CC Resolution No. 05-056
RESOLUTION NO. 05-056
A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF CUPERTINO
RESCINDING RESOLUTION NO. 04-291 AND ESTABLISHING USER FEES
WHEREAS, the State of California requires fees charged for service rendered not to exceed
the cost of delivering said services; and
WHEREAS, a public hearing has been held to review user fees; and
WHEREAS, the City Council of the City of Cupertino has established guidelines for setting
user fees;
NOW, THEREFORE, BE IT RESOLVED that:
1. User fees are established per attachments A through E.
2. All user fees previously established by Council action or resolution are hereby
superseded.
3. User fees are effective July 1,2005.
PASSED AND ADOPTED at a special meeting of the City Council of the City of Cupertino
this 5th day of April 2005 by the following vote:
Vote
Members of the City Council
AYES:
NOES:
ABSENT:
ABSTAIN:
Lowenthal, Sandoval, Wang
Kwok
James
None
,
A~
Mayor, City of Cupertino
ATTEST:
t4~Ú¡~ Jm.-t,{
City Clerk
CITY OF CUPERTINO
SUMMARY OF USER FEES
Resolution 05-056/ April 5, 2005 and 05-072/May 3, 2005
Fees Effective July 1, 2005
Department Schedule
General A
Engineering B
Planning C
Building D
Recreation E
CITY OF CUPERTINO
Resolution 05-056/April 5, 2005 and 05-072/May 3, 2005
Fees Effective July 1, 2005
Schedule A - General
Photocopies - per sheet
Microfilm/Microfiche Printout
Budget Documents
Comprehensive Annual Financial Reports (cAFR)
Returned Check Charge
Late Payment on 30 Day Delinquent City Invoices
Property Liens Administrative Fee
Municipal Code Book
Williamson Act Filings
Candidate Statement Fee
Tape Dubbing - Audio, Video, DVD, CD
VHS
DVD
CD Webcast/cD Audio
DV cAM/BETA cAM
U-Matic
MiniDV
Audio Cassette
Notary Fee
Fingerprinting Processing
Handbill Permit
Renewals
Solicitor Permit (Includes fingerprinting)
Renewals
Massage Establishment Fee (Includes fmgerprinting/background check and
business start-up inspection)
Establishment with Therapist Permit
Renewals (Includes two inspections per year)
Massage Therapist Fee (Includes fingerprinting/background check)
Therapist with Managing Employee
Renewals
$0.20
$0.50/ftame
$50.00
$30.00
$25.00
12% per annum
$30 per book/blocklparcel
lien
$77.00
$105.00
$2,474.00
$12.00/tape
$20.00/DVD
$12.00/cD
$50.00/tape
$25.00/tape
$30.00/DV
$1. OO/tape
$10.00/signature
State Fee $32.00 Plus
$12.00 City Admin. Fee
$93.00
$26.00
$140.00
$26.00
$274.00
$320.00
$136.00
$184.00
$230.00
$46.00
CITY OF CUPERTINO
Resolution 05-056/ April 5, 2005 and 05-072/May 3, 2005
Fees Effective July 1,2005
Schedule A - General (continued)
Massage Managing Employee (Includes fingerprinting/background check)
Managing Employee with Therapist Permit
Renewals
Massage Permit Appeal (Denial/Revocation)
Taxi Driver Permits (Includes fingerprinting and background check)
Renewals
All Municipal Code Parking Violations
eve Parking Citation Dismissals Administrative Fee
Noise Variances
Duplicate Business Licenses
Business License Exemption Administrative Fee
Business License Database
New Business Monthly Reports
Community Festivals
Farmers Market
Flea Markets
Sign Removal (Public Right-of-Way)
Dangerous Dog Annual Registration Fee
Internet Processing Fee
False Alarms
Police Disturbances
Abatement Fee
Compilation of New Records (For information requests greater than 1/2 hour.)
Graffiti Cleanup
2
$184.00
$230.00
$46.00
$145.00
$184.00
$46.00
$35.00
$25.00
$140.00
$20.00
$60.00
$100.00
20.00/month
$8.00/day/vendor
$2.00/weeklvendor
$8.50/month/vendor
$15.00/sign
$177.00
$2.00/transaction
$130.00
Actual Cost ·
Actual Cost ·
Actual Cost ·
Actual Cost ·
CITY OF CUPERTINO
Resolution 05-056/April5, 2005 and 05-072/May 3, 2005
Fees Effective July 1, 2005
Schedule A - General (Continued)
Damage to City Property
Grounds, Streets, Facilities
Traffic - Engineering
Traffic - Maintenance
Code Enforcement
Public Requests for GIS Printed Maps
Standard pre-formatted maps
Plotted maps
Printed maps
Custom request maps
For prints or plots of aerial photography, see Engineering fees
Public Requests for GIS Data
Digital data layers for GIS Data
Custom request data layers on CDROM
Ortho-rectified aerial photography
Actual Cost -
Actual Cost -
$25.00
$2.00
Actual Cost-
$25.00/1ayer
$200.00 for all city layers
Actual Cost-
$25.00/tile
$300.00 full City of
Cupertino (15 3 tiles)
- Actual cost is: 1) Employee hourly rate plus 40% for benefits and overhead, and 2) cost of materials,
contractors and supplies.
3
CITY OF CUPERTINO
Resolution 05-056/ April 5, 2005 and 05-072/May 3, 2005
Fees Effective July 1,2005
Schedule B - Engineering
Street Cuts Miscellaneous
Cost of Improvements $10,000 or under
Cost of Improvements between $10,001 and $15,000
Cost of Improvements $15,001 and over
Utility, greater of $1 ,303 minimum or 5% of cost of improvement
Grading permit; greater of $2,000 minimum or 6% of cost of improvements
Prace1 Map/Tract Map
Parcel Map (1-4 lots)
Tract Map (> 41ots)
Plan Check & Inspection
Review of Building Permit Only
Review ofPubliclPrivate Improvement Plans:
Residential; greater of $2, 130 minimum or 5% of cost of improvements
Commercial; greater of $3,440 minimum or 6% of cost of improvements
Annexation (plus county filing fee)
Certificates of Compliance
Encroachment Permits
Residential
Non-Residential
Annual Utility Company
Pool Permit
Lot Line Adjustment
Soil & Geo Reports (plus any materiaVservice fees)
Short Report
Long Report
Geo Report Deposit
Engineering Copies
Micro fiche
Improvement Plans
Traffic ReportslPlans
Microfilm
Transportation Permit (Per Department of Transportation)
Single
Annual Utility Company
Additional Engineering Investigation or Coordination
* Price is for first sheet only. Each additional sheet is $10.00.
