Loading...
HomeMy WebLinkAboutAH Summary 11-20-201850 i; OFFICE OF COMMUNITY DEVELOPMENT CITY HALL 10300 TORRE AVENUE o CUPERTINO, CA 95014-.3255 (408) 777-3308 o FAX (408) 777-3333 o planning cupertino.org To: Mayor and City. Council Members Planning Commissioners From: Benjamin Fu; Assist. Director of Community Development Date: November 27, 2018 Subj: REPORT OF ADMINISTRATIVE HEARING DECISION MADE November 20, 2018 Chapter 119.1L2.1170 of the Cupertino Municipal code provides for Appeal of decisions made at an Administrative Hearing 1. Application TM -2017-01, Richard Wu (Lands of Wu), 10400 S Stelling Rd Description Tentative Map application to subdivide an existing 19,580 SF (0.449 acres) lot into two separate residential lots Action The application was approved at the Administrative blearing. The approval is effective November 20, 2018. The fourteen -calendar day appeal will expire on December 4, 2018. Enclosures: Administrative Hearing Report of November 20, 2018 Resolution No(s) 98 Plan set 2. Application ' ASA -2017-08, TR -2017-43, Satya Naranaya Dasari, vacant lot, APN# 366-09-044 Description Architectural and Site approval to allow the construction of a new single family residence on a vacant lot located in a Planned Residential Zone (Seven Springs); Tree Removal Permit to allow the removal and replacement of 7 development trees to facilitate the construction of the new residence Action The application was approved at the Administrative Hearing. The approval is effective November 20, 2018. The fourteen -calendar day appeal will expire on December 4, 2018. Enclosures: Administrative Hearing Report of November 20, 2018 Resolution No(s) 99 & 100 Plan set A OFFICE OF COMMUNITY DEVELOPMENT CITY HALL 10300 TORRE AVENUE ® CUPERTINO, CA 95014-3255 (408) 777-3308 ® FAX (408) 777=3333 e Ulanningx@cupertino.or ADMINISTRATIVE HEARING STAFF REPORT Agenda Date: November, 20, 2018 Subject Architectural and Site Approval to consider allowing the construction of a new 4,954 square foot two story single family residence on a vacant lot in a Planned Residential zone (Seven Springs) and a Tree Removal Permit to consider allowing the removal and replacement of seven (7) development trees; (Application No.: ASA -2017-08, TR -2017=42; Applicant: Satya Dasari; Location: Lot 190 Stauffer Lane; APN(s): 366-097044) Recommended Action That the Dearing Officer adopt the draft resolutions to: L. Find the project"exempt from CE®A; 2. Approve the Architectural and Site Approval application (Attachment 1); and 3. Approve the Tree Removal Permit application (Attachment 2) Discussion Project Data: tll]�ll�lla� s Nionta Nista South ��a�Il�Il�ikIl® ` -Density Formula) Low Density (1 2 Acre Slope y.;.,� i ✓ ",kj*Y.3'yFi`&'`a ^/ »,"•y�Tf d'f+r+`" �P%�g. c� Z�an�Ilg�Il®n� '. Planned DevelopmentResidential - P(Res) �� . h w%IlstllIlt�lC®p�sed�� 2.3 DU/acre No change 3W gm 18,931square ware feet (0.435 acres) AwerageSll®pe ���� 8.4% 8.4% ��lL � � �� � oor AreaRa�tio 5`032 SF 4,954 SF � � # . , ®MM rS�fb�e]k�� 20' min. (slope,:_ 20%) 26' 20 mina 42/-211, Left: 16 10 min. �� Right: 75 -7 ASA -2017-08 Stauffer Lane November 20, 2018 Page 2 of 7 Site Development Allowed/Required Proposed 2nd Floor Setbacks Front 25' min. 29'-3" Rear 25' min. 45'-9" Interior Side 15' min. Left and Right: 16' Building Height 30' max. 27'-6" Grading Quantity 2,500 cubic yards max. 1,290 cubic yards Parking 6 spaces (2 garage + 4 open) 7 spaces (3 garage + 4 open) Consistency General Plan Yes Zoning' Yes Background: The Seven Springs Planned Residential Community was developed in 1984/1985 with 408 units on a large portion of the former Seven Springs Ranch. Most of the units were developed on small lots interior to the site, with traditional single family homes along Rainbow Drive and Bubb Road. In addition, ten single family lots were allowed, fronting Dorothy Anne Way and Stauffer Lane, on the steeper portions of the property. Of these, 9 have been developed. The applicant, Satya Dasari, is proposing to construct a new 4,954 square foot two story single family residence on the last undeveloped lot in the development on Stauffer Lane. Site Description The 18,938 square foot lot is on the east side of Stauffer Lane, approximately 120 feet north of the intersection with Prospect Road. The property is surrounded to the north and west by single family residential use within the Seven Springs development. The east of the property is designated open space beyond which lie the small lot single family homes in Seven Springs. To the south is residential property in the City of Saratoga. ASA -2017-08 Stauffer Lane November 20, 2018 Page 3 of 7 The lot has substantial native vegetation, including Coast Live Oak. Several peach trees are also onsite, which may be remnants of a previous orchard in the area. It is quasi - rectangular in shape, with a curved property line along the street frontage and is relatively flat, with an average slope of 8.4%. The site is located in a Fault Rupture Zone, as the Monte Vista Fault line is located along the open space area behind the property. Analysis: ` Conformance with General Plan and Zoning The proposed project is consistent with the General Plan Land Use Designation of Very Low Density (1/2 acre slope density formula) per Appendix F Slope Density Formula in the Cupertino General Plan. It is also consistent with the Residential Hillside (RHS) development standards, as the original Use Permit, U-1983-09, for the Seven Springs community applies RHS development standards to all "non -phased" hillside areas. Homes developed under the Residential Hillside standards must comply with the Floor Area calculations in the Municipal Code. After determining the base allowable floor area, a reduction is further applied to lots with average slopes greater than 10%. In this case, the average. slope of the property is 8.4%; therefore, there are no reductions to the base allowable floor area. This is compatible with the way floor area has been calculated for the existing homes along Stauffer Lane. The proposed 4,954 SF two story residence also complies with the calculations in the Municipal Code. The proposed residence also complies with the setback and height requirements of the Residential Hillside standards. Architectural and Site Approval The proposed residence includes two levels and a basement underneath the footprint of the first floor living area. A breakdown of the square footage of the house is detailed in Table 1. House Size below. Table 1. House Size g ry�e61L.®t����®`Y'h�®u����®t�61L��•1 aa WHOM NE INS z?s` £.. � ���! �p .az "`^s'. � .. a. +.,n«.. �,r,F.h �al'�v'..1n,. suvJ'�i.#�'+.l. v"'zT`..'. ^i»✓� _ :.. Y� ...Se""'.,ss✓°«txu2'"=ix«'.£m:.Aivm.�� .9. .�3«.�u* «�.°�E7 '•v.✓�Lnsd°.'«..3.: a`.+« Primiary Residency First Floor 2,390 $F 2,390 SF Second Floor 1,986 SF 1,986 SF Garage 578 SF 578 SF Basement 2,290 SF 2,290 SF Total 4,954 SF 7,244 SF ASA -2017-08 Stauffer Lane November 20, 2018 PaLye 4 of 7 The proposed residence is designed in a Spanish -like architectural style. The design features a roof -covered, wraparound terrace supported by classic columns, beginning from the front of the house and extending around to the rear. The exterior finishes are to complement the architectural style of the neighborhood and include classic tile roof and smoothed colored white stucco finish, including stone -finished retaining walls. The residence will sit below natural grade, and will require approximately 1,080 cubic yards of cut to allow for the driveway design, proposed living space, and basement. The residence is accessed via a proposed driveway that spans much of the front yard. The applicant has worked with staff to establish a driveway design with permeable pavers that allows for sufficient flat area for onsite parking spaces and eliminate steep driveway cuts that can cause damage to incoming and exiting vehicles. The grading for the development necessitates down slope retaining walls. To accommodate the finished grade, building pad, and driveway areas, stepped, downhill facing, Allen Block retaining walls are located along the side (northwest) property line and extends along the front property line, ranging in height from 5'-0" to 1'-8". These are clad with stone wall finish and screened by drought tolerant landscaping. The neighbors further up Stauffer Lane and immediately adjacent are not anticipated to be significantly impacted due to the stepped down design of the home. Due to the site topography, the neighbors would largely see only a one story fagade when viewing the site head-on at street level. Additionally, while not required, the applicant is proposing to plant privacy screening along the northwest (side) property line to help mitigate privacy impacts to the next door neighbor from the second story windows and balcony. These trees will be considered a part of the development and protected as development trees under the City's Protected Tree ordinance. Trees Removal Permit A total of five (5) coast live oak (Quercus agrifolia) and four (4) peach trees were identified on the project site. According to an arborist report dated March 2017 by John J. Leone (W.E. 1056A) (Attachment 2), the oak trees are in low to fair condition, but exhibit otherwise good vigor and displays no sign of disease, infestation, decay, or damage. The peach trees are noted as being in poor condition. The applicant is proposing to remove the three (3) oak trees and all four peach trees to allow for the proposed development. Trees in a Planned Development zoning district are considered development trees which are designated as Protected Trees per the City's Municipal Code. Removal of these trees requires a Tree Removal Permit and replacement planting. Table 2. Tree Inventory shows the tree inventory and proposed replacement, corresponding to Sheet T1 Tree Replacement Plan in the plan set. ASA -2017-08 Stauffer Lane November 20, 2018 Paae 5 of 7 Table 2. Tree Inventory � y -0 ou p�'£4'.b`2kc>_..S'1.i'i7` 2-24" box Oak edTMX`bE.':tro:&' 2-24" box Oak T1 25" Coast Live Oak Yes T2 44" Coast Live Oak Yes 1-36" box Oak 1-36" box Oak T3 8" Coast Live Oak No Not Required Not Required T4 32" Coast Live Oak No Not Required Not Required T5 10" Coast Live Oak Yes 1-24" box Oak 1-24" box ,Oak T6 20" Peach Yes 2-24" box or 1-36" palm 2-24" box or 1-36" native/drought tolerant T7 15" Peach Yes 2-24" box or 1-36" palm 2-24" box or 1-36" native/drought tolerant T8 18" Peach Yes 2-24" box or 1-36" palm 2-24" box or 1-36" native/drought tolerant T9 18" Peach Yes 2-24" box or 1-36" palm 2-24" box or 1-36" native/drought tolerant The applicant has proposed to replace the peach trees with palm trees. however, the applicant. is being required to select alternate replacement trees that are native and drought tolerant to satisfy the replacement requirements. These conditions have been incorporated as conditions of approval in the draft resolution. Geotechnical Review The property is located within a Fault Rupture Zone. A Geotechnical Investigation for the project has been prepared by Wayne Ting & Associates (Attachment 4) and a Geologic Hazard Evaluation by Buckley Engineering Associates (Attachment 5). An updated Geotechnical Investigation by Wayne Ting & Associates, Inc. was also provided to address the excavation of the basement (Attachment 6). These have been peer reviewed. by Cotton Shires, the City's Geotechnical Consultant (Attachment 7). Cotton Shires recommends that the applicant's geotechnical consultant's recommendations be incorporated into the structural plans. These include requirements that the foundation of the at -grade portions of the residence be on a pier and grade beam foundation system sufficiently imbedded. into the bedrock, and that the basement be on a mat. slab. Shoring recommendations have also been provided for the basement construction. A 50 -foot building setback from the Monte Vista fault trace located behind the property is also required to minimize the risk of a fault rupture affecting the project. Finally, Cotton Shires also recommends that the applicant's geotechnical consultant review, and approve all geotechnical aspects of the project and building and grading plans to .ensure that. the recommendations have been properly incorporated. The City ASA -2017-08 Stauffer Lane November 20, 2018 Page 6 of 7 Consultant's recommendations are incorporated as conditions of approval. Environmental Review A Phase I Environmental Assessment was prepared by Phase I Assessments (Attachment 8). The assessment revealed no evidence of existing or historical Recognized Environmental Conditions in connection with the subject property. As such, the report concluded that no additional assessments or investigation related to potential environmental impacts are needed. This project is categorically exempt from the requirements of the California Environmental Quality Act (CEQA) per Section 15303(a) — New Construction or Conversion of Small Structures because the exemption applies to a new single-family residence in a residential zone. Other Department/Agency Review The City's Public Works Department, Building Division, and Santa Clara County Fire Department have reviewed the project and have no objections. Their conditions have been incorporated as conditions of approval in the draft resolution. Public Noticing and Outreach The following table is a brief summary of the noticing done for this project: Notice of Public Meeting, Site Signage, &'Legal Ad Agenda ■ One site sign posted on the site (at least 10 days ■ Posted on the City's official prior to hearing) notice bulletin board (one ■ Legal ad placed in the newspaper (at least 10 days week prior to hearing) prior to hearing) ■ Posted on the City of ■ 22 notices mailed to property owners within 300' Cupertino's Web site (one of project site (10 days prior to hearing) week prior to hearing) No public comments were received at the time of production of this staff report. Permit Streamlining Act: This matter is adjudicatory and is subject to the Permit Streamlining Act (Government Code Section 65920 — 65964). The City has complied with the deadlines found in the Permit Streamlining Act. Project Received: November 13, 2017, Deemed Incomplete: December 13, 2017 Project Resubmitted: March 21, 2018; Deemed Incomplete: April 17, 2018 Project Resubmitted: June 5, 2018; Deemed Incomplete: July 3, 2018 Project Resubmitted: August 29, 2018; Deemed Complete: September 26, 2018 ■ ASA -2017-08 Stauffer Lane November 20, 2018 Page 7 of 7 The City has 60 days, until November 26, 2018, to make a decision on the project. Conclusion: Staff recommends approval of the Architectural and Site Approval because the project is consistent with the General Plan and zoning ordinance, in accordance with Chapter 19.32. Next Steps: The Hearing Officer's decision on this project is final unless appealed within 14 calendar days of the decision. The applicant may apply for building and grading permits after the appeal period ends in order to allow construction to commence. This aproval expires on November 20, 2020, at which time the applicant may apply for a one-year extension. Prepared by: Jeffrey Tsumura, Assistant Planner Reviewed and Approved b3�: Piu Ghosh, Principal Planner Attachments 1- Draft Resolution for ASA -2017-06 2 - Arborist Report, prepared by John J. Leone 3 - Plan Set 4 - Geotechnical Investigation 5 - Geologic Hazard Evaluation 6 — Updated Geotechnical Investigation 7 - Geologic and Geotechnical Peer Review. 8 — Phase I Environmental Assessment ASA -2017-08 CITY OF CUPERTINO 10300 Torre Avenue Cupertino, California 95014 RESOLUTION NO. 99 OF THE ADMINISTRATIVE HEARING OFFICER OF THE CITY OF CUPERTINO APPROVING AN ARCHITECTURAL AND SITE APPROVAL PERMIT TO ALLOW FOR A 4,954 SQ. FT. TWO STORY SINGLE FAMILY REIDENCE ON A VACANT LOT IN A PLANNED RESIDENTIAL ZONE (SEVEN SPRINGS) (APN 366-09-044) SECTION I: PROTECT DESCRIPTION Application No.: ASA -2017-08. Applicant: Satya Dasari Location: Lot 190 Stauffer Lane SECTION II: FINDINGS FOR ARCHITECTURAL AND SITE APPROVAL PERMIT: WHEREAS, the City of Cupertino received an application for an Architectural and Site Approval to consider allowing the construction of a new 4,954 sq. ft. two story single family residence on a vacant lot in a Planned Residential zone (Seven Springs), as described in Section I. of this Resolution; and WHEREAS, the necessary public notices have been given as required by the Procedural Ordinance of the City of Cupertino, and the Administrative Hearing Officer has held at least one public meeting in regard to the application; and WHEREAS, the project is determined to be exempt from the California Environmental Quality Act (CEQA); and WHEREAS, the applicant has met the burden of proof required to support said application; and WHEREAS, the Administrative Hearing Officer finds as follows with regard to this application: 1. The proposed development, at the proposed location, will not be detrimental or injurious to property or improvements in the vicinity, and will not be detrimental to the public health, safety, general welfare, or convenience; The proposed project is located on the last undeveloped lot in the Seven Springs development on Stauffer Lane. The lot is surrounded by existing single family residential uses and Resolution No -99 ASA -2017-08 November 20, 2018 Page 2 designated open space. A geotechnical study and geologic hazards evaluation has been conducted for the project and all recommendations of the geotechnical consultant have been incorporated into the development conditions of approval. In addition, the development is required to meet the Best Management Practices (BMPs), as required by the State Water Resources Control Board and the Bay Area Air Quality Management District's (BAAQMD) air quality standards for construction activities. The project is also required to adhere to the City's C.3 Municipal Permit for stormwater runoff management. Therefore, the proposal will not be detrimental or injurious to property or improvements in the vicinity. 