Loading...
TUP-2018-04.pdfCITY OF CUPERTINO 10300 Torre Avenue, Cupertino, California 95014 (408) 777-3308 To: Mayor and City Council members Chairman and Planning Commissioners From: Benjamin Fu, Assistant Director of Community Development Prepared by: Erika Poveda, Assistant Planner Date: November 14, 2018 Subject: Director's Temporary Use Permit (TUP-2018-04) to allow the installation and operation of temporary modular buildings at 10900 North Blaney Avenue. Chapter 19.12.030 of the Cupertino Municipal Code allows for administrative approval of a temporary use permit, authorizing the use of a site in any zoning district for a temporary use. The Director reports his/her decision to the City Council & Planning Commission in time to allow an appeal of the decision within fourteen calendar days. BACKGROUND The applicant, Jessica Gavello, on behalf of Pacific Gas and Electric (PG&E), is requesting approval to allow the installation of five (5) temporary modular buildings for a period of six (6) months at the subject property. DISCUSSION PG&E currently occupies the existing office complex on the subject property, which is bounded by commercial land uses to the north, single-family residential to the east, Interstate -280 to the south, and a planned development single-family residential cluster to the west. The applicant is proposing five (5) modular buildings to accommodate PG&E employees who will be temporarily displaced by the anticipated tenant improvement work under a separate Building Permit (permit # B-2018-1444) to remodel the existing restrooms, breakrooms, and meeting rooms and to construct new locker rooms. The modular TUP-2018-04 10900 N. Blaney Avenue Temporary Modular Buildings Page 2 buildings will not be visible from the public right-of-way since they will be screened by an existing office building and landscaping on site. The placement of the modular buildings will result in the temporary loss of approximately 50 parking stalls. However, the proposed site will continue to have a parking surplus of approximately 118 parking spaces after the installation of the temporary buildings as shown in Table 1 below. Table 1: Parking Analysis Use Building Area (Sq. Ft.) Parking Requirement Number of Stalls Needed Building 1— Office 4,386 1/285 sq. ft. 15.39 Building 2 — Office 7,901 1/285 sq. ft. 27.72 Building 3 - Office 21,062 1/285 sq. ft. 73.90 Building 4 - Office 6,935 1/285 sq. ft. 24.33 Building 5 - Office 31,413 1/285 sq. ft. 110.22 Temporary Modular Buildings (proposed) 3,152 1/285 sq. ft. 11.06 Total Parking Needed 263 Total Existing Parkin On -Site 431 Total Available Parking with Modular Building AL ii 381 Parking Surplus 118 ACTION The Director of Community Development deems this application as minor, and approves the temporary modular trailers subject to the following conditions of approval. SECTION I: CONDITIONS ADMINISTERED BY THE COMMUNITY DEVELOPMENT DEPARTMENT 1W.1100WGIVA 90ra WSIM411 The approval is based on the Site Plan consisting of one (1) sheet entitled, "A-004," one (1) sheet entitled, "Temporary Trailer(s) and Distance from Existing Buildings," two (2) supplemental site plan/aerials and one (1) parking analysis table, except as may be amended by the following conditions. 2. ACCURACY OF PROTECT PLANS The applicant/property owner is responsible for verifying all pertinent property TUP-2018-04 10900 N. Blaney Avenue Temporary Modular Buildings Page 3 data including, but not limited to, property boundary locations, building setbacks, property size, building square footage, any relevant easements and/or construction records. Any misrepresentation of any project data may invalidate this approval and require additional review. 3. DURATION The modular buildings and all associated equipment shall be removed from the site no later than six (6) months from the date of building permit issuance for the modular buildings. The applicant shall apply for a new Temporary Use Permit, prior to permit expiration, should the modular buildings be proposed to remain onsite past the expiration date for the Community Development Department's review and decision. 4. BUILDING PERMIT REQUIRED Issuance of a building permit shall be required prior to installation of proposed equipment and facilities. 5. PATH OF TRAVEL Provide accessible path of travel from the public right of way and accessible parking spaces to the entrance of the proposed office trailers as well as to the proposed restrooms. 6. ANNOTATION OF THE CONDITIONS OF APPROVAL The conditions set forth shall be attached to, incorporated into, or annotated on the first page of the building plans. 7. CONSULATION WITH OTHER DEPARMENTS The applicant is responsible to consult with other departments and/or agencies with regard to the proposed project for additional conditions and requirements. Any misrepresentation of any submitted data may invalidate an approval by the Community Development Department. 8. INDEMNIFICATION To the extent permitted by law, the Applicant shall indemnify and hold harmless the City, its City Council, its officers, employees and agents (the "indemnified parties") from and against any claim, action, or proceeding brought by a third party against the indemnified parties and the applicant to attack, set aside, or void this ordinance or any permit or approval authorized hereby for the project, including (without limitation) reimbursing the City its actual attorneys' fees and costs incurred in defense of the litigation. The City may, in its sole discretion, elect to defend any such action with attorneys of its choice. TUP-2018-04 10900 N. Blaney Avenue Temporary Modular Buildings Page 4 9. NOTICE OF FEES, DEDICATIONS, RESERVATIONS OR OTHER EXACTIONS The Conditions of Project Approval set forth herein may include certain fees, dedication requirements, reservation requirements, and other exactions. Pursuant to Government Code Section 66020(d) (1), these Conditions constitute written notice of a statement of the amount of such fees, and a description of the dedications, reservations, and other exactions. You are hereby further notified that the 90 -day approval period in which you may protest these fees, dedications, reservations, and other exactions, pursuant to Government Code Section 66020(a), has begun. If you fail to file a protest within this 90 -day period complying with all of the requirements of Section 66020, you will be legally barred from later challenging such exactions. SECTION II: CONDITIONS ADMINISTERED BY THE SANTA CLARA COUNTY FIRE DEPARTMENT 1. FIRE SPRINKLERS REQUIRED Approved automatic sprinkler systems in new and existing buildings and structures shall be provided. 2. FIRE APPARATUS (ENGINE) ACCESS ROADS REQUIRED Provide access roadways with a paved all weather surface, a minimum unobstructed width of 20', vertical clearance of 13'-6", minimum circulating turning radius of 36' outside and 23' inside, and a maximum slope of 15%. 3. CONSTRUCTION SITE FIRE SAFETY All construction sites must comply with applicable provisions of the CFC Chapter 33 and our Standard Detail and Specification SI -7. Provide appropriate notations on subsequent plan submittals, as appropriate to the project. 4. ADDRESS IDENTIFICATION New and existing buildings shall have approved address numbers, building numbers or approved building identification placed in a position that is plainly legible and visible from the street or road fronting the property. This approval of the temporary use permit is effective November 14, 2018. The fourteen (14) calendar appeal period will end on Monday, November 28, 2018 at 5:00 p.m. Attachments Attachment 1 - Plan Set