4
$200.00
$300.00
5% of cost
$1,303.00 minimum
$2,000.00 minimum
$3,250.00
$6,750.00
$500.00
$2,130.00 minimum
$3,440.00 minimum
$1,400.00
$1,200.00
$200.00
$200.00
$350.00
$500.00
$2,300.00
$600.00
$600.00
$7,150.00
$20.00/sheet*
$20.00/sheet*
$20.00/sheet*
$0.50/frame*
$16.00
$90.00
$50.00/hr
CITY OF CUPERTINO
Resolution 05-056/ April 5, 2005 and 05-072/May 3, 2005
Fees Effective July 1, 2005
Schedule B - Engineering (continued)
Telecommunications Facility Fee (5% increase per year)
Installation Rate
Occupancy Rate
$1.75/lineal ft. of conduit/yr
$0.90/lineal ft. ofleased
conduit/yr
Banners
Large Banners Across Stevens Creek Boulevard
Small Banner on Light Poles (for 20 poles)
$320.00
$630.00
Aerial Photo Custom Work
24" x 36"
8 ~"x II"
$50.00/sheet
$lO.OO/sheet
Soil/Geo Report Research
$1,200.00
Special Events
$1,090.00
$1,230.00
Schools - Traffic Request
Insurance Review
$315.00
Block PartyIParade ($950.00)
No Charge
Vacation of Public Street ROW
$460.00
Small Traffic Calming Request
$890.00
RuraVSemi-Rural Classification Application
$600.00
Comprehensive Neighborhood Traffic Request
$1,720.00
Certificate of Correction
$130.00
Floodplain Evaluation
$50.00
Permit Parking Study
$880.00
Permit Parking Issuance (per household)
$45.00
Research
$170.00/hr.
5
CITY OF CUPERTINO
Resolution 05-056/ April 5, 2005 and 05-072/May 3, 2005
Fees Effective July 1, 2005
Schedule C - Definition of Planning Fee Services
Maior
Five thousand or more square feet commercial; 10,000 or more square feet office/industrial; eight or more
residential units.
Minor
Less than 5,000 square feet commercial; less than 10,000 square feet office/industrial; less than eight
residential units.
Appeal
A request from the project applicant or interested party to reverse or amend a decision made by staff or an
advisory body. An appointed public official serving on the board that made the decision subject to the
appeal, an appointed public official serving on a board that is directly affected by the decision and the City
Council members are exempted from the fee requirement.
Directors Application
An application that receives fmal approval by staff either via an advertised public hearing or non-hearing
format. The application may involve a pre-application meeting and/or Environmental Review committee
review.
Temporary Sign Permit
A staff review of a temporary sign application that includes an evaluation of the sign request, the entry into
the temporary log and site review by Code Enforcement Officers. The permit fee is in addition to the
submittal of a deposit to guarantee removal of the sign upon expiration of the temporary permit.
Tentative Map
Five or more parcels.
Parcel Map
Four or less parcels.
Housing Mitigation Fee
Fee collected is used to construct new affordable residential units for Cupertino residents and employees.
The fees mitigate the need for affordable units caused by expanding offices creating new jobs and new
residential development, office, R&D, industrial and residential development.
NOTES:
Mixed use applications wiU be classified based upon the highest intensity and review process.
The Director of Community Development will have discretion to classify projects based upon the above
criteria.
6
CITY OF CUPERTINO
Resolution 05-056/ April 5, 2005 and 05-0'72/May 3, 2005
Fees Effective July 1, 2005
Schedule C - Planning
General Plan Amendment Authorization - Major
$3,590.00
General Plan Amendment Authorization - Minor
$1,795.00
Study Session
$3,590.00
General Plan Amendment - Major
$11,185.00
General Plan Amendment - Minor
$5,593.00
Development Agreement
$14,789.00
Zoning - Minor
$2,770.00
Zoning < one acre
$5,539.00
Zoning one to five acres
$8,420.00
$11,473.00
$12,206.00
Zoning> five acres
Tentative Map
Use Permit - Major
$12,206.00
Exception (per exception)
$2,150.00
Amendment to Development Approval
$3,260.00
Hillside Exception
$5,407.00
Parcel Map
$5,701.00
Use Permit - Minor
$5,701.00
Planning Commission - Architectural and Site Approval
$5,701.00
Planning Commission Interpretation
$2,849.00
Planning Commission - Tree Removal
$2,462.00
Environmental Impact Report
$21,353.00
Negative Declaration - Major
$3,285.00
Negative Declaration - Minor
$1,643.00
For all projects requiring more than 48 hours of staff time, applicants will be charged at the hourly rate of
$110.00 per hour, which includes staff time, overhead and administrative oversight.
7
CITY OF CUPERTINO
Resolution 05-056/ April 5, 2005 and 05-072/May 3, 2005
Fees Effective July 1, 2005
Schedule C - Planning (Continued)
Categorical Exemption
$191.00
Design Review Committee - Architectural and Site Approval
$2,757.00
R-l Design Review
$1,915.00
R-I Exception
Sign Exception
$2,150.00
$1,612.00
$549.00
Fence Exception
Director - Variance
$1.377.00
Director - Minor Modification
$963.00
Director - Tree Removal
$795.00
Minor Residential Permit
$963.00
Temporary Use Permit
$1,100.00
Temporary Sign Permit
$161.00
Sign Program
$551.00
Appeal
$145.00
Zoning, Planning, Municipal Code (Building Permit Fees)
CommerciaVMulti-Family
Residential Single Family
$0.21/sq. ft.
$0.1 1/sq. ft.
Wireless Master Plan Fee: Equipment Mount on Existing Light Standard or
Utility Pole
$5.00/mount
Wireless Master Plan Fee: Other Personal Wireless Facility
$1,OOO.OO/facility
Housing Mitigation In-Lieu Fees
Residential
Office/IndustriaVR&D
$1.1 5/sq. ft.
$2.25/sq. ft.
Stevens Creek Blvd. Specific Plan Fee
$.044/sq. ft.
For an projects requiring more than 48 hours of staff time, applicants will be charged at the hourly rate of
$110.00 per hour, which includes staff time, overhead and administrative oversight.
