Loading...
HomeMy WebLinkAboutAH Packet 12-13-2018CITY OF CUPERTINO AGENDA ADMINISTRATIVE HEARING 5:00 PM 10300 Torre Avenue, City Hall Conference Room C Thursday, December 13, 2018 ROLL CALL APPROVAL OF MINUTES 1.Subject: Draft Minutes of November 20, 2018 Recommended Action: approve or modify the Draft Minutes of November 20, 2018 Draft Minutes of November 20, 2018 ORAL COMMUNICATIONS This portion of the meeting is reserved for persons wishing to address the members on any matter not on the agenda. Speakers are limited to three (3) minutes. In most cases, State law will prohibit the members from making any decisions with respect to a matter not listed on the agenda WRITTEN COMMUNICATIONS PUBLIC MEETING 2.Subject: Architectural and Site approval and a Director's Minor Modification to allow renovations of a lobby and courtyard areas at an existing office park (Cupertino City Center). Application No (s).: ASA-2018-06, DIR-2018-12; Applicant(s): James Mallery (Prometheus Real Estate Group); Location: 20400 Stevens Creek Boulevard APN#369-01-028 Recommended Action: That the Hearing Officer conduct the public meeting and find: 1) that the proposed project is exempt from CEQA; and 2) approve the applications per the Draft Resolutions Hearing Officer's decision final unless appealed Staff Report 1 - Draft Resolution for ASA-2018-06 2 - Draft Resolution for DIR-2018-12 3 - Plan Set OLD BUSINESS Page 1 December 13, 2018Administrative Hearing AGENDA NEW BUSINESS ADJOURNMENT In compliance with the Americans with Disabilities Act (ADA), anyone who is planning to attend the next meeting who is visually or hearing impaired or has any disability that needs special assistance should call the City Clerk's Office at 408-777-3223, 48 hours in advance of the meeting to arrange for assistance. Upon request, in advance, by a person with a disability, meeting agendas and writings distributed for the meeting that are public records will be made available in the appropriate alternative format. Also upon request, in advance, an assistive listening device can be made available for use during the meeting. Any writings or documents provided to a majority of the members after publication of the agenda will be made available for public inspection. Please contact the City Clerk’s Office in City Hall located at 10300 Torre Avenue during normal business hours. IMPORTANT NOTICE: Please be advised that pursuant to Cupertino Municipal Code 2.08.100 written communications sent to the Cupertino City Council, Commissioners or City staff concerning a matter on the agenda are included as supplemental material to the agendized item. These written communications are accessible to the public through the City’s website and kept in packet archives. You are hereby admonished not to include any personal or private information in written communications to the City that you do not wish to make public; doing so shall constitute a waiver of any privacy rights you may have on the information provided to the City. Members of the public are entitled to address the members concerning any item that is described in the notice or agenda for this meeting, before or during consideration of that item. If you wish to address the members on any other item not on the agenda, you may do so during the public comment. Page 2 Cupertino, CA 95014 (408) 777-3308 ACTION MINUTES OF THE SPECIAL MEETING OF THE ADMINISTRATIVE HEARING HELD ON November 20, 2018 ROLL CALL Hearing Officer present: Benjamin Fu, Assistant Director of Community Development Staff present: Jeffrey Tsumura, Assistant Planner Applicant(s) present: Satya Dasari, property owner, Stauffer Lane Richard Wu, property owner, 10400 S Stelling Road APPROVAL OF MINUTES: 1.September 27, 2018 The minutes of September 27, 2018 were approved as written POSTPONEMENTS/REMOVAL FROM CALENDAR: None ORAL COMMUNICATIONS: None WRITTEN COMMUNICATIONS: None PUBLIC MEETING ITEMS: 2. Application No.(s): ASA-2017-08, TR-2017-42 Applicant:Satya Naranaya Dasari Location: vacant lot, APN# 366-09-044 Architectural and Site approval to allow the construction of a new single family residence on a vacant lot located in a Planned Residential Zone (Seven Springs); Tree Removal Permit to allow the removal and replacement of 7 development trees to facilitate the construction of the new residence Administrative Hearing decision final unless appealed. Staff member Tsumura addressed the Hearing Officer. He explained that the applicant is proposing to build a new two-story single family residence on the last undeveloped lot on Stauffer Lane. The lot is 18,938 square feet. The proposed two story home is 4,954 square feet 2 Administrative Hearing November 20, 2018 with a basement. The City’s consulting Geologist has reviewed the project. Their construction recommendations have been incorporated into the conditions of approval. The proposed project meets the development requirements in the City’s Municipal Code and for the Seven Springs area slope density calculations. The proposed home is consistent with the other homes in the Seven Springs area and on Stauffer Lane. Due to the building design, materials and topography of the lot, the massing of the home will be minimized. The property owner will be planting privacy trees (not required) to reduce the visual impacts to the adjacent neighbors. As the proposed project meets all the requirements for development, Staff supports the project. The Hearing Officer asked for clarification of the FAR for the proposed home in relation to the existing homes on Stauffer Lane. Staff member Tsumura stated that the proposed FAR is 26.2%. The existing homes range in FAR from 6% to 27.6%, with homes ranging from 3,704 and 6,915 square feet. The Hearing Officer asked how close the nearest neighbor is. Staff member Tsumura said the closest building is the neighbor. The houses will be about 34’ apart from each other. The property owner addressed the Hearing Officer. He said the design of the house will add beauty to the development. The slope of the lot helps to reduce the visual impacts to the neighborhood. The Hearing Officer opened the public comment period. There were no speakers The Hearing Officer closed the comment period. The Hearing Officer acknowledged that these lots can be challenging to develop. He appreciated that there had been no comments against the project as an indication of the good outreach. The Hearing Officer confirmed that the projects meets, and in some cases exceeds, all of the development requirements per the City’s Code. DECISION: The application was approved by the Hearing Officer per the draft resolution(s). 3. Application No.(s): TM-2017-01 Applicant:Richard Wu (Lands of Wu) Location: 10400 S Stelling Rd APN#: 359-13-037 Tentative Map application to subdivide an existing 19,580 SF (0.449 acres) lot into two separate residential lots Administrative Hearing decision final unless appealed. Staff member Tsumura addressed the Hearing Officer. The property owner would like to subdivide the exiting lot into to residential lots of 8,512 and 11,068 square feet each. The second lot will have an access easement creating a flag lot, making the lot 8,565 square feet. The project site currently has one single family residence of 2,062 square feet, a detached carport and a variety of types of vegetation. The City’s R-7.5 Zoning Code allows for the lot of this size to be subdivided into two residential lots as long as there is a minimum of 7,500 square feet. The creation of the two new residential lots is in conformance with the surrounding neighborhood both in size and configuration. The property owner will need to 3 Administrative Hearing November 20, 2018 bring the two existing driveways up to current City standards. There are no protected trees on site. Any trees that need removed, will be removed and replaced in accordance with the City’s Tree Ordinance. Two new single family residences will be built on the newly created lots. Those application will be submitted separately and are not part of this approval. As the proposed sub-division application meeting all of the Zoning requirements, Staff recommends approval of the application. The Hearing Officer asked what the lot size and FAR is of the neighboring lots that have flag lots. Staff member Tsumura stated that flag lots on S. Stelling range from 10,125 to 11,772 square feet and on Tula Lane they range from 8,800 to 11,336 square feet. The Hearing Officer opened the public comment period. There were no speakers. The Hearing Officer closed the comment period. The Hearing Officer explained that the City typically discourages the creation of flag lots, however, in this instance, the creation of a flag lot is consistent with the existing conditions in the neighborhood. He stated that the development would make this lot consistent with the other lots in the area. DECISION: The application was approved by the Hearing Officer per the draft resolution(s). ADJOURNMENT Respectfully submitted: _____/s/Beth Ebben Beth Ebben Deputy Board Clerk ADMINISTRATIVE HEARING STAFF REPORT Agenda Date: December 13, 2018 SUBJECT Architectural and Site Approval and a Director’s Minor Modification to consider landscape and building renovations to two (2) existing office buildings at the Cupertino City Center; (Application No(s).: ASA-2018-06 and DIR-2018-12; Applicant(s): James Mallery (WRNS Studios); Location: 20400 and 20450 Stevens Creek Boulevard; APN(s): 369 01 023, 369-01-028, 369-01-027 and Lot 7 (common area)) RECOMMENDED ACTION That the Hearing Officer: 1. Find that the proposed actions are exempt from CEQA; and 2. Adopt the resolutions to approve the Architectural and Site Approval and Director’s Minor Modification permits in accordance with the draft resolutions (Attachments 1 and 2). DISCUSSION: Application Summary: Architectural and Site approval and Director's Minor Modification for renovations of a lobby and courtyard areas at an existing Office Park (Cupertino City Center). Project Data: General Plan Designation:Commercial/Office/Residential Special Area:City Center Node within the Heart of the City Special Area Zoning Designation:P(CG,OP,Res) Mixed Use Planned Development with General Commercial, Professional Office, and Residential uses Existing Proposed Lot Size:72,900 sq. ft.72,900 sq. ft. (no change) Floor Area:- 356,256 sq. ft. (total)- No change ASA-2018-06 20400 & 20450 Stevens Creek Boulevard (Cupertino City Center) December 13, 2018 DIR-2018-12 Page 2 Net Affected Floor Area 4,620 sq. ft.(total)4,320 sq. ft. Maximum Existing Height:45 feet 125’-10” (legal non- conforming) Project Consistency with: General Plan:Yes Zoning:Yes Environmental Assessment: Categorically Exempt per Section 15301 (Existing Facilities) of California Quality Act (CEQA) Background: Site Description The project site is located within the Cupertino City Center on the southeast corner of Stevens Creek Boulevard and S. De Anza Boulevard. The surrounding land uses are the Montebello Condominiums to the north, Cupertino City Center Apartments to the east, Cupertino Park Center Apartments to the south, and the Juniper Hotel to the west. The site is also located adjacent to a surface parking lot to the northeast, Cali Mill Plaza (a privately owned, publicly accessible park) to the northwest, the private City Center Amphitheater to the southeast, and Seagate offices to the southwest. The Cupertino City Center sub-area is intended to continue as a predominantly mixed use area with office, residential, and hotel, with public spaces and neighborhood centers to local residents. The existing site is split diagonally into two parcels, with an eight-story building on each parcel (20400 Stevens Creek Boulevard on the northeastern parcel and 20450 Stevens Creek Boulevard on the southwestern parcel). Two levels of underground parking are located underneath the two buildings. The roof of the parking podium contains a courtyard on-grade that connects the two buildings. An exposed glass elevator, stairway, and a glass canopy connects the underground parking to the courtyard level. The original ASA-2018-06 20400 & 20450 Stevens Creek Boulevard (Cupertino City Center) December 13, 2018 DIR-2018-12 Page 3 intent in the development of the City Center Master Plan was to have a strong site axis and connection between the Cali Mill Plaza at the northwest corner of the City Center complex and the amphitheater near the southeast corner of the City Center complex. While this connection was not memorialized through a public access easement, the intent has always been to maintain this connection. The adjacent properties, including the streets, access driveways, and adjacent plazas are owned and maintained by the Cupertino City Center Owners Association (CCC-OA), consisting of Prometheus and a few other adjacent building owners, as common areas for the development. The buildings were constructed in 1989 as part of the City Center Master Plan (U-1986-04). Application Requests The applicant is seeking a complete renovation of the existing courtyard, which runs diagonally between the two buildings and connects Cali Mill Plaza with the amphitheater, complete with a new landscape design. The project also includes a redesign of the buildings’ courtyard and corner lobby entries, new building finishes, and an updated “beacon” element at the top of the existing towers. An Architectural and Site Approval permit is required in order to approve the proposed renovations in the courtyard and to the buildings. Since the proposed improvements extend beyond the property boundaries of the two buildings, additional permits (Director’s Minor Modifications) are required to approve the improvements. These include new alley loading docks withroll-down doors, new trash enclosures, and updated paving materials and markings to improve safety measures to a pedestrian walkway. There is no change in the existing offices uses, which are permitted in this zoning district. Signage is not approved as part of this proposal. Therefore, any future signs must be approved through a sign permit or a Master Sign Program. Analysis: The applicant team has worked extensively with staff to address policies in General Plan: Community Vision 2015-2040 such as site planning, building and parking location, building layout, street interfaces, reduced driveway openings, shared and consolidated driveway access, sidewalk and street frontage landscaping, pedestrian-oriented public spaces, and public art. Site Planning and Landscape Design Courtyard The redesign proposes a variety of hardscape, groundcover, landscaping, and scale to create three unique spaces: a “Garden Passage” from the southeast, a “Recreation Passage” from the northwest, and the “Central Courtyard.” The spaces would provide outdoor recreational area for the office employees. Although the proposed outdoor ASA-2018-06 20400 & 20450 Stevens Creek Boulevard (Cupertino City Center) December 13, 2018 DIR-2018-12 Page 4 spaces are intended for office employees, the courtyard redesign does not propose a change to the way the courtyard is available for use by through pedestrian traffic. The original intent of the City Center development was to maintain a clear sight line and thoroughfare from Cali Mill Plaza to the amphitheater along Torre Avenue. The applicant has indicated the proposed remodel is to create visual interest that would draw the public towards the courtyard. Additionally, the proposed design features contemplate future public events such as farmer’s markets and stage performances at the periphery of the courtyard between Cali Mill Plaza and the office buildings. The applicant intends to maintain this thoroughfare and does not propose to isolate this area, physically or operationally, for solely private uses. The proposed Garden Passage begins at the intersection of the interior private streets, and serves as the southeast entry point to the Central Courtyard. A mix of concrete and stone pavers replaces the existing brick paver and tile, and adds various raised steel planters with native landscaping in place of the existing corner feature’s circular planter bed. The walkway narrows as it makes its way between the buildings towards the courtyard in order to emphasize the landscaping on either side and provide the user with a “nature walk” experience. The proposed landscaping through the Garden Passage includes low water use and drought tolerant groundcover, grasses, perennials, and accent trees. The proposed Recreation Passage begins at the northwest corner of the property, and includes a small event space with stadium steps for gatherings, lectures, and performances. It also includes the same paving materials, raised steel planters, and landscaping elements as the Garden Passage, but features a wider walkway area in between the two buildings Figure 1: Exhibit from approved plans (U-1986-04) Figure 2: Updated Courtyard Concept ASA-2018-06 20400 & 20450 Stevens Creek Boulevard (Cupertino City Center) December 13, 2018 DIR-2018-12 Page 5 with deeper nooks to allow for recreational table games, potential food vendors, event areas, and outdoor furniture. The Central Courtyard features a mix of garden areas, built-in benches, and designated furnished areas for outdoor meetings and gatherings. A variety of stone pavers, blended aggregate, ornamental gravel ballasts, and planting areas help to distinguish between the spaces. The furniture and hardscape is of high quality and complements the space. A new, 12’-3” tall modular wood trellis feature is also proposed in the center of the courtyard, replacing the existing glass canopy over the underground parking elevator and stairway. It extends 66 feet in length, spanning from the parking elevator to the edge of the Recreation Passage. This will also encompass an outdoor dining area with communal patio furniture, an outdoor kitchen with BBQ grill, and a bar height counter. Vine Columns A key landscape feature includes three (3) contemporary “vine columns”, with a cable network suspended from the project’s existing buildings. Custom-designed galvanized and painted steel tube and steel plates will be used to connect the