January 10, 196810300 Torre Avenue, Cupertino, California 95014 Phone: 252-�505
C I T Y O F C U P E R T I N 0
California
MINUTES OF THE ARCHITECTURAL & SITE CONTROL COMMITTEE MEETING OF
JANUARY 10, 1968
TIME: 8:00 P.M.
PLACE:
I
II
III
IV
V
Council Chambers, 10300 Torre Avenue, Cupertino
SALUTE TO THE FLAG
ROLL- CALL -
Comma present: Comm. Aguilar, Fitch, Irwin
Comm. absent: Comm. Klausmeyer, Kowitz
Staff present: William D. Benevich
COMMUNICATIONS
A._';Wr.tten There were none
B. Verbal - There were none
MINUTES OF THE ARCH. & SITE CONTROL COMMITTEE MEETING OF
DECEMBER 27, 1967.
Moved by Comm. Aguilar, seconded by Comm. Fitch, to approve
the..Minutes of December 27, 1967
AYES: Comm. Aguilar, Fitch, Irwin
NAYS... None
ABSENT: Comm. Klausmeyer, Kowitz
Motion carried, 3-0
APPLICATIONS'
Application: 318-HC-68, Franchise Development..Corpa,
1345 El Camino Real, Burlingame, requesting Arch. & Site
Control Approval to construct a "'Mr. Ed's" Restaurant,
to be located on the southwest corner of Bubb Rd. Ext.
and Stevens Creek Blvd.
Mr. Harry Hinton from Franchise Development Corp., represented
the application. Mr. Hinton stated that they are making a
change on the roofing material from cedar shakes to concrete
tile. They are requesting that the landscaping plan for the
building and the parking lot area be presented to the Arch.
& Site Control Cimmittee prior to final inspection of the
building.
The building is to be constructed of wood frame, white stucco
with brown trim. The interior walls of the building will be
covered with sheetrock and wood paneling. They intend to
install a drop ceiling with fire retardant acoustical and
recessed lighting fixtures. Concrete the roof will be
either earth or brown colored. It was noted on the elevations
that the fireplace will be constructed of slump stone.
Mr. Hinton stated that the parapet roof will be covered with 19,
the same roofing materials as the roof.
Chairman Irwin asked the applicant where the apurtenances
would be placed, and Mr. Hinton stated that all apurtenances
will be hidden from view within the parapet area of the roof.
Two 30 gal. trash containers will be housed within the building.
It was noted on the Planning Dept. - H-Control check list
that 17 car spaces will be required. Mr. Hinton stated they
are planning to install a minimum of 18 car spaces at this
time.
The Committee requested that a concrete berm be installed
around all landscaped areas.
Moved by Comm. Aguilar, seconded by Comm. Fitch, to recommend
for approval to the City Council Application 318-HC-68 per
plans submitted with the following conditions:
1. Concrete tile roofing to be used
2. 10 standard conditions
3. Landscaping plans showing the concrete berms to be
presented prior to final inspection of the building
AYES: Comm. Aguilar, Fitch, Irwin
NAYS: None
ABSENT: Comm. Klausmeyer, Kowitz
Motion carried, 3-0
VI UNFINISHED BUSINESS
There were none
VII NEW BUSINESS
Chairman Irwin requested that he be allowed to receive a key
to the City Hall
VII ADJOURNMENT
Meeting adjourned at 9:00 P.M.
APPROVED
/s/ Keith E. Irwin
Chairman
ATAST f /%
hief Buildi(Z�Xnspector " - 2 -