8
CITY OF CUPERTINO
Resolution 05-056/ April 5, 2005 and 05-072/May 3, 2005
Fees Effective July 1,2005
Schedule D - Building Valuation Schedule
OCCUPANCY AND TYPE REMODEL COST PER SO. FT. COST PER NEW SO. FT.
1. APARTMENT HOUSES
*Type I or II F.R. $121.61 $253.34
Type V - Masonry or Type ill 98.78 205.78
Type V - Wood Frame 91.32 190.24
Type I - Basement Garage 41.65 86.77
2. AUDITORIUM
Type I or II F.R. $128.86 $243.14
Type II - I-Hour 93.33 176.09
TypelI-N 88.29 166.58
Type III - I -Hour 98.12 185.14
Type III - N 93.08 175.62
Type V -I-Hour 93.82 177.02
Type V - N 87.55 165.18
3. BANKS
*Type I or II F.R. $188.98 $343.59
Type II - I -Hour 139.21 253.11
Type II - N 134.75 244.99
Type III -I-Hour 153.63 279.33
Type III - N 148.14 269.35
Type V - I -Hour 139.21 253.11
Type V - N 133.34 242.44
4. BOWLING ALLEYS
Type II-I-Hour $80.46 $118.32
TypelI-N 75.09 110.43
Type III - I -Hour 87.56 128.76
TypeIII-N 81.88 120.41
Type V - I-I Hour 59.00 86.77
5. CHURCHES
Type I or II F .R. $105.87 $230.14
Type II - I -Hour 79.51 172.84
Type II - N 75.56 164.26
Type III - I-Hour 86.44 187.92
Type III - N 82.60 179.57
Type V -I-Hour 80.79 175.62
* Add 0.5 percent to total cost for each story over three
**Deduct 11 percent for mini-warehouses
***Deduct 20 percent for "shell only" buildings
9
CITY OF CUPERTINO
Resolution 05-056/ AprilS, 2005 and 05-072/May 3, 2005
Fees Effective July 1, 2005
Schedule D - Building Valuation Schedule
OCCUPANCY AND TYPE REMODEL COST PER SO. FT.
6. CONVALESCENT HOSPITALS
·Type I or II F.R.
Type II I -Hour
Type III - I -Hour
Type V - I-Hour
7. DWELLINGS
Type V - Masonry
Type V - Wood Frame
Basements
Semi-Finished
Unfinished
8. FIRE STATIONS
Type I or II F.R.
Type II - I -Hour
Type II - N
Type III - I-Hour
Type III - N
Type V - I -Hour
Type V - N
9. HOMES FOR THE ELDERLY
Type I or II F.R.
Type II - I-Hour
Type II- N
Typeill-1-Hour
Type III - N
Type V - I-Hour
Type V - N
10. HOSPITALS
·Type I or II F.R.
Type III - I-Hour
Type V - I-Hour
· Add 0.5 percent to total cost for each story over three
··Deduct 1 I percent for mini-warehouse
.. ·Deduct 20 percent for "shell only" buildings
.... Add 25% for hazardous occupancy or high tech
COST PER NEW SO. FT.
$153.01
107.57
110.25
103.90
$322.94
224.11
229.68
216.46
$105.33
100.75
$224.11
214.37
$25.30 $53.82
19.30 41.06
$140.67 $265.41
92.59 174.70
87.30 164.72
101.32 191.17
97.02 183.05
95.05 179.34
90.13 170.06
$115.48 $240.58
93.77 195.34
89.76 186.99
97.66 203.46
93.65 195.1 I
94.32 196.50
91.09 189.78
$185.53 $378.62
153.58 313 .43
146.53 299.05
10
CITY OF CUPERTINO
Resolution 05-056/ April 5, 2005 and 05-072/May 3, 2005
Fees Effective July 1, 2005
Schedule D - Building Valuation Schedule
OCCUPANCY AND TYPE
REMODEL COST PER SO. FT.
COST PER NEW SO. FT.
11. HOTELS AND MOTELS
·Type I or II F .R.
Type III - I -Hour
TypeIII-N
Type V - I-Hour
Type V - N
12. INDUSTRIAL PLANTS ****
Type I or II F.R.
Type II - I-Hour
Type II - (Stock)
Type III - I -Hour
Type III - N
Tilt-Up
Type V - I -Hour
TypeV-N
13. JAILS
Type I or II F .R.
Type III - I -Hour
Type V - I -Hour
14. LmRARIES
Type I or II F.R.
Type II - I-Hour
Type II- N
Type III - I-I-Hour
Type III - N
Type V -I-Hour
TypeV-N
15. MEDICAL OFFICES ****
Type I or II F.R.
Type II-I-Hour
Type II - N
Type III - I -Hour
Type III - N
Type V -I-Hour
Type V-N
· Add 0.5 percent to total cost for each story over three
··Deduct 11 percent for mini-warehouse
···Deduct 20 percent for "shell only" buildings
.... Add 25% for hazardous or high tech occupancies
$117.16 $234.32
101.50 203.00
96.74 193.49
88.39 176.78
86.65 173.30
$93.73 $132.01
65.23 91.87
59.96 84.45
71.82 101.15
67.70 95.35
49.42 69.60
67.70 95.35
61.93 87.23
$210.39 $369.1 1
192.41 337.56
144.27 253.1 1
$137.72 $270.05
100.81 197.66
95.84 187.92
106.49 208.80
10 1.16 198.36
99.98 196.04
95.84 187.92
$144.16 $277.24
111.23 213.90
105.68 203.23
120.64 232.00
112.32 215.99
108.82 209.26
104.96 201.84
II
CITY OF CUPERTINO
Resolution 05-056/ April 5, 2005 and 05-072/May 3, 2005
Fees Effective July 1, 2005
Schedule D - Building Valuation Schedule
OCCUPANCY AND TYPE
REMODEL COST PER SO. FT.
COST PER NEW SO. FT.
16. OFFICES
Type I or II F .R.
Type II-I-Hour
TypeII-N
Type III - I -Hour
Type III - N
Type V - I-Hour
TypeV-N
17. PRIVATE GARAGES
Wood Frame
Masonry
Öpen carports/covered decks/patios
Uncovered decks
18. PUBLIC BUILDINGS
Type I or II F .R.
Type II - I -Hour
Type II - N
Type III - I-Hour
Type III - N
Type V - I-Hour
Type V - N
19. PUBLIC GARAGES
Type I or II F .R.