stainless steel cables to the existing building steel framing. These connections will be placed at the eighth floor, approximately 104’-9” above the courtyard. Most of the structural steel will be concealed behind the building veneer, allowing it to be visually discrete, with the only visible steel component being connector plates between 8” to 12” in height. The columns will be anchored at the courtyard level with dual steel plates bolted on the top and bottom of the below-grade garage structural slab. Custom 18” tall, elliptical-shaped, sculptural precast planters will encompass the base with light-weight planting soil to sustain the vines and provide additional seating. A selection of up to seven vine species, tolerant to both sun and shade conditions and suitable for Cupertino’s microclimate,will provide all-season foliage. Woody stemmed Figure 3: Site Section (looking northeast - toward "Summer Lobby" ASA-2018-06 20400 & 20450 Stevens Creek Boulevard (Cupertino City Center) December 13, 2018 DIR-2018-12 Page 6 vines were omitted to ensure growth and resiliency along the cable structures. The vines will be 10 to 15 feet tall at the time of planting, and are anticipated to reach a mature height of 40 feet or taller within five years, or up to four stories. The applicant has provided a maintenance plan that includes inspection, adjustments, and general maintenance of the cable systems on an annual basis. The vine plantings will receive pruning and routine landscape maintenance on a quarterly basis. Boom lift and scissor lift equipment would be typically used for these operations. Perimeter Improvements Site and landscape improvements extend outside the perimeter of the project site, and incorporate new landscaping and cast-in-place concrete finishes to the renovated lobby entrances, as well as the edges of the Recreation Passage and Garden Passage. Additionally, the pedestrian crossing in front of the northeast entry will be enhanced with the same pavement materials, bollards, and ADA pads for increased pedestrian safety and visibility. Finally, the service areas in the private alleyways along the north and west sides of the project site will include new trash enclosures with steel posts, anodized aluminum fence panels, and concrete planters with landscape screen planting. The improvements proposed within the common areas have received approval by the CCC-OA. Architectural Design Lobby Entries In addition to the site improvements, the applicant proposes approximately 4,622 square feet of interior lobby updates. Overall, with the proposed changes to the lobby areas described below, the project proposes a net conversion of approximately 327 square feet from interior to exterior space. Therefore, a Development Permit is not required for this ASA-2018-06 20400 & 20450 Stevens Creek Boulevard (Cupertino City Center) December 13, 2018 DIR-2018-12 Page 7 project. An adjustment will be made to the Heart of the City Development Allocation to increase the available Development Allocation by 327 square feet. The building’s existing courtyard lobbies are identical in form. Approximately 330 square feet of the courtyard area closest to the south tower will be converted into an indoor space to create a new “Winter Lobby”. Aluminum-framed storefront windows will be installed at the ground and second story levels to be flush with an existing cantilevered third story wall and existing columns. In addition, a folding nana-wall window system is proposed along one side of the entry doors at the ground level. Existing exterior granite clad walls on the first story will be replaced with new fiberglass reinforced plastic (FRP) cladding and new aluminum window systems. Approximately 835 square feet of existing lobby area in the north tower will be converted into exterior courtyard area to create the northeasterly “Summer Lobby”. The new lobby entrance will be set back and incorporate the same materials and window systems as the proposed Winter Lobby. The newly created courtyard area will include stone pavers, planter areas, and will be furnished by outdoor patio seating. The applicant also proposes modifications to both buildings corner entrances facing the private streets. Both entrances propose reconfigured stairways and will receive identical FRP cladding finishes similar to the courtyard lobbies, and new planter beds. Existing, approximately 10’-9” high, window panels on both sides of the entryways will be replaced with new, 17’-0” tall windows. The applicant is proposing to enclose approximately 178 square feet of the existing exterior entryway into the interior remodel. Figure 5: Summer Lobby (Central Courtyard – northeast corner) Figure 4: Winter Lobby (Central Courtyard – southwest corner) ASA-2018-06 20400 & 20450 Stevens Creek Boulevard (Cupertino City Center) December 13, 2018 DIR-2018-12 Page 8 Additionally, a cantilevered, wood slat entry canopy and a vertical platform lift (to satisfy ADA requirements)are proposed at the northeast entry. Tower Beacon The applicant is proposing to replace the existing lighting system within the tower “beacons” at the northeast and southwest corners of the building. The towers stand at 125’-10” in height (approximately 20 feet above the building’s roof) and are the tallest elements of the buildings. The plans call for replacement of the existing fluorescent lighting with more energy efficient LED lighting. The proposed design conceals an LED lighting fixture behind a metal valance, which reflects indirect lighting off the screen and greatly diffuses the light for neighboring views. The proposed design directs light in a more intentional way to reduce glare and light pollution. Total lumen output is reduced by over 50% from 79,286 lumens to 36,448 lumens at full brightness. Additionally, the fixtures are dimmable and can be used independently of each other. A photometric study indicates a measurement of 0.1 foot-candles at 33 feet away from the face of the neighboring Montebello Condominiums, which sits three stories below the towers and is the closest residential building to the beacons. This indicates little to no impact to the residential neighbors from this illumination. Environmental Review This project is categorically exempt from the requirements of the California Environmental Quality Act (CEQA) per Section 15301 –Existing Facilities. Other Department/Agency Review The City’s Public Works Department; Building Division; Environmental Programs Division; the Santa Clara County Fire Department; and Cupertino Sanitary District reviewed the request and have no objections to the project. Their pre-hearing comments have been incorporated as conditions of approval in the draft resolutions. Figure 6: Tower Lighting ASA-2018-06 20400 & 20450 Stevens Creek Boulevard (Cupertino City Center) December 13, 2018 DIR-2018-12 Page 9 PUBLIC NOTICING AND COMMUNITY OUTREACH The following table is a brief summary of the noticing for this project: Notice of Public Hearing Agenda Site Signage (at least 10 days prior to hearing) 206 notices mailed to property owners XXX feet/adjacent to the project site (at least 10 days prior to the hearing) Posted on the City's official notice bulletin board (five days prior to hearing) Posted on the City of Cupertino’s Web site (five days prior to hearing) No comments have been received at the time of production of this staff report. PERMIT STREAMLINING ACT This project is subject to the Permit Streamlining Act (Government Code Section 65920 – 65964). The City has complied with the deadlines found in the Permit Streamlining Act. Project Received:June 1, 2018; Deemed Incomplete:June 29, 2018 Revisions Received:August 24, 2018; Deemed Incomplete:September 20, 2018 Revisions Received:November 8, 2018; Deemed Complete:November 15, 2018 Since this project is Categorically Exempt, the City has 60 days (until January 15, 2019) to make a decision on the project. CONCLUSION Staff recommends approval of the Architectural and Site Approval and Director’s Minor Modification, since the plans and conditions of approval address all concerns related to the proposed project. Additionally, all of the findings for approval of the proposed project, consistent with chapters 19.12, 19.164, and 19.168 of the Cupertino Municipal Code, may be made as follows. With respect to the Architectural and Site Approval permit, the following findings may be made: 1. The proposed development, at the proposed location, will not be detrimental or injurious to property or improvements in the vicinity, and will not be detrimental to the public health, safety, general welfare, or convenience; The applicant proposes a complete courtyard landscape renovation between two existing buildings and a remodel of the building’s corner and courtyard lobby entries. The lobby remodel will result in a net reduction of approximately 327 square feet from the buildings. A distinctive component of the courtyard renovations is the addition of three (3) “vine columns”, featuring a selection of vine species determined to be tolerant to sun and shade, and suitable ASA-2018-06 20400 & 20450 Stevens Creek Boulevard (Cupertino City Center) December 13, 2018 DIR-2018-12 Page 10 for Cupertino’s microclimate. A custom-designed cable network will be suspended from the buildings. Improvements along the site perimeter are also proposed, including landscape modifications, enhancements to the pedestrian crossing within the block, improvements to allow accessibility to the differently abled, and new trash enclosures along the building alleyways. New building finishes will be added to the façade along the ground level. An updated lighting system is also proposed to the building’s existing tower “beacons” with a reduced lumen output and diffused, indirect illumination to reduce glare to the nearby residential developments. All of the proposed changes are improvements to the existing site and will not be detrimental or injurious to property or improvements in the vicinity. 2. The proposal is consistent with the purposes of Chapter 19.168, the General Plan any specific plan, zoning ordinances, applicable planned development permit, conditional use permits, variances, subdivision maps or other entitlements to use which regulate the subject property including, but not limited to, adherence to the following specific criteria: a) Abrupt changes in building scale should be avoided. A gradual transition related to height and bulk should be achieved between new and existing buildings. The scale of the building will be maintained with no changes to the height of the building. Although the proposed remodel of the Winter Lobby will convert approximately 330 square feet of courtyard area into interior space, this conversion will occur under an existing building overhang. Additionally, there will be a reduction in interior floor area with the creation of the Summer Lobby which will remove some bulk from the existing building and not add any height to the existing building. Therefore, there will be no changes to the overall height of the building. The new lobby design and siding materials will provide enhanced architectural articulation, including a new cantilevered, wood slat entry canopy and scaled window paneling that will further enhance the addition and mitigate the overall building mass. b) In order to preserve design harmony between new and existing buildings and in order to preserve and enhance property values, the materials, textures and colors of new building should harmonize with adjacent development by being consistent or compatible with design and color schemes with the future character of the neighborhoods and purposes of the zone in which they are situated. The location, height and materials of walls, fencing, hedges and screen planting should harmonize with adjacent development. Unsightly storage areas, utility installations and unsightly elements of parking lots should be concealed. The planting of ground cover or various types of pavements should be used to prevent dust and erosion, and the unnecessary destruction of existing healthy trees should be avoided. Lighting for development should be adequate to meet safety ASA-2018-06 20400 & 20450 Stevens Creek Boulevard (Cupertino City Center) December 13, 2018 DIR-2018-12 Page 11 requirements as specified by the engineering and building departments, and provide shielding to prevent spill-over light to adjoining property owners. The new building materials will integrate fiberglass reinforced plastic (FRP) panel material, window framing, and colors complementary with existing building materials and colors to preserve design harmony and integrity. New screen walls and trash enclosures are proposed along the north and west private alleys and will incorporate anodized aluminum fence panels and concrete planters with landscape screen planting for a contemporary design. A variety of new native and low water use groundcover, plantings, and pavements are proposed throughout the courtyard and edges of the project site. The proposed tower beacon lighting system will feature new LED fixtures with lower lumen output and diffused, indirect lighting, resulting in reduced lighting to neighboring properties. Additionally, these fixtures are dimmable and can be used independently of each other. c) The number, location, color, size, height, lighting and landscaping of outdoor advertising signs and structures have been designed to minimize traffic hazard, positively affect the general appearance of the neighborhood and harmonize with adjacent development. Signage approval is not included in this application and will be reviewed separately under a separate building permit or Master Sign Program. d) With respect to new projects within existing residential neighborhoods, new development should be designed to protect residents from noise, traffic, light and visually intrusive effects by use of buffering, setbacks, landscaping, walls and other appropriate design measures. No new windows above the ground level are proposed for the walls facing outwards towards the private roads within the City Center facing the residential property. The height of four (4) existing window panels on two sides of the corner entryways will be increased, from approximately 10’-9” to 17’-0” measured from finished floor to give a sense of space to the entrance lobby areas. Since these are high volume spaces, there will not be any privacy issues to the existing residences. Additionally, the proposed lighting systems in the existing tower beacons will result in less glare and visual intrusion to the adjacent residences. With respect to the Director’s Minor Modification permits, the following findings may be made: 1. The application is a minor change to a plan which has received site and designs approval. The modifications to the site under this permit are small strips of land along the primary project site, and include new landscaping and pavement materials. Two new trash enclosures, ASA-2018-06 20400 & 20450 Stevens Creek Boulevard (Cupertino City Center) December 13, 2018 DIR-2018-12 Page 12 required by the City’s Municipal Code, are proposed along the western and northern alleyway loading docks. Additionally, the project includes updated paving materials and markings to improve safety measures to a pedestrian walkway along Macadam Lane. The affected areas are small and are primarily on-grade improvements. The proposed modifications for this project, therefore, is considered minor. 2. The proposed development and/or use will be located and conducted in a manner in accord with the Cupertino Comprehensive General Plan, underlying zoning regulations, and the purpose of this title and complies with the California Environmental Quality Act (CEQA). The proposed project is consistent with and will be conducted in a manner in accordance with the General Plan and Zoning Ordinance. No increase in floor area or height is proposed. Furthermore, the proposed modifications to the site are categorically exempt under CEQA in as the project is an existing site that involves only minor modifications. NEXT STEPS The permit will be effective 14 calendar days from the date of the hearing. The decision of the Administrative Hearing Officer is final, unless appealed within 14 calendar days from the date of the hearing. The applicant team may apply for building and/or other permits with the City at the end of the appeal period. This approval is valid until December 13, 2019. The applicant team may apply for a one- time one year extension before the approval expires. Prepared by: Jeffrey Tsumura, Assistant Planner Reviewed and Approved by:Piu Ghosh, Principal Planner ATTACHMENTS 1. Draft Resolution for ASA-2018-06 2. Draft Resolution for DIR-2018-12 3. Plan Set ASA-2018-06 CITY OF CUPERTINO 10300 Torre Avenue Cupertino, California 95014 DRFT RESOLUTION NO. OF THE ADMINISTRATIVE HEARING OFFICER OF THE CITY OF CUPERTINO APPROVING AN ARCHITECTURAL AND SITE APPROVAL PERMIT TO CONSIDER ALLOWING LANDSCAPE AND ARCHITECTURAL MODIFICATIONS TO TWO (2) EXISTING HIGH RISE BUILDINGS IN THE CUPERTINO CITY CENTER LOCATED AT 20400 AND 20450 STEVENS CREEK BOULEVARD (APN 369-01-027 & 369-01-028) SECTION I: PROJECT DESCRIPTION Application No.:ASA-2018-06 Applicant:James Mallery (WRNS Studios) Location:20400 & 20450 Stevens Creek Boulevard SECTION II: FINDINGS FOR ARCHITECTURAL AND SITE APPROVAL PERMIT: WHEREAS, the City of Cupertino received an application for an Architectural and Site Approval and Director’s Minor Modification to consider allowing landscape and architectural modifications to two (2) existing high rise buildings in the Cupertino City Center, as described in Section I. of this Resolution; and WHEREAS, the necessary public notices have been given as required by the Procedural Ordinance of the City of Cupertino, and the Administrative Hearing Officer has held at least one public meeting in regard to the application; and WHEREAS, the project is determined to be exempt from the California Environmental Quality Act (CEQA); and WHEREAS, the applicant has met the burden of proof required to support said application; and WHEREAS, the Administrative Hearing Officer finds as follows with regard to this application: 1.The proposed development, at the proposed location, will not be detrimental or injurious to property or improvements in the vicinity, and will not be detrimental to the public health, safety, general welfare, or convenience; Resolution No. ASA-2018-06 December 13, 2018 Page 2 The applicant proposes a complete courtyard landscape renovation between two existing buildings and a remodel of the building’s corner and courtyard lobby entries. The lobby remodel will result in a net reduction of approximately 327 square feet from the buildings. A distinctive component of the courtyard renovations is the addition of three (3) “vine columns”, featuring a selection of vine species determined to be tolerant to sun and shade, and suitable for Cupertino’s microclimate. A custom-designed cable network will be suspended from the buildings. Improvements along the site perimeter are also proposed, including landscape modifications, enhancements to the pedestrian crossing within the block, improvements to allow accessibility to the differently abled, and new trash enclosures along the building alleyways. New building finishes will be added to the façade along the ground level. An updated lighting system is also proposed to the building’s existing tower “beacons” with a reduced lumen output and diffused, indirect illumination to reduce glare to the nearby residential developments. All of the proposed changes are improvements to the existing site and will not be detrimental or injurious to property or improvements in the vicinity. 