Loading...
U-2005-17bI 10300 Torre Avenue f Cupertino, CA 95014 CITY OF (408) 777-3308 EkT I N 0 FAX (408) 777-3333 Community Development Department September 30, 2005 Mr. Larry Yamaoka Yamaoka Development, Inc. 505 S. Pastoria Avenue Sunnyvale, CA 94086 SUBJECT: PLANNING COMMISSION ACTION LETTER U-2005-17, ASA - 2005 -12 This letter confirms the decision of the Planning Commission, given at the meeting of September 27, 2005, approving a use permit and an architectural site approval to operate and make exterior changes to a restaurant and family entertainment center at an existing shopping center (Chuck E. Cheese), located at 19805 Stevens Creek Blvd., according to Planning Commission. Resolutions Nos. 6325 and 6326. Please be aware that if these permits are not used within a two-year period, they shall expire on September 27, 2007. Also, please note that an appeal of this decision can be made within 14 calendar days from the date of this letter. If this happens, you will be notified of a public hearing, which will be scheduled before the City Council. Sincerely, Colin Jun Senior Planner Cc Alice Winters, CEEC Entertainment, Inc., 4441 W. Airport Freeway, Irving, TX 75062 G: \ Planning � Post Hearing � Action Letters � 2005 � action letter u200517, asa200512.doc U-2005-17 CITY OF CUPERTINO 10300 Torre Avenue Cupertino, California 95014 RESOLUTION NO. 6325 OF THE PLANNING COMMISSION OF THE CITY OF CUPERTINO APPROVING A USE PERMIT TO OPERATE A RESTAURANT AND FAMILY ENTERTAINMENT CENTER IN AN EXISTING SHOPPING CENTER AT 19805 STEVENS CREEK BOULEVARD SECTION 1: FINDINGS WHEREAS, the Planning Commission of the City of Cupertino received an application for a Use Permit, as described in Section II of this Resolution; and WHEREAS, the necessary public notices have been given in accordance with the Procedural Ordinance of the City of Cupertino, and the Planning Commission has held one or more public hearings on this matter; and WHEREAS, the applicant has met the burden of proof required to support said application; and has satisfied the following requirements: 1) The proposed use, at the proposed location, will not be detrimental or injurious to property or improvements in the vicinity, and will not be detrimental to the public health, safety, general welfare, or convenience; 2) The proposed use will be located and conducted in a manner in accord with the Cupertino Comprehensive General Plan and the purpose of this title. NOW, THEREFORE, BE IT RESOLVED: That after careful consideration of maps, facts, exhibits, testimony and other evidence submitted in this matter, the application for Use Permit is hereby approved, subject to the conditions which are enumerated in this Resolution beginning on Page 2 thereof; and That the subconclusions upon which the findings and conditions specified in this resolution are based and contained in the public hearing record concerning Application No. U-2005-17 as set forth in the Minutes of the Planning Commission Meeting of September 27, 2005, and are incorporated by reference as though fully set forth herein. Resolution No.6325 U-2005-17 September 27, 2005 Page 2 SECTION 11: PROJECT DESCRIPTION Application No U-2005-17 Applicant- Alice Winters (Chuck E. Cheese) Location: 19805 Stevens Creek Boulevard SECTION III: CONDITIONS ADMINISTERED BY THE COMMUNITY DEVELOPMENT DEPT. 1. APPROVED EXHIBITS The recommendation of approval is based on Exhibits titled: "Chuck E Cheese's/Store #786/19625 Stevens Creek Blvd./ Cupertino, CA 95014" dated 09/21/05 and consisting of 5 sheets labeled CS. A0.0, A4.0, A9.0 and a colored elevation dated September 19, 2005, except as may be amended by the Conditions contained in this Resolution. 2. APPROVAL OF LAND USE Approval is granted for a 300 -seat restaurant with an associated entertainment center, featuring up to 90 coin-operated games and rides in an existing commercial building. 3. ENTRY DOORS Any entrance door shall be oriented toward the Stevens Creek Boulevard frontage. Doors designated for public use on the north and west sides of the building shall be signed and equipped for emergency exit only and be consistent with local building and fire codes. 4. BUILDING DESIGN CHANGES The logo parapet wall and signage shall be centered on the front elevation. 