Type I or II Open Parking
Type II - N
Type III - I-Hour
Type III - N
Type V - I -Hour
20. RESTAURANTS
·Type III - I-Hour
Type III - N
Type V - I -Hour
TypeV-N
· Add 0.5 percent to total cost for each story over three
··Deduct 11 percent for mini-warehouse
···Deduct 20 percent for "shell only" buildings
.... Add 25% for hazardous or high tech occupancies
$148.67
99.53
94.80
107.46
102.73
100.64
94.80
$37.21
41.95
25.42
25.22
$143.14
11 6.00
110.90
120.41
116.23
110.20
106.26
$80.55
60.45
46.12
60.95
54.19
55.51
$167.22
161.55
153.14
147.13
12
$247.78
165.88
157.99
179.10
171.22
167.74
157.99
$56.38
63.57
38.51
32.37
$286.29
232.00
221.79
240.82
232.46
220.40
212.51
$113.45
85.14
64.96
85.84
76.33
78.18
$225.97
218.31
206.94
198.82
CITY OF CUPERTINO
Resolution 05-0~61 April 5, 200~ and O~-072IMt\y 3, 2005
Fees Effective July 1,2005
Schedule D - Building Valuation Schedule
OCCUPANCY AND TYPE REMODEL COST PER SO. FT. COST PER NEW SO. FT.
21. SCHOOLS
Type I or II F.R. $162.53 $257.98
Type II - I-Hour 110.94 176.09
Type III - I-Hour 118.68 188.38
Type III - N 114.15 181.19
Type V -I-Hour 111.23 176.55
Type V-N 106.11 168.43
22. SERVICE STATIONS
Type II - N $87.31 $155.90
Type III - I-Hour 91.07 162.63
Type V - I-Hour 77.56 138.50
Canopies 36.38 64.96
23. STORES
·Type I or II F .R. $145.29 $191.17
Type II-I-Hour 88.87 116.93
TypeII-N 86.93 114.38
Type III - I-Hour 108.08 142.22
Type III - N 101.38 13 3.40
Type V - I-Hour 90.98 119.71
Type V - N 84.10 110.66
24. THEATERS
Type I or II F.R. $145.20 $254.74
Type III - I -Hour 105.79 185.60
Type III - N 100.77 176.78
Type V -I-Hour 99.58 174.70
Type V - N 94.15 165.18
25. WAREHOUSES**
Type I or II F.R. $72.20 $114.61
Type II or V-I-Hour 42.82 67.98
Type II or V-N 40.19 63.80
Type III - I -Hour 48.53 77.02
Type III - N 46.19 73.31
· Add 0.5 percent to total cost for each story over three
··Deduct 1 I percent for mini-warehouse
···Deduct 20 percent for "shell only" buildings
.... Add 25% for hazardous or high tech occupancies
13
CITY OF CUPERTINO
Resolution 05-056/ April 5, 2005 and 05-072/May 3, 2005
Fees Effective July 1, 2005
Schedule D - Building Valuation Schedule
EOUIPMENT AND AIR CONDITIONING
Commercial
Residential
Sprinkler Systems
$ 5.26
$ 4.39
$ 3.25
RETAINING WALLS. PER SO. FT. (HEIGHT X LENGTH) AREA ABOVE GRADE
Masonry
Concrete
$ 30.07
$ 26.46
...............................................................................
Address Changes
$268.92
14
CITY OF CUPERTINO
Resolution 05-056/April 5, 2005 and 05-072/May 3, 2005
Fees Effective July 1, 2005
Schedule D - Building Permit
Permit Valuation
$1 - $3,000
$83.16
$3,001 - 25,000
$93.96 for the first $3,000 plus $10.80 for each additional
$1,000 or fraction thereof, to and including $25,000.
$25,001 - 50,000
$324.00 for the first $25,000 plus $8.64 for each additional
$1,000 or fraction thereof, to and including $50,000.
$50,001 - 100,000
$540.00 for the first $50,000 plus $6.48 for each additional
$1,000 or traction thereof, to and including $100,000.
$100,001 - 500,000
$851.04 for the first $100,000 plus $4.32 for each additional
$1,000 or traction thereof, to and including $500,000.
$500,001 -1,000,000
$2.817.72 for the first $500,000 plus $3.24 for each additional
$1,000 or fraction thereof, to and including $1,000,000.
$1,000,001 -
$4.795.20 for the first $1,000,000 and up plus $2.16 for each
additional $1,000 or fraction thereof.
PLAN CHECKING
Structural and Non-Structural
1.3345% of building permit fee for each plan submitted. Each additional identical repeat plan for
multi-unit residential developments wil! be assessed at $34.86 each unit.
Energy
48% of building permit fee for each plan submitted. Each additional identical repeat plan for
multi-unit residential developments wil! be assessed at $34.86 each unit.
Repeat plan checks that exceed 2 reviews wil! be charged an hourly rate at $87.14 per hour.
15
CITY OF CUPERTINO
Resolution 05-056/ AprilS, 2005 and 05-072/May 3, 2005
Fees Effective July 1, 2005
Schedule D - Building - Electrical Fees
New Residential Buildings and Remodels tbat add additional square footage
The following fees shall include all wiring and electrical equipment in or on each building, or
other electrical equipment on the same premises constructed at the same time.
Permit Fee
$38.37
New multi-familv residential buildings (apartments and condominiums) having
three or more living units not including the area of garages, carports and other
non-commercial automobile storage areas constructed at the same time, per
square foot
$.07
New single and two-familv residential buildings not including the area of
garages, carports and other minor accessory buildings constructed at the
same time, per square foot
$.08
For other types of residential occupancies and alterations, additions and
modifications to existing residential buildings, use the UNIT FEE SCHEDULE
New commercial buildings and completelv remodeled spaces not including the
Area of garages, per square foot
$.13
Commercial alterations and modifications to existing buildings, use the
Unit fee schedule
16
CITY OF CUPERTINO
Resolution 05-056/April 5, 2005 and 05-0'72/May 3, 2005
Fees Effective July 1, 2005
Schedule D - Building - Electrical
UNIT FEE SCHEDULE
Remodel - No additional square footage
Permit Fee
Residential Appliances
For fixed residential appliances or receptacle outlets for same, including
wall-mounted electric ovens; counter mounted cooking tops; electric
ranges, self-contained room console, or through-wall air conditioners;
space heaters; food waste grinders; dishwashers washing machines;
water heaters; clothes dryers; or other motor operated appliances not
exceeding one horsepower (HP) in rating each
NOTE: For other types of air conditioners and other motor-driven
appliances having larger electrical ratings, see Power Apparatus.