2.The proposal is consistent with the purposes of Chapter 19.168, the General Plan any specific plan, zoning ordinances, applicable planned development permit, conditional use permits, variances, subdivision maps or other entitlements to use which regulate the subject property including, but not limited to, adherence to the following specific criteria: a) Abrupt changes in building scale should be avoided. A gradual transition related to height and bulk should be achieved between new and existing buildings. The scale of the building will be maintained with no changes to the height of the building. Although the proposed remodel of the Winter Lobby will convert approximately 330 square feet of courtyard area into interior space, this conversion will occur under an existing building overhang. Additionally, there will be a reduction in interior floor area with the creation of the Summer Lobby which will remove some bulk from the existing building and not add any height to the existing building. Therefore, there will be no changes to the overall height of the building. The new lobby design and siding materials will provide enhanced architectural articulation, including a new cantilevered, wood slat entry canopy and scaled window paneling that will further enhance the addition and mitigate the overall building mass. b) In order to preserve design harmony between new and existing building and in order to preserve and enhance property values, the materials, textures and colors of new building should harmonize with adjacent development by being consistent or compatible with design and color schemes with the future character of the neighborhoods and purposes of the zone in which they are situated. The location, height and materials of walls, fencing, hedges and screen planting should harmonize with adjacent development. Unsightly storage areas, utility Resolution No. ASA-2018-06 December 13, 2018 Page 3 installations and unsightly elements of parking lots should be concealed. The planting of ground cover or various types of pavements should be used to prevent dust and erosion, and the unnecessary destruction of existing healthy trees should be avoided. Lighting for development should be adequate to meet safety requirements as specified by the engineering and building departments, and provide shielding to prevent spill-over light to adjoining property owners. The new building materials will integrate fiberglass reinforced plastic (FRP) panel material, window framing, and colors complementary with existing building materials and colors to preserve design harmony and integrity. New screen walls and trash enclosures are proposed along the north and west private alleys and will incorporate anodized aluminum fence panels and concrete planters with landscape screen planting for a contemporary design. A variety of new native and low water use groundcover, plantings, and pavements are proposed throughout the courtyard and edges of the project site. The proposed tower beacon lighting system will feature new LED fixtures with lower lumen output and diffused, indirect lighting, resulting in reduced lighting to neighboring properties. Additionally, these fixtures are dimmable and can be used independently of each other. c) The number, location, color, size, height, lighting and landscaping of outdoor advertising signs and structures have been designed to minimize traffic hazard, positively affect the general appearance of the neighborhood and harmonize with adjacent development. Signage approval is not included in this application and will be reviewed separately under a separate building permit or Master Sign Program. d) With respect to new projects within existing residential neighborhoods, new development should be designed to protect residents from noise, traffic, light and visually intrusive effects by use of buffering, setbacks, landscaping, walls and other appropriate design measures. No new windows above the ground level are proposed for the walls facing outwards towards the private roads within the City Center facing the residential property. The height of four (4) existing window panels on two sides of the corner entryways will be increased, from approximately 10’-9” to 17’-0” measured from finished floor to give a sense of space to the entrance lobby areas. Since these are high volume spaces, there will not be any privacy issues to the existing residences. Additionally, the proposed lighting systems in the existing tower beacons will result in less glare and visual intrusion to the adjacent residences. NOW, THEREFORE, BE IT RESOLVED: That after careful consideration of the maps, facts, exhibits, testimony, staff’s report and presentation,and other evidence submitted in this matter, subject to the conditions which are enumerated in this Resolution beginning on PAGE 4 thereof,: Resolution No. ASA-2018-06 December 13, 2018 Page 4 The application for a Architectural and Site Approval, Application no. ASA-2018-06 is hereby approved and that the subconclusions upon which the findings and conditions specified in this resolution are based and contained in the Public Hearing record concerning Application no. ASA-2018-06 as set forth in the Minutes of the Administrative Hearing Meeting of December 13, 2018 and are incorporated by reference as though fully set forth herein. SECTION III: CONDITIONS ADMINISTERED BY THE COMMUNITY DEVELOPMENT DEPT. 1. APPROVED EXHIBITS Approval is based on the plan set drawn by WRNS Studio entitled “Cupertino City Center, 20400 and 20450 Stevens Creek Blvd” consisting of fifty-five(55) sheets,except as may be amended by conditions in this resolution. 2. ACCURACY OF PROJECT PLANS The applicant/property owner is responsible to verify all pertinent property data including but not limited to property boundary locations, building setbacks, property size, building square footage, any relevant easements and/or construction records. Any misrepresentation of any property data may invalidate this approval and may require additional review. 3. ANNOTATION OF THE CONDITIONS OF APPROVAL The conditions of approval set forth shall be incorporated into and annotated on the first page of the building plans. 4. CONCURRENT APPROVAL CONDITIONS The conditions of approval contained in file no. DIR-2018-12 shall be applicable to this approval. 5. EXTERIOR BUILDING MATERIALS/TREATMENTS The final building exterior plan shall closely resemble the details shown on the original approved plans. Final building exterior treatment plan (including but not limited to details on exterior color, materials, architectural treatments, doors, windows, lighting fixtures, and/or embellishments) shall be reviewed and approved by the Director of Community Development prior to issuance of building permits to ensure quality and consistency. Any exterior changes determined to be substantial by the Director of Community Development shall either require a modification to this permit or a new permit based on the extent of the change. Resolution No. ASA-2018-06 December 13, 2018 Page 5 6. PREVIOUS CONDITIONS OF APPROVAL All prior conditions of approval through past approvals shall remain in effect unless superseded by or in conflict with subsequent conditions of approval and as specifically amended by this approval. 7. SIGNAGE Signage is not approved with this application. Signage shall conform to the City Sign Code. 8. SITE IMPROVEMENTS All proposed site improvements shall be completed prior to final occupancy of any structures approved in conjunction with the project. 9. TREE PROTECTION As part of the demolition or building permit drawings, a tree protection plan shall be prepared by a certified arborist for the trees to be retained. In addition, the following measures shall be added to the protection plan: For trees to be retained, chain link fencing and other root protection shall be installed around the dripline of the tree prior to any project site work. No parking or vehicle traffic shall be allowed under root zones, unless using buffers approved by the Project Arborist. No trenching within the critical root zone area is allowed. If trenching is needed in the vicinity of trees to be retained, the City’s consulting arborist shall be consulted before any trenching or root cutting beneath the dripline of the tree. Wood chip mulch shall be evenly spread inside the tree projection fence to a four-inch depth. Tree protection conditions shall be posted on the tree protection barriers. Retained trees shall be watered to maintain them in good health. A covenant on the property shall be recorded that identifies all the protected trees, prior to final occupancy. The tree protection measures shall be inspected and approved by the certified arborist prior to issuance of building permits. The City’s consulting arborist shall inspect the trees to be retained and shall provide reviews prior to issuance of demolition, grading or building permits. A report ascertaining the good health of the trees mentioned above shall be provided prior to issuance of final occupancy. 10. LANDSCAPE PROJECT SUBMITTAL Prior to issuance of building permits, the applicant shall submit a full Landscape Documentation Package, per sections 14.15.050 A, B, C, and D of the Landscape Resolution No. ASA-2018-06 December 13, 2018 Page 6 Ordinance, for projects with landscape area 500 square feet or more or elect to submit a Prescriptive Compliance Application per sections 14.15.040 A, B, and C for projects with landscape area between 500 square feet and 2,500 square feet.The Landscape Documentation Package or Prescriptive Compliance Application shall be reviewed and approved to the satisfaction of the Director of Community Development prior to issuance of building permits, and additional requirements per sections 14.15.040 D, E, F, and G or 14.15.050 E, F, G, H, and I will be required to be reviewed and approved prior to final inspections. 11. LANDSCAPE AND IRRIGATION MAINTENANCE Per the Landscape Ordinance (CMC, Chapter 14.15), a maintenance schedule shall be established and submitted to the Director of Community Development or his/her designee, either with the landscape application package, with the landscape installation report, or any time before the landscape installation report is submitted. 12. LANDSCAPE INSTALLATION REPORT The project is subject to all provisions delineated in the Landscape Ordinance (CMC, Chapter 14.15). A landscape installation audit shall be conducted by a certified landscape professional after the landscaping and irrigation system have been installed. The findings of the assessment shall be consolidated into a landscape installation report. The landscape installation report shall include, but is not limited to: inspection to confirm that the landscaping and irrigation system are installed as specified in the landscape and irrigation design plan, system tune-up, system test with distribution uniformity, reporting overspray or run-off that causes overland flow, and preparation of an irrigation schedule. The landscape installation report shall include the following statement: “The landscape and irrigation system have been installed as specified in the landscape and irrigation design plan and complies with the criteria of the ordinance and the permit.” 13. GRADING AND CONSTRUCTION HOURS AND NOISE LIMITS a) All grading activities shall be limited to the dry season (April 15 to October 1), unless permitted otherwise by the Director of Public works. b) Construction hours and noise limits shall be compliant with all requirements of Chapter 10.48 of the Cupertino Municipal Code. c) Grading, street construction, underground utility and demolition hours for work done more than 750 feet away from residential areas shall be limited to Monday through Friday, 7 a.m. to 8 p.m. and Saturday and Sunday, 9 a.m. to 6 p.m. Grading, street construction, demolition or underground utility work within 750 Resolution No. ASA-2018-06 December 13, 2018 Page 7 feet of residential areas shall not occur on Saturdays, Sundays, holidays, and during the nighttime period as defined in Section 10.48.053(b) of the Municipal Code. d) Construction activities shall be limited to Monday through Friday, 7 a.m. to 8 p.m. and Saturday and Sunday, 9 a.m. to 6 p.m. Construction activities are not allowed on holidays as defined in Chapter 10.48 of the Municipal Code. Night time construction is allowed if compliant with nighttime standards of Section 10.48 of the Cupertino Municipal Code. e) Rules and regulations pertaining to all construction activities and limitations identified in this permit, along with the name and telephone number of an applicant appointed disturbance coordinator, shall be posted in a prominent location at the entrance to the job site. f) The applicant shall be responsible for educating all contractors and subcontractors of said construction restrictions. The applicant shall comply with the above grading and construction hours and noise limit requirements unless otherwise indicated. 14. DUST CONTROL The following construction practices shall be implemented during all phases of construction for the proposed project to prevent visible dust emissions from leaving the site: a) Water all active construction areas at least twice daily and more often during windy periods to prevent visible dust from leaving the site; active areas adjacent to windy periods; active areas adjacent to existing land uses shall be kept damp at all times, or shall be treated with non-toxic stabilizers or dust palliatives. b) Cover all trucks hauling soil, sand, and other loose materials or require all trucks to maintain at least 2 feet of freeboard; c) Pave, apply water at least three times daily, or apply (non-toxic) soil stabilizers on all unpaved access roads, parking areas and staging areas at construction sites. d) Sweep streets daily, or more often if necessary (preferably with water sweepers) if visible soil material is carried onto adjacent public streets. e) The applicant shall incorporate the City’s construction best management practices into the building permit plan set. 15. NOISE CONTROL Noise levels are not to exceed those listed in Chapter 10.48: Community Noise Control of the Cupertino Municipal Code, unless approved by special exception by the Noise Control Officer. The applicant may have to conduct future tests to Resolution No. ASA-2018-06 December 13, 2018 Page 8 verify they are complying with the ordinance at the request of the Community Development Director. 16. UTILITY STRUCTURE PLAN Prior to issuance of building permits, the applicant shall work with staff to provide a detailed utility plan to demonstrate screening or undergrounding of all new utlity structures [including, but not limited to backflow preventers (BFP), fire department connections (FDC), post-indicator valves (PIV), and gas meters] to the satisfaction of the Director of Community Development, Public Works, Fire Department, and applicable utility agencies. 17. SCREENING All mechanical and other equipment on the building or on the site shall be screened so they are not visible from public street areas or adjoining developments. Screening materials/colors shall match building features and materials. The height of the screening shall be taller than the height of the mechanical equipment that it is designed to screen. The location of equipment and necessary screening shall be reviewed and approved by the Director of Community Development prior to issuance of building permits. 18. CONSULTATION WITH OTHER DEPARTMENTS The applicant is responsible to consult with other departments and/or agencies with regard to the proposed project for additional conditions and requirements. Any misrepresentation of any submitted data may invalidate an approval by the Community Development Department. 