2. The proposal is consistent with the purposes of Chapter 19.168, the General Plan any specific plan, zoning ordinances, applicable planned development permit, conditional use permits, variances, subdivision maps or other entitlements to use which regulate the subject property including, but not limited to, adherence to the following specific criteria: a) Abrupt changes in building scale should be avoided. A gradual transition related to height and bulk should be achieved between new and existing buildings. The finished floor of the first level of the proposed residence will sit below natural grade, and will feature stepped, downhill facing retaining walls to create the buiding pad and driveway areas. While the second story will continue to be visible, the whole house will have a lower profile. Due to the stepped down design of the home and site topography, much of the massing of the first floor will not be visiblefrom street level. Additionally, the mass of the building is accentuated with varied wall and roof setbacks that will provide architectural articulation and relief. b) In order to preserve design harmony between new and existing building and in order to preserve and enhance property values, the materials, textures and colors of new building should harmonize with adjacent development by being consistent or compatible with design and color schemes with the future character of the neighborhoods and purposes of the zone in which they are situated. The location, height and materials of walls, fencing, hedges and screen planting should harmonize with adjacent development. Unsightly storage areas, utility installations and unsightly elements of parking lots should be concealed. The planting of ground cover or various types of pavements should be used to prevent dust and erosion, and the unnecessary destruction of existing healthy trees should be avoided. Lighting for development should be adequate to meet safety requirements as specified by the engineering and building departments., and provide shielding to prevent spill-over light to adjoining property owners. The newly proposed architectural design, materials, finishes, and textures will be consistently applied to the entire building fagade to allow for four-sided complete Resolution No.99 ASA -2017-08 November 20, 2018 Page 3 architectural integrity and will be compatible with the architectural style of the neighborhood. Landscaping is being proposed throughout the site, and ornamental trees and shrubs along the street frontage will help to soften the edges. Native oak trees are preserved and incorporated into the new landscape design where allowed, and those removed will be replaced with new native oak trees. All removed trees will be replaced with native and drought tolerant trees. Additionally, privacy shrubs are proposed along the neighboring side property line to help mitigate privacy impacts to the next door neighbor from the building's second story windows and balcony. c) The number, location, color, size, height, lighting and landscaping of outdoor advertising signs and structures have been designed to minimize traffic hazard, positively affect the general appearance of the neighborhood and harmonize with adjacent development. No signage is proposed or approved as part of this proposal. d) With respect to new projects within existing residential neighborhoods, new development should be designed to protect residents from noise, traffic, light and visually intrusive effects by use of buffering, setbacks, landscaping, walls and other appropriate design measures. The proposed home is similar in scale and proportion to the existing residential neighborhood, and complies with RHS setback requirements. Landscape is proposed, even though not required, along the side and front property lines for privacy screening and to provide relief from the massing of the structure. As the two story building sits below natural grade, the neighbors would largely see only a one story fagade when viewing the propertylbuilding from the street level. NOW, THEREFORE, BE IT RESOLVED: That after careful consideration of the maps, facts, exhibits, testimony, staff's report and presentation, and other evidence submitted in this matter, subject to the conditions which are enumerated in this Resolution beginning on PAGE 1 thereof,: The application for a Architectural and Site Approval, Application no. ASA -2017-08 is hereby approved and that the subconclusions upon which the findings and conditions specified in this resolution are based and contained in the Public Meeting record concerning Application no. ASA -2017-08 as set forth in the Minutes of the Administrative Hearing Meeting of November 20, 2018 and are incorporated by reference as though fully set forth herein. Resolution No.99 ASA -2017-08 November 20, 2018 Page 4 SECTION III: CONDITIONS ADMINISTERED BY THE COMMUNITY DEVELOPMENT DEPT. 1. APPROVED EXHIBITS Approval is based on the plan set drawn by Fahed Habayeb, entitled "New SFR Dasari Residence" consisting of thirteen (13) sheets labeled as CS, SP, Al, A2, A3, AFD, L0, L1, T1, C1, C2, C3, and C4, except as may be amended by conditions in this resolution. 2. ACCURACY OF PROTECT PLANS The applicant/property owner is responsible to verify all pertinent property data including but not limited to property boundary locations, building setbacks, property size, building square footage, any relevant easements and/or construction records. Any misrepresentation of any property data may invalidate this approval and may require additional review. 3. ANNOTATION OF THE CONDITIONS OF APPROVAL The conditions of approval set forth shall be incorporated into and annotated on the first page of the building plans. 4. CONCURRENT APPROVAL CONDITIONS The conditions of approval contained in file no. TR -2017-42 shall be applicable to this approval. 5. DEVELOPMENT TREES The applicant understands that trees proposed as part of a development application are deemed development trees. Development trees may not be removed without a Tree Removal Permit and that they shall be responsible for ensuring the proper maintenance and care of the trees. 6. EXTERIOR BUILDING MATERIALS/TREATMENTS The final building exterior plan shall closely resemble the details shown on the original approved plans and color and material board. Final building exterior treatment plan (including but not limited to details on exterior color, materials, architectural treatments, doors, windows, lighting fixtures, and/or embellishments) shall be reviewed and approved by the Director of Community Development prior to issuance of building permits to ensure quality and consistency. Any exterior changes determined to be substantial by the Director of Community Development shall either require a modification to this permit or a new permit based on the extent of the change. Resolution No.99 ASA -2017-08 November 20, 2018 Page 5 7. LANDSCAPE PROTECT SUBMITTAL Prior to issuance of building permits, the applicant shall submit a full Landscape Documentation Package, per sections 14.15.050 A, B, C, and D of the Landscape Ordinance, for projects with landscape area 500 square feet or more or elect to submit a Prescriptive Compliance Application per sections 14.15.040 A, B, and C for projects with landscape area between 500 square feet and 2,500 square feet. The Landscape Documentation Package or Prescriptive Compliance Application shall be reviewed and approved to the satisfaction of the Director of Community Development prior to issuance of building permits, and additional requirements per sections 14.15.040 D, E, F, and G or 14.15.050 E, F, G, H, and I will be required to be reviewed and approved prior to final inspections. 8. STRUCTURAL PLANS Structural plans should be generated that incorporate the recommendations of the Project Geotechnical Consultant. 9. GEOLOGIC AND GEOTECHNICAL PLAN REVIEW The applicant's geotechnical consultant shall review and approve all geotechnical aspects of the development plans (i.e., site preparation and grading, site drainage improvements and design parameters for foundations, drainage, pavement and retaining walls) to ensure that their recommendations have been properly incorporated and provide a letter certifying that this has been completed. The Geotechnical Plan Review shall be submitted to the City for review and approval by the City staff prior to issuance of building permits. 10. GEOTECHNICAL FIELD INSPECTION The applicant's geotechnical consultant shall inspect, test (as needed), and approve all geotechnical aspects of the project construction. The inspection shall include, but not be limited to: site preparation and grading, site surface and subsurface drainage improvements and excavation for foundation and retaining walls prior to the placement of steel and concrete. The following should be specifically performed: a. The Project Geotechnical Consultant shall closely monitor the fill and expansive soil over -excavation, and pool backfill to assure that rigid grid foundation is placed on low -expansion potential materials, and atop suitably compacted fill materials. Resolution No.99 ASA -2017-08 November 20, 2018 Page 6 b. The results of these inspections and the as -built conditions of the project shall be described by the consultants in a letter and submitted to the City for review prior to final project (as -built) approval. 11. BELOW MARKET RATE HOUSING PROGRAM The applicant shall participate in the City's Below Market Rate (BMR) Housing Program by paying the applicable BMR Housing Mitigation Fee. 12. DEMOLITION REQUIREMENTS All demolished building and site materials shall be recycled to the maximum extent feasible subject to the Building Official. The applicant shall provide evidence that materials were recycled prior to issuance of final demolition permits. 13. GRADING AND CONSTRUCTION HOURS AND NOISE LIMITS a. All grading activities shall be limited to the dry season (April 15 to October 1), unless permitted otherwise by the Director of Public Works. b. Construction hours and noise limits shall be compliant with all requirements of Chapter 10.48 of the Cupertino Municipal Code. c. Grading, street construction, underground utility and demolition hours for work done more than 750 feet away from residential areas shall be limited to Monday through Friday, 7 a.m. to 8 p.m. and Saturday and Sunday, 9 a.m. to 6 p.m. Grading, street construction, demolition or underground utility work within 750 feet of residential areas shall not occur on Saturdays, Sundays, holidays, and during the nighttime period as defined in Section 10.48.053(b) of the Municipal Code. d. Construction activities shall be limited to Monday through Friday, 7 a.m. to 8 p.m. and Saturday and Sunday, 9 a.m. to 6 p.m. Construction activities are not allowed on holidays as defined in Chapter 10.48 of the Municipal Code. Night time construction is allowed if compliant with nighttime standards of Section 10.48 of the Cupertino Municipal Code. e. Rules and regulations pertaining to all construction activities and limitations identified in this permit, along with the name and telephone number of an applicant appointed disturbance coordinator, shall be posted in a prominent location at the entrance to the job site. f. The applicant shall be responsible for educating all contractors and subcontractors of said construction restrictions. The applicant shall comply with the above grading and construction hours and noise limit requirements unless otherwise indicated. Resolution No.99 ASA -2017-08 November 20, 2018 Page 7 14. COVENANT DISCLOSURE The property is under a , Cupertino planned development zoning and property purchasers should check with the City to determine the specific restrictions under the Planned Development Zone and related permits. 15. DUST CONTROL The following construction practices shall be implemented during all phases of construction for the proposed project to prevent visible dust emissions from leaving the site: a. Water all active construction areas at least twice daily and more often during windy periods to prevent visible dust from leaving the site; active areas adjacent to windy periods; active areas adjacent to existing land uses shall be kept damp at all times, or shall be treated with non-toxic stabilizers or dust palliatives. b. Cover all trucks hauling soil, sand, and other loose materials or require all trucks to maintain at least 2 feet of freeboard; c. Pave, apply water at least three times daily, or apply (non-toxic) soil stabilizers on all unpaved access roads, parking areas and staging areas at construction sites. d. Sweep streets daily, or more often if necessary (preferably with water sweepers) if visible soil material is carried onto adjacent public streets. e. The applicant shall incorporate the City's construction best management practices into the building permit plan set. 16. CONSULTATION WITH OTHER DEPARTMENTS The applicant is responsible to consult with other departments and/or agencies with regard to the proposed project for additional conditions and requirements. Any misrepresentation of any submitted data may invalidate an approval by the Community Development Department. 17. INDEMNIFICATION Except as otherwise prohibited by law, the applicant shall indemnify and hold harmless the City, its City Council, and its officers, employees and agents (collectively, the "indemnified parties") from and against any claim, action, or proceeding brought by a third party against one or more of the indemnified parties or one or more of the indemnified parties and the applicant to attack, set aside, or void this Resolution or any permit or approval authorized hereby for the project, including (without limitation) reimbursing the City its actual attorneys' fees and costs incurred in defense of the litigation. The applicant shall pay such attorneys' fees and costs within 30 days following receipt of invoices from City. Such attorneys' fees and costs shall include amounts paid to counsel not otherwise employed as City staff and shall include City Resolution No.99 ASA -2017-08 November 20, 2018 Page 8 Attorney time and overhead costs and other City staff overhead costs and any costs directly related to the litigation reasonably incurred by City. 18. NOTICE OF FEES, DEDICATIONS, RESERVATIONS, OR OTHER EXACTIONS The Conditions of Project Approval set forth herein may include certain fees, dedication requirements, reservation requirements, and other exactions. Pursuant to Government Code Section 66020(d) (1), these Conditions constitute written notice of a statement of the amount of such fees, and a description of the dedications, reservations, and other exactions. You are hereby further notified that the 90 -day approval period in which you may protest these fees, dedications, reservations, and other exactions, pursuant to Government Code Section 66020(a), has begun. If you fail to file a protest within this 90 -day period complying with all of the requirements of Section 66020, you will be legally barred from later challenging such exactions. SECTION IV: CONDITIONS ADMINISTERED BY THE PUBLIC WORKS DEPT 19. TRAFFIC IMPACT FEES The project is subject to pay Traffic Impact Fees. The fee is set at $5,968 per unit. 20. STREAMSIDE PERMIT The project is subject to applying for a Streamside Modification Permit due to its proximity to Prospect Creek. The purpose of this permit is to ensure that the project does not adversely impact the adjacent creek. 21. STREET IMPROVEMENTS Provide frontage improvements along the project to the satisfaction of the Director of Public Works. Street improvements may include, but not be limited to, a new driveway and storm drain lateral. 22. GRADING Grading shall be as approved and required by the Director of Public Works in accordance with Chapter 16.08 of the Cupertino Municipal Code. 401 Certifications and 404 permits may be required. Please contact Army Corp of Engineers and/or Regional Water Quality Control Board as appropriate. 23. DRAINAGE Drainage shall be provided to the satisfaction of the Director of Public Works. Hydrology and pre- and post -development hydraulic calculations must be provided to indicate whether additional storm water control measures are to be constructed or renovated. The storm drain system may include, but is not limited to, subsurface storage of peak stormwater flows (as needed), bioretention basins, vegetated swales, Resolution No.99 ASA -2017-08 November 20, 2018 Page 9 and hydrodynamic separators to reduce the amount of runoff from the site and improve water quality. The storm drain system shall be designed to detain water on- site (e.g., via buried pipes, retention systems or other approved systems and improvements) as necessary to avoid an increase of the ten percent flood water surface elevation to the satisfaction of the Director of Public Works. Any storm water overflows or surface sheeting should be directed away from neighboring private properties and to the public right of way as much as reasonably possible. 