Non-Residential Appliances
For residential appliances and self-contained factory-wired, non-residential
appliances non exceeding one horsepower (HP), kilowatt (KW), or
kilovotampere (KV A) in rating including medical and dental devices; food,
beverage, and ice cream cabinets; i!1uminated show cases; drinking fountains;
vending machines; laundry machines; or other similar types of equipment,
each
NOTE: For other types of air conditioners and other motor-driven appliances
having larger electrical ratings, see Power Apparatus.
Services
For services of 600 volts or less and not over 200 amperes in rating, each
For services of 600 volts or less and over 200 amperes to 1,000 amperes in
rating, each
For services over 600 volts over 1,000 amperes in rating, each
17
$ 38.37
$ 4.80
$ 4.80
$ 29.43
$ 59.94
$119.88
CITY OF CUPERTINO
Resolution 05-056/Apri15, 2005 and 05-0'71IMay 3, 1005
Fees Effective July 1, 2005
Schedule D - Building - Electrical
USER FEE SCHEDULE
(continued)
Remodel- No additional square footage
Signs, Outline Lighting and Marquees
For signs, outline lighting systems or marquees supplied from one
branch circuit, each
For additional branch circuits within the same sign, outline lighting
system or marquee, each
Misce!1aneous Apparatus, Conduits, Conductors, and Special Circuits
For electrical apparatus, conduits and conductors for which a permit is
required but for which no fee is herein set forth
Power Device/Apparatus
For motors, generators, transformers, rectifiers, synchronous converters,
capacitors, industrial heating, air conditioners and heat pumps, cooking
or baking equipment and other apparatuses, as fo!1ows:
Rating in horsepower (HP), kilowatts (KW), kilovolt-amperes (KV A),
or kilovolt-amperes-reactive (KV AR):
1 unit
2 through 5 units, each additional
6 and over, each additional
NOTE:
1. For equipment or appliances having more than one motor, transformer,
heater, etc., the sum of the combined ratings may be used.
2. These fees include a!1 switches, circuit breakers, contractors, thermostats,
relays and other directly related control equipment.
18
$23.98
$ 4.80
$27.58
$47.96
$17.99
$11.99
CITY OF CUPERTINO
Resolution 05-056/ April 5, 2005 and 05-072/May 3, 2005
Fees Effective July 1, 2005
Schedule D - Building - Electrical
UNIT FEE SCHEDULE
(continued)
Remodel- No additional square footage
Busways
For trolley and plug-in-type busways, each 100 feet or fraction thereof
Note: An additional fee wiU be required for lighting fixtures, motors
and other appliances that are connected to trolley and plug-in-type
busways. No fee is required for portable tools.
Receptacle, Switch and Lighting Outlets
For receptacle, switch, lighting or other outlets at which current is
used or controlled, except services, feeders and meters.
First 20 each
Additional outlets, each
NOTE: For multi-outlet assemblies, each 5 feet or
fraction thereof may be considered as one outlet.
Lighting Fixtures
For lighting fixtures, sockets or other lamp holding devices
First 20 each
Additional fixtures, each
For pole or platform-mounted lighting fixtures each
For theatrical-type lighting fixtures or assemblies each
19
$7.02
$1.20
$0.73
$ 1.20
$0.73
$1.20
$1.20
CITY OF CUPERTINO
Resolution 05-056/ AprilS, 2005 and 05-072lMay 3, 2005
Fees Effective July 1,2005
Schedule D - Building - Mechanical Fees
New Residential Buildings and Remodels that add additional square footage.
The following fees shall include all mechanical equipment in or on each building, or
other mechanical equipment on the same premised constructed at the same time.
New multi-familv residential buildings (apartments and condominiums)
having three or more living units not including the area of garages, carports
and other non-commercial automobile storage areas constructed at the same
time, per square foot
$0.07
New and single and two-familv residential buildings not including the area
of garages, carports and other minor accessory buildings constructed at the
same time, per square foot
$0.08
For other types of residential occupancies and alterations and modifications
To existing building, use the unit fee schedule
New commercial buildings and completelv remodeled spaces not including
The area of garages, per square foot
$0.13
Commercial alterations and modifications to existing buildings, use the unit
Fee schedule
20
CITY OF CUPERTINO
Resolution 05-056/ April 5, 2005 and 05-072lMay 3, 2005
Fees Effective July 1, 2005
Schedule D - Building - Mechanical Fees
UNIT FEE SCHEDULE
Remodels - No additional Square Footage
Permit Fee
For the repair of alteration of, or addition to each heating appliance,
refrigeration unit, cooling unit, V A V boxes, absorption unit, or each
heating, cooling, absorption, or evaporative cooling system, including
installation of controls regulated by this Code.
For each air-handling unit, Ale units, heat pumps to and including
10,000 cubic feet per minute, including ducts attached thereto. Does
not apply to central type.
NOTE: This fee shall not apply to an air-handling unit that is a
portion of a factory-assembled appliance, cooling unit, evaporative
cooler or absorption unit for which a pennit is required elsewhere
in this Code.