19. INDEMNIFICATION Except as otherwise prohibited by law, the applicant shall indemnify and hold harmless the City, its City Council, and its officers, employeesand agents (collectively, the “indemnified parties”) from and against any claim, action, or proceeding brought by a third party against one or more of the indemnified parties or one or more of the indemnified parties and the applicant to attack, set aside, or void this Resolution or any permit or approval authorized hereby for the project, including (without limitation) reimbursing the City its actual attorneys’ fees and costs incurred in defense of the litigation. The applicant shall pay such attorneys’ fees and costs within 30 days following receipt of invoices from City. Such attorneys’ fees and costs shall include amounts paid to counsel not otherwise employed as City staff and shall include City Attorney time and overhead costs and other City staff overhead costs and any costs directly related to the litigation reasonably incurred by City. Resolution No. ASA-2018-06 December 13, 2018 Page 9 20. NOTICE OF FEES, DEDICATIONS, RESERVATIONS, OR OTHER EXACTIONS The Conditions of Project Approval set forth herein may include certain fees, dedication requirements, reservation requirements, and other exactions. Pursuant to Government Code Section 66020(d) (1), these Conditions constitute written notice of a statement of the amount of such fees, and a description of the dedications, reservations, and other exactions. You are hereby further notified that the 90-day approval period in which you may protest these fees, dedications, reservations, and other exactions, pursuant to Government Code Section 66020(a), has begun. If you fail to file a protest within this 90-day period complying with all of the requirements of Section 66020, you will be legally barred from later challenging such exactions. PASSED AND ADOPTED this 13th day of December, 2018 at a noticed Administrative Hearing of the City of Cupertino, State of California, held by the Administrative Hearing Officer, pursuant to Cupertino Municipal Code Section 19.12.120. ATTEST:APPROVED: Jeffrey Tsumura Benjamin Fu Assistant Planner Assistant Director of Community Development CITY OF CUPERTINO 10300 Torre Avenue Cupertino, California 95014 DRAFT RESOLUTION OF THE ADMINISTRATIVE HEARING MEETING OF THE CITY OF CUPERTINO ALLOWING MODIFICATIONS TO THE SITE INCLUDING LANDSCAPING AND PAVEMENT MODIFICATIONS TO THE PERIMETER OF THE BUILDINGS LOCATED IN THE SHARED PRIVATE AREAS ALONG 20400 AND 20450 STEVENS CREEK BOULEVARD (APN 369-01-023 & 369-01-995) SECTION I: PROJECT DESCRIPTION Application No.:DIR-2018-12 Applicant:James Mallery (WRNS Studio) Location:Perimeter around 20400 and 20450 Stevens Creek Boulevard (APN 369-01-023 and 369-01-995) SECTION II: FINDINGS WHEREAS, the Administrative Hearing Officer of the City of Cupertino received an application to allow for site and architectural modifications for the site located at 20400 and 20450 Stevens Creek Boulevard within the Cupertino City Center; WHEREAS, the project is categorically exempt from the California Environmental Quality Act (CEQA); and WHEREAS, the necessary public hearing notices have been given as required by the Procedural Ordinance of the City of Cupertino, and the Administrative Hearing Officer has held at least one public hearing in regard to the application; and WHEREAS, the applicant has met the burden of proof required to support said application; and WHEREAS, the Administrative Hearing Officer finds: 1. The application is a minor change to a plan which has received site and designs approval. The modifications to the site under this permit are small strips of land along the primary project site, and include new landscaping and pavement materials. Two new Draft Resolution DIR-2018-12 December 13, 2018 Page 2 trash enclosures, required by the City’s Municipal Code, are proposed along the western and northern alleyway loading docks. Additionally, the project includes updated paving materials and markings to improve safety measures to a pedestrian walkway along Macadam Lane. The affected areas are small and are primarily on- grade improvements. The proposed modifications for this project, therefore, is considered minor. 2. The proposed development and/or use will be located and conducted in a manner in accord with the Cupertino Comprehensive General Plan, underlying zoning regulations, and the purpose of this title and complies with the California Environmental Quality Act (CEQA). The proposed project is consistent with and will be conducted in a manner in accordance with the General Plan and Zoning Ordinance. No increase in floor area or height is proposed. Furthermore, the proposed modifications to the site are categorically exempt under CEQA in as the project is an existing site that involves only minor modifications. NOW, THEREFORE, BE IT RESOLVED: That after careful consideration of maps, facts, exhibits, testimony and other evidence submitted in this matter, subject to the conditions which are enumerated in Section III and IV of this Resolution beginning on Page 2 thereof, the Application No. DIR-2018-12 is hereby approved; and that the sub-conclusions upon which the findings and conditions specified in this Resolution are based and contained in the public hearing record concerning Application DIR-2018-12 as set forth in the Minutes of the Administrative Hearing Meeting of December 13, 2018, and are incorporated by reference as though fully set forth herein. SECTION III: CONDITIONS ADMINISTERED BY THE COMMUNITY DEVELOPMENT DEPARTMENT 1. APPROVED EXHIBITS Approval is based on the plan set drawn by WRNS Studio entitled “Cupertino City Center, 20400 and 20450 Stevens Creek Blvd” consisting of fifty-five (55) sheets, except as may be amended by conditions in this resolution. 2. ACCURACY OF PROJECT PLANS The applicant/property owner is responsible to verify all pertinent property data including but not limited to property boundary locations, building setbacks, property size, building square footage, any relevant easements and/or Draft Resolution DIR-2018-12 December 13, 2018 Page 3 construction records. Any misrepresentation of any property data may invalidate this approval and may require additional review. 3. ANNOTATION OF THE CONDITIONS OF APPROVAL The conditions of approval set forth shall be incorporated into and annotated on the first page of the building plans. 4. CONCURRENT APPROVAL CONDITIONS The conditions of approval contained in file no. ASA-2018-06 shall be applicable to this approval. 5. SIGNAGE Signage is not approved with this application. All signage shall conform to the City’s Sign Ordinance. 6. TREE PROTECTION As part of the demolition or building permit drawings, a tree protection plan shall be prepared by a certified arborist for the trees to be retained. In addition, the following measures shall be added to the protection plan: For trees to be retained, chain link fencing and other root protection shall be installed around the dripline of the tree prior to any project site work. No parking or vehicle traffic shall be allowed under root zones, unless using buffers approved by the Project Arborist. No trenching within the critical root zone area is allowed. If trenching is needed in the vicinity of trees to be retained, the City’s consulting arborist shall be consulted before any trenching or root cutting beneath the dripline of the tree. Wood chip mulch shall be evenly spread inside the tree projection fence to a four-inch depth. Tree protection conditions shall be posted on the tree protection barriers. Retained trees shall be watered to maintain them in good health. A covenant on the property shall be recorded that identifies all the protected trees, prior to final occupancy. The tree protection measures shall be inspected and approved by the certified arborist prior to issuance of building permits. The City’s consulting arborist shall inspect the trees to be retained and shall provide reviews prior to issuance of demolition, grading or building permits. A report ascertaining the good health of the trees mentioned above shall be provided prior to issuance of final occupancy. Draft Resolution DIR-2018-12 December 13, 2018 Page 4 7. LANDSCAPE PROJECT SUBMITTAL Prior to issuance of building permits, the applicant shall submit a full Landscape Documentation Package, per sections 14.15.050 A, B, C, and D of the Landscape Ordinance, for projects with landscape area 500 square feet or more or elect to submit a Prescriptive Compliance Application per sections 14.15.040 A, B, and C for projects with landscape area between 500 square feet and 2,500 square feet.The Landscape Documentation Package or Prescriptive Compliance Application shall be reviewed and approved to the satisfaction of the Director of Community Development prior to issuance of building permits, and additional requirements per sections 14.15.040 D, E, F, and G or 14.15.050 E, F, G, H, and I will be required to be reviewed and approved prior to final inspections. 8. LANDSCAPE AND IRRIGATION MAINTENANCE Per the Landscape Ordinance (CMC, Chapter 14.15), a maintenance schedule shall be established and submitted to the Director of Community Development or his/her designee, either with the landscape application package, with the landscape installation report, or any time before the landscape installation report is submitted. 9. LANDSCAPE INSTALLATION REPORT The project is subject to all provisions delineated in the Landscape Ordinance (CMC, Chapter 14.15). A landscape installation audit shall be conducted by a certified landscape professional after the landscaping and irrigation system have been installed. The findings of the assessment shall be consolidated into a landscape installation report. The landscape installation report shall include, but is not limited to: inspection to confirm that the landscaping and irrigation system are installed as specified in the landscape and irrigation design plan, system tune-up, system test with distribution uniformity, reporting overspray or run-off that causes overland flow, and preparation of an irrigation schedule. The landscape installation report shall include the following statement: “The landscape and irrigation system have been installed as specified in the landscape and irrigation design plan and complies with the criteria of the ordinance and the permit.” 10. GRADING AND CONSTRUCTION HOURS AND NOISE LIMITS a) All grading activities shall be limited to the dry season (April 15 to October 1), unless permitted otherwise by the Director of Public works. b) Construction hours and noise limits shall be compliant with all requirements of Chapter 10.48 of the Cupertino Municipal Code. Draft Resolution DIR-2018-12 December 13, 2018 Page 5 c) Grading, street construction, underground utility and demolition hours for work done more than 750 feet away from residential areas shall be limited to Monday through Friday, 7 a.m. to 8 p.m. and Saturday and Sunday, 9 a.m. to 6 p.m. Grading, street construction, demolition or underground utility work within 750 feet of residential areas shall not occur on Saturdays, Sundays, holidays, and during the nighttime period as defined in Section 10.48.053(b) of the Municipal Code. d) Construction activities shall be limited to Monday through Friday, 7 a.m. to 8 p.m. and Saturday and Sunday, 9 a.m. to 6 p.m. Construction activities are not allowed on holidays as defined in Chapter 10.48 of the Municipal Code. Night time construction is allowed if compliant with nighttime standards of Section 10.48 of the Cupertino Municipal Code. e) Rules and regulations pertaining to all construction activities and limitations identified in this permit, along with the name and telephone number of an applicant appointed disturbance coordinator, shall be posted in a prominent location at the entrance to the job site. f) The applicant shall be responsible for educating all contractors and subcontractors of said construction restrictions. The applicant shall comply with the above grading and construction hours and noise limit requirements unless otherwise indicated 11. DUST CONTROL The following construction practices shall be implemented during all phases of construction for the proposed project to prevent visible dust emissions from leaving the site: a) Water all active construction areas at least twice daily and more often during windy periods to prevent visible dust from leaving the site; active areas adjacent to windy periods; active areas adjacent to existing land uses shall be kept damp at all times, or shall be treated with non-toxic stabilizers or dust palliatives. b) Cover all trucks hauling soil, sand, and other loose materials or require all trucks to maintain at least 2 feet of freeboard; c) Pave, apply water at least three times daily, or apply (non-toxic) soil stabilizers on all unpaved access roads, parking areas and staging areas at construction sites. d) Sweep streets daily, or more often if necessary (preferably with water sweepers) if visible soil material is carried onto adjacent public streets. e) The applicant shall incorporate the City’s construction best management practices into the building permit plan set. Draft Resolution DIR-2018-12 December 13, 2018 Page 6 12. UTILITY STRUCTURE PLAN Prior to issuance of building permits, the applicant shall work with staff to provide a detailed utility plan to demonstrate screening or undergrounding of all new utlity structures [including, but not limited to backflow preventers (BFP), fire department connections (FDC), post-indicator valves (PIV), and gas meters] to the satisfaction of the Director of Community Development, Public Works, Fire Department, and applicable utility agencies. 13. NOISE CONTROL Noise levels are not to exceed those listed in Chapter 10.48: Community Noise Control of the Cupertino Municipal Code, unless approved by special exception by the Noise Control Officer. The applicant may have to conduct future tests to verify they are complying with the ordinance at the request of the Community Development Director. 14. CONSULTATION WITH OTHER DEPARTMENTS The applicant is responsible to consult with other departments and/or agencies with regard to the proposed project for additional conditions and requirements. Any misrepresentation of any submitted data may invalidate an approval by the Community Development Department. 15. INDEMNIFICATION Except as otherwise prohibited by law, the applicant shall indemnify and hold harmless the City, its City Council, and its officers, employees and agents (collectively, the “indemnified parties”) from and against any claim, action, or proceeding brought by a third party against one or more of the indemnified parties or one or more of the indemnified parties and the applicant to attack, set aside, or void this Resolution or any permit or approval authorized hereby for the project, including (without limitation) reimbursing the City its actual attorneys’ fees and costs incurred in defense of the litigation. The applicant shall pay such attorneys’ fees and costs within 30 days following receipt of invoices from City. Such attorneys’ fees and costs shall include amounts paid to counsel not otherwise employed as City staff and shall include City Attorney time and overhead costs and other City staff overhead costs and any costs directly related to the litigation reasonably incurred by City. 16. NOTICE OF FEES, DEDICATIONS, RESERVATIONS OR OTHER EXACTIONS The Conditions of Project Approval set forth herein may include certain fees, dedication requirements, reservation requirements, and other exactions. Pursuant to Government Code Section 66020(d) (1), these Conditions constitute Draft Resolution DIR-2018-12 December 13, 2018 Page 7 written notice of a statement of the amount of such fees, and a description of the dedications, reservations, and other exactions. You are hereby further notified that the 90-day approval period in which you may protest these fees, dedications, reservations, and other exactions, pursuant to Government Code Section 66020(a), has begun. If you fail to file a protest within this 90-day period complying with all of the requirements of Section 66020, you will be legally barred from later challenging such exactions. PASSED AND ADOPTED this 13th day of December, 2018 at a noticed Public Hearing of the Administrative Hearing Officer of the City of Cupertino, State of California, held by the Director of Community Development, or his or her designee, pursuant to Cupertino Municipal Code Section 19.12.120. ATTEST: APPROVED: ________________________ _______________________ ____ Jeffrey Tsumura Benjamin Fu Assistant Planner Asst. Director of Community Development SCALE:PROJECT #:1 180824 FORMAL APP RESUBMITTAL 1CUPERTINO CITY CENTER3/19/2018COVER SHEET17012.00G.000PrometheusCUPERTINO CITY CENTERPLANNING FORMAL APPLICATIONResubmittal8/24/201820400 & 20450 STEVENS CREEK BLVDCUPERTINO, CA 950141 OB3 -20400OB4 -20450 PHASE 1PHASE 1PHASE 2PHASE 2PHASE 1PHASE 1WINTERLOBBYPHASING DIAGRAM 11DIRECTOR'S MINOR MODIFICATION (DIR) #2CUPERTINO CITY CENTER PROPERTY (ARCHITECTURAL AND SITE APPROVAL (ASA MAJOR)DIRECTOR'S MINOR MODIFICATION (DIR) # 2DIRECTOR'S MINOR MODIFICATION (DIR) # 1NOTE: LANDSCAPE AND SITE IMPROVEMENTS WILL TAKE PLACE OUTSIDE OF THE PROPERTY LINES OF 28/LOT 2 27/LOT 3. SUCH SITE IMPROVEMENTS ARE PART OF DIR # 1 AND DIR # 2111SCALE:PROJECT #:1180824 FORMAL APP RESUBMITTAL 1As indicatedCUPERTINO CITY CENTER3/19/2018PROJECT INFORMATION17012.00G.001PROJECT INFORMATIONSHEET INDEXVICINITY MAPTHE PROJECT IS A RENOVATION TO THE EXISTING CUPERTINO CITY CENTER HIGH RISE BUILDINGS BUILT IN THE 1980’S.THE EXISTING SITE CONTAINS 2 HIGH RISE TOWERS CONNECTED BY A PODIUM OF 2 LEVELS OF UNDERGROUND PARKING. THE ROOF OF THE PARKING PODIUM CONTAINS A PLAZA THAT CONNECTS THE TWO BUILDINGS. ORIGINAL STAIRS, AND EXPOSED GLASS ELEVATOR, AND GLASS CANOPY CONNECTS THE UNDERGROUND PARKING TO THE PLAZA LEVEL.THE ADJACENT PROPERTIES, INCLUDING THE STREETS, ACCESS DRIVEWAYS, AND ADJACENT PLAZAS ARE OWNED AND OPERATED BY A HOA/COMMON AGREEMENT WITH PROMETHEUS AND A FEW OTHER ADJACENT BUILDING OWNERS.THE RENOVATION PROJECT CONSISTS OF TWO PHASES OF WORK: PHASE 1 AND PHASE 2. THIS PLANNING APPLICATION CONCERNS PHASE 1 ONLY. PHASE 1 EXTERIOR WORK INCLUDES UPDATES OF ORIGINAL ELEMENTS. THE PROJECT UPDATES THE TWO BUILDINGS' CORNER STREET ENTRANCES. SOME EXTERIOR GRANITE-CLAD WALLS WILL BE REPLACED WITH NEW CLADDING AND PUNCHED WINDOWS. THE PROJECT HAS NEW ALLEY LOADING DOCK ROLL-DOWN DOORS AND TRASH ENCLOSURES. THERE IS A COMPLETE OVERHAUL OF THE EXISTING PLAZA WITH A NEW LANDSCAPE DESIGN.ONE OF THE HIGHLIGHTS OF THE PROJECT WILL BE (3) 5 STORY ‘GREEN COLUMNS’ IN THE COURTYARD, WITH A CABLE NETWORK SUSPENDED FROM THE PROJECT’S EXISTING BUILDINGS.THE PROJECT INCLUDES AN ACCENT LIGHTING “BEACON” ELEMENT AT THE TOP OF THE EXISTING TOWERS.PHASE 1 INTERIOR WORK INCLUDES ROUGHLY 4,620 SF OF GROUND FLOOR FINISH UPDATES AND REDESIGN OF THE CENTRAL HALLWAY AND LOBBIES. AN EXISTING SINGLE OCCUPANCY SHOWER WILL BE RELOCATED. SOME EXTERIOR SPACE IS MADE INTERIOR, AND SOME INTERIOR SPACE IS MADE EXTERIOR; IN TOTAL FOR BOTH BUILDINGS, OVER 300 SF OF INTERIOR SPACE IS CONVERTED TO EXTERIOR SPACE.PHASE 2 (NOT PART OF THIS PLANNING SUBMITTAL) CONSISTS OF SOME RENOVATION WORK ALONG THE TWO ADJACENT DRIVEWAYS AND A RENOVATION TO THE EXISTING CIRCULAR FOUNTAIN TO THE NORTHWEST OF THE SITE.SIGNAGE IS NOT PART OF THE PROJECT SCOPE. ANY PROPOSED SIGNS INCONSISTENT WITH THE MASTER SIGN PROGRAM WILL REQUIRE MODIFICATION TO THE MASTER SIGN PROGRAM UNDER A SEPARATE PERMIT.GENERAL PLAN DESIGNATION: "HEART OF THE CITY SPECIFIC PLAN"ZONING DESIGNATION: P (CG, OF, RES)THIS PROJECT CONCERNS AN EXISTING BUILDING. ALL ELEVATIONS ARE APPROXIMATE FOR THE EXISTING BUILDING. BUILDING ELEVATIONS ARE NOT CHANGED DUE TO THE PROJECT.