HomeMy WebLinkAboutAH Packet 12-13-2018CITY OF CUPERTINO
AGENDA
ADMINISTRATIVE HEARING
5:00 PM
10300 Torre Avenue, City Hall Conference Room C
Thursday, December 13, 2018
ROLL CALL
APPROVAL OF MINUTES
1.Subject: Draft Minutes of November 20, 2018
Recommended Action: approve or modify the Draft Minutes of November 20, 2018
Draft Minutes of November 20, 2018
ORAL COMMUNICATIONS
This portion of the meeting is reserved for persons wishing to address the members on
any matter not on the agenda. Speakers are limited to three (3) minutes. In most cases,
State law will prohibit the members from making any decisions with respect to a matter
not listed on the agenda
WRITTEN COMMUNICATIONS
PUBLIC MEETING
2.Subject: Architectural and Site approval and a Director's Minor Modification to
allow renovations of a lobby and courtyard areas at an existing office park
(Cupertino City Center). Application No (s).: ASA-2018-06, DIR-2018-12;
Applicant(s): James Mallery (Prometheus Real Estate Group); Location: 20400
Stevens Creek Boulevard APN#369-01-028
Recommended Action: That the Hearing Officer conduct the public meeting and find:
1) that the proposed project is exempt from CEQA; and
2) approve the applications per the Draft Resolutions
Hearing Officer's decision final unless appealed
Staff Report
1 - Draft Resolution for ASA-2018-06
2 - Draft Resolution for DIR-2018-12
3 - Plan Set
OLD BUSINESS
Page 1
December 13, 2018Administrative Hearing AGENDA
NEW BUSINESS
ADJOURNMENT
In compliance with the Americans with Disabilities Act (ADA), anyone who is planning
to attend the next meeting who is visually or hearing impaired or has any disability
that needs special assistance should call the City Clerk's Office at 408-777-3223, 48
hours in advance of the meeting to arrange for assistance. Upon request, in advance,
by a person with a disability, meeting agendas and writings distributed for the meeting
that are public records will be made available in the appropriate alternative format.
Also upon request, in advance, an assistive listening device can be made available for
use during the meeting.
Any writings or documents provided to a majority of the members after publication of
the agenda will be made available for public inspection. Please contact the City
Clerk’s Office in City Hall located at 10300 Torre Avenue during normal business
hours.
IMPORTANT NOTICE: Please be advised that pursuant to Cupertino Municipal
Code 2.08.100 written communications sent to the Cupertino City Council,
Commissioners or City staff concerning a matter on the agenda are included as
supplemental material to the agendized item. These written communications are
accessible to the public through the City’s website and kept in packet archives. You are
hereby admonished not to include any personal or private information in written
communications to the City that you do not wish to make public; doing so shall
constitute a waiver of any privacy rights you may have on the information provided to
the City.
Members of the public are entitled to address the members concerning any item that is
described in the notice or agenda for this meeting, before or during consideration of
that item. If you wish to address the members on any other item not on the agenda, you
may do so during the public comment.
Page 2
Cupertino, CA 95014
(408) 777-3308
ACTION MINUTES OF THE SPECIAL MEETING OF
THE ADMINISTRATIVE HEARING HELD ON November 20, 2018
ROLL CALL
Hearing Officer present: Benjamin Fu, Assistant Director of Community Development
Staff present: Jeffrey Tsumura, Assistant Planner
Applicant(s) present: Satya Dasari, property owner, Stauffer Lane
Richard Wu, property owner, 10400 S Stelling Road
APPROVAL OF MINUTES:
1.September 27, 2018
The minutes of September 27, 2018 were approved as written
POSTPONEMENTS/REMOVAL FROM CALENDAR:
None
ORAL COMMUNICATIONS:
None
WRITTEN COMMUNICATIONS:
None
PUBLIC MEETING ITEMS:
2. Application No.(s): ASA-2017-08, TR-2017-42
Applicant:Satya Naranaya Dasari
Location: vacant lot, APN# 366-09-044
Architectural and Site approval to allow the construction of a new single family residence on a
vacant lot located in a Planned Residential Zone (Seven Springs); Tree Removal Permit to
allow the removal and replacement of 7 development trees to facilitate the construction of the
new residence
Administrative Hearing decision final unless appealed.
Staff member Tsumura addressed the Hearing Officer. He explained that the applicant is
proposing to build a new two-story single family residence on the last undeveloped lot on
Stauffer Lane. The lot is 18,938 square feet. The proposed two story home is 4,954 square feet
2 Administrative Hearing
November 20, 2018
with a basement. The City’s consulting Geologist has reviewed the project. Their construction
recommendations have been incorporated into the conditions of approval. The proposed
project meets the development requirements in the City’s Municipal Code and for the Seven
Springs area slope density calculations. The proposed home is consistent with the other homes
in the Seven Springs area and on Stauffer Lane. Due to the building design, materials and
topography of the lot, the massing of the home will be minimized. The property owner will be
planting privacy trees (not required) to reduce the visual impacts to the adjacent neighbors. As
the proposed project meets all the requirements for development, Staff supports the project.
The Hearing Officer asked for clarification of the FAR for the proposed home in relation to the
existing homes on Stauffer Lane. Staff member Tsumura stated that the proposed FAR is
26.2%. The existing homes range in FAR from 6% to 27.6%, with homes ranging from 3,704 and
6,915 square feet. The Hearing Officer asked how close the nearest neighbor is. Staff member
Tsumura said the closest building is the neighbor. The houses will be about 34’ apart from
each other.
The property owner addressed the Hearing Officer. He said the design of the house will add
beauty to the development. The slope of the lot helps to reduce the visual impacts to the
neighborhood.
The Hearing Officer opened the public comment period.
There were no speakers
The Hearing Officer closed the comment period.
The Hearing Officer acknowledged that these lots can be challenging to develop. He
appreciated that there had been no comments against the project as an indication of the good
outreach. The Hearing Officer confirmed that the projects meets, and in some cases exceeds, all
of the development requirements per the City’s Code.
DECISION: The application was approved by the Hearing Officer per the draft resolution(s).
3. Application No.(s): TM-2017-01
Applicant:Richard Wu (Lands of Wu)
Location: 10400 S Stelling Rd APN#: 359-13-037
Tentative Map application to subdivide an existing 19,580 SF (0.449 acres) lot into two separate
residential lots
Administrative Hearing decision final unless appealed.
Staff member Tsumura addressed the Hearing Officer. The property owner would like to
subdivide the exiting lot into to residential lots of 8,512 and 11,068 square feet each. The
second lot will have an access easement creating a flag lot, making the lot 8,565 square feet.
The project site currently has one single family residence of 2,062 square feet, a detached
carport and a variety of types of vegetation. The City’s R-7.5 Zoning Code allows for the lot of
this size to be subdivided into two residential lots as long as there is a minimum of 7,500
square feet. The creation of the two new residential lots is in conformance with the
surrounding neighborhood both in size and configuration. The property owner will need to
3 Administrative Hearing
November 20, 2018
bring the two existing driveways up to current City standards. There are no protected trees on
site. Any trees that need removed, will be removed and replaced in accordance with the City’s
Tree Ordinance. Two new single family residences will be built on the newly created lots.
Those application will be submitted separately and are not part of this approval. As the
proposed sub-division application meeting all of the Zoning requirements, Staff recommends
approval of the application.
The Hearing Officer asked what the lot size and FAR is of the neighboring lots that have flag
lots. Staff member Tsumura stated that flag lots on S. Stelling range from 10,125 to 11,772
square feet and on Tula Lane they range from 8,800 to 11,336 square feet.
The Hearing Officer opened the public comment period.
There were no speakers.
The Hearing Officer closed the comment period.
The Hearing Officer explained that the City typically discourages the creation of flag lots,
however, in this instance, the creation of a flag lot is consistent with the existing conditions in
the neighborhood. He stated that the development would make this lot consistent with the
other lots in the area.
DECISION: The application was approved by the Hearing Officer per the draft resolution(s).
ADJOURNMENT
Respectfully submitted:
_____/s/Beth Ebben
Beth Ebben
Deputy Board Clerk
ADMINISTRATIVE HEARING STAFF REPORT
Agenda Date: December 13, 2018
SUBJECT
Architectural and Site Approval and a Director’s Minor Modification to consider
landscape and building renovations to two (2) existing office buildings at the Cupertino
City Center; (Application No(s).: ASA-2018-06 and DIR-2018-12; Applicant(s): James
Mallery (WRNS Studios); Location: 20400 and 20450 Stevens Creek Boulevard; APN(s):
369 01 023, 369-01-028, 369-01-027 and Lot 7 (common area))
RECOMMENDED ACTION
That the Hearing Officer:
1. Find that the proposed actions are exempt from CEQA; and
2. Adopt the resolutions to approve the Architectural and Site Approval and Director’s
Minor Modification permits in accordance with the draft resolutions (Attachments 1
and 2).
DISCUSSION:
Application Summary:
Architectural and Site approval and Director's Minor Modification for renovations of a
lobby and courtyard areas at an existing Office Park (Cupertino City Center).
Project Data:
General Plan Designation:Commercial/Office/Residential
Special Area:City Center Node within the Heart of the City
Special Area
Zoning Designation:P(CG,OP,Res) Mixed Use Planned Development
with General Commercial, Professional Office, and
Residential uses
Existing Proposed
Lot Size:72,900 sq. ft.72,900 sq. ft. (no change)
Floor Area:- 356,256 sq. ft. (total)- No change
ASA-2018-06 20400 & 20450 Stevens Creek Boulevard (Cupertino City Center) December 13, 2018
DIR-2018-12 Page 2
Net Affected Floor Area 4,620 sq. ft.(total)4,320 sq. ft.
Maximum Existing
Height:45 feet 125’-10” (legal non-
conforming)
Project Consistency with:
General Plan:Yes
Zoning:Yes
Environmental
Assessment:
Categorically Exempt per Section 15301 (Existing
Facilities) of California Quality Act (CEQA)
Background:
Site Description
The project site is located within the
Cupertino City Center on the
southeast corner of Stevens Creek
Boulevard and S. De Anza
Boulevard. The surrounding land
uses are the Montebello
Condominiums to the north,
Cupertino City Center Apartments
to the east, Cupertino Park Center
Apartments to the south, and the
Juniper Hotel to the west. The site is
also located adjacent to a surface
parking lot to the northeast, Cali Mill
Plaza (a privately owned, publicly
accessible park) to the northwest, the
private City Center Amphitheater to
the southeast, and Seagate offices to the southwest.
The Cupertino City Center sub-area is intended to continue as a predominantly mixed
use area with office, residential, and hotel, with public spaces and neighborhood centers
to local residents.
The existing site is split diagonally into two parcels, with an eight-story building on each
parcel (20400 Stevens Creek Boulevard on the northeastern parcel and 20450 Stevens
Creek Boulevard on the southwestern parcel). Two levels of underground parking are
located underneath the two buildings. The roof of the parking podium contains a
courtyard on-grade that connects the two buildings. An exposed glass elevator, stairway,
and a glass canopy connects the underground parking to the courtyard level. The original
ASA-2018-06 20400 & 20450 Stevens Creek Boulevard (Cupertino City Center) December 13, 2018
DIR-2018-12 Page 3
intent in the development of the City Center Master Plan was to have a strong site axis
and connection between the Cali Mill Plaza at the northwest corner of the City Center
complex and the amphitheater near the southeast corner of the City Center complex.
While this connection was not memorialized through a public access easement, the intent
has always been to maintain this connection. The adjacent properties, including the
streets, access driveways, and adjacent plazas are owned and maintained by the
Cupertino City Center Owners Association (CCC-OA), consisting of Prometheus and a
few other adjacent building owners, as common areas for the development. The buildings
were constructed in 1989 as part of the City Center Master Plan (U-1986-04).
Application Requests
The applicant is seeking a complete renovation of the existing courtyard, which runs
diagonally between the two buildings and connects Cali Mill Plaza with the
amphitheater, complete with a new landscape design. The project also includes a
redesign of the buildings’ courtyard and corner lobby entries, new building finishes, and
an updated “beacon” element at the top of the existing towers. An Architectural and Site
Approval permit is required in order to approve the proposed renovations in the
courtyard and to the buildings. Since the proposed improvements extend beyond the
property boundaries of the two buildings, additional permits (Director’s Minor
Modifications) are required to approve the improvements. These include new alley
loading docks withroll-down doors, new trash enclosures, and updated paving materials
and markings to improve safety measures to a pedestrian walkway. There is no change
in the existing offices uses, which are permitted in this zoning district.
Signage is not approved as part of this proposal. Therefore, any future signs must be
approved through a sign permit or a Master Sign Program.
Analysis:
The applicant team has worked extensively with staff to address policies in General Plan:
Community Vision 2015-2040 such as site planning, building and parking location,
building layout, street interfaces, reduced driveway openings, shared and consolidated
driveway access, sidewalk and street frontage landscaping, pedestrian-oriented public
spaces, and public art.
Site Planning and Landscape Design
Courtyard
The redesign proposes a variety of hardscape, groundcover, landscaping, and scale to
create three unique spaces: a “Garden Passage” from the southeast, a “Recreation
Passage” from the northwest, and the “Central Courtyard.” The spaces would provide
outdoor recreational area for the office employees. Although the proposed outdoor
ASA-2018-06 20400 & 20450 Stevens Creek Boulevard (Cupertino City Center) December 13, 2018
DIR-2018-12 Page 4
spaces are intended for office employees, the courtyard redesign does not propose a
change to the way the courtyard is available for use by through pedestrian traffic.
The original intent of the City Center
development was to maintain a clear sight
line and thoroughfare from Cali Mill Plaza
to the amphitheater along Torre Avenue.
The applicant has indicated the proposed
remodel is to create visual interest that
would draw the public towards the
courtyard. Additionally, the proposed
design features contemplate future public
events such as farmer’s markets and stage
performances at the periphery of the
courtyard between Cali Mill Plaza and the
office buildings. The applicant intends to
maintain this thoroughfare and does not
propose to isolate this area, physically or
operationally, for solely private uses.
The proposed Garden Passage begins at the intersection of the interior private streets,
and serves as the southeast entry point to the Central Courtyard. A mix of concrete and
stone pavers replaces the existing brick paver and tile, and adds various raised steel
planters with native landscaping in place of the existing corner feature’s circular planter
bed. The walkway narrows as it makes its way between the buildings towards the
courtyard in order to emphasize the landscaping on either side and provide the user with
a “nature walk” experience. The proposed landscaping through the Garden Passage
includes low water use and drought tolerant groundcover, grasses, perennials, and
accent trees.
The proposed Recreation Passage
begins at the northwest corner of
the property, and includes a small
event space with stadium steps
for gatherings, lectures, and
performances. It also includes the
same paving materials, raised
steel planters, and landscaping
elements as the Garden Passage,
but features a wider walkway
area in between the two buildings
Figure 1: Exhibit from approved plans (U-1986-04)
Figure 2: Updated Courtyard Concept
ASA-2018-06 20400 & 20450 Stevens Creek Boulevard (Cupertino City Center) December 13, 2018
DIR-2018-12 Page 5
with deeper nooks to allow for recreational table games, potential food vendors, event
areas, and outdoor furniture.
The Central Courtyard features a mix of garden areas, built-in benches, and designated
furnished areas for outdoor meetings and gatherings. A variety of stone pavers, blended
aggregate, ornamental gravel ballasts, and planting areas help to distinguish between the
spaces. The furniture and hardscape is of high quality and complements the space.
A new, 12’-3” tall modular wood trellis feature is also proposed in the center of the
courtyard, replacing the existing glass canopy over the underground parking elevator
and stairway. It extends 66 feet in length, spanning from the parking elevator to the edge
of the Recreation Passage. This will also encompass an outdoor dining area with
communal patio furniture, an outdoor kitchen with BBQ grill, and a bar height counter.
Vine Columns
A key landscape feature includes three (3) contemporary “vine columns”, with a cable
network suspended from the project’s existing buildings. Custom-designed galvanized
and painted steel tube and steel plates will be used to connect the stainless steel cables to
the existing building steel framing. These connections will be placed at the eighth floor,
approximately 104’-9” above the courtyard. Most of the structural steel will be concealed
behind the building veneer, allowing it to be visually discrete, with the only visible steel
component being connector plates between 8” to 12” in height. The columns will be
anchored at the courtyard level with dual steel plates bolted on the top and bottom of the
below-grade garage structural slab. Custom 18” tall, elliptical-shaped, sculptural precast
planters will encompass the base with light-weight planting soil to sustain the vines and
provide additional seating.
A selection of up to seven vine species, tolerant to both sun and shade conditions and
suitable for Cupertino’s microclimate,will provide all-season foliage. Woody stemmed
Figure 3: Site Section (looking northeast - toward "Summer Lobby"
ASA-2018-06 20400 & 20450 Stevens Creek Boulevard (Cupertino City Center) December 13, 2018
DIR-2018-12 Page 6
vines were omitted to ensure growth and resiliency along the cable structures. The vines
will be 10 to 15 feet tall at the time of planting, and are anticipated to reach a mature
height of 40 feet or taller within five years, or up to four stories.
The applicant has provided a maintenance plan that includes inspection, adjustments,
and general maintenance of the cable systems on an annual basis. The vine plantings will
receive pruning and routine landscape maintenance on a quarterly basis. Boom lift and
scissor lift equipment would be typically used for these operations.
Perimeter Improvements
Site and landscape improvements extend outside the perimeter of the project site, and
incorporate new landscaping and cast-in-place concrete finishes to the renovated lobby
entrances, as well as the edges of the Recreation Passage and Garden Passage.
Additionally, the pedestrian crossing in front of the northeast entry will be enhanced with
the same pavement materials, bollards, and ADA pads for increased pedestrian safety
and visibility. Finally, the service areas in the private alleyways along the north and west
sides of the project site will include new trash enclosures with steel posts, anodized
aluminum fence panels, and concrete planters with landscape screen planting.
The improvements proposed within the common areas have received approval by the
CCC-OA.
Architectural Design
Lobby Entries
In addition to the site improvements, the applicant proposes approximately 4,622 square
feet of interior lobby updates. Overall, with the proposed changes to the lobby areas
described below, the project proposes a net conversion of approximately 327 square feet
from interior to exterior space. Therefore, a Development Permit is not required for this
ASA-2018-06 20400 & 20450 Stevens Creek Boulevard (Cupertino City Center) December 13, 2018
DIR-2018-12 Page 7
project. An adjustment will be made to the Heart of the City Development Allocation to
increase the available Development Allocation by 327 square feet.
The building’s existing
courtyard lobbies are identical in
form. Approximately 330 square
feet of the courtyard area closest
to the south tower will be
converted into an indoor space to
create a new “Winter Lobby”.
Aluminum-framed storefront
windows will be installed at the
ground and second story levels
to be flush with an existing
cantilevered third story wall and existing columns. In addition, a folding nana-wall
window system is proposed along one side of the entry doors at the ground level. Existing
exterior granite clad walls on the first story will be replaced with new fiberglass
reinforced plastic (FRP) cladding and new aluminum window systems.
Approximately 835 square feet of existing lobby area in the north tower will be converted
into exterior courtyard area to
create the northeasterly
“Summer Lobby”. The new lobby
entrance will be set back and
incorporate the same materials
and window systems as the
proposed Winter Lobby. The
newly created courtyard area will
include stone pavers, planter
areas, and will be furnished by
outdoor patio seating.
The applicant also proposes modifications to both buildings corner entrances facing the
private streets. Both entrances propose reconfigured stairways and will receive identical
FRP cladding finishes similar to the courtyard lobbies, and new planter beds. Existing,
approximately 10’-9” high, window panels on both sides of the entryways will be
replaced with new, 17’-0” tall windows. The applicant is proposing to enclose
approximately 178 square feet of the existing exterior entryway into the interior remodel.
Figure 5: Summer Lobby (Central Courtyard – northeast corner)
Figure 4: Winter Lobby (Central Courtyard – southwest corner)
ASA-2018-06 20400 & 20450 Stevens Creek Boulevard (Cupertino City Center) December 13, 2018
DIR-2018-12 Page 8
Additionally, a cantilevered, wood slat entry canopy and a vertical platform lift (to satisfy
ADA requirements)are proposed at the northeast entry.
Tower Beacon
The applicant is proposing to replace the existing
lighting system within the tower “beacons” at the
northeast and southwest corners of the building.
The towers stand at 125’-10” in height
(approximately 20 feet above the building’s roof)
and are the tallest elements of the buildings. The
plans call for replacement of the existing fluorescent
lighting with more energy efficient LED lighting.
The proposed design conceals an LED lighting
fixture behind a metal valance, which reflects
indirect lighting off the screen and greatly diffuses
the light for neighboring views. The proposed
design directs light in a more intentional way to
reduce glare and light pollution. Total lumen output
is reduced by over 50% from 79,286 lumens to 36,448 lumens at full brightness.
Additionally, the fixtures are dimmable and can be used independently of each other.
A photometric study indicates a measurement of 0.1 foot-candles at 33 feet away from
the face of the neighboring Montebello Condominiums, which sits three stories below the
towers and is the closest residential building to the beacons. This indicates little to no
impact to the residential neighbors from this illumination.
Environmental Review
This project is categorically exempt from the requirements of the California
Environmental Quality Act (CEQA) per Section 15301 –Existing Facilities.
Other Department/Agency Review
The City’s Public Works Department; Building Division; Environmental Programs
Division; the Santa Clara County Fire Department; and Cupertino Sanitary District
reviewed the request and have no objections to the project. Their pre-hearing comments
have been incorporated as conditions of approval in the draft resolutions.
Figure 6: Tower Lighting
ASA-2018-06 20400 & 20450 Stevens Creek Boulevard (Cupertino City Center) December 13, 2018
DIR-2018-12 Page 9
PUBLIC NOTICING AND COMMUNITY OUTREACH
The following table is a brief summary of the noticing for this project:
Notice of Public Hearing Agenda
Site Signage (at least 10 days prior to
hearing)
206 notices mailed to property owners
XXX feet/adjacent to the project site (at
least 10 days prior to the hearing)
Posted on the City's official notice
bulletin board (five days prior to
hearing)
Posted on the City of Cupertino’s
Web site (five days prior to hearing)
No comments have been received at the time of production of this staff report.
PERMIT STREAMLINING ACT
This project is subject to the Permit Streamlining Act (Government Code Section 65920 –
65964). The City has complied with the deadlines found in the Permit Streamlining Act.
Project Received:June 1, 2018; Deemed Incomplete:June 29, 2018
Revisions Received:August 24, 2018; Deemed Incomplete:September 20, 2018
Revisions Received:November 8, 2018; Deemed Complete:November 15, 2018
Since this project is Categorically Exempt, the City has 60 days (until January 15, 2019) to
make a decision on the project.
CONCLUSION
Staff recommends approval of the Architectural and Site Approval and Director’s Minor
Modification, since the plans and conditions of approval address all concerns related to
the proposed project. Additionally, all of the findings for approval of the proposed
project, consistent with chapters 19.12, 19.164, and 19.168 of the Cupertino Municipal
Code, may be made as follows.
With respect to the Architectural and Site Approval permit, the following findings may
be made:
1. The proposed development, at the proposed location, will not be detrimental or
injurious to property or improvements in the vicinity, and will not be detrimental to
the public health, safety, general welfare, or convenience;
The applicant proposes a complete courtyard landscape renovation between two existing
buildings and a remodel of the building’s corner and courtyard lobby entries. The lobby
remodel will result in a net reduction of approximately 327 square feet from the buildings. A
distinctive component of the courtyard renovations is the addition of three (3) “vine columns”,
featuring a selection of vine species determined to be tolerant to sun and shade, and suitable
ASA-2018-06 20400 & 20450 Stevens Creek Boulevard (Cupertino City Center) December 13, 2018
DIR-2018-12 Page 10
for Cupertino’s microclimate. A custom-designed cable network will be suspended from the
buildings. Improvements along the site perimeter are also proposed, including landscape
modifications, enhancements to the pedestrian crossing within the block, improvements to
allow accessibility to the differently abled, and new trash enclosures along the building
alleyways. New building finishes will be added to the façade along the ground level. An
updated lighting system is also proposed to the building’s existing tower “beacons” with a
reduced lumen output and diffused, indirect illumination to reduce glare to the nearby
residential developments. All of the proposed changes are improvements to the existing site
and will not be detrimental or injurious to property or improvements in the vicinity.