For each air-handling unit Ale unit, heat pump over 10,000 cfm
For the installation or relocation of each commercial or industrial-type
Hood
For the installation of each residential hood that is served by a mechanical
exhaust, including the ducts for such hood
For the installation or relocation of each forced-air or gravity-type furnace
or burner, including ducts and vents attached to such appliance, up to and
including 100,000 Btu/h
For each ventilation system which is not a portion of any heating or
air conditioning system authorized by a permit
For each ventilation fan connected to a single duct
For the installation or relocation of each forced air or gravity type
furnace or burner, including ducts and vents attached to such appliance
over 100,000 Btu/h
21
$ 38.37
$ 13.19
$ 10.26
$ 17.82
$137.87
$ 10.26
$ 14.31
$10.26
$ 7.02
$ 17.55
CITY OF CUPERTINO
Resolution 05-056/ April 5, 2005 and 05-072lMay 3, 2005
Fees Effective July 1, 2005
Schedule D - Building - Mechanical Fees
UNIT FEE SCHEDULE
(continued)
Remodels - No additional Square Footage
For the installation or relocation of each floor furnace, including vent
For the installation or relocation of each suspended heater, recessed
wall heater or floor-mounted unit heater
For the installation, relocation or replacement of each appliance vent
installed and not included in an appliance permit
For the installation or relocation of each boiler or compressor to and
including three horsepower, or each absorption system to and including
100,000 Btu/h (29.3 kw)
For the installation or relocation of each boiler or compressor over three
horsepower to and including 15 horsepower, or each absorption system
over 100,000 Btu/h and including 500,000 Btu/h
For the installation or relocation of each boiler or compressor over 15
horsepower to and including 30 horsepower, or each absorption system
over 500,000 Btu/h to and including 1,000,000 Btu/h
For the installation or relocation of each boiler or compressor over 30
horsepower to and including 50 horsepower, or for each absorption system
over 1,000,000 Btu/h to and including 1,750,000 Btu/h
For the installation or relocation of each boiler or refrigeration compressor
over 50 horsepower, or each absorption system over 1,750,000 Btu/h
For each appliance or piece of equipment regulated by this Code but not
classed in other appliance categories, or for which no other fee is listed
in this Code
22
$ 14.31
$ 14.31
$ 7.02
$ 14.31
$ 26.19
$ 35.91
$ 53.46
$89.37
$ 10.26
CITY OF CUPERTINO
Resolution 05-056/ApriI5, 2005 and 05-072lMay 3, 2005
Fees Effective July 1, 2005
Schedule D - Building - Plumbing Fees
New Residential Buildings and Remodels that add additional square footage
The following fees shall include all plumbing equipment in or on each building, or other
plumbing equipment on the same premises constructed at the same time.
New multi-familv residential buildings (apartments and condominiums) having
three or more living units not including the area of garages, carports and other
non-commercial automobile storage areas constructed at the same, per square
foot
$0.07
New single and two-familv residential buildings not including the area of
garages, carports and other minor accessory buildings constructed at the same
time, per square foot
$0.08
For other types of residential occupancies and alterations and modifications
To existing building, use the unit fee schedule
New commercial buildings and completely remodeled spaces not including
The area of garages, per square foot
$0.13
Commercial alterations and modifications to existing buildings, use the
unit fee schedule
23
CITY OF CUPERTINO
Resolution 05-0561 AprilS, 2005 and 05-0721May 3, 2005
Fees Effective July 1, 2005
Schedule D - Building - Plnmbing Fees
UNIT FEE SCHEDULE
Remodel- No additional Square Footage
Permit Fee
$38.37
For instaUation, alteration or repair of water piping water treating
equipment
$ 9.00
For repair or alteration of drainage or vent piping, floor, area,
condensate piping
$ 9.00
For each plumbing fixture or trap or set of fixtures on one trap
(including water, drainage piping and backflow protection therefor)
$ 9.00
For each gas piping system of one (!) to four (4) outlets
$ 5.40
For each gas piping system of five (5) or more, per outlet
$ 1.20
For each industrial waste pre-treatment interceptor, including its trap
and vent, excepting kitchen type grease traps functioning as fixture
traps
For each building sewer, sanitary sewer, and each trailer park sewer
$17.99
$ 9.00
$21.58
Kitchen type trap and/or system
Stonn/rainwater systems per drain
$ 9.00
$10.79
For each water heater and/or vent
Water service
$ 9.00
$ 9.00
Re-pipe per fixture
24
CITY OF CUPERTINO
Resolution 05-056/ April 5, 2005 and 05-072lMay 3, 2005
Fees Effective July 1,2005
Schedule D - Building - Plumbing Fees
UNITS FEE SCHEDULE
Remodel- No additional Square Footage
(continued)
For each lawn sprinkler system on anyone meter, including backflow
protection devices therefor
$13.19
Five (5) or more, each
$ 1.08
For atmospheric type vacuum breakers/backflow not included in item 1
I to 5
over 5 each additional
$10.79
$ 2.16
For each cesspool
$67.14
$33.57
For each private sewage disposal system
25
CITY OF CUPERTINO
Resolution 05-056/Apri15, 2005 and 05-072/May 3, 2005
Fees Effective July 1, 2005
Schedule D
OTHER BUILDING INSPECTION FEES
Private Swimming Pools
For new private, residential, in-ground, swimming pools for
single-family and multi-family occupancies including a complete
system of necessary branch circuit wiring, bonding, grounding,
underwater lighting, water pumping and other similar electrical
equipment directly related to the operation of a swimming pool,
each including plan check and energy.
For other types of swimming pools, therapeutic whirlpools,
spas and alterations to existing swimming pools, use the
UNIT FEE SCHEDULE
Temporary Power Service
For a temporary service power pole or pedestal including all
pole or pedestal-mounted receptacle outlets and appurtenances,
each.
For a temporary distribution system and temporary lighting
and receptacle outlets for construction sites, decorative light,
Christmas tree sales lots, fireworks stands, etc. each.
Inspection outside of the normal business hours
(minimum charge two hours)
Inspection for which no fee is specifically established
(minimum charge one hour)
Re-inspection - A fee may be assessed for each inspection or re-inspection
when such portion of work for which inspection is called is not complete
or when corrections called for are not made.
26
$540.00
$62.1 0
$11.88
$90.72/hr.
$68.04/hr.
$176.18
CITY OF CUPERTINO
Resolution 05-056/ AprilS, 2005 and 05-072/May 3, 2005
Fees Effective July 1, 2005
Schedule E - Recreation
Recreation classes and excursion fees shall be determined as follows:
Classes
1. Determine the maximum hourly rate paid to instructor.
2. Multiply the instructor's hourly rate by the number of class meetings.
3. Determine the minimum number of participants and divide into the instructor's cost.
4. Add indirect overhead percent - 32%.
5. Add 20% to establish non-resident fee.
6. Add cost for specialized equipment or supplies.
Special conditions: For classes taught by contract instructors, the indirect overhead is only
added to the City's percentage.
Excursions
1. Transportation cost divided by the number of participants plus overhead transfer.
2. Add 20% to establish non-resident fee.
3. Add any admission cost, supplies or leadership cost.
Additional factors that mav be used to determine the class or excursion user fee:
The total number of participants in a given activity may generate additional revenue whereby
the total program cost may be reduced.
Classes that traditionally have waiting lists may have the user fee increased.
Programs in competition with adjacent cities or the private sector may require fees to be
increased or decreased to remain competitive.