24. DEVELOPMENT AGREEMENT The project developer shall enter into a development agreement with the City of Cupertino providing for payment of fees, including but not limited to checking and inspection fees, storm drain fees, park dedication fees and fees for third party geotechnical and structural review. Said agreement shall be executed prior to issuance of construction permits. Fees: a. Checking & Inspection Fees: b. Grading Permit: c. Storm Drainage Fee: d. Traffic Impact Fee: e. Encroachment Permit Fee: Bonds: Per current fee schedule ($823.70) Per current fee schedule ($931.52) Per current fee schedule ($4,550 per AC) Per current fee schedule ($5,968 per unit) Per current fee schedule ($437.97) Encroachment Bond: 100% of Off-site improvements On-site Grading Bond: 100% of site improvements The fees described above are imposed based upon the current fee schedule adopted by the City Council. However, the fees imposed herein may be modified at the time of recordation of a final map or issuance of a building permit in the event of said change or changes, the fees changed at that time will reflect the then current fee schedule. 25. SURVEYS A Boundary Survey and a horizontal control plan will, be required for all new construction to ensure the proposed building will be set based on the boundary survey and setback requirements. 26. OPERATIONS & MAINTENANCE AGREEMENT Developer shall enter into an Operations & Maintenance Agreement with the City prior to final occupancy. The Agreement shall include the operation and Resolution No.99 ASA -2017-08 November 20, 2018 Page 10 maintenance for non-standard appurtenances in the public road right-of-way that may include, but is not limited to, landscape, sidewalk, pavers, and street lights. 27. WATER BACKFLOW PREVENTERS Domestic and Fire Water Backflow preventers and similar above ground equipment shall be placed away from the public right of way and site driveways to a location approved by the Cupertino Planning Department, Santa Clara County Fire Department and the water company. 28. BEST MANAGEMENT PRACTICES Utilize Best Management Practices (BMPs), as required by the State Water Resources Control Board, for construction activity, which disturbs soil. BMP plans shall be included in grading and street improvement plans. 29. EROSION CONTROL PLAN Developer must provide an approved erosion control plan by a Registered Civil Engineer. This plan should include all erosion control measures used to retain materials on site. Erosion control notes shall be stated on the plans. 30. WORK SCHEDULE Every 6 months, the developer shall submit a work schedule to the City to show the timetable for all grading/erosion control work in conjunction with this project. 31. TRAFFIC CONTROL PLAN The developer must submit a traffic control plan by a Registered Traffic Engineer to be approved by the City. The plan shall include a temporary traffic control plan for work in the right of way as well as a routing plan for all vehicles used during construction. All traffic control signs must be reviewed and approved by the City prior to commencement of work. The City has adopted Manual on Uniform Traffic Control Devices (MUTCD) standards for all signage and striping work throughout the City. 32. FIRE PROTECTION Fire sprinklers shall be installed in any new construction to the approval of the City. 33. SANTA CLARA COUNTY FIRE DEPARTMENT A letter of clearance for the project shall be obtained from the Santa Clara County Fire Department prior to issuance of building permits. Clearance should include written approval of the location of any proposed Fire Backflow Preventers, Fire Department Connections and Fire Hydrants (typically Backflow Preventers should Resolution No.99 ASA -2017-08 November 20, 2018 Page 11 be located on private property adjacent to the public right of way, and fire department connections must be located within 100' of a Fire Hydrant). 34. SAN JOSE WATER SERVICE COMPANY CLEARANCE Provide San Jose Water Service Company approval for water connection, service capability and location and layout of water lines and backflow preventers before issuance of a building permit approval. 35. DEDICATION OF UNDERGROUND WATER RIGHTS Developer shall "quit claim' to the City all rights to pump, take or otherwise extract water from the underground basin or any underground strata in the Santa Clara Valley. 36. SANITARY DISTRICT A letter of clearance for the project shall be obtained from the Cupertino Sanitary District prior to issuance of building permits. 37. UTILITY EASEMENTS Clearance approvals from the agencies with easements on the property (including PG&E, AT&T, and San Jose Water Company, and/or equivalent agencies) will be required prior to issuance of building permits. PASSED AND ADOPTED this 20th day of November, 2018 at a special noticed Administrative Hearing Meeting of the City of Cupertino, State of California, held by the Administrative Hearing Officer, pursuant to Cupertino Municipal Code Section 19.12.120. ATTEST: /s/Teffrey Tsumura Jeffrey Tsumura Assistant Planner APPROVED: /s/Benjamin Fu Benjamin Fu Assistant Director of Community Development CITY OF CUPERTINO 10300 Torre Avenue Cupertino, California 95014 RESOLUTION NO. 100 OF THE ADMINISTRATIVE HEARING OFFICER OF THE CITY OF CUPERTINO TO ALLOW THE REMOVAL AND REPLACEMENT OF SEVEN (7) DEVELOPMENT TREES TO FACILITATE THE CONSTRUCTION OF A NEW SINGLE FAMILY HOME ON A VACANT LOT IN A PLANNED RESIDENTIAL ZONE (SEVEN SPRINGS) (APN 366-09-044) SECTION I: PROTECT DESCRIPTION Application No.: TR -2017-42 Applicant: Satya Dasari Location: Lot 190 Stauffer Lane (APN 366-09-044) SECTION II: FINDINGS WHEREAS, the Administrative Hearing Officer of the City of Cupertino received an application for a Tree Removal Permit as described in Section I of this Resolution; and WHEREAS, the project is categorically exempt from the California Environmental Quality Act (CEQA); and WHEREAS, the necessary public notices have been given as required by the Procedural Ordinance of the City of Cupertino, and the Administrative Hearing Officer has held at least one public meeting in regard to the application; and WHEREAS, the applicant has met the burden of proof required to support said application; and WHEREAS, the Administrative Hearing Officer finds: 1. That the location of the trees restricts the economic enjoyment of the property by severely limiting the use of property in a manner not typically experienced by owners of similarly zoned and situated property, and the applicant has demonstrated to the satisfaction of the approval authority that there are no reasonable alternatives to preserve the tree(s); ! Resolution No. 100 TR -2017-42 November 20, 2018 Page 2 The three (3) Coast Live Oak, ranging in size from 10" to 44" DBH, and four (4) peach trees, ranging in size from 15" to 20 DBH, at their locations on the project lot are situated in locations that would severely restrict a reasonably sized home, as compared to the surrounding neighborhood, from being built and are located within the building pad of the proposed project. The City's Municipal Code allows removal of such trees as long as appropriate replacements are planted. NOW, THEREFORE, BE IT RESOLVED: That after careful consideration of maps, facts, exhibits, testimony and other evidence submitted in this matter, the Application No. TR -2017-42, is hereby approved; and That the subconclusions upon which the findings and conditions specified in this Resolution are based and contained in the public meeting record concerning Application TR -2017-42 as set forth in the Minutes of the Administrative Hearing Meeting of November 20, 2018, and are incorporated by reference herein. SECTION III: CONDITIONS ADMINISTERED BY THE COMMUNITY DEVELOPMENT DEPARTMENT 1. APPROVED EXHIBITS Approval is based on the arborist report prepared by John J. Leone (#WE -1056A), dated March 2017 consisting of 26 sheets, including a site plan and photographs; except as may be amended by conditions in this resolution. 2. CONCURRENT APPROVAL CONDITIONS The conditions of approval contained in file no. ASA -2017-08 shall be applicable to this approval. 3. TREE REPLACEMENT SIZE AND LOCATION The applicant has proposed to plant three (3) 24" and one (1) 36" box oak trees to satisfy the replacement requirement of the oak trees to be removed. In lieu of the proposed palm trees, native and drought tolerant trees shall be provided for the four peach trees proposed to be removed, to the satisfaction of the Community Development Director. The size of the. proposed replacement trees shall be consistent with the City's Protected Tree Ordinance unless deemed infeasible by the City's Consulting Arborist: a. Diameter of trunk size of removed tree up to 12 inches shall be replaced with one 24 -inch box tree; Resolution No. 100 TR -2017-42 November 20, 2018 Page 3 b. Over 12 inches and up to 36 inches shall be replaced by two 24 -inch box tree or one 36 -inch box tree; and c. Over 36 inches shall be replaced with one 36 -inch box tree. If it is determined by the City's Consulting Arborist that it is physically not feasible to plant the required replacements trees, the Applicant may pay in -lieu fees determined to be appropriate by the Community Development Director. 4. ARBORIST REVIEW Prior to building permit issuance, the number, location and species of trees shall be reviewed and approved by the City in consultation with the City's Arborist. The replacement trees shall be planted prior to building permit final. The Applicant shall provide the Department of Community Development adequate documentation, including, but not limited to, photographs, receipts or invoices, to verify that replacements have been planted. The City's consulting arborist shall inspect the trees after planting and a report ascertaining the good health of the trees mentioned above shall be provided prior to issuance of final occupancy. 5. PROTECTED TREES The applicant understands that the replacement trees may not be removed without a Tree Removal Permit and that they shall be responsible for ensuring the proper maintenance and care of the trees. The applicant shall also disclose the location and species of all replacements trees on site upon sale of the property. 6. INDEMNIFICATION Except as otherwise prohibited by law, the applicant shall indemnify and hold harmless the City, its City Council, and its officers, employees and agents (collectively, the "indemnified parties") from and against any claim, action, or proceeding brought by a third party against one or more of the indemnified parties or one or more of the indemnified parties and the applicant to attack, set aside, or void this Resolution or any permit or approval authorized hereby for; the project; including (without limitation) reimbursing the City its actual attorneys' fees and costs incurred in defense of the litigation. The applicant shall pay such attorneys' fees and costs within 30 days following receipt of invoices from City. Such attorneys' fees and costs shall include amounts paid to counsel not otherwise employed as City staff and shall include City Attorney time and overhead costs and other City staff overhead costs and any costs directly related to the litigation reasonably incurred by City. Resolution No. 100 TR -2017-42 November 20, 2018 Page 4 7. NOTICE OF FEES, DEDICATIONS, RESERVATIONS, OR OTHER EXACTIONS The Conditions of Project Approval set forth herein may include certain fees, dedication requirements, reservation requirements, and other exactions. Pursuant to Government Code Section 66020(d) (1), these Conditions constitute written notice of a statement of the amount of such fees, and a description of the dedications, reservations, and other exactions. You are hereby further notified that the 90 -day approval period in which you may protest these fees, dedications, reservations, and other exactions, pursuant to Government Code Section 66020(a), has begun. If you fail to file a protest within this 90 -day period complying with all of the requirements of Section 66020, you will be legally barred from later challenging such exactions. PASSED AND ADOPTED this 20th day of November, 2018 at a special noticed Administrative Hearing Meeting of the City of Cupertino, State of California, held by the Administrative Hearing Officer, or his or her designee, pursuant to Cupertino Municipal Code Section 19.12.120. ATTEST: /s/Teffrey Tsumura Jeffrey Tsumura Assistant Planner APPROVED: /s/Bedamin Fu Benjamin Fu Asst. Director of Community Development FIRE MARSHALL NOTES THE OWNER(S), OCCUPANT(S) AND ANY CONTRACTOR(S) OR SUBCONTRACTOR(S) ARE RESPONSIBLE FOR CONSULTING WITH THE WATER PURVEYOR OF RECORD IN ORDER TO DETERMINE IF ANY MODIFICATION OR UPGRADE OF THE EXISTING WATER SERVICE IS REQUIRED. A STATE OF CALIFORNIA LICENSED (C-16) FIRE PROTECTION CONTRACTOR SHALL SUBMIT PLANS, CALCULATIONS, A COMPLETED PERMIT APPLICATION AND APPROPRIATE FEES TO THIS DEPARTMENT FOR REVIEW AND APPROVAL PRIOR TO BEGINNING THEIR WORK CRC SEC. 3132 AS ADOPTED AND AMENDEDBYCUPMC. WATER SUPPLY REQUIREMENTS: POTABLE WATER SUPPLIES SHALL BE PROTECTED FROM CONTAMINATION CAUSED BY FIRE PROTECTION WATER SUPPLIES. IT IS THE RESPONSIBILITY OF THE APPLICANT AND ANY CONTRACTORS AND SUBCONTRACTORS TO CONTACT THE WATER PURVEYOR SUPPLYING THE SITE OF SUCH PROJECT, AND TO COMPLY WITH THE REQUIREMENTS OF THAT PURVEYOR SUCH REQUIREMENTS SHALL BE INCORPORATED INTO THE DESIGN OF ANY WATER-BASED FIRE PROTECTION SYSTEMS, AND/OR FIRE SUPPRESSION WATER SUPPLY SYSTEMS OR STORAGE CONTAINERS THAT MAY BE PHYSICALLY CONNECTED IN ANY MANNER TO AN APPLIANCE CAPABLE OF CAUSING CONTAMINATION OF THE POTABLE WATER SUPPLY OF THE PURVEYOR OF RECORD. FINAL APPROVAL OF THE SYSTEM(S) UNDER CONSIDERATION WILL NOT BE GRANTED BY THIS OFFICE UNTIL COMPLIANCE WITH THE REQUIREMENTS OF THE WATER PURVEYOR OF RECORD ARE DOCUMENTED BY THAT PURVEYOR AS HAVING BEEN MET BY THE APPLICANT(S). 2016 CFC SEC. 903.3.5 AND HEALTH AND SAFETY CODE 13114) WILDLAND-URBAN INTERFACE THIS PROJECT IS LOCATED WITHIN THE DESIGNATED WILDLAND-URBAN INTERFACE FIRE AREA THE BUILDING CONSTRUCTION SHALL COMPLY WITH THE PROVISIONS OF SECTION R327 OF THE CALIFORNIA RESIDENTIAL CODE ORTHE CALIFORNIA BUILDING CODE (CBC) CHAPTER 7A, AS APPLICABLE. NOTE THAT VEGETATION CLEARANCE SHALL BE IN COMPLIANCE WITH CBC SECTION 701A.324 PRIORTO PROJECT FINAL APPROVAL CHECK WITH THE PLANNING DEPARTMENT FOR RELATED LANDSCAPE PLAN REQUIREMENTS. THIS PROJECT SHALL BE IN COMPLIANCE WITH CHAPTER 7A OF CALIFORNIA BUILDING CODE. CONSTRUCTION SITE FIRE SAFETY: ALL CONSTRUCTION SITES MUST COMPLY WITH APPLICABLE PROVISIONS OF THE CFC CHAPTER 33 AND OUR STANDARD DETAIL AND SPECIFICATION SI -7. PROVIDE APPROPRIATE NOTATIONS ON SUBSEQUENT PLAN SUBMITTALS, AS APPROPRIATE TO THE PROJECT. CFC CHP. 33 ADDRESS IDENTIFICATION: NEW AND EXISTING BUILDINGS SHALL HAVE APPROVED ADDRESS NUMBERS, BUILDING NUMBERS OR APPROVED BUILDING IDENTIFICATION PLACED IN A POSITION THAT IS PLAINLY LEGIBLE AND VISIBLE FROM THE STREET OR ROAD FRONTING THE PROPERTY. THESE NUMBERS SHALL CONTRAST WITH THEIR BACKGROUND. WHERE REQUIRED BY THE FIRE CODE OFFICIAL, ADDRESS NUMBERS SHALL BE PROVIDED IN ADDITIONAL APPROVED LOCATIONS TO FACILITATE EMERGENCY RESPONSE. ADDRESS NUMBERS SHALL BE ARABIC NUMBERS OR ALPHABETICAL LETTERS. NUMBERS SHALL BE A MINIMUM OF 41NCHES (101.6 MM) HIGH WITH A MINIMUM STROKE WIDTH OF 0.5 INCH (12.7 MM): WHERE ACCESS IS BY MEANS OFA PRIVATE ROAD AND THE BUILDING CANNOT BE VIEWED FROM THE PUBLIC WAY, A MONUMENT, POLE OR OTHER SIGN OR MEANS SHALL BE USED TO IDENTIFY THE STRUCTURE ADDRESS NUMBERS SHALL BE MAINTAINED. CFC SEC. 505.1 APPROVAL 25�D"qc /" I/- 1 Daze 14, NEW SOFORO ncn]sr,ro Reso�d(\emce Stauffer Ln., Cupertino, CCA — A.P.N.9 366-09-0 44 — ZONING P(RES) _ TOTAL PARCEL SIZE 18,930.57 SOFT. _AVERAGE SLOPE 8.4% —ALLOWABLE BUILDING 5,032 SOFT. ND USE DESIGNATION RESIDENTIAL VERY LOW DENSITY V. ACRE SLOP DENSITY FORMULA A= (B-1000 /100001� 59.59)+4,500 \\ A=/18,930.57 1000-10000\ 59.59)+4,500 = 5,032.13 S.F. —1ST FLOOR 2,390 SOFT. —2ND FLOOR 1,986 SOFT. (66.9% OF TOTAL 1ST FLOOR) — 3 CAR GARAGE 578 SOFT. —TOTAL LIVING 4,954 SQFT. =26.1% LOT COVERAGE SITE SECTION —1ST FLOOR 2,390 SOFT. — 3 CAR GARAGE 578 SOFT. —ALL COVERED PORCH 1,668 SOFT. TOTAL 4,636 SOFT. 24.4% —BASEMENT 2,290 SOFT. _ BUILDING HEIGHT 27'-6' _ FRONT SETBACK 26' _ REAR SETBACK 42'-2' _RIGHT SETBACK 76' _ LEFT SETBACK 16' CODES COVER SHEET & PROJECT DATA CALIFORNIA RESIDENTIAL CODE (CRC) 2016 CALIFORNIA BUILDING CODE (CBC) _ LANDSCAPE DOCUMENTATION CALIFORNIA ELECTRICAL CODE (CEC) _ 2016 CALIFORNIA MECH. CODE (CMC) 2016 CALIFORNIA PLUMBING CODE (CPC) 2016 CALIFORNIA ENERGY CODE 2016 CALIFORNIA FIRE CODE (CFC) 2016 2016 CALIFORNIA GREEN BUILDING STANDARD CODE 2016 DRAWING INDEX CIVIL COVER SHEET CS COVER SHEET & PROJECT DATA SP SITE PLAN LO LANDSCAPE DOCUMENTATION L1 LANDSCAPE PLAN T1 TREE REPLACEMENT PLAN Al BASEMENT, 1ST & 2ND FLOOR PLANS A2 ELEVATIONS AS BUILDING CROSS SECTIONS AFD FLOOR AREA DIAGRAM & CALCULATION Cl CIVIL COVER SHEET C2 GRADING AND DRAINAGE PLAN C3 SITE SECTION C4 EROSION CONTROL PLAN WZ t] E m am$� =LJ Z °oe� ❑ Z �z W= W LL MA I 1 1117 PLANNING 2 318 PLANNING 3 5 18 PLANNING JOB NO. 0817 SCALE AS NOTED DRAWN BY FH SHEET NO. FAULT LINE ' /t F71 pplgc boli Nu i5� ff Date Signature _ - Case pager ® • • O / / j / O . 12 .. • a. +. e o e ry o/ / _ I _.. 16'0'c- .. +1 oil ' V i _..:. . — —� MC .� ' . •MUT— / I 7 ' r L ! f —I 'rl.a 1 `T'Ti�_`' �—•'T ,.'—_ 1. �� Y I / IJ - ti t 51 11 If J�H- / I I I•' t A �:�I t�t�} � r y�i��`�-',-�-�•+'I �lir��-��_��--'�.r�-'s `?�l� �-{ r- _ �, �--?r;�•. �,�� /, / /�- �L H • t" T LEE 'Ir 41 I / 114 • / �'' /' / /' ' / INDICATE 1ST FLOOR INDICATE IST FLOOR COVERED PORCH --- --- G----- —-- ---- — -- ---- ---- ----- ----� —7 ----- — / /i /' INDICATE STEPPED LANDSCAPED RETAINING WALLS .r --1250— -_ SITE PLAN _ 1/18,• ----- -,C --a--a- -- --- --- -- -- -_---- -_ '_-_- --- ' CJI' W �j E <� >-.oo mp amok T<T� o�em 1J Uy oa Z oo�t ❑Z mzw� wz ;N� LULw 0 � U O Q S r L Lu.