2. The proposal is consistent with the purposes of Chapter 19.168, the General Plan any
specific plan, zoning ordinances, applicable planned development permit, conditional
use permits, variances, subdivision maps or other entitlements to use which regulate
the subject property including, but not limited to, adherence to the following specific
criteria:
a) Abrupt changes in building scale should be avoided. A gradual transition related
to height and bulk should be achieved between new and existing buildings.
The scale of the building will be maintained with no changes to the height of the building.
Although the proposed remodel of the Winter Lobby will convert approximately 330 square
feet of courtyard area into interior space, this conversion will occur under an existing
building overhang. Additionally, there will be a reduction in interior floor area with the
creation of the Summer Lobby which will remove some bulk from the existing building and
not add any height to the existing building. Therefore, there will be no changes to the
overall height of the building. The new lobby design and siding materials will provide
enhanced architectural articulation, including a new cantilevered, wood slat entry canopy
and scaled window paneling that will further enhance the addition and mitigate the overall
building mass.
b) In order to preserve design harmony between new and existing buildings and in
order to preserve and enhance property values, the materials, textures and colors
of new building should harmonize with adjacent development by being consistent
or compatible with design and color schemes with the future character of the
neighborhoods and purposes of the zone in which they are situated. The location,
height and materials of walls, fencing, hedges and screen planting should
harmonize with adjacent development. Unsightly storage areas, utility
installations and unsightly elements of parking lots should be concealed. The
planting of ground cover or various types of pavements should be used to prevent
dust and erosion, and the unnecessary destruction of existing healthy trees should
be avoided. Lighting for development should be adequate to meet safety
ASA-2018-06 20400 & 20450 Stevens Creek Boulevard (Cupertino City Center) December 13, 2018
DIR-2018-12 Page 11
requirements as specified by the engineering and building departments, and
provide shielding to prevent spill-over light to adjoining property owners.
The new building materials will integrate fiberglass reinforced plastic (FRP) panel
material, window framing, and colors complementary with existing building materials and
colors to preserve design harmony and integrity. New screen walls and trash enclosures
are proposed along the north and west private alleys and will incorporate anodized
aluminum fence panels and concrete planters with landscape screen planting for a
contemporary design. A variety of new native and low water use groundcover, plantings,
and pavements are proposed throughout the courtyard and edges of the project site. The
proposed tower beacon lighting system will feature new LED fixtures with lower lumen
output and diffused, indirect lighting, resulting in reduced lighting to neighboring
properties. Additionally, these fixtures are dimmable and can be used independently of each
other.
c) The number, location, color, size, height, lighting and landscaping of outdoor
advertising signs and structures have been designed to minimize traffic hazard,
positively affect the general appearance of the neighborhood and harmonize with
adjacent development.
Signage approval is not included in this application and will be reviewed separately under
a separate building permit or Master Sign Program.
d) With respect to new projects within existing residential neighborhoods, new
development should be designed to protect residents from noise, traffic, light and
visually intrusive effects by use of buffering, setbacks, landscaping, walls and
other appropriate design measures.
No new windows above the ground level are proposed for the walls facing outwards
towards the private roads within the City Center facing the residential property. The height
of four (4) existing window panels on two sides of the corner entryways will be increased,
from approximately 10’-9” to 17’-0” measured from finished floor to give a sense of space
to the entrance lobby areas. Since these are high volume spaces, there will not be any
privacy issues to the existing residences. Additionally, the proposed lighting systems in
the existing tower beacons will result in less glare and visual intrusion to the adjacent
residences.
With respect to the Director’s Minor Modification permits, the following findings may be
made:
1. The application is a minor change to a plan which has received site and designs
approval.
The modifications to the site under this permit are small strips of land along the primary project
site, and include new landscaping and pavement materials. Two new trash enclosures,
ASA-2018-06 20400 & 20450 Stevens Creek Boulevard (Cupertino City Center) December 13, 2018
DIR-2018-12 Page 12
required by the City’s Municipal Code, are proposed along the western and northern alleyway
loading docks. Additionally, the project includes updated paving materials and markings to
improve safety measures to a pedestrian walkway along Macadam Lane. The affected areas are
small and are primarily on-grade improvements. The proposed modifications for this project,
therefore, is considered minor.
2. The proposed development and/or use will be located and conducted in a manner in
accord with the Cupertino Comprehensive General Plan, underlying zoning
regulations, and the purpose of this title and complies with the California
Environmental Quality Act (CEQA).
The proposed project is consistent with and will be conducted in a manner in accordance with
the General Plan and Zoning Ordinance. No increase in floor area or height is proposed.
Furthermore, the proposed modifications to the site are categorically exempt under CEQA in
as the project is an existing site that involves only minor modifications.
NEXT STEPS
The permit will be effective 14 calendar days from the date of the hearing. The decision
of the Administrative Hearing Officer is final, unless appealed within 14 calendar days
from the date of the hearing. The applicant team may apply for building and/or other
permits with the City at the end of the appeal period.
This approval is valid until December 13, 2019. The applicant team may apply for a one-
time one year extension before the approval expires.
Prepared by: Jeffrey Tsumura, Assistant Planner
Reviewed and Approved by:Piu Ghosh, Principal Planner
ATTACHMENTS
1. Draft Resolution for ASA-2018-06
2. Draft Resolution for DIR-2018-12
3. Plan Set
ASA-2018-06
CITY OF CUPERTINO
10300 Torre Avenue
Cupertino, California 95014
DRFT RESOLUTION NO.
OF THE ADMINISTRATIVE HEARING OFFICER OF THE CITY OF
CUPERTINO APPROVING AN ARCHITECTURAL AND SITE APPROVAL
PERMIT TO CONSIDER ALLOWING LANDSCAPE AND ARCHITECTURAL
MODIFICATIONS TO TWO (2) EXISTING HIGH RISE BUILDINGS IN THE
CUPERTINO CITY CENTER LOCATED AT 20400 AND 20450 STEVENS CREEK
BOULEVARD (APN 369-01-027 & 369-01-028)
SECTION I: PROJECT DESCRIPTION
Application No.:ASA-2018-06
Applicant:James Mallery (WRNS Studios)
Location:20400 & 20450 Stevens Creek Boulevard
SECTION II: FINDINGS FOR ARCHITECTURAL AND SITE APPROVAL PERMIT:
WHEREAS, the City of Cupertino received an application for an Architectural and Site
Approval and Director’s Minor Modification to consider allowing landscape and
architectural modifications to two (2) existing high rise buildings in the Cupertino City
Center, as described in Section I. of this Resolution; and
WHEREAS, the necessary public notices have been given as required by the Procedural
Ordinance of the City of Cupertino, and the Administrative Hearing Officer has held at
least one public meeting in regard to the application; and
WHEREAS, the project is determined to be exempt from the California Environmental
Quality Act (CEQA); and
WHEREAS, the applicant has met the burden of proof required to support said
application; and
WHEREAS, the Administrative Hearing Officer finds as follows with regard to this
application:
1.The proposed development, at the proposed location, will not be detrimental or
injurious to property or improvements in the vicinity, and will not be detrimental to
the public health, safety, general welfare, or convenience;
Resolution No. ASA-2018-06 December 13, 2018
Page 2
The applicant proposes a complete courtyard landscape renovation between two existing
buildings and a remodel of the building’s corner and courtyard lobby entries. The lobby
remodel will result in a net reduction of approximately 327 square feet from the buildings.
A distinctive component of the courtyard renovations is the addition of three (3) “vine
columns”, featuring a selection of vine species determined to be tolerant to sun and shade,
and suitable for Cupertino’s microclimate. A custom-designed cable network will be
suspended from the buildings. Improvements along the site perimeter are also proposed,
including landscape modifications, enhancements to the pedestrian crossing within the block,
improvements to allow accessibility to the differently abled, and new trash enclosures along
the building alleyways. New building finishes will be added to the façade along the ground
level. An updated lighting system is also proposed to the building’s existing tower “beacons”
with a reduced lumen output and diffused, indirect illumination to reduce glare to the nearby
residential developments. All of the proposed changes are improvements to the existing site
and will not be detrimental or injurious to property or improvements in the vicinity.
2.The proposal is consistent with the purposes of Chapter 19.168, the General Plan
any specific plan, zoning ordinances, applicable planned development permit,
conditional use permits, variances, subdivision maps or other entitlements to use
which regulate the subject property including, but not limited to, adherence to the
following specific criteria:
a) Abrupt changes in building scale should be avoided. A gradual transition related
to height and bulk should be achieved between new and existing buildings.
The scale of the building will be maintained with no changes to the height of the building.
Although the proposed remodel of the Winter Lobby will convert approximately 330 square
feet of courtyard area into interior space, this conversion will occur under an existing
building overhang. Additionally, there will be a reduction in interior floor area with the
creation of the Summer Lobby which will remove some bulk from the existing building and
not add any height to the existing building. Therefore, there will be no changes to the
overall height of the building. The new lobby design and siding materials will provide
enhanced architectural articulation, including a new cantilevered, wood slat entry canopy
and scaled window paneling that will further enhance the addition and mitigate the overall
building mass.
b) In order to preserve design harmony between new and existing building and in
order to preserve and enhance property values, the materials, textures and colors
of new building should harmonize with adjacent development by being consistent
or compatible with design and color schemes with the future character of the
neighborhoods and purposes of the zone in which they are situated. The location,
height and materials of walls, fencing, hedges and screen planting should
harmonize with adjacent development. Unsightly storage areas, utility
Resolution No. ASA-2018-06 December 13, 2018
Page 3
installations and unsightly elements of parking lots should be concealed. The
planting of ground cover or various types of pavements should be used to prevent
dust and erosion, and the unnecessary destruction of existing healthy trees should
be avoided. Lighting for development should be adequate to meet safety
requirements as specified by the engineering and building departments, and
provide shielding to prevent spill-over light to adjoining property owners.
The new building materials will integrate fiberglass reinforced plastic (FRP) panel material,
window framing, and colors complementary with existing building materials and colors to
preserve design harmony and integrity. New screen walls and trash enclosures are proposed
along the north and west private alleys and will incorporate anodized aluminum fence
panels and concrete planters with landscape screen planting for a contemporary design. A
variety of new native and low water use groundcover, plantings, and pavements are
proposed throughout the courtyard and edges of the project site. The proposed tower beacon
lighting system will feature new LED fixtures with lower lumen output and diffused,
indirect lighting, resulting in reduced lighting to neighboring properties. Additionally,
these fixtures are dimmable and can be used independently of each other.
c) The number, location, color, size, height, lighting and landscaping of outdoor
advertising signs and structures have been designed to minimize traffic hazard,
positively affect the general appearance of the neighborhood and harmonize with
adjacent development.
Signage approval is not included in this application and will be reviewed separately under
a separate building permit or Master Sign Program.
d) With respect to new projects within existing residential neighborhoods, new
development should be designed to protect residents from noise, traffic, light and
visually intrusive effects by use of buffering, setbacks, landscaping, walls and
other appropriate design measures.
No new windows above the ground level are proposed for the walls facing outwards towards
the private roads within the City Center facing the residential property. The height of four
(4) existing window panels on two sides of the corner entryways will be increased, from
approximately 10’-9” to 17’-0” measured from finished floor to give a sense of space to the
entrance lobby areas. Since these are high volume spaces, there will not be any privacy issues
to the existing residences. Additionally, the proposed lighting systems in the existing tower
beacons will result in less glare and visual intrusion to the adjacent residences.
NOW, THEREFORE, BE IT RESOLVED:
That after careful consideration of the maps, facts, exhibits, testimony, staff’s report and
presentation,and other evidence submitted in this matter, subject to the conditions which
are enumerated in this Resolution beginning on PAGE 4 thereof,:
Resolution No. ASA-2018-06 December 13, 2018
Page 4
The application for a Architectural and Site Approval, Application no. ASA-2018-06 is
hereby approved and that the subconclusions upon which the findings and conditions
specified in this resolution are based and contained in the Public Hearing record
concerning Application no. ASA-2018-06 as set forth in the Minutes of the Administrative
Hearing Meeting of December 13, 2018 and are incorporated by reference as though fully
set forth herein.
SECTION III: CONDITIONS ADMINISTERED BY THE COMMUNITY
DEVELOPMENT DEPT.
1. APPROVED EXHIBITS
Approval is based on the plan set drawn by WRNS Studio entitled “Cupertino City
Center, 20400 and 20450 Stevens Creek Blvd” consisting of fifty-five(55) sheets,except
as may be amended by conditions in this resolution.
2. ACCURACY OF PROJECT PLANS
The applicant/property owner is responsible to verify all pertinent property data
including but not limited to property boundary locations, building setbacks, property
size, building square footage, any relevant easements and/or construction records.
Any misrepresentation of any property data may invalidate this approval and may
require additional review.
3. ANNOTATION OF THE CONDITIONS OF APPROVAL
The conditions of approval set forth shall be incorporated into and annotated on the
first page of the building plans.
4. CONCURRENT APPROVAL CONDITIONS
The conditions of approval contained in file no. DIR-2018-12 shall be applicable to this
approval.
5. EXTERIOR BUILDING MATERIALS/TREATMENTS
The final building exterior plan shall closely resemble the details shown on the
original approved plans. Final building exterior treatment plan (including but not
limited to details on exterior color, materials, architectural treatments, doors,
windows, lighting fixtures, and/or embellishments) shall be reviewed and approved
by the Director of Community Development prior to issuance of building permits to
ensure quality and consistency. Any exterior changes determined to be substantial
by the Director of Community Development shall either require a modification to this
permit or a new permit based on the extent of the change.
Resolution No. ASA-2018-06 December 13, 2018
Page 5
6. PREVIOUS CONDITIONS OF APPROVAL
All prior conditions of approval through past approvals shall remain in effect unless
superseded by or in conflict with subsequent conditions of approval and as
specifically amended by this approval.
7. SIGNAGE
Signage is not approved with this application. Signage shall conform to the City Sign
Code.
8. SITE IMPROVEMENTS
All proposed site improvements shall be completed prior to final occupancy of any
structures approved in conjunction with the project.
9. TREE PROTECTION
As part of the demolition or building permit drawings, a tree protection plan shall be
prepared by a certified arborist for the trees to be retained. In addition, the following
measures shall be added to the protection plan:
For trees to be retained, chain link fencing and other root protection shall be
installed around the dripline of the tree prior to any project site work.
No parking or vehicle traffic shall be allowed under root zones, unless using
buffers approved by the Project Arborist.
No trenching within the critical root zone area is allowed. If trenching is
needed in the vicinity of trees to be retained, the City’s consulting arborist shall
be consulted before any trenching or root cutting beneath the dripline of the
tree.
Wood chip mulch shall be evenly spread inside the tree projection fence to a
four-inch depth.
Tree protection conditions shall be posted on the tree protection barriers.
Retained trees shall be watered to maintain them in good health.
A covenant on the property shall be recorded that identifies all the protected
trees, prior to final occupancy.
The tree protection measures shall be inspected and approved by the certified arborist
prior to issuance of building permits. The City’s consulting arborist shall inspect the
trees to be retained and shall provide reviews prior to issuance of demolition, grading
or building permits. A report ascertaining the good health of the trees mentioned
above shall be provided prior to issuance of final occupancy.
10. LANDSCAPE PROJECT SUBMITTAL
Prior to issuance of building permits, the applicant shall submit a full Landscape
Documentation Package, per sections 14.15.050 A, B, C, and D of the Landscape
Resolution No. ASA-2018-06 December 13, 2018
Page 6
Ordinance, for projects with landscape area 500 square feet or more or elect to
submit a Prescriptive Compliance Application per sections 14.15.040 A, B, and C for
projects with landscape area between 500 square feet and 2,500 square feet.The
Landscape Documentation Package or Prescriptive Compliance Application shall be
reviewed and approved to the satisfaction of the Director of Community
Development prior to issuance of building permits, and additional requirements per
sections 14.15.040 D, E, F, and G or 14.15.050 E, F, G, H, and I will be required to be
reviewed and approved prior to final inspections.
11. LANDSCAPE AND IRRIGATION MAINTENANCE
Per the Landscape Ordinance (CMC, Chapter 14.15), a maintenance schedule shall
be established and submitted to the Director of Community Development or his/her
designee, either with the landscape application package, with the landscape
installation report, or any time before the landscape installation report is submitted.
12. LANDSCAPE INSTALLATION REPORT
The project is subject to all provisions delineated in the Landscape Ordinance (CMC,
Chapter 14.15). A landscape installation audit shall be conducted by a certified
landscape professional after the landscaping and irrigation system have been
installed. The findings of the assessment shall be consolidated into a landscape
installation report.
The landscape installation report shall include, but is not limited to: inspection to
confirm that the landscaping and irrigation system are installed as specified in the
landscape and irrigation design plan, system tune-up, system test with distribution
uniformity, reporting overspray or run-off that causes overland flow, and preparation
of an irrigation schedule.
The landscape installation report shall include the following statement: “The
landscape and irrigation system have been installed as specified in the landscape and
irrigation design plan and complies with the criteria of the ordinance and the permit.”
13. GRADING AND CONSTRUCTION HOURS AND NOISE LIMITS
a) All grading activities shall be limited to the dry season (April 15 to October 1),
unless permitted otherwise by the Director of Public works.
b) Construction hours and noise limits shall be compliant with all requirements of
Chapter 10.48 of the Cupertino Municipal Code.
c) Grading, street construction, underground utility and demolition hours for work
done more than 750 feet away from residential areas shall be limited to Monday
through Friday, 7 a.m. to 8 p.m. and Saturday and Sunday, 9 a.m. to 6 p.m.
Grading, street construction, demolition or underground utility work within 750
Resolution No. ASA-2018-06 December 13, 2018
Page 7
feet of residential areas shall not occur on Saturdays, Sundays, holidays, and
during the nighttime period as defined in Section 10.48.053(b) of the Municipal
Code.
d) Construction activities shall be limited to Monday through Friday, 7 a.m. to 8 p.m.
and Saturday and Sunday, 9 a.m. to 6 p.m. Construction activities are not allowed
on holidays as defined in Chapter 10.48 of the Municipal Code. Night time
construction is allowed if compliant with nighttime standards of Section 10.48 of
the Cupertino Municipal Code.
e) Rules and regulations pertaining to all construction activities and limitations
identified in this permit, along with the name and telephone number of an
applicant appointed disturbance coordinator, shall be posted in a prominent
location at the entrance to the job site.
f) The applicant shall be responsible for educating all contractors and subcontractors
of said construction restrictions.
The applicant shall comply with the above grading and construction hours and noise
limit requirements unless otherwise indicated.
14. DUST CONTROL
The following construction practices shall be implemented during all phases of
construction for the proposed project to prevent visible dust emissions from leaving
the site:
a) Water all active construction areas at least twice daily and more often during
windy periods to prevent visible dust from leaving the site; active areas adjacent
to windy periods; active areas adjacent to existing land uses shall be kept damp
at all times, or shall be treated with non-toxic stabilizers or dust palliatives.
b) Cover all trucks hauling soil, sand, and other loose materials or require all trucks
to maintain at least 2 feet of freeboard;
c) Pave, apply water at least three times daily, or apply (non-toxic) soil stabilizers
on all unpaved access roads, parking areas and staging areas at construction
sites.
d) Sweep streets daily, or more often if necessary (preferably with water sweepers)
if visible soil material is carried onto adjacent public streets.
e) The applicant shall incorporate the City’s construction best management
practices into the building permit plan set.
15. NOISE CONTROL
Noise levels are not to exceed those listed in Chapter 10.48: Community Noise
Control of the Cupertino Municipal Code, unless approved by special exception
by the Noise Control Officer. The applicant may have to conduct future tests to
Resolution No. ASA-2018-06 December 13, 2018
Page 8
verify they are complying with the ordinance at the request of the Community
Development Director.
16. UTILITY STRUCTURE PLAN
Prior to issuance of building permits, the applicant shall work with staff to provide a
detailed utility plan to demonstrate screening or undergrounding of all new utlity
structures [including, but not limited to backflow preventers (BFP), fire department
connections (FDC), post-indicator valves (PIV), and gas meters] to the satisfaction of
the Director of Community Development, Public Works, Fire Department, and
applicable utility agencies.
17. SCREENING
All mechanical and other equipment on the building or on the site shall be screened
so they are not visible from public street areas or adjoining developments. Screening
materials/colors shall match building features and materials. The height of the
screening shall be taller than the height of the mechanical equipment that it is
designed to screen. The location of equipment and necessary screening shall be
reviewed and approved by the Director of Community Development prior to issuance
of building permits.
18. CONSULTATION WITH OTHER DEPARTMENTS
The applicant is responsible to consult with other departments and/or agencies with
regard to the proposed project for additional conditions and requirements. Any
misrepresentation of any submitted data may invalidate an approval by the
Community Development Department.
19. INDEMNIFICATION
Except as otherwise prohibited by law, the applicant shall indemnify and hold
harmless the City, its City Council, and its officers, employeesand agents (collectively,
the “indemnified parties”) from and against any claim, action, or proceeding brought
by a third party against one or more of the indemnified parties or one or more of the
indemnified parties and the applicant to attack, set aside, or void this Resolution or
any permit or approval authorized hereby for the project, including (without
limitation) reimbursing the City its actual attorneys’ fees and costs incurred in defense
of the litigation. The applicant shall pay such attorneys’ fees and costs within 30 days
following receipt of invoices from City. Such attorneys’ fees and costs shall include
amounts paid to counsel not otherwise employed as City staff and shall include City
Attorney time and overhead costs and other City staff overhead costs and any costs
directly related to the litigation reasonably incurred by City.
Resolution No. ASA-2018-06 December 13, 2018
Page 9
20. NOTICE OF FEES, DEDICATIONS, RESERVATIONS, OR OTHER EXACTIONS
The Conditions of Project Approval set forth herein may include certain fees,
dedication requirements, reservation requirements, and other exactions. Pursuant to
Government Code Section 66020(d) (1), these Conditions constitute written notice of
a statement of the amount of such fees, and a description of the dedications,
reservations, and other exactions. You are hereby further notified that the 90-day
approval period in which you may protest these fees, dedications, reservations, and
other exactions, pursuant to Government Code Section 66020(a), has begun. If you
fail to file a protest within this 90-day period complying with all of the requirements
of Section 66020, you will be legally barred from later challenging such exactions.
PASSED AND ADOPTED this 13th day of December, 2018 at a noticed Administrative
Hearing of the City of Cupertino, State of California, held by the Administrative Hearing
Officer, pursuant to Cupertino Municipal Code Section 19.12.120.
ATTEST:APPROVED:
Jeffrey Tsumura Benjamin Fu
Assistant Planner Assistant Director of Community Development
CITY OF CUPERTINO
10300 Torre Avenue
Cupertino, California 95014
DRAFT RESOLUTION
OF THE ADMINISTRATIVE HEARING MEETING OF THE CITY OF
CUPERTINO ALLOWING MODIFICATIONS TO THE SITE INCLUDING
LANDSCAPING AND PAVEMENT MODIFICATIONS TO THE PERIMETER
OF THE BUILDINGS LOCATED IN THE SHARED PRIVATE AREAS ALONG
20400 AND 20450 STEVENS CREEK BOULEVARD
(APN 369-01-023 & 369-01-995)
SECTION I: PROJECT DESCRIPTION
Application No.:DIR-2018-12
Applicant:James Mallery (WRNS Studio)
Location:Perimeter around 20400 and 20450 Stevens Creek Boulevard (APN
369-01-023 and 369-01-995)
SECTION II: FINDINGS
WHEREAS, the Administrative Hearing Officer of the City of Cupertino received an
application to allow for site and architectural modifications for the site located at 20400
and 20450 Stevens Creek Boulevard within the Cupertino City Center;
WHEREAS, the project is categorically exempt from the California Environmental
Quality Act (CEQA); and
WHEREAS, the necessary public hearing notices have been given as required by the
Procedural Ordinance of the City of Cupertino, and the Administrative Hearing Officer
has held at least one public hearing in regard to the application; and
WHEREAS, the applicant has met the burden of proof required to support said
application; and
WHEREAS, the Administrative Hearing Officer finds:
1. The application is a minor change to a plan which has received site and designs
approval.
