TUP-2019-01.pdfCITY OF CUPERTINO
10300 Torre Avenue, Cupertino, California 95014 (408) 777-3308
To: Mayor and City Council members
Chairman and Planning Commissioners
From: Benjamin Fu, Interim Director of Community Development
Prepared by: Jeffrey Tsumura, Assistant Planner
Date: February 12, 2019
Subject: Director's Temporary Use Permit, TUP-2019-01, to allow for the installation
and operation of a temporary wireless facility for a period of 12 months at
18920 Forge Drive.
Chapter 19.12.030 of the Cupertino Municipal Code allows for administrative
approval of a temporary use permit, authorizing the use of a site in any zoning
district for a temporary use. The Director reports his/her decision to the City
Council & Planning Commission in time to allow an appeal of the decision within
fourteen calendar days.
113 '40=3 COX1
The applicant, Rebecca Tolentino, on behalf of Apple, Inc., is requesting approval to allow
the installation and operation of a temporary wireless facility for a period of 12 months,
located on the office building at 18920 Forge Drive (Attachment 1).
Background
The temporary facility will be used to test equipment and fill coverage gaps while the
three carriers (Verizon Wireless, T -Mobile, and AT&T) identify permanent cell sites in
the area.
Verizon Wireless is currently pursuing a permanent wireless solution with Apple, Inc.,
with the temporary facility being used to fill coverage gaps.
Location
The subject property is an existing office complex occupied by Apple, Inc. The property
is bounded by office buildings to the north and west. Kaiser Permanente Medical Center
overflow parking is located to the east and single family residences to the south, both of
which are within the City of Santa Clara jurisdiction.
TUP-2019-01
18920 Forge Drive Temporary Wireless Facility Page 2
�Irl
I
I
�I
I
I�
(P) AT&T •`
PROJECT AREA
REFER TO PROPOSED ANTENNA PLAN _Ig
ON SHEET A-�3
I r
r
I j
u
I -Iq awmucwcew
I
nii ii u iiiu iii�������n
I
_ I
RVffPM wE
The facility is to be located at the southwesterly corner of the south and west -facing
building walls.
Equipment
The proposed equipment includes a total of six new wireless panel antennas mounted on
saddle mount brackets. Each antenna is approximately 23.6"H X 11.8"W X 3.5"D in size
and will extend up to 12 inches from the building, depending on how the antennas are
oriented. Consistent with the temporary nature of the equipment, the bracket system fits
over the building parapet and is fixed on the other side, as opposed to being installed
directly on the exterior building wall. The mounting system provides better stability and
will be painted to match the building.
Three antennas will be installed on the west -facing building wall at the southernmost
corner, and three antennas will be installed on the south -facing building wall at the
westernmost corner.
TUP-2019-01
18920 Forge Drive Temporary Wireless Facility Page 3
Elevation View
South Elevation
West Elevation
Visibility
The antennas are proposed towards the rear of the property and should not create any
visual impacts from Forge Drive. The antennas are located approximately 225 feet from
the nearest single-family residence and are further obstructed from neighboring
residences by mature coast redwood trees along the southern property line. The office
building to the west is located approximately 267 feet from the antennas, is separated by
two parking lots, and is also screened by existing perimeter trees. No impacts are
anticipated to the overflow Medical Center parking to the east.
Noise
The antennas will not run on generators or similar power sources that can cause
significant stationary noise. Additionally, the distance from nearby residential and office
uses is substantial—they are surrounded by large parking areas and further screened by
existing redwood trees. Therefore, no significant noise impacts are anticipated.
RF Study
A radio frequency (RF) energy emissions exposure report was prepared by Hammett &
Edison, Inc., to analyze the RF energy exposure of the temporary wireless equipment at
the project site (Attachment 2). The report determined that the equipment will not expose
members of the general public to hazardous levels of RF energy as determined per FCC
General Population limits. However, to prevent occupational exposures in excess of the
TUP-2019-01
18920 Forge Drive Temporary Wireless Facility
Page 4
FCC Guidelines, appropriate RF safety training and explanatory signs posted on the
antennas have been recommended to help mitigated unintended exposure during certain
maintenance activities high on the side of the building. A condition of approval has been
added to ensure these recommendations are carried out.