27
CITY OF CUPERTINO
Resolution 05-056/ April 5, 2005 and 05-0nlMay 3, 2005
Fees Effective July 1, 2005
Schedule E - Recreation
Facility Use Fee Schedule (Staff Use Only)
CLASSIFICATIONS:
Group I: City of Cupertino activities that are open to the public. Official city sponsored
programs.
Group II: Clubs with 5 I % resident membership, recreation programs and events with full or
affiliated city co-sponsorship and open to the public.
Group III: Programs and events sponsored by Cupertino based non-profit recreation,
education or community service organization with 5 I % resident participation.
These organizations must show an official structure and status.
Group IV: Private, special interest or business groups for functions not open to the public.
These functions would include parties, banquets, receptions, industrial
conferences, seminars, trade shows, etc.
Group V: Programs and events sponsored by non-resident non-profit recreation, education
or community service organization. These organizations must show official
structure and status.
Group VI: Cupertino Businesses using the Cupertino Room of the Quinlan Community
Center for promotional and business related purposes other than negotiation or
direct sale.
28
CITY OF CUPERTINO
Resolution 05-056/ April 5, 2005 and 05-072lMay 3, 2005
Fees Effective July 1,2005
Schedule E - Recreation
Quinlan Commnnity Center
ROOM RENTAL SCHEDULE PER HOUR
Cupertino Room
Group II
Group III
Group IV
Group V
Group VI
Mondav - Thursdav
N/A
$30
$140
$50
$265
Fridav - Sundav
$17
$80
$230
$140
$265
Classroom
Group II
Group III
Group IV
Group V
N/A
$20
$45
$25
$12
$60
$90
$75
Conference Room
Group II
Group III
Group IV
Group V
N/A
$10
$40
$25
$12
$25
$60
$50
Security Staff
Security staff is required when alcohol is served at any City facility: $25.00 per hour.
Overtime Fee
Functions exceeding the permitted reservation time shall be charged $150.00 for any time up to the first
half hour, and $150.00 for every half hour thereafter. This charge will be deducted from the security
deposit. This applies to all City facilities.
Securitv Deposit
A security deposit shall be required for Groups III, IV, V, and VI. Security deposit is due at time of
reservation. The Department Director may also require a deposit based on the nature of an event. The
security deposit will be refunded if no damage occurs, rooms are left in clean condition, and permits
conclude on time.
Quinlan Community Center
Cupertino Room - Groups IV, VI $750
All Other Rooms - Group IV $300
Group II, II, V - All Rooms $300
29
CITY OF CUPERTINO
Resolution 05-056/ April 5, 2005 and 05-072lMay 3, 2005
Fees Effective July 1, 2005
Schedule E - Recreation
Monta Vista Recreation Center
Creekside Park Building
Room Rental Schedule Per Hour
Monta Vista Recreation Center
Creekside Park Building
Multi-Purpose
Group ill
Group IV
Group V
N/A
N/A
N/A
N/A
N/A
N/A
Classroom
Group II
Group III
Group IV
Group V
$15
$15
$30
$20
$15
$15
$30
$20
Conference Room/Kitchen
Group II
Group ill
Group IV
Group V
$15
$15
$25
$20
N/A
N/A
N/A
N/A
Securitv Staff
Security staffis required when alcohol is served at any City facility: $25.00 per hour.
Overtime Fee
Functions exceeding the permitted reservation time shall be charged $150.00 for any time up to the first
half hour, and $150.00 for every half hour thereafter. This charge will be deducted from the security
deposit. This applies to all City facilities.
Securitv Deposit
A security deposit shall be required for Groups ill, IV, V, and VI. Security deposit is due at time of
reservation. The Department Director may also require a deposit based on the nature of an event. The
security deposit will be refunded if no damage occurs, rooms are left in clean condition, and permits
conclude on time.
30
CITY OF CUPERTINO
Resolution 05-056/ April 5, 2005 and 05-072/May 3, 2005
Fees Effective July 1, 2005
Schedule E - Recreation
Senior Center
Annual Mernbership
Newsletter - Mailed
Resident
$22
$5.00
Non-Resident
$27
$5.00
Room Rental Schedule Per Hour
Reception Room
Evenings and Weekends -
Group II
Group III
Group IV
Group V
$12
$80
$230
$140
Classroom. Conference Room. Arts & Crafts Room.
Bav Room
Group II
Group III
Group IV
Group V
$12
$60
$90
$75
- Senior Center rooms are not available for rental Monday through Thursday 8:00 a.m. to 10:00 p.m. and
Friday, 8:00 a.m. to 5:00 p.m.
Securitv Staff
Security staff is required when alcohol is served at any City facility: $25.00 per hour.
Overtime Fee
Functions exceeding the permitted reservation time shall be charged $150.00 for any time up to the first
half hour, and $150.00 for every half hour thereafter. This charge will be deducted from the security
deposit. This applies to all City facilities.
Securitv Deposit
A security deposit shall be required for Groups III, IV, V, and VI. Security deposit is due at time of
reservation. The Department Director may also require a deposit based on the nature of an event. The
security deposit will be refunded if no damage occurs, rooms are left in clean condition, and permits
conclude on time.
Cupertino Senior Center
Reception Hall- Group IV $750
All Other Rooms - Group IV $300
Group II, III, V - All Rooms $300
31
CITY OF CUPERTINO
Resolution 05-056/ April 5, 2005 and 05-071lMay 3, 2005
Fees Effective July 1,2005
Schedule E - Recreation
OUTDOOR F AClLITlES
Memorial SoftbaU Field
Cupertino residents/businesses only
Non-Residents
Field can be reserved for a maximum of 2 hours
THERE IS NO FEE FOR CURRENT SOFTBALL TEAMS PLAYING
IN CUPERTINO LEAGUES
$25.00
$40.00
Field preparation
(includes dragging, watering, chalking, and bases)
$36.50
Field Attendant (2 hour minimum)
Field Attendant is required any time lights or field preparation
is requested.
$ 8.25/hr.
Lights (in the evening)
$ 5.00/hr.