The modifications to the site under this permit are small strips of land along the
primary project site, and include new landscaping and pavement materials. Two new
Draft Resolution DIR-2018-12 December 13, 2018
Page 2
trash enclosures, required by the City’s Municipal Code, are proposed along the
western and northern alleyway loading docks. Additionally, the project includes
updated paving materials and markings to improve safety measures to a pedestrian
walkway along Macadam Lane. The affected areas are small and are primarily on-
grade improvements. The proposed modifications for this project, therefore, is
considered minor.
2. The proposed development and/or use will be located and conducted in a manner in
accord with the Cupertino Comprehensive General Plan, underlying zoning
regulations, and the purpose of this title and complies with the California
Environmental Quality Act (CEQA).
The proposed project is consistent with and will be conducted in a manner in
accordance with the General Plan and Zoning Ordinance. No increase in floor area or
height is proposed. Furthermore, the proposed modifications to the site are
categorically exempt under CEQA in as the project is an existing site that involves
only minor modifications.
NOW, THEREFORE, BE IT RESOLVED:
That after careful consideration of maps, facts, exhibits, testimony and other evidence
submitted in this matter, subject to the conditions which are enumerated in Section III
and IV of this Resolution beginning on Page 2 thereof, the Application No. DIR-2018-12 is
hereby approved; and that the sub-conclusions upon which the findings and conditions
specified in this Resolution are based and contained in the public hearing record
concerning Application DIR-2018-12 as set forth in the Minutes of the Administrative
Hearing Meeting of December 13, 2018, and are incorporated by reference as though fully
set forth herein.
SECTION III: CONDITIONS ADMINISTERED BY THE COMMUNITY
DEVELOPMENT DEPARTMENT
1. APPROVED EXHIBITS
Approval is based on the plan set drawn by WRNS Studio entitled “Cupertino City
Center, 20400 and 20450 Stevens Creek Blvd” consisting of fifty-five (55) sheets,
except as may be amended by conditions in this resolution.
2. ACCURACY OF PROJECT PLANS
The applicant/property owner is responsible to verify all pertinent property data
including but not limited to property boundary locations, building setbacks,
property size, building square footage, any relevant easements and/or
Draft Resolution DIR-2018-12 December 13, 2018
Page 3
construction records. Any misrepresentation of any property data may invalidate
this approval and may require additional review.
3. ANNOTATION OF THE CONDITIONS OF APPROVAL
The conditions of approval set forth shall be incorporated into and annotated on
the first page of the building plans.
4. CONCURRENT APPROVAL CONDITIONS
The conditions of approval contained in file no. ASA-2018-06 shall be applicable
to this approval.
5. SIGNAGE
Signage is not approved with this application. All signage shall conform to the
City’s Sign Ordinance.
6. TREE PROTECTION
As part of the demolition or building permit drawings, a tree protection plan shall
be prepared by a certified arborist for the trees to be retained. In addition, the
following measures shall be added to the protection plan:
For trees to be retained, chain link fencing and other root protection shall be
installed around the dripline of the tree prior to any project site work.
No parking or vehicle traffic shall be allowed under root zones, unless using
buffers approved by the Project Arborist.
No trenching within the critical root zone area is allowed. If trenching is
needed in the vicinity of trees to be retained, the City’s consulting arborist
shall be consulted before any trenching or root cutting beneath the dripline of
the tree.
Wood chip mulch shall be evenly spread inside the tree projection fence to a
four-inch depth.
Tree protection conditions shall be posted on the tree protection barriers.
Retained trees shall be watered to maintain them in good health.
A covenant on the property shall be recorded that identifies all the protected
trees, prior to final occupancy.
The tree protection measures shall be inspected and approved by the certified
arborist prior to issuance of building permits. The City’s consulting arborist shall
inspect the trees to be retained and shall provide reviews prior to issuance of
demolition, grading or building permits. A report ascertaining the good health of
the trees mentioned above shall be provided prior to issuance of final occupancy.
Draft Resolution DIR-2018-12 December 13, 2018
Page 4
7. LANDSCAPE PROJECT SUBMITTAL
Prior to issuance of building permits, the applicant shall submit a full Landscape
Documentation Package, per sections 14.15.050 A, B, C, and D of the Landscape
Ordinance, for projects with landscape area 500 square feet or more or elect to
submit a Prescriptive Compliance Application per sections 14.15.040 A, B, and C for
projects with landscape area between 500 square feet and 2,500 square feet.The
Landscape Documentation Package or Prescriptive Compliance Application shall be
reviewed and approved to the satisfaction of the Director of Community
Development prior to issuance of building permits, and additional requirements per
sections 14.15.040 D, E, F, and G or 14.15.050 E, F, G, H, and I will be required to be
reviewed and approved prior to final inspections.
8. LANDSCAPE AND IRRIGATION MAINTENANCE
Per the Landscape Ordinance (CMC, Chapter 14.15), a maintenance schedule shall
be established and submitted to the Director of Community Development or his/her
designee, either with the landscape application package, with the landscape
installation report, or any time before the landscape installation report is submitted.
9. LANDSCAPE INSTALLATION REPORT
The project is subject to all provisions delineated in the Landscape Ordinance (CMC,
Chapter 14.15). A landscape installation audit shall be conducted by a certified
landscape professional after the landscaping and irrigation system have been
installed. The findings of the assessment shall be consolidated into a landscape
installation report.
The landscape installation report shall include, but is not limited to: inspection to
confirm that the landscaping and irrigation system are installed as specified in the
landscape and irrigation design plan, system tune-up, system test with distribution
uniformity, reporting overspray or run-off that causes overland flow, and
preparation of an irrigation schedule.
The landscape installation report shall include the following statement: “The
landscape and irrigation system have been installed as specified in the landscape
and irrigation design plan and complies with the criteria of the ordinance and the
permit.”
10. GRADING AND CONSTRUCTION HOURS AND NOISE LIMITS
a) All grading activities shall be limited to the dry season (April 15 to October 1),
unless permitted otherwise by the Director of Public works.
b) Construction hours and noise limits shall be compliant with all requirements of
Chapter 10.48 of the Cupertino Municipal Code.
Draft Resolution DIR-2018-12 December 13, 2018
Page 5
c) Grading, street construction, underground utility and demolition hours for work
done more than 750 feet away from residential areas shall be limited to Monday
through Friday, 7 a.m. to 8 p.m. and Saturday and Sunday, 9 a.m. to 6 p.m.
Grading, street construction, demolition or underground utility work within 750
feet of residential areas shall not occur on Saturdays, Sundays, holidays, and
during the nighttime period as defined in Section 10.48.053(b) of the Municipal
Code.
d) Construction activities shall be limited to Monday through Friday, 7 a.m. to 8
p.m. and Saturday and Sunday, 9 a.m. to 6 p.m. Construction activities are not
allowed on holidays as defined in Chapter 10.48 of the Municipal Code. Night
time construction is allowed if compliant with nighttime standards of Section
10.48 of the Cupertino Municipal Code.
e) Rules and regulations pertaining to all construction activities and limitations
identified in this permit, along with the name and telephone number of an
applicant appointed disturbance coordinator, shall be posted in a prominent
location at the entrance to the job site.
f) The applicant shall be responsible for educating all contractors and
subcontractors of said construction restrictions.
The applicant shall comply with the above grading and construction hours and
noise limit requirements unless otherwise indicated
11. DUST CONTROL
The following construction practices shall be implemented during all phases of
construction for the proposed project to prevent visible dust emissions from leaving
the site:
a) Water all active construction areas at least twice daily and more often during
windy periods to prevent visible dust from leaving the site; active areas adjacent
to windy periods; active areas adjacent to existing land uses shall be kept damp
at all times, or shall be treated with non-toxic stabilizers or dust palliatives.
b) Cover all trucks hauling soil, sand, and other loose materials or require all trucks
to maintain at least 2 feet of freeboard;
c) Pave, apply water at least three times daily, or apply (non-toxic) soil stabilizers
on all unpaved access roads, parking areas and staging areas at construction
sites.
d) Sweep streets daily, or more often if necessary (preferably with water sweepers)
if visible soil material is carried onto adjacent public streets.
e) The applicant shall incorporate the City’s construction best management
practices into the building permit plan set.
Draft Resolution DIR-2018-12 December 13, 2018
Page 6
12. UTILITY STRUCTURE PLAN
Prior to issuance of building permits, the applicant shall work with staff to provide a
detailed utility plan to demonstrate screening or undergrounding of all new utlity
structures [including, but not limited to backflow preventers (BFP), fire department
connections (FDC), post-indicator valves (PIV), and gas meters] to the satisfaction of
the Director of Community Development, Public Works, Fire Department, and
applicable utility agencies.
13. NOISE CONTROL
Noise levels are not to exceed those listed in Chapter 10.48: Community Noise
Control of the Cupertino Municipal Code, unless approved by special exception
by the Noise Control Officer. The applicant may have to conduct future tests to
verify they are complying with the ordinance at the request of the Community
Development Director.
14. CONSULTATION WITH OTHER DEPARTMENTS
The applicant is responsible to consult with other departments and/or agencies
with regard to the proposed project for additional conditions and requirements.
Any misrepresentation of any submitted data may invalidate an approval by the
Community Development Department.
15. INDEMNIFICATION
Except as otherwise prohibited by law, the applicant shall indemnify and hold
harmless the City, its City Council, and its officers, employees and agents
(collectively, the “indemnified parties”) from and against any claim, action, or
proceeding brought by a third party against one or more of the indemnified
parties or one or more of the indemnified parties and the applicant to attack, set
aside, or void this Resolution or any permit or approval authorized hereby for
the project, including (without limitation) reimbursing the City its
actual attorneys’ fees and costs incurred in defense of the litigation.
The applicant shall pay such attorneys’ fees and costs within 30
days following receipt of invoices from City. Such attorneys’ fees and costs shall
include amounts paid to counsel not otherwise employed as City staff and shall
include City Attorney time and overhead costs and other City staff overhead
costs and any costs directly related to the litigation reasonably incurred by City.
16. NOTICE OF FEES, DEDICATIONS, RESERVATIONS OR OTHER EXACTIONS
The Conditions of Project Approval set forth herein may include certain fees,
dedication requirements, reservation requirements, and other exactions.
Pursuant to Government Code Section 66020(d) (1), these Conditions constitute
Draft Resolution DIR-2018-12 December 13, 2018
Page 7
written notice of a statement of the amount of such fees, and a description of the
dedications, reservations, and other exactions. You are hereby further notified
that the 90-day approval period in which you may protest these fees, dedications,
reservations, and other exactions, pursuant to Government Code Section
66020(a), has begun. If you fail to file a protest within this 90-day period
complying with all of the requirements of Section 66020, you will be legally
barred from later challenging such exactions.
PASSED AND ADOPTED this 13th day of December, 2018 at a noticed Public Hearing
of the Administrative Hearing Officer of the City of Cupertino, State of California, held
by the Director of Community Development, or his or her designee, pursuant to
Cupertino Municipal Code Section 19.12.120.
ATTEST: APPROVED:
________________________ _______________________ ____
Jeffrey Tsumura Benjamin Fu
Assistant Planner Asst. Director of Community Development
SCALE:PROJECT #:1 180824 FORMAL APP RESUBMITTAL 1CUPERTINO CITY CENTER3/19/2018COVER SHEET17012.00G.000PrometheusCUPERTINO CITY CENTERPLANNING FORMAL APPLICATIONResubmittal8/24/201820400 & 20450 STEVENS CREEK BLVDCUPERTINO, CA 950141
OB3 -20400OB4 -20450 PHASE 1PHASE 1PHASE 2PHASE 2PHASE 1PHASE 1WINTERLOBBYPHASING DIAGRAM 11DIRECTOR'S MINOR MODIFICATION (DIR) #2CUPERTINO CITY CENTER PROPERTY (ARCHITECTURAL AND SITE APPROVAL (ASA MAJOR)DIRECTOR'S MINOR MODIFICATION (DIR) # 2DIRECTOR'S MINOR MODIFICATION (DIR) # 1NOTE: LANDSCAPE AND SITE IMPROVEMENTS WILL TAKE PLACE OUTSIDE OF THE PROPERTY LINES OF 28/LOT 2 27/LOT 3. SUCH SITE IMPROVEMENTS ARE PART OF DIR # 1 AND DIR # 2111SCALE:PROJECT #:1180824 FORMAL APP RESUBMITTAL 1As indicatedCUPERTINO CITY CENTER3/19/2018PROJECT INFORMATION17012.00G.001PROJECT INFORMATIONSHEET INDEXVICINITY MAPTHE PROJECT IS A RENOVATION TO THE EXISTING CUPERTINO CITY CENTER HIGH RISE BUILDINGS BUILT IN THE 1980’S.THE EXISTING SITE CONTAINS 2 HIGH RISE TOWERS CONNECTED BY A PODIUM OF 2 LEVELS OF UNDERGROUND PARKING. THE ROOF OF THE PARKING PODIUM CONTAINS A PLAZA THAT CONNECTS THE TWO BUILDINGS. ORIGINAL STAIRS, AND EXPOSED GLASS ELEVATOR, AND GLASS CANOPY CONNECTS THE UNDERGROUND PARKING TO THE PLAZA LEVEL.THE ADJACENT PROPERTIES, INCLUDING THE STREETS, ACCESS DRIVEWAYS, AND ADJACENT PLAZAS ARE OWNED AND OPERATED BY A HOA/COMMON AGREEMENT WITH PROMETHEUS AND A FEW OTHER ADJACENT BUILDING OWNERS.THE RENOVATION PROJECT CONSISTS OF TWO PHASES OF WORK: PHASE 1 AND PHASE 2. THIS PLANNING APPLICATION CONCERNS PHASE 1 ONLY. PHASE 1 EXTERIOR WORK INCLUDES UPDATES OF ORIGINAL ELEMENTS. THE PROJECT UPDATES THE TWO BUILDINGS' CORNER STREET ENTRANCES. SOME EXTERIOR GRANITE-CLAD WALLS WILL BE REPLACED WITH NEW CLADDING AND PUNCHED WINDOWS. THE PROJECT HAS NEW ALLEY LOADING DOCK ROLL-DOWN DOORS AND TRASH ENCLOSURES. THERE IS A COMPLETE OVERHAUL OF THE EXISTING PLAZA WITH A NEW LANDSCAPE DESIGN.ONE OF THE HIGHLIGHTS OF THE PROJECT WILL BE (3) 5 STORY ‘GREEN COLUMNS’ IN THE COURTYARD, WITH A CABLE NETWORK SUSPENDED FROM THE PROJECT’S EXISTING BUILDINGS.THE PROJECT INCLUDES AN ACCENT LIGHTING “BEACON” ELEMENT AT THE TOP OF THE EXISTING TOWERS.PHASE 1 INTERIOR WORK INCLUDES ROUGHLY 4,620 SF OF GROUND FLOOR FINISH UPDATES AND REDESIGN OF THE CENTRAL HALLWAY AND LOBBIES. AN EXISTING SINGLE OCCUPANCY SHOWER WILL BE RELOCATED. SOME EXTERIOR SPACE IS MADE INTERIOR, AND SOME INTERIOR SPACE IS MADE EXTERIOR; IN TOTAL FOR BOTH BUILDINGS, OVER 300 SF OF INTERIOR SPACE IS CONVERTED TO EXTERIOR SPACE.PHASE 2 (NOT PART OF THIS PLANNING SUBMITTAL) CONSISTS OF SOME RENOVATION WORK ALONG THE TWO ADJACENT DRIVEWAYS AND A RENOVATION TO THE EXISTING CIRCULAR FOUNTAIN TO THE NORTHWEST OF THE SITE.SIGNAGE IS NOT PART OF THE PROJECT SCOPE. ANY PROPOSED SIGNS INCONSISTENT WITH THE MASTER SIGN PROGRAM WILL REQUIRE MODIFICATION TO THE MASTER SIGN PROGRAM UNDER A SEPARATE PERMIT.GENERAL PLAN DESIGNATION: "HEART OF THE CITY SPECIFIC PLAN"ZONING DESIGNATION: P (CG, OF, RES)THIS PROJECT CONCERNS AN EXISTING BUILDING. ALL ELEVATIONS ARE APPROXIMATE FOR THE EXISTING BUILDING. BUILDING ELEVATIONS ARE NOT CHANGED DUE TO THE PROJECT.-NORTHEAST ENTRY: 130' 6" ABOVE SEA LEVEL.-LEVEL 1: 137' 6" ABOVE SEA LEVEL.-HIGHEST OCCUPIED FLOOR (8TH): 92' 6" ABOVE LEVEL 1-MAXIMUM HEIGHT OF STRUCTURE (AT 'LIGHT BEACON'): 125' 10" ABOVE LEVEL 1.SITE AREA: 72,900 SF (1.67 ACRES).APPROXIMATE BUILDING AREA OF BOTH EXISTING BUILDINGS: 356,256 SFFLOOR AREA RATIO: 72,900 SF / 356,256 SF (EXISTING) = 4.9.THIS PROJECT UPDATES THE GARAGE ELEVATOR AND STAIR CORE AT THE CENTER OF THE COURTYARD. THE EXISTING PARKING FACILITIES ACCOMMODATE APPROXIMATELY 530 CARS. TWO OR THREE PARKING STALL ARE REMOVED IN THE PROJECT. THIS PROJECT DOES NOT CHANGE OR AFFECT THE EXISTING BICYCLE PARKING FACILITIES OR CAPACITY. THIS PROJECT DOES NOT CHANGE THE NUMBER OF ACCESSIBLE PARKING STALLS. THE EXISTING OFFICE BUILDING WILL REMAIN AN OFFICE BUILDING. FUNCTION WILL NOT CHANGE DUE TO THE PROJECT. HOURS OF OPERATION ARE REGULAR BUSINESS HOURS. THE NUMBER OF BUSINESS USERS WILL NOT CHANGEPROJECT DESCRIPTION00 GENERALG.000 COVER SHEETX X XG.001 PROJECT INFORMATIONX X XG.002 EXISTING CONDITIONSX X X301 CIVILC0.0 TITLE SHEETX X XC1.0 PRELIMINARY EXISTING CONDITIONS PLANS X X XC2.0 PRELIMINARY SITE PLAN (ALTERNATIVE 4) X X XC2.1 PRELIMINARY SITE PLANX X XC3.0 PRELIMINARY GRADING AND DRAINAGE PLAN X X XC3.1 PRELIMINARY GRADING AND DRAINAGE PLAN X X XC4.0 PRELIMINARY CONSTRUCTION DETAILS X X X702 LANDSCAPEL-0.01 ILLUSTRATIVE LANDSCAPE PLANX X XL.0.02 ILLUSTRATIVE CONCEPT PLAN - COURTYARD X X XL.0.03 COURTYARD LANDSCAPE - AERIAL VIEWS X X XL.0.04 COURTYARD LANDSCAPE - VIEWSX X XL.0.05 COURTYARD LANDSCAPE - SECTIONSX X XL.0.06 COURTYARD LANDSCAPE - SECTIONSX X XL.0.07 LANDSCAPE ELEMENTSX X XL.0.08 LANDSCAPE ELEMENTS - VINE COLUMNS X X XL.0.09 LANDSCAPE ELEMENTS - PLANTER EDGES X X XL.0.10 LANDSCAPE ELEMENTS - PLANTING & PAVING X X XL.0.20 ILLUSTRATIVE LANDSCAPE PLANX X XL.0.30 LANDSCAPE MATERIALSX X XL.0.31 LANDSCAPE MATERIALSX X XL.0.32 LANDSCAPE MATERIALSXL.0.33 LANDSCAPE MATERIALSXL.1.00 LANDSCAPE MATERIALS PLANX X XL.2.00 PLANTING PLANX X XL.2.05 PLANTING SCHEDULE & NOTESX X XL.3.00 VINE COLUMNS - ROOF PLANX X XL.3.01 VINE COLUMNS - ELEVATIONSX X X2004 ARCHITECTURALAS.101 SITE PLANX X XAD.301 DEMO ELEVATIONSX XA.101 LEVEL 1 FLOOR PLANSX X XA.301 OVERALL ELEVATIONSX X XA.302 STREETSIDE ELEVATIONS OB3X X XA.303 STREETSIDE ELEVATIONS OB4X X XA.304 BUILDING ENTRANCE ELEVATIONSX X XA.305 COURTYARD ELEVATIONSX X XA.311 BUILDING SECTIONSX X XA.321 NE ENTRY RENDERINGX X XA.322 WINTER LOBBY EXTERIOR RENDERING X X XA.323 SUMMER LOBBY EXTERIOR RENDERING X X XA.324 FRP CLADDING VIEWSX XA.325 TRELLIS VIEWSX XA.801 WALL SECTIONS AND DETAILSX X XA.802 WALL SECTIONS AND DETAILSX XA.803 TRELLIS DETAILSX XA.804 TRELLIS DETAILSX XA.811 MATERIALS BOARDX X XA.812 PRECEDENT IMAGESX X XA.821 SITE DETAILSX2107 ELECTRICALE.001 SITE LIGHTINGX X XE.002 TOWER BEACON LIGHTING IMAGERYX XE.003 TOWER BEACON LIGHTINGX X XE.004 SITE LIGHTING LUMINAIRE SCHEDULEX X X4Grand total: 55INFORMAL APP 3/19/2018FORMAL APP 5/18/2018FORMAL APP RESUB. 5/23/2018PHASE AND SCOPE DIAGRAMPLOTS AND PERMITS
SCALE:PROJECT #:1 180824 FORMAL APP RESUBMITTAL 1CUPERTINO CITY CENTER3/19/2018EXISTING CONDITIONS17012.00G.002
SE ENTRYSW ENTRYNE ENTRY1SCALE:CUPERTINO CITY CENTER24 AUGUST, 2018PROJECT #:17012.001180824 FORMAL APP RESUBMITTAL 1PRELIMINARY EXISTING CONDITIONS PLANC1.0AS NOTED
GARDEN PASSAGE
ENHANCED SW ENTRY
ENHANCED NE ENTRY
SERVICE AREA SCREENING
RECREATION PASSAGE
CENTRAL COURTYARD
SERVICE AREA SCREENING
WATER WALL & SLOPED LAWN
REPLACING EXISTING FOUNTAIN
(FUTURE PHASE)
LARGE EVENT SPACE
FOUNTAIN PLAZA
(FUTURE PHASE)
SMALL EVENT SPACE
• C.I.P. Conc. W/Intergral Color &
Contrasting ‘Topcast’ Finish
• Bollards (Stainless Steel)
• Replacement Stairs (Precast
Conc.)
• Concrete Trash Screen Wall /
Screen Planting
• See Arch. Dwgs
(IMPROVEMENTS SIM. TO SE ENTRY)
• Concrete Trash Screen Wall / Screen Planting
• See Arch. Dwgs
SCALE: 1" = 20'
4020010
N
SCALE: 1" = 20' - 0"1 ILLUSTRATIVE LANDSCAPE PLAN - OVERALL
CUPERTINO CITY CENTER05/07/18
17012.00 SCALE:PROJECT #: 1/20" = 1'-0"
Illustrative Concept Plan L-0.01
05/18/18
NOTES:
1: Future items outside the limits of work
or listed as phased improvements are not
a part of the project scope, and will be
reviewed under a separate permit at a
future date.