-NORTHEAST ENTRY: 130' 6" ABOVE SEA LEVEL.-LEVEL 1: 137' 6" ABOVE SEA LEVEL.-HIGHEST OCCUPIED FLOOR (8TH): 92' 6" ABOVE LEVEL 1-MAXIMUM HEIGHT OF STRUCTURE (AT 'LIGHT BEACON'): 125' 10" ABOVE LEVEL 1.SITE AREA: 72,900 SF (1.67 ACRES).APPROXIMATE BUILDING AREA OF BOTH EXISTING BUILDINGS: 356,256 SFFLOOR AREA RATIO: 72,900 SF / 356,256 SF (EXISTING) = 4.9.THIS PROJECT UPDATES THE GARAGE ELEVATOR AND STAIR CORE AT THE CENTER OF THE COURTYARD. THE EXISTING PARKING FACILITIES ACCOMMODATE APPROXIMATELY 530 CARS. TWO OR THREE PARKING STALL ARE REMOVED IN THE PROJECT. THIS PROJECT DOES NOT CHANGE OR AFFECT THE EXISTING BICYCLE PARKING FACILITIES OR CAPACITY. THIS PROJECT DOES NOT CHANGE THE NUMBER OF ACCESSIBLE PARKING STALLS. THE EXISTING OFFICE BUILDING WILL REMAIN AN OFFICE BUILDING. FUNCTION WILL NOT CHANGE DUE TO THE PROJECT. HOURS OF OPERATION ARE REGULAR BUSINESS HOURS. THE NUMBER OF BUSINESS USERS WILL NOT CHANGEPROJECT DESCRIPTION00 GENERALG.000 COVER SHEETX X XG.001 PROJECT INFORMATIONX X XG.002 EXISTING CONDITIONSX X X301 CIVILC0.0 TITLE SHEETX X XC1.0 PRELIMINARY EXISTING CONDITIONS PLANS X X XC2.0 PRELIMINARY SITE PLAN (ALTERNATIVE 4) X X XC2.1 PRELIMINARY SITE PLANX X XC3.0 PRELIMINARY GRADING AND DRAINAGE PLAN X X XC3.1 PRELIMINARY GRADING AND DRAINAGE PLAN X X XC4.0 PRELIMINARY CONSTRUCTION DETAILS X X X702 LANDSCAPEL-0.01 ILLUSTRATIVE LANDSCAPE PLANX X XL.0.02 ILLUSTRATIVE CONCEPT PLAN - COURTYARD X X XL.0.03 COURTYARD LANDSCAPE - AERIAL VIEWS X X XL.0.04 COURTYARD LANDSCAPE - VIEWSX X XL.0.05 COURTYARD LANDSCAPE - SECTIONSX X XL.0.06 COURTYARD LANDSCAPE - SECTIONSX X XL.0.07 LANDSCAPE ELEMENTSX X XL.0.08 LANDSCAPE ELEMENTS - VINE COLUMNS X X XL.0.09 LANDSCAPE ELEMENTS - PLANTER EDGES X X XL.0.10 LANDSCAPE ELEMENTS - PLANTING & PAVING X X XL.0.20 ILLUSTRATIVE LANDSCAPE PLANX X XL.0.30 LANDSCAPE MATERIALSX X XL.0.31 LANDSCAPE MATERIALSX X XL.0.32 LANDSCAPE MATERIALSXL.0.33 LANDSCAPE MATERIALSXL.1.00 LANDSCAPE MATERIALS PLANX X XL.2.00 PLANTING PLANX X XL.2.05 PLANTING SCHEDULE & NOTESX X XL.3.00 VINE COLUMNS - ROOF PLANX X XL.3.01 VINE COLUMNS - ELEVATIONSX X X2004 ARCHITECTURALAS.101 SITE PLANX X XAD.301 DEMO ELEVATIONSX XA.101 LEVEL 1 FLOOR PLANSX X XA.301 OVERALL ELEVATIONSX X XA.302 STREETSIDE ELEVATIONS OB3X X XA.303 STREETSIDE ELEVATIONS OB4X X XA.304 BUILDING ENTRANCE ELEVATIONSX X XA.305 COURTYARD ELEVATIONSX X XA.311 BUILDING SECTIONSX X XA.321 NE ENTRY RENDERINGX X XA.322 WINTER LOBBY EXTERIOR RENDERING X X XA.323 SUMMER LOBBY EXTERIOR RENDERING X X XA.324 FRP CLADDING VIEWSX XA.325 TRELLIS VIEWSX XA.801 WALL SECTIONS AND DETAILSX X XA.802 WALL SECTIONS AND DETAILSX XA.803 TRELLIS DETAILSX XA.804 TRELLIS DETAILSX XA.811 MATERIALS BOARDX X XA.812 PRECEDENT IMAGESX X XA.821 SITE DETAILSX2107 ELECTRICALE.001 SITE LIGHTINGX X XE.002 TOWER BEACON LIGHTING IMAGERYX XE.003 TOWER BEACON LIGHTINGX X XE.004 SITE LIGHTING LUMINAIRE SCHEDULEX X X4Grand total: 55INFORMAL APP 3/19/2018FORMAL APP 5/18/2018FORMAL APP RESUB. 5/23/2018PHASE AND SCOPE DIAGRAMPLOTS AND PERMITS SCALE:PROJECT #:1 180824 FORMAL APP RESUBMITTAL 1CUPERTINO CITY CENTER3/19/2018EXISTING CONDITIONS17012.00G.002 SE ENTRYSW ENTRYNE ENTRY1SCALE:CUPERTINO CITY CENTER24 AUGUST, 2018PROJECT #:17012.001180824 FORMAL APP RESUBMITTAL 1PRELIMINARY EXISTING CONDITIONS PLANC1.0AS NOTED GARDEN PASSAGE ENHANCED SW ENTRY ENHANCED NE ENTRY SERVICE AREA SCREENING RECREATION PASSAGE CENTRAL COURTYARD SERVICE AREA SCREENING WATER WALL & SLOPED LAWN REPLACING EXISTING FOUNTAIN (FUTURE PHASE) LARGE EVENT SPACE FOUNTAIN PLAZA (FUTURE PHASE) SMALL EVENT SPACE • C.I.P. Conc. W/Intergral Color & Contrasting ‘Topcast’ Finish • Bollards (Stainless Steel) • Replacement Stairs (Precast Conc.) • Concrete Trash Screen Wall / Screen Planting • See Arch. Dwgs (IMPROVEMENTS SIM. TO SE ENTRY) • Concrete Trash Screen Wall / Screen Planting • See Arch. Dwgs SCALE: 1" = 20' 4020010 N SCALE: 1" = 20' - 0"1 ILLUSTRATIVE LANDSCAPE PLAN - OVERALL CUPERTINO CITY CENTER05/07/18 17012.00 SCALE:PROJECT #: 1/20" = 1'-0" Illustrative Concept Plan L-0.01 05/18/18 NOTES: 1: Future items outside the limits of work or listed as phased improvements are not a part of the project scope, and will be reviewed under a separate permit at a future date. 2: Signage improvements are not a part of the project scope. Any proposed signs inconsistent with the Master Sign Program will require modification to the Master Sign Program under a separate permit. OB4 20450 OB3 20400 RECREATIONAL PASSAGE BAR-HEIGHT COUNTER COMMUNAL TABLES BUILT-IN BENCH (TYP.) TRASH/RECYCLING RECEPTACLE (TYP)(4) VINE COLUMN (TYP.) (3) WINTER LOBBY TRELLIS SUMMER LOBBY SKYLIGHT IN PAVEMENT GARDEN PASSAGE OUTDOOR MEETING ROOMS SCALE: 1" = 20' 4020010 N SCALE: 1" = 20' - 0"1 ILLUSTRATIVE COURTYARD PLAN CUPERTINO CITY CENTER05/07/18 17012.00 SCALE:PROJECT #: Illustrative Concept Plan - Courtyard L-0.02 1/20" = 1'-0" 05/18/18 OB4 20450 OB3 20400 1 COURTYARD LANDSCAPE VIEW - AERIAL CUPERTINO CITY CENTER05/07/18 17012.00 SCALE:PROJECT #: Courtyard Landscape - Aerial Views 2 COURTYARD LANDSCAPE VIEW - AERIAL L-0.03 NTS 05/18/18 3 OUTDOOR MEETING ROOM NEAR WINTER LOBBY CUPERTINO CITY CENTER05/07/18 17012.00 SCALE:PROJECT #: Courtyard Landscape - Views 4 RECREATIONAL PASSAGE - LOOKING NW 1 GARDEN PASSAGE - LOOKING NW 2 GARDEN PASSAGE AT CENTRAL COURTYARD L-0.04 NTS 05/18/18 2 SITE SECTION - (LOOKING TOWARDS WINTER LOBBY) CUPERTINO CITY CENTER05/07/18 17012.00 SCALE:PROJECT #: 1 SITE SECTION - (LOOKING TOWARDS SUMMER LOBBY) L-0.05Courtyard Landscape - Sections NTS 05/18/18 1 COURTYARD SECTION - (LOOKING TOWARDS SUMMER LOBBY) CUPERTINO CITY CENTER05/07/18 17012.00 SCALE:PROJECT #: Courtyard Landscape - Sections 2 COURTYARD SECTION - (LOOKING TOWARDS WINTER LOBBY) L-0.06 NTS 05/18/18 STEEL PLANTER VINE COLUMNS LINEAR STONE PAVERS STADIUM SEATING & STAGE WATER WALL (FUTURE PHASE) ACCENT TREES SOFT EDGE PLANTING TILTED PLANTERS FOUNTAIN PLAZA LAWN INFORMAL HEDGE VINE COLUMNS RECREATION/GAMES TABLES OUTDOOR MEETING ROOM SMALL LAWN/LOUNGING COMMUNAL TABLE OUTDOOR MEETING ROOM LARGELINEAR PRECAST PAVERS EVENT SPACE - STAGE STADIUM STEPS EVENT SPACE - SEATING EVENT SPACE - PERFORMANCE EVENT SPACE - LECTURE N 3 SITE FURNISHINGS - SPECIAL EVENTS CUPERTINO CITY CENTER05/07/18 17012.00 SCALE:PROJECT #: Landscape Elements 4 PLANTING ELEMENTS 1 HARDSCAPE ELEMENTS 2 SITE FURNISHINGS L-0.07 NTS 05/18/18 VINE COLUMN, TYP. HORIZONTAL SUSPENSION CABLE, TYP. VERTICAL CHORD CABLE, TYP.VINE CABLES VINE CABLES VINE COLUMNS VINE COLUMNS DAY BED PLANTER VINE COLUMNS DAY BED PLANTER N 3 VINE COLUMNS - BASE PLANTERS CUPERTINO CITY CENTER05/07/18 17012.00 SCALE:PROJECT #: Landscape Elements - Vine Columns 4 VINE COLUMNS - LIGHTING 1 VINE COLUMNS - PLAN 2 VINE COLUMNS - ELEMENTS L-0.08 NTS 05/18/18 3 PLANTER - HARD EDGES CUPERTINO CITY CENTER05/07/18 17012.00 SCALE:PROJECT #: Landscape Elements - Planter Edges 4 PLANTER - SOFT EDGES 1 PLANTER - HARD EDGES 2 PLANTER - HARD EDGES L-0.09 NTS 05/18/18 3 PLANTING - VINE COLUMNS CUPERTINO CITY CENTER05/07/18 17012.00 SCALE:PROJECT #: Landscape Elements - Planting & Paving 4 PAVING - MATERIALS 1 PLANTING - ACCENT TREES 2 PLANTING - GROUND PLANE & UNDERSTORY L-0.10 NTS Western RedbudCercis occidentalis King Sago PalmCycas revoluta Mediterranean Fan PalmChaemerops humilis Kousa DogwoodCornus kousa Princess FlowerTibouchina urvilleana Crape MyrtleLagerstroemia Tuskegee Fruitless OliveOlea europea var. ‘Swan Hill’ California LilacCeanothus var. ‘Dark Star’ Chinese Fringe-Flower var. (2 Varieties)Loropetalum chinense ‘Jazz Hands - White &Pink’ Asian Star JasmineTrachelospermum asiaticum Coral BellsHeuchera micrantha ‘Palace Purple’ Sea LavendarLagerstroemia tuskegee HorsetailEquisetum hyemale Variegated Flax LilyDianella tasmanica ‘Variegata’Beach StrawberryFragaria chiloensisSouthern Sword FernNephrolepis cordifolia Evergreen ClemitisClematis Armandii Lavender Trumpet VineClytostoma Callistegioides Chocolate VineAkebia Quinata Virginia CreeperParthenocissus Quinquifolia Passion VinePassiflora var. Pink JasmineJasminum Polyanthum Purple Vine LilacHardenbergia violacea ‘Happy Wanderer’ Winterbourn PhilodendronPhilodendron ‘Xanadu’ PRECAST PLANK PAVERS PRECAST PLANK PAVERS ORNAMENTAL GRAVEL BALLASTDECOMPOSED GRANITE STONE PAVERSGLASS PAVERS 05/18/18 SCALE: 1" = 20' 4020010 N SCALE: 1" = 20' - 0"1 ILLUSTRATIVE LANDSCAPE PLAN - OVERALL CUPERTINO CITY CENTER05/07/18 17012.00 SCALE:PROJECT #: 1/20" = 1'-0" Illustrative Landscape Plan L-0.20 NOTES: 1: Future items outside the limits of work or listed as phased improvements are not a part of the project scope, and will be reviewed under a separate permit at a future date. 2: Signage improvements are not a part of the project scope. Any proposed signs inconsistent with the Master Sign Program will require modification to the Master Sign Program under a separate permit. 05/18/18 CUPERTINO CITY CENTER03/15/18 17012.00 SCALE:PROJECT #: Landscape Materials Board NTS L-0.30 C.I.P. CONCRETE - ‘TOPCAST’ LIGHT SANDBLAST FINISH C.I.P. CONCRETE - ‘TOPCAST ‘ LIGHT EXPOSED AGGREGATE FINISH GASCOGNE BEIGE LIMESTONE BUSH HAMMER FINISH GASCOGNE BEIGE LIMESTONE SANDBLAST FINISH PRECAST PLANK PAVERS - SANDBLAST FINISH STONE PAVERS TYPE 1 - LINEAR NARROW FORMAT PRECAST PLANK PAVERS - 12” X 24” (ACKER-STONE ‘PALAZZO’, BENTLEY WHITE) CAST-IN-PLACE CONCRETE WITH CONTRASTING ‘TOPCAST’ FINISH STONE PAVERS TYPE 2 - LARGE FORMAT (24” X 48” & 12” X 48”) 05/18/18 CUPERTINO CITY CENTER03/15/18 17012.00 SCALE:PROJECT #: Landscape Materials Board NTS L-0.30 A3 A4 A2 A5A1 CUPERTINO CITY CENTER03/15/18 17012.00 SCALE:PROJECT #: Landscape Materials Board NTS L-0.31 05/18/18 BLENDED AGGREGATE W/ STABILIZER ORNAMENTAL GRAVEL BALLASTRIVER WASH COBBLE 2”-3” DIAM D.G. AND OYSTER SHELL AGGREGATE THERMORY ASH WOOD AT BENCHES, STADIUM SEATING, & STAGE THERMORY ASH WOOD - STAINED FINISH GLASS BLOCK PAVERS W/ METAL FRAME AT SKYLIGHT GLASS BLOCK PAVERS - ETCHED FINISH PRECAST CONCRETE AT PLANTER CURBWALLS & STAIR TREADS PRECAST CONCRETE - MATCH BUILDING COLOR/FINISH METAL PLANTERS - GALV. STEEL W/ ‘CHAMPAGNE’ POWDERCOAT FINISH METAL PLANTERS - PAINT COLOR - ‘CHAMPAGNE’ METALLIC CUPERTINO CITY CENTER03/15/18 17012.00 SCALE:PROJECT #: Landscape Materials Board NTS L-0.30 B1 E2 E3 C5 E1 E4 A6 C3 CUPERTINO CITY CENTER03/15/18 17012.00 SCALE:PROJECT #: Landscape Materials Board NTS L-0.31 05/18/18 VINE COLUMN CABLES - S. S. CABLES 8MM - 26MM DIAMETER PRECAST CONCRETE - WHITE SANDBLAST FINISH CUPERTINO CITY CENTER03/15/18 17012.00 SCALE:PROJECT #: Landscape Materials Board NTS L-0.30 D2 C4 2 VINE PLANTING SCHEDULE SYMBOL KEY BOTANICAL NAME COMMON NAME MINIMUM SIZE (HT.X SPRD.)QUANTITY SPACING NOTES AKQU AKEBIA QUINATA CHOCOLATE VINE 15 GAL. (8'-10' HT.)TBD CONTRACT GROW TO 8' -10' MIN. HT. (STAKED) CLAR CLEMATIS ARMANDII EYEGREEN CLEMITIS 15 GAL. (8'-10' HT.)CONTRACT GROW TO 8' -10' MIN. HT. (STAKED) CLCA CLYTOSTOMA CALLISTEGIOIDES LAVENDER TRUMPET VINE 15 GAL. (8'-10' HT.)CONTRACT GROW TO 8' -10' MIN. HT. (STAKED) HAVI HARDENBERGIA VIOLACEA 'HAPPY WANDERER'PURPLE VINE LILAC 15 GAL. (8'-10' HT.)CONTRACT GROW TO 8' -10' MIN. HT. (STAKED) JAPO JASMINUM POLYANTHUM PINK JASMINE 15 GAL. (8'-10' HT.)CONTRACT GROW TO 8' -10' MIN. HT. (STAKED) PAQU PARTHENOCISSUS QUINQUIFOLIA VIRGINIA CREEPER 15 GAL. (8'-10' HT.)CONTRACT GROW TO 8' -10' MIN. HT. (STAKED) PACE PASSIFLORA CAERULEA VAR.BLUE PASSION VINE VAR.15 GAL. (8'-10' HT.)CONTRACT GROW TO 8' -10' MIN. HT. (STAKED) UNDERSTORY PLANTING SCHEDULE SYMBOL KEY BOTANICAL NAME COMMON NAME MINIMUM SIZE (HT.X SPRD.)QUANTITY SPACING NOTES DITA DIANELLA TASMANICA 'VARIEGATA'VARIEGATED FLAX LILY 5 GAL.TBD EQHY EQUISETUM HYEMALE HORSETAIL 5 GAL. FRCH FRAGARIA CHILOENSIS BEACH STRAWBERRY 1 GAL. HEMI HEUCHERA MICRANTHA 'PALACE PURPLE'CORAL BELLS 1 GAL. LIPE LIMONIUM PEREZII SEA LAVENDAR 5 GAL. LOCH LOROPETALUM CHINENSE 'JAZZ HANDS - WHITE & PINK'CHINESE FRINGE-FLOWER 15 GAL. PHXA PHILODENDRON 'XANADU'WINTERBOURN PHILODENDRON 15 GAL. NECO NEPHROLEPIS CORDIFOLIA SOUTHERN SWORD FERN 15 GAL. TRAS TRACHELOSPERMUM ASIATICUM ASIAN STAR JASMINE 5 GAL. TREE SCHEDULE SYMBOL KEY BOTANICAL NAME COMMON NAME MINIMUM SIZE (HT .X SPRD.)QUANTITY SPACING NOTES ACRU ACER RUBRUM ' BOWHALL'BOWHALL COLUMNAR RED MAPLE 36" BOX 8 AS SHOWN STREET TREE CABE CARPINUS BETULUS 'FASTIGIATA'COLUMNAR EUROPEAN HORNBEAM 36" BOX 8 AS SHOWN STREET TREE (ALTERNATE SELECTION) CEDA CEANOTHUS 'DARK STAR'DARK STAR CALIFORNIA LILAC 24" BOX TBD AS SHOWN ACCENT TREE (OPTION) CROC CERCIS OCCIDENTALIS WESTERN REDBUD 24" BOX AS SHOWN ACCENT TREE (OPTION) CHHU CHAEMEROPS HUMILIS MEDITERRANEAN FAN PALM 24" BOX AS SHOWN ACCENT TREE (OPTION) COKO CORNUS KOUSA KOUSA DOGWOOD 24" BOX AS SHOWN ACCENT TREE (OPTION) CYRE CYCAS REVOLUTA SAGO PALM 24" BOX AS SHOWN ACCENT TREE (OPTION) LATU LAGERSTROEMIA X FAUREII 'TUSKEGEE'TUSKEGEE CRAPE MYRTLE (PINK FLOWER)24" BOX AS SHOWN ACCENT TREE (OPTION) OLEU OLEA EUROPEA 'SWAN HILL'FRUITLESS OLIVE 24" BOX AS SHOWN ACCENT TREE (OPTION) TIUR TIBOUCHINA URVILLEANA PRINCESS FLOWER 24" BOX AS SHOWN ACCENT TREE (OPTION) PLANT SCHEDULE PLANTING NOTES 1.VERIFY LOCATION OF EXISTING TREES TO REMAIN PRIOR TO SOIL PREPARATION. PROTECT ALL TREES INDICATED TO REMAIN. 2.VERIFY AND COORDINATE WORK AROUND ALL UNDERGROUND UTILITIES BEFORE EXCAVATION. NOTIFY ALL UTILITY PROVIDERS AT LEAST TWO (2) WORKING DAYS PRIOR TO BEGINNING WORK. 3.VERIFY THAT THE CONDITIONS ARE SUITABLE TO PROMOTE HEALTHY PLANT GROWTH. DO NOT PROCEED IF CONDITIONS DETRIMENTAL TO HEALTHY GROWING ENVIRONMENT ARE PRESENT, INCLUDING OVER-COMPACTED SOILS, ADVERSE DRAINAGE CONDITIONS, DEBRIS, OR OTHER HARMFUL CIRCUMSTANCES. PROCEEDING WITHOUT NOTIFICATION DENOTES ACCEPTANCE. 4.COORDINATE WITH OTHER SUBCONTRACTORS AND TRADES TO ENSURE PROTECTION OF GROWING CONDITIONS AND PLANT MATERIALS. 5.VERIFY PLANT QUANTITIES SHOWN ON THE PLANS BASED ON GRAPHIC REPRESENTATION. QUANTITIES SHOWN ARE FOR CONTRACTOR CONVENIENCE ONLY. 6.FINISH GRADING SHALL PROVIDE POSITIVE SURFACE DRAINAGE ACROSS PLANTED AREAS AND AWAY FROM BUILDING FOUNDATIONS. REFER TO CIVIL GRADING PLANS FOR ALL EXISTING AND PROPOSED GRADE INFORMATION. 7.ALL PLANTING AREAS SHALL HAVE THE EXISTING TOPSOIL TESTED, TILLED AND AMENDED TO CONFORM TO RECOMMENDATIONS MADE BY AN AGRONOMIC SOIL TESTING LAB IN ORDER TO ASSURE HEALTHY PLANT GROWTH. PROVIDE 2" MINIMUM OF BARK MULCH. 8.UNLESS OTHERWISE INDICATED, ALL PLANTINGS SHALL BE TRIANGULARLY SPACED. 1.ALL LANDSCAPE AREAS WILL BE PERMANENTLY IRRIGATED USING A PERMANENT AUTOMATIC IRRIGATION SYSTEM. 2.ALL IRRIGATION IMPROVEMENTS WILL UTILIZE HIGH EFFICIENCY DESIGN AND EQUIPMENT COMPONENTS IN CONFORMANCE WITH CITY OF CUPERTINO AND SANTA CLARA VALLEY WATER DISTRICT (SCVWD) STANDARDS AND REQUIREMENTS. 3.THE IRRIGATION SYSTEM DESIGN WILL COMPLY WITH ABA 1881 REQUIREMENTS, FOLLOW THE STATEWIDE MODEL ORDINANCE GUIDELINES AND CITY REQUIREMENTS WITH THE USE OF WATER-EFFICIENT LANDSCAPE AND LOW WATER USE PLANTS. 4.THE IRRIGATION SYSTEM WILL PROVIDE 100% HEAD TO HEAD COVERAGE AND WILL BE DESIGNED TO MINIMIZE OVERSPRAY. ALL REMOTE CONTROL AND QUICK-COUPLING VALVES WILL BE INSTALLED WITHIN SHRUB / GROUND COVER PLANTING AREAS WHENEVER POSSIBLE. 