acoustical Consultant
Board Certified Member (1982)
Institute of Noise Control Engineering
Omei Preschool Noise Study, Granada Avenue – Cupertino Page 5 of 5
Environmental Consulting Services * * * Saratoga
REFERENCES
1. Project drawings A.01, A.02 and A.03 - Omei Preschool, Bryan Architects & Assoc, Cupertino, CA;
Jan 2019,
2. Business Plan - Omei Preschool; November 2018.
3. Discussion with Maria Tzankova, project owner, about planned preschool operations; March 2019.
4. Noise Ordinance, Municipal Code Section 10.48, Noise levels for residential and commercial zones; City
of Cupertino.
5. Highway Noise - A Design Guide for Highway Engineers, National Cooperative Highway Research
Program Report 117, Highway Research Board, National Academy of Sciences, Washington, D.C.,
1971 (model enhanced and field validated by ECS).
Memorandum
Date: April 4, 2019
To: Ms. Erika Poveda, City of Cupertino
From: Brian Jackson
Subject: Trip Generation Study for Omei Preschool at 21685 Granada Avenue in Cupertino, CA
Hexagon Transportation Consultants, Inc. has completed a trip generation study for a proposed
preschool at 21685 Granada Avenue in Cupertino, California. The existing building on the site
previously housed a special needs child care center, which had an enrollment of 13 children and
one teacher. The proposed Omei Preschool also would accommodate an enrollment of up to 13
children and one teacher. The preschool’s main hours of operation would be from 8:30 AM to 4:00
PM on weekdays (Monday – Friday) and would serve children 3 to 5 years of age. Optional student
care would be provided before school from 7:00 to 8:30 AM, and after school from 4:00 to 6:00 PM.
The purpose of this trip generation study is to document the projected number of net new AM and
PM peak hour vehicle trips generated by the proposed preschool. The City of Cupertino typically
does not require preparation of a comprehensive transportation impact analysis, including an
evaluation of intersection level of service, for projects deemed “small”. For small projects, a trip
generation analysis usually is sufficient. The reason the City typically does not require more
extensive traffic analysis for small projects is because once the project-generated AM and/or PM
peak hour trips are assigned to the roadway network based on the inbound/outbound splits, the
trips disperse, and the number of new trips added to any one intersection is effectively negligible.
Accordingly, City of Cupertino staff have indicated that a trip generation study will suffice for the
proposed project.
Project Trip Generation
Hexagon prepared trip estimates based on trip generation rates obtained from the ITE Trip
Generation Manual, 10th Edition (2017). The average AM and PM peak hour trip generation rates
for Day Care Center (Land Use Category 565) were applied to both the proposed project and the
previous special needs child care center that operated on the site. The ITE defines a day care
center as a facility where care for preschool age children is provided during the daytime hours. Day
care facilities generally include classrooms, offices, eating areas and playgrounds. This definition
applies to both the previous use and the proposed use.
Based on the ITE rates for Day Care Center, the proposed preschool would be expected to
generate 53 gross daily vehicle trips, with 10 gross trips occurring during the weekday AM peak
hour of traffic (one-hour period between 7:00 AM and 9:00 AM) and 10 gross trips occurring during
the weekday PM peak hour of traffic (one-hour period between 4:00 PM and 6:00 PM). Since the
previous use had the same number of children as the proposed use would ultimately accommodate
(13 students), the project would result in no new vehicle trips (see Table 1).
Trip Generation Study for Omei Preschool in Cupertino April 4, 2019
P a g e | 2
Table 1
Project Trip Generation Estimates
AM Peak Hour PM Peak Hour
Daily Daily
Land Use Rate
Trips Rate In Out Total Rate In Out Total
Proposed Use
Omei School 1 13 Children 4.09 53 0.78 5 5 10 0.79 5 5 10
Previous Use
Child Care 1 13 Children 4.09 (53) 0.78 (5) (5) (10) 0.79 (5) (5) (10)
Net New Trips:0 0 0 0 0 0 0
Size
1 Day Care Center (Land Use 565) average rates from ITE Trip Generation, 10th Edition (2017) were used.