2: Signage improvements are not a part
of the project scope. Any proposed
signs inconsistent with the Master Sign
Program will require modification to the
Master Sign Program under a separate
permit.
OB4
20450
OB3
20400
RECREATIONAL PASSAGE
BAR-HEIGHT COUNTER
COMMUNAL TABLES
BUILT-IN BENCH (TYP.)
TRASH/RECYCLING RECEPTACLE (TYP)(4)
VINE COLUMN (TYP.) (3)
WINTER LOBBY
TRELLIS
SUMMER
LOBBY
SKYLIGHT IN PAVEMENT
GARDEN PASSAGE
OUTDOOR MEETING ROOMS
SCALE: 1" = 20'
4020010
N
SCALE: 1" = 20' - 0"1 ILLUSTRATIVE COURTYARD PLAN
CUPERTINO CITY CENTER05/07/18
17012.00 SCALE:PROJECT #:
Illustrative Concept Plan - Courtyard L-0.02
1/20" = 1'-0"
05/18/18
OB4
20450
OB3
20400
1 COURTYARD LANDSCAPE VIEW - AERIAL
CUPERTINO CITY CENTER05/07/18
17012.00 SCALE:PROJECT #:
Courtyard Landscape - Aerial Views
2 COURTYARD LANDSCAPE VIEW - AERIAL
L-0.03
NTS
05/18/18
3 OUTDOOR MEETING ROOM NEAR WINTER LOBBY
CUPERTINO CITY CENTER05/07/18
17012.00 SCALE:PROJECT #:
Courtyard Landscape - Views
4 RECREATIONAL PASSAGE - LOOKING NW
1 GARDEN PASSAGE - LOOKING NW 2 GARDEN PASSAGE AT CENTRAL COURTYARD
L-0.04
NTS
05/18/18
2 SITE SECTION - (LOOKING TOWARDS WINTER LOBBY)
CUPERTINO CITY CENTER05/07/18
17012.00 SCALE:PROJECT #:
1 SITE SECTION - (LOOKING TOWARDS SUMMER LOBBY)
L-0.05Courtyard Landscape - Sections
NTS
05/18/18
1 COURTYARD SECTION - (LOOKING TOWARDS SUMMER LOBBY)
CUPERTINO CITY CENTER05/07/18
17012.00 SCALE:PROJECT #:
Courtyard Landscape - Sections
2 COURTYARD SECTION - (LOOKING TOWARDS WINTER LOBBY)
L-0.06
NTS
05/18/18
STEEL PLANTER VINE COLUMNS
LINEAR STONE PAVERS
STADIUM SEATING & STAGE WATER WALL (FUTURE PHASE)
ACCENT TREES
SOFT EDGE PLANTING
TILTED PLANTERS FOUNTAIN PLAZA LAWN
INFORMAL HEDGE
VINE COLUMNS
RECREATION/GAMES TABLES
OUTDOOR MEETING ROOM SMALL
LAWN/LOUNGING COMMUNAL TABLE
OUTDOOR MEETING ROOM LARGELINEAR PRECAST PAVERS
EVENT SPACE - STAGE
STADIUM STEPS
EVENT SPACE - SEATING
EVENT SPACE - PERFORMANCE
EVENT SPACE - LECTURE
N
3 SITE FURNISHINGS - SPECIAL EVENTS
CUPERTINO CITY CENTER05/07/18
17012.00 SCALE:PROJECT #:
Landscape Elements
4 PLANTING ELEMENTS
1 HARDSCAPE ELEMENTS 2 SITE FURNISHINGS
L-0.07
NTS
05/18/18
VINE COLUMN, TYP.
HORIZONTAL SUSPENSION CABLE, TYP.
VERTICAL CHORD CABLE, TYP.VINE CABLES
VINE CABLES
VINE COLUMNS
VINE COLUMNS DAY BED PLANTER
VINE COLUMNS DAY BED PLANTER
N
3 VINE COLUMNS - BASE PLANTERS
CUPERTINO CITY CENTER05/07/18
17012.00 SCALE:PROJECT #:
Landscape Elements - Vine Columns
4 VINE COLUMNS - LIGHTING
1 VINE COLUMNS - PLAN 2 VINE COLUMNS - ELEMENTS
L-0.08
NTS
05/18/18
3 PLANTER - HARD EDGES
CUPERTINO CITY CENTER05/07/18
17012.00 SCALE:PROJECT #:
Landscape Elements - Planter Edges
4 PLANTER - SOFT EDGES
1 PLANTER - HARD EDGES 2 PLANTER - HARD EDGES
L-0.09
NTS
05/18/18
3 PLANTING - VINE COLUMNS
CUPERTINO CITY CENTER05/07/18
17012.00 SCALE:PROJECT #:
Landscape Elements - Planting & Paving
4 PAVING - MATERIALS
1 PLANTING - ACCENT TREES 2 PLANTING - GROUND PLANE & UNDERSTORY
L-0.10
NTS
Western RedbudCercis occidentalis
King Sago PalmCycas revoluta
Mediterranean Fan PalmChaemerops humilis
Kousa DogwoodCornus kousa
Princess FlowerTibouchina urvilleana
Crape MyrtleLagerstroemia Tuskegee
Fruitless OliveOlea europea var. ‘Swan Hill’
California LilacCeanothus var. ‘Dark Star’
Chinese Fringe-Flower var. (2 Varieties)Loropetalum chinense ‘Jazz Hands - White &Pink’
Asian Star JasmineTrachelospermum asiaticum Coral BellsHeuchera micrantha ‘Palace Purple’
Sea LavendarLagerstroemia tuskegee
HorsetailEquisetum hyemale
Variegated Flax LilyDianella tasmanica ‘Variegata’Beach StrawberryFragaria chiloensisSouthern Sword FernNephrolepis cordifolia
Evergreen ClemitisClematis Armandii
Lavender Trumpet VineClytostoma Callistegioides
Chocolate VineAkebia Quinata
Virginia CreeperParthenocissus Quinquifolia
Passion VinePassiflora var.
Pink JasmineJasminum Polyanthum
Purple Vine LilacHardenbergia violacea ‘Happy Wanderer’
Winterbourn PhilodendronPhilodendron ‘Xanadu’
PRECAST PLANK PAVERS
PRECAST PLANK PAVERS
ORNAMENTAL GRAVEL BALLASTDECOMPOSED GRANITE
STONE PAVERSGLASS PAVERS
05/18/18
SCALE: 1" = 20'
4020010
N
SCALE: 1" = 20' - 0"1 ILLUSTRATIVE LANDSCAPE PLAN - OVERALL
CUPERTINO CITY CENTER05/07/18
17012.00 SCALE:PROJECT #: 1/20" = 1'-0"
Illustrative Landscape Plan L-0.20
NOTES:
1: Future items outside the limits of work
or listed as phased improvements are not
a part of the project scope, and will be
reviewed under a separate permit at a
future date.
2: Signage improvements are not a part
of the project scope. Any proposed
signs inconsistent with the Master Sign
Program will require modification to the
Master Sign Program under a separate
permit.
05/18/18
CUPERTINO CITY CENTER03/15/18
17012.00 SCALE:PROJECT #:
Landscape Materials Board
NTS
L-0.30
C.I.P. CONCRETE - ‘TOPCAST’
LIGHT SANDBLAST FINISH
C.I.P. CONCRETE - ‘TOPCAST ‘
LIGHT EXPOSED AGGREGATE FINISH
GASCOGNE BEIGE LIMESTONE
BUSH HAMMER FINISH
GASCOGNE BEIGE LIMESTONE
SANDBLAST FINISH
PRECAST PLANK PAVERS
- SANDBLAST FINISH
STONE PAVERS TYPE 1 - LINEAR NARROW FORMAT
PRECAST PLANK PAVERS - 12” X 24”
(ACKER-STONE ‘PALAZZO’, BENTLEY WHITE)
CAST-IN-PLACE CONCRETE WITH CONTRASTING ‘TOPCAST’ FINISH
STONE PAVERS TYPE 2 - LARGE FORMAT (24” X 48” & 12” X 48”)
05/18/18
CUPERTINO CITY CENTER03/15/18
17012.00 SCALE:PROJECT #:
Landscape Materials Board
NTS
L-0.30
A3 A4
A2 A5A1
CUPERTINO CITY CENTER03/15/18
17012.00 SCALE:PROJECT #:
Landscape Materials Board
NTS
L-0.31
05/18/18
BLENDED AGGREGATE W/
STABILIZER
ORNAMENTAL GRAVEL BALLASTRIVER WASH COBBLE 2”-3” DIAM
D.G. AND OYSTER SHELL
AGGREGATE
THERMORY ASH WOOD AT BENCHES,
STADIUM SEATING, & STAGE
THERMORY ASH WOOD
- STAINED FINISH
GLASS BLOCK PAVERS W/ METAL
FRAME AT SKYLIGHT
GLASS BLOCK PAVERS
- ETCHED FINISH
PRECAST CONCRETE AT PLANTER
CURBWALLS & STAIR TREADS
PRECAST CONCRETE - MATCH
BUILDING COLOR/FINISH
METAL PLANTERS - GALV. STEEL
W/ ‘CHAMPAGNE’ POWDERCOAT
FINISH
METAL PLANTERS - PAINT
COLOR - ‘CHAMPAGNE’ METALLIC
CUPERTINO CITY CENTER03/15/18
17012.00 SCALE:PROJECT #:
Landscape Materials Board
NTS
L-0.30
B1 E2 E3
C5 E1
E4 A6 C3
CUPERTINO CITY CENTER03/15/18
17012.00 SCALE:PROJECT #:
Landscape Materials Board
NTS
L-0.31
05/18/18
VINE COLUMN CABLES - S. S. CABLES
8MM - 26MM DIAMETER
PRECAST CONCRETE - WHITE
SANDBLAST FINISH
CUPERTINO CITY CENTER03/15/18
17012.00 SCALE:PROJECT #:
Landscape Materials Board
NTS
L-0.30
D2 C4
2
VINE PLANTING SCHEDULE
SYMBOL KEY BOTANICAL NAME COMMON NAME MINIMUM SIZE
(HT.X SPRD.)QUANTITY SPACING NOTES
AKQU AKEBIA QUINATA CHOCOLATE VINE 15 GAL. (8'-10' HT.)TBD CONTRACT GROW TO 8' -10' MIN. HT. (STAKED)
CLAR CLEMATIS ARMANDII EYEGREEN CLEMITIS 15 GAL. (8'-10' HT.)CONTRACT GROW TO 8' -10' MIN. HT. (STAKED)
CLCA CLYTOSTOMA CALLISTEGIOIDES LAVENDER TRUMPET VINE 15 GAL. (8'-10' HT.)CONTRACT GROW TO 8' -10' MIN. HT. (STAKED)
HAVI HARDENBERGIA VIOLACEA 'HAPPY
WANDERER'PURPLE VINE LILAC 15 GAL. (8'-10' HT.)CONTRACT GROW TO 8' -10' MIN. HT. (STAKED)
JAPO JASMINUM POLYANTHUM PINK JASMINE 15 GAL. (8'-10' HT.)CONTRACT GROW TO 8' -10' MIN. HT. (STAKED)
PAQU PARTHENOCISSUS QUINQUIFOLIA VIRGINIA CREEPER 15 GAL. (8'-10' HT.)CONTRACT GROW TO 8' -10' MIN. HT. (STAKED)
PACE PASSIFLORA CAERULEA VAR.BLUE PASSION VINE VAR.15 GAL. (8'-10' HT.)CONTRACT GROW TO 8' -10' MIN. HT. (STAKED)
UNDERSTORY PLANTING SCHEDULE
SYMBOL KEY BOTANICAL NAME COMMON NAME MINIMUM SIZE
(HT.X SPRD.)QUANTITY SPACING NOTES
DITA DIANELLA TASMANICA 'VARIEGATA'VARIEGATED FLAX LILY 5 GAL.TBD
EQHY EQUISETUM HYEMALE HORSETAIL 5 GAL.
FRCH FRAGARIA CHILOENSIS BEACH STRAWBERRY 1 GAL.
HEMI HEUCHERA MICRANTHA 'PALACE PURPLE'CORAL BELLS 1 GAL.
LIPE LIMONIUM PEREZII SEA LAVENDAR 5 GAL.
LOCH LOROPETALUM CHINENSE 'JAZZ HANDS -
WHITE & PINK'CHINESE FRINGE-FLOWER 15 GAL.
PHXA PHILODENDRON 'XANADU'WINTERBOURN PHILODENDRON 15 GAL.
NECO NEPHROLEPIS CORDIFOLIA SOUTHERN SWORD FERN 15 GAL.
TRAS TRACHELOSPERMUM ASIATICUM ASIAN STAR JASMINE 5 GAL.
TREE SCHEDULE
SYMBOL KEY BOTANICAL NAME COMMON NAME MINIMUM SIZE (HT
.X SPRD.)QUANTITY SPACING NOTES
ACRU ACER RUBRUM ' BOWHALL'BOWHALL COLUMNAR RED MAPLE 36" BOX 8 AS SHOWN STREET TREE
CABE CARPINUS BETULUS 'FASTIGIATA'COLUMNAR EUROPEAN HORNBEAM 36" BOX 8 AS SHOWN STREET TREE (ALTERNATE SELECTION)
CEDA CEANOTHUS 'DARK STAR'DARK STAR CALIFORNIA LILAC 24" BOX TBD AS SHOWN ACCENT TREE (OPTION)
CROC CERCIS OCCIDENTALIS WESTERN REDBUD 24" BOX AS SHOWN ACCENT TREE (OPTION)
CHHU CHAEMEROPS HUMILIS MEDITERRANEAN FAN PALM 24" BOX AS SHOWN ACCENT TREE (OPTION)
COKO CORNUS KOUSA KOUSA DOGWOOD 24" BOX AS SHOWN ACCENT TREE (OPTION)
CYRE CYCAS REVOLUTA SAGO PALM 24" BOX AS SHOWN ACCENT TREE (OPTION)
LATU LAGERSTROEMIA X FAUREII 'TUSKEGEE'TUSKEGEE CRAPE MYRTLE (PINK FLOWER)24" BOX AS SHOWN ACCENT TREE (OPTION)
OLEU OLEA EUROPEA 'SWAN HILL'FRUITLESS OLIVE 24" BOX AS SHOWN ACCENT TREE (OPTION)
TIUR TIBOUCHINA URVILLEANA PRINCESS FLOWER 24" BOX AS SHOWN ACCENT TREE (OPTION)
PLANT SCHEDULE PLANTING NOTES
1.VERIFY LOCATION OF EXISTING TREES TO
REMAIN PRIOR TO SOIL PREPARATION. PROTECT
ALL TREES INDICATED TO REMAIN.
2.VERIFY AND COORDINATE WORK AROUND ALL
UNDERGROUND UTILITIES BEFORE EXCAVATION.
NOTIFY ALL UTILITY PROVIDERS AT LEAST TWO
(2) WORKING DAYS PRIOR TO BEGINNING WORK.
3.VERIFY THAT THE CONDITIONS ARE SUITABLE TO
PROMOTE HEALTHY PLANT GROWTH. DO NOT
PROCEED IF CONDITIONS DETRIMENTAL TO
HEALTHY GROWING ENVIRONMENT ARE
PRESENT, INCLUDING OVER-COMPACTED SOILS,
ADVERSE DRAINAGE CONDITIONS, DEBRIS, OR
OTHER HARMFUL CIRCUMSTANCES.
PROCEEDING WITHOUT NOTIFICATION DENOTES
ACCEPTANCE.
4.COORDINATE WITH OTHER SUBCONTRACTORS
AND TRADES TO ENSURE PROTECTION OF
GROWING CONDITIONS AND PLANT MATERIALS.
5.VERIFY PLANT QUANTITIES SHOWN ON THE
PLANS BASED ON GRAPHIC REPRESENTATION.
QUANTITIES SHOWN ARE FOR CONTRACTOR
CONVENIENCE ONLY.
6.FINISH GRADING SHALL PROVIDE POSITIVE
SURFACE DRAINAGE ACROSS PLANTED AREAS
AND AWAY FROM BUILDING FOUNDATIONS.
REFER TO CIVIL GRADING PLANS FOR ALL
EXISTING AND PROPOSED GRADE INFORMATION.
7.ALL PLANTING AREAS SHALL HAVE THE EXISTING
TOPSOIL TESTED, TILLED AND AMENDED TO
CONFORM TO RECOMMENDATIONS MADE BY AN
AGRONOMIC SOIL TESTING LAB IN ORDER TO
ASSURE HEALTHY PLANT GROWTH. PROVIDE 2"
MINIMUM OF BARK MULCH.
8.UNLESS OTHERWISE INDICATED, ALL PLANTINGS
SHALL BE TRIANGULARLY SPACED.
1.ALL LANDSCAPE AREAS WILL BE PERMANENTLY
IRRIGATED USING A PERMANENT AUTOMATIC
IRRIGATION SYSTEM.
2.ALL IRRIGATION IMPROVEMENTS WILL UTILIZE
HIGH EFFICIENCY DESIGN AND EQUIPMENT
COMPONENTS IN CONFORMANCE WITH CITY OF
CUPERTINO AND SANTA CLARA VALLEY WATER
DISTRICT (SCVWD) STANDARDS AND
REQUIREMENTS.
3.THE IRRIGATION SYSTEM DESIGN WILL COMPLY
WITH ABA 1881 REQUIREMENTS, FOLLOW THE
STATEWIDE MODEL ORDINANCE GUIDELINES AND
CITY REQUIREMENTS WITH THE USE OF
WATER-EFFICIENT LANDSCAPE AND LOW WATER
USE PLANTS.
4.THE IRRIGATION SYSTEM WILL PROVIDE 100%
HEAD TO HEAD COVERAGE AND WILL BE
DESIGNED TO MINIMIZE OVERSPRAY. ALL REMOTE
CONTROL AND QUICK-COUPLING VALVES WILL BE
INSTALLED WITHIN SHRUB / GROUND COVER
PLANTING AREAS WHENEVER POSSIBLE.
5.IRRIGATION SYSTEM PLANS AND DESIGN WILL BE
PROVIDED AT A LATER DATE.
6.THE FINAL IRRIGATION PLANS WILL ACCURATELY
AND CLEARLY IDENTIFY:
··LOCATION, TYPE AND SIZE OF THE WATER
METERS FOR THE LANDSCAPE.
··LOCATION, TYPE AND SIZE OF ALL
COMPONENTSOF THE IRRIGATION SYSTEM.
··STATIC WATER PRESSURE AT THE POINT OF
CONNECTION TO THE PUBLIC WATER SUPPLY.
··FLOW RATE (GALLONS PER MINUTE) AND
REMOTE CONTROL VALVE SIZE.
7.IRRIGATION SYSTEM FEATURES EMPLOYED TO
ACHIEVE WATER CONSERVATION GOALS WILL
INCLUDE:
··SMART IRRIGATION CONTROLLERS CAPABLE
OF RESPONDING TO ON-SITE WEATHER
CONDITIONS.
··CONTROLLERS WITH MULTIPLE PROGRAMS.
··WATERING SCHEDULES EMPLOYING SHORT
CYCLES.
··RAIN SHUT-OFF DEVICES TO PREVENT
IRRIGATION AFTER SIGNIFICANT
PRECIPITATION.
··SUB-SURFACE DRIP AND/OR BUBBLER
IRRIGATION FOR SHRUBS AND TREES.
··SUB-SURFACE DRIP IRRIGATION FOR GROUND
COVER AREAS.
··USE OF FLOW REDUCERS TO MITIGATE SPRAY
OF BROKEN HEADS NEXT TO SIDEWALKS,
STREETS AND DRIVEWAYS.
IRRIGATION NOTES
CUPERTINO CITY CENTER03/15/18
17012.00 SCALE:PROJECT #:
Planting Schedule & Notes L-2.05
NTS
05/18/18
EXTERIOR SITE FURNISHINGS - FF&E SCHEDULE
SYMBOL NAME QUANTITY/ MODEL MANUFACTURER DIMENSIONS MATERIAL/COLOR SPEC #NOTES IMAGE
FN-01 No. 9 LOUNGE CHAIR 8 LOLL 23"w x 29.5"d x 28.25"h SEE SPECS 12 93 00 OFOI
FN- 02 DANSK LOUNGE CHAIR 18 GLOSTER 32"w x 29"d x 28.5"h
Materials - Leather,
Wood, Synthetic,
Upholstery / Fabric
COLOR TBD
12 93 00 OFOI
FN-03 CHIPMAN CHAIR- ARMLESS 16 LANDSCAPE
FORMS 22"d x 20"w x 33"h SEE SPECS 12 93 00 OFOI
FN-04 CHIPMAN STOOL 9 LANDSCAPE
FORMS 19"d x 22"w x 35"h SEE SPECS 12 93 00 OFOI
FN- 05 DANSK ROUND SIDE TABLE -
WHITE ACRYLIC STONE TOP 9 GLOSTER ROUND 19"w x 15.75"h SEE SPECS 12 93 00 OFOI
FN- 06 SATELLITE COCKTAIL TABLE
(RECTANGLE)4 LOLL 22"w x 40"l x 13"h SEE SPECS 12 93 00 OFOI
FN-07 CHIPMAN DINING HEIGHT
TABLE 4 LANDSCAPE
FORMS 45"dia. x 29" h SEE SPECS 12 93 00 OFOI
FN-08 GO-OUTDOOR TABLE DINING
HEIGHT 2 LANDSCAPE
FORMS 30"d x 114"l x 30"h SEE SPECS 12 93 00 OFOI
FN-09 HALO 36 ELEVATED FIRE PIT 1 SOLUS 36"w x 36" l x 16.25"h SEE SPECS 12 93 00 CFCI
FN-10 IRRIGATED PLANTER POT -
URBAN TALL SQUARE 6
TOURNESOL
SITEWORKS OR
EQUAL HIGH
QUALITY
DESIGNER SERIES
24" sq. (Top) x 16.5" sq.