— NO. •- NO. DATE ISSUE 1 1117 PLANNING 2 318 PLANNING JOB NO. 0817 SCALE AS NOTED DRAWN BY FH SHEET NO. S P WATER -EFFICIENT LANDSCAPE CHECKLIST Community Derelupotant Deportment 10300 Torre Avenue 408.777.3308/Fax 408.x:3333 Cupertino, CA 95014 planningitcupertino.org htep:/ /cvperti no.org(pla tial n,Y, PART 1: CERTIFIED/LICENSED PROFESSIONAL INFORMATION COMPo LANY k COMPANY ADDRL Gre ewis - Landsca a Architect 5 O NAM6 uc /CEET.e 11550 Lake Spring Ct., Cupertino Gre o Lewis #2176 TURF AREA ❑ no turf GhIAII. PHONE lewulandscape@sbcglobal.net 831 359-0960 R PROFE4 ALSGYL PART 2: PROPERTY 6c PROPERTY OWN ER INWIIMA LUN Sofa Dasari 5 O Landscape Parameter 11550 Lake Spring Ct., Cupertino 408 666-6231 TURF AREA ❑ no turf 7993 Stauffer Ln., Cupertino YES Turf.lmll not be planted on slopes more than 5"6. PROIECTTYPEw,-.wo,c..wra WATERSOURCE Pressure regulators shall be installed on the irrigation system to ensure the All portions of turf areas shall be wider than ten (10) feet (unless irrigated withCpl subsurface irrigation or low volume irrigation system). ii�• New A Potable ❑ Rehabilitated ❑ Recycled TOTAL LANDSCAPE AREA TURF PLANT ARBA ❑ Non -Residential ❑ On-site captured rainwater $029 sc.rr. 718�c. tar. ❑ Graywater Plants with similar water needs shall be grouped within hydrozones. Each,ry hydrozone shalt be controlled by asePa. in valve. YES f1 WAITER PURVEYOR NUN-TURFFLANTAREA SPECIALLNDSCMEAREA YES 7311- so. Y. 0 sU.Gr. PART 3: COMPLIANCE CHECKLIST C. .... .ily D mefopment Depe,1-1 Landscape Parameter Requirements Compliance TURF AREA ❑ no turf Turfshall not -red 5%.fthsle.duap, tern orL2i0s+ lt,whichear islesttv in ares. (No turf in non-residunHal area) YES Turf.lmll not be planted on slopes more than 5"6. YES Pressure regulators shall be installed on the irrigation system to ensure the All portions of turf areas shall be wider than ten (10) feet (unless irrigated withCpl subsurface irrigation or low volume irrigation system). YES Y'� PLANTING AREA At least80%(100%for non-rosidential arm) of non -turf arca shall consist of native or low water use plants. YES pressure range. No invasive and/or noxious plant species shall be planted. YES Plants with similar water needs shall be grouped within hydrozones. Each,ry hydrozone shalt be controlled by asePa. in valve. YES f1 189 SOIL MANAGENTENT Atisi4m. yd. ufasnp4!ut(6)hdxsdeep,shall bcappkd prlatl0s,fLoFladsrapemrn YES _..__.._._.___.--.--._.._....._._..__...._.._..-.-'----_.._...ES All irrigation emission devices most meet the requirements set in the ANSI A minimum three (3) inch layer of mulch shall be applied on all exposed soil 515 standard, ASABE/ICC 802.2014 "Landscape Irrigation Sprinkler and Emitter surfaces of planting meas, -pi in arms of direct sedingapplicatinn(e.g. ' YES StandarcL" All sprinkler heads installed in the landscape most document amet ro-see hydding). Y� distribution uniformity low quarter of 0.65 or higher using theprotoml defined Grading shall be designed to minimus soil erosion, run-off, and water waste. YES IRRICATIONSYSIEM 0 n irrigation system Automatic irrigation controllers are required and mustuse evapotranspiration or sail mmistumsensardata and milimamin sensor. ' YES Irrigation controllers shall be a type which docs not lose programming data in the event the primary power source is Interrupted. YES WATER -EFFICIENT LANDSCAPE CHECKLIST C. .... .ily D mefopment Depe,1-1 - 10300 Torre Avenue 408.777.3308/Fax 408.777.3333 Cupertino, CA 95014 planningdocuNrtino.org http://ctipertin(,.org/pimning Landscape Parameter Requirements Compliance IRRIGATION SYSTEM Pressure regulators shall be installed on the irrigation system to ensure the ETWU 1 0.25 Drip dynamic pressure of the system is within the manufacturer's recommended WF5 6607 pressure range. 57,273 2 0.25 Drip ,Manual shut-off valves (such as a gate valve, ball valve, or butterfly valve) shall .�( Y, 189 be installed as close to possible an the point ofcomacdonof the water supply. ........... __._............ _....__.__------ /" - ....... __.._... 3 0.5 Drip _..__.._._.___.--.--._.._....._._..__...._.._..-.-'----_.._...ES All irrigation emission devices most meet the requirements set in the ANSI 0.6173 515 standard, ASABE/ICC 802.2014 "Landscape Irrigation Sprinkler and Emitter 8929 4 0.8 Spray StandarcL" All sprinkler heads installed in the landscape most document amet YES 718 distribution uniformity low quarter of 0.65 or higher using theprotoml defined VERIFY TYPE OF AND THICKNESS OF STRUCTURAL BASE LAYERS WITH SOILS AND STRUCTURAL ENGINEERS in ASABE(ICC802-7A14. Dedicated irrigation meters one required for non-residendalProjects with more ❑ YES than L000sq. ft. of 1xa&capeams. this is single family residential Cake )Marla(iar WATLR FEATURES pool and spa covers shall be installed. ❑YES ❑pool Recirculating water systems shell be used for all water features. ❑YES ❑ other. water features am limited to 10% of We landscaped area. ❑ YES no water features I am aware of available informational rosoumes regarding name and low water use plant, irrigation efficiency, and otherespecls of water-efEdentlandscaping. I certify that the information provided on this checklist is werect,and the installed landscape complies with the requiremenlvof Chapter 14.15 tint /or the requircmentuf the PresaiptiveComplianceOpWrn I oleo underatund thatany changes to the project will necessitate a new checklist El .._ .. _ ❑ . Applicant Comments - ❑ UseadJJtimwll>aW ancx.�wm Stiff Evaluatfort Staff Comments 8 i ❑ ❑ Approved Ll Not Approved ❑ Permit If ❑ ❑ WATER BUDGET WORKSHEET Call my Dccrl.pnrent Department 103001'orre Avenue 408.777.3308/Fax 408.777.3333 Cupertino, CA 9501.1 planningdeupertino.org h ttp:/ /cupo,tiiio.org/ planning PART 1: PROPERTY INFORMATION PRttl LCI' AUURL' ' A.Y.N. 7993 Stauffer Lane, Cupertino RELERENCEEte TOTAL LA,4oSCAPE AREA NON-TURFPLANTAII SPECIALLYNDSCAPEAIREA 45.38029 311 so,. 0 so or w RTF RECULARLANDSCAPE AREA TOP OF CONCRETE RETAINER WILL USUALLY BERUSH WITH TOP OF PAVERS - OR A PAVER WILL BE MORTARED TO THE TOP OPENINGS USE CALSTONE 49 JOIM ROCK IF OF THE CONCRETE HYDROZONE PLANT mRIGATIO.N FACTOR IPF) METHOD IRRIG AnON EFFICT:f'`l� CY (IE) RAG (I'VIL) I.,WIXCAPE AREA (SQ. Fr.) tTAFx L\.NP SCME AREA ETWU 1 0.25 Drip 0.81 0.3086 6607 2039.20 57,273 2 0.25 Drip 0.81 0.3086 189 58.33 1638 3 0.5 Drip 0.81 0.6173 515 317.9 8929 4 0.8 Spray 0.75 1 1.0667 718 765.87 21,510 VERIFY TYPE OF AND THICKNESS OF STRUCTURAL BASE LAYERS WITH SOILS AND STRUCTURAL ENGINEERS _ Cake )Marla(iar TOTALS (A)8029 (B) 3181 9 350 SPECIAL LANDSCAPE AREA - 1 t TOTALS (C) 0 (D)0 (Z) 0 PART 3: WATER BUDGET CALCULATIONS DERNmONS 124026 MAWA HYDROZONC Put to hydrozone a, letter, or planting (17 * (2)89,350 (ETWU) < ( ) description. (eg. 1,:, 3, A, B, G front pomh, adjacent ro driveway, frontawn,.W.) PART 4: ETAF CALCULATIONS PLANT FACTOR (PF: Use wUCOI_S o determine Plant Factor. Plant foil arc0.0.1for very low water ase plants, 0.3-0.3 for low Average ETAF for Regular Landscapes=(B)+(A) water use plants, 0.4-0.6 for moderate water useplants, and 0.7-1.0 for high water use pl.nb. 0.40 (ETAF)<(055 for residential) IRRIGATION METHOD: Overhead spray., dip IRRIGATION EFFICIENCY 11 E): 0.75 forspray and 0.81 fur drip (ETAF)<(0.45 for tion -residential) LTARThe m.:durum average EvopoTranspleadonAd)usureat Factor for residential properties, excinsive.f Special L.od-pc =%Sife-wide ETAF= B+D + A+C % 1s 0, 55..d for rum -residential properties is 0d5, ETAF for ( ) ( ) and misting SpecialLandscape Areas shall not cseeed 1.0. Era -ev.potmnspiraton rate means the quantity of water 0.40 Site -wide ETAF bevaporated from adjacent sod and other surfaces and transpired y pants daring a specified time • 0.621, a cmversi.n facto, that convert acro-inches/nem/year t. F07MVr.A6 gallons/K.ft./Year. ET WU = bTe x 0.62 x (ETAF x Landscape Area) E:stmeIed Total Water Us MAWA - Era x 0.62 x I(LTAF• x Landscape Area) + (0-ETAF) x SLA)] Maximum Applied Water Allowance PERVIOUS CONCRETE PAVERS TOP OF CONCRETE RETAINER WILL USUALLY BERUSH WITH TOP OF PAVERS 3 THICK ttP. N0.8 AGGREGATE IN OR A PAVER WILL BE MORTARED TO THE TOP OPENINGS USE CALSTONE 49 JOIM ROCK IF OF THE CONCRETE USING CALSTONE NARROW RETAINER RUSH WITH JOINT PERMEABLE PAVERS OTHER PAVERS TOS ELEVATION VERIFY TYPE OF AND THICKNESS OF STRUCTURAL BASE LAYERS WITH SOILS AND STRUCTURAL ENGINEERS T NO. 8 AGGREGATE OTHER PAVERS I"WASHED CONCRETE '... BEDDING COURSE SAND ASTM,3370 4" NO.57 STONE r, i1 U U`+' UTP+oL - SPECIFIED BY SOIL ENGINEER > 67MIN. NO.2 STONE SUBBASE 10' MIN NO. 57 STONE I t OPTIONAL GEOTEKTILE PERFORATED PIPE (SLOPE AT ON BOTTOM AND SIDES 0.50% MIN) W/ PERFORATIONS OF OPEN -GRADED BASE \ DOWN. SEE PIAN FOR LENGTH AND LOCATION. FLAT BOTTOM TOS ELEVATION VERIFY TYPE OF AND THICKNESS OF STRUCTURAL BASE LAYERS WITH SOILS AND STRUCTURAL ENGINEERS Permeable PavingA No Scale LANDSCAPE DOCUMENTATION PACKAGE CHECKLIST 1 -PROJECT INFORMATION a Date -5/14/18 b Applicant - Greg Lewis- Landscape Architect C Project Address - 7993 Stauffer Ln., Cupertino d Total Landscape Area - 8029 sf e Type of project -single family residential g Checklist of all documents in package - see this page IT Contacts of Applicant - owner- Satyanaranyana Dasad 11550 Lake Spring Court, Cupertino i "I agree to comply with the requirements of the water efficient landscape ordinance and submit a complete Landscape Documentation Package" APPENDIX A - WATER EFFICIENT LANDSCAPE CHECKLIST- SEE LO APPENDIX B - WATER BUDGET WORKSHEET -SEE SHEET LO APPENDIX C - WELCO COMPLIANCE CERTIFICATE - NOT DONE YET APPENDIX D - LANDSCAPE (PLANTING) PLAN -SEE SHEET Ll IRRIGATION PLAN HAS NOT BEEN DONE YET GRADING - see Grading Plan by GPM Engineers - Mohamed S. Genidy (510) 377-7866 cell (650) 331-7264 office SOIL MANAGEMENT REPORT IRRIGATION SCHEDULE - LANDSCAPE AND IRRIGATION MAINTENANCE SCHEDULE - LANDSCAPE AND IRRIGATION INSTALLATION REPORT LANDSCAPE MAINTENANCE AGREEMENT Hydrozone Summary HYDROZONE - DESCRIPTION GPM SQ.FT. % OF TOTAL VALVES 1 - DRIP, LOW WATER SHRUBS 6607 82% Pig, I Off 2- DRIP, LOW WATER,TREE 189 2% 3- DRIP, MED WATER,FRUTTTREE 515 6% 4- SPRAY,HIGH WATER,LAWN, 718 9% TOTALS 8029 100% TOP OF CONCRETE RETAINER WILL USUALLY BE FLUSH VERS WIND'PAVERS OR A PAVER WILL BE WILL MORTARED TO THE TOP STONE DURALOCK OF THE CONCRETE MERICSAND RETAINER FLUSH WITH < OTHER PAVERS I"WASHED CONCRETE '... °� )� � +� SAND ASTM,3370 JZCK"P COMPACTED BASEROCK-DEPTH - r, i1 U U`+' UTP+oL - SPECIFIED BY SOIL ENGINEER > n l�Favon Number COMPACTED SUBGRADEAS PER SPECIFIED BYSOIL FNGINEER CD s4C CD 6��Lla-✓/, Dare VERIFY TYPE OF AND THICKNESS OF STRUCTURAL BASE LAYERS WITH SOILS AND STRUCTURAL ENGINEERS _ Cake )Marla(iar Non - Permeable PavingB No Scale Revision U w o H ro U 4 tY Lu ao U � � Z U n g 2� U 3�W _J 3 O a" w� af O 5 rr rA, W U U U o %T, L W fy ^^<n U e � � 9cyh�i� -f-- V C/D Dale 7/5118 soy. Ar Noted down -v Job Sheet LO of WATER EFFICIENT COMPLIANCE CHECKLIST NOTES -TURF, PLANTING, SOIL MANAGEMENT 1 THERE IS TURF LAWN SPECIFIED FOR THE LANDSCAPE 2 AT LEAST 80% OF NON -TURF AREA CONSISTS OF NATIVE OR LOW WATER USE PLANTS PLANTS WITH SIMILAR WATER NEEDS ARE GROUPED WITHIN HYDROZONES. EACH HYDROZONE SHALL BE CONTROLLED BY A SEPARATE GROUP OF VALVES 4 AT LEAST 6 CUBIC YARDS OF COMPOST (BFI SUPER HUMUS) AND 16 POUNDS OF 12-12-12 FERTILIZER SHALL BE THOUROUGHLY TILLED INTO THE TOP 8 INCHES OF SOIL (EXCEPT UNDER CANOPY OF EXISTING TREES TO BE SAVED) OR FOLLOW THE AMENDMENT AND FERTILIZER RECOMMENDATIONS OF A SOIL FERTILITY TEST AND ANALYSIS FROM A SOIL LAB (HIGHLY RECOMMENDED) 5 INSTALL 3 INCH DEEP LAYER OF TOP DRESS MULCH ON ALL EXPOSED SOIL SURFACES OF PLANTING AREAS EXCEPT IN AREAS OF DIRECT SEEDING APPLICATION OR SOD LAWN. USE VISION RECYCLING DARK BROWN MAHOGONY COLORED WONDER MULCH OR DARK BROWN PRO CHIP BARK OR OTHER MULCH APPROVED BY THE OWNER (PROVIDE SAMPLES) 6 GRADING SHALL BE DESIGNED TO MINIMIZE SOIL EROSION, RUN-OFF AND WATER WASTE ADDITIONAL NOTES 7 SEE SHEETS L3 AND L4 IN FUTURE LANDSCAPE CONSTRUCTION DRAWINGS FOR PLANTING AND IRRIGATION DETAILS AND SPECIFICATIONS 8 DON'T TRENCH TOO CLOSE TO STRUCTURES WITHOUT THE APPROVAL OF THE BUILDING ARCHITECT, CIVIL, OR STRUCTURAL ENGINEER 9 PRIOR TO ORDERING PLANTS OR SIGNING FINAL CONTRACT FOR WORK MAKE SURE YOU HAVE THE MOST CURRENT SET OF APPROVED PLANS AND MAKE SURE THERE ARE NO CHANGES TO THE PLANT CHOICES 10 ADJUST FINAL LOCATIONS OF PLANTS TO AVOID CONFLICTS WITH UTILITIES, LIGHTS, AND IRRIGATION COMPONENTS. SCREEN VALVES AND UTILITIES WITH PLANTS. DON'T PUT PLANTS TOO CLOSE TO PAVING OR BUILDINGS 11 THERE IS 6796 SF OF LOW WATER USE RATED PLANTING IN THE FRONT AND IN THE REAR YARD 12 ALL SHRUBS AND GROUND COVERS TO BE DRIP IRRIGATED USING 314" PE DRIP TUBING RUN OVER THE ROOTBALL OF EACH PLANT. USE TWO 2 GPH EMITTERS AT EACH SMALL PLANT, THREE 2 GPH EMITTERS AT EACH MEDIUM PLANT, FOUR 2 GPH EMITTERS AT EACH LARGE PLANT AND TWENTY 2 GPH EMITTERS AT EACH TREE WITH FOUR OF THE EMITTERS AT THE EDGE AND ON TOP OF THE ROOT BALL AND THE REMAINDER OF THE EMITTERS OUT UNDER THE FUTURE CANOPY. INSTALL AUTOMATIC ANTI SIPHON VALVES 12 INCHES ABOVE HIGHEST DOWNSTREAM DRIP EMITTER. INSTALL MANUAL GATE VALVE AT POINT OF CONNECTION WITH HOUSE WATER LINE AND INSTALL A SUBMETER TO KEEP TRACK OF IRRIGATION WATER USE. INSTALL AN ET CONTROLLER THAT CHANGES IT'S WATERING TIMES DEPENDING ON THE CURRENT WEATHER. PRIVACY SCREENING NOTES IDENTIFY THE SPECIES OF PRIVACY PLANTING. IF TREE MINIMUM HEIGHT OF 8FT MUST BE PROVIDED AT TIME OF PLANTING. IF SHRUB, MINIMUM HEIGHT OF 6FT SHALL BE REQUIRED AT TIME OF PLANTING. PITTOSPORUM UNDULATUM HAVE BEEN SPECIFIED ON THE PLAN 1. PRIVACY PLANTING: THE FINAL PRIVACY -PLANTING PLAN SHALL BE REVIEWED AND APPROVED BY THE PLANNING DIVISION PRIOR TO ISSUANCE OF BUILDING PERMITS. THE VARIETY, SIZE, PLANTING DISTANCE SHALL BE CONSISTENT WITH THE CITY'S REQUIREMENTS. 2. PRIVACY PROTECTION COVENANT: THE PROPERTY OWNER SHALL RECORD A COVENANT ON THIS PROPERTY TO INFORM FUTURE PROPERTY OWNERS OF THE PRIVACY PROTECTION MEASURES AND TREE PROTECTION REQUIREMENTS CONSISTENT WITH THE R-1 ORDINANCE, FOR ALL WINDOWS WITH VIEWS INTO NEIGHBORING YARDS AND A SILL HEIGHT THAT IS 5FT OR LESS FROM THE SECOND STORY FINISHED FLOOR. THE PRECISE LANGUAGE WILL BE SUBJECT TO APPROVAL BY THE DIRECTOR OF COMMUNITY DEVELOPMENT. PROOF OF THE RECORDATION MUST BE SUBMITTED TO THE COMMUNITY DEVELOPMENT DEPARTMENT PRIOR TO FINAL OCCUPANCY OF THE RESIDENCE. Paving In Frontyard Setback IMPERVIOUS PAVING IN 20 FOOT FRONT YARD SETBACK CANNOT EXCEED 40% TOTAL AREA IN FRONT YARD SETBACK = 3952 sq.ft. TOTAL IMPERVIOUS PAVING IN FRONT YARD SETBACK = 823 sq.ft. = 21% of TOTAL FRONT YARD SETBACK AREA IMPERVIOUS PAVERS ARE CALSTONE 4X8 PAVERS, RUNNING BOND ON THE ENTRY WALK AND HERRINGBONE ON THE DRIVEWAY, GRAY OR DARK BROWN TO MATCH THE GRAY OR DARK BROWN COLOR IN THE SUNSET TERRA COTTA COLOR OF THE PERVIOUS PAVERS ALL PERVIOUS PAVERS ARE CALSTONE 4X8 PAVERS, HERRINGBONE 45 DEGREE ANGLE, SUNSET TERRA COTTA COLOR Paving Areas TREE PROTECTION DURING CONSTRUCTION. PROTECTED TREES DESIGNATED FOR PRESERVATION SHALL BE PROTECTED DURING DEVELOPMENT OF A PROPERTY BY COMPLIANCE WITH THE FOLLOWING, WHICH MAY BE MODIFIED BY THE PLANNING DIRECTOR: A. PROTECTIVE FENCING SHALL BE INSTALLED NO CLOSER TO THE TRUNK THAN ONE FOOT FURTHER OUT THAN THE DRIPLINE, AND FAR ENOUGH FROM THE TRUNK TO PROTECT THE INTEGRITY OF THE TREE. THE FENCE SHALL BE A MINIMUM OF SIX FEET IN HEIGHT AND SHALL BE SET SECURELY IN PLACE. THE FENCE SHALL BE CHAINLINK WITH 2" DIA. STEEL POSTS MIN. 10' O.C. TO ALLOW VISIBILITY TO THE TRUNK FOR INSPECTIONS AND SAFETY. THERE SHALL BE NO STORAGE OF ANY KIND WITHIN THE PROTECTIVE FENCING. B. THE EXISTING GRADE LEVEL AROUND A TREE SHALL NORMALLY BE MAINTAINED OUT TO THE DRIPLINE OF THE TREE. ALTERNATE GRADE LEVELS MAY BE APPROVED BY THE PLANNING DIRECTOR AND PROJECT ARBORIST. C. TREES THAT HAVE BEEN DAMAGED BY CONSTRUCTION SHALL BE REPAIRED IN ACCORDANCE WITH ACCEPTED ARBORICULTURE METHODS. D. NO SIGNS, WIRES, OR ANY OTHER OBJECT SHALL BE ATTACHED TO THE TREE. E. PLEASE SEE ADDITIONAL TREE PROTECTION 11.08 OF MUNICIPAL CODE IF NEC AND ARBORIST REPORT BY JOHN LEONE (510)449.3654 ARBORJOHNL@AOL.COM Plai KEY Trees QA24 QA36 AR24 AR QTY SIZE SPACING WWUTIOGS BOTANICAL NAME COMMON NAME GALLONS 24" 20' LOW 36" 20' LOW 24" 10' LOW 15 10' LOW FT 5 5 Screening Shrubs PU 5 15 Shrubs min. 6' high PY 1 EL 1 AH 1 RC 1 MC 1 WF 1 Ground Covers SL 1 DV 1 LB 1 LW 1 LY 1 P 1 10' MED Quercus agdfolia Quercus agdfolia Quercus agrifolia Quercus agrifolia Tracheycarpus fortunei or Windmill Palm Syagrus romanzoffianum Queen Palm Tracheycarpus fortune! or Windmill Palm Syagrus romanzoffianum Queen Palm Fruit tree to be selected by owner Archtostaphlos Howard McMinn B' LOW Pittosporum undulatum Victorian Box Screen Shrub - see notes 8' LOW Phormium Yellow Wave Flax 8' LOW Eleagnus pungens Fruitlandii Sllverberry 4' LOW Archtostaphlos Howard McMinn Manzanita 4' LOW Rhaphiolepis minor India Hawthorne 4' LOW Myrtus communis Myrtle 4' LOW Westringia compacta Coast Rosemary 4' LOW Salvia leucantha Max. Sage 4' LOW Dietes vegeta Fortnight Lily 3' LOW Lomandra Breeze 4' LOW Lantana montevidensis white 4' LOW Lantana Dwarf Yellow 3' LOW Limonium perezii Sea Statice 4 replacement Oaktee Ic:et FenceFFTFrFTMC I4" • • • Fruit Trees —ess- i Application N1.1in5 bar DrivewayImpervious Paving 782 sf _ — — w — — — — — — — _.