5. LANDSCAPING CHANGES The applicant shall rehabilitate the landscape strip along Portal Avenue between the rear property line and building front, adding new landscaping where there are holes and providing a low -profile shrub row near the top of the berm. Landscaping shall also be incorporated along the west building elevation. The landscape plan shall be reviewed and approved by the Community Development Director concurrent with a building permit application 6. NOTICE OF FEES, DEDICATIONS, RESERVATIONS OR OTHER EXACTIONS The Conditions of Project Approval set forth herein may include certain fees, dedication requirements, reservation requirements, and other exactions. Pursuant to Government Code Section 66020(d) (1), these Conditions constitute written notice Resolution No.6325 U-2005-17 September 27, 2005 Page 3 of a statement of the amount of such fees, and a description of the dedications, reservations, and other exactions. You are hereby further notified that the 90 -day approval period in which you may protest these fees, dedications, reservations, and other exactions, pursuant to Government Code Section 66020(a), has begun. If you fail to file a protest within this 90 -day period complying with all of the requirements of Section 66020, you will be legally barred from later challenging such exactions. 7. NOISE CONTROL Applicant shall contract with an acoustical consultant to provide a noise report evaluating Chuck E. Cheese's exterior noise levels and interior noise levels in adjacent tenant spaces and compare the levels to City noise standards. Typical noise levels should be measured in an existing Chuck E. Cheese's restaurant of a construction type comparable to the Cupertino tenant space. Recommended noise mitigation measures shall be incorporated into tenant improvement plans submitted to the City. Applicant shall also sign the parking strip abutting and parallel to the residential property line, prohibiting parking between the hours of 9 p.m. and 7 a.m. 8. SIGNAGE Signage is not approved with this use permit application. Signage shall conform to the City Sign Code. Applicant may apply for a sign exception as needed. SECTION IV: CONDITIONS ADMINISTERED BY THE PUBLIC WORKS DEPT, 9. TRASH ENCLOSURES The trash enclosure plan must be designed to the satisfaction of the Environmental Programs Division of the Public Works Department prior to building permit approval. 10. BEST MANAGEMENT PRACTICES Utilize Best Management Practices (BMP's), as required by the State Water Resources Control Board, for construction activity, which disturbs soil. BMP plans shall be included in your grading and street improvement plans. Erosion and or sediment control plan shall be provided. Resolution No.6325 U-2005-17 September 27, 2405 Page 4 PASSED AND ADOPTED this 27tH day of September 2005, at a Regular Meeting of the Planning Commission of the City of Cupertino, State of California, by the following roll call vote:: AYES: COMMISSIONERS: Chairperson Wong NOES: COMMISSIONERS: ABSTAIN: COMMISSIONERS: ABSENT: COMMISSIONERS: ATTEST: Chen, Giefer, Vice -Chair Miller, Saadati & / s/ Steve Piasecki Steve Piasecki Director of Community Development G: CupertinofPl anrtinglPDReport/RESIU-2 005-17 APPROVED: /s/ Gilbert Wong Gilbert Wong, Chairperson Planning Commission E 'a chi 'm U zm z� W U x tt n 'pZ ssuE Dm; zi SEP-. xa N CS LIST OF CONTACTS INDEX TO DRAWINGS- 001 — ECE >a!e'a a�,,=�„m c STORE # 786 SEPTEMBER 21, 2005 AmTRG%M 19625 STEVENS CREEK BLVD. CUPERTINO, CA 95014 SITE LOCATION MAP AREA LOCATION MAP PROJECT SCOPE r yM � aikmmw Ct z N r � � Hrskn PIS! Q`oA � � Yu96m mn mrnown exaaumi m � = r .n S' YaNcp v cMioleo. �_ p'kvry w ... ..�..�..... p qm way „ v 9 WnoatonD GENERAL NOTES LODE]NFOR Cupertino sovenz creek Bvd o �. Po�!al Pi � p r r' � � o. I W� wa,orp aroi ekac cu kwMvvaa ruGG ., � `. V _ ql � � U I I � VB un Avc G21 A "9z P-.- Ave Sv d �a ens p _� "k` L � �� � I a ®o mMIRCI�M nit e ur�.mmsuau � ♦w sr.1�+J Aotlre9 * ^ tlav Ct RPlorz ;� ��— _ "'"' _. .n ®ar po.uva�vu anw rwF uvrmr. mYAi m d iu A4d W y STEV—S CREEK BOULEVARD �iVlsa a p w 'c p.R Y n Cvp��ni@��pPT% � PMI � Dr ?`-P m wommu oroaoi maw A foo, uWuw� r� .1 �w�w suexc rox m .native .�aun Or _ p.+n S:tRt621 Ln moww.x noccesetrt'/ ms uf»u-tR Gi:iyea Rth-' Va Avw SharlySruy "'" � �e ru mvurnn.rsvc.w mw re. FOR REFERENCE ONLY E 'a chi 'm U zm z� W U x tt n 'pZ ssuE Dm; zi SEP-. xa N CS RETA L 5T EXISTIkS T NT .I HULK E. [.uccSE E%15TIN6 FABRG STORE 57 -CD G51 STEVENS CREEK BOULEVARD o ISITE PLAN Z 21 S— 2005 F'RZJrrT EkMMAR- TABLE RETA L 5T EXISTIkS T NT .I HULK E. [.uccSE E%15TIN6 FABRG STORE 57 -CD G51 STEVENS CREEK BOULEVARD o ISITE PLAN Z 21 S— 2005 I � O N�!rlr�Yl 02 WEVATI 11 m•r-0 CD 0 1J.._, paw RT ELEVATION t r EFS. M P�w% ®EFS -I P -i IgLYBFIQY flED Front Elevation Puildlno Pl FS/Powt(cloa e zo El 1-10 0 110 qp auausr uoox swziss saxoswess cnxoe swzws rouvaExar xEo Side Elevation 19805 Stevens Creek Blvd. Cupertino, CA - Store # 786 Exterior & Interior Remodel September 19, 2005