(Bottom) x 48" h
FRP; FOR COLOR,
SEE SPECS 12 93 00
CFCI; PLANTERS W/
'MONA' SELF-
WATERING
SUB-IRRIGATION
SYSTEM
FN-11 MAGLIN ASH URN 4 MAGLIN 36"h x 4" diam. (Cylinder)FRP; FOR COLOR,
SEE SPECS 12 93 00 MLAU300-S
SURFACE MOUNT
FN-12 POPP PING PONG TABLE 2 POPP 5"w x 96" l x 30"h YELLOW / BLACK 12 93 00 CFCI
FN-13 MAGLIN MULTIBIN
TRASH/RECYCLE UNIT 4 MAGLIN 35"w x 19"d x 47.5"h PLAIN DOORS
(LDO); SEE SPECS 12 93 00 CFCI
FN-14 BOLLARDS
5 TOTAL
(BASE BID);
27 TOTAL
(ADD ALT. 4)
CALPIPE OR
EQUAL NOM. PIPE SIZE 6"
STAINLESS STEEL;
/ STANDARD FLAT
BOLLARD CAP, SEE
SPECS
12 93 00 CFCI
5
4
S A N F R AN C I S C O
C ALI F ORNI A 9 41 0 7
41 5 .4 8 9.2 2 2 4 TEL
41 5 .3 5 8.91 0 0 F AX
WWW W.RNSSTUDIO.OCM
01 SECOND STREET
TH LF ORO STE.,40 2
SHEET NO:
SHEET TITLE:
DATEISSUES
PROJECT NO.:
DATE:
SCALE:
All drawings and written material appearing herein constitute original and unpublished work of theArchitect/Engineer and may not be duplicated, used or disclosed without consent of Architect/Engineer.If this drawing is not 30"x42", then the drawing has been revised from its original size.Noted scales must be adjusted. This line should be equal to one inch
03/08/2018SCHEMATIC DESIGN
REVISION LIST#DATE
2/1/2018 3:59:21 PM17012.00
8/03/2018
CUPERTINO CITY
CENTER
20400 Stevens Creek Blvd
Cupertino, CA 95014
735 NW 18TH AVEPORTLAND, OR 97209(503) 334 2080
05/10/2018DESIGN DEVELOPMENT
06/21/2018CD PROGRESS SET
08/03/2018BUILDING PERMIT
NO SCALE
SITE FURNISHINGS
SCHEDULE
L-1.05
EXTERIOR SITE FURNISHINGS - FF&E SCHEDULE
SYMBOL NAME QUANTITY/ MODEL MANUFACTURER DIMENSIONS MATERIAL/COLOR SPEC #NOTES IMAGE
FN-01 No. 9 LOUNGE CHAIR 8 LOLL 23"w x 29.5"d x 28.25"h SEE SPECS 12 93 00 OFOI
FN- 02 DANSK LOUNGE CHAIR 18 GLOSTER 32"w x 29"d x 28.5"h
Materials - Leather,
Wood, Synthetic,
Upholstery / Fabric
COLOR TBD
12 93 00 OFOI
FN-03 CHIPMAN CHAIR- ARMLESS 16 LANDSCAPE
FORMS 22"d x 20"w x 33"h SEE SPECS 12 93 00 OFOI
FN-04 CHIPMAN STOOL 9 LANDSCAPE
FORMS 19"d x 22"w x 35"h SEE SPECS 12 93 00 OFOI
FN- 05 DANSK ROUND SIDE TABLE -
WHITE ACRYLIC STONE TOP 9 GLOSTER ROUND 19"w x 15.75"h SEE SPECS 12 93 00 OFOI
FN- 06 SATELLITE COCKTAIL TABLE
(RECTANGLE)4 LOLL 22"w x 40"l x 13"h SEE SPECS 12 93 00 OFOI
FN-07 CHIPMAN DINING HEIGHT
TABLE 4 LANDSCAPE
FORMS 45"dia. x 29" h SEE SPECS 12 93 00 OFOI
FN-08 GO-OUTDOOR TABLE DINING
HEIGHT 2 LANDSCAPE
FORMS 30"d x 114"l x 30"h SEE SPECS 12 93 00 OFOI
FN-09 HALO 36 ELEVATED FIRE PIT 1 SOLUS 36"w x 36" l x 16.25"h SEE SPECS 12 93 00 CFCI
FN-10 IRRIGATED PLANTER POT -
URBAN TALL SQUARE 6
TOURNESOL
SITEWORKS OR
EQUAL HIGH
QUALITY
DESIGNER SERIES
24" sq. (Top) x 16.5" sq.
(Bottom) x 48" h
FRP; FOR COLOR,
SEE SPECS 12 93 00
CFCI; PLANTERS W/
'MONA' SELF-
WATERING
SUB-IRRIGATION
SYSTEM
FN-11 MAGLIN ASH URN 4 MAGLIN 36"h x 4" diam. (Cylinder)FRP; FOR COLOR,
SEE SPECS 12 93 00 MLAU300-S
SURFACE MOUNT
FN-12 POPP PING PONG TABLE 2 POPP 5"w x 96" l x 30"h YELLOW / BLACK 12 93 00 CFCI
FN-13 MAGLIN MULTIBIN
TRASH/RECYCLE UNIT 4 MAGLIN 35"w x 19"d x 47.5"h PLAIN DOORS
(LDO); SEE SPECS 12 93 00 CFCI
FN-14 BOLLARDS
5 TOTAL
(BASE BID);
27 TOTAL
(ADD ALT. 4)
CALPIPE OR
EQUAL NOM. PIPE SIZE 6"
STAINLESS STEEL;
/ STANDARD FLAT
BOLLARD CAP, SEE
SPECS
12 93 00 CFCI
5
4
S A N F R AN C I S C O
C ALI F ORNI A 9 41 0 7
41 5 .4 8 9.2 2 2 4 TEL
41 5 .3 5 8.91 0 0 F AX
WWW W.RNSSTUDIO.OCM
01 SECOND STREET
TH LF ORO STE.,402
SHEET NO:
SHEET TITLE:
DATEISSUES
PROJECT NO.:
DATE:
SCALE:
All drawings and written material appearing herein constitute original and unpublished work of theArchitect/Engineer and may not be duplicated, used or disclosed without consent of Architect/Engineer.If this drawing is not 30"x42", then the drawing has been revised from its original size.Noted scales must be adjusted. This line should be equal to one inch
03/08/2018SCHEMATIC DESIGN
REVISION LIST#DATE
2/1/2018 3:59:21 PM17012.00
8/03/2018
CUPERTINO CITY
CENTER
20400 Stevens Creek Blvd
Cupertino, CA 95014
735 NW 18TH AVEPORTLAND, OR 97209(503) 334 2080
05/10/2018DESIGN DEVELOPMENT
06/21/2018CD PROGRESS SET
08/03/2018BUILDING PERMIT
NO SCALE
SITE FURNISHINGS
SCHEDULE
L-1.05
C2
C6
C8
C7
L3
0.33
CUPERTINO CITY CENTER03/15/18
17012.00 SCALE:PROJECT #:
Landscape Materials Board
NTS
L-0.30
MATERIALS LEGEND
LIMIT OF WORK
MATCHLINE
PAVEMENTS AND PLANTING
CONCRETE
-PEDESTRIAN
-INTEGRAL COLOR W/ 'TOP-CAST' FINISH
CONCRETE
-VEHICULAR
-INTEGRAL COLOR W/ 'TOP-CAST' FINISH
STONE PAVERS
-TYPE 1 - GRANITE (1-1/2" THK. MORTAR SET)
STONE PAVERS
-TYPE 2 - LIMESTONE (1-1/2" THK. MORTAR SET)
CONCRETE UNIT PAVERS
-TYPE 1 - (1-1/2" THK. MORTAR SET)
CONCRETE UNIT PAVERS
-TYPE 2 - (1-1/2" THK. MORTAR SET)
GLASS PAVERS (AT SKYLIGHT)
DECOMPOSED GRANITE
-W/ STABLIZER
PLANTING AREA
SITE LIGHTING
MATERIALS SCHEDULE
A1
A2
A3
A4
LIGHT FIXTURE - PEDESTRIAN POLE /
LIGHT COLUMN - 16' HT.
LIGHT FIXTURE - MAST POLE - 20' HT.
W/ SPOT LIGHTS (4); (STAGE LIGHTING)
BOLLARD LIGHT -
STAINLESS STEEL
L1
L2
SITE FURNISHINGS
C1
C2
OUTDOOR KITCHEN W COUNTER
(BBQ, SINK, KEGERATOR)
BAR HEIGHT COUNTER & STOOLS
(PRODUCTS & TYPES TBD)
RAISED PLANTERS
(2' HT, GALV. STEEL, PAINTED)
RAISED PLANTER AT VINE COLUMNS
(1.5' HT, CUSTOM PRECAST)
CUSTOM WOOD BENCHES
(IPE WOOD)
OUTDOOR PING PONG TABLE
(PRECAST CONCRETE)
C3
C4
B2
B1
C5
C6
A5
A6
L3
STAIRS, WALLS, CURBS & FENCES
WATER FEATURE
(PHASE 2 IMPROVEMENT - N.I.C.)
VINE COLUMN
(TENSIONED SS CABLE & MESH STRUCTURE)
E1
E3
E2
E4
A7
P.A.
SPECIAL CONSTRUCTION
ENTRY STEPS
(PRECAST CONC. W/ SS HANDRAILS)
STADIUM SEATING & STAGE
(WOOD FRAME/IPE DECKING)
PLANTER EDGE
(PRECAST CONCRETE)
'SOFT' PLANTER EDGE
(GEO TEXTILE ASSEMBLY)
METAL LOUVER SCREEN FENCE & GATES - 8' HT.
(SLIDING, TELESCOPING GATES)
D1
D2
E5
P.A.
KEY NOTES
PHASE 2 IMPROVEMENT - N.I.C.
TRELLIS STRUCTURE - SEE ARCH DWGS.
SALVAGED & RELOCATED PRECAST CONC. TREE PLANTER
1
2
3
CUPERTINO CITY
CENTER
RESIDENCES
Restaurant &
Meeting Rooms
CUPERTINO CITY CENTER
APARTMENTS
PARKING
STRUCTURE
SCOFIELD DRIVE
JUNIPER HOTEL
Retail
MONTEBELLO RESIDENCES
OB4
OB3
CUPERTINO CITY
CENTER
RESIDENCES
Restaurant &
Meeting Rooms
CUPERTINO CITY CENTER
APARTMENTS
PARKING
STRUCTURE
SCOFIELD DRIVE
JUNIPER HOTEL
Retail
MONTEBELLO RESIDENCES
OB4
OB3
P.A.
P.A.
P.A.
P.A.
P.A.
P.A.
P.A.
P.A.P.A.
P.A.
P.A.
P.A.
P.A.
P.A.
P.A.
P.A.P.A.
P.A.
P.A.
P.A.
P.A.
P.A.
P.A.
P.A.
P.A.
P.A.P.A.
P.A.
P.A.
P.A.
P.A.
P.A.
P.A.
P.A.
P.A.
P.A.
P.A.
P.A.
P.A.
P.A.
P.A.
P.A.
P.A.
P.A.P.A.
P.A.
P.A.
P.A.
2
E3
C5
A2
A1
A3
A4
A5
A6
A7
B1
B2
D1
L1
E2
C1C2C3 C4C3C6
L3 C3C5B1B2E4
A4
C4A1
A1 E1
L3
B1
A3
C6
C4
P.A.P.A.
P.A.
P.A.
P.A.
P.A.
P.A.
P.A.
P.A.
P.A.
P.A.
L1
P.A.
E1
D2
D2
1
1
1
E1
3
3
D2
B2
A1
L2
L1
E5
E5L1
A6
A5
E4
E3
E3
E3
C5
E3
E3
N
CUPERTINO CITY CENTER03/15/18
17012.00 SCALE:PROJECT #:
Landscape Materials Plan L-1.00
SCALE: 1" = 20'
4020010
1/20" = 1'-0"
MATERIALS LEGEND
LIMIT OF WORK
MATCHLINE
PAVEMENTS AND PLANTING
CONCRETE
-PEDESTRIAN
-INTEGRAL COLOR W/ 'TOP-CAST' FINISH
CONCRETE
-VEHICULAR
-INTEGRAL COLOR W/ 'TOP-CAST' FINISH
STONE PAVERS
-TYPE 1 - GRANITE (1-1/2" THK. MORTAR SET)
STONE PAVERS
-TYPE 2 - LIMESTONE (1-1/2" THK. MORTAR SET)
CONCRETE UNIT PAVERS
-TYPE 1 - (1-1/2" THK. MORTAR SET)
CONCRETE UNIT PAVERS
-TYPE 2 - (1-1/2" THK. MORTAR SET)
GLASS PAVERS (AT SKYLIGHT)
DECOMPOSED GRANITE
-W/ STABLIZER
PLANTING AREA
SITE LIGHTING
MATERIALS SCHEDULE
A1
A2
A3
A4
LIGHT FIXTURE - PEDESTRIAN POLE /
LIGHT COLUMN - 16' HT.
LIGHT FIXTURE - MAST POLE - 20' HT.
W/ SPOT LIGHTS (4); (STAGE LIGHTING)
BOLLARD LIGHT -
STAINLESS STEEL
L1
L2
SITE FURNISHINGS
C1
C2
OUTDOOR KITCHEN W COUNTER
(BBQ, SINK, KEGERATOR)
BAR HEIGHT COUNTER & STOOLS
(PRODUCTS & TYPES TBD)
RAISED PLANTERS
(2' HT, GALV. STEEL, PAINTED)
RAISED PLANTER AT VINE COLUMNS
(1.5' HT, CUSTOM PRECAST)
CUSTOM WOOD BENCHES
(IPE WOOD)
OUTDOOR PING PONG TABLE
(PRECAST CONCRETE)
C3
C4
B2
B1
C5
C6
A5
A6
L3
STAIRS, WALLS, CURBS & FENCES
WATER FEATURE
(PHASE 2 IMPROVEMENT - N.I.C.)
VINE COLUMN
(TENSIONED SS CABLE & MESH STRUCTURE)
E1
E3
E2
E4
A7
P.A.
SPECIAL CONSTRUCTION
ENTRY STEPS
(PRECAST CONC. W/ SS HANDRAILS)
STADIUM SEATING & STAGE
(WOOD FRAME/IPE DECKING)
PLANTER EDGE
(PRECAST CONCRETE)
'SOFT' PLANTER EDGE
(GEO TEXTILE ASSEMBLY)
METAL LOUVER SCREEN FENCE & GATES - 8' HT.
(SLIDING, TELESCOPING GATES)
D1
D2
E5
P.A.
KEY NOTES
PHASE 2 IMPROVEMENT - N.I.C.
TRELLIS STRUCTURE - SEE ARCH DWGS.
SALVAGED & RELOCATED PRECAST CONC. TREE PLANTER
1
2
3
CUPERTINO CITY
CENTER
RESIDENCES
Restaurant &
Meeting Rooms
CUPERTINO CITY CENTER
APARTMENTS
PARKING
STRUCTURE
SCOFIELD DRIVE
JUNIPER HOTEL
Retail
MONTEBELLO RESIDENCES
OB4
OB3
CUPERTINO CITY
CENTER
RESIDENCES
Restaurant &
Meeting Rooms
CUPERTINO CITY CENTER
APARTMENTS
PARKING
STRUCTURE
SCOFIELD DRIVE
JUNIPER HOTEL
Retail
MONTEBELLO RESIDENCES
OB4
OB3
P.A.
P.A.
P.A.
P.A.
P.A.
P.A.
P.A.
P.A.P.A.
P.A.
P.A.
P.A.
P.A.
P.A.
P.A.
P.A.P.A.
P.A.
P.A.
P.A.
P.A.
P.A.
P.A.
P.A.
P.A.
P.A.P.A.
P.A.
P.A.
P.A.
P.A.
P.A.
P.A.
P.A.
P.A.
P.A.
P.A.
P.A.
P.A.
P.A.
P.A.
P.A.
P.A.
P.A.P.A.
P.A.
P.A.
P.A.
2
E3
C5
A2
A1
A3
A4
A5
A6
A7
B1
B2
D1
L1
E2
C1C2C3 C4C3C6
L3 C3C5B1B2E4
A4
C4A1
A1 E1
L3
B1
A3
C6
C4
P.A.P.A.
P.A.
P.A.
P.A.
P.A.
P.A.
P.A.
P.A.
P.A.
P.A.
L1
P.A.
E1
D2
D2
1
1
1
E1
3
3
D2
B2
A1
L2
L1
E5
E5L1
A6
A5
E4
E3
E3
E3
C5
E3
E3
N
CUPERTINO CITY CENTER03/15/18
17012.00 SCALE:PROJECT #:
Landscape Materials Plan L-1.00
SCALE: 1" = 20'
4020010
1/20" = 1'-0"
MATERIALS LEGEND
LIMIT OF WORK
MATCHLINE
PAVEMENTS AND PLANTING
CONCRETE
-PEDESTRIAN
-INTEGRAL COLOR W/ 'TOP-CAST' FINISH
CONCRETE
-VEHICULAR
-INTEGRAL COLOR W/ 'TOP-CAST' FINISH
STONE PAVERS
-TYPE 1 - GRANITE (1-1/2" THK. MORTAR SET)
STONE PAVERS
-TYPE 2 - LIMESTONE (1-1/2" THK. MORTAR SET)
CONCRETE UNIT PAVERS
-TYPE 1 - (1-1/2" THK. MORTAR SET)
CONCRETE UNIT PAVERS
-TYPE 2 - (1-1/2" THK. MORTAR SET)
GLASS PAVERS (AT SKYLIGHT)
DECOMPOSED GRANITE
-W/ STABLIZER
PLANTING AREA
SITE LIGHTING
MATERIALS SCHEDULE
A1
A2
A3
A4
LIGHT FIXTURE - PEDESTRIAN POLE /
LIGHT COLUMN - 16' HT.
LIGHT FIXTURE - MAST POLE - 20' HT.
W/ SPOT LIGHTS (4); (STAGE LIGHTING)
BOLLARD LIGHT -
STAINLESS STEEL
L1
L2
SITE FURNISHINGS
C1
C2
OUTDOOR KITCHEN W COUNTER
(BBQ, SINK, KEGERATOR)
BAR HEIGHT COUNTER & STOOLS
(PRODUCTS & TYPES TBD)
RAISED PLANTERS
(2' HT, GALV. STEEL, PAINTED)
RAISED PLANTER AT VINE COLUMNS
(1.5' HT, CUSTOM PRECAST)
CUSTOM WOOD BENCHES
(IPE WOOD)
OUTDOOR PING PONG TABLE
(PRECAST CONCRETE)
C3
C4
B2
B1
C5
C6
A5
A6
L3
STAIRS, WALLS, CURBS & FENCES
WATER FEATURE
(PHASE 2 IMPROVEMENT - N.I.C.)
VINE COLUMN
(TENSIONED SS CABLE & MESH STRUCTURE)
E1
E3
E2
E4
A7
P.A.
SPECIAL CONSTRUCTION
ENTRY STEPS
(PRECAST CONC. W/ SS HANDRAILS)
STADIUM SEATING & STAGE
(WOOD FRAME/IPE DECKING)
PLANTER EDGE
(PRECAST CONCRETE)
'SOFT' PLANTER EDGE
(GEO TEXTILE ASSEMBLY)
METAL LOUVER SCREEN FENCE & GATES - 8' HT.
(SLIDING, TELESCOPING GATES)
D1
D2
E5
P.A.
KEY NOTES
PHASE 2 IMPROVEMENT - N.I.C.
TRELLIS STRUCTURE - SEE ARCH DWGS.
SALVAGED & RELOCATED PRECAST CONC. TREE PLANTER
1
2
3
CUPERTINO CITY
CENTER
RESIDENCES
Restaurant &
Meeting Rooms
CUPERTINO CITY CENTER
APARTMENTS
PARKING
STRUCTURE
SCOFIELD DRIVE
JUNIPER HOTEL
Retail
MONTEBELLO RESIDENCES
OB4
OB3
CUPERTINO CITY
CENTER
RESIDENCES
Restaurant &
Meeting Rooms
CUPERTINO CITY CENTER
APARTMENTS
PARKING
STRUCTURE
SCOFIELD DRIVE
JUNIPER HOTEL
Retail
MONTEBELLO RESIDENCES
OB4
OB3
P.A.
P.A.
P.A.
P.A.
P.A.
P.A.
P.A.
P.A.P.A.
P.A.
P.A.
P.A.
P.A.
P.A.
P.A.
P.A.P.A.
P.A.
P.A.
P.A.
P.A.
P.A.
P.A.
P.A.
P.A.
P.A.P.A.
P.A.
P.A.
P.A.
P.A.
P.A.
P.A.
P.A.
P.A.
P.A.
P.A.
P.A.
P.A.
P.A.
P.A.
P.A.
P.A.
P.A.P.A.
P.A.
P.A.
P.A.
2
E3
C5
A2
A1
A3
A4
A5
A6
A7
B1
B2
D1
L1
E2
C1C2C3 C4C3C6
L3 C3C5B1B2E4
A4
C4A1
A1 E1
L3
B1
A3
C6
C4
P.A.P.A.
P.A.
P.A.
P.A.
P.A.
P.A.
P.A.
P.A.
P.A.
P.A.
L1
P.A.
E1
D2
D2
1
1
1
E1
3
3
D2
B2
A1
L2
L1
E5
E5L1
A6
A5
E4
E3
E3
E3
C5
E3
E3
N
CUPERTINO CITY CENTER03/15/18
17012.00 SCALE:PROJECT #:
Landscape Materials Plan L-1.00
SCALE: 1" = 20'
4020010
1/20" = 1'-0"
MATERIALS LEGEND
LIMIT OF WORK
MATCHLINE
PAVEMENTS AND PLANTING
CONCRETE
-PEDESTRIAN
-INTEGRAL COLOR W/ 'TOP-CAST' FINISH
CONCRETE
-VEHICULAR
-INTEGRAL COLOR W/ 'TOP-CAST' FINISH
STONE PAVERS
-TYPE 1 - GRANITE (1-1/2" THK. MORTAR SET)
STONE PAVERS
-TYPE 2 - LIMESTONE (1-1/2" THK. MORTAR SET)
CONCRETE UNIT PAVERS
-TYPE 1 - (1-1/2" THK. MORTAR SET)
CONCRETE UNIT PAVERS
-TYPE 2 - (1-1/2" THK. MORTAR SET)
GLASS PAVERS (AT SKYLIGHT)
DECOMPOSED GRANITE
-W/ STABLIZER
PLANTING AREA
SITE LIGHTING
MATERIALS SCHEDULE
A1
A2
A3
A4
LIGHT FIXTURE - PEDESTRIAN POLE /
LIGHT COLUMN - 16' HT.
LIGHT FIXTURE - MAST POLE - 20' HT.
W/ SPOT LIGHTS (4); (STAGE LIGHTING)
BOLLARD LIGHT -
STAINLESS STEEL
L1
L2
SITE FURNISHINGS
C1
C2
OUTDOOR KITCHEN W COUNTER
(BBQ, SINK, KEGERATOR)
BAR HEIGHT COUNTER & STOOLS
(PRODUCTS & TYPES TBD)
RAISED PLANTERS
(2' HT, GALV. STEEL, PAINTED)
RAISED PLANTER AT VINE COLUMNS
(1.5' HT, CUSTOM PRECAST)
CUSTOM WOOD BENCHES
(IPE WOOD)
OUTDOOR PING PONG TABLE
(PRECAST CONCRETE)
C3
C4
B2
B1
C5
C6
A5
A6
L3
STAIRS, WALLS, CURBS & FENCES
WATER FEATURE
(PHASE 2 IMPROVEMENT - N.I.C.)
VINE COLUMN
(TENSIONED SS CABLE & MESH STRUCTURE)
E1
E3
E2
E4
A7
P.A.
SPECIAL CONSTRUCTION
ENTRY STEPS
(PRECAST CONC. W/ SS HANDRAILS)
STADIUM SEATING & STAGE
(WOOD FRAME/IPE DECKING)
PLANTER EDGE
(PRECAST CONCRETE)
'SOFT' PLANTER EDGE
(GEO TEXTILE ASSEMBLY)
METAL LOUVER SCREEN FENCE & GATES - 8' HT.
(SLIDING, TELESCOPING GATES)
D1
D2
E5
P.A.
KEY NOTES
PHASE 2 IMPROVEMENT - N.I.C.
TRELLIS STRUCTURE - SEE ARCH DWGS.
SALVAGED & RELOCATED PRECAST CONC. TREE PLANTER
1
2
3
CUPERTINO CITY
CENTER
RESIDENCES
Restaurant &
Meeting Rooms
CUPERTINO CITY CENTER
APARTMENTS
PARKING
STRUCTURE
SCOFIELD DRIVE
JUNIPER HOTEL
Retail
MONTEBELLO RESIDENCES
OB4
OB3
CUPERTINO CITY
CENTER
RESIDENCES
Restaurant &
Meeting Rooms
CUPERTINO CITY CENTER
APARTMENTS
PARKING
STRUCTURE
SCOFIELD DRIVE
JUNIPER HOTEL
Retail
MONTEBELLO RESIDENCES
OB4
OB3
P.A.
P.A.
P.A.
P.A.
P.A.
P.A.
P.A.
P.A.P.A.
P.A.
P.A.
P.A.
P.A.
P.A.
P.A.
P.A.P.A.
P.A.
P.A.
P.A.
P.A.
P.A.
P.A.
P.A.
P.A.
P.A.P.A.
P.A.
P.A.
P.A.
P.A.
P.A.
P.A.
P.A.
P.A.
P.A.
P.A.
P.A.
P.A.
P.A.
P.A.
P.A.
P.A.
P.A.P.A.