___ P 9 Driveway Pervious Paving1510 sf 2'box replace ent tree 24"box replacement tree _ %•/ v?S cTr,ar�ayer Tile Porch under overhang 1634 sf R2box replace ent tree The Porch at entry door 140 sf Front Entry Walk Impervious Pavers and Steps 259 sf — / Impervious Paving NW side of house 156,-4 "1 have complied with the criteria of the Water Conservation in Landscaping Ordinance and applied Pervious Pavers rear path 862 sf � �p p gPlanting Plan 1 rt -1 U-10" them for the efficient use of water in the landscape design plan" Gregory Lewis - Landscape Architect Lic. #2176 7-5-18 0' 10' 20' Revision N U w F- ,o = 4 a� W a U U)am Z U a 2Tj U W 3 } 3:2 O a C9 c0 W Q U C) W 0) cn U J L N } ON n ,to nsne Scale As Noted aawa c,ea Jab Spee' L 1 or 3 i" .HP(' ."14 ,y t,Y j AIcy _...A tl� C��fl G-. Application Num br ya'c4 Y:,.syy--�� aiz F3,1 �r r .w .-m_r� 9J Sdalt.r 9�IC�t"� TREE PROTECTION DURING CONSTRUCTION. PROTECTED TREES DESIGNATED FOR PRESERVATION SHALL BE PROTECTED DURING DEVELOPMENT OF A PROPERTY BY COMPLIANCE WITH THE FOLLOWING, WHICH MAY BE MODIFIED BY THE PLANNING DIRECTOR: A. PROTECTIVE FENCING SHALL BE INSTALLED NO CLOSER TO THE TRUNK THAN ONE FOOT FURTHER OUT THAN THE DRIPLINE, AND FAR ENOUGH FROM THE TRUNK TO PROTECT THE INTEGRITY OF THE TREE. THE FENCE SHALL BE A MINIMUM OF SIX FEET IN HEIGHT AND SHALL BE SET SECURELY IN PLACE. THE FENCE SHALL BE CHAINLINK WITH 2" DIA. STEEL POSTS MIN. 10' O.C. TO ALLOW VISIBILITY TO THE TRUNK FOR INSPECTIONS AND SAFETY. THERE SHALL BE NO STORAGE OF ANY KIND WITHIN THE PROTECTIVE FENCING. B. THE EXISTING GRADE LEVEL AROUND A TREE SHALL NORMALLY BE MAINTAINED OUT TO THE DRIPLINE OF THE TREE. ALTERNATE GRADE LEVELS MAY BE APPROVED BY THE PLANNING DIRECTOR AND PROJECT ARBORIST. C. TREES THAT HAVE BEEN DAMAGED BY CONSTRUCTION SHALL BE REPAIRED IN ACCORDANCE WITH ACCEPTED ARBORICULTURE METHODS. D. NO SIGNS, WIRES, OR ANY OTHER OBJECT SHALL BE ATTACHED TO THE TREE. E. PLEASE SEE ADDITIONAL TREE PROTECTION 11.08 OF MUNICIPAL CODE IF NEC AND ARBORIST REPORT BY JOHN LEONE (510)449.3654 ARBORJOHNL@AOL.COM Plant Legend SIZE COMMENTS REPLACEMENT T1 CA Live Oak KEY QTY SIZE SPACING RA BOTANICAL NAME COMMON NAME 44" GALLONS one 36" box Oaks RATING V. Save Trees T4 CA Live Oak 32" Save T5 CA Live Oak QA24 3 24" 20' LOW Quercus agrifolia Quercus agrifolia QA36 1 36" 20' LOW Quercus agrifolia Quercus agrifolia AR24 8 15 10' LOW Tracheycarpus fortunei or Windmill Palm two 24" box Palms TOTAL REPLACEMENT TREES REQUIRED eleven 24" box Syagrus romanzoffianum Queen Palm AR 2 15 10' LOW Tracheycarpus fortunei or Windmill Palm Syagrus romanzoffianum Queen Palm FT 5 5 10' MED Fruit tree to be selected by owner EXISTING TREES SIZE COMMENTS REPLACEMENT T1 CA Live Oak 25" Remove - in paving two 24" box Oaks T2 CA Live Oak 44" Remove - too close to house one 36" box Oaks T3 CA Live Oak V. Save T4 CA Live Oak 32" Save T5 CA Live Oak 10" Remove - too close to house one 24" box Oak T6 Peach 20" Remove - In house - two 24" box Palms T7 Peach 15" Remove - In house - two 24" box Palms T8 Peash 18" Remove - In house - two 24" box Palms T9 Peach 18" Remove - In house - two 24" box Palms TOTAL REPLACEMENT TREES REQUIRED eleven 24" box one 36" box Tree Replacement Plan "'=10'-O" U 1(0 10' 20' Revision wo F Of x� U W Us o U)�_ 0 v H Z g2 C0 — ng � x 0a W n C1 7 �f IS W U Uo ry J D Dal" 7/5/78 Sccle AS Noled Drown c,ea :ob 5hee, T 1 2ND FLOOR PLAN 8 8 N, �z ROOF PLAN 1 8 M Ll E < W wz ; N O O m ttao z .06 C6 {<oD tV Vy =Z Op om ❑Z mzw.j W LL( W a` N I t W Q U Uo a� LL- -� J i LUe 17— mai v N NO. DATE ISSUE 1 1117 PLANNING 2 318 PLANNING JOB NO. 0817 SCALE AS NOTED DRAWN BY FH SHEET N0. Al qv Aba PROS L DRC Application Number 1(-1910 '—/ ( Data in �C"°iz a,"L1 -' :1 �j v 5 'l Z Gel � �d _ _ 149,01-1 /4-, etianagar M Ll E < W wz ; N O O m ttao z .06 C6 {<oD tV Vy =Z Op om ❑Z mzw.j W LL( W a` N I t W Q U Uo a� LL- -� J i LUe 17— mai v N NO. DATE ISSUE 1 1117 PLANNING 2 318 PLANNING JOB NO. 0817 SCALE AS NOTED DRAWN BY FH SHEET N0. Al FRONT (SOUTH WEST) ELEVATION 3/16" — — —27'_6.. I' 2F TP — --- — --21'-0- _ - 2ND FLR ---- --11,_o Q _ 1ST FLOOR 0'- poroflr 1'-2" W W7_ G E � ini 0 W W N 0 O m a 9 CJ Z o o L ❑Z wzw WQ W2 I w La N.G. = NATURAL GRADE a M, Application I 0 j, - D A -E -ase Mai LEFT (NORTHWEST) SIDE ELEVATION 3/16" RIGHT (SOUTH EAST) SIDE ELEVATION 3/16" U 0 c v s=. I $ V LL: w d Uj t0 _I CC b. m w c Z w cc ccN TOR n NO. DATE ISSUE 1 11 17 PWG 9 a is p] MA KtAK (NUK I H tA5 I ) tLtVA I IUN 3/16" elevations JOB NO. 0814 SCAL AS NOTED RAWN FH ----------- TOR���� 27'-6' V SECTION 1 1n 8 - D 77. _ D. i5T FLOOR f� p—prD• _ 6' V _ Besemen� GRATE ROOM ------------------------------------ 4,z0 LOFT IBALCONY SECTION 2 1n 8 NATUR4 UNE-_ J moi, r �-I 1111 n I -m --II I -MAN .aaa�a�avviaa�aaaaaaa�aaaamaaaaaaa�.�a�maaaa��.�oa��.a�aaaa�aaaa�aaaaaaa�o�aaaa..�aa�moaaaa�.���_ . � n 11 11 ■__I E. 11111 NOR LI'� 7*1 F-; 4w 111 I `' � � • _ �. oa�a�aaaa�aaaa�aa�a�aaaa�a�a�������aaa�a�a��a�aaaaomaaaaaaaaaaaa�a�aa0� ��aaaoaa�aaaaaaaaaa�aaaaaaa� ��\ UIl 7Iirt nvfl-�inin1n r5n•..�!�FrINrill LImtiinr�u=lnr1it1�uun.�n¢n�-1n1mt r°h 1il\� \ Sammi 1.. 8 ------------------------------- T----------------- --------------------------------f ---- 'or LAUNDRY 6Ef GE MON 4 8 ------------------ -=—� ---------- W «—=-- m wj s N O O M ❑ Q W s �Cd 0�pm T Z 0 Q P N ❑Z �zw� W? WN~ <a w 4 � 1 U Uo W.= NO. DATE ISSUE 1 1117 PLANNING 2 3 18 PLANNING 3 5 19 PLANNING JOB NO. 0817 SCALE AS NOTED In A3 tr'af 6 t LWG"'uL 1 Application NumbG/®_-. ////qq'' ��LL o Ili;,'e.. jar iI/ �at ,ase Manager - D 77. _ D. i5T FLOOR f� p—prD• _ 6' V _ Besemen� GRATE ROOM ------------------------------------ 4,z0 LOFT IBALCONY SECTION 2 1n 8 NATUR4 UNE-_ J moi, r �-I 1111 n I -m --II I -MAN .aaa�a�avviaa�aaaaaaa�aaaamaaaaaaa�.�a�maaaa��.�oa��.a�aaaa�aaaa�aaaaaaa�o�aaaa..�aa�moaaaa�.���_ . � n 11 11 ■__I E. 11111 NOR LI'� 7*1 F-; 4w 111 I `' � � • _ �. oa�a�aaaa�aaaa�aa�a�aaaa�a�a�������aaa�a�a��a�aaaaomaaaaaaaaaaaa�a�aa0� ��aaaoaa�aaaaaaaaaa�aaaaaaa� ��\ UIl 7Iirt nvfl-�inin1n r5n•..�!�FrINrill LImtiinr�u=lnr1it1�uun.�n¢n�-1n1mt r°h 1il\� \ Sammi 1.. 8 ------------------------------- T----------------- --------------------------------f ---- 'or LAUNDRY 6Ef GE MON 4 8 ------------------ -=—� ---------- W «—=-- m wj s N O O M ❑ Q W s �Cd 0�pm T Z 0 Q P N ❑Z �zw� W? WN~ <a w 4 � 1 U Uo W.= NO. DATE ISSUE 1 1117 PLANNING 2 3 18 PLANNING 3 5 19 PLANNING JOB NO. 0817 SCALE AS NOTED In A3 -1-7-D(7- w APPROVAL _ DRO /" 1 -16 Si, E 1a.NUtl Lu .ata Mc?Y1ager PROPOSED 1ST FLOOR PLAN DIAGRAM 1/8" = 1'-0" PROPOSED BASEMENT FLOOR PLAN NOT PART OF THE AREA DIAGRAM 1/8" = 1'-0" TOTAL PROPOSED 2ND FLOOR PLAN DIAGRAM 18" = 1'-0" FLOOR AREA CALCULATION GARAGE 1ST FLOOR 2ND FLOOR in 220'-7"x21'-3" = 436.96 5 21' -4"x20' -T' = 435.78 q. 16'-8"x15' = 249.48 2 10'-7"x10'-5"= 109.55 6 18'-6"X18'-2"= 336.60 0'-6"x53'-6'= 1,107.53 3 7'-3"X10'-2" = 73.17 7 10'-1 "x9'-3" = 92.92 6 '-7'x40'-5" = 305.53 4 2'-10"x10'-7" = 31.11 8 264"x21'-5" = 542.43 1'-87"x10'-3" = 16.68 9 10'-1"x39'-7"= 397.89 6'-2"x6'-5"= 102.96 O '-7"x25'-1 = 89.74 '� 15'-3"x13'-5" = 203.66 1 'X1'-1" = 5.39 23'-2"x20'-1"= 467.93 j3)7' -7"x2'-10" = 21.55 578 2,390 1,986 m w 13 E Lu ` W 0 U c d J O p v A ❑z mZ WJ wz ;��� <g W ILLL- 1 1117 PLANNING 2 318 PLANNING 3 5 20 PLANNING FLOOR AREA DIAGRAM & CALCULATION JOB NO. 0817 SCALE AS NOTED o AFD PRELIMINARY GRADING AND DRAINAGE SURVEY DRAWINGS BASED ON TOPOGRAPHIC SURVEY BY 3F �o° KEVIN BRONSON PLS LOT 190, TRACT 7993 APN 366-09-044 gfr� e BASIS OF BEARINGS THE BEARING OF 549'50 00"E BETWEEN FOUND MONUMENTS ON THE CENTERLINE OF STAUFFER LANE, AS SHOWN ON THE MAP OF TRACT 7993, RECORDED IN BOOK 582 OF MAPS AT PAGE 31 &32, SANTA CLARA COUNTY RECORDS, IS THE BASIS OF BEARINGS FOR THIS SURVEY. SANTA CLARA VALLEY {NATER DISTRICT BY 139, AN ALUMINUM DISK IN THE HEADWALL OF CALABAZAS CREEK, HAVING AN NAVD88 ELEVATION OF 300.71; IS THE BASIS OF ALL ELEVATIONS SHOWN ON THIS MAP. SHEET INDEX SHEET N0. Cl C2 C3 TITLE TITLE SHEET GRADING AND DRAINAGE PLAN SITE SECTION EARTH WORK QUANTITIES CUT: -1 .080 CY FILL: 210 CY EXPORT: 870 CY IMPORT: 0 CY NOTE: EARTHWORK QUANTITIES SHOWN ARE APPROXIMATE. IT SHALL BE THE CONTRACTOR'S RESPONSIBILITY TO INDEPENDENTLY ESTIMATE QUANTITIES FOR HISMER OWN USE. STAUFFER LN., CUPERTINO SITE PLAN SCALE 1"=30' ABBREVIATIONS LEGEND DIRECTED BY: I? nFESSIQ � . ELc s �T ALL W K SHALL BE IN ACCORDANCE WITH THE STANDARD DETAILS AND SPECIFICATIONS OF CITY 1' 27' MANHOLE FRAMES AND COVERS SHALL BE BROUGHT TO FINISH GRADE BEFORE OF CU ERTINO. FINAL PAVING. `{moiVV DESCRIPTION SYMBOL DESCRIPTION PRIOR REQUIRING AN INSPECTION. TWO 2 WORKING DAYS PRIOR TO INSTALLING PERMANENT STRIPING, () R16E) DURING STREET CONSTRUCTION. THE CONTRACTOR SHALL CALL FOR RENEW AND APPROVAL OF THE PROPOSED STRIPING BY THE CITY TRAFFIC PROPOSED EXISITING 23. APPROVAL OF THESE PLANS DOES NOT RELEASE THE CONTRACTOR OF THE Q Q MAX MAXIMUM A EXISITING OF THE BASE MATERIAL AND SURFACE STRUCTURES. IF UTILITIES ARE TO BE INSTALLED SUBSEQUENTLY, CATIONOF/OR DEPARTURE FROM THE CITY OF SPECIFICATION OR THESE A WRITTEN NOTIFICATION FROM THE AFFECTED UTILITY COMPANY INDICATING ITS COMMITMENT TO BORE SITE PLAN SCALE 1"=30' ABBREVIATIONS LEGEND DIRECTED BY: I? nFESSIQ � . ELc s �T ALL W K SHALL BE IN ACCORDANCE WITH THE STANDARD DETAILS AND SPECIFICATIONS OF CITY 1' 27' MANHOLE FRAMES AND COVERS SHALL BE BROUGHT TO FINISH GRADE BEFORE OF CU ERTINO. FINAL PAVING. SYMBOL DESCRIPTION SYMBOL DESCRIPTION PRIOR REQUIRING AN INSPECTION. TWO 2 WORKING DAYS PRIOR TO INSTALLING PERMANENT STRIPING, () R16E) DURING STREET CONSTRUCTION. THE CONTRACTOR SHALL CALL FOR RENEW AND APPROVAL OF THE PROPOSED STRIPING BY THE CITY TRAFFIC PROPOSED EXISITING 23. APPROVAL OF THESE PLANS DOES NOT RELEASE THE CONTRACTOR OF THE ® AT MAX MAXIMUM PROPOSED EXISITING OF THE BASE MATERIAL AND SURFACE STRUCTURES. IF UTILITIES ARE TO BE INSTALLED SUBSEQUENTLY, CATIONOF/OR DEPARTURE FROM THE CITY OF SPECIFICATION OR THESE A WRITTEN NOTIFICATION FROM THE AFFECTED UTILITY COMPANY INDICATING ITS COMMITMENT TO BORE ENGINEECUPERTINR IMPROVEMENT PLANS, THE CITY ENGINEER SHALL HAVE THEY AUTHORITY TO AB AGGREGATE BASE MIN MINIMUM AREA, WITH THE EXCEPTION OF STREET CROSSINGS, UNLESS OTHERWISE APPROVED AND AUTHORIZED BY THE CIN ENGINEER. 24. SEPTIC TANKS SHALL BE PUMPED AND BACKFILLED TO THE SATISFACTION OF AC ASPHALT CONCRETE NO., III NUMBER - - 25. FOR ALL FIVE (5) FOOT MONOLITHIC SIDEWALKS, ALL FIRE HYDRANTS AND PROPERTY UNE ELECTROLIER SHALL BE INSTALLED BEHIND SIDEWALK. 5. ALL TRENCH BACKFILL, FILL AREAS, AND BASE MATERIAL SHALL ATTAIN A MINIMUM 95% RELATIVE AD AREA DRAIN NTS NOT TO SCALE — — — — OR THE LATEST REVISED PLANS. EASEMENTS' fir,,-^��,f� x\ TREE TO BE REMOVED BC BEGINNING OF CURVE PAE PEDESTRIAN ACCESS EASEMENT B. ALL CONCRETE USED FOR ALL STRUCTURES MUST BE CLASS 'A' (6 SACKS PER CUBIC YARD) AS PER 28. CONSTRUCTION SIGNING SHALL BE INSTALLED PRIOR TO BEGINNING OF WORK. STANDARD SPECIFICATIONS AND SHALL ATTAIN A STRENGTH OF 3000 P.S.I. IN 28 DAYS. SIDEWALKS, CURBS AND GUTTERS SHALL BE CLASS -B- (5 SACKS PER CUBIC YARD) AS PER STANDARD SPECIFICATION BLDG BUILDING PCC PORTLAND CEMENT CONCRETE 9. DROP INLETS INSTALLED SHALL BE CITY OF CUPERTINO STANDARD UNLESS OTHERWISE NOTED ON THE TO POURING ANY CABINET OR SIGNAL FOUNDATIONS RELATING TO THIS JOB. NEW LOT ONES INSTALLED. CLASS 'A" P.C.C. SHALL BE USED. 30. ANY AND ALL STORM UNES INSTALLED AS PART OF THE WORK ON THESE SOS BOTTOM OF STEPS PCR POINT OF CURB RETURN @ MONUMENT TREE PROTECTION ZONE WITH BW BACK OF WALK PG&E PACIFIC GAS AND ELECTRIC TYPE II FENCING AT DRIP UNE CB CATCH BASIN PL, P/L PROPERTY UNE BENCHMARK AND BACK OF WALK CL CENTERUNE POC POINT ON CURVE X X SD EX XX SD STORM DRAIN LINE CONIC CONT CONCRETE ON PRC POINT OF REVERSE CURVE STORM GRAIN EASEMENT DDCV DOUBLE DETECTOR DOUBLE DE PSDE PRIVATE ® CATCH BASIN xx.xx oy. CHECK VALVE PT PUE POINT PUBUC UTILITY EASEMENT ® FIELD INLET + SPOT ELEVATION DI DS DROP INLET DOWN SPOUT PVC POLYVINYL CHLORIDE QSDMH O STORM DRAIN MANHOLE XX,XX XX.XX \ �� CONTOUR UNE ELEVATIONS DWY EB DRIVEWAY ELECTRICAL BOX PVI R RCP POINT OF VERTICAL INTERSECTION RADIUS REINFORCED CONCRETE PIPE AREA DRAIN W/ PVC LINE EC END OF CURVE RIM RIM ELEVATION EL, ELEV. ELEVATION R/W RIGHT OF WAY + BUBBLER ® SPLASH BLOCK AT ROOF DOWNSPOUT EP EVAE EDGE OF PAVEMENT EMERGENCY VEHICLE S SE SLOPE SLOPE EASEMENT XX SS _ _ - — EX XX SS — - — SANITARY SEWER LINE OVERLAND RELEASE EX, (E) ACCESS EASEMENT EXISTING SD SDE STORM DRAIN STORM DRAIN EASEMENT OF CURB SDMH STORM DRAIN MANHOLE ®FACE SSMH' SANITARY SEWER MANHOLE C C RET WALL FF FINISHED FLOOR ELEVATION SS SANITARY SEWER -------� SANITARY SEWER LATERAL FG FINISHED GRADE SSCO SSDI SANITARY SEWER LATERAL CLEANOUT SANTARY SEWER DRAIN INLET SANITARY SEWER CLEANOUT C{ STREET SIGN FH FL FIRE HYDRANT FLOW LINE SSEB SANITARY SEWER GRADEEASEMBREAK OSSCO FP FINISHED PAVEMENT SANITARY SEWER N DG WATER VALVE i FPW FIRE PROTECTION WATER SSMH SANITARY SEWER MANHOLE ;t;� �( S�p SITE OR STREET UGHT FS FINISHED SURFACE ELEV. ST. STA STREET STATION ❑ 60 METER FT G FEET GAS S/W SIDEWALK WATER FIRE HYDRANT GB GRADE BREAK TELEPHONE UTILITY POLE E EARTHEN SWALE GFF GARAGE FINISHED FLOOR ELEV. TC TOP OF CURB WATER MAIN LINE GRND HOPE GROUND HIGH DENSITY POLYETHYLENE TEMP TEMPORARY n — G GAS x - — x — - WOOD FENCE HGL HYDRAULIC GRADE LINE TG TOP OF GRATE HIGH POINT TP TOP OF PAVEMENT — --�— — ELECTRICAL — CMU FENCE INV IN INVERT TOS TOP OF STEPS 7 JTJOINT TRENCH G� BUILDING ENTERANCE IRR JT IRRIGATION JOINT TRENCH TCP VC TYPICAL VERTICAL CURVE LF UNEAR FEET A WL WATERLINE LP LOW POINT WILE WATER LINE EASEMENT LT LEFT WM WS WATER METER WATER SERVICE WV WATER VALVE / f 0 �J :14r,at1®n Number (o14aTIager YY C}�� SfERiN SQR�04K �1 & W d i OSp hq AD VICINITY MAP N.T.S. GENERAL NOTES DIRECTED BY: I? nFESSIQ � . ELc s �T ALL W K SHALL BE IN ACCORDANCE WITH THE STANDARD DETAILS AND SPECIFICATIONS OF CITY 1' 27' MANHOLE FRAMES AND COVERS SHALL BE BROUGHT TO FINISH GRADE BEFORE OF CU ERTINO. FINAL PAVING. SCALE: AS NOTED 0 22. THE DEVELOPER SHALL PAY ALL COSTS OF MOISTURE -DENSITY CURVES (CALIF. 2- THE CONTRACTOR IS REQUIRED TO NOTIFY THE PUBLIC WORKS INSPECTOR TWO (2) WORKING DAYS TEST N0. AND ANY OTHER TESTS REQUIRED BY THE CIN ENGINEER PRIOR REQUIRING AN INSPECTION. TWO 2 WORKING DAYS PRIOR TO INSTALLING PERMANENT STRIPING, () R16E) DURING STREET CONSTRUCTION. THE CONTRACTOR SHALL CALL FOR RENEW AND APPROVAL OF THE PROPOSED STRIPING BY THE CITY TRAFFIC ENGINEER. THE CITY SHALL HAVE THE RIGHT TO MAKE CHANGES IN THE LOCATION OF THE ALIGNMENT 23. APPROVAL OF THESE PLANS DOES NOT RELEASE THE CONTRACTOR OF THE OF LANE STRIPES AND PAVEMENT MARKINGS. RESPONSIBILITY FOR THE CORRECTIONS OF MISTAKES, ERRORS, OR OMISSIONS CIVIL • STRUCTURAL -PLANING -DEVELOPMENT CONTAINED THEREIN. IF, DURING THE COURSE CONSTRUCTION OF 3. ALL UN ERGROUND UTIUTIES SHALL BE INSTALLED AND ADEQUATELY BACKFILLED BEFORE PLACEMENT IMPROVEMENTS, PUBLIC INTEREST REQUIRES A MODIFICATION A OF THE BASE MATERIAL AND SURFACE STRUCTURES. IF UTILITIES ARE TO BE INSTALLED SUBSEQUENTLY, CATIONOF/OR DEPARTURE FROM THE CITY OF SPECIFICATION OR THESE A WRITTEN NOTIFICATION FROM THE AFFECTED UTILITY COMPANY INDICATING ITS COMMITMENT TO BORE ENGINEECUPERTINR IMPROVEMENT PLANS, THE CITY ENGINEER SHALL HAVE THEY AUTHORITY TO OR TU NEL SHALL BE SUBMITTED TO THE CITY ENGINEER BEFORE PROCEEDING WITH THE WORK. REQUIRE SUCH MODIFICATION OR DEPARTURE AND TO SPECIFY THE MANNER IN ROLE NO UTILITIES, EXCEPT STORM AND SANITARY SEWER, WILL NOT BE PERMITTED IN PAVEMENT WHICH THE SAME IS TO BE COMPLETED. AREA, WITH THE EXCEPTION OF STREET CROSSINGS, UNLESS OTHERWISE APPROVED AND AUTHORIZED BY THE CIN ENGINEER. 24. SEPTIC TANKS SHALL BE PUMPED AND BACKFILLED TO THE SATISFACTION OF 4. THE CONTRACTOR SHALL HAVE ALL OF THE UTILITIES, UNDERGROUND MAINS, AND SERVICES THAT MAY THE SANTA CLARA COUNTY HEALTH DEPARTMENT PRIOR TO CONSTRUCTION. CONFLICT WITH THE PR^'rGT ' ^^"E^ "' ^" FIELD. THE CONTRACTOR SHALL CONTACT UNDERGROUND SERVICE ALERT (USA) TWO (2) WORKING DAYS IN ADVANCE OF ANY WORK, FOR LOCATION OF THE 25. FOR ALL FIVE (5) FOOT MONOLITHIC SIDEWALKS, ALL FIRE HYDRANTS AND UNDERGROUND FACILITIES, AT (800) 227-2600. ELECTROLIER SHALL BE INSTALLED BEHIND SIDEWALK. 5. ALL TRENCH BACKFILL, FILL AREAS, AND BASE MATERIAL SHALL ATTAIN A MINIMUM 95% RELATIVE COMPACTION AS PER STANDARD SPECIFICATIONS. FOR TYPICAL TRENCH SECTIONS, REFER TO THE 26. IT SHALL BE THE RESPONSIBILTY OF THE CONTRACTOR, AND ALL CIN STANDARD DETAILS, WITH THE EXCEPTION OF SANITARY SEWERS. SUB_ CONTRACTORS TO INSURE THEY ARE FURNISHED WITH APPROVED PLANS OR THE LATEST REVISED PLANS. 6. ALL TREES, ROOTS AND FOREIGN MATTER IN EXISTING OR PROPOSED RIGHT OF WAY SHALL BE REMOVED TO A DEPTH OF TWO (2) FEET BELOW SUBGRADE AND DISPOSED OF. 27. ALL WATER ONES, VALVES, HYDRANTS, AND APPURTENANCES THERETO 7. ALL EXISTING PAVEMENT REMOVED OR DAMAGED SHALL BE REPLACED AS REQUIRED BY THE CITY INSTALLED WITHIN THE CIN OF CUPERTINO MUNICIPAL WATER UTILITYS ENGINEER. SERVICES AREA, SHALL BE THE PROPERTY OF SAID WATER UTUTY. B. ALL CONCRETE USED FOR ALL STRUCTURES MUST BE CLASS 'A' (6 SACKS PER CUBIC YARD) AS PER 28. CONSTRUCTION SIGNING SHALL BE INSTALLED PRIOR TO BEGINNING OF WORK. STANDARD SPECIFICATIONS AND SHALL ATTAIN A STRENGTH OF 3000 P.S.I. IN 28 DAYS. SIDEWALKS, CURBS AND GUTTERS SHALL BE CLASS -B- (5 SACKS PER CUBIC YARD) AS PER STANDARD SPECIFICATION AND SHALL ATTAIN A STRENGTH OF 3,000 P.S.I. IN 28 DAYS. 29. NOTIFY CITY OF CUPERTINO TRAFFIC SIGNAL MAINTENANCE FOR INSPECTION OF FOUNDATION EXCAVATIONS, (408) 777-1366, TWO (2) WORKING DAYS PRIOR 9. DROP INLETS INSTALLED SHALL BE CITY OF CUPERTINO STANDARD UNLESS OTHERWISE NOTED ON THE TO POURING ANY CABINET OR SIGNAL FOUNDATIONS RELATING TO THIS JOB. PLANS. THE BOXES SHALL BE INSTALLED AT THE SAME TME THE P.C.C. CURB AND GUTTER IS INSTALLED. CLASS 'A" P.C.C. SHALL BE USED. 30. ANY AND ALL STORM UNES INSTALLED AS PART OF THE WORK ON THESE STENCILED WITH "NO DUMPING FLOWS TO BAY". STENCILS TO BE PROVIDED BY THE CITY. PLANS SHALL BE CLEANED OF ALL EXCESS MATERIAL, DEBRIS AND OBSTRUCTIONS. STORM LINES SHALL BE FLUSHED AS DIRECTED BY THE CITY ENGINEER. 