Loading...
DRC Reso 229ASA -2005-13 CITY OF CUPERTINO 10300 Torre Avenue Cupertino, California 95014 RESOLUTION NO. 229 OF THE DESIGN REVIEW COMMITTEE OF THE CITY OF CUPERTINO APPROVING AN ARCHITECTURAL AND SITE REVIEW OF A PERSONAL WIRELESS SERVICE FACILITY WITH, 3 PANEL ANTENNAS LOCATED ON THE ROOF OF AN EXISTING TWO-STORY OFFICE BUILDING LOCATED AT 21760 STEVENS CREEK BOULEVARD SECTION 1: PROJECT DESCRIPTION Application No.: ASA -2005-13 Applicant: Audrey Smith (for T -Mobile) Location: 21760 Stevens Creek Boulevard SECTION 11: FINDINGS WHEREAS, the necessary public notices have been given in accordance with the Procedural, Ordinance of the City of Cupertino, and the Design Review Committee has held one or more public hearings on this matter; and :r WHEREAS, the applicant has met the burden of proof required to support said application; andhassatisfied the following requirements: 1. The proposal, at the proposed location, will not be detrimental or injurious i to, Property, or improvements in the vicinity, and will not be detrimental to the Public health, Safety, general welfare, or convenience; 2. The,proposal is consistent with the. purposes of this chapter, the General Plan, and zoning ordinance; 3. Abrupt changes in building scale is avoided and a gradual transition related to height and bulk is achieved; 4. Design harmony between new structures and existing buildings is protected through the. use of consistent. or compatible design and color schemes; 5. The project complies with federal safety standards for radio frequency radiation emissions; and 6. The project is consistent 'with the City's Wireless Facilities Master Plan and Wireless Communications Facilities Ordinance. NOW, THEREFORE, BE IT RESOLVED: That after careful consideration of maps, facts, exhibits, testimony and other evidence submitted in this matter, the design review application is hereby approved subject to the conditions which are enumerated in this Resolution beginning on page 2 thereof; and Resolution No. 229 Page 2 ASA -2005-13 December 15, 2005 That the subconclusions upon which the findings and conditions specified in this resolution are based and contained in the public hearing record concerning Application ASA -2005-13 set forth in the Minutes of the Design Review Committee meeting of, December 15, 2005, and are incorporated by reference as though fully set forth herein. SECTION III. CONDITIONS ADMINISTERED BY THE COMMUNITY DEVELOPMENT DEPT. 1. APPROVED PROTECT This approval is based on the approved plan set exhibits entitled "BI -MARK STEVENS CREEK BLVD. SF -14973,21760 STEVENS CREEK BLVD. CUPERTINO, CA 95014 SANTA CLARA COUNTY" dated 10/25/05 and consisting of 5 sheets labeled T-1, A-1 through A- 4, except as may be amended by the conditions contained in this resolution. 2. NOTICE OF FEES, DEDICATIONS, RESERVATIONS OR OTHER EXACTIONS The Conditions of Project Approval set forth herein may include certain fees, dedication requirements, reservation requirements, and other exactions. Pursuant to Government Code Section 66020(d) (1), these Conditions constitute written notice of a statement of the amount of such fees, and a description of the dedications, reservations, and other exactions. You are hereby further notified that the 90 -day approval period in which you may protest these fees, dedications, reservations, and other exactions, pursuant to Government Code Section 66020(a), has begun. If you fail to file a protest within this 90 - day period complying with all of the requirements of Section 66020, you will be legally barred from later challenging such exactions. 3. ABANDONMENT If after installation, the aerial is not used for its permitted purpose for a continuous period of 18 months, said antennas and associated facilities shall be removed. The applicant shall bear the entire cost of demolition and removal. 4. EXPIRATION DATE This use permit shall expire five (5) years after the effective date of the permit. The applicant may apply for a renewal of the use permit at which time the Planning Commissionmay review the state of wireless communication and camouflage technologies to determine if the visual impact of the personal wireless facility can be reduced. 5. FIELD MEASUREMENT OF RF RADIATION Within one month of activation of the personal wireless service facility, the applicant shall submit a report prepared by a State -licensed radio engineer documenting the actual level of radio frequency radiation emissions at the following exposure sites: 1. ground level, 30 feet away from antenna 2. 2nd floor office suite below antenna 3. 2nd floor level of adjacent office building to the east 4. same roof top exposure adjacent to antenna (indicate distance) . 1 Resolution No. 229 ASA-2005-13 December 15, 2005 Page 3 The measured results shall be compared to the relevant federal safety standards. If the measurements exceed federal standards, the engineer shall offer recommendations to achieve standards. PASSED AND ADOPTED this 15th day of December 2005, at a Regular Meeting of the Design Review Committee of the City of Cupertino, State of California, by the following roll call vote: AYES: COMMISSIONERS: Giefer, Chairperson Miller NOES: COMMISSIONERS: none ABSTAIN: COMMISSIONERS: none ABSENT COMMISSIONERS: none ATTEST: PROV Ciddy Wordell Mar filler, Chair City Planner Design Review Committee