P.A.
P.A.
P.A.
2
E3
C5
A2
A1
A3
A4
A5
A6
A7
B1
B2
D1
L1
E2
C1C2C3 C4C3C6
L3 C3C5B1B2E4
A4
C4A1
A1 E1
L3
B1
A3
C6
C4
P.A.P.A.
P.A.
P.A.
P.A.
P.A.
P.A.
P.A.
P.A.
P.A.
P.A.
L1
P.A.
E1
D2
D2
1
1
1
E1
3
3
D2
B2
A1
L2
L1
E5
E5L1
A6
A5
E4
E3
E3
E3
C5
E3
E3
N
CUPERTINO CITY CENTER03/15/18
17012.00 SCALE:PROJECT #:
Landscape Materials Plan L-1.00
SCALE: 1" = 20'
4020010
1/20" = 1'-0"
MATERIALS LEGEND
LIMIT OF WORK
MATCHLINE
PAVEMENTS AND PLANTING
CONCRETE
-PEDESTRIAN
-INTEGRAL COLOR W/ 'TOP-CAST' FINISH
CONCRETE
-VEHICULAR
-INTEGRAL COLOR W/ 'TOP-CAST' FINISH
STONE PAVERS
-TYPE 1 - GRANITE (1-1/2" THK. MORTAR SET)
STONE PAVERS
-TYPE 2 - LIMESTONE (1-1/2" THK. MORTAR SET)
CONCRETE UNIT PAVERS
-TYPE 1 - (1-1/2" THK. MORTAR SET)
CONCRETE UNIT PAVERS
-TYPE 2 - (1-1/2" THK. MORTAR SET)
GLASS PAVERS (AT SKYLIGHT)
DECOMPOSED GRANITE
-W/ STABLIZER
PLANTING AREA
SITE LIGHTING
MATERIALS SCHEDULE
A1
A2
A3
A4
LIGHT FIXTURE - PEDESTRIAN POLE /
LIGHT COLUMN - 16' HT.
LIGHT FIXTURE - MAST POLE - 20' HT.
W/ SPOT LIGHTS (4); (STAGE LIGHTING)
BOLLARD LIGHT -
STAINLESS STEEL
L1
L2
SITE FURNISHINGS
C1
C2
OUTDOOR KITCHEN W COUNTER
(BBQ, SINK, KEGERATOR)
BAR HEIGHT COUNTER & STOOLS
(PRODUCTS & TYPES TBD)
RAISED PLANTERS
(2' HT, GALV. STEEL, PAINTED)
RAISED PLANTER AT VINE COLUMNS
(1.5' HT, CUSTOM PRECAST)
CUSTOM WOOD BENCHES
(IPE WOOD)
OUTDOOR PING PONG TABLE
(PRECAST CONCRETE)
C3
C4
B2
B1
C5
C6
A5
A6
L3
STAIRS, WALLS, CURBS & FENCES
WATER FEATURE
(PHASE 2 IMPROVEMENT - N.I.C.)
VINE COLUMN
(TENSIONED SS CABLE & MESH STRUCTURE)
E1
E3
E2
E4
A7
P.A.
SPECIAL CONSTRUCTION
ENTRY STEPS
(PRECAST CONC. W/ SS HANDRAILS)
STADIUM SEATING & STAGE
(WOOD FRAME/IPE DECKING)
PLANTER EDGE
(PRECAST CONCRETE)
'SOFT' PLANTER EDGE
(GEO TEXTILE ASSEMBLY)
METAL LOUVER SCREEN FENCE & GATES - 8' HT.
(SLIDING, TELESCOPING GATES)
D1
D2
E5
P.A.
KEY NOTES
PHASE 2 IMPROVEMENT - N.I.C.
TRELLIS STRUCTURE - SEE ARCH DWGS.
SALVAGED & RELOCATED PRECAST CONC. TREE PLANTER
1
2
3
CUPERTINO CITY
CENTER
RESIDENCES
Restaurant &
Meeting Rooms
CUPERTINO CITY CENTER
APARTMENTS
PARKING
STRUCTURE
SCOFIELD DRIVE
JUNIPER HOTEL
Retail
MONTEBELLO RESIDENCES
OB4
OB3
CUPERTINO CITY
CENTER
RESIDENCES
Restaurant &
Meeting Rooms
CUPERTINO CITY CENTER
APARTMENTS
PARKING
STRUCTURE
SCOFIELD DRIVE
JUNIPER HOTEL
Retail
MONTEBELLO RESIDENCES
OB4
OB3
P.A.
P.A.
P.A.
P.A.
P.A.
P.A.
P.A.
P.A.P.A.
P.A.
P.A.
P.A.
P.A.
P.A.
P.A.
P.A.P.A.
P.A.
P.A.
P.A.
P.A.
P.A.
P.A.
P.A.
P.A.
P.A.P.A.
P.A.
P.A.
P.A.
P.A.
P.A.
P.A.
P.A.
P.A.
P.A.
P.A.
P.A.
P.A.
P.A.
P.A.
P.A.
P.A.
P.A.P.A.
P.A.
P.A.
P.A.
2
E3
C5
A2
A1
A3
A4
A5
A6
A7
B1
B2
D1
L1
E2
C1C2C3 C4C3C6
L3 C3C5B1B2E4
A4
C4A1
A1 E1
L3
B1
A3
C6
C4
P.A.P.A.
P.A.
P.A.
P.A.
P.A.
P.A.
P.A.
P.A.
P.A.
P.A.
L1
P.A.
E1
D2
D2
1
1
1
E1
3
3
D2
B2
A1
L2
L1
E5
E5L1
A6
A5
E4
E3
E3
E3
C5
E3
E3
N
CUPERTINO CITY CENTER03/15/18
17012.00 SCALE:PROJECT #:
Landscape Materials Plan L-1.00
SCALE: 1" = 20'
4020010
1/20" = 1'-0"
MATERIALS LEGEND
LIMIT OF WORK
MATCHLINE
PAVEMENTS AND PLANTING
CONCRETE
-PEDESTRIAN
-INTEGRAL COLOR W/ 'TOP-CAST' FINISH
CONCRETE
-VEHICULAR
-INTEGRAL COLOR W/ 'TOP-CAST' FINISH
STONE PAVERS
-TYPE 1 - GRANITE (1-1/2" THK. MORTAR SET)
STONE PAVERS
-TYPE 2 - LIMESTONE (1-1/2" THK. MORTAR SET)
CONCRETE UNIT PAVERS
-TYPE 1 - (1-1/2" THK. MORTAR SET)
CONCRETE UNIT PAVERS
-TYPE 2 - (1-1/2" THK. MORTAR SET)
GLASS PAVERS (AT SKYLIGHT)
DECOMPOSED GRANITE
-W/ STABLIZER
PLANTING AREA
SITE LIGHTING
MATERIALS SCHEDULE
A1
A2
A3
A4
LIGHT FIXTURE - PEDESTRIAN POLE /
LIGHT COLUMN - 16' HT.
LIGHT FIXTURE - MAST POLE - 20' HT.
W/ SPOT LIGHTS (4); (STAGE LIGHTING)
BOLLARD LIGHT -
STAINLESS STEEL
L1
L2
SITE FURNISHINGS
C1
C2
OUTDOOR KITCHEN W COUNTER
(BBQ, SINK, KEGERATOR)
BAR HEIGHT COUNTER & STOOLS
(PRODUCTS & TYPES TBD)
RAISED PLANTERS
(2' HT, GALV. STEEL, PAINTED)
RAISED PLANTER AT VINE COLUMNS
(1.5' HT, CUSTOM PRECAST)
CUSTOM WOOD BENCHES
(IPE WOOD)
OUTDOOR PING PONG TABLE
(PRECAST CONCRETE)
C3
C4
B2
B1
C5
C6
A5
A6
L3
STAIRS, WALLS, CURBS & FENCES
WATER FEATURE
(PHASE 2 IMPROVEMENT - N.I.C.)
VINE COLUMN
(TENSIONED SS CABLE & MESH STRUCTURE)
E1
E3
E2
E4
A7
P.A.
SPECIAL CONSTRUCTION
ENTRY STEPS
(PRECAST CONC. W/ SS HANDRAILS)
STADIUM SEATING & STAGE
(WOOD FRAME/IPE DECKING)
PLANTER EDGE
(PRECAST CONCRETE)
'SOFT' PLANTER EDGE
(GEO TEXTILE ASSEMBLY)
METAL LOUVER SCREEN FENCE & GATES - 8' HT.
(SLIDING, TELESCOPING GATES)
D1
D2
E5
P.A.
KEY NOTES
PHASE 2 IMPROVEMENT - N.I.C.
TRELLIS STRUCTURE - SEE ARCH DWGS.
SALVAGED & RELOCATED PRECAST CONC. TREE PLANTER
1
2
3
CUPERTINO CITY
CENTER
RESIDENCES
Restaurant &
Meeting Rooms
CUPERTINO CITY CENTER
APARTMENTS
PARKING
STRUCTURE
SCOFIELD DRIVE
JUNIPER HOTEL
Retail
MONTEBELLO RESIDENCES
OB4
OB3
CUPERTINO CITY
CENTER
RESIDENCES
Restaurant &
Meeting Rooms
CUPERTINO CITY CENTER
APARTMENTS
PARKING
STRUCTURE
SCOFIELD DRIVE
JUNIPER HOTEL
Retail
MONTEBELLO RESIDENCES
OB4
OB3
P.A.
P.A.
P.A.
P.A.
P.A.
P.A.
P.A.
P.A.P.A.
P.A.
P.A.
P.A.
P.A.
P.A.
P.A.
P.A.P.A.
P.A.
P.A.
P.A.
P.A.
P.A.
P.A.
P.A.
P.A.
P.A.P.A.
P.A.
P.A.
P.A.
P.A.
P.A.
P.A.
P.A.
P.A.
P.A.
P.A.
P.A.
P.A.
P.A.
P.A.
P.A.
P.A.
P.A.P.A.
P.A.
P.A.
P.A.
2
E3
C5
A2
A1
A3
A4
A5
A6
A7
B1
B2
D1
L1
E2
C1C2C3 C4C3C6
L3 C3C5B1B2E4
A4
C4A1
A1 E1
L3
B1
A3
C6
C4
P.A.P.A.
P.A.
P.A.
P.A.
P.A.
P.A.
P.A.
P.A.
P.A.
P.A.
L1
P.A.
E1
D2
D2
1
1
1
E1
3
3
D2
B2
A1
L2
L1
E5
E5L1
A6
A5
E4
E3
E3
E3
C5
E3
E3
N
CUPERTINO CITY CENTER03/15/18
17012.00 SCALE:PROJECT #:
Landscape Materials Plan L-1.00
SCALE: 1" = 20'
4020010
1/20" = 1'-0"
MATERIALS LEGENDLIMIT OF WORK
MATCHLINE
PAVEMENTS AND PLANTING
CONCRETE
-PEDESTRIAN
-INTEGRAL COLOR W/ 'TOP-CAST' FINISH
CONCRETE
-VEHICULAR
-INTEGRAL COLOR W/ 'TOP-CAST' FINISH
STONE PAVERS
-TYPE 1 - GRANITE (1-1/2" THK. MORTAR SET)
STONE PAVERS
-TYPE 2 - LIMESTONE (1-1/2" THK. MORTAR SET)
CONCRETE UNIT PAVERS
-TYPE 1 - (1-1/2" THK. MORTAR SET)
CONCRETE UNIT PAVERS
-TYPE 2 - (1-1/2" THK. MORTAR SET)
GLASS PAVERS (AT SKYLIGHT)
DECOMPOSED GRANITE
-W/ STABLIZER
PLANTING AREA
SITE LIGHTING
MATERIALS SCHEDULE
A1
A2
A3
A4
LIGHT FIXTURE - PEDESTRIAN POLE /
LIGHT COLUMN - 16' HT.
LIGHT FIXTURE - MAST POLE - 20' HT.
W/ SPOT LIGHTS (4); (STAGE LIGHTING)
BOLLARD LIGHT -
STAINLESS STEEL
L1
L2
SITE FURNISHINGS
C1
C2
OUTDOOR KITCHEN W COUNTER
(BBQ, SINK, KEGERATOR)
BAR HEIGHT COUNTER & STOOLS
(PRODUCTS & TYPES TBD)
RAISED PLANTERS
(2' HT, GALV. STEEL, PAINTED)
RAISED PLANTER AT VINE COLUMNS
(1.5' HT, CUSTOM PRECAST)
CUSTOM WOOD BENCHES
(IPE WOOD)
OUTDOOR PING PONG TABLE
(PRECAST CONCRETE)
C3
C4
B2
B1
C5
C6
A5
A6
L3
STAIRS, WALLS, CURBS & FENCES
WATER FEATURE
(PHASE 2 IMPROVEMENT - N.I.C.)
VINE COLUMN
(TENSIONED SS CABLE & MESH STRUCTURE)
E1
E3
E2
E4
A7
P.A.
SPECIAL CONSTRUCTION
ENTRY STEPS
(PRECAST CONC. W/ SS HANDRAILS)
STADIUM SEATING & STAGE
(WOOD FRAME/IPE DECKING)
PLANTER EDGE
(PRECAST CONCRETE)
'SOFT' PLANTER EDGE
(GEO TEXTILE ASSEMBLY)
METAL LOUVER SCREEN FENCE & GATES - 8' HT.
(SLIDING, TELESCOPING GATES)
D1
D2
E5
P.A.
KEY NOTES
PHASE 2 IMPROVEMENT - N.I.C.
TRELLIS STRUCTURE - SEE ARCH DWGS.
SALVAGED & RELOCATED PRECAST CONC. TREE PLANTER
1
2
3
CUPERTINO CITY
CENTER
RESIDENCES
Restaurant &
Meeting Rooms
CUPERTINO CITY CENTER
APARTMENTS
PARKING
STRUCTURE
SCOFIELD DRIVE
JUNIPER HOTEL
Retail
MONTEBELLO RESIDENCES
OB4
OB3
CUPERTINO CITY
CENTER
RESIDENCES
Restaurant &
Meeting Rooms
CUPERTINO CITY CENTER
APARTMENTS
PARKING
STRUCTURE
SCOFIELD DRIVE
JUNIPER HOTEL
Retail
MONTEBELLO RESIDENCES
OB4
OB3
P.A.
P.A.
P.A.
P.A.
P.A.
P.A.
P.A.
P.A.P.A.
P.A.
P.A.
P.A.
P.A.
P.A.
P.A.
P.A.P.A.
P.A.
P.A.
P.A.
P.A.
P.A.
P.A.
P.A.
P.A.
P.A.P.A.
P.A.
P.A.
P.A.
P.A.
P.A.
P.A.
P.A.
P.A.
P.A.
P.A.
P.A.
P.A.
P.A.
P.A.
P.A.
P.A.
P.A.P.A.
P.A.
P.A.
P.A.
2
E3
C5
A2
A1
A3
A4
A5
A6
A7
B1
B2
D1
L1
E2
C1C2C3 C4C3C6
L3 C3C5B1B2E4
A4
C4A1
A1 E1
L3
B1
A3
C6
C4
P.A.P.A.
P.A.
P.A.
P.A.
P.A.
P.A.
P.A.
P.A.
P.A.
P.A.
L1
P.A.
E1
D2
D2
1
1
1
E1
3
3
D2
B2
A1
L2
L1
E5
E5L1
A6
A5
E4
E3
E3
E3
C5
E3
E3
N
CUPERTINO CITY CENTER03/15/18
17012.00 SCALE:PROJECT #:
Landscape Materials Plan L-1.00
SCALE: 1" = 20'
4020010
1/20" = 1'-0"
(THERMORY ASH WOOD)
TRASH/RECYCLINGC7
ASH URNC8
C8
STONE PAVERS
TYPE 1 - LIMESTONE (1-1/2” THK. MORTAR SET)
TYPE 1 - LIMESTONE (1-1/2” THK. MORTAR SET)
TYPE 1 - LIMESTONE (1-1/2” THK. MORTAR SET)
BLENDED DG & OYSTER SHELL AGGREGATE
- LARGE FORMAT (24”X48”; 12”X48”)
- 12” X 24”
- LINEAR, NARROW FORMAT
- LINEAR, NARROW FORMAT
C7
C7
05/18/18
DESIGNATED OUTDOOR
SMOKING AREA
CUPERTINO CITY
CENTER
RESIDENCES
Restaurant &
Meeting Rooms
CUPERTINO CITY CENTER
APARTMENTS
PARKING
STRUCTURE
SCOFIELD DRIVE
JUNIPER HOTEL
Retail
MONTEBELLO RESIDENCES
OB4
OB3
CUPERTINO CITY
CENTER
RESIDENCES
Restaurant &
Meeting Rooms
CUPERTINO CITY CENTER
APARTMENTS
PARKING
STRUCTURE
SCOFIELD DRIVE
JUNIPER HOTEL
Retail
MONTEBELLO RESIDENCES
OB4
OB3
TREES & VINE COLUMNS
EXISTING TREE TO REMAIN
(PROTECT IN PLACE)
STREET TREES
COURTYARD / ACCENT TREES
VINE COLUMN PLANTERS (W/ MIXED
ORNAMENTAL VINES & GROUNDCOVER)
SHADE TREE IN SALVAGED PRECAST PLANTERS
(PHASE 2 IMPROVEMENT - N.I.C.)
PLANT LEGEND
SHRUBS / GROUNDCOVER
INFORMAL HEDGE / BUFFER
RAISED PLANTERS (W/ LOW SHRUBS / PERENNIALS)
UNDERSTORY PLANTING
(SHRUBS / GROUNDCOVERS / GRASSES / PERENNIALS)
SOD LAWN / NATURAL TURF
SHEET NOTES
1.FOR PLANTING, AND IRRIGATION NOTES SEE SHEET L-2.05
2.FOR PLANT SCHEDULE, SEE SHEET L-2.05
PLANTING NOTES
LIMIT OF WORK
MATCHLINE
CUPERTINO CITY CENTER03/15/18
17012.00 SCALE:PROJECT #:
SCALE: 1" = 20'
4020010
N
Planting Plan L-2.00
1/20" = 1'-0"
05/18/18
VINE PLANTING SCHEDULE
SYMBOL KEY BOTANICAL NAME COMMON NAME MINIMUM SIZE
(HT.X SPRD.)QUANTITY SPACING NOTES
AKQU AKEBIA QUINATA CHOCOLATE VINE 15 GAL. (8'-10' HT.)TBD CONTRACT GROW TO 8' -10' MIN. HT. (STAKED)
CLAR CLEMATIS ARMANDII EYEGREEN CLEMITIS 15 GAL. (8'-10' HT.)CONTRACT GROW TO 8' -10' MIN. HT. (STAKED)
CLCA CLYTOSTOMA CALLISTEGIOIDES LAVENDER TRUMPET VINE 15 GAL. (8'-10' HT.)CONTRACT GROW TO 8' -10' MIN. HT. (STAKED)
HAVI HARDENBERGIA VIOLACEA 'HAPPY
WANDERER'PURPLE VINE LILAC 15 GAL. (8'-10' HT.)CONTRACT GROW TO 8' -10' MIN. HT. (STAKED)
JAPO JASMINUM POLYANTHUM PINK JASMINE 15 GAL. (8'-10' HT.)CONTRACT GROW TO 8' -10' MIN. HT. (STAKED)
PAQU PARTHENOCISSUS QUINQUIFOLIA VIRGINIA CREEPER 15 GAL. (8'-10' HT.)CONTRACT GROW TO 8' -10' MIN. HT. (STAKED)
PACE PASSIFLORA CAERULEA VAR.BLUE PASSION VINE VAR.15 GAL. (8'-10' HT.)CONTRACT GROW TO 8' -10' MIN. HT. (STAKED)
UNDERSTORY PLANTING SCHEDULE
SYMBOL KEY BOTANICAL NAME COMMON NAME MINIMUM SIZE
(HT.X SPRD.)QUANTITY SPACING NOTES
DITA DIANELLA TASMANICA 'VARIEGATA'VARIEGATED FLAX LILY 5 GAL.TBD
EQHY EQUISETUM HYEMALE HORSETAIL 5 GAL.
FRCH FRAGARIA CHILOENSIS BEACH STRAWBERRY 1 GAL.
HEMI HEUCHERA MICRANTHA 'PALACE PURPLE'CORAL BELLS 1 GAL.
LIPE LIMONIUM PEREZII SEA LAVENDAR 5 GAL.
LOCH LOROPETALUM CHINENSE 'JAZZ HANDS -
WHITE & PINK'CHINESE FRINGE-FLOWER 15 GAL.
PHXA PHILODENDRON 'XANADU'WINTERBOURN PHILODENDRON 15 GAL.
NECO NEPHROLEPIS CORDIFOLIA SOUTHERN SWORD FERN 15 GAL.
TRAS TRACHELOSPERMUM ASIATICUM ASIAN STAR JASMINE 5 GAL.
TREE SCHEDULE
SYMBOL KEY BOTANICAL NAME COMMON NAME MINIMUM SIZE (HT
.X SPRD.)QUANTITY SPACING NOTES
ACRU ACER RUBRUM ' BOWHALL'BOWHALL COLUMNAR RED MAPLE 36" BOX 8 AS SHOWN STREET TREE
CABE CARPINUS BETULUS 'FASTIGIATA'COLUMNAR EUROPEAN HORNBEAM 36" BOX 8 AS SHOWN STREET TREE (ALTERNATE SELECTION)
CEDA CEANOTHUS 'DARK STAR'DARK STAR CALIFORNIA LILAC 24" BOX TBD AS SHOWN ACCENT TREE (OPTION)
CROC CERCIS OCCIDENTALIS WESTERN REDBUD 24" BOX AS SHOWN ACCENT TREE (OPTION)
CHHU CHAEMEROPS HUMILIS MEDITERRANEAN FAN PALM 24" BOX AS SHOWN ACCENT TREE (OPTION)
COKO CORNUS KOUSA KOUSA DOGWOOD 24" BOX AS SHOWN ACCENT TREE (OPTION)
CYRE CYCAS REVOLUTA SAGO PALM 24" BOX AS SHOWN ACCENT TREE (OPTION)
LATU LAGERSTROEMIA X FAUREII 'TUSKEGEE'TUSKEGEE CRAPE MYRTLE (PINK FLOWER)24" BOX AS SHOWN ACCENT TREE (OPTION)
OLEU OLEA EUROPEA 'SWAN HILL'FRUITLESS OLIVE 24" BOX AS SHOWN ACCENT TREE (OPTION)
TIUR TIBOUCHINA URVILLEANA PRINCESS FLOWER 24" BOX AS SHOWN ACCENT TREE (OPTION)
PLANT SCHEDULE PLANTING NOTES
1.VERIFY LOCATION OF EXISTING TREES TO
REMAIN PRIOR TO SOIL PREPARATION. PROTECT
ALL TREES INDICATED TO REMAIN.
2.VERIFY AND COORDINATE WORK AROUND ALL
UNDERGROUND UTILITIES BEFORE EXCAVATION.
NOTIFY ALL UTILITY PROVIDERS AT LEAST TWO
(2) WORKING DAYS PRIOR TO BEGINNING WORK.
3.VERIFY THAT THE CONDITIONS ARE SUITABLE TO
PROMOTE HEALTHY PLANT GROWTH. DO NOT
PROCEED IF CONDITIONS DETRIMENTAL TO
HEALTHY GROWING ENVIRONMENT ARE
PRESENT, INCLUDING OVER-COMPACTED SOILS,
ADVERSE DRAINAGE CONDITIONS, DEBRIS, OR
OTHER HARMFUL CIRCUMSTANCES.
PROCEEDING WITHOUT NOTIFICATION DENOTES
ACCEPTANCE.
4.COORDINATE WITH OTHER SUBCONTRACTORS
AND TRADES TO ENSURE PROTECTION OF
GROWING CONDITIONS AND PLANT MATERIALS.