10, A MINIMUM THICKNESS OF SIX (6) INCHES OF P.C.C. SHALL BE REQUIRED FOR COMMERCIAL DRIVEWAY APPROACHES AND FIVE (5)INCHES FOR RESIDENTIAL LOCATIONS SHALL BE DETERMINED PRIOR TO THE INSTALLATION OF THE CURBS. THE DRIVEWAY SHALL BE INSTALLED AT THE SAME TIME AS THE CURB. 11. ALL STREET CURBS SHALL BE VERTICAL P.C.C. CURBS. 12. CONTRACTOR'S ENGINEER TO CERTIFY THAT LOCATION OF NEW SIDEWALK, CURB AND GUTTER IS IN ACCORDANCE WITH THE APPROVED PLANS. 13. INSTALL CIN OF CUPERTINO STANDARD MONUMENT BOX(ES) AND MONUMENT(S) AS SHOWN ON THE PLANS. 14. ALL GRADE STAKES AND LATHS REQUIRED BY THE CIN ENGINEER SHALL BE INSTALLED BY THE CONTRACTOR'S ENGINEER AS DIRECTED. MINIMUM OFF -SETS FOR CUT STAKES SHALL BE FIVE (5) FEET. 15. PRIOR TO COMMENCING WORK, THE CONTRACTOR SHALL HAVE CUT SHEETS APPROVED BY THE CITY ENGINEER. NOTIFY THE CITY ENGINEER TWO (2) WORKING DAYS PRIOR TO REQUIRING INSPECTION. 16. THE CONTRACTOR SHALL SUBMIT A WRITTEN REQUEST FOR FINAL INSPECTON. 17. ONE POUND OF DISPERSING BLACK SHALL BE MIXED WITH EACH CUBIC YARD OF CONCRETE AT THE BATCH PLANT. 18. GRADING OF LOTS OUTSIDE OF R/W AS PER TYPICAL SECTION AND FOR CROSS-SECTION, SHALL BE COMPLETED AND APPROVED BY THE CIN ENGINEER BEFORE PROCEEDING WITH PREPARATION OF THE SUBGRADE AND PLACEMENT OF SURFACE STRUCTURES ON LOTS. ALL LOTS SHALL BE GRADED TO THE STREET ELEVATION, OR AS SHOWN ON THE PLANS, OR AS DETERMINED BY THE CITY ENGINEER. 19. NOTIFY THE CIN ENGINEER TWO 2 WORKING DAYS IN ADVANCE OF REQUIRING SERVICES FOR CHECKING FIELD STAKING. AT THIS TIME, THREE 3 COPIES OF THE CUT SHEETS WILL BE FURNISHED. 20. ALL STANDARD STREET MONUMENTS, LOT CORNER PIPES, AND OTHER PERMANENT MONUMENTS DISTURBED DURING CONSTRUCTION SHALL BE REPLACED BEFORE ACCEPTANCE OF THE IMPROVEMENTS BY THE CITY OF CUPERTINO. STREET CLEANING: THE PRIME CONTRACTOR OR DEVELOPER IS TO HIRE A STREET CLEANING CONTRACTOR TO CLEAN UP DIRT AND DEBRIS FROM CITY STREETS THAT ARE ATTRIBUTABLE TO THE DEVELOPMENTS' CONSTRUCTION ACTIVITIES. THE STREET CLEANING CONTRACTOR IS TO HAVE THE CAPABILITY OF WASHING THE STREETS FROM A TANKER TRUCK WITH A HIGH-PRESSURE NOZZLE WITH RECLAIMED WATER, WHERE FEASIBLE, AND/OR SWEEPING THE STREETS WITH BOTH A BROOM -TYPE SWEEPER AND A REGENERATIVE AIR VACUUM SWEEPER, AS DIRECTED BY THE PUBLIC WORKS DIRECTOR, OR HIS/HER DESIGNATED REPRESENTATIVE. RESlDFNTlAL OCCUPANCY R A : FOR RESIDENTIAL DEVELOPMENTS, NO RESIDENTIAL UNITS WELL BE RELEASED FOR OCCUPANCY UNLESS THE IMPROVEMENTS TO BE CONSTRUCTED TO CIN STANDARDS AND/OR TO BE ACCEPTED FOR MAINTENANCE BY THE CITY, INCLUDING WATER METERS AND SANITARY SEWER CLEANOUTS, ARE SUBSTANTIALLY COMPLETE PER THE CITY OF CUPERTINO STANDARD PROVISIONS FOR PUBLIC WORKS CONSTRUCTION. FOR PHASED DEVELOPMENTS, PORTIONS OF THE UNITS MAY BE RELEASED FOR OCCUPANCY, AT THE CITY'S SOLE DISCRETION. PROVIDED THAT ALL PUBUC AND PRIVATE IMPROVEMENTS, CONDITIONS OF APPROVAL, AND BUILDING CODE REQUIREMENTS THAT ARE NECESSARY TO SUPPORT THE UNITS TO BE RELEASED FOR OCCUPANCY HAVE BEEN COMPLETED AS DETERMINED BY THE CITY. WHEN ALL OF THE IMPROVEMENTS ARE COMPLETE AND/OR READY FOR ACCEPTANCE FOR MAINTENANCE BY THE CIN COUNCIL, THE REMAINING UNITS MAY BE RELEASED FOR OCCUPANCY, PROVIDED THAT ALL OTHER CONDITIONS OF APPROVAL AND BUILDING CODES REQUIREMENTS HAVE BEEN MET. THE PUBLIC WORKS DIRECTOR SHALL MAKE THE DETERMINATION OF WHAT PUBUC IMPROVEMENTS ARE SUBSTANTIALLY COMPLETE. DATE: 11-2-2017 NO. REVISION DATE DIRECTED BY: I? nFESSIQ � . ELc s �T GPM ENGINEERS 3340 ONT,( 94536 SUITE 292 FREMONT,(A-1264 TEL(650)331-7164 FAY (6$0)471.9004 PROJECT: NEW RESIDENCE APN 366-09-044 STAUFFER LN., SHEET TITLE: COVER SHEET SHEET NUMBER C SCALE: AS NOTED 0 DESIGNED BY: MG 0 DRAWN BY: EH 0 * s MGENIDY@GFMENGINEERS.COM CUPERTINO CA A 9 - L�OQa CIVIL • STRUCTURAL -PLANING -DEVELOPMENT OF 3 � / 1 \ / 1 INV 370.50 10'X12'X3' DEEP GRAVEL BASIN- ------------ > ASIN R a { ` _ j EARiH SWALE o o Z \ I I AREA DRAW AREA GRAI \ \\ so I\ n \ \ \ SD SU SD SD \ \ \ \\ATEA DRAT \ `SD SD SDSD SU \ll \\\ \ \ `y \ o / °a \ _ y382.00 o \ \ 1 SUM' PUM v �, vvv vv FF 383.0 �� a \ \ 11 BASEMENT 374.00 PAD 373.0 EJECkR PUMP W/ TANK COMBO W/ OVERFLW WARNING \\ 1 12 LaiE, / \ BW 38500 \ !.; \ ,FDA 3$. �i. -s k; \\. BACK FLOESSUWEPREYEMER _F I ���! / •� 5- - _ - _ TW 385. BW 383.00 1 TC 377 pp BW 385.00 F� ,..� ^. C� /� \ 3 33 / . \...: \ \ /J� 378. \ \\\ \ \\.... \\ \\ 79.30/ / \ 378.14 \ I { 367.88 �iI \ CO `� 1.88 37.0 0 r{ \ of \ B1.7z SEWER To UPPER R�o(t % 00, 82.00 36z.00 \\0 1x\\ i� so ---SD \/ / SO o \ l \ \ 380.66 \ \ 379.76 i I TRENCH DRAIN AREA D TC 50 I Ga2l� - } - `W' \ I \\ - ! N 385.00 O CONFORM O . TW 38700 383.20 \ TW 386.M r ._ 5�' 38300 M I o I 3 1.00\ BW 382.40 \8CI o ow 3fpp 1W 388. \ ' \ \ - / O• / NEprW - -�11_10 -o- --kfEi€R - --EX IX 386.00 1 LATERAL INV! 375,49+ 1 � I -=o--- -p 11 I I w m 8;�°0 /� 9 1 1 I V3 m m - - - _ - - - - \ STORM UTILITY NOTES NDS #66 - 4• DRAIN PIPE RISER (LENGTH AS REQUIRED) NDS #101 SPEE-D BASIN W/ LOCKING BASEMENT OUTLET DRAIN PIPE d AREA DRAIN NOT TO SCALE 2X14 W 2X4 P.T. :a• e' STONE r ---,GRADE HEADER r+ N.TS EX GRADE SWALE \ ALLEN BLOCK REI' WALL W/ FABRIC SOIL REINFORCEMENT - I? 5% RPE 1O SUMP a LANDSCAPE RETAINING WALL NOT TO SCALE 4'0 PIPE 4"0 SCHEDULE PVC ABM 4"OFMVIEL b DOWNSPOUT CONNECTION 0 0 0 0 fly NOT TO SCALE M PRONDE 11RFADFD END CAP AT EALU EW SNR11 PIPE PETR PLAN 0 0 DIRECTED BY: VSOFES50N� Z YFRIAGENIDY@13PMENGINIERS101A 0 0 S KE 3.1 4' GRAVE7. LAYER X 36' 0 12• MIN. THICK (OPER GRAOED) DESIGNED BY: MG M UPPED IN GEXAM 10' TEEMONT,CA-7264 TEL4FAX SO)471.90D4Q APN 366-09-044 STAUFFER LN.,GRADING EARTHEN SWALE SHALLOW GRAVEL BASINNOT TO SCALE Cbi 1X EXPs NOT TO SCALE 1. ALL STORM PIPE LOCATED OUTSIDE OF VEHICULAR TRAVELED LANES SHALL BE PVC SUR 35 UNLESS OTHERWISE SPECIFIED ON PLANS 2. ALL STORM PIPE LOCATE) IN VEHICULAR TRAVELED LANES SHALL BE PVC SD26 UNLESS OTHERWISE SPECIFIED ON PIANS 3• ALL PERFORATED PIPES SHALL BE PVC SDR 35 WITH J' PERFORATIONS FACING DOWN. 4. ALL PVC CONNECTIONS TO CONCRETE STRUCTURES SHALL BE BY WATER STOP v:�--AI 7- ��? -46P -SDI Application Number �W izN DATE: 11-2-2017 NO. REVISION DATE DIRECTED BY: VSOFES50N� Z YFRIAGENIDY@13PMENGINIERS101A GPM ENGINEERS 3340 WALNUT AVE., SUITE 191 PROJECT: NEW RESIDENCE SHEET TITLE: SHEET NUMBER SCALE: AS NOTED DESIGNED BY: MG aDRAWN TEEMONT,CA-7264 TEL4FAX SO)471.90D4Q APN 366-09-044 STAUFFER LN.,GRADING AND DRAINAGE PLANC2 BY: EH Cbi 1X EXPs CUPERTINOCA ,^ '•"FO CIVIL • STRUCTURAL •PLANING •DEVELOPMENT , OF 3 SITE SECTION AT GARAGE SCALE: H 1' = 10'-0' V 1' = 5'-0' File: C:\Dropbox\gpm\_jobs\2017 jobs\Fand\17-328 Satya 51ho lLg for invalid reference 0 -7 - 4d5 Au' M "ML &q 7 = © � A.pppplir f8on �t;�/.kjAs bw Date ,�gnat re Case k4ai7ageY DATE: 11-2-2017 NO. - REVISION DATE DIRECTED BY: oQpoFE5570 '�F GPM ENGINEERS PROJECT: SHEET TITLE: SHEET NUMBER SCALE: AS NOTED . yc' yc m m 3340 WALNUTAYE., SUITE 292 "EMONT,CA94536 NEW RESIDENCE SITE SECTIONS C 3 DESIGNED BY: MG TEL(650)331-7364 FAX (650) 472.9004 APN 366-09-044 STAUFFER LN., DRAWN BY: EH Q Cbl ,A MGENIOY@GPAIENGINEEAS.COM CUPERTINO, CA 0 aEXP. �0 CAUFO CIVIL . STRUCTURAL -PLANING -DEVELOPMENT OF 3 IOewrwlafti`J 1-1 � t 6a�8flMw�wa} EROSION CONTROL NOTES: 1. ALL GRADING, EROSION CONTROL AND RELATED WORK UNDERTAKEN ON THIS SITE IS SUBJECT TO ALL TERMS AND CONDITIONS OF CITY REGULATIONS AND MADE A PART HEREOF BY REFERENCE. EROSION CONTROL MEASURES SHALL BE IN ACCORDANCE WITH THE ASSOCIATION OF BAY AREA GOVERNMENT'S (ABAG) MANUAL OF STANDARDS FOR EROSION AND SEDIMENT CONTROL MEASURES AND IN ACCORDANCE WITH STANDARD DETAILS SHOWN. 2. THE CONTRACTOR WILL BE LIABLE FOR ANY AND ALL DAMAGE TO ANY PUBLIC OWNED AND MAINTAINED ROAD CAUSED BY THE AFORESAID CONTRACTOR'S GRADING ACTIVITIES, AND SHALL BE RESPONSIBLE FOR THE CLEANUP OF ANY MATERIALS SPILLED ON ANY PUBLIC ROAD ON THE HAUL ROUTE. 3. THE EROSION CONTROL MEASURES ARE TO BE OPERABLE DURING THE RAINY SEASON., OCTOBER 1ST TO APRIL 15TH. 4. ALL. EROSION CONTROL MEASURES SHALL BE MAINTAINED UNTIL DISTURBED AREAS ARE STABIUZED AND CHANGES TO THIS EROSION AND SEDIMENT CONTROL PLAN SHALL BE MADE TO MEET FIELD CONDITIONS ONLY WITH THE APPROVAL ON OR AT THE DIRECTION OF THE SOILS ENGINEER. 5. DURING THE RAINY SEASON. ALL PAVED AREAS SHALL BE KEPT CLEAR OF EARTH MATERIAL AND DEBRIS. THE SITE SHALL BE MAINTAINED SO AS TO MINIMIZE SEDIMENT RUNOFF TO ANY STORM DRAINAGE SYSTEM. 6. ALL EROSION CONTROL FACILITIES MUST BE INSPECTED AND REPAIRED AT THE END OF EACH WORKING DAY DURING THE RAINY SEASON. 7. WHEN NO LONGER NECESSARY AND PRIOR TO FINAL ACCEPTANCE OF DEVELOPMENT. SEDIMENT BASINS SHALL BE REMOVED OR OTHERWISE DEACTIVATED AS REQUIRED BY THE COUNTY. B. A CONSTRUCTION ENTRANCE SHALL BE PROVIDED AT ANY POINT OF EGRESS FROM THE SITE TO ROADWAY. A CONSTRUCTION ENTRANCE SHOULD BE COMPOSED OF COARSE DRAIN ROCK (2" TO 3- MIN. DIAMETER) AT LEAST EIGHT INCH THICK BY FIFTY FEET LONG BY TWENTY FEET WIDE AND SHALL BE MAINTAINED UNTIL SITE IS PAVED. 9. HYDROSEED ALL CUT AND FILL SLOPES IMMEDIATELY AFTER GRADING. ALL AREAS SPECIFIED FOR HYDROSEEDING SHALL BE NOZZLE PUNTED WITH STABILIZATION MATERIAL CONSISTING OF FIBER, SEED, FERTIUZER, TACKIFlER AND WATER, MIXED AND APPLIED IN THE FOLLOWING PROPORTIONS: FIBER, 2000 LBS/ACRE SEED, 200 LBS/ACRE FERTILIZER (11-8-4), 500 LBS/ACRE TACKIFlER• 6 LBS/ACRE WATER. AS REQUIRED BY APPLICATION 10. SEED MIX SHALL BE CLYDE ROBINS OR #180/CR #190/C4R #120 11. WATER UTILIZED IN THE STABILIZATION MATERIAL SHALL BE OF SUCH QUALITY THAT IT WILL PROMOTE GERMINATION AND STIMULATE GROWTH OF PLANTS. IT SHALL BE FREE OF POLLUTANT MATERIALS AND WEED SEED. 12. HYDROSEEDING SHALL CONFORM TO THE PROVISIONS OF SECTION 20, -EROSION CONTROL AND HIGHWAY PLANTING-, OF THE STANDARD SPECIFICATIONS OF THE STATE OF CALIFORNIA DEPARTMENT OF TRANSPORTATION. AS LAST REVISED. 13. A DISPERSING AGENT MAY BE ADDED TO THE HYDROSEEDING MATERIAL, PROVIDED THAT THE CONTRACTOR FURNISHES SUITABLE EVIDENCE THAT THE ADDITIVE WILL NOT ADVERSELY AFFECT THE PERFORMANCE OF THE SEEDING MIXTURE. 14. STABILIZING MATERIALS SHALL BE APPLIED AS SOON AS PRACTICABLE AFTER COMPLETION OF GRADING OPERATIONS AND PRIOR TO THE ONSET OF WINTER RAINS, OR AT SUCH OTHER TIME AS DIRECTED BY THE COUNTY ENGINEER. THE MATERIAL SHALL BE APPLIED BEFORE INSTALLATION OF OTHER LANDSCAPING MATERIALS SUCH AS TREES. SHRUBS AND GROUND COVERS. 15. THE STABILIZATION MATERIAL SHALL BE APPLIED WITHIN 4 -HOURS AFTER MIXING. MIXED MATERIAL NOT USED WITHIN 4 -HOURS SHALL BE REMOVED FROM THE SITE. 16. THE CONTRACTOR SHALL MAINTAIN THE SOIL STABILIZATION MATERIAL AFTER PLACEMENT. THE SOILS ENGINEER MAY REQUIRE SPRAY APPLICATION OF WATER OR OTHER MAINTENANCE ACTIVITIES TO ASSURE THE EFFECTIVENESS OF THE STABILIZATION PROCESS. APPLICATION OF WATER SHALL BE ACCOMPLISHED USING NOZZLES THAT PRODUCE A SPRAY THAT DOES NOT CONCENTRATE OR WASH AWAY THE STABILIZATION MATERIALS. 17. ALL GRADED AREAS SHOULD BE PLANTED WITH LOW-WATER, DEEP ROOTED, FAST GROWING VEGETATION. 18. THERE IS TO BE NO RAIN PREDICTED DURING THE SEVEN DAYS PRECEEDING THE START DATE FOR GRADING OPERATION 19. THERE IS TO BE NO RAIN PREDICTED DURING THE SEVEN DAYS FOLLOWING THE START DATE FOR GRADING OPERATION 20. ALL CUT AND FILL SLOPES SHALL BE PROTECTED. 21. ALL OPERATIONS IN PHASE I SHALL BE COMPLETED BEFORE ANY GRADING. 22. ALL CUT AND FILL SLOPES STEEPER THAN 3:1 SHALL BE PROTECTED BY STRAW MULCH AFTER HYDROSEEDING (CONFIRMING TO CAL TRANS STANDARD SPECIFICATION SECTION 20-2.06) BEFORE ANY RAIN STORM. 23. ALL SWALES SHALL BE PROTECTED BY STRAW WATTLES NOT TO EXCEED 20' APART. Application Number `8'x.3 I!'--`.asa m2.i'T'uaoer -- - - ------ --------------- a � \ n EROSION CONTROL PLAN SCALE: 1' = 20' 0 10 O 40 BO SCALE: 1" = 20' FIBERBE DO - 'OV WOOD STAKE PROJECT: NEW RESIDENCE qPN 366-09-044 STAUFFER LN., 4' SPA FINISHEDMAX ENTRENCHMENT DETAIL ENTRENCHMENT DETAIL IN SLOPE AREA RUNOFF WATER'RAD(' WITH SEDIMENT ERE 7• i'il ]' amOp. '� 2. ADJACENT ROLLS SHALL TIGHTLY ABUT. Q 3. RUNOFF MUST NOT BE ALLOWED TO RUN UNDER OR AROUND FIBER ROLL 1. Os FINISHE GRADE 1Y MM. �����,c37. 1Y MIN. WOOD STAKE PROJECT: NEW RESIDENCE qPN 366-09-044 STAUFFER LN., 3/4':3/4' : MAX 4' SPACING SHEET NUMBER /w - ■ lV ENTRENCHMENT DETAIL ENTRENCHMENT DETAIL IN SLOPE AREA IN FLAT AREA NOTES: 1. FIBER ROLL INSTALLATION REQUIRES THE PLACEMENT AND SECURE STAKING OF THE ROLL IN A TRENCH, 3- TO 4- DEEP, DUG ON CONTOUR 2. ADJACENT ROLLS SHALL TIGHTLY ABUT. Q 3. RUNOFF MUST NOT BE ALLOWED TO RUN UNDER OR AROUND FIBER ROLL FIBER ROLL DETAIL N.T.S. SLOPE TOWARDS SITE PROJECT SITE 50' MIN. TO EP EXISTING S/W 3" TO 4' URB CUT FRACTURED SME AGXGAIF (E) ROAD �i i s v \ i OPOSE'DDG .i 12' MIN. GEOTEXTIILE FABRIC 1. ENTRANCE SHALL BE MAINTAINED IN A CONDITION THAT WILL PREVENT TRACKING OR FLOWING OF SEDIMENT ONTO PUBLIC RIGHTS-OF-WAY. THIS MAY REQUIRE PERIODIC TOP DRESSING WITH ADDITIONAL STONE AS CONDITIONS DEMAND, AND REPAIR AND/OR CLEANOUT OF ANY MEASURES USED TO TRAP SEDIMENT. ALL SEDIMENT SPILLED, DROPPED, WASHED OR TRACKED ONTO PUBLIC RIGHTS-OF-WAY SHALL BE REMOVED IMMEDIATELY. 2. WHEELS SHALL BE CLEANED TO REMOVE SEDIMENT PRIOR TO ENTRANCE ONTO PUBLIC RIGHT-OF-WAYS. IT SHALL BE DONE ON A WASH RACK THAT DRAINS INTO AN APPROVED SEDIMENT TRAP OR SEDIMENT BASIN AS DETAILED ON THESE PLANS. ALL SEDIMENT SHALL BE PREVENTED FROM ENTERING ANY STORM DRAIN, DITCH, OR WATERCOURSE THROUGH THE USE OF INLET PROTECTION (E.G. SAND BAGS OR OTHER APPROVED METHODS.) 3. THE MATERIAL FOR CONSTRUCTION OF THE PAD SHALL BE 3' TO 4' STONE. 4. THE THICKNESS OF THE PAD SHALL NOT BE LESS THAN B'. 5. THE LENGTH OF THE PAD SHALL BE AS REQUIRED, BUT NOT LESS THAN 56. STABILIZED CONSTRUCTION ENTRANCE __(�) N.T.S. 1-11 BAGS WRAP INLET GRATE WITH FABRIC FILTER OR APPROVED EQUAL NEW DRAINAGE INLET PROTECTION N.T.S. ® CONSTRUCTION ENTRANCE FIBER ROLL Q INLET SEDIMENT FILTER NOTES: 0. KEEP CONSTRUCTION TRAFFIC OUT OF STORMWATER TREATMENT AREA LOCATIONS, AND MINIMIZE COMPACTION OF EXISTING SOILS. 6. PROTECT STORMWATER TREATMENT AREAS FROM CONSTRUCTION SITE RUNOFF. RUNOFF FROM UNSTABILRED AREAS MUST BE DIVERTED AWAY FROM STORMWATER TREATMENT AREAS. e. MORE CONSTRUCTION BMPS MAY BE REQUIRED AT THE DISCRETION OF THE CITY ENGINEER OR STORMWATER INSPECTOR. DATE: 11-2-2017 NO. REVISION DATE DIRECTED BY: YAOFEssIp �s �C' �%c a K1 GPM ENGINEERS 3340 WALNUT 94536 SUITE 192 FREMOH0) CA 94536 TEL (650) 331-7264 FAX (650)472.9004 PROJECT: NEW RESIDENCE qPN 366-09-044 STAUFFER LN., SHEET TITLE: EROSION C 0 N T R 0 L PLAN SHEET NUMBER /w - ■ lV SCALE: AS NOTED DESIGNED BY: MG Q DRAWN BY: EH Q FF:B MGENIDY@GPMENGINEERS.COM CUPERTINO, CA Q 1. Os CIVIL • STRUCTURAL -PLANING -DEVELOPMENT OF 4 CUPERTINO Subject OFFICE OF COMMUNITY DEVELOPMENT CITY HALL 10300 TORRE AVENUE • CUPERTINO, CA 95014-3255 (408) 777-3308 • FAX (408) 777-3333 • planning@cupertino.org ADMINISTRATIVE HEARING STAFF REPORT Agenda Date: November 20, 2018 Tentative Map application to consider allowing the subdivision of an approximately 0.45 acre lot into two (2) parcels of approximately 8,512 square feet (Lot 1) and 11,068 square feet (Lot 2); (Application No.: TM -2017-01 (TM -2017-01); Applicant(s): Richard Wu; Location: 10400 S. Stelling Road; APN(s): 359-13-037) Recommended Action That the Hearing Officer adopt the draft resolution to: 1. Find the project exempt from CEQA; and 2. Approve the Tentative Map application (Attachment 1); Discussion Project Data: General Plan Planning Area Joll man General Plan Designation Low Density (1-5 DU/Ac.) Zoning Designation R1-7.5 Existing Proposed Density: 2.22 DU/acre 4.44 DU/acre Lot Area 19,580 square feet (0.45 acres) Net Lot Area 19,580 square feet (0.45 acres) Site Development Required/Allowed ProposedLot1 Proposed Lot - Lot Area - 8,512 sf 11,068 sf Net Lot Area 7,500 (min.) 8,512 sf 8,565 sf General Plan Consistency: Yes Zoning Consistency Yes TM -2017-01 10400 S. Stelling Road November 20, 2018 Paze 2 of 5 Background: Site Description The applicant, Richard Wu, is seeking to subdivide one single-family residential lot into two single-family residential lots (see tentative map — attachment 2). The 19,580 square foot property is located on the eastern side of S. Stelling Road. The neighboring uses are mostly single family residences, with single family residences to the north, east, and south of the property. De Anza College is located across South Stelling Road immediately to the west. The project site currently contains a single family home (approximately 2,062 square feet), and a detached carport (approximately 440 square feet). Vegetation present on the site consists of numerous trees and shrubs of varying conditions, including, but not limited to, coast live oak and Monterey pine. Analysis: Conformance with General Plan and Zoning The proposed project is consistent with the General Plan land use (low density residential) and density (1-5 dwelling units/acre) which allows a maximum of two (2) dwelling units on the site based on its acreage. The zoning for the property is R1-7.5 which requires a minimum net lot area of 7,500 square feet upon subdivision. In this case, the two lots will have a minimum net lot area of 8,512 square feet and 8,565 square feet. Subdivision Design, & Street Improvements The project proposal will create two lots: Lot 1 with frontage on S. Stelling Road, and a flag lot (Lot 2) with access off S. Stelling Road. The proposed lot widths of approximately 68 feet and 88 