5.IRRIGATION SYSTEM PLANS AND DESIGN WILL BE PROVIDED AT A LATER DATE. 6.THE FINAL IRRIGATION PLANS WILL ACCURATELY AND CLEARLY IDENTIFY: ··LOCATION, TYPE AND SIZE OF THE WATER METERS FOR THE LANDSCAPE. ··LOCATION, TYPE AND SIZE OF ALL COMPONENTSOF THE IRRIGATION SYSTEM. ··STATIC WATER PRESSURE AT THE POINT OF CONNECTION TO THE PUBLIC WATER SUPPLY. ··FLOW RATE (GALLONS PER MINUTE) AND REMOTE CONTROL VALVE SIZE. 7.IRRIGATION SYSTEM FEATURES EMPLOYED TO ACHIEVE WATER CONSERVATION GOALS WILL INCLUDE: ··SMART IRRIGATION CONTROLLERS CAPABLE OF RESPONDING TO ON-SITE WEATHER CONDITIONS. ··CONTROLLERS WITH MULTIPLE PROGRAMS. ··WATERING SCHEDULES EMPLOYING SHORT CYCLES. ··RAIN SHUT-OFF DEVICES TO PREVENT IRRIGATION AFTER SIGNIFICANT PRECIPITATION. ··SUB-SURFACE DRIP AND/OR BUBBLER IRRIGATION FOR SHRUBS AND TREES. ··SUB-SURFACE DRIP IRRIGATION FOR GROUND COVER AREAS. ··USE OF FLOW REDUCERS TO MITIGATE SPRAY OF BROKEN HEADS NEXT TO SIDEWALKS, STREETS AND DRIVEWAYS. IRRIGATION NOTES CUPERTINO CITY CENTER03/15/18 17012.00 SCALE:PROJECT #: Planting Schedule & Notes L-2.05 NTS 05/18/18 EXTERIOR SITE FURNISHINGS - FF&E SCHEDULE SYMBOL NAME QUANTITY/ MODEL MANUFACTURER DIMENSIONS MATERIAL/COLOR SPEC #NOTES IMAGE FN-01 No. 9 LOUNGE CHAIR 8 LOLL 23"w x 29.5"d x 28.25"h SEE SPECS 12 93 00 OFOI FN- 02 DANSK LOUNGE CHAIR 18 GLOSTER 32"w x 29"d x 28.5"h Materials - Leather, Wood, Synthetic, Upholstery / Fabric COLOR TBD 12 93 00 OFOI FN-03 CHIPMAN CHAIR- ARMLESS 16 LANDSCAPE FORMS 22"d x 20"w x 33"h SEE SPECS 12 93 00 OFOI FN-04 CHIPMAN STOOL 9 LANDSCAPE FORMS 19"d x 22"w x 35"h SEE SPECS 12 93 00 OFOI FN- 05 DANSK ROUND SIDE TABLE - WHITE ACRYLIC STONE TOP 9 GLOSTER ROUND 19"w x 15.75"h SEE SPECS 12 93 00 OFOI FN- 06 SATELLITE COCKTAIL TABLE (RECTANGLE)4 LOLL 22"w x 40"l x 13"h SEE SPECS 12 93 00 OFOI FN-07 CHIPMAN DINING HEIGHT TABLE 4 LANDSCAPE FORMS 45"dia. x 29" h SEE SPECS 12 93 00 OFOI FN-08 GO-OUTDOOR TABLE DINING HEIGHT 2 LANDSCAPE FORMS 30"d x 114"l x 30"h SEE SPECS 12 93 00 OFOI FN-09 HALO 36 ELEVATED FIRE PIT 1 SOLUS 36"w x 36" l x 16.25"h SEE SPECS 12 93 00 CFCI FN-10 IRRIGATED PLANTER POT - URBAN TALL SQUARE 6 TOURNESOL SITEWORKS OR EQUAL HIGH QUALITY DESIGNER SERIES 24" sq. (Top) x 16.5" sq. (Bottom) x 48" h FRP; FOR COLOR, SEE SPECS 12 93 00 CFCI; PLANTERS W/ 'MONA' SELF- WATERING SUB-IRRIGATION SYSTEM FN-11 MAGLIN ASH URN 4 MAGLIN 36"h x 4" diam. (Cylinder)FRP; FOR COLOR, SEE SPECS 12 93 00 MLAU300-S SURFACE MOUNT FN-12 POPP PING PONG TABLE 2 POPP 5"w x 96" l x 30"h YELLOW / BLACK 12 93 00 CFCI FN-13 MAGLIN MULTIBIN TRASH/RECYCLE UNIT 4 MAGLIN 35"w x 19"d x 47.5"h PLAIN DOORS (LDO); SEE SPECS 12 93 00 CFCI FN-14 BOLLARDS 5 TOTAL (BASE BID); 27 TOTAL (ADD ALT. 4) CALPIPE OR EQUAL NOM. PIPE SIZE 6" STAINLESS STEEL; / STANDARD FLAT BOLLARD CAP, SEE SPECS 12 93 00 CFCI 5 4 S A N F R AN C I S C O C ALI F ORNI A 9 41 0 7 41 5 .4 8 9.2 2 2 4 TEL 41 5 .3 5 8.91 0 0 F AX WWW W.RNSSTUDIO.OCM 01 SECOND STREET TH LF ORO STE.,40 2 SHEET NO: SHEET TITLE: DATEISSUES PROJECT NO.: DATE: SCALE: All drawings and written material appearing herein constitute original and unpublished work of theArchitect/Engineer and may not be duplicated, used or disclosed without consent of Architect/Engineer.If this drawing is not 30"x42", then the drawing has been revised from its original size.Noted scales must be adjusted. This line should be equal to one inch 03/08/2018SCHEMATIC DESIGN REVISION LIST#DATE 2/1/2018 3:59:21 PM17012.00 8/03/2018 CUPERTINO CITY CENTER 20400 Stevens Creek Blvd Cupertino, CA 95014 735 NW 18TH AVEPORTLAND, OR 97209(503) 334 2080 05/10/2018DESIGN DEVELOPMENT 06/21/2018CD PROGRESS SET 08/03/2018BUILDING PERMIT NO SCALE SITE FURNISHINGS SCHEDULE L-1.05 EXTERIOR SITE FURNISHINGS - FF&E SCHEDULE SYMBOL NAME QUANTITY/ MODEL MANUFACTURER DIMENSIONS MATERIAL/COLOR SPEC #NOTES IMAGE FN-01 No. 9 LOUNGE CHAIR 8 LOLL 23"w x 29.5"d x 28.25"h SEE SPECS 12 93 00 OFOI FN- 02 DANSK LOUNGE CHAIR 18 GLOSTER 32"w x 29"d x 28.5"h Materials - Leather, Wood, Synthetic, Upholstery / Fabric COLOR TBD 12 93 00 OFOI FN-03 CHIPMAN CHAIR- ARMLESS 16 LANDSCAPE FORMS 22"d x 20"w x 33"h SEE SPECS 12 93 00 OFOI FN-04 CHIPMAN STOOL 9 LANDSCAPE FORMS 19"d x 22"w x 35"h SEE SPECS 12 93 00 OFOI FN- 05 DANSK ROUND SIDE TABLE - WHITE ACRYLIC STONE TOP 9 GLOSTER ROUND 19"w x 15.75"h SEE SPECS 12 93 00 OFOI FN- 06 SATELLITE COCKTAIL TABLE (RECTANGLE)4 LOLL 22"w x 40"l x 13"h SEE SPECS 12 93 00 OFOI FN-07 CHIPMAN DINING HEIGHT TABLE 4 LANDSCAPE FORMS 45"dia. x 29" h SEE SPECS 12 93 00 OFOI FN-08 GO-OUTDOOR TABLE DINING HEIGHT 2 LANDSCAPE FORMS 30"d x 114"l x 30"h SEE SPECS 12 93 00 OFOI FN-09 HALO 36 ELEVATED FIRE PIT 1 SOLUS 36"w x 36" l x 16.25"h SEE SPECS 12 93 00 CFCI FN-10 IRRIGATED PLANTER POT - URBAN TALL SQUARE 6 TOURNESOL SITEWORKS OR EQUAL HIGH QUALITY DESIGNER SERIES 24" sq. (Top) x 16.5" sq. (Bottom) x 48" h FRP; FOR COLOR, SEE SPECS 12 93 00 CFCI; PLANTERS W/ 'MONA' SELF- WATERING SUB-IRRIGATION SYSTEM FN-11 MAGLIN ASH URN 4 MAGLIN 36"h x 4" diam. (Cylinder)FRP; FOR COLOR, SEE SPECS 12 93 00 MLAU300-S SURFACE MOUNT FN-12 POPP PING PONG TABLE 2 POPP 5"w x 96" l x 30"h YELLOW / BLACK 12 93 00 CFCI FN-13 MAGLIN MULTIBIN TRASH/RECYCLE UNIT 4 MAGLIN 35"w x 19"d x 47.5"h PLAIN DOORS (LDO); SEE SPECS 12 93 00 CFCI FN-14 BOLLARDS 5 TOTAL (BASE BID); 27 TOTAL (ADD ALT. 4) CALPIPE OR EQUAL NOM. PIPE SIZE 6" STAINLESS STEEL; / STANDARD FLAT BOLLARD CAP, SEE SPECS 12 93 00 CFCI 5 4 S A N F R AN C I S C O C ALI F ORNI A 9 41 0 7 41 5 .4 8 9.2 2 2 4 TEL 41 5 .3 5 8.91 0 0 F AX WWW W.RNSSTUDIO.OCM 01 SECOND STREET TH LF ORO STE.,402 SHEET NO: SHEET TITLE: DATEISSUES PROJECT NO.: DATE: SCALE: All drawings and written material appearing herein constitute original and unpublished work of theArchitect/Engineer and may not be duplicated, used or disclosed without consent of Architect/Engineer.If this drawing is not 30"x42", then the drawing has been revised from its original size.Noted scales must be adjusted. This line should be equal to one inch 03/08/2018SCHEMATIC DESIGN REVISION LIST#DATE 2/1/2018 3:59:21 PM17012.00 8/03/2018 CUPERTINO CITY CENTER 20400 Stevens Creek Blvd Cupertino, CA 95014 735 NW 18TH AVEPORTLAND, OR 97209(503) 334 2080 05/10/2018DESIGN DEVELOPMENT 06/21/2018CD PROGRESS SET 08/03/2018BUILDING PERMIT NO SCALE SITE FURNISHINGS SCHEDULE L-1.05 C2 C6 C8 C7 L3 0.33 CUPERTINO CITY CENTER03/15/18 17012.00 SCALE:PROJECT #: Landscape Materials Board NTS L-0.30 MATERIALS LEGEND LIMIT OF WORK MATCHLINE PAVEMENTS AND PLANTING CONCRETE -PEDESTRIAN -INTEGRAL COLOR W/ 'TOP-CAST' FINISH CONCRETE -VEHICULAR -INTEGRAL COLOR W/ 'TOP-CAST' FINISH STONE PAVERS -TYPE 1 - GRANITE (1-1/2" THK. MORTAR SET) STONE PAVERS -TYPE 2 - LIMESTONE (1-1/2" THK. MORTAR SET) CONCRETE UNIT PAVERS -TYPE 1 - (1-1/2" THK. MORTAR SET) CONCRETE UNIT PAVERS -TYPE 2 - (1-1/2" THK. MORTAR SET) GLASS PAVERS (AT SKYLIGHT) DECOMPOSED GRANITE -W/ STABLIZER PLANTING AREA SITE LIGHTING MATERIALS SCHEDULE A1 A2 A3 A4 LIGHT FIXTURE - PEDESTRIAN POLE / LIGHT COLUMN - 16' HT. LIGHT FIXTURE - MAST POLE - 20' HT. W/ SPOT LIGHTS (4); (STAGE LIGHTING) BOLLARD LIGHT - STAINLESS STEEL L1 L2 SITE FURNISHINGS C1 C2 OUTDOOR KITCHEN W COUNTER (BBQ, SINK, KEGERATOR) BAR HEIGHT COUNTER & STOOLS (PRODUCTS & TYPES TBD) RAISED PLANTERS (2' HT, GALV. STEEL, PAINTED) RAISED PLANTER AT VINE COLUMNS (1.5' HT, CUSTOM PRECAST) CUSTOM WOOD BENCHES (IPE WOOD) OUTDOOR PING PONG TABLE (PRECAST CONCRETE) C3 C4 B2 B1 C5 C6 A5 A6 L3 STAIRS, WALLS, CURBS & FENCES WATER FEATURE (PHASE 2 IMPROVEMENT - N.I.C.) VINE COLUMN (TENSIONED SS CABLE & MESH STRUCTURE) E1 E3 E2 E4 A7 P.A. SPECIAL CONSTRUCTION ENTRY STEPS (PRECAST CONC. W/ SS HANDRAILS) STADIUM SEATING & STAGE (WOOD FRAME/IPE DECKING) PLANTER EDGE (PRECAST CONCRETE) 'SOFT' PLANTER EDGE (GEO TEXTILE ASSEMBLY) METAL LOUVER SCREEN FENCE & GATES - 8' HT. (SLIDING, TELESCOPING GATES) D1 D2 E5 P.A. KEY NOTES PHASE 2 IMPROVEMENT - N.I.C. TRELLIS STRUCTURE - SEE ARCH DWGS. SALVAGED & RELOCATED PRECAST CONC. TREE PLANTER 1 2 3 CUPERTINO CITY CENTER RESIDENCES Restaurant & Meeting Rooms CUPERTINO CITY CENTER APARTMENTS PARKING STRUCTURE SCOFIELD DRIVE JUNIPER HOTEL Retail MONTEBELLO RESIDENCES OB4 OB3 CUPERTINO CITY CENTER RESIDENCES Restaurant & Meeting Rooms CUPERTINO CITY CENTER APARTMENTS PARKING STRUCTURE SCOFIELD DRIVE JUNIPER HOTEL Retail MONTEBELLO RESIDENCES OB4 OB3 P.A. P.A. P.A. P.A. P.A. P.A. P.A. P.A.P.A. P.A. P.A. P.A. P.A. P.A. P.A. P.A.P.A. P.A. P.A. P.A. P.A. P.A. P.A. P.A. P.A. P.A.P.A. P.A. P.A. P.A. P.A. P.A. P.A. P.A. P.A. P.A. P.A. P.A. P.A. P.A. P.A. P.A. P.A. P.A.P.A. P.A. P.A. P.A. 2 E3 C5 A2 A1 A3 A4 A5 A6 A7 B1 B2 D1 L1 E2 C1C2C3 C4C3C6 L3 C3C5B1B2E4 A4 C4A1 A1 E1 L3 B1 A3 C6 C4 P.A.P.A. P.A. P.A. P.A. P.A. P.A. P.A. P.A. P.A. P.A. L1 P.A. E1 D2 D2 1 1 1 E1 3 3 D2 B2 A1 L2 L1 E5 E5L1 A6 A5 E4 E3 E3 E3 C5 E3 E3 N CUPERTINO CITY CENTER03/15/18 17012.00 SCALE:PROJECT #: Landscape Materials Plan L-1.00 SCALE: 1" = 20' 4020010 1/20" = 1'-0" MATERIALS LEGEND LIMIT OF WORK MATCHLINE PAVEMENTS AND PLANTING CONCRETE -PEDESTRIAN -INTEGRAL COLOR W/ 'TOP-CAST' FINISH CONCRETE -VEHICULAR -INTEGRAL COLOR W/ 'TOP-CAST' FINISH STONE PAVERS -TYPE 1 - GRANITE (1-1/2" THK. MORTAR SET) STONE PAVERS -TYPE 2 - LIMESTONE (1-1/2" THK. MORTAR SET) CONCRETE UNIT PAVERS -TYPE 1 - (1-1/2" THK. MORTAR SET) CONCRETE UNIT PAVERS -TYPE 2 - (1-1/2" THK. MORTAR SET) GLASS PAVERS (AT SKYLIGHT) DECOMPOSED GRANITE -W/ STABLIZER PLANTING AREA SITE LIGHTING MATERIALS SCHEDULE A1 A2 A3 A4 LIGHT FIXTURE - PEDESTRIAN POLE / LIGHT COLUMN - 16' HT. LIGHT FIXTURE - MAST POLE - 20' HT. W/ SPOT LIGHTS (4); (STAGE LIGHTING) BOLLARD LIGHT - STAINLESS STEEL L1 L2 SITE FURNISHINGS C1 C2 OUTDOOR KITCHEN W COUNTER (BBQ, SINK, KEGERATOR) BAR HEIGHT COUNTER & STOOLS (PRODUCTS & TYPES TBD) RAISED PLANTERS (2' HT, GALV. STEEL, PAINTED) RAISED PLANTER AT VINE COLUMNS (1.5' HT, CUSTOM PRECAST) CUSTOM WOOD BENCHES (IPE WOOD) OUTDOOR PING PONG TABLE (PRECAST CONCRETE) C3 C4 B2 B1 C5 C6 A5 A6 L3 STAIRS, WALLS, CURBS & FENCES WATER FEATURE (PHASE 2 IMPROVEMENT - N.I.C.) VINE COLUMN (TENSIONED SS CABLE & MESH STRUCTURE) E1 E3 E2 E4 A7 P.A. SPECIAL CONSTRUCTION ENTRY STEPS (PRECAST CONC. W/ SS HANDRAILS) STADIUM SEATING & STAGE (WOOD FRAME/IPE DECKING) PLANTER EDGE (PRECAST CONCRETE) 'SOFT' PLANTER EDGE (GEO TEXTILE ASSEMBLY) METAL LOUVER SCREEN FENCE & GATES - 8' HT. (SLIDING, TELESCOPING GATES) D1 D2 E5 P.A. KEY NOTES PHASE 2 IMPROVEMENT - N.I.C. TRELLIS STRUCTURE - SEE ARCH DWGS. SALVAGED & RELOCATED PRECAST CONC. TREE PLANTER 1 2 3 CUPERTINO CITY CENTER RESIDENCES Restaurant & Meeting Rooms CUPERTINO CITY CENTER APARTMENTS PARKING STRUCTURE SCOFIELD DRIVE JUNIPER HOTEL Retail MONTEBELLO RESIDENCES OB4 OB3 CUPERTINO CITY CENTER RESIDENCES Restaurant & Meeting Rooms CUPERTINO CITY CENTER APARTMENTS PARKING STRUCTURE SCOFIELD DRIVE JUNIPER HOTEL Retail MONTEBELLO RESIDENCES OB4 OB3 P.A. P.A. P.A. P.A. P.A. P.A. P.A. P.A.P.A. P.A. P.A. P.A. P.A. P.A. P.A. P.A.P.A. P.A. P.A. P.A. P.A. P.A. P.A. P.A. P.A. P.A.P.A. P.A. P.A. P.A. P.A. P.A. P.A. P.A. P.A. P.A. P.A. P.A. P.A. P.A. P.A. P.A. P.A. P.A.P.A. P.A. P.A. P.A. 2 E3 C5 A2 A1 A3 A4 A5 A6 A7 B1 B2 D1 L1 E2 C1C2C3 C4C3C6 L3 C3C5B1B2E4 A4 C4A1 A1 E1 L3 B1 A3 C6 C4 P.A.P.A. P.A. P.A. P.A. P.A. P.A. P.A. P.A. P.A. P.A. L1 P.A. E1 D2 D2 1 1 1 E1 3 3 D2 B2 A1 L2 L1 E5 E5L1 A6 A5 E4 E3 E3 E3 C5 E3 E3 N CUPERTINO CITY CENTER03/15/18 17012.00 SCALE:PROJECT #: Landscape Materials Plan L-1.00 SCALE: 1" = 20' 4020010 1/20" = 1'-0" MATERIALS LEGEND LIMIT OF WORK MATCHLINE PAVEMENTS AND PLANTING CONCRETE -PEDESTRIAN -INTEGRAL COLOR W/ 'TOP-CAST' FINISH CONCRETE -VEHICULAR -INTEGRAL COLOR W/ 'TOP-CAST' FINISH STONE PAVERS -TYPE 1 - GRANITE (1-1/2" THK. MORTAR SET) STONE PAVERS -TYPE 2 - LIMESTONE (1-1/2" THK. MORTAR SET) CONCRETE UNIT PAVERS -TYPE 1 - (1-1/2" THK. MORTAR SET) CONCRETE UNIT PAVERS -TYPE 2 - (1-1/2" THK. MORTAR SET) GLASS PAVERS (AT SKYLIGHT) DECOMPOSED GRANITE -W/ STABLIZER PLANTING AREA SITE LIGHTING MATERIALS SCHEDULE A1 A2 A3 A4 LIGHT FIXTURE - PEDESTRIAN POLE / LIGHT COLUMN - 16' HT. LIGHT FIXTURE - MAST POLE - 20' HT. W/ SPOT LIGHTS (4); (STAGE LIGHTING) BOLLARD LIGHT - STAINLESS STEEL L1 L2 SITE FURNISHINGS C1 C2 OUTDOOR KITCHEN W COUNTER (BBQ, SINK, KEGERATOR) BAR HEIGHT COUNTER & STOOLS (PRODUCTS & TYPES TBD) RAISED PLANTERS (2' HT, GALV. STEEL, PAINTED) RAISED PLANTER AT VINE COLUMNS (1.5' HT, CUSTOM PRECAST) CUSTOM WOOD BENCHES (IPE WOOD) OUTDOOR PING PONG TABLE (PRECAST CONCRETE) C3 C4 B2 B1 C5 C6 A5 A6 L3 STAIRS, WALLS, CURBS & FENCES WATER FEATURE (PHASE 2 IMPROVEMENT - N.I.C.) VINE COLUMN (TENSIONED SS CABLE & MESH STRUCTURE) E1 E3 E2 E4 A7 P.A. SPECIAL CONSTRUCTION ENTRY STEPS (PRECAST CONC. W/ SS HANDRAILS) STADIUM SEATING & STAGE (WOOD FRAME/IPE DECKING) PLANTER EDGE (PRECAST CONCRETE) 'SOFT' PLANTER EDGE (GEO TEXTILE ASSEMBLY) METAL LOUVER SCREEN FENCE & GATES - 8' HT. (SLIDING, TELESCOPING GATES) D1 D2 E5 P.A. KEY NOTES PHASE 2 IMPROVEMENT - N.I.C. TRELLIS STRUCTURE - SEE ARCH DWGS. SALVAGED & RELOCATED PRECAST CONC. TREE PLANTER 1 2 3 CUPERTINO CITY CENTER RESIDENCES Restaurant & Meeting Rooms CUPERTINO CITY CENTER APARTMENTS PARKING STRUCTURE SCOFIELD DRIVE JUNIPER HOTEL Retail MONTEBELLO RESIDENCES OB4 OB3 CUPERTINO CITY CENTER RESIDENCES Restaurant & Meeting Rooms CUPERTINO CITY CENTER APARTMENTS PARKING STRUCTURE SCOFIELD DRIVE JUNIPER HOTEL Retail MONTEBELLO RESIDENCES OB4 OB3 P.A. P.A. P.A. P.A. P.A. P.A. P.A. P.A.P.A. P.A. P.A. P.A. P.A. P.A. P.A. P.A.P.A. P.A. P.A. P.A. P.A. P.A. P.A. P.A. P.A. P.A.P.A. P.A. P.A. P.A. P.A. P.A. P.A. P.A. P.A. P.A. P.A. P.A. P.A. P.A. P.A. P.A. P.A. P.A.P.A. P.A. P.A. P.A. 2 E3 C5 A2 A1 A3 A4 A5 A6 A7 B1 B2 D1 L1 E2 C1C2C3 C4C3C6 L3 C3C5B1B2E4 A4 C4A1 A1 E1 L3 B1 A3 C6 C4 P.A.P.A. P.A. P.A. P.A. P.A. P.A. P.A. P.A. P.A. P.A. L1 P.A. E1 D2 D2 1 1 1 E1 3 3 D2 B2 A1 L2 L1 E5 E5L1 A6 A5 E4 E3 E3 E3 C5 E3 E3 N CUPERTINO CITY CENTER03/15/18 17012.00 SCALE:PROJECT #: Landscape Materials Plan L-1.00 SCALE: 1" = 20' 4020010 1/20" = 1'-0" MATERIALS LEGEND LIMIT OF WORK MATCHLINE PAVEMENTS AND PLANTING CONCRETE -PEDESTRIAN -INTEGRAL COLOR W/ 'TOP-CAST' FINISH CONCRETE -VEHICULAR -INTEGRAL COLOR W/ 'TOP-CAST' FINISH STONE PAVERS -TYPE 1 - GRANITE (1-1/2" THK. MORTAR SET) STONE PAVERS -TYPE 2 - LIMESTONE (1-1/2" THK. MORTAR SET) CONCRETE UNIT PAVERS -TYPE 1 - (1-1/2" THK. MORTAR SET) CONCRETE UNIT PAVERS -TYPE 2 - (1-1/2" THK. MORTAR SET) GLASS PAVERS (AT SKYLIGHT) DECOMPOSED GRANITE -W/ STABLIZER PLANTING AREA SITE LIGHTING MATERIALS SCHEDULE A1 A2 A3 A4 LIGHT FIXTURE - PEDESTRIAN POLE / LIGHT COLUMN - 16' HT. LIGHT FIXTURE - MAST POLE - 20' HT. W/ SPOT LIGHTS (4); (STAGE LIGHTING) BOLLARD LIGHT - STAINLESS STEEL L1 L2 SITE FURNISHINGS C1 C2 OUTDOOR KITCHEN W COUNTER (BBQ, SINK, KEGERATOR) BAR HEIGHT COUNTER & STOOLS (PRODUCTS & TYPES TBD) RAISED PLANTERS (2' HT, GALV. STEEL, PAINTED) RAISED PLANTER AT VINE COLUMNS (1.5' HT, CUSTOM PRECAST) CUSTOM WOOD BENCHES (IPE WOOD) OUTDOOR PING PONG TABLE (PRECAST CONCRETE) C3 C4 B2 B1 C5 C6 A5 A6 L3 STAIRS, WALLS, CURBS & FENCES WATER FEATURE (PHASE 2 IMPROVEMENT - N.I.C.) VINE COLUMN (TENSIONED SS CABLE & MESH STRUCTURE) E1 E3 E2 E4 A7 P.A. SPECIAL CONSTRUCTION ENTRY STEPS (PRECAST CONC. W/ SS HANDRAILS) STADIUM SEATING & STAGE (WOOD FRAME/IPE DECKING) PLANTER EDGE (PRECAST CONCRETE) 'SOFT' PLANTER EDGE (GEO TEXTILE ASSEMBLY) METAL LOUVER SCREEN FENCE & GATES - 8' HT. (SLIDING, TELESCOPING GATES) D1 D2 E5 P.A. KEY NOTES PHASE 2 IMPROVEMENT - N.I.C. TRELLIS STRUCTURE - SEE ARCH DWGS. SALVAGED & RELOCATED PRECAST CONC. TREE PLANTER 1 2 3 CUPERTINO CITY CENTER RESIDENCES Restaurant & Meeting Rooms CUPERTINO CITY CENTER APARTMENTS PARKING STRUCTURE SCOFIELD DRIVE JUNIPER HOTEL Retail MONTEBELLO RESIDENCES OB4 OB3 CUPERTINO CITY CENTER RESIDENCES Restaurant & Meeting Rooms CUPERTINO CITY CENTER APARTMENTS PARKING STRUCTURE SCOFIELD DRIVE JUNIPER HOTEL Retail MONTEBELLO RESIDENCES OB4 OB3 P.A. P.A. P.A. P.A. P.A. P.A. P.A. P.A.P.A. P.A. P.A. P.A. P.A. P.A. P.A. P.A.P.A. P.A. P.A. P.A. P.A. P.A. P.A. P.A. P.A. P.A.P.A. P.A. P.A. P.A. P.A. P.A. P.A. P.A. P.A. P.A. P.A. P.A. P.A. P.A. P.A. P.A. P.A. P.A.P.A. P.A. P.A. P.A. 2 E3 C5 A2 A1 A3 A4 A5 A6 A7 B1 B2 D1 L1 E2 C1C2C3 C4C3C6 L3 C3C5B1B2E4 A4 C4A1 A1 E1 L3 B1 A3 C6 C4 P.A.P.A. P.A. P.A. P.A. P.A. P.A. P.A. P.A. P.A. P.A. L1 P.A. E1 D2 D2 1 1 1 E1 3 3 D2 B2 A1 L2 L1 E5 E5L1 A6 A5 E4 E3 E3 E3 C5 E3 E3 N CUPERTINO CITY CENTER03/15/18 17012.00 SCALE:PROJECT #: Landscape Materials Plan L-1.00 SCALE: 1" = 20' 4020010 1/20" = 1'-0" MATERIALS LEGEND LIMIT OF WORK MATCHLINE PAVEMENTS AND PLANTING CONCRETE -PEDESTRIAN -INTEGRAL COLOR W/ 'TOP-CAST' FINISH CONCRETE -VEHICULAR -INTEGRAL COLOR W/ 'TOP-CAST' FINISH STONE PAVERS -TYPE 1 - GRANITE (1-1/2" THK. MORTAR SET) STONE PAVERS -TYPE 2 - LIMESTONE (1-1/2" THK. MORTAR SET) CONCRETE UNIT PAVERS -TYPE 1 - (1-1/2" THK. MORTAR SET) CONCRETE UNIT PAVERS -TYPE 2 - (1-1/2" THK. MORTAR SET) GLASS PAVERS (AT SKYLIGHT) DECOMPOSED GRANITE -W/ STABLIZER PLANTING AREA SITE LIGHTING MATERIALS SCHEDULE A1 A2 A3 A4 LIGHT FIXTURE - PEDESTRIAN POLE / LIGHT COLUMN - 16' HT. LIGHT FIXTURE - MAST POLE - 20' HT. W/ SPOT LIGHTS (4); (STAGE LIGHTING) BOLLARD LIGHT - STAINLESS STEEL L1 L2 SITE FURNISHINGS C1 C2 OUTDOOR KITCHEN W COUNTER (BBQ, SINK, KEGERATOR) BAR HEIGHT COUNTER & STOOLS (PRODUCTS & TYPES TBD) RAISED PLANTERS (2' HT, GALV. STEEL, PAINTED) RAISED PLANTER AT VINE COLUMNS (1.5' HT, CUSTOM PRECAST) CUSTOM WOOD BENCHES (IPE WOOD) OUTDOOR PING PONG TABLE (PRECAST CONCRETE) C3 C4 B2 B1 C5 C6 A5 A6 L3 STAIRS, WALLS, CURBS & FENCES WATER FEATURE (PHASE 2 IMPROVEMENT - N.I.C.) VINE COLUMN (TENSIONED SS CABLE & MESH STRUCTURE) E1 E3 E2 E4 A7 P.A. SPECIAL CONSTRUCTION ENTRY STEPS (PRECAST CONC. W/ SS HANDRAILS) STADIUM SEATING & STAGE (WOOD FRAME/IPE DECKING) PLANTER EDGE (PRECAST CONCRETE) 'SOFT' PLANTER EDGE (GEO TEXTILE ASSEMBLY) METAL LOUVER SCREEN FENCE & GATES - 8' HT. (SLIDING, TELESCOPING GATES) D1 D2 E5 P.A. KEY NOTES PHASE 2 IMPROVEMENT - N.I.C. TRELLIS STRUCTURE - SEE ARCH DWGS. SALVAGED & RELOCATED PRECAST CONC. TREE PLANTER 1 2 3 CUPERTINO CITY CENTER RESIDENCES Restaurant & Meeting Rooms CUPERTINO CITY CENTER APARTMENTS PARKING STRUCTURE SCOFIELD DRIVE JUNIPER HOTEL Retail MONTEBELLO RESIDENCES OB4 OB3 CUPERTINO CITY CENTER RESIDENCES Restaurant & Meeting Rooms CUPERTINO CITY CENTER APARTMENTS PARKING STRUCTURE SCOFIELD DRIVE JUNIPER HOTEL Retail MONTEBELLO RESIDENCES OB4 OB3 P.A. P.A. P.A. P.A. P.A. P.A. P.A. P.A.P.A. P.A. P.A. P.A. P.A. P.A. P.A. P.A.P.A. P.A. P.A. P.A. P.A. P.A. P.A. P.A. P.A. P.A.P.A. P.A. P.A. P.A. P.A. P.A. P.A. P.A. P.A. P.A. P.A. P.A. P.A. P.A. P.A. P.A. P.A. P.A.P.A. P.A. P.A. P.A. 2 E3 C5 A2 A1 A3 A4 A5 A6 A7 B1 B2 D1 L1 E2 C1C2C3 C4C3C6 L3 C3C5B1B2E4 A4 C4A1 A1 E1 L3 B1 A3 C6 C4 P.A.P.A. P.A. P.A. P.A. P.A. P.A. P.A. P.A. P.A. P.A. L1 P.A. E1 D2 D2 1 1 1 E1 3 3 D2 B2 A1 L2 L1 E5 E5L1 A6 A5 E4 E3 E3 E3 C5 E3 E3 N CUPERTINO CITY CENTER03/15/18 17012.00 SCALE:PROJECT #: Landscape Materials Plan L-1.00 SCALE: 1" = 20' 4020010 1/20" = 1'-0" MATERIALS LEGEND LIMIT OF WORK MATCHLINE PAVEMENTS AND PLANTING CONCRETE -PEDESTRIAN -INTEGRAL COLOR W/ 'TOP-CAST' FINISH CONCRETE -VEHICULAR -INTEGRAL COLOR W/ 'TOP-CAST' FINISH STONE PAVERS -TYPE 1 - GRANITE (1-1/2" THK. MORTAR SET) STONE PAVERS -TYPE 2 - LIMESTONE (1-1/2" THK. MORTAR SET) CONCRETE UNIT PAVERS -TYPE 1 - (1-1/2" THK. MORTAR SET) CONCRETE UNIT PAVERS -TYPE 2 - (1-1/2" THK. MORTAR SET) GLASS PAVERS (AT SKYLIGHT) DECOMPOSED GRANITE -W/ STABLIZER PLANTING AREA SITE LIGHTING MATERIALS SCHEDULE A1 A2 A3 A4 LIGHT FIXTURE - PEDESTRIAN POLE / LIGHT COLUMN - 16' HT. LIGHT FIXTURE - MAST POLE - 20' HT. W/ SPOT LIGHTS (4); (STAGE LIGHTING) BOLLARD LIGHT - STAINLESS STEEL L1 L2 SITE FURNISHINGS C1 C2 OUTDOOR KITCHEN W COUNTER (BBQ, SINK, KEGERATOR) BAR HEIGHT COUNTER & STOOLS (PRODUCTS & TYPES TBD) RAISED PLANTERS (2' HT, GALV. STEEL, PAINTED) RAISED PLANTER AT VINE COLUMNS (1.5' HT, CUSTOM PRECAST) CUSTOM WOOD BENCHES (IPE WOOD) OUTDOOR PING PONG TABLE (PRECAST CONCRETE) C3 C4 B2 B1 C5 C6 A5 A6 L3 STAIRS, WALLS, CURBS & FENCES WATER FEATURE (PHASE 2 IMPROVEMENT - N.I.C.) VINE COLUMN (TENSIONED SS CABLE & MESH STRUCTURE) E1 E3 E2 E4 A7 P.A. SPECIAL CONSTRUCTION ENTRY STEPS (PRECAST CONC. W/ SS HANDRAILS) STADIUM SEATING & STAGE (WOOD