5.VERIFY PLANT QUANTITIES SHOWN ON THE
PLANS BASED ON GRAPHIC REPRESENTATION.
QUANTITIES SHOWN ARE FOR CONTRACTOR
CONVENIENCE ONLY.
6.FINISH GRADING SHALL PROVIDE POSITIVE
SURFACE DRAINAGE ACROSS PLANTED AREAS
AND AWAY FROM BUILDING FOUNDATIONS.
REFER TO CIVIL GRADING PLANS FOR ALL
EXISTING AND PROPOSED GRADE INFORMATION.
7.ALL PLANTING AREAS SHALL HAVE THE EXISTING
TOPSOIL TESTED, TILLED AND AMENDED TO
CONFORM TO RECOMMENDATIONS MADE BY AN
AGRONOMIC SOIL TESTING LAB IN ORDER TO
ASSURE HEALTHY PLANT GROWTH. PROVIDE 2"
MINIMUM OF BARK MULCH.
8.UNLESS OTHERWISE INDICATED, ALL PLANTINGS
SHALL BE TRIANGULARLY SPACED.
1.ALL LANDSCAPE AREAS WILL BE PERMANENTLY
IRRIGATED USING A PERMANENT AUTOMATIC
IRRIGATION SYSTEM.
2.ALL IRRIGATION IMPROVEMENTS WILL UTILIZE
HIGH EFFICIENCY DESIGN AND EQUIPMENT
COMPONENTS IN CONFORMANCE WITH CITY OF
CUPERTINO AND SANTA CLARA VALLEY WATER
DISTRICT (SCVWD) STANDARDS AND
REQUIREMENTS.
3.THE IRRIGATION SYSTEM DESIGN WILL COMPLY
WITH ABA 1881 REQUIREMENTS, FOLLOW THE
STATEWIDE MODEL ORDINANCE GUIDELINES AND
CITY REQUIREMENTS WITH THE USE OF
WATER-EFFICIENT LANDSCAPE AND LOW WATER
USE PLANTS.
4.THE IRRIGATION SYSTEM WILL PROVIDE 100%
HEAD TO HEAD COVERAGE AND WILL BE
DESIGNED TO MINIMIZE OVERSPRAY. ALL REMOTE
CONTROL AND QUICK-COUPLING VALVES WILL BE
INSTALLED WITHIN SHRUB / GROUND COVER
PLANTING AREAS WHENEVER POSSIBLE.
5.IRRIGATION SYSTEM PLANS AND DESIGN WILL BE
PROVIDED AT A LATER DATE.
6.THE FINAL IRRIGATION PLANS WILL ACCURATELY
AND CLEARLY IDENTIFY:
··LOCATION, TYPE AND SIZE OF THE WATER
METERS FOR THE LANDSCAPE.
··LOCATION, TYPE AND SIZE OF ALL
COMPONENTSOF THE IRRIGATION SYSTEM.
··STATIC WATER PRESSURE AT THE POINT OF
CONNECTION TO THE PUBLIC WATER SUPPLY.
··FLOW RATE (GALLONS PER MINUTE) AND
REMOTE CONTROL VALVE SIZE.
7.IRRIGATION SYSTEM FEATURES EMPLOYED TO
ACHIEVE WATER CONSERVATION GOALS WILL
INCLUDE:
··SMART IRRIGATION CONTROLLERS CAPABLE
OF RESPONDING TO ON-SITE WEATHER
CONDITIONS.
··CONTROLLERS WITH MULTIPLE PROGRAMS.
··WATERING SCHEDULES EMPLOYING SHORT
CYCLES.
··RAIN SHUT-OFF DEVICES TO PREVENT
IRRIGATION AFTER SIGNIFICANT
PRECIPITATION.
··SUB-SURFACE DRIP AND/OR BUBBLER
IRRIGATION FOR SHRUBS AND TREES.
··SUB-SURFACE DRIP IRRIGATION FOR GROUND
COVER AREAS.
··USE OF FLOW REDUCERS TO MITIGATE SPRAY
OF BROKEN HEADS NEXT TO SIDEWALKS,
STREETS AND DRIVEWAYS.
IRRIGATION NOTES
CUPERTINO CITY CENTER03/15/18
17012.00 SCALE:PROJECT #:
Planting Schedule & Notes L-2.05
NTS
05/18/18
TOTAL LANDSCAPE PLANTED AREA: 8,700 SF
VINE COLUMN
V02
VINE COLUMN
V03
VINE COLUMN
V01
CUPERTINO CITY CENTER03/15/18
17012.00 SCALE:PROJECT #:
Vine Columns - Roof Plan L-3.00
3/16" = 1'-0"
SCALE: 3/16" = 1'-0"1 VINE COLUMNS - ROOF PLAN
SCALE: 3/16" = 1' - 0"
4201 8
VINE COLUMN
V02
VINE COLUMN
V03
VINE COLUMN
V01
000 82
SCALE: 1/4" = 1' - 0"
41
N
AS NOTED
LANDSCAPE
CONSTRUCTION
DETAILS - VINE COLUMNS
L-6.40
5
4
S A N F R AN C I S C O
C ALI F ORNI A 9 41 0 7
41 5 .4 8 9.2 2 2 4 TEL
41 5 .3 5 8.91 0 0 F A X
WWW W.RNSSTUDIO.OCM
01 SECOND STREET
TH LF ORO STE.,40 2
SHEET NO:
SHEET TITLE:
DATEISSUES
PROJECT NO.:
DATE:
SCALE:
All drawings and written material appearing herein constitute original and unpublished work of theArchitect/Engineer and may not be duplicated, used or disclosed without consent of Architect/Engineer.If this drawing is not 30"x42", then the drawing has been revised from its original size.Noted scales must be adjusted. This line should be equal to one inch
03/08/2018SCHEMATIC DESIGN
REVISION LIST#DATE
2/1/2018 3:59:21 PM17012.00
5/10/2018
CUPERTINO CITY
CENTER
20400 Stevens Creek Blvd
Cupertino, CA 95014
735 NW 18TH AVEPORTLAND, OR 97209(503) 334 2080
100% DESIGN DEVELOPMENT
05/10/2018DESIGN DEVELOPMENT
SCALE: 1/4" = 1'-0"1 VINE COLUMNS - ROOF PLAN
05/18/18
1'-6"+0'-0" EL
T.O. Fin. Surface
+68'-0" EL
5TH FLOOR LEVEL
+107'-0" EL
8TH FLOOR LEVEL
BLUE CABLES = DIAGONAL
RED CABLES = PERIMETER
PINK CABLES = TOP CHORDS
BLACK CABLES = VERTICAL CHORDS
LINE OF COUNTER WEIGHT
COUNTER WEIGHT
SIZE & SCALE TBD
VINE COLUMN 02VINE COLUMN 01VINE COLUMN 03 1'-6"+0'-0" EL
T.O. Fin. Surface
+68'-0" EL
5TH FLOOR LEVEL
+107'-0" EL
8TH FLOOR LEVEL
BLUE CABLES = DIAGONAL
RED CABLES = PERIMETER
PINK CABLES = TOP CHORDS
BLACK CABLES = VERTICAL CHORDS
LINE OF COUNTER WEIGHT
COUNTER WEIGHT
SIZE & SCALE TBD
VINE COLUMN 02VINE COLUMN 01 VINE COLUMN 03
BEYOND
CUPERTINO CITY CENTER03/15/18
17012.00 SCALE:PROJECT #:
Vine Columns - Elevations L-3.01
3/32" = 1'-0"
1 FRONT ELEVATION - VINE COLUMNS 2 SIDE ELEVATION - VINE COLUMNS
VINE COLUMN 01VINE COLUMN 03 +0'-0" EL
Level 1 - T.O. Fin. Surface
+105'-6" EL
ROOF REF
VERTICAL CABLES WITH VINES
+27'-6" EL
LEVEL 3
+14'-6" EL
LEVEL 2
+40'-6" EL
LEVEL 4
+53'-6" EL
LEVEL 5
XTEND MESH AREA
TOP SUPPORT CABLES
RIGID RING
MAIN SUPPORTIVE CABLES
VINE COLUMN 03
+104'-9" EL
VINE CONNECTION
VINE COLUMN 01VINE COLUMN 03 +0'-0" EL
Level 1 - T.O. Fin. Surface
+105'-6" EL
ROOF REF
VERTICAL CABLES WITH VINES
+27'-6" EL
LEVEL 3
+14'-6" EL
LEVEL 2
+40'-6" EL
LEVEL 4
+53'-6" EL
LEVEL 5
XTEND MESH AREA
TOP SUPPORT CABLES
RIGID RING
MAIN SUPPORTIVE CABLES
VINE COLUMN 03
+104'-9" EL
VINE CONNECTION
000 16
SCALE: 1/8" = 1' - 0"
842
AS NOTED
LANDSCAPE
CONSTRUCTION
DETAILS - VINE COLUMNS
L-6.41
5
4
S A N F R AN C I S C O
C ALI F OR NI A 9 41 0 7
41 5 .4 8 9.2 2 2 4 TEL
41 5 .3 5 8.91 0 0 F A X
WWW W.RNSSTUDIO.OCM
01 SECOND STREET
TH LF ORO STE.,40 2
SHEET NO:
SHEET TITLE:
DATEISSUES
PROJECT NO.:
DATE:
SCALE:
All drawings and written material appearing herein constitute original and unpublished work of theArchitect/Engineer and may not be duplicated, used or disclosed without consent of Architect/Engineer.If this drawing is not 30"x42", then the drawing has been revised from its original size.Noted scales must be adjusted. This line should be equal to one inch
03/08/2018SCHEMATIC DESIGN
REVISION LIST#DATE
2/1/2018 3:59:21 PM17012.00
5/10/2018
CUPERTINO CITY
CENTER
20400 Stevens Creek Blvd
Cupertino, CA 95014
735 NW 18TH AVEPORTLAND, OR 97209(503) 334 2080
100% DESIGN DEVELOPMENT
05/10/2018DESIGN DEVELOPMENT
SCALE: 1/8" = 1'-0"1 FRONT ELEVATION - VINE COLUMNS
ELEVATIONSCALE: 1/8" = 1'-0"2 SIDE ELEVATION - VINE COLUMNS
ELEVATION 000 16
SCALE: 1/8" = 1' - 0"
842
05/18/18
UPUPABCDEFGHJ123456789101112KLMD.74.78.3H.31A.3112A.311A.3051A.3052A.3054A.3053A.3022A.3021A.303114'-10"13'-6"30'-0"30'-0"30'-0"30'-0"30'-0"30'-0"14'-10"30'-0" 30'-0" 30'-0" 30'-0" 30'-0" 30'-0" 13'-6"14'-10" 13'-6" 30'-0"30'-0"13'-6"14'-10"13'-6"13'-6"(E) RAMP TO REMAINENTRANCE CANOPYNEW TRASH ENCLOSUREMECHANICAL PENTHOUSEMECHANICAL PENTHOUSEA.3013A.30112A.301BALCONIESBALCONIESBALCONIESBALCONIESBUILDING SIGNAGE20400 OB320450 OB4CALI AVENUEJUNIPER HOTELRESTAURANT &MEETING ROOMSRETAILMONTEBELLO RESIDENCESPARKING LOTPARKING STRUCTURECUPERTINO CITYCENTER APARTMENTSPROMETHEUS REG APARTMENT COMPLEXPARKSEAGATE TECHNOLOGY LLCALLEYALLEYGARAGEENTRANCEGARAGEENTRANCELOADINGDOCKLOADING DOCK(E) RAMP TO REMAINNEW TENANT DOOR AND CANOPYNEW TENANT DOOR AND CANOPYTENANT DOOR AND CANOPY (TYP OF 4)PLANTER, SEE LANDSCAPE DRAWINGSTRELLIS ELEVATOR AND STAIRS TO GARAGE BELOWSTAIR EXIT DOORSTAIR EXIT DOOREXISTING 'SKY BRIDGES' TO REMAINTOWER BEACON LIGHTINGTOWER BEACON LIGHTINGGREEN COLUMN, SEE LANDSCAPE DRAWINGSA.3041Y2Y1.2Y1PHASE 2: NOT PART OF THIS PERMIT A.8012A.8032WORK IN THIS AREA PART OF DIR 2WORK IN THIS AREA PART OF DIR 2WORK IN THIS AREA PART OF DIR 1WORK IN THIS AREA PART OF DIR 1WORK IN THIS AREA PART OF DIR 1WORK IN THIS AREA PART OF DIR 1WORK IN THIS AREA PART OF DIR 1111111A.8024A.8026SCALE:PROJECT #:1 180824 FORMAL APP RESUBMITTAL 1 1" = 20'-0"CUPERTINO CITY CENTER3/19/2018SITE PLAN17012.00AS.101
DNLEVEL 10"LEVEL 214'-6"FF LEVEL NE STREET-7'-0"1234567894.78.3LEVEL 327'-6"LEVEL 440'-6"LEVEL 666'-6"LEVEL 553'-6"LEVEL 779'-6"LEVEL 892'-6"ROOF REF105'-6"T. O. PARAPET125'-10"(E) CONCRETE WALL AND WINDOWS TO REMAIN, LEVELS 2-8SCOPE OF RECLADDING OR DEMOLITION OF EXTERIOR ENVELOPELEVEL 10"LEVEL 214'-6"LEVEL 327'-6"LEVEL 440'-6"LEVEL 666'-6"LEVEL 553'-6"LEVEL 779'-6"LEVEL 892'-6"ROOF REF105'-6"T. O. PARAPET125'-10"(E) CONCRETE WALL AND WINDOWS TO REMAIN, LEVELS 2-8SCOPE OF RECLADDING OR DEMOLITION OF EXTERIOR ENVELOPELEVEL 10"LEVEL 214'-6"FF LEVEL NE STREET-7'-0"ABCDEFGHJLEVEL 327'-6"LEVEL 440'-6"LEVEL 666'-6"LEVEL 553'-6"LEVEL 779'-6"LEVEL 892'-6"ROOF REF105'-6"T. O. PARAPET125'-10"(E) CONCRETE WALL AND WINDOWS TO REMAIN, LEVELS 2-8SCOPE OF RECLADDING OR DEMOLITION OF EXTERIOR ENVELOPEAD.3013AD.3011OB3 -20400OB4 -20450 SCOPE OF RECLADDING OR DEMOLITION OF EXTERIOR ENVELOPE2AD.301SCALE:PROJECT #:1 180824 FORMAL APP RESUBMITTAL 1As indicatedCUPERTINO CITY CENTER3/19/2018DEMO ELEVATIONS17012.00AD.301 1/16" = 1'-0"1OB3 NORTH DEMO ELEVATION 1/16" = 1'-0"2OB3 SOUTHWEST DEMO ELEVATION 1/16" = 1'-0"3OB3 EAST DEMO ELEVATION 1" = 50'-0"4RECLADDING SCOPE
UPUPABCDEF123456D.74.71A.3113A.3042A.304A.3041NOT IN SCOPENOT IN SCOPESUMMER LOBBYBENCH SEATINGRECEPTION DESKVERTICAL PLATFORM LIFTEXISTING AREA WAY TO REMAINPLANTER AND LANDSCAPE,SEE LANDSCAPE DRAWINGSOUTDOOR SEATINGA.80123A.802GHJ789101112KLM8.3H.3G.21A.311NOT IN SCOPENOT IN SCOPEWINTER LOBBYRECEPTION DESKEXISTING ELEVATOR TO REMAINWITH NEW FINISHESRELOCATED MEN'S SHOWERLANDSCAPE PLANTER, SEELANDSCAPE DRAWINGSRAMPBENCH SEATINGLOBBY SEATING4A.8015A.801SCALE:PROJECT #:1180824 FORMAL APP RESUBMITTAL 1 1/8" = 1'-0"CUPERTINO CITY CENTER3/19/2018LEVEL 1 FLOOR PLANS17012.00A.101 1/8" = 1'-0"2LEVEL 1 OB3 1/8" = 1'-0"1LEVEL 1 OB4OB3OB4
LEVEL 10"LEVEL 214'-6"FF LEVEL NE STREET-7'-0"1234567894.78.3LEVEL 327'-6"LEVEL 440'-6"LEVEL 666'-6"LEVEL 553'-6"LEVEL 779'-6"LEVEL 892'-6"ROOF REF105'-6"T. O. PARAPET125'-10"A.30211A.303OPP SIM(E) CONCRETE WALL AND WINDOWS TO REMAINTOWER LIGHT 'BEACON'1LEVEL 10"LEVEL 214'-6"LEVEL 327'-6"LEVEL 440'-6"LEVEL 666'-6"LEVEL 553'-6"LEVEL 779'-6"LEVEL 892'-6"ROOF REF105'-6"T. O. PARAPET125'-10"A.3051A.3054A.3053(E) CONCRETE WALL AND WINDOWS TO REMAINA.3054OPP SIMA.3053OPP SIMLEVEL 10"LEVEL 214'-6"FF LEVEL NE STREET-7'-0"ABCDEFGHJLEVEL 327'-6"LEVEL 440'-6"LEVEL 666'-6"LEVEL 553'-6"LEVEL 779'-6"LEVEL 892'-6"ROOF REF105'-6"T. O. PARAPET125'-10"A.30222A.303OPP SIM(E) CONCRETE WALL AND WINDOWS TO REMAINTOWER LIGHT 'BEACON'SCALE:PROJECT #:1 180824 FORMAL APP RESUBMITTAL 1 1/16" = 1'-0"CUPERTINO CITY CENTER3/19/2018OVERALL ELEVATIONS17012.00A.301 1/16" = 1'-0"1OB3 NORTH ELEVATION 1/16" = 1'-0"2300_OB3 SOUTHWEST ELEVATION 1/16" = 1'-0"3OB3 EAST ELEVATION OVERALL
LEVEL 10"LEVEL 214'-6"FF LEVEL NE STREET-7'-0"ABCDEFGHJLEVEL 327'-6"VERTICAL PLATFORM LIFTOPEN TO GARAGE(N) WINDOW TO REPLACE(E) WINDOW(FRP-2X) FRP PANELPROFILE B(FRP-1X) FRP PANELPROFILE A(MT-1X) CHAMPAGNE ANOD AL PANELTRASH ENCLOSURE BEYOND(E) CONCRETE WALL AND WINDOWS TO REMAIN, LEVELS 2-8CONCRETE PLANTER WALL(FRP-2X) FRP PANELPROFILE B11LEVEL 10"LEVEL 214'-6"FF LEVEL NE STREET-7'-0"1234567894.78.3LEVEL 327'-6"(E) GRANITE CLAD TO REMAIN)TRASH ENCLOSURE(N) FRAMELESS GLASS DOORCANOPY BEYOND (ALT 1)PAINTED STEEL FRAME BEYONDROLL DOWN DOOR(E) EXIT DOOR TO REMAIN(E) CONCRETE WALL AND WINDOWS TO REMAIN1A.8023A.802SIM2A.821TRASH ENCLOSUREA.80281(MT-1X) CHAMPAGNE ANDO AL PANEL1SCALE:PROJECT #:1 180824 FORMAL APP RESUBMITTAL 1 1/8" = 1'-0"CUPERTINO CITY CENTER3/19/2018STREETSIDE ELEVATIONS OB317012.00A.302 1/8" = 1'-0"2OB3 EAST ELEVATION 1/8" = 1'-0"1OB3 NORTH ELEVATION
LEVEL 10"LEVEL 214'-6"FF LEVEL SW STREET-3'-0"456789101112LEVEL 327'-6"(FRP-2X) FRP PANELPROFILE B(N) FRAMELESS GLASS DOOROPEN TO GARAGE(E) CONCRETE WALL AND WINDOWS TO REMAIN(E) RAMP TO REMAINCANOPY AT DOORBEYONDSIM(MT-1X) CHAMPAGNE ANOD AL PANEL1LEVEL 10"LEVEL 214'-6"FF LEVEL SW STREET-3'-0"DEFGHJKLMLEVEL 327'-6"(E) GRANITE CLADDING TO REMAIN(N) WINDOW TO REPLACE(E) WINDOWSS PIPE HANDRAIL, PTDCONCRETE RETAININGWALL, SSDBOARD FORMED CONC WALL(FRP-2X) FRP PANELPROFILE BENTRANCE CANOPYROLL DOWN DOOR(FRP-2X) FRP PANELPROFILE B(FRP-2X) FRP PANELPROFILE B(FRP-2X) FRP PANELPROFILE B(E) CONCRETE WALL AND WINDOWS TO REMAIN1A.8023A.802SIMA.8028TRASH ENCLOSURE1SCALE:PROJECT #:1 180824 FORMAL APP RESUBMITTAL 1 1/8" = 1'-0"CUPERTINO CITY CENTER3/19/2018STREETSIDE ELEVATIONS OB417012.00A.303 1/8" = 1'-0"1OB4 SOUTH ELEVATION 1/8" = 1'-0"2OB4 WEST ELEVATION
LEVEL 10"LEVEL 214'-6"FF LEVEL NE STREET-7'-0"1A.3113A.304CONCRETE RETAININGWALL, SSDCONCRETE RETAININGWALL, SSDFRAMELESS GL DR(N) WINDOW TO REPLACE(E) WINDOW(N) WINDOW TO REPLACE(E) WINDOWSS PIPE HANDRAILLEVEL 10"LEVEL 214'-6"FF LEVEL NE STREET-7'-0"12FRAMELESS GLASS DOORVERTICAL PLATFORM LIFT(FRP-1X) FRP PANELPROFILE ALEVEL 10"LEVEL 214'-6"FF LEVEL NE STREET-7'-0"SS PIPE HANDRAIL, PTD(FRP-2X) FRP PANELPROFILE B(FRP-1X) FRP PANELPROFILE AA.8022SCALE:PROJECT #:1 180824 FORMAL APP RESUBMITTAL 1As indicatedCUPERTINO CITY CENTER3/19/2018BUILDING ENTRANCE ELEVATIONS17012.00A.304 1/8" = 1'-0"1NE STREET ENTRANCE ELEVATION 1/8" = 1'-0"2NE ENTRANCE SECTION EL 2 3/16" = 1'-0"3NE ENTRANCE SECTION EL
LEVEL 10"LEVEL 214'-6"FGLEVEL 327'-6"(N) WINDOW TO REPLACE(E) WINDOWA.8012(FRP-1X) FRP PANELPROFILE A(MT-1X) CHAMPAGNEALUMINUM WINDOWSYSTEM, ANODIZED BYLINETEC(MT-1X) CHAMPAGNEALUMINUM STOREFRONTPANELVISION GLASS IGU (GL-2)67(E) CONCRETE WALL AND WINDOWS TO REMAINLEVEL 10"LEVEL 214'-6"FGLEVEL 327'-6"LOCATION OF TENANT SIGNAGE(MT-1X) CHAMPAGNEALUMINUM WINDOWSYSTEM, ANODIZED BYLINETEC(FRP-1X) FRP PANELPROFILE A(MT-1X) CHAMPAGNEALUMINUM STOREFRONTPANELVISION GLASS IGU (GL-2)Y2.81A.311ALUMINUM FRAMED FULLVISION STOREFRONTGLASS SYSTEMY35A.801FOLDING NANAWALLSYSTEM(MT-1X) CHAMPAGNEANODIZED ALUMINUMSURROUND67(E) CONCRETE WALL AND WINDOWS TO REMAIN(N) WINDOW TO REPLACE(E) WINDOWDEMO GLASS STOREFRONTENCLOSURELOCATION OF TENANT SIGNAGELEVEL 10"LEVEL 214'-6"LEVEL 327'-6"PLANTERS, SLD(E) CONCRETE WALL AND WINDOWS TO REMAIN, LEVELS 2-8(FRP-1X) FRP PANELPROFILE A(MT-1X) CHAMPAGNEALUMINUM MULLION CAPOVER (E) WINDOW MULLIONLEVEL 10"LEVEL 214'-6"KLMLEVEL 327'-6"(FRP-1X) FRP PANELPROFILE ADOOR CANOPY(E) CONCRETE WALL AND WINDOWS TO REMAIN, LEVELS 2-8VISION GLASS IGU (GL-2)(MT-1X) CHAMPAGNEALUMINUM WINDOWSYSTEM, ANODIZED BYLINETECSCALE:PROJECT #:1 180824 FORMAL APP RESUBMITTAL 1 1/8" = 1'-0"CUPERTINO CITY CENTER3/19/2018COURTYARD ELEVATIONS17012.00A.305 1/8" = 1'-0"1UNFOLDED COURTYARD NORTH ELEVATION 1/8" = 1'-0"2COURTYARD ELEVATION SOUTHWEST 1/8" = 1'-0"4COURTYARD ELEVATION, TYP OF 4 1/8" = 1'-0"3COURTYARD ELEVATION, TYP OF 4