feet, respectively, are more than the lot development standards of the Single Family (R1) ordinance minimum of 60 feet. Lot 1 is proposed to be rectangular in shape and will be 8,512 square feet. Lot 2 is proposed to be a flag lot with a 20 feet wide access lane from S. Stelling Road, and will have a net developable area of 8,565 square feet. TM -2017-01 10400 S. Stelling Road November 20, 2018 Paae 3 of 5 Generally, flag lots are discouraged unless they serve to better integrate the subdivision with the surrounding neighborhood (General Plan Policy LU -27.7.2). In this case, the proposed lot resides next to six existing flag lots to the north and seven flag lots behind the property along Tula Lane. The proposed configuration is therefore consistent with the neighborhood pattern along this segment of S. Stelling Road. The property has two existing driveway cuts along S. Stelling Road: one on the northern end (to be used for Lot 1) and one along the southern end of the front lot line (to be used for Lot 2). The project is required to bring its two existing driveway cuts along S. Stelling Road into compliance, per the City's Standard Details. No street dedication is needed as the site has existing sidewalk, curb and gutter. Therefore, no reduction in existing lot size is anticipated. Trees While there are several trees on the property, there are no Protected Trees. None of the existing trees are proposed to be removed with the subdivision nor do any need to be removed for the required street improvements. Should any trees need to be removed in conjunction with development on the site, appropriate replacements will be required in compliance with the Municipal Code at that time. Concurrent Applications Two (2) Two Story Permits were submitted concurrently with the Tentative Map application. The floorplans are pending design modifications and are being reviewed separately since they are not deemed complete. Environmental Review The Tentative Map is categorically exempt from the California Environmental Quality Act (CEQA) per section 15315 (Minor Land Divisions) of the CEQA Guidelines because the division of property is in an urbanized zone for residential use, results in four or fewer parcels, is in conformance with the General Plan and zoning, no variances or exceptions are required, all services and access to the proposed parcels to local standards are available, the parcel was not involved in.a division of a larger parcel within the previous 2 years, and the parcel does not have an average slope greater than 20 percent. Other Department/Agency Review The City's Public Works Department and Cupertino Sanitary have reviewed the project and have no objections. Their conditions have been incorporated as conditions of approval in the draft resolutions. TM -2017-01 10400 S. Stelling Road November 20, 2018 Page 4 of 5 In compliance with the Subdivision Map Act requirements, notices have been sent to the two school districts that will serve the new parcels. However, no comments have been received on the project as of the date of production of this staff report. The applicant will be required to pay the appropriate school impact fees upon development of the lots with homes. The payment of this fee, pursuant to the SB 50 (1998,) is full and complete mitigation of the impacts of land use approvals on the provision of adequate school facilities. Public Noticing and Outreach The following table is a brief summary of the noticing done for this project: Notice of Public Meeting Site Signage, & Legal Ad Agenda . ■ One site sign posted on the site (at least 10 days ■ Posted on the City's official prior to hearing) notice bulletin board (one ■ Legal ad placed in the newspaper (at least 10 week prior to hearing) days prior to hearing) ■ Posted on the City of ■ 38 notices mailed to property owners within Cupertino's Web site (one 300' of project site (10 days prior to hearing) week prior to hearing) No public comments were received at the time of production of this staff report. Permit Streamlining Act: This matter is adjudicatory and is subject to the Permit Streamlining Act (Government Code Section 65920 — 65964). The City has complied with the deadlines found in the Permit Streamlining Act. Project Received: July 7, 2017; Deemed Incomplete: August 7, 2017; Project Resubmitted: March 13, 2018; Deemed Incomplete: April 10, 2018; Project Resubmitted: April 26, 2018; Deemed Incomplete: May 23, 2018; Project Resubmitted: July 10, 2018; Deemed Incomplete: July 26, 2018; Project Resubmitted: September 5, 2018; Deemed Complete: September 18, 2018 Since this project is Categorically Exempt, the City had 60 days (until November 18, 2018) to make a decision on the project. However, the applicant has agreed to the later hearing date without objection. Conclusion: Staff recommends approval of the Tentative Map because the project is consistent with the General Plan, subdivision, and zoning ordinances in accordance with Chapters 18.20 and 19.28 of the Cupertino Municipal Code. TM -2017-01 10400 S. Stelling Road November 20, 2018 1 Page 5 of 5 Next Steps: The Hearing Officer's decision on this project is final unless appealed within 14 calendar days of the decision on November 20, 2018. This aproval expires on November 20, 2020, unless extended further by the State, at which time the applicant may apply for a one-year extension. Prepared by: Jeffrey Tsumura, Assistant Planner Reviewed and Approved by: Piu Ghosh, Principal Planner . Attachments 1— Draft Resolution for TM -2017-01 2— Tentative Map CITY OF CUPERTINO 10300 Torre Avenue Cupertino, California 95014 RESOLUTION NO. 98 OF THE ADMINISTRATIVE HEARING OFFICER OF THE CITY OF CUPERTINO TO ALLOW THE SUBDIVISION OF AN APPROXIMATELY 0.45 ACRE LOT INTO TWO (2) PARCELS OF APPROXIMATELY 8,512 SQUARE FEET AND 11,068 SQUARE FEET AT 10400 S. STELLING ROAD (APN 359-13-037) SECTION I: PROTECT DESCRIPTION Application No.: TM -2017-01 Applicant: Richard Wu (Lands if Wu) Location: 10400 S. Stelling Road (APN 359-13-037) SECTION II: FINDINGS WHEREAS, the City of Cupertino received an application to subdivide an approximately 0.45 acre lot into two (2) parcels of approximately 8,512 square feet and 11,068 square feet; and WHEREAS, the project is categorically exempt from the California Environmental Quality Act (CEQA); and WHEREAS, the necessary notices have been given in accordance with the Procedural Ordinance of the City of Cupertino, and the Administrative Hearing Officer has held one or more Public Hearings on this matter; and WHEREAS, the applicant has met the burden of proof required to support said application; and WHEREAS, the Administrative Hearing Officer finds: a. That the proposed subdivision map is consistent with the City of Cupertino General Plan. The subject property is consistent with the General Plan since the property is permitted to have up to two dwelling units based on its land use designation of Low Density (1-5 DU/Ac.). Additionally, the proposed lots are sized to be comparable to adjacent residential development, and are compatible with the existing neighborhood lot orientation pattern. The lot acreage will be consistent with the underlying single family residential standards proposed with a minimum lot square footage of 7,500 square feet. The proposed subdivision is compatible with Resolution No. 98 TM -2017-01 November 20, 2018 Page - 2 - the adjoining land uses and no physical constraints are present that would conflict with anticipated land use development. The proposed properties are designed to allow for future single family residences and will be evaluated for consistency with the development standards in the R1 Ordinance. The proposed properties are designed to allow for future passive solar as the lot configurations allow for a structure to be oriented in an east -west alignment for southern exposure. Furthermore the design and improvement of the divided parcel does not result in any reduction in allowable densities or percentage of a lot that may be occupied by a building in providing for future passive solar provisions. b. That the design and improvements of the proposed subdivision are consistent with the General Plan. The off-site improvements proposed with the project are identical to the existing improvements adjacent to the subject site. These are consistent with the City's General Plan policies related to pedestrian safety etc. by providing sidewalks and driveway cuts consistent with the City's Standard Details. c. That the site is physically suitable for the type development contemplated under the approved subdivision. The proposed subdivision is compatible with the adjoining land uses and no physical constraints are present that would conflict with anticipated land use development. There are no topographical anomalies that differentiate this property from adjacent properties. The site is located on the valley floor and the proposed two lot subdivision is typical of properties in the neighborhood. d. That the site is physically suitable for the intensity of development contemplated under the approved subdivision. The subject property is physically suitable in size and shape in conformance to development standards and is appropriately configured to accommodate reasonably sized single-family dwelling units. e. That the design of the subdivision or the proposed improvements are not likely to cause substantial environmental damage nor substantially and avoidable injure fish and wildlife or their habitat. The proposed subdivision design and improvements are not likely to cause serious public health problems nor substantially injure fish and wildlife or their habitat because the property is a developed site and located in an urbanized area where residential land use is allowed. f. That the design of the subdivision or the type of improvements associated therewith are not likely to cause serious public health problems. Resolution No. 98 TM -2017-01 November 20, 2018 Page -3 - The proposed development is consistent with the existing adjacent residential development, and the on-site and off-site improvements improve neighborhood walkability through size - appropriate driveway cuts and street and street trees planting. g. That the design of the subdivision and its associated improvements will not conflict with easements acquired by the public at large for access through or use of property within the proposed subdivision. No easement or right-of-way exists currently that would be impeded or conflict with the proposed subdivision. NOW, THEREFORE, BE IT RESOLVED: That after careful consideration of maps, facts, exhibits, testimony and other evidence submitted in this matter, subject to the conditions which are enumerated in this Resolution beginning on Page 1 thereof, the application for a Tentative Map, Application no. TM -2017-01, is hereby approved; and That the subconclusions upon which the findings and conditions specified in this Resolution are based and contained in the Public Hearing record concerning Application no. TM -2017-01 .as set forth in the Minutes of Administrative Hearing Meeting of November 20, 2018, and are incorporated by reference as though fully set forth herein. SECTION III: CONDITIONS ADMINISTERED BY THE COMMUNITY DEVELOPMENT DEPT. 1. APPROVED EXHIBITS Approval is based on the plan set entitled, "Tentative Map, 10400 S. Stelling Road, Cupertino, CA 95014" drawn by SMP Engineers, dated October 2, 2017 consisting of one (1) sheet labeled "TM"; except as may be amended by conditions in this resolution. 2. ACCURACY OF PROTECT PLANS The applicant/property owner is responsible to verify all pertinent property data including but not limited to property boundary locations, building setbacks, property size, building square footage, any relevant easements and/or construction records. Any misrepresentation of any property data may invalidate this approval and may require additional review. 4. DEVELOPMENT ALLOCATION The project is granted a development allocation of one unit from the Citywide allocation. Resolution No. 98 TM -2017-01 November 20, 2018 Page -4- 5. GRADING AND CONSTRUCTION HOURS AND NOISE LIMITS a. All grading activities shall be limited to the dry season (April 15 to October 1), unless permitted otherwise by the Director of Public works. b. Construction hours and noise limits shall be compliant with all requirements of Chapter 10.48 of the Cupertino Municipal Code. c. Grading, street construction, underground utility and demolition hours for work done more than 750 feet away from residential areas shall be limited to Monday through Friday, 7 a.m. to 8 p.m. and Saturday and Sunday, 9 a.m. to 6 p.m. Grading, street construction, demolition or underground utility work within 750 feet of residential areas shall not occur on Saturdays, Sundays, holidays, and during the nighttime period as defined in the Municipal Code. d. Construction activities shall be limited to Monday through Friday, 7 a.m. to 8 p.m. and Saturday and Sunday, 9 a.m. to 6 p.m. Construction activities are not allowed on holidays as defined in Chapter 10.48 of the Municipal Code. Night time construction is allowed if compliant with nighttime standards of Section 10.48 of of the Cupertino Municipal Code. e. Rules and regulations pertaining to all construction activities and limitations identified in this permit, along with the name and telephone number of an applicant appointed disturbance coordinator, shall be posted in a prominent location at the entrance to the job site. f. The applicant shall be responsible for educating all contractors and subcontractors of said construction restrictions. The applicant shall annotate all permit plans with the above requirements and shall comply with the above grading and construction hours and noise limit requirements unless otherwise indicated. 6. CONSTRUCTION MANAGEMENT PLAN Final map improvement plans shall include a construction management plan detailing how construction activities will be conducted. The plan shall address, but not be limited to the following activities: a. Construction staging area (shall not occur within 15 feet of neighboring residential property lines) b. Construction schedule and hours c. Construction phasing plan, if any d. Contractor parking area e. Tree preservation/protection plan f. Site dust, noise and storm run-off management plan g. Emergency/complaint and construction site manager contacts Resolution No. 98 TM -2017-01 November 20, 2018 Page - 5 - 7. DEMOLITION OF STRUCTURES Prior to recordation of the final map, the applicant shall demolish and remove all structures on the property. All demolished buildings and site materials shall be recycled to the maximum extent feasible subject to the Building Official. The applicant shall provide evidence that materials will be recycled prior to issuance of demolition permit. 8. CONSULTATION WITH OTHER DEPARTMENTS The applicant is responsible for consulting with other departments and/or agencies with regard to the proposed project for additional conditions and requirements. Any misrepresentation of any submitted data may invalidate an approval by the Community Development Department. 9. EXPIRATION The approval or conditional approval of the Tentative Map Subdivision shall expire twenty four (24) months from the date of Administrative Hearing approval. An extension or extensions may be approved as provided in Section 18.20.080. 10. INDEMNIFICATION Except as otherwise prohibited by law, the applicant shall indemnify and hold harmless the City, its City Council, and its officers, employees and agents (collectively, the "indemnified parties") from and against any claim, action, or proceeding brought by a third party against one or more of the indemnified parties or one or more of the indemnified parties and the applicant to attack, set aside, or void this Resolution or any permit or approval authorized hereby for the project, including (without limitation) reimbursing the City its actual attorneys' fees and costs incurred in defense of the litigation. The applicant shall pay such attorneys' fees and costs within 30 days following receipt of invoices from City. Such attorneys' fees and costs shall include amounts paid to counsel not otherwise employed as City staff and shall include City Attorney time and overhead costs and other City staff overhead costs and any costs directly related to the litigation reasonably incurred by City. 11. NOTICE OF FEES, DEDICATIONS, RESERVATIONS, OR OTHER EXACTIONS The Conditions of Project Approval set forth herein may include certain fees, dedication requirements, reservation requirements, and other exactions. Pursuant to Government Code Section 66020(d) (1), these Conditions constitute written notice of a statement of the amount of such fees, and a description of the dedications, reservations, and other exactions. You are hereby further notified that the 90 -day approval period in which you may protest these fees, dedications, reservations, and other exactions, pursuant to Government Code Section 66020(a), has begun. If you Resolution No. 98 TM -2017-01 November 20, 2018 Page - 6 - fail to file a protest within this 90 -day period complying with all of the requirements of Section 66020, you will be legally barred from later challenging such exactions. SECTION IV: CONDITIONS ADMINISTERED BY THE PUBLIC WORKS DEPT. 12. COVENANT OF EASEMENTS Prior to issuance of a Building Permit on the site, the applicant shall record an easement for purposes of vehicular and pedestrian ingress and egress, maintenance, and utilities through the site to be determined upon approvals of development applications. The easement language and layout shall be reviewed and approved by the City prior to recordation with the County Recorder's Office. The easement shall contain a provision that it may not be modified or removed without express written approval from the City. 13. PARCEL MAP Prior to approval of the Building permit, a parcel map shall be recorded. And, existing house must be demolished prior to recordation of the parcel map as building(s) cannot straddle between parcel lines. Additional private storm drain easements (PSDE) may be required based on the final grading & drainage design. 