ACTION
The Director of Community Development deems this application as minor, and approves
the temporary COW subject to the following conditions of approval.
SECTION I: CONDITIONS ADMINISTERED BY THE COMMUNITY DEVELOPMENT DEPT.
1. APPROVED PROTECT
This approval is based on the plan set entitled "CCL04017, Apple Campus - Forge
1 Building, Rooftop, 18920 Forge Drive, Cupertino, CA 95014" consisting of 11
sheets labeled as T-1, A-1 through A-6, D-1, GN -1, GN -2, and S-1, dated January
7, 2019, except as may be amended by the following conditions.
2. ACCURACY OF PROTECT PLANS
The applicant/property owner is responsible for verifying all pertinent property
data including, but not limited to, property boundary locations, building setbacks,
property size, building square footage, any relevant easements and/or
construction records. Any misrepresentation of any project data may invalidate
this approval and require additional review.
3. DURATION
The wireless antennas and all associated equipment shall be removed from the site
no later than 12 months after installation, or March 1, 2020, whichever occurs first.
The Applicant shall notify the City when the equipment is installed. A new
Temporary Use Permit with updated justification shall be submitted to the City
for review and approval prior to the Temporary Use Permit expiration.
4. BUILDING PERMIT REQUIRED
Issuance of a building permit shall be required prior to installation of proposed
equipment and facilities.
5. RF SAFETY MITIGATIONS
RF Safety measures are required to protect the health of workers and contractors
authorized to work on equipment located on the building rooftop. These measures
include:
TUP-2019-01
18920 Forge Drive Temporary Wireless Facility
Page 5
a) Appropriate RF safety training, to include review of personal monitor use and
lockout/tagout procedures, be provided to all authorized personnel who have access
to the antennas.
b) No access within six feet directly in front of the antennas themselves while the
pertinent group of antennas are in operation, unless other measures can be
demonstrated to ensure that occupational protection requirements are met.
c) Explanatory/RF warning signs and carrier contact information be posted on the
antennas, readily visible from any angle of approach to persons who might need to
work within that distance.
6. ANNOTATION OF THE CONDITIONS OF APPROVAL
The conditions set forth shall be attached to, incorporated into, or annotated on the first
page of the building plans.
7. CONSULATION WITH OTHER DEPARMENTS
The applicant is responsible to consult with other departments and/or agencies with
regard to the proposed project for additional conditions and requirements. Any
misrepresentation of any submitted data may invalidate an approval by the Community
Development Department.
8. INDEMNIFICATION
To the extent permitted by law, the Applicant shall indemnify and hold harmless the City,
its City Council, its officers, employees and agents (the "indemnified parties") from and
against any claim, action, or proceeding brought by a third party against the indemnified
parties and the applicant to attack, set aside, or void this ordinance or any permit or
approval authorized hereby for the project, including (without limitation) reimbursing
the City its actual attorneys' fees and costs incurred in defense of the litigation. The City
may, in its sole discretion, elect to defend any such action with attorneys of its choice.
9. NOTICE OF FEES, DEDICATIONS, RESERVATIONS OR OTHER EXACTIONS
The Conditions of Project Approval set forth herein may include certain fees, dedication
requirements, reservation requirements, and other exactions. Pursuant to Government
Code Section 66020(d) (1), these Conditions constitute written notice of a statement of the
amount of such fees, and a description of the dedications, reservations, and other
exactions. You are hereby further notified that the 90 -day approval period in which you
may protest these fees, dedications, reservations, and other exactions, pursuant to
Government Code Section 66020(a), has begun. If you fail to file a protest within this 90 -
day period complying with all of the requirements of Section 66020, you will be legally
barred from later challenging such exactions.
This approval of the temporary use permit is effective February 6, 2019. The fourteen (14) calendar
appeal period will expire on February 20, 2019.
TUP-2019-01
18920 Forge Drive Temporary Wireless Facility
Attachments
Attachment 1—
Plan Set
Attachment 2
— RF Study
Attachment 3
— Coverage Maps
P:\PDREPORT\DIR-TUPreports\TUP REPORTS \ 2019 \ TUP-2019-01.docx
Page 6