FRAME/IPE DECKING) PLANTER EDGE (PRECAST CONCRETE) 'SOFT' PLANTER EDGE (GEO TEXTILE ASSEMBLY) METAL LOUVER SCREEN FENCE & GATES - 8' HT. (SLIDING, TELESCOPING GATES) D1 D2 E5 P.A. KEY NOTES PHASE 2 IMPROVEMENT - N.I.C. TRELLIS STRUCTURE - SEE ARCH DWGS. SALVAGED & RELOCATED PRECAST CONC. TREE PLANTER 1 2 3 CUPERTINO CITY CENTER RESIDENCES Restaurant & Meeting Rooms CUPERTINO CITY CENTER APARTMENTS PARKING STRUCTURE SCOFIELD DRIVE JUNIPER HOTEL Retail MONTEBELLO RESIDENCES OB4 OB3 CUPERTINO CITY CENTER RESIDENCES Restaurant & Meeting Rooms CUPERTINO CITY CENTER APARTMENTS PARKING STRUCTURE SCOFIELD DRIVE JUNIPER HOTEL Retail MONTEBELLO RESIDENCES OB4 OB3 P.A. P.A. P.A. P.A. P.A. P.A. P.A. P.A.P.A. P.A. P.A. P.A. P.A. P.A. P.A. P.A.P.A. P.A. P.A. P.A. P.A. P.A. P.A. P.A. P.A. P.A.P.A. P.A. P.A. P.A. P.A. P.A. P.A. P.A. P.A. P.A. P.A. P.A. P.A. P.A. P.A. P.A. P.A. P.A.P.A. P.A. P.A. P.A. 2 E3 C5 A2 A1 A3 A4 A5 A6 A7 B1 B2 D1 L1 E2 C1C2C3 C4C3C6 L3 C3C5B1B2E4 A4 C4A1 A1 E1 L3 B1 A3 C6 C4 P.A.P.A. P.A. P.A. P.A. P.A. P.A. P.A. P.A. P.A. P.A. L1 P.A. E1 D2 D2 1 1 1 E1 3 3 D2 B2 A1 L2 L1 E5 E5L1 A6 A5 E4 E3 E3 E3 C5 E3 E3 N CUPERTINO CITY CENTER03/15/18 17012.00 SCALE:PROJECT #: Landscape Materials Plan L-1.00 SCALE: 1" = 20' 4020010 1/20" = 1'-0" MATERIALS LEGENDLIMIT OF WORK MATCHLINE PAVEMENTS AND PLANTING CONCRETE -PEDESTRIAN -INTEGRAL COLOR W/ 'TOP-CAST' FINISH CONCRETE -VEHICULAR -INTEGRAL COLOR W/ 'TOP-CAST' FINISH STONE PAVERS -TYPE 1 - GRANITE (1-1/2" THK. MORTAR SET) STONE PAVERS -TYPE 2 - LIMESTONE (1-1/2" THK. MORTAR SET) CONCRETE UNIT PAVERS -TYPE 1 - (1-1/2" THK. MORTAR SET) CONCRETE UNIT PAVERS -TYPE 2 - (1-1/2" THK. MORTAR SET) GLASS PAVERS (AT SKYLIGHT) DECOMPOSED GRANITE -W/ STABLIZER PLANTING AREA SITE LIGHTING MATERIALS SCHEDULE A1 A2 A3 A4 LIGHT FIXTURE - PEDESTRIAN POLE / LIGHT COLUMN - 16' HT. LIGHT FIXTURE - MAST POLE - 20' HT. W/ SPOT LIGHTS (4); (STAGE LIGHTING) BOLLARD LIGHT - STAINLESS STEEL L1 L2 SITE FURNISHINGS C1 C2 OUTDOOR KITCHEN W COUNTER (BBQ, SINK, KEGERATOR) BAR HEIGHT COUNTER & STOOLS (PRODUCTS & TYPES TBD) RAISED PLANTERS (2' HT, GALV. STEEL, PAINTED) RAISED PLANTER AT VINE COLUMNS (1.5' HT, CUSTOM PRECAST) CUSTOM WOOD BENCHES (IPE WOOD) OUTDOOR PING PONG TABLE (PRECAST CONCRETE) C3 C4 B2 B1 C5 C6 A5 A6 L3 STAIRS, WALLS, CURBS & FENCES WATER FEATURE (PHASE 2 IMPROVEMENT - N.I.C.) VINE COLUMN (TENSIONED SS CABLE & MESH STRUCTURE) E1 E3 E2 E4 A7 P.A. SPECIAL CONSTRUCTION ENTRY STEPS (PRECAST CONC. W/ SS HANDRAILS) STADIUM SEATING & STAGE (WOOD FRAME/IPE DECKING) PLANTER EDGE (PRECAST CONCRETE) 'SOFT' PLANTER EDGE (GEO TEXTILE ASSEMBLY) METAL LOUVER SCREEN FENCE & GATES - 8' HT. (SLIDING, TELESCOPING GATES) D1 D2 E5 P.A. KEY NOTES PHASE 2 IMPROVEMENT - N.I.C. TRELLIS STRUCTURE - SEE ARCH DWGS. SALVAGED & RELOCATED PRECAST CONC. TREE PLANTER 1 2 3 CUPERTINO CITY CENTER RESIDENCES Restaurant & Meeting Rooms CUPERTINO CITY CENTER APARTMENTS PARKING STRUCTURE SCOFIELD DRIVE JUNIPER HOTEL Retail MONTEBELLO RESIDENCES OB4 OB3 CUPERTINO CITY CENTER RESIDENCES Restaurant & Meeting Rooms CUPERTINO CITY CENTER APARTMENTS PARKING STRUCTURE SCOFIELD DRIVE JUNIPER HOTEL Retail MONTEBELLO RESIDENCES OB4 OB3 P.A. P.A. P.A. P.A. P.A. P.A. P.A. P.A.P.A. P.A. P.A. P.A. P.A. P.A. P.A. P.A.P.A. P.A. P.A. P.A. P.A. P.A. P.A. P.A. P.A. P.A.P.A. P.A. P.A. P.A. P.A. P.A. P.A. P.A. P.A. P.A. P.A. P.A. P.A. P.A. P.A. P.A. P.A. P.A.P.A. P.A. P.A. P.A. 2 E3 C5 A2 A1 A3 A4 A5 A6 A7 B1 B2 D1 L1 E2 C1C2C3 C4C3C6 L3 C3C5B1B2E4 A4 C4A1 A1 E1 L3 B1 A3 C6 C4 P.A.P.A. P.A. P.A. P.A. P.A. P.A. P.A. P.A. P.A. P.A. L1 P.A. E1 D2 D2 1 1 1 E1 3 3 D2 B2 A1 L2 L1 E5 E5L1 A6 A5 E4 E3 E3 E3 C5 E3 E3 N CUPERTINO CITY CENTER03/15/18 17012.00 SCALE:PROJECT #: Landscape Materials Plan L-1.00 SCALE: 1" = 20' 4020010 1/20" = 1'-0" (THERMORY ASH WOOD) TRASH/RECYCLINGC7 ASH URNC8 C8 STONE PAVERS TYPE 1 - LIMESTONE (1-1/2” THK. MORTAR SET) TYPE 1 - LIMESTONE (1-1/2” THK. MORTAR SET) TYPE 1 - LIMESTONE (1-1/2” THK. MORTAR SET) BLENDED DG & OYSTER SHELL AGGREGATE - LARGE FORMAT (24”X48”; 12”X48”) - 12” X 24” - LINEAR, NARROW FORMAT - LINEAR, NARROW FORMAT C7 C7 05/18/18 DESIGNATED OUTDOOR SMOKING AREA CUPERTINO CITY CENTER RESIDENCES Restaurant & Meeting Rooms CUPERTINO CITY CENTER APARTMENTS PARKING STRUCTURE SCOFIELD DRIVE JUNIPER HOTEL Retail MONTEBELLO RESIDENCES OB4 OB3 CUPERTINO CITY CENTER RESIDENCES Restaurant & Meeting Rooms CUPERTINO CITY CENTER APARTMENTS PARKING STRUCTURE SCOFIELD DRIVE JUNIPER HOTEL Retail MONTEBELLO RESIDENCES OB4 OB3 TREES & VINE COLUMNS EXISTING TREE TO REMAIN (PROTECT IN PLACE) STREET TREES COURTYARD / ACCENT TREES VINE COLUMN PLANTERS (W/ MIXED ORNAMENTAL VINES & GROUNDCOVER) SHADE TREE IN SALVAGED PRECAST PLANTERS (PHASE 2 IMPROVEMENT - N.I.C.) PLANT LEGEND SHRUBS / GROUNDCOVER INFORMAL HEDGE / BUFFER RAISED PLANTERS (W/ LOW SHRUBS / PERENNIALS) UNDERSTORY PLANTING (SHRUBS / GROUNDCOVERS / GRASSES / PERENNIALS) SOD LAWN / NATURAL TURF SHEET NOTES 1.FOR PLANTING, AND IRRIGATION NOTES SEE SHEET L-2.05 2.FOR PLANT SCHEDULE, SEE SHEET L-2.05 PLANTING NOTES LIMIT OF WORK MATCHLINE CUPERTINO CITY CENTER03/15/18 17012.00 SCALE:PROJECT #: SCALE: 1" = 20' 4020010 N Planting Plan L-2.00 1/20" = 1'-0" 05/18/18 VINE PLANTING SCHEDULE SYMBOL KEY BOTANICAL NAME COMMON NAME MINIMUM SIZE (HT.X SPRD.)QUANTITY SPACING NOTES AKQU AKEBIA QUINATA CHOCOLATE VINE 15 GAL. (8'-10' HT.)TBD CONTRACT GROW TO 8' -10' MIN. HT. (STAKED) CLAR CLEMATIS ARMANDII EYEGREEN CLEMITIS 15 GAL. (8'-10' HT.)CONTRACT GROW TO 8' -10' MIN. HT. (STAKED) CLCA CLYTOSTOMA CALLISTEGIOIDES LAVENDER TRUMPET VINE 15 GAL. (8'-10' HT.)CONTRACT GROW TO 8' -10' MIN. HT. (STAKED) HAVI HARDENBERGIA VIOLACEA 'HAPPY WANDERER'PURPLE VINE LILAC 15 GAL. (8'-10' HT.)CONTRACT GROW TO 8' -10' MIN. HT. (STAKED) JAPO JASMINUM POLYANTHUM PINK JASMINE 15 GAL. (8'-10' HT.)CONTRACT GROW TO 8' -10' MIN. HT. (STAKED) PAQU PARTHENOCISSUS QUINQUIFOLIA VIRGINIA CREEPER 15 GAL. (8'-10' HT.)CONTRACT GROW TO 8' -10' MIN. HT. (STAKED) PACE PASSIFLORA CAERULEA VAR.BLUE PASSION VINE VAR.15 GAL. (8'-10' HT.)CONTRACT GROW TO 8' -10' MIN. HT. (STAKED) UNDERSTORY PLANTING SCHEDULE SYMBOL KEY BOTANICAL NAME COMMON NAME MINIMUM SIZE (HT.X SPRD.)QUANTITY SPACING NOTES DITA DIANELLA TASMANICA 'VARIEGATA'VARIEGATED FLAX LILY 5 GAL.TBD EQHY EQUISETUM HYEMALE HORSETAIL 5 GAL. FRCH FRAGARIA CHILOENSIS BEACH STRAWBERRY 1 GAL. HEMI HEUCHERA MICRANTHA 'PALACE PURPLE'CORAL BELLS 1 GAL. LIPE LIMONIUM PEREZII SEA LAVENDAR 5 GAL. LOCH LOROPETALUM CHINENSE 'JAZZ HANDS - WHITE & PINK'CHINESE FRINGE-FLOWER 15 GAL. PHXA PHILODENDRON 'XANADU'WINTERBOURN PHILODENDRON 15 GAL. NECO NEPHROLEPIS CORDIFOLIA SOUTHERN SWORD FERN 15 GAL. TRAS TRACHELOSPERMUM ASIATICUM ASIAN STAR JASMINE 5 GAL. TREE SCHEDULE SYMBOL KEY BOTANICAL NAME COMMON NAME MINIMUM SIZE (HT .X SPRD.)QUANTITY SPACING NOTES ACRU ACER RUBRUM ' BOWHALL'BOWHALL COLUMNAR RED MAPLE 36" BOX 8 AS SHOWN STREET TREE CABE CARPINUS BETULUS 'FASTIGIATA'COLUMNAR EUROPEAN HORNBEAM 36" BOX 8 AS SHOWN STREET TREE (ALTERNATE SELECTION) CEDA CEANOTHUS 'DARK STAR'DARK STAR CALIFORNIA LILAC 24" BOX TBD AS SHOWN ACCENT TREE (OPTION) CROC CERCIS OCCIDENTALIS WESTERN REDBUD 24" BOX AS SHOWN ACCENT TREE (OPTION) CHHU CHAEMEROPS HUMILIS MEDITERRANEAN FAN PALM 24" BOX AS SHOWN ACCENT TREE (OPTION) COKO CORNUS KOUSA KOUSA DOGWOOD 24" BOX AS SHOWN ACCENT TREE (OPTION) CYRE CYCAS REVOLUTA SAGO PALM 24" BOX AS SHOWN ACCENT TREE (OPTION) LATU LAGERSTROEMIA X FAUREII 'TUSKEGEE'TUSKEGEE CRAPE MYRTLE (PINK FLOWER)24" BOX AS SHOWN ACCENT TREE (OPTION) OLEU OLEA EUROPEA 'SWAN HILL'FRUITLESS OLIVE 24" BOX AS SHOWN ACCENT TREE (OPTION) TIUR TIBOUCHINA URVILLEANA PRINCESS FLOWER 24" BOX AS SHOWN ACCENT TREE (OPTION) PLANT SCHEDULE PLANTING NOTES 1.VERIFY LOCATION OF EXISTING TREES TO REMAIN PRIOR TO SOIL PREPARATION. PROTECT ALL TREES INDICATED TO REMAIN. 2.VERIFY AND COORDINATE WORK AROUND ALL UNDERGROUND UTILITIES BEFORE EXCAVATION. NOTIFY ALL UTILITY PROVIDERS AT LEAST TWO (2) WORKING DAYS PRIOR TO BEGINNING WORK. 3.VERIFY THAT THE CONDITIONS ARE SUITABLE TO PROMOTE HEALTHY PLANT GROWTH. DO NOT PROCEED IF CONDITIONS DETRIMENTAL TO HEALTHY GROWING ENVIRONMENT ARE PRESENT, INCLUDING OVER-COMPACTED SOILS, ADVERSE DRAINAGE CONDITIONS, DEBRIS, OR OTHER HARMFUL CIRCUMSTANCES. PROCEEDING WITHOUT NOTIFICATION DENOTES ACCEPTANCE. 4.COORDINATE WITH OTHER SUBCONTRACTORS AND TRADES TO ENSURE PROTECTION OF GROWING CONDITIONS AND PLANT MATERIALS. 5.VERIFY PLANT QUANTITIES SHOWN ON THE PLANS BASED ON GRAPHIC REPRESENTATION. QUANTITIES SHOWN ARE FOR CONTRACTOR CONVENIENCE ONLY. 6.FINISH GRADING SHALL PROVIDE POSITIVE SURFACE DRAINAGE ACROSS PLANTED AREAS AND AWAY FROM BUILDING FOUNDATIONS. REFER TO CIVIL GRADING PLANS FOR ALL EXISTING AND PROPOSED GRADE INFORMATION. 7.ALL PLANTING AREAS SHALL HAVE THE EXISTING TOPSOIL TESTED, TILLED AND AMENDED TO CONFORM TO RECOMMENDATIONS MADE BY AN AGRONOMIC SOIL TESTING LAB IN ORDER TO ASSURE HEALTHY PLANT GROWTH. PROVIDE 2" MINIMUM OF BARK MULCH. 8.UNLESS OTHERWISE INDICATED, ALL PLANTINGS SHALL BE TRIANGULARLY SPACED. 1.ALL LANDSCAPE AREAS WILL BE PERMANENTLY IRRIGATED USING A PERMANENT AUTOMATIC IRRIGATION SYSTEM. 2.ALL IRRIGATION IMPROVEMENTS WILL UTILIZE HIGH EFFICIENCY DESIGN AND EQUIPMENT COMPONENTS IN CONFORMANCE WITH CITY OF CUPERTINO AND SANTA CLARA VALLEY WATER DISTRICT (SCVWD) STANDARDS AND REQUIREMENTS. 3.THE IRRIGATION SYSTEM DESIGN WILL COMPLY WITH ABA 1881 REQUIREMENTS, FOLLOW THE STATEWIDE MODEL ORDINANCE GUIDELINES AND CITY REQUIREMENTS WITH THE USE OF WATER-EFFICIENT LANDSCAPE AND LOW WATER USE PLANTS. 4.THE IRRIGATION SYSTEM WILL PROVIDE 100% HEAD TO HEAD COVERAGE AND WILL BE DESIGNED TO MINIMIZE OVERSPRAY. ALL REMOTE CONTROL AND QUICK-COUPLING VALVES WILL BE INSTALLED WITHIN SHRUB / GROUND COVER PLANTING AREAS WHENEVER POSSIBLE. 5.IRRIGATION SYSTEM PLANS AND DESIGN WILL BE PROVIDED AT A LATER DATE. 6.THE FINAL IRRIGATION PLANS WILL ACCURATELY AND CLEARLY IDENTIFY: ··LOCATION, TYPE AND SIZE OF THE WATER METERS FOR THE LANDSCAPE. ··LOCATION, TYPE AND SIZE OF ALL COMPONENTSOF THE IRRIGATION SYSTEM. ··STATIC WATER PRESSURE AT THE POINT OF CONNECTION TO THE PUBLIC WATER SUPPLY. ··FLOW RATE (GALLONS PER MINUTE) AND REMOTE CONTROL VALVE SIZE. 7.IRRIGATION SYSTEM FEATURES EMPLOYED TO ACHIEVE WATER CONSERVATION GOALS WILL INCLUDE: ··SMART IRRIGATION CONTROLLERS CAPABLE OF RESPONDING TO ON-SITE WEATHER CONDITIONS. ··CONTROLLERS WITH MULTIPLE PROGRAMS. ··WATERING SCHEDULES EMPLOYING SHORT CYCLES. ··RAIN SHUT-OFF DEVICES TO PREVENT IRRIGATION AFTER SIGNIFICANT PRECIPITATION. ··SUB-SURFACE DRIP AND/OR BUBBLER IRRIGATION FOR SHRUBS AND TREES. ··SUB-SURFACE DRIP IRRIGATION FOR GROUND COVER AREAS. ··USE OF FLOW REDUCERS TO MITIGATE SPRAY OF BROKEN HEADS NEXT TO SIDEWALKS, STREETS AND DRIVEWAYS. IRRIGATION NOTES CUPERTINO CITY CENTER03/15/18 17012.00 SCALE:PROJECT #: Planting Schedule & Notes L-2.05 NTS 05/18/18 TOTAL LANDSCAPE PLANTED AREA: 8,700 SF VINE COLUMN V02 VINE COLUMN V03 VINE COLUMN V01 CUPERTINO CITY CENTER03/15/18 17012.00 SCALE:PROJECT #: Vine Columns - Roof Plan L-3.00 3/16" = 1'-0" SCALE: 3/16" = 1'-0"1 VINE COLUMNS - ROOF PLAN SCALE: 3/16" = 1' - 0" 4201 8 VINE COLUMN V02 VINE COLUMN V03 VINE COLUMN V01 000 82 SCALE: 1/4" = 1' - 0" 41 N AS NOTED LANDSCAPE CONSTRUCTION DETAILS - VINE COLUMNS L-6.40 5 4 S A N F R AN C I S C O C ALI F ORNI A 9 41 0 7 41 5 .4 8 9.2 2 2 4 TEL 41 5 .3 5 8.91 0 0 F A X WWW W.RNSSTUDIO.OCM 01 SECOND STREET TH LF ORO STE.,40 2 SHEET NO: SHEET TITLE: DATEISSUES PROJECT NO.: DATE: SCALE: All drawings and written material appearing herein constitute original and unpublished work of theArchitect/Engineer and may not be duplicated, used or disclosed without consent of Architect/Engineer.If this drawing is not 30"x42", then the drawing has been revised from its original size.Noted scales must be adjusted. This line should be equal to one inch 03/08/2018SCHEMATIC DESIGN REVISION LIST#DATE 2/1/2018 3:59:21 PM17012.00 5/10/2018 CUPERTINO CITY CENTER 20400 Stevens Creek Blvd Cupertino, CA 95014 735 NW 18TH AVEPORTLAND, OR 97209(503) 334 2080 100% DESIGN DEVELOPMENT 05/10/2018DESIGN DEVELOPMENT SCALE: 1/4" = 1'-0"1 VINE COLUMNS - ROOF PLAN 05/18/18 1'-6"+0'-0" EL T.O. Fin. Surface +68'-0" EL 5TH FLOOR LEVEL +107'-0" EL 8TH FLOOR LEVEL BLUE CABLES = DIAGONAL RED CABLES = PERIMETER PINK CABLES = TOP CHORDS BLACK CABLES = VERTICAL CHORDS LINE OF COUNTER WEIGHT COUNTER WEIGHT SIZE & SCALE TBD VINE COLUMN 02VINE COLUMN 01VINE COLUMN 03 1'-6"+0'-0" EL T.O. Fin. Surface +68'-0" EL 5TH FLOOR LEVEL +107'-0" EL 8TH FLOOR LEVEL BLUE CABLES = DIAGONAL RED CABLES = PERIMETER PINK CABLES = TOP CHORDS BLACK CABLES = VERTICAL CHORDS LINE OF COUNTER WEIGHT COUNTER WEIGHT SIZE & SCALE TBD VINE COLUMN 02VINE COLUMN 01 VINE COLUMN 03 BEYOND CUPERTINO CITY CENTER03/15/18 17012.00 SCALE:PROJECT #: Vine Columns - Elevations L-3.01 3/32" = 1'-0" 1 FRONT ELEVATION - VINE COLUMNS 2 SIDE ELEVATION - VINE COLUMNS VINE COLUMN 01VINE COLUMN 03 +0'-0" EL Level 1 - T.O. Fin. Surface +105'-6" EL ROOF REF VERTICAL CABLES WITH VINES +27'-6" EL LEVEL 3 +14'-6" EL LEVEL 2 +40'-6" EL LEVEL 4 +53'-6" EL LEVEL 5 XTEND MESH AREA TOP SUPPORT CABLES RIGID RING MAIN SUPPORTIVE CABLES VINE COLUMN 03 +104'-9" EL VINE CONNECTION VINE COLUMN 01VINE COLUMN 03 +0'-0" EL Level 1 - T.O. Fin. Surface +105'-6" EL ROOF REF VERTICAL CABLES WITH VINES +27'-6" EL LEVEL 3 +14'-6" EL LEVEL 2 +40'-6" EL LEVEL 4 +53'-6" EL LEVEL 5 XTEND MESH AREA TOP SUPPORT CABLES RIGID RING MAIN SUPPORTIVE CABLES VINE COLUMN 03 +104'-9" EL VINE CONNECTION 000 16 SCALE: 1/8" = 1' - 0" 842 AS NOTED LANDSCAPE CONSTRUCTION DETAILS - VINE COLUMNS L-6.41 5 4 S A N F R AN C I S C O C ALI F OR NI A 9 41 0 7 41 5 .4 8 9.2 2 2 4 TEL 41 5 .3 5 8.91 0 0 F A X WWW W.RNSSTUDIO.OCM 01 SECOND STREET TH LF ORO STE.,40 2 SHEET NO: SHEET TITLE: DATEISSUES PROJECT NO.: DATE: SCALE: All drawings and written material appearing herein constitute original and unpublished work of theArchitect/Engineer and may not be duplicated, used or disclosed without consent of Architect/Engineer.If this drawing is not 30"x42", then the drawing has been revised from its original size.Noted scales must be adjusted. This line should be equal to one inch 03/08/2018SCHEMATIC DESIGN REVISION LIST#DATE 2/1/2018 3:59:21 PM17012.00 5/10/2018 CUPERTINO CITY CENTER 20400 Stevens Creek Blvd Cupertino, CA 95014 735 NW 18TH AVEPORTLAND, OR 97209(503) 334 2080 100% DESIGN DEVELOPMENT 05/10/2018DESIGN DEVELOPMENT SCALE: 1/8" = 1'-0"1 FRONT ELEVATION - VINE COLUMNS ELEVATIONSCALE: 1/8" = 1'-0"2 SIDE ELEVATION - VINE COLUMNS ELEVATION 000 16 SCALE: 1/8" = 1' - 0" 842 05/18/18 UPUPABCDEFGHJ123456789101112KLMD.74.78.3H.31A.3112A.311A.3051A.3052A.3054A.3053A.3022A.3021A.303114'-10"13'-6"30'-0"30'-0"30'-0"30'-0"30'-0"30'-0"14'-10"30'-0" 30'-0" 30'-0" 30'-0" 30'-0" 30'-0" 13'-6"14'-10" 13'-6" 30'-0"30'-0"13'-6"14'-10"13'-6"13'-6"(E) RAMP TO REMAINENTRANCE CANOPYNEW TRASH ENCLOSUREMECHANICAL PENTHOUSEMECHANICAL PENTHOUSEA.3013A.30112A.301BALCONIESBALCONIESBALCONIESBALCONIESBUILDING SIGNAGE20400 OB320450 OB4CALI AVENUEJUNIPER HOTELRESTAURANT &MEETING ROOMSRETAILMONTEBELLO RESIDENCESPARKING LOTPARKING STRUCTURECUPERTINO CITYCENTER APARTMENTSPROMETHEUS REG APARTMENT COMPLEXPARKSEAGATE TECHNOLOGY LLCALLEYALLEYGARAGEENTRANCEGARAGEENTRANCELOADINGDOCKLOADING DOCK(E) RAMP TO REMAINNEW TENANT DOOR AND CANOPYNEW TENANT DOOR AND CANOPYTENANT DOOR AND CANOPY (TYP OF 4)PLANTER, SEE LANDSCAPE DRAWINGSTRELLIS ELEVATOR AND STAIRS TO GARAGE BELOWSTAIR EXIT DOORSTAIR EXIT DOOREXISTING 'SKY BRIDGES' TO REMAINTOWER BEACON LIGHTINGTOWER BEACON LIGHTINGGREEN COLUMN, SEE LANDSCAPE DRAWINGSA.3041Y2Y1.2Y1PHASE 2: NOT PART OF THIS PERMIT A.8012A.8032WORK IN THIS AREA PART OF DIR 2WORK IN THIS AREA PART OF DIR 2WORK IN THIS AREA PART OF DIR 1WORK IN THIS AREA PART OF DIR 1WORK IN THIS AREA PART OF DIR 1WORK IN THIS AREA PART OF DIR 1WORK IN THIS AREA PART OF DIR 1111111A.8024A.8026SCALE:PROJECT #:1 180824 FORMAL APP RESUBMITTAL 1 1" = 20'-0"CUPERTINO CITY CENTER3/19/2018SITE PLAN17012.00AS.101 DNLEVEL 10"LEVEL 214'-6"FF LEVEL NE STREET-7'-0"1234567894.78.3LEVEL 327'-6"LEVEL 440'-6"LEVEL 666'-6"LEVEL 553'-6"LEVEL 779'-6"LEVEL 892'-6"ROOF REF105'-6"T. O. PARAPET125'-10"(E) CONCRETE WALL AND WINDOWS TO REMAIN, LEVELS 2-8SCOPE OF RECLADDING OR DEMOLITION OF EXTERIOR ENVELOPELEVEL 10"LEVEL 214'-6"LEVEL 327'-6"LEVEL 440'-6"LEVEL 666'-6"LEVEL 553'-6"LEVEL 779'-6"LEVEL 892'-6"ROOF REF105'-6"T. O. PARAPET125'-10"(E) CONCRETE WALL AND WINDOWS TO REMAIN, LEVELS 2-8SCOPE OF RECLADDING OR DEMOLITION OF EXTERIOR ENVELOPELEVEL 10"LEVEL 214'-6"FF LEVEL NE STREET-7'-0"ABCDEFGHJLEVEL 327'-6"LEVEL 440'-6"LEVEL 666'-6"LEVEL 553'-6"LEVEL 779'-6"LEVEL 892'-6"ROOF REF105'-6"T. O. PARAPET125'-10"(E) CONCRETE WALL AND WINDOWS TO REMAIN, LEVELS 2-8SCOPE OF RECLADDING OR DEMOLITION OF EXTERIOR ENVELOPEAD.3013AD.3011OB3 -20400OB4 -20450 SCOPE OF RECLADDING OR DEMOLITION OF EXTERIOR ENVELOPE2AD.301SCALE:PROJECT #:1 180824 FORMAL APP RESUBMITTAL 1As indicatedCUPERTINO CITY CENTER3/19/2018DEMO ELEVATIONS17012.00AD.301 1/16" = 1'-0"1OB3 NORTH DEMO ELEVATION 1/16" = 1'-0"2OB3 SOUTHWEST DEMO ELEVATION 1/16" = 1'-0"3OB3 EAST DEMO ELEVATION 1" = 50'-0"4RECLADDING SCOPE UPUPABCDEF123456D.74.71A.3113A.3042A.304A.3041NOT IN SCOPENOT IN SCOPESUMMER LOBBYBENCH SEATINGRECEPTION DESKVERTICAL PLATFORM LIFTEXISTING AREA WAY TO REMAINPLANTER AND LANDSCAPE,SEE LANDSCAPE DRAWINGSOUTDOOR SEATINGA.80123A.802GHJ789101112KLM8.3H.3G.21A.311NOT IN SCOPENOT IN SCOPEWINTER LOBBYRECEPTION DESKEXISTING ELEVATOR TO REMAINWITH NEW FINISHESRELOCATED MEN'S SHOWERLANDSCAPE PLANTER, SEELANDSCAPE DRAWINGSRAMPBENCH SEATINGLOBBY SEATING4A.8015A.801SCALE:PROJECT #:1180824 FORMAL APP RESUBMITTAL 1 1/8" = 1'-0"CUPERTINO CITY CENTER3/19/2018LEVEL 1 FLOOR PLANS17012.00A.101 1/8" = 1'-0"2LEVEL 1 OB3 1/8" = 1'-0"1LEVEL 1 OB4OB3OB4 LEVEL 10"LEVEL 214'-6"FF LEVEL NE STREET-7'-0"1234567894.78.3LEVEL 327'-6"LEVEL 440'-6"LEVEL 666'-6"LEVEL 553'-6"LEVEL 779'-6"LEVEL 892'-6"ROOF REF105'-6"T. O. PARAPET125'-10"A.30211A.303OPP SIM(E) CONCRETE WALL AND WINDOWS TO REMAINTOWER LIGHT 'BEACON'1LEVEL 10"LEVEL 214'-6"LEVEL 327'-6"LEVEL 440'-6"LEVEL 666'-6"LEVEL 553'-6"LEVEL 779'-6"LEVEL 892'-6"ROOF REF105'-6"T. O. PARAPET125'-10"A.3051A.3054A.3053(E) CONCRETE