14. STREET IMPROVEMENTS & DEDICATION Provide a street dedication in fee title (if applicable) and frontage improvements along the project to the satisfaction of the Director of Public Works. Street improvements may include, but not be limited to, driveway cut (20' wide), curb & gutter, sidewalk, street tree installations, close unused driveway cut and associated utility work. 15. GRADING & DRAINAGE Grading shall be as approved and required by the Director of Public Works in accordance with Chapter 16.08 of the Cupertino Municipal Code. Drainage shall be provided to the satisfaction of the Director of Public Works. Hydrology and pre- and post -development hydraulic calculations must be provided to indicate whether additional storm water control measures are to be constructed or renovated. Any storm water overflows or surface sheeting should be directed away from neighboring private properties and to the public right of way as much as reasonably possible. All storm drain inlets shall be clearly marked with the words "No Dumping — Flows to Creek" using permanently affixed metal medallions or equivalent, as approved by the Environmental Programs Division. Resolution No. 98 TM -2017-01 November 20, 2018 Page - 7 - Additional comments to be provided at Building Permit stage to address -overland release and number of detention basins proposed for the project. 16. C.3 REQUIREMENTS C.3 regulated improvements are required for all projects creating and/or replacing 10,000 S.F. or more of impervious surface (collectively over the entire project site). The developer shall reserve a minimum of 4% of developable surface area for the placement of low impact development measures, for storm water treatment, unless an alternative storm water treatment plan, that satisfies C.3 requirements, is approved by the Director of Public Works. 17. IMPROVEMENT AGREEMENT The project developer shall enter into a development agreement with the City of Cupertino providing for payment of fees, including but not limited to checking and inspection fees, storm drain fees, park dedication fees and fees for under grounding of utilities. Said agreement shall be executed prior to issuance of construction permits Fees: a. Checking & Inspection Fees: Per current fee schedule ($3,648.00 or 5% of improvement costs) b. Grading Permit: Per current fee schedule ($2,825.00 or 6% of improvement costs) c. Storm Drainage Fee: Per current fee schedule($4,550 per AC) e. Traffic Impact Fee $7,000 per new peak -hour trip generated f. Power Cost: g. Parcel Map Fee: Per current fee schedule ($5,528.00) h. Park Fees: Per current fee schedule (+/- $135,000 based on 4 units @ $60,000 per unit minus $105,000 credit for existing unit) i. Storm Management Plan Fee Per current fee schedule ($1,208) j. Street Tree $387 ** Based on the latest effective PG&E rate schedule approved by the PUC Bonds: Faithful Performance Bond: 100% of Off-site and On-site Improvements Labor & Material Bond: 100% of Off-site and On-site Improvement On-site Grading Bond: 100% of site improvements. Resolution No. 98 TM -2017-01 November 20, 2018 Page - 8 - The fees described above are imposed based upon the current fee schedule adopted by the City Council. However, the fees imposed herein may be modified at the time of recordation of a final map or issuance of a building permit in the event of said change. or changes, the fees changed at that time will reflect the then current fee schedule. 18. SURVEYS A boundary survey and a survey site map prepared by a licensed Land Surveyor will be required for all new construction to ensure the proposed building will be set based on the boundary survey and setback requirements. 19. OPERATIONS & MAINTENANCE AGREEMENT Developer shall enter into an Operations & Maintenance Agreement with the City prior to final occupancy. The Agreement shall include the operation and maintenance for non-standard appurtenances in the public road right-of-way that may include, but is not limited to, sidewalk, pavers, and street lights. 20. UNDERGROUND UTILITIES Developer shall comply with the requirements of the Underground Utilities Ordinance No. 331 and other related Ordinances and regulations of the City of Cupertino, and shall coordinate with affected utility providers for installation of underground utility devices. Developer shall submit detailed plans showing utility underground provisions. Said plans shall be subject to prior approval of the affected Utility provider and the Director of Public Works. 21. TRANSFORMERS Electrical transformers, telephone cabinets and similar equipment shall be placed in underground vaults. The developer must receive written approval from both the Public Works Department and the Community Development Department prior to installation of any above ground equipment. Should above ground equipment be permitted by the City, equipment and enclosures shall be screened with fencing and landscaping such that said equipment is not visible from public street areas, as determined by the Community Development Department. Transformers shall not be located in the front or side building setback area. 22. WATER BACKFLOW PREVENTERS Domestic and Fire Water Backflow preventers and similar above ground equipment shall be placed away from the public right of way and site driveways to a location approved by the Cupertino Planning Department, Santa Clara County Fire Department and the water company. Resolution No. 98 TM -2017-01 November 20, 2018 Page - 9 - 23. BEST MANAGEMENT PRACTICES. Utilize Best Management Practices (BMPs), as required by the State Water Resources Control Board, for construction activity, which disturbs soil. BMP plans shall be included in grading and street improvement plans. 24. EROSION CONTROL PLAN Developer must provide an approved erosion control plan by a Registered Civil Engineer. This plan should include all erosion control measures used to retain materials on site. Erosion control notes shall be stated on the plans. 25. WORK SCHEDULE Every 6 months, the developer shall submit a work schedule to the City to show the timetable for all grading/erosion control work in conjunction with this project. 26. TRAFFIC CONTROL PLAN The developer must submit a traffic control plan by a Registered Traffic Engineer to be approved by the City. The plan shall include a temporary traffic control plan for work in the right of way as well as a routing plan for all vehicles used during construction. All traffic control signs must be reviewed and approved by the City prior to commencement of work. The City has adopted Manual on Uniform Traffic Control Devices (MUTCD) standards for all signage and striping work throughout the City. 27. STREET TREES Street trees shall be planted within the Public Right of Way to the satisfaction of the Director of Public Works and shall be of a type approved by the City in accordance with Ordinance No. 125. 28. FIRE PROTECTION Fire sprinklers shall be installed in any new construction to the approval of the City. 29. SANTA CLARA COUNTY FIRE DEPARTMENT A letter of clearance for the project shall be obtained from the Santa Clara County Fire Department prior to issuance of building permits. Clearance should include written approval of the location of any proposed Fire Backflow Preventers, Fire Department Connections and Fire Hydrants (typically Backflow Preventers should be located on private property adjacent to the public right of way, and fire department connections must be located within 100' of a Fire Hydrant). Resolution No. 98 TM -2017-01 November 20, 2018 Page -10 - 30. FIRE HYDRANT Fire hydrants shall be located as required by the City and Santa Clara County Fire Department as needed. 31. SAN JOSE WATER SERVICE COMPANY CLEARANCE Provide San Jose Water Service Company approval for water connection, service capability and location and layout of water lines and backflow preventers before issuance of a building permit approval. 32. DEDICATION OF UNDERGROUND WATER RIGHTS Developer shall "quit claim" to the City all rights to pump, take or otherwise extract water from the underground basin or any underground strata in the Santa Clara Valley. 33. SANITARY DISTRICT A letter of clearance for the project shall be obtained from the Cupertino Sanitary District prior to issuance of building permits. 34. UTILITY EASEMENTS Clearance approvals from the agencies with easements on the property (including PG&E, AT&T, and California Water Company, and/or equivalent agencies) will be required prior to issuance of building permits. SECTION V: CONDITIONS ADMINISTERED BY CUPERTINO SANITARY 35. CONNECTION PERMIT FEES Connection permit fees, lateraldisconnection fees, frontage fees, and acreage fees will be required for the proposed lots during the Building Permit Phase. 36. LATERAL & SEWED LINE CLEANOUT Each lot shall have their own newly installed lateral and property line cleanout per District's standards. Resolution No. 98 TM -2017-01 November 20, 2018 Page -11- PASSED AND ADOPTED this 20th day of November, 2018 at a noticed special Public Hearing of the Administrative Hearing Officer of the City of Cupertino, State of California, held by the Director of Community Development, or his or her designee, pursuant to Cupertino Municipal Code Section 19.12.120. ATTEST: APPROVED: /s/, effrey Tsumura /s/Benjamin Fu Jeffrey Tsumura Benjamin Fu Assistant Planner Asst. Director of Community Development r PROPOSEDLOTS STREET CENTER UNE x 287.53 TENTATIVE MAP BASIS OF ELEVATIONS: S t r RESIDENCES THE BASIS OF ELEVATIONS FOR THIS MAP IS THE SANTA CLARA VALLEY WATER DISTRICT BENCHMARK NO. BM462 BRASS t �' TWO NEW SINGLE FAMILY DISK ON TOP OF CURB NEAR CATCH BASIN AT SOUTHWEST .L '1 10400 S. STELLING RD. CORNER OF McCLELLAN & S. STELLING RD. EL: 290.15' 0.45 CUPERTINO, CALIFORNIA 95014 BASIS OF BEARINGS: - R.O.W. THE BEARING N 89'56'35" E. OF THE CENTERLINE OF EXIST. BEGINNING AT A POINT ON THE EASTERLY LINE OF STELLING RD., DISTANT THEREON NORTH MCCLELLAN RD. AS SHOWN UPON CERTAIN TRACT NO. 7976, r� W 440 FEET FROM THE POINT OF INTERSECTION OF SAID EASTERLY LINE OF STELLING RD. RECORDED IN BOOK 574, AT PAGES 6-7, WAS TAKEN AS BASIS - WITH THE NORTHERLY LINE OF McCLLELAN RD., SAID POINT OF INTERSECTION ALSO BEING OF BEARINGS FOR ALL BEARINGS SHOWN HEREON. o AT THE SOUTHWESTERLY CORNER OF SECTION 13, TOWNSHIP 7 SOUTH, RANGE 2 WEST, - DIc4\ M.D.B. & M; THENCE RUNNING NORTH AND ALONG THE EASTERLY LINE OF STELLING RD. 88 FEET THENCE RUNNING N 89' 58' E AND PARALLEL WITH THE NORTHERLY LINE OF _I +a( McCLEELAN RD., 247.50 FEET THENCE RUNNING SOUTH AND PARALLEL WITH THE EASTERLY sk Y 94� LINE OF STELLING RD., 88 FEET; THENCE RUNNINGS 89' 58' W, AND PARALLEL WITH THE L' E NORTHERLY UNE OF McCLEELAN RD., 247.50 FEET TO THE POINT OF BEGINNING, AND BEING >c, xiA PORTION OF THE SOUTHWEST Y4 OF SECTION 13, TOWNSHIP 7 SOUTH RANGE 2 WEST, � M.D.B. & M. u iRu CITY OF CUPERTINO CALIFORNIA SCALE: 1"=10' OCTOBER 2017 7 t SMP ENGINEERS NETAREA PROPOSEDLOTS STREET CENTER UNE x 287.53 EXTERIOR BOUNDARY UNE SQ. FT. ACRES LOT 1 8,512 0.20 LOT 2 11,068 0.25 TOTAL 19,580 0.45 LEGEND AND ABBREVIATIONS CE STREET CENTER UNE x 287.53 EXTERIOR BOUNDARY UNE O NEW LOT UNE I EXIST. PROPERTY UNE -- --- EASEMENT UNE O INDICATES FOUND STANDARD CITY MONUMENT • INDICATES FOUND MONUMENT AS NOTED O INDICATES SET CITY STANDARD MONUMENT O INDICATES SET 3/4" IRON PIPE WITH CAP RCE 32436 R.O.W. RIGHT OF WAY EXIST. EXISTING SB SETBACK 45.0' Rii 350' -r---- SITE \ /I (` I NI I TV MAP EXISTING PARCEL I SQ. FT. I ACRES w 0 i ssM RIM 287.68 INV 276.38 1 NTS '-387 97 � 288.33, AL�3ERTLANEALS/JUDY DRIVEWAY \ APN# 359-13-125 \ RESIDENTIAL 1 .as ' 2 288.12 W- x 2 8.90 287.88 2 7.67 I 1 287.26 287.2 \ f x 287.53 287.80 O I I 1 U: V' I I I I I I$$I88 28th a N 87.4 72 q� - - SHRUB 285. 'SH 2 I: I x 287.17 r� W (E) W v1 N r^ 28�., 0 i ssM RIM 287.68 INV 276.38 1 NTS '-387 97 � 288.33, AL�3ERTLANEALS/JUDY DRIVEWAY \ APN# 359-13-125 \ RESIDENTIAL 1 .as ' 2 288.12 W- x 2 8.90 287.88 2 7.67 (N) WATER tB:IER 287.27 �- SIT -3 L7287.18 -X 48'Wx 287.13 7.7 I 1 287.26 287.2 \ f x 287.53 287.80 O DRIP DRIP 80 x 267.98 O QONC 7. 2 zi a x 287.60 287.33 � 87.4 72 O N - - SHRUB 285. 'SH -I x 287.17 x 28.4 X286.51 O 6"0 x 284.52 DRIP 20' (N) SEWER LINE CHANDRASHEKAR M & VIN2I o %286.01 - DIc4\ _I DRIVEWAY 1 N 89a5� (N) WATER tB:IER 287.27 �- SIT -3 L7287.18 -X 48'Wx 287.13 7.7 I 1 287.26 287.2 \ f x 287.53 / x1284,01 286.49 \ / \ r' '- \ x 285.35 83.93 286.68 \ f k5'4.` - 4X6"0 x 285.98\ 7- DRIP 25' I ' x 285.37 J x 283.60 285.93 Ia285.43 284.89 I 8"0 \ ' 2X8"ot DRIP 30' x 283. 1 L - DRIP 40' 97.3b' I •283.84 O 1 O QONC CO 287.25 00 6 10"o 0286.14 I I DRIP 30' zi a x 287.60 287.33 � � o O N CD CD I O SHRUB 285. 287.40 O I GO Z . O x 287.35 I - I 8.3 28178111 S DRIVEWAY (E) SEWER UNE -----_SS ]LAR d6� x23 7.10 LOT 1 -287.08 125.17' i 286. CONC EXIST. SIDEWALK PARCELA 19,580 0.45 EXIST. CURB &GUTTER - LOT 1 LOT 2 M LOT GROSS AREA DIAGRAM S. STELLING TYPICAL GENERAL NOTES 1. PROPERTY OWNER: YUN J. WU 10400 S STEWNG RD. CUPERTINO, CA 95014 2, SUBDIVIDER: YUN J. WU 10400 S STEWNO RD. CUPERTINO, CA 9501 3. PREPARED BY: SAEID RAZAM. RCE 52724 SMP ENGINEERS CIVIL ENGINEERS AND LAND SURVEYORS 1534 CAROB LANE LOS ALTOS, CA 94024 (650) 941-8055 4. ASSESSOR'S PARCEL NUMBER: 359-13-037 5. CONTOUR INTERVAL - 1' S. EXISTING LAND USE: COMMERCIAL 7. PROPOSED LAND USE LOTS 1 THRU 2 RESIDENTIAL B. EXISTING WELLS: THERE ARE NO KNOWN WEL.S. 9. FLOOD ZONE CLASSIFICATION: FEMA FLOOD ZONE X - AREAS OF 0.2% ANNUAL CHANCE FLOOD; AREAS OF 1R ANNUAL CHANCE FLOOD WITH DEPTHS OF LESS THAN 1 FOOT OR WITH DRAINAGE AREAS LESS THAN 1 SQUARE MILE; AND AREAS PROTECTED BY LEVEES FROM 1S ANNUAL CHANCE FLOOD. 10. STREETS: ALL PROPOSED STREET MODIFICATIONS WALL BE DEDICATED AND IMPROVED TO THE SATISFACTION OF THE DIRECTOR OF PUBLIC WORKS. 11. EXISTING USE OF ADJACENT PROPERTIES RESIDENTIAL AND COMMERCIAL 12. WATER: SAN JOSE WATER COMPANY 13. FIRE PROTECTION: COUNTY OF SANTA CLARA 14, SANITARY SEWER: CUPERTINO SANITARY DISTRICT 15. POWER AND GAS PACIFIC GAS AND ELECTRIC. 16. TELEPHONE AT&T 17. PROPOSED STREET PLANTING: IN ACCORDANCE WITH CITY ORDINANCE N.T.S. I n.l.a.NO. 125 HL AREA TO BE SUBOIMDED: APPROXIMATELY 0.449 ACRES (19,580 SQUARE FEET) INTO 2 LOTS -286.79 All storm drain inlets shall be clearly marked with the Words "No Dumping - Flows to 19. NEW EASEMENT FOR PUBLIC UTIUTIES (P.U.E.), PRIVATE INGRESS AND ROSS] & NIESJE DONALD Creek" USIn ermanentl affixed metal medallions Dr a uivalent, as a roved 6 the EGRESS EASEMENT (P.I.E.E), PRIVATE WATER UNE EASEMENT (P.W.E) 9 permanently 9 PP Y PRIVATE STORM AND SANITARY EASEMENTS (P.SO.E.) AND (P.S.S.E.) APN# 359-13-124 Environmental Programs Division. SHALL BE DESIGNATED ON THE FINAL MAP. RESIDENTIAL / ` (t) HUUSt 20. DATUM \ ELEVATION: SANTA CLARA VALLEY WATER DISTRICT BENCHMARK. RIDGE 310.85 21. ALL DIMENSIONSARE APPROXIMATE. J \ 22. NO NEW STREET NAMES ARE SPECIFICALLY PROPOSED AT THIS TIME. •,,,2$6.19 f \ f / 8"m / x1284,01 286.49 \ / \ r' '- \ x 285.35 83.93 286.68 \ f k5'4.` - 4X6"0 x 285.98\ 7- DRIP 25' I ' x 285.37 J x 283.60 285.93 Ia285.43 284.89 I 8"0 \ ' 2X8"ot DRIP 30' x 283. 1 L - DRIP 40' 97.3b' I •283.84 283.77 283.50 1 QONC 286.30 6 10"o 0286.14 I I DRIP 30' zi N2889°56'3o5" DRIP 25' I E 222.50' I 0285.36 - 285.07 284.90 SHRUB 285. 97.33' 5.81 \ I 6"0 x 284.52 DRIP 20' I CHANDRASHEKAR M & VIN2I %286.01 C) DIc4\ APN# 359-13-1 C) / x284.90/ RESIDENTIAL N "- ` \ _. "1x84.61 1X284,63 9 x 285.73 285.90 x 285.05✓, ---- - --_. O i � x 285.11 P ' 88.80 r- ------------ 7 5.65 >/ 2f85.27 x 284.99 -X 284.8 x 284.85 \1:284.41 EA (E) HOUSE 285.79 CONC. \ x'6.87 FF 287.04 - I / x 284.77 x 281 48 RIDGE298.31 286.5 O -kt-286.50 T-2116.50 x 284.98 \ o I x P CARPORT iii � x 284.98 1, I °0 � W A 286.93.I -_-- 6,83--------------------- 285.28 285.51 00 I .x285.63 DRIP x 284.86 I I .28 1.101 I O DRO 6.88 O z LOT 7285.85 / O U) t 286.50 X286.01 x 285.61 \ x285.75 283.7p� KELVINSHIH-T1�1.�LIU/ 286.72 \ x 285.81 x 284.66 x28.6 G SHIO-CHUAN 11Vd1�Gn,)n 286.60 286.58 286.22 \ _ _ APN# 359.13-118 OOD \ RESIDENTIAL ECK 2 28 .95 / \ x 285.70 x 285.41 4�T. IPE EM EI� bVA` ) RIDGE309.59 Applica 00 1-f- `111'rO x 286.86 f \ f / x1284,01 286.49 \ / \ r' '- \ x 285.35 83.93 286.68 \ f k5'4.` - 4X6"0 x 285.98\ 7- DRIP 25' I ' x 285.37 J x 283.60 285.93 Ia285.43 284.89 I 8"0 \ ' 2X8"ot DRIP 30' x 283. 1 L - DRIP 40' 97.3b' I •283.84 283.77 283.50 I QONC DRIP DRIP 30' N 286. x286.,�?25.17' - 6 10"o 0286.14 I I DRIP 30' \ S q9°56'35" W 222.50' f/ JEAN Q ZHOU /JERRY Q ZHANG II TA -PEN & JING-YE GUO \ / \ LIEH-WEI HVANG KEVIN L & SUSAN T\ ERGHO APN# 359-13-079 I APN# 359-13-117 / APPS 359-13-116 \ _ APN# 359-1d115-, ` 1 RESIDENTIAL RESIDENTIAL RESIDENTIAL RESIDENTIAL GRAPHIC SCALE 10 0 5 10 20 40 sMP P-Powl ENGINEERS CIVIL ENGINEERS LAND SURVEYORS 1534 CAROB LANE LOS ALTOS, CA 94024 TEL' ((650) 941-8055 FAX: 6501 941-8755 OWNER COPYRIGHT © 2016 SMP ENGINEERS CIVIL ENGINEERS O U co 0 UF^ EL Z Iz C0 C) (L 0 �wU- Q � W z Z Z I- -jQ J W rij anager QP9FESS/2Yq( Z Dales �'ra 4t Kyi0M o. C4>f fr9` CMI. y3 P OF CAU�� Data: 10/2/2017 Scae i"=10* Prepared by, A.D. Checked by. A.A. Job k 216008 sheet: TM