LEVEL 10"LEVEL 214'-6"LEVEL P1-11'-0"LEVEL P2-20'-3"LEVEL 327'-6"LEVEL 440'-6"LEVEL 666'-6"LEVEL 553'-6"LEVEL 779'-6"LEVEL 892'-6"ROOF REF105'-6"T. O. PARAPET125'-10"2A.311MONTEBELLO RESIDENCES BEYONDSEAGATE TECHNOLOGY, LLCJUNIPER HOTEL BEYONDSOUTHWEST ENTRANCENORTHEAST ENTRANCEPARKING (NOT IN SCOPE)X0.4X0.61A.803LEVEL 10"LEVEL 214'-6"LEVEL P1-11'-0"LEVEL P2-20'-3"LEVEL 327'-6"LEVEL 440'-6"LEVEL 666'-6"LEVEL 553'-6"LEVEL 779'-6"LEVEL 892'-6"ROOF REF105'-6"T. O. PARAPET125'-10"1A.311(E) CONCRETE WALL AND WINDOWS TO REMAINCUPERTINO CITY CENTER APARTMENTS BEYONDMONTEBELLO RESIDENCES BEYONDEXISTING FOUNTAINPARKING (NOT IN SCOPE)SCALE:PROJECT #:1 180824 FORMAL APP RESUBMITTAL 1 1/16" = 1'-0"CUPERTINO CITY CENTER3/19/2018BUILDING SECTIONS17012.00A.311 1/16" = 1'-0"1BUILDING SECTION 1/16" = 1'-0"2SITE SECTION
SCALE:PROJECT #:1 180824 FORMAL APP RESUBMITTAL 1CUPERTINO CITY CENTER3/19/2018NE ENTRY RENDERING17012.00A.321
SCALE:PROJECT #:1 180824 FORMAL APP RESUBMITTAL 1CUPERTINO CITY CENTER3/19/2018WINTER LOBBY EXTERIOR RENDERING17012.00A.322
SCALE:PROJECT #:1 180824 FORMAL APP RESUBMITTAL 1CUPERTINO CITY CENTER3/19/2018SUMMER LOBBY EXTERIOR RENDERING17012.00A.323
SCALE:PROJECT #:1 180824 FORMAL APP RESUBMITTAL 1CUPERTINO CITY CENTER3/19/2018FRP CLADDING VIEWS17012.00A.324FRP RENDERING2NTSFRP RENDERING1NTS
SCALE:PROJECT #:1 180824 FORMAL APP RESUBMITTAL 1CUPERTINO CITY CENTER3/19/2018TRELLIS VIEWS17012.00A.325TRELLIS VIEW1NTSKITCHENETTE VIEW4NTSTRELLIS VIEW3NTS1
LEVEL 10"LEVEL 214'-6"GFRP1'-4"1'-8"NEW ALUMINUM WINDOWPLANTER, SEE LANDSCAPE DRAWINGS(E) WINDOW TO REMAIN4A.8013A.801LEVEL 10"LEVEL 214'-6"8.31'-0"NEW FRPEXISTING 6' METAL STUDEXISTING GRANITE STEEL ASSEMBLYTO REMAIN2'-0"8"PLANTERS, SEE LANDSCAPEDRAWINGSLEVEL 10"LEVEL 214'-6"8.3EXISTING SECOND FLOOR WINDOWNEW FRP OVER GRANITENEW WINDOWGRANITE VENEER ASSEMBLY TO REMAINPLANTER SEE LANDSCAPE DRAWINGS1'-8"ALUMINUM FRAME1'-4"LEVEL 10"LEVEL 214'-6"LEVEL 327'-6"ALUMINUM CLADDINGSTEELGLASS CURTAINWALLEXISTING BEAM UNDER 3RD FLOORLEVEL 10"LEVEL 214'-6"4PLANTER AS OCCURS, SEE LANDSCAPE DRAWINGSWINDOWCANOPY STEELFRP OVER GRANITE TENANT ENTRANCE CANOPYSCALE:PROJECT #:1 180824 FORMAL APP RESUBMITTAL 1 1/2" = 1'-0"CUPERTINO CITY CENTER3/19/2018WALL SECTIONS AND DETAILS17012.00A.801 1/2" = 1'-0"2COURTYARD ENLARGED ELEVATION 1/2" = 1'-0"3WALL SECTION AT COURTYARD 1/2" = 1'-0"4WINDOW SECTION AT COURTYARD 1/2" = 1'-0"5WINTER LOBBY CURTAINWALL 1/2" = 1'-0"1TENANT CANOPY SECTION
VENT WOODEXISTING SOFFIT CAVITY(E) INSULATION TO REMAINHSS STEEL4'-8"5'-3"LEVEL 2FRP OVER (E) GRANITE(E) WINDOW TO REMAINLEVEL 10"LEVEL 214'-6"FF LEVEL NE STREET-7'-0"1VEHICULAR RAMP TO P1 GARAGELINE OF BUILDING BEYOND3" MAX1'-9"LEVEL 10"LEVEL 214'-6"AVARIES1'-8"1'-1 3/4"(E) GRANITE TO REMAINPERFORATED SS MECHANIZED ROLL UP DOORLEVEL 10"ABOARD FORMED CONCRETE PLANTER1PLANTS, SEE LANDSCAPE DRAWINGSGH12EXIT STAIRS10'-10"4"4'-0"BOARD FORMED CONC PLANTER, SLD, SSDEXIT DOOR TO REMAIN4YD BIN (54" X 82")3YD BIN (42" X 82")1.5YD BIN (33" X 82")3YD BIN (42" X 82")20'-0"3'-0"A.821124" MINCONC CURB8"8"8"CONC CURBEXISTING PLANTERPLANTER19'-0"9'-0" MIN111'-2"10'-2"6' TALL ALUMINUM FENCE, REMOVEABLEGATE, OPENS TO 180 DEGREESA.8025A.8028A.8027A56A.8028A.8025EXISTING LOUVER DOORSTRANSFORMER ROOMEXIT STAIRS(E) PLANTERBOARD FORMED CONCRETE PALNTER WALL(E) PG&E MAN HOLEA.82113'-5"3'-5"MAINTAIN CLEARNCE REQUIRED TO OPERATE (E) LOUVER DOOR3YD BIN (42" X 82")3YD BIN (42" X 82")3YD BIN (42" X 82")(E) EXIT DOOR TO REMAINPLANTS, SLDTRANSFORMER ROOMA.80271CONC CURB8"18'-4 3/4"10'-10"9'-2" MIN2'-7"2" MIN6' TALL ALUMINUM FENCE, REMOVEABLE6' TALL ALUMINUM FENCE, REMOVEABLEGATE, OPENS TO 180 DEGREESCONC CURB. HEIGH TOF CURB TO ALLOW FOR FULL OPERATION OF EXISTING SWING DOORS8"9'-5"17'-4 3/4"LEVEL 10"5(MT-2X) MEDIUM BRONZE ANOD ALUM FENCE & GATE, REMOVEABLE IN FOUR PANELS(E) LOUVERS BEYOND2A.8211(PT-2X) MEDIUM BRONZE PTD HSS STL POSTS, REMOVEABLE(PT-2X) MEDIUM BRONZE PTD HSS STL POSTS, REMOVEABLELEVEL 10"A1(MT-2X) MEDIUM BRONZE ANOD ALUM FENCE PANEL, FIXED2A.821SCALE:PROJECT #:1 180824 FORMAL APP RESUBMITTAL 1As indicatedCUPERTINO CITY CENTER3/19/2018WALL SECTIONS AND DETAILS17012.00A.802 1/2" = 1'-0"2ENTRY CANOPY 1/2" = 1'-0"3STREET ENTRY WINDOW SECTION 1/2" = 1'-0"1LOADING DOCK ROLL UP DOOR 1/2" = 1'-0"5TRASH ENCLOSURE SIDE EL 1/4" = 1'-0"4ENLARGED N-S ALLEY 1/4" = 1'-0"6ENLARGED E-W ALLEY 1/2" = 1'-0"8TRASH ENCLOSURE FRONT EL 1/2" = 1'-0"7TRASH ENCLOSURE SIDE 2
X0.5Y2.81A.311Y2X0.4X0.6Y3Y1.2Y1DIM PT6'-9"8'-6"6'-9"6'-0"6'-0"6'-0"6'-0"6'-0"6'-0"6'-0"6'-0"6'-0"6'-0"6'-0"DIM PTDIM PTDIM PTDIM PTDIM PTDIM PTA.8035A.8036SINGLE-PLY ROOFING OVER PLYWD SUBSTRATE, PAINT TO MATCH STRUCTURE16'-10"VERT AL EXTRUSIONSHORIZ AL EXTRUSIONS7A.8041A.8041A.80366'-0"22'-0"(MT-1X) CHAMPAGNE ALEXTRUDED TRELLISMODULES(PT-2X) MEDIUM BRONZEPTD STL BM, SSDLEVEL 10"Y2.8Y2Y3Y1.2Y1A.803111'-1"(MT-1X) PERFORATEDALUMINUM COMPOSITEWALL PANEL RAINSCREENW/ OPEN JOINT REVEALS,ANODIZED BY LINETEC(PT-2X) MEDIUM BRONZEPTD STL BM, SSD(PT-2X) MEDIUM BRONZEPTD STL COL, SSD1Y2.8Y3STANDING SEAM ROOFA.8042HORIZ TRELLIS EXTRUSIONSVERT TRELLIS EXTRUSIONSSINGLE PLY ROOFING OVER PLYWD SUBSTRATE, PTD TO MATCH STRUCTUREA.8048DIM PTDIM PT7A.804A.8041(PT-2X) MEDIUM BRONZEPTD STL BM, SSD(MT-1X) CHAMPAGNE ALEXTRUDED TRELLISMODULESX0.5X0.4X0.6DIM PT1/2"8'-5"1/2"DIM PT6'-0"(MT-1) CHAMPAGNE AL TRELLIS UNISTRUT(PT-3) MEDIUM BRONZE PTD BM ABOVE2A.8046A.804(MT-1) CHAMPAGNE AL TRELLIS UNISTRUT(PT-2X) MEDIUM BRONZE PTD BM ABOVE4A.804SHOP FABRICATED TRELLIS MODULE. ALL EXTRUSIONS SCREWED TO UNISTRUTS, ALL FASTENERS CONCEALED.(MT-1X) CHAMPAGNE AL TRELLIS EXTRUSIONS11X0.6DIM PTDIM PT6'-0"(MT-1X) CHAMPAGNE AL TRELLIS UNISTRUT(PT-2X) MEDIUM BRONZE PTD BM ABOVE(PT-2X) MEDIUM BRONZE PTD BM ABOVE(MT-1X) CHAMPAGNE AL TRELLIS UNISTRUT2A.8046A.8041/2"6'-8 1/2"2A.8044A.804SHOP FABRICATED TRELLIS MODULE. ALL EXTRUSIONS SCREWED TO UNISTRUTS, ALL FASTENERS CONCEALED.(MT-1X) CHAMPAGNE AL TRELLIS EXTRUSIONS11SCALE:PROJECT #:1 180824 FORMAL APP RESUBMITTAL 1As indicatedCUPERTINO CITY CENTER3/19/2018TRELLIS DETAILS17012.00A.803 1/4" = 1'-0"3TRELLIS ENLARGED PLAN 1/4" = 1'-0"2TRELLIS ENLARGED ELEVATION 1" = 1'-0"1TRELLIS ROOF SECTION 1" = 1'-0"6TYP TRELLIS CENTER MODULE 1" = 1'-0"5TYP TRELLIS SIDE MODULE
(MT-1X) CHAMPAGNE ANODIZED ALUM EXTRUSIONNEOPRENE WASHER(PT-2X) MEDIUM BRONZE PTD STL SLEEVE O/ T-BOLTPLASTIC SLEEVE AROUND T-BOLT HEADSS T-BOLT HEAD IN EXTRUDED SLOT1"EXTRUDED SCREW POINTS, TYP EA CORNERALUM TUBING INTERIOR SLEEVE @ CANTILEVERS114" 4" 4" 4" 4"(PT-2X) MEDIUM BRONZE PTD WF BEAM(MT-1X) CHAMPAGNE ANODIZED ALUM EXTRUSION3" TO BOT OF BMDOWNLIGHT BEYOND, SEE SPECS2" WIDE L4x3X1/4 STL ANGLE WELDED TO STL BEAM, TYP, PT3/8" DIA PTD GALV STL T-BOLT W/ PTD STL TUBE SLEEVE, TYPA.8043(MT-1X) CHAMPAGNE AL UNISTRUT BEYONDALIGNCOL BEYOND-11(PT-2X) MEDIUM BRONZE PTD WF BEAM, SSD3/8" DIA PTD GALV STL T-BOLT W/ PTD STL TUBE SLEEVE, TYPNEOPRENE WASHERS, TYP(MT-1X) CHAMPAGNE AL UNISTRUT EXTRUSION, SCREWED TO TRELLIS IN SHOP, BOLTED TO WF1 1/2"1 1/2"MAX1"-3" TO BOT OF BM11(PT-2X) MEDIUM BRONZE PTD WF BEAM, SSDMEDIUM BRONZE ANODIZED ALUM EXTRUSION3" TO BOT OF BM3/4" STL PL COL CONNECTION WELDED TO BM, SSD2" WIDE L4x3X1/4 STL ANGLE WELDED TO STL BEAM, TYP, PT COLOR PT-1023/8" DIA PTD GALV STL T-BOLT W/ PTD STL TUBE SLEEVE, TYP1"1" STL PL COL CONNECTION WELDED TO BM, SSD-(MT-1X) CHAMPAGNE AL UNISTRUT EXTRUSION, SCREWED TO TRELLIS IN SHOP, BOLTED TO WF11(MT-1X) CHAMPAGNE VERT ALUMINUM TRELLIS EXTRUSIONCAP END OF EXTRUSION WITH AL PLATE WITH COUNTERSUNK SCREW OR WELD, TYP(MT-1X) CHAMPAGNE AL TRELLIS UNISTRUT, SCREW TRELLIS EXTRUSION TO UNISTRUTWF BEAM BEYOND, SSDT-BOLT CONNECTION TO WF BEAM ABOVETYP4"5"TYP4"ALIGNEQEQ11(MT-1X) CHAMPAGNE ALUM TUBING, SEE SPECSNEOPRENE WASHER(PT-2X) MEDIUM BRONZE PTD STL SLEEVE O/ T-BOLTPLASTIC SLEEVE AROUND T-BOLT HEADSS T-BOLT HEAD IN EXTRUDED SLOTEXTRUDED SCREW POINTS, TYP EA CORNER11(PT-2X) MEDIUM BRONZE PTD WF BEAM, SSD(MT-1X) CHAMPAGNE ANODIZED HORIZ ALUM EXTRUSION(MT-1X) CHAMPAGNE AL UNISTRUT BEYOND, CAP ENDS WITH WELDED AL PL, ANOD MED BRONZE, TAPER ENDS AT 45 DEG11"DIM PTOF BM-(PT-2X) SINGLE-PLY ROOFING, PTD TO MATCH BEAMS1(MT-2X) MEDIUM BRONZE PTD WF BEAM, SSDMED BRONZE ANODIZED HORIZ ALUM EXTRUSION BEYOND(MT-1X) CHAMPAGNE AL UNISTRUT SCREWED TO EACH AL EXTRUSION-1 1/2"1 1/2"DIM PTCAP END OF AL EXTRUSIONS W/ WELDED AL PL, ANOD MED BRONZE1(PT-2X) SINGLE-PLY ROOFING, PTD TO MATCH BEAMSSCALE:PROJECT #:1 180824 FORMAL APP RESUBMITTAL 1As indicatedCUPERTINO CITY CENTER3/19/2018TRELLIS DETAILS17012.00A.804 12" = 1'-0"3VERT EXT BOLT CONNECTION 3" = 1'-0"2TRELLIS SECTION BTWN SIM MODULES 3" = 1'-0"6TRELLIS SECTION BTWN DIF MODULES 3" = 1'-0"4TRELLIS SECTION @ COLS 6" = 1'-0"1TRELLIS EXTRUSION TRANSITION 12" = 1'-0"5HORIZ EXT BOLT CONNECTION 3" = 1'-0"8TRELLIS ROOF SECTION @ DRIP EDGE 3" = 1'-0"7TRELLIS ROOF SECTION @ EDGE
SCALE:PROJECT #:1 180824 FORMAL APP RESUBMITTAL 1CUPERTINO CITY CENTER3/19/2018MATERIALS BOARD17012.00A.811(MT-1X) PUNCHED OPENING AND STOREFRONT MULLION COLOR; ANODIZED ALUMINUM CHAMPAGNE10NTSFRP MATERIAL -PROFILE "A" SIMILAR1NTS(PT-2X) STRUCTURE PAINT COLOR MEDIUM BRONZE7NTS(MT-1X) ELEVATOR PERFORATED CHAMPAGNE ANODIZED ALUMINUM CLADDING9NTSFRP MATERIAL -PROFILE "B" SIMILAR5NTSWOOD AT SUMMER LOBBY CEILING AND CANOPIES8NTSSTAINLESS STEEL HANDRAILS6NTSCLEAR DOUBLE GLAZED GLASS4NTSINTERIOR ACCENT METAL COLOR2NTSFRP MATERIAL -PROFILE "B" SIMILAR3NTS1
SCALE:PROJECT #:1 180824 FORMAL APP RESUBMITTAL 1CUPERTINO CITY CENTER3/19/2018PRECEDENT IMAGES17012.00A.812WINDOW TYPE 4 - STREET SIDE7NTSWINDOW TYPE 3 - COURTYARD6NTSWINDOW TYPE 2 - TENANT ENTRIES5NTSWINDOW TYPE 1 - LOBBY ENTRIES4NTSVENT WOOD CEILING1NTSLOBBY ENTRANCE CANOPY2NTSBUILDING IDENTIFICATION SIGNAGE - FOR REFERENCE ONLY3NTS
(MT-2X) MEDIUM BRONZE ANODIZED AL EXTRUSIONS5'-0".180 DEGREE HINGE, TYPBD FORMED CONC PLANTERALIGN8" WIDE, 4" HIGH CONC CURB AS OCCURS2A.821GATE(PT-2X) MEDIUM BRONZE PTD HSS POST, REMOVEABLE(PT-2X) MEDIUM BRONZE PTD HSS POST, REMOVEABLEGATE OPENING9'-0" MIN CLR(PT-2X) MEDIUM BRONZE PTD HSS POST, FIXED1"2A.821(PT-2X) MEDIUM BRONZE PTD GALV STL ANGLE(MT-2X) MEDIUM BRONZE ANODIZED AL EXTRUSIONS OVER PTD GALV STL FURRINGSTL SLEEVE EMBEDDED IN PAVEMENT, FOR LOCKABLE, REMOVEABLE POST BEYOND6'-0" MINCONC CURB, 4" TALL OR AS REQ'D FOR OPERABLE (E) DOORS8"HSS POST BEYOND(E) CONC SLABSCALE:PROJECT #:1 180824 FORMAL APP RESUBMITTAL 1 3" = 1'-0"CUPERTINO CITY CENTER3/19/2018SITE DETAILS17012.00A.821 3" = 1'-0"1TRASH ENCLOSURE PLAN 3" = 1'-0"2TRASH ENCLOSURE SECTION1
SCALE:PROJECT #:CUPERTINO CITY CENTER05/18/18Unnamed17012.00S-000SITE LIGHTING PLAN1SCALE: 1" = 20'-0"SITE LIGHTINGE.00120400 & 20450 STEVENS CREEK BOULEVARD08/24/181180824 FORMAL APP RESUBMITTAL1
SCALE:PROJECT #:CUPERTINO CITY CENTER05/18/18Unnamed17012.00S-000SCALE: NTSTOWER BEACON LIGHTING IMAGERYE.002CLOSEUP OF RENDERED VIEW - WHITE LIGHT7CLOSEUP VIEW OF LIGHTING MOCKUP - WHITE DOWNLIGHT YELLOW UPLIGHT7SCALE: NTSCLOSEUP OF RENDERED VIEW - DAYLIGHT8SCALE: NTSPROPOSED DESIGNREAL WORLD EXAMPLES SIMILAR IN SCALELIGHTING CONCEPT20400 & 20450 STEVENS CREEK BOULEVARD08/24/181180824 FORMAL APP RESUBMITTAL1
SCALE:PROJECT #:CUPERTINO CITY CENTER05/18/18Unnamed17012.00S-000PHOTOMETRIC STUDY - PLAN VIEW AT TOWER BEACON6PHOTOMETRIC STUDY - SECTION VIEW THROUGH TOWER BEACON5SCALE: NTSSCALE: NTSTOWER BEACON LIGHTINGE.003QUANTITATIVE STUDY COMPARING EXISTING AND PROPOSED TOWER LIGHTING1SCALE: NTS5E.003ROOF OF TOWERPROPOSED PHILLIPSCOLORGRAZEREXTERIOR TOWER WALLCALCULATION PLANE 33'FROM TOWER LIGHTINGAT FACE OF NEIGHBORINGAPARTMENT BUILDINGEXTENT OF NEIGHBORINGAPARTMENT BUILDINGThe diagrams to the left illustrate an evaluation ofthe tower beacon lighting, comparing the impactof existing lighting compared to the proposeddesign. The chart quantifies the output of the twodesigns, with the important figure being the totallumen output which most accuratelycommunicates the amount of light exiting thefixtures. In both scenarios, the light leaving thefixtures is obstructed by a number of othermaterials, so the total lumen output shown is notthe true amount of light escaping the beacon.In the existing design, a number of high outputfluorescent fixtures uplight a cavity surroundinglarge steel structures. These structures are solidin the middle which blocks a fairly large portion ofthe light, but they have an open perimeter thatallows the light to escape on all four sides. Thisallows for a greater amount of uplight to escape,contributing to light pollution more heavily thanthe proposed design.The proposed design conceals the fixture behindmetal vailance, so the only light escaping thebeacon is indirect lighting that has been reflectedoff the screen. This greatly reduces the perceivedbrightness of the lighting application fromneighboring views, as well as cuts the total lightoutput. In the proposed design, the metalvailance shields the light sources on both top andbottom. The proposed design directs light in amore intentional way to minimize glare and lightpollution. All fixtures in the proposed design aredimmable, and may be used independently ofeach other or in combination. The total outputonly reflects a scenario where all fixtures areswitched on at full brightness. All fixtures used to calculate the figures on theproposed design are tentative selections basedon design development thus far. Fixtureselections are subject to change pendingarchitectural or design changes that may call fordifferent fixture characteristics that are moreappropriate for the updated design.PROPOSED PHILLIPSCOLORGRAZER20400 & 20450 STEVENS CREEK BOULEVARD08/24/18111180824 FORMAL APP RESUBMITTAL
SCALE:PROJECT #:CUPERTINO CITY CENTER05/18/18Unnamed17012.00S-000SITE LIGHTING LUMINAIRE SCHEDULE1SCALE: NTSSITE LIGHTING LUMINAIRE SCHEDULEE.00420400 & 20450 STEVENS CREEK BOULEVARD08/24/181180824 FORMAL APP RESUBMITTAL1