WALL AND WINDOWS TO REMAINA.3054OPP SIMA.3053OPP SIMLEVEL 10"LEVEL 214'-6"FF LEVEL NE STREET-7'-0"ABCDEFGHJLEVEL 327'-6"LEVEL 440'-6"LEVEL 666'-6"LEVEL 553'-6"LEVEL 779'-6"LEVEL 892'-6"ROOF REF105'-6"T. O. PARAPET125'-10"A.30222A.303OPP SIM(E) CONCRETE WALL AND WINDOWS TO REMAINTOWER LIGHT 'BEACON'SCALE:PROJECT #:1 180824 FORMAL APP RESUBMITTAL 1 1/16" = 1'-0"CUPERTINO CITY CENTER3/19/2018OVERALL ELEVATIONS17012.00A.301 1/16" = 1'-0"1OB3 NORTH ELEVATION 1/16" = 1'-0"2300_OB3 SOUTHWEST ELEVATION 1/16" = 1'-0"3OB3 EAST ELEVATION OVERALL LEVEL 10"LEVEL 214'-6"FF LEVEL NE STREET-7'-0"ABCDEFGHJLEVEL 327'-6"VERTICAL PLATFORM LIFTOPEN TO GARAGE(N) WINDOW TO REPLACE(E) WINDOW(FRP-2X) FRP PANELPROFILE B(FRP-1X) FRP PANELPROFILE A(MT-1X) CHAMPAGNE ANOD AL PANELTRASH ENCLOSURE BEYOND(E) CONCRETE WALL AND WINDOWS TO REMAIN, LEVELS 2-8CONCRETE PLANTER WALL(FRP-2X) FRP PANELPROFILE B11LEVEL 10"LEVEL 214'-6"FF LEVEL NE STREET-7'-0"1234567894.78.3LEVEL 327'-6"(E) GRANITE CLAD TO REMAIN)TRASH ENCLOSURE(N) FRAMELESS GLASS DOORCANOPY BEYOND (ALT 1)PAINTED STEEL FRAME BEYONDROLL DOWN DOOR(E) EXIT DOOR TO REMAIN(E) CONCRETE WALL AND WINDOWS TO REMAIN1A.8023A.802SIM2A.821TRASH ENCLOSUREA.80281(MT-1X) CHAMPAGNE ANDO AL PANEL1SCALE:PROJECT #:1 180824 FORMAL APP RESUBMITTAL 1 1/8" = 1'-0"CUPERTINO CITY CENTER3/19/2018STREETSIDE ELEVATIONS OB317012.00A.302 1/8" = 1'-0"2OB3 EAST ELEVATION 1/8" = 1'-0"1OB3 NORTH ELEVATION LEVEL 10"LEVEL 214'-6"FF LEVEL SW STREET-3'-0"456789101112LEVEL 327'-6"(FRP-2X) FRP PANELPROFILE B(N) FRAMELESS GLASS DOOROPEN TO GARAGE(E) CONCRETE WALL AND WINDOWS TO REMAIN(E) RAMP TO REMAINCANOPY AT DOORBEYONDSIM(MT-1X) CHAMPAGNE ANOD AL PANEL1LEVEL 10"LEVEL 214'-6"FF LEVEL SW STREET-3'-0"DEFGHJKLMLEVEL 327'-6"(E) GRANITE CLADDING TO REMAIN(N) WINDOW TO REPLACE(E) WINDOWSS PIPE HANDRAIL, PTDCONCRETE RETAININGWALL, SSDBOARD FORMED CONC WALL(FRP-2X) FRP PANELPROFILE BENTRANCE CANOPYROLL DOWN DOOR(FRP-2X) FRP PANELPROFILE B(FRP-2X) FRP PANELPROFILE B(FRP-2X) FRP PANELPROFILE B(E) CONCRETE WALL AND WINDOWS TO REMAIN1A.8023A.802SIMA.8028TRASH ENCLOSURE1SCALE:PROJECT #:1 180824 FORMAL APP RESUBMITTAL 1 1/8" = 1'-0"CUPERTINO CITY CENTER3/19/2018STREETSIDE ELEVATIONS OB417012.00A.303 1/8" = 1'-0"1OB4 SOUTH ELEVATION 1/8" = 1'-0"2OB4 WEST ELEVATION LEVEL 10"LEVEL 214'-6"FF LEVEL NE STREET-7'-0"1A.3113A.304CONCRETE RETAININGWALL, SSDCONCRETE RETAININGWALL, SSDFRAMELESS GL DR(N) WINDOW TO REPLACE(E) WINDOW(N) WINDOW TO REPLACE(E) WINDOWSS PIPE HANDRAILLEVEL 10"LEVEL 214'-6"FF LEVEL NE STREET-7'-0"12FRAMELESS GLASS DOORVERTICAL PLATFORM LIFT(FRP-1X) FRP PANELPROFILE ALEVEL 10"LEVEL 214'-6"FF LEVEL NE STREET-7'-0"SS PIPE HANDRAIL, PTD(FRP-2X) FRP PANELPROFILE B(FRP-1X) FRP PANELPROFILE AA.8022SCALE:PROJECT #:1 180824 FORMAL APP RESUBMITTAL 1As indicatedCUPERTINO CITY CENTER3/19/2018BUILDING ENTRANCE ELEVATIONS17012.00A.304 1/8" = 1'-0"1NE STREET ENTRANCE ELEVATION 1/8" = 1'-0"2NE ENTRANCE SECTION EL 2 3/16" = 1'-0"3NE ENTRANCE SECTION EL LEVEL 10"LEVEL 214'-6"FGLEVEL 327'-6"(N) WINDOW TO REPLACE(E) WINDOWA.8012(FRP-1X) FRP PANELPROFILE A(MT-1X) CHAMPAGNEALUMINUM WINDOWSYSTEM, ANODIZED BYLINETEC(MT-1X) CHAMPAGNEALUMINUM STOREFRONTPANELVISION GLASS IGU (GL-2)67(E) CONCRETE WALL AND WINDOWS TO REMAINLEVEL 10"LEVEL 214'-6"FGLEVEL 327'-6"LOCATION OF TENANT SIGNAGE(MT-1X) CHAMPAGNEALUMINUM WINDOWSYSTEM, ANODIZED BYLINETEC(FRP-1X) FRP PANELPROFILE A(MT-1X) CHAMPAGNEALUMINUM STOREFRONTPANELVISION GLASS IGU (GL-2)Y2.81A.311ALUMINUM FRAMED FULLVISION STOREFRONTGLASS SYSTEMY35A.801FOLDING NANAWALLSYSTEM(MT-1X) CHAMPAGNEANODIZED ALUMINUMSURROUND67(E) CONCRETE WALL AND WINDOWS TO REMAIN(N) WINDOW TO REPLACE(E) WINDOWDEMO GLASS STOREFRONTENCLOSURELOCATION OF TENANT SIGNAGELEVEL 10"LEVEL 214'-6"LEVEL 327'-6"PLANTERS, SLD(E) CONCRETE WALL AND WINDOWS TO REMAIN, LEVELS 2-8(FRP-1X) FRP PANELPROFILE A(MT-1X) CHAMPAGNEALUMINUM MULLION CAPOVER (E) WINDOW MULLIONLEVEL 10"LEVEL 214'-6"KLMLEVEL 327'-6"(FRP-1X) FRP PANELPROFILE ADOOR CANOPY(E) CONCRETE WALL AND WINDOWS TO REMAIN, LEVELS 2-8VISION GLASS IGU (GL-2)(MT-1X) CHAMPAGNEALUMINUM WINDOWSYSTEM, ANODIZED BYLINETECSCALE:PROJECT #:1 180824 FORMAL APP RESUBMITTAL 1 1/8" = 1'-0"CUPERTINO CITY CENTER3/19/2018COURTYARD ELEVATIONS17012.00A.305 1/8" = 1'-0"1UNFOLDED COURTYARD NORTH ELEVATION 1/8" = 1'-0"2COURTYARD ELEVATION SOUTHWEST 1/8" = 1'-0"4COURTYARD ELEVATION, TYP OF 4 1/8" = 1'-0"3COURTYARD ELEVATION, TYP OF 4 LEVEL 10"LEVEL 214'-6"LEVEL P1-11'-0"LEVEL P2-20'-3"LEVEL 327'-6"LEVEL 440'-6"LEVEL 666'-6"LEVEL 553'-6"LEVEL 779'-6"LEVEL 892'-6"ROOF REF105'-6"T. O. PARAPET125'-10"2A.311MONTEBELLO RESIDENCES BEYONDSEAGATE TECHNOLOGY, LLCJUNIPER HOTEL BEYONDSOUTHWEST ENTRANCENORTHEAST ENTRANCEPARKING (NOT IN SCOPE)X0.4X0.61A.803LEVEL 10"LEVEL 214'-6"LEVEL P1-11'-0"LEVEL P2-20'-3"LEVEL 327'-6"LEVEL 440'-6"LEVEL 666'-6"LEVEL 553'-6"LEVEL 779'-6"LEVEL 892'-6"ROOF REF105'-6"T. O. PARAPET125'-10"1A.311(E) CONCRETE WALL AND WINDOWS TO REMAINCUPERTINO CITY CENTER APARTMENTS BEYONDMONTEBELLO RESIDENCES BEYONDEXISTING FOUNTAINPARKING (NOT IN SCOPE)SCALE:PROJECT #:1 180824 FORMAL APP RESUBMITTAL 1 1/16" = 1'-0"CUPERTINO CITY CENTER3/19/2018BUILDING SECTIONS17012.00A.311 1/16" = 1'-0"1BUILDING SECTION 1/16" = 1'-0"2SITE SECTION SCALE:PROJECT #:1 180824 FORMAL APP RESUBMITTAL 1CUPERTINO CITY CENTER3/19/2018NE ENTRY RENDERING17012.00A.321 SCALE:PROJECT #:1 180824 FORMAL APP RESUBMITTAL 1CUPERTINO CITY CENTER3/19/2018WINTER LOBBY EXTERIOR RENDERING17012.00A.322 SCALE:PROJECT #:1 180824 FORMAL APP RESUBMITTAL 1CUPERTINO CITY CENTER3/19/2018SUMMER LOBBY EXTERIOR RENDERING17012.00A.323 SCALE:PROJECT #:1 180824 FORMAL APP RESUBMITTAL 1CUPERTINO CITY CENTER3/19/2018FRP CLADDING VIEWS17012.00A.324FRP RENDERING2NTSFRP RENDERING1NTS SCALE:PROJECT #:1 180824 FORMAL APP RESUBMITTAL 1CUPERTINO CITY CENTER3/19/2018TRELLIS VIEWS17012.00A.325TRELLIS VIEW1NTSKITCHENETTE VIEW4NTSTRELLIS VIEW3NTS1 LEVEL 10"LEVEL 214'-6"GFRP1'-4"1'-8"NEW ALUMINUM WINDOWPLANTER, SEE LANDSCAPE DRAWINGS(E) WINDOW TO REMAIN4A.8013A.801LEVEL 10"LEVEL 214'-6"8.31'-0"NEW FRPEXISTING 6' METAL STUDEXISTING GRANITE STEEL ASSEMBLYTO REMAIN2'-0"8"PLANTERS, SEE LANDSCAPEDRAWINGSLEVEL 10"LEVEL 214'-6"8.3EXISTING SECOND FLOOR WINDOWNEW FRP OVER GRANITENEW WINDOWGRANITE VENEER ASSEMBLY TO REMAINPLANTER SEE LANDSCAPE DRAWINGS1'-8"ALUMINUM FRAME1'-4"LEVEL 10"LEVEL 214'-6"LEVEL 327'-6"ALUMINUM CLADDINGSTEELGLASS CURTAINWALLEXISTING BEAM UNDER 3RD FLOORLEVEL 10"LEVEL 214'-6"4PLANTER AS OCCURS, SEE LANDSCAPE DRAWINGSWINDOWCANOPY STEELFRP OVER GRANITE TENANT ENTRANCE CANOPYSCALE:PROJECT #:1 180824 FORMAL APP RESUBMITTAL 1 1/2" = 1'-0"CUPERTINO CITY CENTER3/19/2018WALL SECTIONS AND DETAILS17012.00A.801 1/2" = 1'-0"2COURTYARD ENLARGED ELEVATION 1/2" = 1'-0"3WALL SECTION AT COURTYARD 1/2" = 1'-0"4WINDOW SECTION AT COURTYARD 1/2" = 1'-0"5WINTER LOBBY CURTAINWALL 1/2" = 1'-0"1TENANT CANOPY SECTION VENT WOODEXISTING SOFFIT CAVITY(E) INSULATION TO REMAINHSS STEEL4'-8"5'-3"LEVEL 2FRP OVER (E) GRANITE(E) WINDOW TO REMAINLEVEL 10"LEVEL 214'-6"FF LEVEL NE STREET-7'-0"1VEHICULAR RAMP TO P1 GARAGELINE OF BUILDING BEYOND3" MAX1'-9"LEVEL 10"LEVEL 214'-6"AVARIES1'-8"1'-1 3/4"(E) GRANITE TO REMAINPERFORATED SS MECHANIZED ROLL UP DOORLEVEL 10"ABOARD FORMED CONCRETE PLANTER1PLANTS, SEE LANDSCAPE DRAWINGSGH12EXIT STAIRS10'-10"4"4'-0"BOARD FORMED CONC PLANTER, SLD, SSDEXIT DOOR TO REMAIN4YD BIN (54" X 82")3YD BIN (42" X 82")1.5YD BIN (33" X 82")3YD BIN (42" X 82")20'-0"3'-0"A.821124" MINCONC CURB8"8"8"CONC CURBEXISTING PLANTERPLANTER19'-0"9'-0" MIN111'-2"10'-2"6' TALL ALUMINUM FENCE, REMOVEABLEGATE, OPENS TO 180 DEGREESA.8025A.8028A.8027A56A.8028A.8025EXISTING LOUVER DOORSTRANSFORMER ROOMEXIT STAIRS(E) PLANTERBOARD FORMED CONCRETE PALNTER WALL(E) PG&E MAN HOLEA.82113'-5"3'-5"MAINTAIN CLEARNCE REQUIRED TO OPERATE (E) LOUVER DOOR3YD BIN (42" X 82")3YD BIN (42" X 82")3YD BIN (42" X 82")(E) EXIT DOOR TO REMAINPLANTS, SLDTRANSFORMER ROOMA.80271CONC CURB8"18'-4 3/4"10'-10"9'-2" MIN2'-7"2" MIN6' TALL ALUMINUM FENCE, REMOVEABLE6' TALL ALUMINUM FENCE, REMOVEABLEGATE, OPENS TO 180 DEGREESCONC CURB. HEIGH TOF CURB TO ALLOW FOR FULL OPERATION OF EXISTING SWING DOORS8"9'-5"17'-4 3/4"LEVEL 10"5(MT-2X) MEDIUM BRONZE ANOD ALUM FENCE & GATE, REMOVEABLE IN FOUR PANELS(E) LOUVERS BEYOND2A.8211(PT-2X) MEDIUM BRONZE PTD HSS STL POSTS, REMOVEABLE(PT-2X) MEDIUM BRONZE PTD HSS STL POSTS, REMOVEABLELEVEL 10"A1(MT-2X) MEDIUM BRONZE ANOD ALUM FENCE PANEL, FIXED2A.821SCALE:PROJECT #:1 180824 FORMAL APP RESUBMITTAL 1As indicatedCUPERTINO CITY CENTER3/19/2018WALL SECTIONS AND DETAILS17012.00A.802 1/2" = 1'-0"2ENTRY CANOPY 1/2" = 1'-0"3STREET ENTRY WINDOW SECTION 1/2" = 1'-0"1LOADING DOCK ROLL UP DOOR 1/2" = 1'-0"5TRASH ENCLOSURE SIDE EL 1/4" = 1'-0"4ENLARGED N-S ALLEY 1/4" = 1'-0"6ENLARGED E-W ALLEY 1/2" = 1'-0"8TRASH ENCLOSURE FRONT EL 1/2" = 1'-0"7TRASH ENCLOSURE SIDE 2 X0.5Y2.81A.311Y2X0.4X0.6Y3Y1.2Y1DIM PT6'-9"8'-6"6'-9"6'-0"6'-0"6'-0"6'-0"6'-0"6'-0"6'-0"6'-0"6'-0"6'-0"6'-0"DIM PTDIM PTDIM PTDIM PTDIM PTDIM PTA.8035A.8036SINGLE-PLY ROOFING OVER PLYWD SUBSTRATE, PAINT TO MATCH STRUCTURE16'-10"VERT AL EXTRUSIONSHORIZ AL EXTRUSIONS7A.8041A.8041A.80366'-0"22'-0"(MT-1X) CHAMPAGNE ALEXTRUDED TRELLISMODULES(PT-2X) MEDIUM BRONZEPTD STL BM, SSDLEVEL 10"Y2.8Y2Y3Y1.2Y1A.803111'-1"(MT-1X) PERFORATEDALUMINUM COMPOSITEWALL PANEL RAINSCREENW/ OPEN JOINT REVEALS,ANODIZED BY LINETEC(PT-2X) MEDIUM BRONZEPTD STL BM, SSD(PT-2X) MEDIUM BRONZEPTD STL COL, SSD1Y2.8Y3STANDING SEAM ROOFA.8042HORIZ TRELLIS EXTRUSIONSVERT TRELLIS EXTRUSIONSSINGLE PLY ROOFING OVER PLYWD SUBSTRATE, PTD TO MATCH STRUCTUREA.8048DIM PTDIM PT7A.804A.8041(PT-2X) MEDIUM BRONZEPTD STL BM, SSD(MT-1X) CHAMPAGNE ALEXTRUDED TRELLISMODULESX0.5X0.4X0.6DIM PT1/2"8'-5"1/2"DIM PT6'-0"(MT-1) CHAMPAGNE AL TRELLIS UNISTRUT(PT-3) MEDIUM BRONZE PTD BM ABOVE2A.8046A.804(MT-1) CHAMPAGNE AL TRELLIS UNISTRUT(PT-2X) MEDIUM BRONZE PTD BM ABOVE4A.804SHOP FABRICATED TRELLIS MODULE. ALL EXTRUSIONS SCREWED TO UNISTRUTS, ALL FASTENERS CONCEALED.(MT-1X) CHAMPAGNE AL TRELLIS EXTRUSIONS11X0.6DIM PTDIM PT6'-0"(MT-1X) CHAMPAGNE AL TRELLIS UNISTRUT(PT-2X) MEDIUM BRONZE PTD BM ABOVE(PT-2X) MEDIUM BRONZE PTD BM ABOVE(MT-1X) CHAMPAGNE AL TRELLIS UNISTRUT2A.8046A.8041/2"6'-8 1/2"2A.8044A.804SHOP FABRICATED TRELLIS MODULE. ALL EXTRUSIONS SCREWED TO UNISTRUTS, ALL FASTENERS CONCEALED.(MT-1X) CHAMPAGNE AL TRELLIS EXTRUSIONS11SCALE:PROJECT #:1 180824 FORMAL APP RESUBMITTAL 1As indicatedCUPERTINO CITY CENTER3/19/2018TRELLIS DETAILS17012.00A.803 1/4" = 1'-0"3TRELLIS ENLARGED PLAN 1/4" = 1'-0"2TRELLIS ENLARGED ELEVATION 1" = 1'-0"1TRELLIS ROOF SECTION 1" = 1'-0"6TYP TRELLIS CENTER MODULE 1" = 1'-0"5TYP TRELLIS SIDE MODULE (MT-1X) CHAMPAGNE ANODIZED ALUM EXTRUSIONNEOPRENE WASHER(PT-2X) MEDIUM BRONZE PTD STL SLEEVE O/ T-BOLTPLASTIC SLEEVE AROUND T-BOLT HEADSS T-BOLT HEAD IN EXTRUDED SLOT1"EXTRUDED SCREW POINTS, TYP EA CORNERALUM TUBING INTERIOR SLEEVE @ CANTILEVERS114" 4" 4" 4" 4"(PT-2X) MEDIUM BRONZE PTD WF BEAM(MT-1X) CHAMPAGNE ANODIZED ALUM EXTRUSION3" TO BOT OF BMDOWNLIGHT BEYOND, SEE SPECS2" WIDE L4x3X1/4 STL ANGLE WELDED TO STL BEAM, TYP, PT3/8" DIA PTD GALV STL T-BOLT W/ PTD STL TUBE SLEEVE, TYPA.8043(MT-1X) CHAMPAGNE AL UNISTRUT BEYONDALIGNCOL BEYOND-11(PT-2X) MEDIUM BRONZE PTD WF BEAM, SSD3/8" DIA PTD GALV STL T-BOLT W/ PTD STL TUBE SLEEVE, TYPNEOPRENE WASHERS, TYP(MT-1X) CHAMPAGNE AL UNISTRUT EXTRUSION, SCREWED TO TRELLIS IN SHOP, BOLTED TO WF1 1/2"1 1/2"MAX1"-3" TO BOT OF BM11(PT-2X) MEDIUM BRONZE PTD WF BEAM, SSDMEDIUM BRONZE ANODIZED ALUM EXTRUSION3" TO BOT OF BM3/4" STL PL COL CONNECTION WELDED TO BM, SSD2" WIDE L4x3X1/4 STL ANGLE WELDED TO STL BEAM, TYP, PT COLOR PT-1023/8" DIA PTD GALV STL T-BOLT W/ PTD STL TUBE SLEEVE, TYP1"1" STL PL COL CONNECTION WELDED TO BM, SSD-(MT-1X) CHAMPAGNE AL UNISTRUT EXTRUSION, SCREWED TO TRELLIS IN SHOP, BOLTED TO WF11(MT-1X) CHAMPAGNE VERT ALUMINUM TRELLIS EXTRUSIONCAP END OF EXTRUSION WITH AL PLATE WITH COUNTERSUNK SCREW OR WELD, TYP(MT-1X) CHAMPAGNE AL TRELLIS UNISTRUT, SCREW TRELLIS EXTRUSION TO UNISTRUTWF BEAM BEYOND, SSDT-BOLT CONNECTION TO WF BEAM ABOVETYP4"5"TYP4"ALIGNEQEQ11(MT-1X) CHAMPAGNE ALUM TUBING, SEE SPECSNEOPRENE WASHER(PT-2X) MEDIUM BRONZE PTD STL SLEEVE O/ T-BOLTPLASTIC SLEEVE AROUND T-BOLT HEADSS T-BOLT HEAD IN EXTRUDED SLOTEXTRUDED SCREW POINTS, TYP EA CORNER11(PT-2X) MEDIUM BRONZE PTD WF BEAM, SSD(MT-1X) CHAMPAGNE ANODIZED HORIZ ALUM EXTRUSION(MT-1X) CHAMPAGNE AL UNISTRUT BEYOND, CAP ENDS WITH WELDED AL PL, ANOD MED BRONZE, TAPER ENDS AT 45 DEG11"DIM PTOF BM-(PT-2X) SINGLE-PLY ROOFING, PTD TO MATCH BEAMS1(MT-2X) MEDIUM BRONZE PTD WF BEAM, SSDMED BRONZE ANODIZED HORIZ ALUM EXTRUSION BEYOND(MT-1X) CHAMPAGNE AL UNISTRUT SCREWED TO EACH AL EXTRUSION-1 1/2"1 1/2"DIM PTCAP END OF AL EXTRUSIONS W/ WELDED AL PL, ANOD MED BRONZE1(PT-2X) SINGLE-PLY ROOFING, PTD TO MATCH BEAMSSCALE:PROJECT #:1 180824 FORMAL APP RESUBMITTAL 1As indicatedCUPERTINO CITY CENTER3/19/2018TRELLIS DETAILS17012.00A.804 12" = 1'-0"3VERT EXT BOLT CONNECTION 3" = 1'-0"2TRELLIS SECTION BTWN SIM MODULES 3" = 1'-0"6TRELLIS SECTION BTWN DIF MODULES 3" = 1'-0"4TRELLIS SECTION @ COLS 6" = 1'-0"1TRELLIS EXTRUSION TRANSITION 12" = 1'-0"5HORIZ EXT BOLT CONNECTION 3" = 1'-0"8TRELLIS ROOF SECTION @ DRIP EDGE 3" = 1'-0"7TRELLIS ROOF SECTION @ EDGE SCALE:PROJECT #:1 180824 FORMAL APP RESUBMITTAL 1CUPERTINO CITY CENTER3/19/2018MATERIALS BOARD17012.00A.811(MT-1X) PUNCHED OPENING AND STOREFRONT MULLION COLOR; ANODIZED ALUMINUM CHAMPAGNE10NTSFRP MATERIAL -PROFILE "A" SIMILAR1NTS(PT-2X) STRUCTURE PAINT COLOR MEDIUM BRONZE7NTS(MT-1X) ELEVATOR PERFORATED CHAMPAGNE ANODIZED ALUMINUM CLADDING9NTSFRP MATERIAL -PROFILE "B" SIMILAR5NTSWOOD AT SUMMER LOBBY CEILING AND CANOPIES8NTSSTAINLESS STEEL HANDRAILS6NTSCLEAR DOUBLE GLAZED GLASS4NTSINTERIOR ACCENT METAL COLOR2NTSFRP MATERIAL -PROFILE "B" SIMILAR3NTS1 SCALE:PROJECT #:1 180824 FORMAL APP RESUBMITTAL 1CUPERTINO CITY CENTER3/19/2018PRECEDENT IMAGES17012.00A.812WINDOW TYPE 4 - STREET SIDE7NTSWINDOW TYPE 3 - COURTYARD6NTSWINDOW TYPE 2 - TENANT ENTRIES5NTSWINDOW TYPE 1 - LOBBY ENTRIES4NTSVENT WOOD CEILING1NTSLOBBY ENTRANCE CANOPY2NTSBUILDING IDENTIFICATION SIGNAGE - FOR REFERENCE ONLY3NTS (MT-2X) MEDIUM BRONZE ANODIZED AL EXTRUSIONS5'-0".180 DEGREE HINGE, TYPBD FORMED CONC PLANTERALIGN8" WIDE, 4" HIGH CONC CURB AS OCCURS2A.821GATE(PT-2X) MEDIUM BRONZE PTD HSS POST, REMOVEABLE(PT-2X) MEDIUM BRONZE PTD HSS POST, REMOVEABLEGATE OPENING9'-0" MIN CLR(PT-2X) MEDIUM BRONZE PTD HSS POST, FIXED1"2A.821(PT-2X) MEDIUM BRONZE PTD GALV STL ANGLE(MT-2X) MEDIUM BRONZE ANODIZED AL EXTRUSIONS OVER PTD GALV STL FURRINGSTL SLEEVE EMBEDDED IN PAVEMENT, FOR LOCKABLE, REMOVEABLE POST BEYOND6'-0" MINCONC CURB, 4" TALL OR AS REQ'D FOR OPERABLE (E) DOORS8"HSS POST BEYOND(E) CONC SLABSCALE:PROJECT #:1 180824 FORMAL APP RESUBMITTAL 1 3" = 1'-0"CUPERTINO CITY CENTER3/19/2018SITE DETAILS17012.00A.821 3" = 1'-0"1TRASH ENCLOSURE PLAN 3" = 1'-0"2TRASH ENCLOSURE SECTION1 SCALE:PROJECT #:CUPERTINO CITY CENTER05/18/18Unnamed17012.00S-000SITE LIGHTING PLAN1SCALE: 1" = 20'-0"SITE LIGHTINGE.00120400 & 20450 STEVENS CREEK BOULEVARD08/24/181180824 FORMAL APP RESUBMITTAL1 SCALE:PROJECT #:CUPERTINO CITY CENTER05/18/18Unnamed17012.00S-000SCALE: NTSTOWER BEACON LIGHTING IMAGERYE.002CLOSEUP OF RENDERED VIEW - WHITE LIGHT7CLOSEUP VIEW OF LIGHTING MOCKUP - WHITE DOWNLIGHT YELLOW UPLIGHT7SCALE: NTSCLOSEUP OF RENDERED VIEW - DAYLIGHT8SCALE: NTSPROPOSED DESIGNREAL WORLD EXAMPLES SIMILAR IN SCALELIGHTING CONCEPT20400 & 20450 STEVENS CREEK BOULEVARD08/24/181180824 FORMAL APP RESUBMITTAL1 SCALE:PROJECT #:CUPERTINO CITY CENTER05/18/18Unnamed17012.00S-000PHOTOMETRIC STUDY - PLAN VIEW AT TOWER BEACON6PHOTOMETRIC STUDY - SECTION VIEW THROUGH TOWER BEACON5SCALE: NTSSCALE: NTSTOWER BEACON LIGHTINGE.003QUANTITATIVE STUDY COMPARING EXISTING AND PROPOSED TOWER LIGHTING1SCALE: NTS5E.003ROOF OF TOWERPROPOSED PHILLIPSCOLORGRAZEREXTERIOR TOWER WALLCALCULATION PLANE 33'FROM TOWER LIGHTINGAT FACE OF NEIGHBORINGAPARTMENT BUILDINGEXTENT OF NEIGHBORINGAPARTMENT BUILDINGThe diagrams to the left illustrate an evaluation ofthe tower beacon lighting, comparing the impactof existing lighting compared to the proposeddesign. The chart quantifies the output of the twodesigns, with the important figure being the totallumen output which most accuratelycommunicates the amount of light exiting thefixtures. In both scenarios, the light leaving thefixtures is obstructed by a number of othermaterials, so the total lumen output shown is notthe true amount of light escaping the beacon.In the existing design, a number of high outputfluorescent fixtures uplight a cavity surroundinglarge steel structures. These structures are solidin the middle which blocks a fairly large portion ofthe light, but they have an open perimeter thatallows the light to escape on all four sides. Thisallows for a greater amount of uplight to escape,contributing to light pollution more heavily thanthe proposed design.The proposed design conceals the fixture behindmetal vailance, so the only light escaping thebeacon is indirect lighting that has been reflectedoff the screen. This greatly reduces the perceivedbrightness of the lighting application fromneighboring views, as well as cuts the total lightoutput. In the proposed design, the metalvailance shields the light sources on both top andbottom. The proposed design directs light in amore intentional way to minimize glare and lightpollution. All fixtures in the proposed design aredimmable, and may be used independently ofeach other or in combination. The total outputonly reflects a scenario where all fixtures areswitched on at full brightness. All fixtures used to calculate the figures on theproposed design are tentative selections basedon design development thus far. Fixtureselections are subject to change pendingarchitectural or design changes that may call fordifferent fixture characteristics that are moreappropriate for the updated design.PROPOSED PHILLIPSCOLORGRAZER20400 & 20450 STEVENS CREEK BOULEVARD08/24/18111180824 FORMAL APP RESUBMITTAL SCALE:PROJECT #:CUPERTINO CITY CENTER05/18/18Unnamed17012.00S-000SITE LIGHTING LUMINAIRE SCHEDULE1SCALE: NTSSITE LIGHTING LUMINAIRE SCHEDULEE.00420400 & 20450 STEVENS CREEK BOULEVARD08/24/181180824 FORMAL APP RESUBMITTAL1