Memorial Park Amphitheater
Cupertino residentIResident business
Non-resident/Non-resident business
$55.00
$75.00
Memorial Park Gazebo
Cupertino residentIResident business
Non-resident/Non-resident business
$55.00
$75.00
Picnic Areas (Daily Rate)
Cupertino residents
Cupertino business
Non-residents
Non-resident business
Electricity at Memorial or Linda Vista Park
$ 55.00
$ 75.00
$ 80.00
$100.00
$ 25.00
Sports Field Fees
Adult Leagues (two hour minimum)
Deposit
$50.00/hr
$600.00
Youth Leagues (Participant/Season)
$11.00 R
$22.00NR
32
CITY OF CUPERTINO
Resolution 05-056/ April 5, 2005 and 05-072/May 3, 2005
Fees Effective July 1, 2005
Schedule E - Recreation
BLACKBERRY FARM PICNIC GROUNDS
General Admission:
Weekends & Holidavs
Weekdavs
ADULT (13 years and over)
Resident
$8.00
Non-Resident
$9.00
Resident
$5.00
Non-Resident
$6.00
CHILD (6 through 12)
$5.00
$6.00
$4.00
$5.00
Group Rates:
Weekends & Holidavs
Weekdavs
Adult
(13 & Older)
Child
(6-12)
Adult
(13 & Older)
Child
(6-12)
100-500 persons
$8.50
$6.50
$5.75
$4.75
501-1,000
$8.00
$6.00
$5.50
$4.50
1,001 or more
$7.50
$5.50
$5.25
$4.25
Full Summer Pass
Available any day the park is open:
Resident Non-Resident
Adult (13 & Up) $85.00 $110.00
Child (6 to 12 years old) $60.00 $70.00
Family Pass (2 people) $140.00 $170.00
Family Pass (3 people) $150.00 $180.00
Family Pass (4 people) $160.00 $190.00
Family Pass (5 people) $170.00 $200.00
Family Pass (6 people) $180.00 $210.00
33
CITY OF CUPERTINO
Resolution 05-056/ April 5, 2005 and 05-072/May 3, 2005
Fees Effective July 1, 2005
Schedule E - Recreation
to-Day Pass
Available any 10 days the park is open:
Resident Non-Resident
Adult (13 and older) $40.00 $45.00
Child (6 to 12 years old) $32.50 $36.00
Children under 6 are free when accompanied by their parents
BLACKBERRY FARM GOLF COURSE
Weekends Weekdavs
Resident Non-Resident Resident Non-Resident
9-Holes $14.00 $16.00 $12.00 $14.00
Junior & Senior $14.00 $16.00 $ 11.00 $13.00
Second 9 Holes (an $12.00 $14.00 $11.00 $13.00
players)
An groups and tournaments pay the full rate (Cupertino resident stin applies).
Staff is authorized to set merchandise fees according to current cost.
BLACKBERRY FARM RETREAT CENTER
Conference Room (9:00 a.m. to 5:00 p.m., with meals)
$69.95/person
34
CITY OF CUPERTINO
Resolution 05-0561 April 5, 2005 and 05-0'72/May 3, 2005
Fees Effective July 1, 2005
Schedule E - Recreation
BLACKBERRY FARM GOLF COURSE
Annual Rate (Weekdays Only)
Adults (17-61)
Cupertino Residents
Non-Residents
$850
$1,000
Semi-Annual Rate (Weekdays Only)
Cupertino Residents
Non-Residents
$455
$540
Super-Annual Rates (Good on Weekends &
Holidays)
Cupertino Residents
Non-Residents
$1,000
$1,125
Super-Semi Annual Rates (Good on Weekends &
Holidays)
Cupertino Residents
Non-Residents
$500
$600
Quick Passes (Ten-play card for tbe price of nine)
Cupertino Resident Weekday
Cupertino Resident Weekend
$99
$117
Non-Resident Weekday
Non-Resident Weekend
$117
$135
Green Fees
Cupertino Resident Weekday
Cupertino Resident Weekend
$12
$14
Non-Resident Weekday
Non-Resident Weekend
$14
$16
35
Jr/Sr
$775
$925
$415
$495
$1,000
$1,125
$500
$600
$90
$117
$108
$135
$11
$14
$13
$16
CITY OF CUPERTINO
Resolution 05-056/ April 5, 2005 and 05-072/May 3, 2005
Fees Effective July 1, 2005
Schedule E - Recreation
Sports Center
Day Passes ~ Resident Non-Resident
$7.00 $10.00
Monthly Passes
One Month Single $55.00 $65.00
One Month Couple $75.00 $90.00
One Month Family $95.00 $115.00
Annual Passes
One Year Juniors «17) $300.00 $330.00
One Year Single $425.00 $455.00
One Year Couple $810.00 $880.00
One Year Family $905.00 $980.00
One Year Senior $380.00 $405.00
EnroUment Fee AU $50.00 $50.00
ADDITIONAL CONDITIONS
I. The Cupertino Tennis Club wi!1 be charged $10.00/hour during primetime and $6.00/hour per court
during non-primetime for aU C.T.C. sponsored activities other than U.S.T.A.leagues and practices.
2. AU competitors in C.T.C./U.S.T.A. leagues participating at the Sports Center must purchase an
annual pass.
3. Individuals may purchase a ten pack of day passes, $60.00 Resident, $90.00 Non-Resident.
4. Specials wi!1 be offered on an on-going basis.
Child Watcb Fees
One visit:
Ten visits:
One Month Pass:
$5.00
$45.00
$100.00
Teen Center
Rental Rate
Deposit
$100.00
$750.00
Overtime Rate
$200.00 first hour; $100.00 each half hour after
Residents:
Daily Pass
Annual Pass
$.00
$.00
Non-Residents:
Daily Pass
$5.00
36
CITY OF CUPERTINO
Resolution 05-0561 April 5, 2005 and 05-072lMay 3, 2005
Fees Effective July 1, 2005
Schedule E - Recreation
Community Hall
ROOM RENTAL SCHEDULE PER HOUR
Group II
Group III
Group IV
Group V
Group VI
Mondav - Thursdav
$40
$40
$150
$60
$275
Fridav - Sunday
$90
$90
$240
$150
$275
Security Staff
Security staff is required when alcohol is served at any City facility: $25.00 per hour.
Overtime Fee
Functions exceeding the permitted reservation time shall be charged $150.00 for any time up to the first half
hour, and $150.00 for every half hour thereafter. This charge wil! be deducted from the security deposit.
This applies to all City facilities.
Securitv Deposit
A security deposit shall be required for Groups III, IV, V, and VI. Security deposit is due at time of
reservation. The Department Director may also require a deposit based on the nature of an event. The
security deposit wil! be refunded if no damage occurs, rooms are left in clean condition, and permits
conclude on time.
Community Hall
Groups IV, VI
Groups II, III, V
$750
$300
37